Loading...
HomeMy WebLinkAboutCAG2020-114 - Original - Statewide Parking Lot Services, Inc. - 2020 Asphalt Grinding - 04/09/2020Agreement Routing Form ��9 For Approvals, Signatures and Records Management KENT This form combines & replaces the Request for Mayor's Signature and Contract Cover Sheet forms. WASH 1 N G T O N (Print on pink or cherry colored paper) Originator: Department: Nancy Yoshitake for Gursimran Singh Public Works Date Sent: Date Required: > 4/3/20 4/9/20 O Authorized to Sign: Date of Council Approval: L. it ,Q ❑ Director or Designee 0 Mayor 3/17/20 Budget Account Number: Grant? ❑ Yes 0 No R20112 Budget? 0 Yes ❑ No Type: Vendor Name: Category: Statewide Parking Lot Services, Inc. Contract Vendor Number: Sub -Category: = 33401 O Project Name: 2020 Asphalt Grinding E %1 Project Details:Planing bituminous pavement to prepare pavement surfaces for overlay *, work. c a� Agreement Amount: $$85,265 Basis for Selection of Contractor: Bid Start Date: Mayor's signature Termination Date: October 16, 2020 Q Local Business? ❑ Yes El No* *Ifineets requirements per KCC3.70.700, please complete "Vendor Purchase -Local Exceptions' form on Cityspoce. Notice required prior to disclosure? ❑ Yes ❑ No Contract ber:L. im aei - ' Comments: O , "11 'I" 0 4 cc W I A .a ,Iqlpm Date Routed to the Mayor's Office: V1 Date Routed to the City Clerk's Office: q V-1-1 31_20 Visit Documents.KentWA.gov to obtain copies of all agreements 10.A 400^ KEN T WAS H N G TO N DATE: March 17, 2020 TO: Kent City Council SUBJECT: 2020 Asphalt Grinding Project Bid - Award MOTION: Award the 2020 Asphalt Grinding Project to Statewide Parking Lot Services, Inc., in the amount of $85,265 and authorize the Mayor to sign all necessary documents, subject to final terms and conditions acceptable to the City Attorney and Public Works Director. SUMMARY: This project includes grinding asphalt pavement to prepare for the overlay work performed by the Public Works street crew. The bid opening was held on March 10, 2020 with three bids received. The lowest responsible and responsive bid was submitted by Statewide Parking Lot Services, Inc. in the amount of $85,265. Bid Tab Summary 01. Statewide Parking Lot Services, Inc. $85,265 02. Puget Paving & Construction, Inc. $88,715 03. Mulier Construction $106,258 Engineer's Estimate $114 000 BUDGET IMPACT: No unbudgeted impacts. The project is funded with B&O Tax and Solid Waste Utility Tax revenue. SUPPORTS STRATEGIC PLAN GOAL: Evolving Infrastructure - Connecting people and places through strategic investments in physical and technological infrastructure. Thriving City - Creating safe neighborhoods, healthy people, vibrant commercial districts, and inviting parks and recreation. ATTACHMENTS: 1. Asphalt Grinding Bid Tab (PDF) Packet Pg. 142 CITY OF KENT KING COUNTY, WASHINGTON KENT SPECIAL PROVISIONS FOR 2020 Asphalt Grinding Project Number:20-3001.2 BIDS ACCEPTED UNTIL BID OPENING March 10, 2020 March 10, 2020 11:45 A.M. 12:00 P.M. DELIVER TO CITY OF KENT, CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 TIMOTHY J. LAPORTE, P.E. PUBLIC WORKS DIRECTOR 4^0 KENT WASHINGTON INDEX Section 1 Bidder's Package Section 2 Payment and Performance Bond and Contract Section 3 Table of Contents Section 4 Kent Special Provisions Section 5 Location Map and Cross Section Details Section 6 Prevailing Wage Rates t BIDDER'S NAME CITY OF KENT KING COUNTY, WASHINGTON KENT SPECIAL PROVISIONS FOR 2020 Asphalt Grinding Project Number: 20-3001.2 BIDS ACCEPTED UNTIL BID OPENING March 10, 2020 March 10, 2020 11:45 A.M. 12:00 P.M. DELIVER TO CITY OF KENT, CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 TIMOTHY J. LAPORTE, P.E. PUBLIC WORKS DIRECTOR • KENT W A 5 H I N G T O N ORDER OF CONTENTS Invitation to Bid Contractor Compliance Statement Declaration - City of Kent Equal Employment Opportunity Policy Administrative Policy 1.2 - Minority and Women Contractors City of Kent Equal Employment Opportunity Compliance Statement Proposal City of Kent Subcontractor List (over $100K) Subcontractor List (over $1 million) Contractor's Qualification Statement Statement that Bidder Has Not Been Disqualified Certification of Compliance with Wage Payment Statutes Proposal Signature Page Cam. 71081RIVIST, n Combined Declaration Form Non -Collusion, Minimum Wage Change Order Bidder's Checklist Payment and Performance Bond Contract Table of Contents Kent Special Provisions Location Map and Cross Section Details Prevailing Wage Rates INVITATION TO BID Notice is hereby given that the City of Kent, Washington, will receive sealed bids at the City Clerk's office through March 10, 2020 up to 11:45 a.m. as shown on the clock on the east wall of the City Clerk's Office on the first floor of City Hall, 220 4th Avenue South, Kent, Washington. All bids must be properly marked and sealed in accordance with this "Invitation to Bid." Bids must be delivered and received at the City Clerk's office by the above -stated time, regardless of delivery method, including U.S. Mail. All bids will be opened and read publicly aloud at 12:00 p.m. for the City of Kent project named as follows: 2020 Asphalt Grinding Project Number: 20-3001.2 The project consists of planing bituminous pavement as necessary to prepare pavement surface associated with the overlay work to be performed by the City of Kent Street Crew. The Engineer's estimated range for this project is approximately $88,000 to $119,000. Bid documents may be obtained by contacting City of Kent Engineering Department, Nancy Yoshitake at 253-856-5508. For technical questions, please call Gursimran Singh, at 253-856- 5668. Bids must be clearly marked "Bid" with the name of the project on the outside of the envelope, addressed to the City Clerk, 220 4th Avenue South, Kent, WA 98032-5895. Only sealed bids will be accepted. No facsimiles or electronic submittals will be considered. Each bid shall be in accordance with the plans and specifications and other contract documents now on file in the office of the City Engineer, City of Kent, Washington. Plans and specifications can also be downloaded at no charge at KentWA.gov/doing- business/bids-procurement. Copies of the WSDOT Standard Specifications are available for perusal only. Apprentice Utilization Requirements are mandatory for all public works estimated to cost one million dollars or more, in which case no less than 15% of the labor hours must be performed by apprentices. KCC 6.01.030. A cashier's check, cash or surety bond in the amount of 5% of the bid must be included with the bid. The City of Kent reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. Bidders must submit with their initial bid a signed statement as to whether they have previously performed work subject to the President's Executive Order No. 11246. No bidder may withdraw his/her bid for a period of sixty (60) days after the day of bid opening. Dated this 191h day of February, 2020. BY: Kimberley A. o oto, City Cle Published in Daily Journal of Commerce on February 25 and March 3, 2020. CONTRACTOR COMPLIANCE STATEMENT (President's Executive Order #11246) Date��