HomeMy WebLinkAboutCAG2019-220 - Change Order - #8 - Scarsella Bros, Inc - 228th St UPRR Grade Separation Bridge & Roadway - 05/28/2020 Agreement Routing Form
• For Approvals,Signatures and Records Management
K E N T This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
WASHINGTON (Print on pink or cherry colored paper)
Originator: Department:
S.Anderson PW Engineering
�. Date Sent: Date Required:
0 6/29/20 N/A
a Authorized to Sign:
< 0 Director or Designee ❑Mayor Date of Council Approval:
N/A
Budget Account Number:
s90117.64110.330 Grant? El Yes ❑No
Budget? El Yes ❑No T Federal, State, Local
Type:
Vendor Name:
Category:
Scarsella Bros., Inc. Contract
Vendor Number:
Sub-Category:
C 34547 Change Order#8
' Projectivame: S. 228th St Union Pacific Railroad Grade Separation Bridge and Roadway
E Phase 5
402 Pro eCt DetaIIS:1) At the existing KC Metro Sewer,STA 14+15 R,perform the following:Remove the existing MH cone,pour a 2'x 2'reinforced concrete
C. footing,fumish and install 72"MH sections and a cone to new finish grade,grout and finish.
2) At existing KC Metro MH F57,clean existing 8"sewer line to receive cured-in-place lining system.
E Agreement Amount:$15,933.79 Basis for Selection of Contractor: Bid
4)
dill
Start Date: N/A
Termination Date: N/A
Local Business? ❑Yes 0 No*
*If meets requirements per KCC3.70.100,please complete'Vendor Purchase-Local Exceptions"form on Cityspoce.
Notice required prior to disclosure?
❑Yes 0 No Contract Number:
CAG2019.
CDate
by City Attorney:
Comments:
the Mayor's Office:the City Clerk's Office:
- Visit Documents.KentWA.gov to obtain copies of all agreements
•
KENT
W A S H N G T O h
CHANGE ORDER NO. #8
NAME OF CONTRACTOR: Scarsella Bros, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBERS. 2281h St. Union Pacific Railroad Grade Separation Bridge
and Roadway Phase 5
ORIGINAL CONTRACT DATE: April 19, 2019
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
This Change makes the following revisions to the Contract Documents
and provides compensation for the added work:
1) At the existing KC Metro Sewer, STA 14+15 R, perform the following:
Remove the existing MH cone, pour a 2' x 2' reinforced concrete footing,
furnish and install 72" MH sections and a cone to new finish grade, grout
and finish.
2) At existing KC Metro MH F57, clean existing 8" sewer line to receive
cured-in-place lining system.
2. The contract amount and time for performance provisions of Section II 'Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $13,802,146.40
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $55,002.48
(incl. applicable WSST)
Current Contract Amount $13,857,148.88
(incl. Previous Change Orders)
Current Change Order $14,539.81
Applicable WSST Tax on this Change $1,453.98
Order
Revised Contract Sum $13,873,142.67
CHANGE ORDER - 1 OF 3
Original Time for Completion 240 working days
(insert date)
Revised Time for Completion under 240 working days
prior Change Orders
(insert date)
Days Required (t) for this Change Order 0 calendar days
Revised Time for Completion 240 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
By:
(signature) signature)
Print Name: Matthew Scarsella Print Name: Timothy J. LaPorte, P.E.
Its Proiect Manager Its Public Works Director
(title)
DATE: 5/22/2020 DATE:
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
&�k (applicable if Mayor's signature required)
4
Kent City Clerk Kent Law Department
[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
K E ENT
FILE NO: 200.2
CHANGE ORDER WORKSHEET NO. 008
Construction Management Division - Public Works
Project S. 2281h St Union Pacific Railroad Project No.: 07-3022
Grade Separation Phase 5
Project Engineer: Cameron Bloomer, PE Fed-Aid No.: HLP-FMSIB-1216 (005)
Owners Rep: KBA, Inc Contractor: Scarsella Bros, Inc.
Date: 5/8/2020
I. PROPOSED CHANGE
This Change makes the following revisions to the Contract Documents and provides
compensation for the added work:
1) At the existing KC Metro Sewer, STA 14+15 R, perform the following: Remove the
existing MH cone, pour a 2' x 2' reinforced concrete footing, Furnish and install 72" MH
sections and a cone to new finish grade, grout and finish.
2) At existing KC Metro MH F57, clean existing 8" sewer line to receive cured-in-place lining
system.
H. REASON AND BACKGROUND FOR CHANGE
1) The plans call for adjusting an existing KC sewer manhole to new finish grade in the
embankment. When work began, this existing MH was discovered to be a concrete pipe
set vertically on top of the 72" sewer main. King County was concerned additional loading
on the vertical pipe could push down into the 72" sewer main below. The City worked with
KC and agreed to install a concrete foundation around the existing vertical pipe and set
new 72" manhole sections on the foundation, taking the load off of the vertical pipe while
raising structure to grade,
2) CO 4 changed sewer work at 761h from open cutting to CIPP installation. Failure of the
existing outside drop at the downstream King County manhole, over time caused
substantial debris build up within the line. Jetting and vacuuming of debris to prevent
downstream problems and allow successful line repair was necessary.
Time and material efforts were tracked in the field, see attached FA Sheets.
FA# 7 - $2,255.06
FA# 10 - $1,196.23
FA# 11 - $1,134.14
FA# 12 - $7,029.07
FA# 13 - $1,345.87
FA# 14 - $754.63
FA# 15 - 5824.81
Total = $14,539.81
1 REV. DATE: 3/15/19
�✓' ICCNT FILE NO: 200.2
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ❑ Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of
oty PE Item
XIII KC Metro MH Adjust to Grade 1 1 LS $14,539.81 $14,539.81
XIII 10% SST LS $1,453.98 $1,459.98
Independent Estimate Attached CREATE PAY ITEM ONLY— Payment to be made PAY THIS PAY ESTIMATE
-REQUIRED at a later date upon completion of work
❑ Material Submittals Required—CC: Construction Coordinator New Sub Reqrd? No
DELETE EXISTING PAY ITEM(S) per 1-09.5 Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch.No. B.I.No. Item Description Qty Unit Unit Price Cost of Item
Independent Estimate Attached -REQUIRED
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch. No. B.I. No. Item Description Qty Unit Unit Price Cost of Item
LF $ $
Independent Estimate Attached -REQUIRED
TOTAL ESTIMATED COST OF CHANGE ORDER * 15 999.79
*Total of the Cost of Item Columns
THIS PAY ESTIMATE 0
IV. WORKING DAYS
Original Contract 240 Due This Change Order* 0 Previous Total 240
DATE: DATE:
* Explanation/Justification Reauired:This Change Order does not impact the critical path, and no change to the working days
is being made.
TOTAL WORKING DAYS* 240
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
2 REV. DATE: 3/15/19
KENT FILE NO: 200.2
Prepared By: _Cam ron loomer Date: 5 8 020
3 2i Zb
Construction Su ,
pervisor: Dater
Construction Manager: `Jy+�%'�z-Y riti'�Zr.-' Date:
3 REV. DATE: 3/15/19
DAILY REPORT OF FORCE ACCOUNT WORKED
KENT
FWW -7
Project: 228th Grade Separation Ph 5 Date of Work: 12/20/2019
Owner: City of Kent Project No: 07-3022
Prime Contractor: Scarsella Bros. Fed Aid No: HLP-1216(006)
Subcontractor: Work by Sub? (mark"x"if yes)
FA Bid Item No.: 1355 Minor Change(Roadway)
Description of Work: Removing Buildup and Cleaning Sewer Standpipe in 76th,in perperation for CIPP lining
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME OCCUPATION HOURS WWR HOURS I WWR AMOUNT
Kent Howard(Rev.) Operator Foreman 2 $ 79.48 $ 107.40 $ 158.96
Dave Jacobs(Rev.) Operator Foreman 2 $ 79.48 $ 107.40 $ 158,96
Eddie Dolan Operator 2 $ 74.00 $ 99.17 $ 148.00
Josh Norotry(Rev.) Pipelayer 2 $ 58.98 $ 81.21 $ 117.96
Jon Griffin(Rev.) Pipelayer 2 $ 58.98 $ 81.21 $ 117.96
$ - $ $
LABOR OH&P @ 29%: $ 203.53 SUBTOTAL-LABOR: $ 701.84
LABOR TOTAL: $ 905.3EQUIPMENT
HOURS 1ADJUSTED HOURS STANDBY DOLLAR
EQUIPMENT AND ATTACHMENTS WORKING RATE STANDBY RATE AMOUNT
02-280 Ford F-150 P/U XLT Ext.Cab(Kent)(Rev 7/1/19) 2 $ 29.15 $ $ 58.30
03-122 Ford F-450 SD Flatbed(Rev 7/1/19) 2 $ 29.82 $ $ 59.64
EQUIPMENT OH&P @ 21%: $ 24.77 SUBTOTAL-EQUIPMENT: $ 117.94
EQUIPMENT TOTAL: $ 142.71
MATERIALS SERVICE
MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT PRICE DOLLAR AMOUNT
ProVac Inv#61258 1 LS $ 997.50 $ 997.50
MATERIALS/SERVICE OH&P @ 21%: $ 209.48 SUBTOTAL-MATERIALS: $ 997.50
MATERIALS TOTAL: $ 1,206.98
Verification Of Hours Worked: FA SUBTOTAL: $ 2,255.06
.`....................
..................................... ..... 12%MARKUP(for prime on subcontract work) $ -
Contractor's Representative(printed nerve)
.................................................
............... FA SHEET TOTAL: $ 2,255.06
Contractor's Representative S' nature Date
Prime Markup on Subcontractor:
Owner's Representative(printed name)• ••.�.................. 12%: <$25,000
10%: $25,000 to$100,000
........ .................... 7%: >$100,000
Owner's Re sentafive S'nature date
Pay Estimate Entered: If checked,this work is in dispute. By signing this form, parties are
agreeing to the time and effort needed to accomplish the task.
Date: Entitlement to be determined at a later date.
By:
1 of 1 P-13(Rev.2017 Dec)
LLI
z w P
Z M
z
ui Ol w 0
x
w w <
J J
w
t U) CC M LLJ,W!
CC �- w 0 i wz 0 ww=) a- 0. F-
0 (.) 0 U
0
<
<
Lu
z z re
-i
IVI U) 0 0
co m 0 a:
0 0 :n < 5 ca
D
(n D
ca x 03 w I X ca of m w C13 Of tn co co y U)
0 0 0 LLJ U.. LLI Lu Lu 0 rfz
a- a_ (L cl a- R (L CL F0— a. P- CL F2
cn U) 0 V) 0 (1) CO 0 co 0 U) 0 U) ri) 0 (1) 0 Y) 0 > D
LU ui w 'J�
0
U)
LL
W4
L
LU
uj
L LU Lu Y-
0 0 CY Ir
P < 0 0 m c;
0 z
ui
rY
z F- 0
ZOU z
w
F-
a z
Z m 0- I.:
0 Z
Z LLI u LLJ LU 0 U)
U) x
u w
0 1 _4�1 < <
to w 44 b4 fA 619, (A 6-�,64 to V� to) 60* tA w 0% to 0) 0) tp� tO Wy U�l te V) in 0
af
(n
0
w co0 0
Ll L)
0 X t- 0- )-
F-
0
0 z
0
L c2 U) m
co
to
0 0 tz 0 (D
0
It-ca I-
4 IE w C) w02
0. con 0 1 ual w x C� ww wC) Im 0 cwc 0 (Lru 0 WW- 0 c
D Lli uj
F
<
z
Li iii
U) V,
Li ui
JN Q:
0-
0
.M
m
00
Ix
U) I"I I
1-- sl 0
E co
4- 00 I LU
0 w
z
<
M ni I L)
U)
;Lt,l�tit FA #7
Pro-Vac Invoice 61258
PO Box 24351 Invoice Date 12/20/2019
Seattle,WA 98124 Completed Date 12/20/2019
z53�435-432$ Customer PO
Billing Address Job Address
Scarsella Bros.,Inc. Scarsella 4073022
PO Box 68697 E1 vt` 7625 South 228th Street
Seattle,WA 98168 USA t Kent,WA 98032 USA
u'f
ET to clean and jet sewer lines _ �+
Task# Description Quantity Your Price Your Total
Travel To Travel 1.50 $195,00 $292.50
PWOL PW-Operator&Laborer 3.00 $235.00 $705.00
Sub-Total 997.50
taxable item, will be � - -tt
added to whole CO at Total Due $1,097,25
the end
Balance Due $1,097.25
Thank you for choosing Pro-Vac
I hereby confirm that the work performed by Pro-Vac was of quality and in a timely manner
12/20/2019
1 have hisite.ttedall the work performed by Pro-Vac and understand that I have been givan the opportunity to arkiress any concerns
regarding the work performed I have tound no such concern;,or these concerns were addressed by the Pro-Vat.opet ator to my
sattsl<-«.66m My signature signifies+Ytyy full acceptance of all wot k mN fot coed l ayt tv that Pro Vac is not resixtn%ible for any damage
done by its equipment,staff,of vehic to Ixlrsonal property,rea�tl ntolx-rty,nt sutrrxtnditul poolierhes where Pro•V a is pet forming
wurk and/ot operations
12/20/2019
DAILY REPORT OF FORCE ACCOUNT WORKED
KENT
Project: 228th Grade Separation Ph 5 Date of Work: 2/26/2020
Owner: City of Kent Project No: 07-3022
Prime Contractor: Scarselia Bros. Fed Aid No: HLP-1216(006)
Subcontractor: Work'by Sub? (mark Y'if yes)
FA Bid Item NO.: 13SS Minor Change(Roadway)
Description of Work: Excavating to raise metro sewer MH 14+15R
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT
Connor McQuiston (Rev.) Clean-up Laborer 3.5 $ 57.92 $ 79.62 $ 202.72
LABOR OH&P @ 290/6 $ 58.79 SUBTOTAL-LABOR: $ 202.72
LABOR TOTAL: $ 261.51
EQUIPMENT
HOURS ;ADJUSTED HOURS STANDBY DOLLAR
EQUIPMENT AND ATTACHMENTS WORKING+ RATE STANDBY RATE AMOUNT
EQUIPMENT OH&P @ 21% $ SUBTOTAL-EQUIPMENT: $
EQUIPMENT TOTAL: $ -
MATERIALS I SERVICE
MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT PRICE DOLLAR AMOUNT
Pro-Vac Invoice#65502 1 LS $ 772.50 $ 772.50
$
MATERIALS/SERVICE OH&P @ 21% $ 162.23 SUBTOTAL-MATERIALS: $ 772.50
MATERIALS TOTAL: $ 934.73
Verification of Hours Worked: FA SUBTOTAL: $ 1,196,23
................................................ 12%MARKUP(for prime on subcontract work) $
Gonhaclors Representative(printed name)
------- • ...... FA.-• FA SHEET TOTAL: $ 1,196.23
Contractor's Represonlativo Si nature Date
........................................................
Prime Markup on Subcontractor:
Owner's Representative(printed name) �'••"- 12%: <$25,000
10%: $25,000 to$100,000
........• ---. ........ 7%: >$100,000
... ...................... ................ .
Owner's Re eserHative Si nature Date
Pay Estimate Entered: If checked,this work is in dispute. By signing this form, parties are
agreeing to the time and effort needed to accomplish the task,
Date: Entitlement to be determined at a later date.
By:
1 of 6 P-13(Rev.2017 Dec)
5
° 1 ° ";
i G z w z
z ° °z
o wO f ( w0 � deOn
w a w
w w Hwtto w 601# 4110), 0 ww1i v1, 69 rA V) t v; M NV) v3l VJ 69 ui b9
u- z a ixxoozzaQz
w w ~ O O m m w w 0
0 ~ a my i ivUg � � aHww
i a � � 4� � � ao � � N
w J Y W w d —
a' O 10 0 m 2 F O Y
2 O j ,� tin ' Q m 0
� CO
co m co co in co ED to co w
W in w 0 W 0 w 0 W 0 w p W O w O w 0 W ❑
aI- a � ar a � a � a � a � a � ar CL ~
i r 0 0 0 v) O v) O cn O cn O cm O v� O v) O cn 0 4 co
Ri
1
J z
ap �r a C,
O C� ui w Sc a
5 <010) 0 az I c
w
z Z 0 0
0 Z
a = i
o Z U w0 (� \ w aw
U w a n , .,`I
° to VT 6% to to 69 Vi 69 Vf 69 69 b9 69 69 V3 Vi V? V3 Vf 69 s, V> r. ai v> v, .r. 69 (� 0
W ._. m O `
F-
C m Job
m x 0
in
a V1 m
m co
co
W W W W W W W W W W
co
Lo > u
.1
F-
Z z
I I ui i„
-.r W 111
W Ul
A j if tr
It
UP
m d
2 C7 1
W
' t-A #10
e ME
` Pro-Vac Invoice 65502
PO Box 24351 Invoice Date 2/26/2020
7MMIMI Sgattie•WA 2$124 Completed Date 2/26/2020
ZS3-435.43aA { l Customer PO
Billing Address Job Address
Scarsella Bros.,Inc. Scarsella Bros Phase 5
PO Box 6BG97 #73025
Seattle,WA 98168 USA 7625 South 228th Street
Kent,WA 98032 USA
Description of Work
Hydro excavate area around structure.
Task# Description Quantity Your Price Your Total
Travel to Travel 0.50 $180,00 $90.00
pWOp 2/26-65502 PW-Operator Only ISO $195.00 $68150
Sub-Total $772.50
taxable item, so taxing the Tax __T_
whole CO at the end Total Due $849.75
Thank you for choosing Pro-Vac Balance Due $849,75
I hereby confirm that the work performed by Pro-Vac was of quality and in a timely manner ^
J
J
2/26/2020
t have inslaected all the work per formed by Pro-Vac and unchm c tat id that i have been given the opportullily to ackhexs any concerns
regarcinq the work performed i have kxntd no such cwcerns•or these concerns were aeicfres d by tilt,Pro-Vac operatot to my
satisfacdtxr My signature significa rntiy full acceloance of all work performed I tyree tlwt Pto V& is not ro%lxnrsible for any damage
dutttr by its equilrineol.staff,at Vellic:les to twisonal proix-fly.teal prolxerty,at strnrxnxitncl l lovel tw%where Pro-Vat h pefforming
walk and/or operations
r
2/26/2020
DAILY REPORT OF FORCE ACCOUNT WORKED
KENT
Project: 228th Grade Separation Ph 5 Date of Work: 2/28/2020
Owner: City of Kent Project No: 07-3022
Prime Contractor: Scarsella Bros. Fed Aid No: HLP-1216(006)
Subcontractor: Work by Sub? x {mark"x"if yes)
FA Bid Item NO.: 1355 Minor Change(Roadway)
Description of Work: Tying rebar for metro sewer MH 14+1511 adjust to grade
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT
Casey Anderson Carpenter Foreman 4 $ 76.92 $ 105.05 $ 307.68
Rafael Barajas Concrete Placement Laborer 4 $ 60.68 $ 82.91 $ 242.72
S S $
LABOR OH&P @ 29%: $ 159.62 SUBTOTAL-LABOR: $ 550.40
LABOR TOTAL: $ 710.02
EQUIPMENT
HOURS ADJUSTED HOURS STANDBY DOLLAR
EQUIPMENT AND ATTACHMENTS WORKING RATE STANDBY RATE AMOUNT
SBS 102-328 Ford Tool Truck 1 $ 20.09 $ $ 20.09
$ $ $
EQUIPMENT OH&P @ 21%: $ 4.22 SUBTOTAL-EQUIPMENT: $ 20.09
EQUIPMENT TOTAL: $ 24.31
MATERIALS SERVICE
MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT PRICE DOLLAR AMOUNT
#4 rebar hoops and crossbars,Addison Order#183349 1 SL $ 230.00 $ 230.00
MATERIALS/SERVICE OH&P @ 21%: $ 48.30 SUBTOTAL-MATERIALS' $ 230.00
MATERIALS TOTAL: $ 278.30
Verification of Hours Worked: FA SUBTOTAL: $ 1,012.62
12%MARKUP(for prime on subcontract work) $ 121.51
Contractor's Representative(punted name)
Corr.....i'... esarrt... FA SHEET TOTAL: $ 1,134.14
....................... ..
Pr ve So"nature Date
..............................•----..........
Prime Markup on Subcontractor:
.....
Owner's Representatove(printed na+rte) ""• 12%: <$25,000
10%: $25,000 to$100,000
.................................
7%: >$100,000
Owner's Representative Si tar Date
Pay Estimate Entered: If checked,this work is in dispute. By signing this form, parties are
agreeing to the time and effort needed to accomplish the task.
Date: ]Entitlement to be determined at a later date.
By:
2 o(6 P-13(Rev. 2017 Dec)
rrt,
.� �h
p N ° V) J to n[
N
T a z � z z r .J. r0 hj lJti
W Q w Q ( }
Q
rs !t► to +n w is tts tow �9 to to to to rA W rA #� � ,, tR
x00zz ¢ ¢ ot
a � o i oog wOW
0
Z '_ UU 0- CL
� c� g da � � v�
w Q z z ~O w W Q a g
(I = F o oom < Yoa �
j C
V) J a ) fn o 4
} } } } } } } } } } Q D rj c
m w Co af m x m � CO cc m x m ix m w m a' m Y
WOWOWOWOLLIOLLJO W O w p w O w O O p:
0cn0cn0cn Orn Ocn 0rn0rnOm 0rn0cn Co <
Ctoo
LA
S
_ CY
�4 Zproo o. ^i � f
G Q ❑ w Z ~
a a °z = rJ
pz U � p '111 � W p w
0 3: wa � a a
O p to W to bi to to to ta to to to (A W to tH to to to to to 64 to to 64 to to to
g o M
o �
u aJ
0 0 J 0
OCIO
� O
L D
U
m rn O
V1 n y W O W O w O O O w O C O R O w O L O
m
.hJ (n Q >
z
Li u
w
W
w U
r
C a Lu
c � n,
u ri
co I-
Is
11
N I '
i
_ 0 SV>U IL v w
m tj ao z
" - FA# 11
'
Invoice
,�ddison ��onstruction Supp>y
pO Box8086
Tacoma, WA 98490
ADDISON Customer No. 4470
(2531) 474'0711
Invoice No. 363441
0`!
Bill To� 8CARSELLA BROS hNC Ship To SCAR3ELLABROGINC
Pu, uua 66697 73270 228TH ST
SEATTiE"\hV\ 88168-0897 � ^ ' ' �' '` y ' (253)261-4338
~' �< KENT. VVA
(n/
903.73025
Terms - --- ----1
02,27,20 14REN17- Origin No 10b
[ ----'- ---- --- --' - — - -
/ Purchasec�Numbef ��Uate Szzilpspersw _ _ Our Orderwurnoe, |
373026 02/27/20 BT�VE ' i8334O
Quantity Item Number
mmcriotion ' Unit Price Amoun!
LUMP SUM QUOTE ' -
P0373025
163 163 R4 REBAR#4G0GRADE 0.0000 080
-868LOS./FT. #13KXK8
2 HOOPS 84D|AM,
2 HOOPS 5~5D|A&1,
72@ 1'8
\\/
~J Invoice subtotal 23000
/\7 8a|eotax@ 1O�OOOUU96 23�O0
\
Invoice total 253.00
20% RESTOCK FEE. SALES UNDER$5O & SPECIAL ORDERS ARE FINAL.
�,7��� � ��~�� "�w
�/. / c/~^^ � / /L/ /� ' '/' /
/
-� 0� ��
IrPe ° ~-^ -
�kA
,/".
Thank YOU
DAILY REPORT OF FORCE ACCOUNT WORKED
KENT
Project: 228th Grade Separation Ph 5 Date of Work: 3/2/2020
Owner: City of Kent Project No: 07-3022
Prime Contractor: Scarsella Bros. Fed Aid No: HLP-1216(006)
Subcontractor: Work bv Sub? (mark"x"if yes)
FA Bid Item No.: 1355 Minor Change(Roadway)
Description of Work: Pour footing for metro sewer MH 14+15R adjust to grade
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT
Geordan Hunkin(Rev.) Operator Loader under 6 CY 2 $ 74.00 $ 99.17 $ 148.00
Siaosi Pele(Rev.) App.Lab 95% 2 $ 55.75 $ 76.37 $ 111.50
Connor McQuiston(Rev.) Clean-up Laborer 2 $ 57.92 $ 79.62 $ 115.84
Harry Greer(Rev.) Clean-up Laborer 2 $ 57.92 $ 79.62 $ 115.84
LABOR OH&P @ 29%: $ 142.44 SUBTOTAL-LABOR: $ 491.18
LABOR TOTAL: $ 633.62
EQUIPMENT
HOURS ADJUSTED HOURS STANDBY DOLLAR
EQUIPMENT AND ATTACHMENTS WORKING RATE STANDBY RATE AMOUNT
17-255 Cat323 Excavator(1/1/2020) 1 $ 100.01 $ $ 100.01
02-216 F-150 P/U 2 $ 15.33 $ $ 30.66
$ $ $
EQUIPMENT OH&P @ 21%: $ 27.44 SUBTOTAL-EQUIPMENT: $ 130.67
EQUIPMENT TOTAL: $ 158.11
MATERIALS I SERVICE
MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT PRICE DOLLAR AMOUNT
Grout-HD Supply Inv.#10012091023 1 LS $ 147.45 $ 147.45
Grout-HD Supply Inv,#10012092088 1 LS $ 135.37 $ 135.37
72-48 Adaptor and Cone Shope Inv.#9999294 1 LS 1250 $ 1,250.00
72"MH Sections Shope Inv.#9999293 1 LS $ 3,622.00 $ 3,622.00
MATERIALWERVICE OH&P @ 21%: $ 1,082.51 SUBTOTAL-MATERIALS: $ 5,154.82
MATERIALS TOTAL: $ 6,237.33
Verification of Hours Worked: FA SUBTOTAL: $ 7,029.07
......................��._��.-���.����,.. ...�.�����.� 12%MARKUP(for prime on subcontract work) $ -
Contractor's Representative(printed name)
......................................................
.................... FA SHEET TOTAL: $ 7,029.07
Contractors Representative Si nature Date
Prime Markup on Subcontractor:
Owner's Represerrtetive(printed name) ����- 12%: <$25,000
10%, $25,000 to$100,000
._........ 7%: >$100,000
Owner's Representative Signature Date
Pay Estimate Entered: If checked,this work is in dispute. By signing this form, parties are
agreeing to the time and effort needed to accomplish the task.
Date: [Entitlement to be determined at a later date.
By:
3 of 6 P-13(Rev.2017 Dec)
ozLu \A r
a z
z = Z)I i .
mo to to
I
Lu a
C\l to F» 60 to I Go &9► 60 m M,19 40 to)
TWO z x 0 0 z < < of
< w 0
U- cz� Cl) 0 W w w
0 c 1) a-
U U a. o-
I ::)- 'L 5 <
CY
yy
w
z z 0 w W Q LL M
0 0
0 0
0 cy m > > a 0 x m <
co 2 8
El < C',
r%
10
W w y
o w 0 w w
0
W ' ' w 'm w m I a, I w <
a- F. Q. F. a_ F- a- a. F- IL F. aF- aa. F-
a.
0 U) 0 U) 0 U) 0 U) 0 (1) 0 U) 0 (B 0 U) 0 w 0 (n m
<
r 1,1
0
V
W. too,
n rt
Ck 4t %a
A.;
LL
C-i z cl
I V; w
ji
o X LU W Y <
z 0 a x — %
F- < 0 0 w L
Ld u Cl z W
w
U) LL
z
z 0 0
0 Z
U L) 0 Q
LU
0
a- zz
z w x ui z 0
0 z
u 3. w wLi
0 0 of 60 W) 611, tA ull n 69 6% b. bel V., t» 6R eq 6q 9,
69 n fn V� 69 C9 w 0)
VO)
ry
w r
g
0
< V)
o
z
0
u1 D
0 C�
C( (n
-j
F a lz (9 iz o t—-Lu o &
Ww uj 0 w o w 0 0 Lu w c uj o 0
Ir 2 ly ly a' cr x x
[ F.
T
En
<
z
V� LAJ
LIJ ul
2
r- (Y' R.
6
. fl 0.
r wi;j
I- llx
E
V
U)
0
0
SUPPLY INVOICE
CONSTRUCTION R INDUSTRIAL BRANCH ADDRESS I VOICE NUMBER
WHITE CAP 030 KENT 10012091023
7820 SOUTH 21j)TI-i INVOICE DATE
1.bU 11;,. 10
KEN IF I,AJA 98032 03103/2020
KING CUSTOMER PO—hiUMBER
228TH
TERRITORY PLEASE RbIlliT PAY1V1E-NrrO--
SOLD TO: 8623000 SHIP TO: 10002382914 HD SUPPLY CONSTRUCTION AN0O INDUSTRIAL-WHITE CAP
P.O.BOX 6040
CYPRESS,
CA 90630-0040
SCARSFI-LA BROTHERS 228THIL)111-1 11l-S PHASE 4
PO BOX 68697 Sou I-H 228 TH STREET AND /2ND AVLNUE
SEATTLE WA 98168-0697 KEN I VVA 98032
ORDER DATE ORDER NO. ORDERED By ACCOUNT MANAGER TAKEN BY
03iO3/2020 36817830 HARRY GREER LEE, CRAIG J MONTGOMERY, VVALTER F
BRANCH ACCT JOB NO. TERMS SNIP VIA I ROUTING
030 10002382914 NET 30DAYS 5,WALK IN
'UNE, PART NUMBER DESCRIPTION CITYORD UNIT PRICE CITY BKO QTYSHP EXTENDED TAX
PRICE ANIT
I 433JSCR50B SOLS BAG COMPLETE REPAIR, K-T5C 29 4,) 147 45 11,
e,S
ev,e—
THESE ITEMS ARE CONTROLLED BY r''if- o 8 (',OVf:RNtviEN r AND AUTHORIZED FOR EXPORT ONLY TO THE COUtj'Rr'0l-
LJLTWATIF DESTINATION FOR USE BY THE ULTIMATE CONSIGNt-",'-OR END-USERS)I-ILPLIN IDENHFIFD Ti ICY MAY NO r BE,
RESOLO.TRANSFERRED OR OTHERWISE OISPOSwED OF TO ANY OTHER COUNTRY OR ANY PERSON OTI-JtjR THAN THE
AUTHORIZED ULTIMATE CONSIGNEE OR ENO-USFR(S)'EITHER IN THEIR ORIGINAL FORM OR AFTf--p,BEING INCORPORA I P-)j?I'jT(j
OTHER ITEMS,VVI111OUT FIRST OBTAINING APPROVAIFROM fF,F LJ 3 GOVU-RNMENT OR AS OTI 1EIRVIISE AU I HORIZED BY
LAW AND RCGULAI QNS
sl
T')I id, i AX
r;, -wd i i!r%3 It) S!'IPPrN':-
10 1 AL INVUICi- I
Please vertfy that the ronilt to address you are using agroos If,the address shown at the top of this Invoice.
t ,
• SUPPLY FA# 12 INVOICE
CONSTRUCTION INDUSTRIAL BRANCH ADDRESS INVOIGENUMBER
WHITE CAP 030 KFN1 fi�4JU9?_t 8�
518-030G
1820 SOUTH 210FH S(flFT 5U1'IF IQ INVOICE DATE
KEN WA98032 01/031 2G2ti
_,
KIN( CUSTOMER PO NUMBER
2"%31 H
IEiNRC?LC.AAENT'T4KEN:� Fr.= f .;:>� I
S TERRITORY, PLEASE REMIT PAYMENT TO:
SOLD To: 8s2300o ; ` . SHIP TO: 10002382914 NO SUPPIY CONSTRUCTigN AND
INDUSTRIAL-WHITECAP
P.O.BOX 6040
CYPRESS,CA 90630.0040
SCARSELLA BROTHERS 228I'H UTILITIES PHAS[4
PO BOX 68697 SOUTH 2281 H STREET AND 72ND AVENUE
SEATTLE WA 98168-0697 ;, KENT WA 98032
- —
ORDER GATE ORgER NO ORDERED BY ACCOUNT MANAGER TAKEN 0Y
03/03/2020 36813862 T HARRY GREER LEE CRAIG J MONTGOMERY,WALTER F
BRANCH ACCt JOB r,+ TERMS
SHIP VIA f ROUTING CUSTOMER JOB NO.
030 10002382914 NET 30 DAYS 5 WALK IN., _ 228TH UTILITIES
UNP PART NUMBER DESCRIPTION OTY ORD UNIT PRICE OTY SKID OTY SHP EXTENDED TAX
1 43TJSGR�E1t3 -
BAG COMPLETE REPAIR JCTSFT �. .� 2{ qc B.aO � � _. .?RICE AMT
50L8 117.96
2 4448R 11923 112 TAMPICO WATER PAINT BRUSH 1 1029 FA 0 10,29 1,03
BRIGADF
3 188165750 14"BLACK PVC SMOOTH GLOVES 3 56 PR (i 2 7 12 0 71
-N FEREO
�5' ( tia 6dl[rj 11 -
�. ov�3 ate. w
6 4-
✓?1a, 1 +D S� l� i�� +
4IfLokl IILN1!4;ARL (f)NIR01L Fri BY IIILUS GtlVFRNMFNI AND AVIHORILL0£t:1RI_XTORI C)NLY TO THI,GOUNIR'lsk
01, !iNIA7f t1Tt*IitlAtIONI()H(I!aLt3YTi'IEUI.FIMAii Ct?NSK;NET: tl�t ASClllSrl_ii(S)rfFlzLiNtIN'Nlli"lict) THEYMAYNtirc',,
Itf SO(i I PANSi LI41411 OR Off f RIA11.SC I}i3t'tr`rP I?CIF TO ANY O ti-11:14(;0UN I RY OP ANY I'1-11SO N 6IME 12-THAN IMF
AijT1 I0RV.LI)Ut IIMA I1 I,r�NStt,iN4'I t 12 LNC?ll t=1�1�ti1.1i1I!tL13 IN TFU IF2{Iltit2INAL I a 1t21 t)I2 A'i TEII BF_Ifi1t>iNC cJF2KLIi{A t [ ,%i,
('titirR 11I MS WIIH0111 FIRST 01IrAiNINGA{q'P£)16P,t (ROM IHI I)'i „(IVC'2NMF OP "I"41iRWISr kIfl`I0RI?i 1)8- ,,
I_A41'ANV"0 6111 A I IONS [[
I .
Jv., 101 K ML I i lP11 -
i;, -
�e�nlpitCc te;nn an! cnnifbuilsP+G afi}�.IrIG �`�
;ua,- r �tr- -.r,.= ;;r•rt-,-[ �rOiAl � VO:C;i- � ( S� (1 'T�C1..
Pkoaari verity that tho romtt to addross you ara using agroes to tho addross shown at tho top of this Involco
sh�pe Shope Concrete LLC
1618 E Main FA# 12 INVOICE 9999293
Puyallup,WA 98372 tn,aioe fate 2 'K)2'2
Phone: (253)848-1551
�t,�av(253)845-0292
Sold to: 595 Job Number; 26842
SCARSELLA BROTHERS.INC Ship to: S 228TH ST UNION PACIFIC PHASF 5
P 0 BOX580397 RAiLROAD GRADE SEPARATION STATE
TA6582 S 228TH ST&72NO AVE 8
SEATTLE,WA 98168-0697 KENT,WA
SHIP DATE SHIP VIA F,0,S. TERMS PAGE
2i2812020 ALEX NET 30 1
CUSTOMER PO# LOAD SALES REP EXEMPT# REFERENCE
DerakR A16 450719 9999293
QtY Item Description Unit Price TX Extension
Structure- 72'
2 41H726SST 72"X 6'MH SECTION-STEPS $1,800,00 17i $3600.00
1 NIG72 72"MANHOLE GASKET $o.oo 0 $o 00
Structure Total $3,600'00
Structure: LUBE
I GL8L8 GASKET LUBE 8 L8. PAIL $22,00 1:1 $2100
Structure Total $22,C0
Taxable $o.00'
Nor-Taxable $3.622 no
Sub Total $3,322 oo
Tax $0.00
Invoice Total 33,G22()Cj
Less Deposit $000
Invoice Balance 553.r'322 oo
c)
page
1�+h,e^� FA# 12
�7 Shope Concrete LLC
,r. 1618 E Main INVOICE 9999294
Puyallup,WA 98372 Invoice Date: 2/28/2020
„ Phone:(253)848-1551
Fax: (253)845.0292 i
t'� \ x�
Sold to: 1595 ,ti,r Job Number: 26842
SCARSELLA BROTHERS, INC Ship to: S 228TH ST UNION PACIFIC PHASE 5
P 0 BOX 68697 RAILROAD GRADE.SEPARATION.,.STATE
TA6582 S.228TH ST&72ND AVE S
SEATTLE,WA 98188-0697 KENT,WA
SHIP DATE SHIP VIA F,0.B. TERMS PAGE
2/28/2020 LEE NET 30 1
CUSTOMER PO# LOAD SALES REP EXEMPT# REFERENCE
DerekR A16 450719 9999294
4ty Item Description Unit Price TX Extension
Structure: 72•
1 MH72RS480H 72"TO 48'MH REDUCING SLAB OFFSET HOLE _j $900.00 ❑ $900 00
1 MH483EC 48"X Y MH ECCENTRIC CONE — C✓✓irt
3 GR424 4"X 24"GRADE RING $75.00 $225,00
Structure Total $1,500.00
Structure: CONE
1 MH4818EC 48"X 18"MH ECCENTRIC CONE(COAL TARED) $275,00 ❑ $275 00
Structure Total ;$275 00
900 + 75 + 275 = 1250
Taxable $0.00
Non-Taxable $1,775.00
Sub Total $1,775.00
Tax $OAO
Invoice Total $1,775.00
Less Deposit $0,00
Invoice Balance $1,775,00
. 00-73C}dS.00 / ` qa lS-,C9orjt
Page 1
h�pe E-C, Shope Concrete LLC FA# 12
1618 E Main CREDIT MEMO 9999413
Puyallup,WA 98372 Invoice Date 3/12C2()
Phone: (253)848-1551
iiNo:,ax:(253) 845-0292
Sold to 1595 Job Number 26342
SCARSELLA BROTHERS, INC Ship toy S 226TH ST UNION PACIFIC PHASE 5
P 0 BOX 68891 RAILROAD GRADE SEPARATION .,STATE
TA6582 S 228TH ST&72ND AVE S
SEA TTLE,WA KENT,%NA
SHIP DATE SHIP VIA TERMS PAGE
313/2020 NET 30
CUSTOMER PO# LOAD SALES REP EXEMPT11 REFERENCE
DerekR A18 450719 9999413
City Item Description Unit Price TX Extension
Structure: 72*
-1 MH483EC 4a"X 3'MH ECCENTRIC CONE 9999294' $37500 7 ($37500)
Structure Total ($375,00)
Taxable $0.00
Non-Taxable ($375.00)
Sub Total ($375,00)
Tax $0,00
Invoice Total ($376.00)
Less Deposit $000
Invoice Balance ($375.00)
Page I
DAILY REPORT OF FORCE ACCOUNT WORKED
- KENT
Project: 228th Grade Separation Ph 5 Date of Work: 3/2/2020
Owner: City of Kent Project No: 07-3022
Prime Contractor: Scarsella Bros. Fed Aid No: HLP-1216(006)
Subcontractor: Work by Sub? x (mork"x"if yes)
FA Bid Item No.: 1355 Minor Change(Roadway)
Description of Work: Pour footing for metro sewer MH 14+15R adjust to grade
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT
Casey Anderson Carpenter Foreman 4 $ 76.92 $ 105.05 $ 307.68
$
LABOR OH&P @ 29%: $ 89.23 SUBTOTAL-LABOR: $ 307.68
LABOR TOTAL: $ 396.91
EQUIPMENT
HOURS ;ADJUSTED HOURS STANDBY DOLLAR
EQUIPMENT AND ATTACHMENTS WORKING RATE STANDBY RATE AMOUNT
SBS 102-328 Ford Tool Truck 1 $ 20.09 $ $ 20.09
EQUIPMENT OH&P @ 21W $ 4.22 SUBTOTAL-EQUIPMENT:
EQUIPMENT TOTAL: $ 24.31
MATERIALS I SERVICE
MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT PRICE DOLLAR AMOUNT
Miles Concrete Ticket 232116,Inv#1773460 1 LS $ 645.00 $ 645.00
$
MATERIALS/SERVICE 01 @ 21%: $ 135.45 SUBTOTAL-MATERIALS: $ 645.00
MATERIALS TOTAL: $ 780.45
Verification of Hours Worked: FA SUBTOTAL: $ 1,201.67
..._„- , ..- 12%MARKUP(for prime on subcontract work) $ 144.20
.........................
Contractor's Representative(printed rtame)
__---_... FA SHEET TOTAL: $ 1,345.87
............................... .... ..
Contraclor's Re resentatrve Si nature Date
Prime Markup on Subcontractor:
................................................................ 12%: <$25,000
Owner's Representative(printer!name)
10%: $25,000 to$100,000
................................................................ 7%: >$100,000
Owner's Re resentative Si nature Date
Pay Estimate Entered: If checked,this work is in dispute. By signing this form, parties are
agreeing to the time and effort needed to accomplish the task
Date: []Entitlement to be determined at a later dale.
By:
4 of 6 P-13(Rev.2017 Dec)
T owO
G Z a J 0 Z Zl /1���
j z :) z � � � tr s
co O iw p �
� wQ � Q
UJ
Q M N! 69 4► 69 fA M W df 69 69 69 M 6'1 to (n to to N9 in M,en M ar3 eH u3 iH w en M En
LL
J w i Z Q Ir w 0 0 z � Q Q x
O N I O O m w w O
�`f ai aaj a)a : Y(
� o o = QY a o oo U ¢ wsJ
X
_ .. O m > > ai o O m ¢ H
m m U) m Q p
M o} } } } } } } } } N Q N o ~
w m Q: m d' m tY m ir m a' m cc m d' m w Co w m H Y
V � a � a ° aoaoaoao0. oaoaoao I O < .
PIMP U) 000000000tnOrnOcnOW) m < �
ti � o
doe
3 = ri
Co o
r o W
1 rw
n
L O 4
u �
C ' ' 1— C
W
Z Q H dIX
ui
Q Q Q O iE
W Z I
Z z o
a ul a 'i r
a zZ Of w0Q
LU
Li Q
m rfl en eq w is 69 69 En Fn fn to to EH fn EA E9 W 69 EA an to cn to en en � b9 69 , Q t a
tu
W m O @'}
O >- Q. g H
n OJ ce
m O 1 F'
a 2 O O
h
L N h m U
rn m m u5 d'
r m rn m
J 3 ry m O •T' N
(N _. � O O �O O a O.� O w t0 w O W O W O O
m
Ili
Q
Z Z
w w
co
w w
o a cc
0.
w w
U a
m
U O
r qi H l•� �•
E U i
R i
O w w
-".`..� m f f U C•-.. 2. w
INVOICE FA #13
CUSTOMER NO. 1)t TL INVOICE NO, PACE
MILES 253 833 3705
SAND& GRAVEL
SB STRUCTURES, LLB;:
PO BOX 68847
SEATTL,F, WA 98168
St I
DATE JOB NUMBER JOB LOCATION-ADDRESS
PRICE TAX TOTAL
TICKET NO, i QUAN-n'TY JUNUI DESCRIPTION
000048 S 228TH ST IMPROVEMENTS PH b KENT
PO NUMBER: 7035
03/02 202-232116/ 5. 00 CY 6SK,AIR 88 . 000 440.00
03/02 202-232116 5. 00 CY WINTER PERFORMANCE 4 . 000 20.00
03/02 202-232116 1 . 00 EA MIN LOAD CHARGE 150. 000 150.00
03/02 202-232116 1 . 00 LD FUEL SURCHARGE-READY MI 10 . 000 10.00
03/02 202-232116 5 . 00 CY ENVIRONMENTAL COMPLIANC 5 . 000 25.00
03/02 202-232116 5. 00 CY AIR ENTRAINMENT
JOB TOTAL LINE 645. 00
PRODUCT RECAP
./ 5 . 00 04C4A 6SK,AIR
5 . 00 5350 WINTER PERFORMANCE
1 . 00 5100 MIN LOAD CHARGE
1 . 00 5401 FUEL SURCHARGE-READY MIX
5 . 00 5300 ENVIRONMENTAL COMPLIANCE RM
5 . 00 4000 AIR ENTRAINMENT
0 7 3 o.LT-0 19// j- 0 o I //cf
2020
AMOUNT DUE"
Retiiit Payrrient to 400 Valley Avenue NE PLIyclklj) DNA 98372-25 16 15 ,
K S'
DAILY REPORT OF FORCE ACCOUNT WORKED
`�- KENT
E#14
Project: 228th Grade Separation Ph 5 Date of Work: 3/3/2020
Owner: City of Kent Project No: 07-3022
Prime Contractor: Scarsella Bros. Fed Aid No: HLP-1216(006)
Subcontractor: Work by Sub? (mark"x"if yes)
FA Bid Item NO.: 1355 Minor Change(Roadway)
Description of Work: grout/finish metro sewer MH 14+15R adjust to grade
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT
Geordan Hunkin(Rev.) Operator Loader under 6 CY 2 $ 74.00 $ 99.17 $ 148.00
Harry Greer(Rev.) Clean-up Laborer 2 $ 57.92 $ 79.62 $ 115.84
Connor McQuiston(Rev.) Clean-up Laborer 2 $ 57.92 $ 79.62 $ 115.84
Siaosi Pele(Rev.) App. Lab 95% 2 $ 55.75 $ 76.37 S 111.50
$ $ $
LABOR OH&P @ 29%: $ 142.44 SUBTOTAL-LABOR: $ 491.18
LABOR TOTAL: $ 633.62
EQUIPMENT
HOURS IADJUSTED HOURS STANDBY DOLLAR
EQUIPMENT AND ATTACHMENTS WORKING RATE STANDBY RATE AMOUNT
17-255 Cat323 Excavator(1/1/2020) 1 $ 100.01 $ $ 100.01
$ $ $
EQUIPMENT OH&P @ 21%: $ 21.00 SUBTOTAL-EQUIPMENT: $ 100.01
EQUIPMENT TOTAL: $ 121,01
MATERIALS i SERVICE
MATERIALS f SERVICE DESCRIPTION QUANTITY UNIT I PRICE DOLLAR AMOUNT
$
MATERIALS/SERVICE OH&P @ 21%: $ SUBTOTAL-MATERIALS: $
MATERIALS TOTAL: $
Verification of Hours Worked: FA SUBTOTAL: $ 754.63
12%MARKUP(for prime on subcontract work) $
Contractor's Repre�ntative(printed name)
FA SHEET TOTAL: $ 754.63
Contractor's R� •sentafive Signature+ �Date
Prime Markup on Subcontractor:
................................................................ 12%: <$25,000
Owner's Representative{printed name)
10%: $25,000 to$100,000
7%: >$100,000
re
Owner's Representative Si natuw�•��������Date
Pay Estimate Entered: If checked,this work is in dispute. By signing this form, parties
are agreeing to the time and effort needed to accomplish the task
Date: Entitlement to be determined at a later date.
By:
5 of 6 P-13(Rev.2017 Dec)
az � 4' oz
� r
w p w
W < " w Q {��' 1 {� h•
tit �? w as ur a uq w +� v► En v► erg Fn 40 i en(w i ea 69 49 L4 os rH
wasp j w � F Q ,� woo zza ¢ z
O a I a �Z O w O O Q m m 2 2 w w a
j F U U J 0- d h F W
V F- � Y a g N
_.
- Z Z O W W J d =
Q O O m Q Q j F Y h
H O f O w J
1 i r0 O m '> j m O a Q o
0o Cl) `n ar m a O
co in m � i
US
co co
�w p n
a a o a_ c wpWO Oa a 4a ~ (no) Ov) OnO+tn0ai0n0c On0 (D m10 l 0 U N
N o
I
lift
rl
OD th
0.
rt
i
` W
L1
L Li Ili
� J
Z O o 4
SLL) U O W z Q
J U O U O
U W F O
0 o z w
W
O Z i ` 4 W
OW' U w Q s- i w `
O X n &9v0rflwwv� v► eAtoe�aeav> FnenofeA � vassr,> cr� enenrnt� +fl #n M
-_ .
� O n a ^ "1
c O '1
l J o a- U- r 3 O
QUQ
OJ r` V� Q K
O
_ ° z
L_ ._._
`n _ _ m U
m
m
V)
x 3 N = J
t o a n _ t 0 (9 _C__)m O OtLU
C7 CC _U H k WOw O W O O O � O Oo _ LUw m
w
c= >_ >
a '
F- a
zUJ ~
z
0 ul
w
o a
a w
N Z ✓.
Dr,
u
y O iy
E V
m
?
v w
g j i m z
h, cn 0
DAILY REPORT OF FORCE ACCOUNT WORKED
�` KENT
#1�
Project: 228th Grade Separation Ph 5 Date of Work: 3/4/2020
- - -- -
Owner: City of Kent Project No: 07-3022
Prime Contractor: Scarsella Bros. __
-- Fed Aid No: HLP-1216{006)
Subcontractor: _.._ - -
Work b Sub? (mark"x"if yes)
FA Bid Item NO.: 1355 Minor Change(Roadway)
Description of Work: set lid,finish metro sewer MH 14+15R adjust to grade
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT
Geordan Hunkin (Rev.) Operator Loader under 6 CY $ 74.00 1 $ 99.17 $ 99.17
Harry Greer(Rev.) Clean-up Laborer 3 $ 57.92 $ 79.62 $ 173.76
Connor McQuiston(Rev.) Clean-up Laborer 3 $ 57.92 $ 79.62 $ 173.76
Siaosi Pele(Rev.) App,Lab 95% 1 $ 55.75 $ 76.37 $ 55.75
$ $ $
LABOR OH&P @ 29%: $ 145.71 SUBTOTAL-LABOR: $ 502.44
LABOR TOTAL: $ 648.15
EQUIPMENT
HOURS JADJUSTED HOURS STANDBY DOLLAR
EQUIPMENT AND ATTACHMENTS WORKING RATE STANDBY RATE AMOUNT
17-255 Cat 323 Excavator(1/1/2020) 1 $ 100.01 $ - 5 100.01
02-216 F-150 P/U 3 $ 15.33 $ $ 45.99
$ $ $
EQUIPMENT OH&P @ 21%: $ 30.66 SUBTOTAL-EQUIPMENT: $ 146.00
EQUIPMENT TOTAL: $MATERIALS SERVICE
176.66
MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT I PRICE DOLLAR AMOUNT
$
MATERIALSISERVICE OH&P @ 21%: $ SUBTOTAL-MATERIALS: $
MATERIALS TOTAL: $
Verification of Hours Worked: FA SUBTOTAL: $ 824.81
Contractor's Re
e) •••-••-•••••••••-••--••-_. 12%MARKUP(for prime on subcontract work) $ -
presentative(printed nam
................................................................ FA SHEET TOTAL: $ 824.81
Contractor's Representative mature Date
Prime Markup on Subcontractor:
Owners Representative(printedname) ............................... 12%: <$25,000
10%: $25,000 to$100,000
.........................•--................_........•-•........ 7%: >$100,000
Owner's ReWeserkaUve Si nature Date
Pay Estimate Entered: If checked,this work is in dispute. By signing this form, parties are
agreeing to the time and effort needed to accomplish the task.
Date: Entitlement to be determined at a later date.
By:
6 of 6 P-13(Rev 2017 Dec)
W a d O z _Q
a � 1'` [ we `b
Q i
LL W Q
W 6M. 40 l to 6% 0 �
wwa I v� iri i- � � i�
a
mmwWa~ w ~� vi o O
d � § EL Y O O u!`
J _ Q z z 0 w w 0 =
4 0 ~ o o m a 7) o Y J
_ C! m > > 0 o O W m Q FQ-
m Q O
m CC m m CC m 0_' } ......} } }. . } _.. !!) J CL Z. V) oo F
a 0 w W LU 00 LU 0 W 00 cl:W CO W m 0 m H y U o
p W p W p W p W p O
V a. a.
CL ate
Oaq .0 crnOv� OtnOrnOfnOcnOmCL j <
` j
• ` z F o
rc
Not
3 .
a . V
_...._
(� OOw di Y-
ow a
7 U O 3 W 2 t W
U LL
o V a C I.-
z D }
oz � ` r 4
U O W W w
p bsrss � E146464 69e9694A 164 in +n6% e» r» wwcn rrsEawwv► viv� =" O p�
f °w O
Q J (� 0 }
' J OJ p
3 = = o z
co
m = m
J N in
_ (�
H c� tz0 0t0tatOtOt0 �z0tolz o
a LL CWL' 0 �w0 � 0 � 0 � 0aw• 0 � 0UJ0 � 0 � 0
_ _ 0
Z) W
Q ~
m W
LLJ
_ LLI
w
R .t' ��
E 0
R in
F'
0 `� �` 0 W
3 y t t. 0
•
KENT
WASHINGTON Field Work Directive FWD 003
Project Name: S. 228`6 St. Union Pacific Railroad PW Project Number: 07-3022
Grade Separation—Ph 5
Contractor: Scarsella Bros., Inc. Federal Aid Number: HLP 1216(006)
Subject: Revise King County Metro MH Date: 211012020
extension detail
Scope: Make the following changes to the Contract Documents:
• Revise King County Metro MH adjustment detail to sketch attached dated 2/11/20, Provide new 72" MH
sections with cone top to new finish grade to be set on perimeter, reinforced foundation; remove and
dispose of existing cone section; grout inside and out of all new MH sections and provide grout bevel
where existing riser and new meet.
Measurement and Payment:
• Track time and material efforts to complete the work for reimbursement with standard
markups noted in 1-09.6. A Change Order will be written when costs are known, Notify
inspector before beginning work.
Attachment(s):
Metro SS Riser Detail dated 02/11/20
Contractor Acknowledgement:
By: ? 7 -- •/-L Date: 3/ /?O7A 0
Matthew Scarsella, Project Manager
Owne Approval:
By: Date: Z
�ason Barry, City of Kent
By: — >.,� ,— Date: 3/2/2020
THIS FIELD WORK DIRECTIVE DOES NOT PROVIDE FOR EITHER A TIME EXTENSION OR A CHANGE IN THE CONTRACT PRICE.LABOR,EQUIPMENT,AND/OR
MATERIAL OUTLINED IN THIS FIELD WORK DIRECTIVE SHALL BE PAID BY BID iTEM(S)OR A CHANGE ORDER SHALL BE DEVELOPED FOR TIME EXTENSION OR
CONTRACT PRICE INCREASES. ANY PROTEST TO THE FIELDWORK DIRECTIVE SHALL FOLLOW 1-04 5 OF THE WSDOT STANDARD SPECIFICATIONS.
FA Sheet No.:
• Independent Cost Estimate
A4ANAGCNKNT
Project Name: 228th Ph 5 Project No 17-3003.2
Item No.: Date 2/19/2020
Description of Work: Raise MH to grade per FWD 3
Work by Subcontractor?: (mark "x"if yes)
Prime Contractor: Scarsella Bro's, Inc. Sub-Contractor: G and G Incorporated
Items/Cost DESCRIPTION QUANTITY UNIT PRICE AMOUNT
Labor $,
Foreman 8 Hrs $ 78.00 $ 624.00
Operator 16 Hrs $ 71.00 $ 1,136.00
Cement Mason 4 Hrs $ 63.00 $ 252.00
Laborer 16 Hrs $ 58.00 $ 928.00
Concrete 2 CY $ 100.00 $ 200.00
Rebar 1 LS $ 100.00 $ 100.00
Riser Sections and Cone 4 EA $ 1,000.00 $ 4,000.00
Grout bags 10 EA $
Excavator 8 Hrs $ 80.00 $ 640.00
Crew Truck 16 Hrs $ 32.00 $ 512.00
SUBTOTAL-MATERIALS $ 8,392.00
Avg Markup @ 25% $ 2,098.00
SUBCONTRACTOR TOTAL 10,490.00
Verification of Hours Worked TOTAL: $ 10,490.00
12% MARKUP(for prime when subcontract work)
Contractor's Representative(printed name)
SHEET TOTAL: $ 10 490.00
Contractor's Representative Signature Date
Prime Markup on Subcontractor:
Ovr.....e.r,"s...Representativa.............................(printed.........nam........................................................... 12%: <$25,000
nere)
10%: $25,000 to$100,000
......................................... 7%: >$100,000
Owner's Representative Signature Gate
Pay Estimate Entered: C If checked,this work is in dispute. By signing this form, parties are
Date: agreeing to the time and effort needed to accomplish the task.
By: Entitlement to be determined at a later date.
1 of 1 P-13 (Rev. 7/12)
�T�O JS IS(1L n4y Z / t�7.0
b ff
f
I
i�€ccl 7Z " M �1
yew - �y
Ge-.uq- HOOPS
Z-To
i
Z,.o.l
82ca
.i LAA-tea.AL- PW
tI JA a o uo co�rK) 1r I.
Cj '•- dq CSTC. A�f 'S l� ROOF F F-Lr GSTC .
(D MIL
Top t"
Z' AMA)
tiS�R �t rav'xwr&#j
It
$
3
Barry, Jason
From: Foss, Steve <Steve.Foss@kingcounty.gov>
Sent: Tuesday, February 18, 2020 12:36 PM
To: Barry,Jason
Cc:" Lampard, Mark; Madfai, Mark; Smith, Susanne Provencio
Subject: RE: S. 228th Metro MH Raise
EXTERNAL EMAIL
Jason,
I have discussed your plan with our engineers and we have no exceptions to your plan. Let me know when you plan on
starting construction.
I will need to be on site for the following:
1. Placement of the CSTS base
2. Verify the form size and rebar placement
3. Installation of the first section on the foundation
4. installation of beveled concrete between new structure and existing vertical pipe
5. Final inspection of finished grade frame and lid
Thank you,
Steve Foss
LPA Inspector/Investigator
Wastewater Treatment Division
King County Department of Natural Resources
206-255-6047
From: Barry,Jason<JBarry@kentwa.gov>
Sent:Tuesday, February 18, 2020 11:01 AM
To: Foss,Steve<Steve.Foss@kingcounty.gov>
Cc: Lampard, Mark<Mark.Lam pard@kingcounty.gov>; Madfai, Mark<MMadfai@kentwa.gov>; Smith,Susanne
Provencio <SPSmith@kentwa.gov>
Subject: RE:S. 228th Metro MH Raise
[EXTERNAL Email Notice!] External communication is important to us. Be cautious of phishing attempts. Do not click or open
suspicious links or attachments.
Hi Steve,
We are proposing the following:
• 6" CSTC compacted base below new concrete foundation
• #4 Rebar mat 18"o/c top and bottom
• 24"x24"x perimeter Commercial Conc Class 3000
• 151b roofing felt or 6 mil plastic bond break between new concrete foundation and existing 48" riser
Please let me know at the earliest if this will be acceptable or additional information is required.
1
Thanks,
Jason
Jason Barry, Capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
t Phone 253-856-5546 1 Cell 253-797-8462
KENT ibarry0)KentWA aov
» www.KentWA.aov n L
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Foss,Steve<Steve.Foss kin count . ov>
Sent: Friday, February 14,2020 4:17 PM
To: Barry,Jason<JBarrv@kentwa.eov>
Cc: Lampard, Mark<Mark.Lampard @ kinpcountv.eov>
Subject: RE:S. 228th Metro MH Raise
EXTERNAL EMAIL
Jason,
I will know on Tuesday by 0900. I'm pretty sure the idea will go through, but they will want to see specifics like rebar size
and spacing,psi of concrete, dimensions of the pad and what will be placed as a base under the pad.Just standard
stuff.
Steve Foss
LPA Inspector/Investigator
Wastewater Treatment Division
King County Department of Natural Resources
206-255-6047
From: Barry,Jason<JBarrv@kentwa.eov>
Sent: Friday, February 14,2020 9:04 AM
To: Foss,Steve<Steve.Foss kingcounty,gov>
Subject: RE: S. 228th Metro MH Raise
[EXTERNAL Email Notice! I External communication is important to us. Be cautious of phishing attempts.Do not click or open
suspicious links or attachments.
Hi Steve,
Any update? Crews are needing to get something going in that corner early next week. Let me
know.
2
Thanks,
Jason
Jason Barry, Capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 I Cell 253-797-8462
KENT jbaay@KentWA.00v
www.KentWA.aov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Foss,Steve<Steve.Foss@kinecounty gov>
Sent: Wednesday, February 12, 2020 4:31 PM
To: Barry,Jason<1Barry@kentwa.eov>
Subject: RE:S. 228th Metro MH Raise
E
TERNAL EMAIL
Jason,
That's what we were thinking too. I will check with Mark to see if your sketch will suffice,or if he will want a stamped
drawing.
Steve Foss
LPA Inspector/Investigator
Wastewater Treatment Division
King County Department of Natural Resources
206-255-6047
From:Barry,Jason<1Barrv@kentwa.gov>
Sent:Wednesday, February 12, 2020 3:11 PM
To: Foss, Steve<Steve,Foss@kinpcountv.eov>
Subject: RE:S. 228th Metro MH Raise
[EXTERNAL Email Notice!j External communication is important to us. Be cautious of phishing attempts. Do not click or open
suspicious links or attachments.
Steve,
Here's what we're wanting to propose to avoid loading the existing riser assembly. Let me know.
Thanks,
Jason
Jason Barry, Capital Projects Manager
40 f Construction Management I Public Works Department
KENT 220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 I Cell 253-797-8462
3
jbarrY0KentWA aov
www.KentWA.gov n6
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Foss, Steve [rM-ailtoSteve Foss0kingcoun aov]
Sent: Wednesday, February 12, 2020 12:06 PM
To: Barry, Jason
Subject: RE: S. 228th Metro MH Raise
EXTERNAL EMAIL
Jason,
Please submit a plan for our review of how you plan on bringing the structure to grade. King County will not allow the
load of the structures to be placed on the vertical pipe.
Steve Foss
LPA Inspector/Investigator
Wastewater Treatment Division
King County Department of Natural Resources
206-255-6047
From: Barry,Jason<JBarry@kentwa.eov>
Sent:Tuesday, February 11, 2020 10:45 AM
To: Foss, Steve<Steve.Foss(&kingcou nty.gov>
Subject: RE:S. 228th Metro MH Raise
[EXTERNAL Email Notice!] External communication is important to us.Be cautious of phishing attempts.Do not click or open
suspicious links or attachments.
They confirmed ID is 48"Steve. Don't have dug up yet to get OD.
From: Foss, Steve [mailto'Steve FossC&kingcounty.gg_v]
Sent: Tuesday, February 11, 2020 9:48 AM
To: Barry, Jason
Subject: RE: S. 228th Metro MH Raise
EXTERNAL EMAIL
Jason,
Do you know the inside and outside diameter of the vertically placed pipe?
Steve Foss
LPA Inspector/Investigator
Wastewater Treatment Division
4
King County Department of Natural Resources
206-255-6047
From: Barry,Jason<1Barry@kentwa.eov>
Sent:Tuesday, February 11, 2020 9:15 AM
To: Foss,Steve<Steve.Foss@kinecountv.eov>
Cc: Lampard, Mark<Mark.Lampard kinecountv.eov>; Zhou,Zhengjie<Zhemjie.ZhouCa?kin>;county sov>
Subject: RE:S. 228th Metro MH Raise
[EXTERNAL Email Notice!]External communication is important to us.Be cautious of phishing attempts. Do not click or open
suspicious links or attachments.
How about using concrete pipe of the same diameter to extend and replicating the current condition at new grade?
Jason
Jason Barry, Capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 ( Cell 253-797-8462
KENT ibarrY(aKCntWA.gov ips
www.KentWA.aov
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From: Foss, Steve [mailto•Steve-oss(ftingcounty gov]
Sent: Tuesday, February 11, 2020 9:06 AM
To: Barry, Jason
Cc: Lampard, Mark; Zhou, Zhengjie
Subject: RE: S. 228th Metro MH Raise
EXTERNAL EMAIL
Jason,
Our engineers have taken a look at the pictures you sent us.They do not think that building on top of the vertically
placed pipe is a viable option.Could you have your engineer's develop a plan that we can review that will allow for the
structure to be raised to elevation, but does not increase the load on the vertical pipe.
Thank you,
Steve Foss
LPA Inspector/Investigator
Wastewater Treatment Division
King County Department of Natural Resources
206-255-6047
5
From: Barry,Jason <JBarrv@kentwa.eov>
Sent: Tuesday, February 4, 2020 1:30 PM
To: Foss,Steve<Steve.Foss@kingcounty.eov>
Cc:Cameron Bloomer(cbloomer@kbacm.com) <cbloomer@kbacm.com>; Gary Paxton (gpaxton kbacm.com)
<gpaxton@kbacm.com>; 'kent.h@scarsellabros.com' <kent.h@scarsellabros.com>
Subject:S. 228th Metro MH Raise
[EXTERNAL Email Notice!I External communication is important to us.Be cautious of phishing attempts. Do not click or open
suspicious links or attachments.
Hi Steve,
Thank you for meeting with us on site this morning. Attached is a photo of the existing riser scenario at the MH to be
raised vertically with our new construction drawing details for reference. The existing riser appears similar to a 48" pipe
bell end with the cone section seated within the bell.
Our construction drawings call for removing the existing cone section and adding new MH sections with new cone up to
new finish grade, approximately 10 feet. To achieve this,the City proposes application of King County's Bell to Bell
connection detail (attached) where the existing riser meets the new MH sections.
Scarsella Bros, is currently working toward the location. It is anticipated work will take place in the next week or two, so
they're looking to procure materials as soon as possible. If you could let me know if the proposed connection is
acceptable for the location as soon as you can we'd appreciate it.
Thanks,
Jason Barry, capital Projects Manager
Construction Management I Public works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5546 1 Cell 253-797-8462
K E N T 1W ryfKeutwA.yov
www.KentWA.gov n
15
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-
MAIL
6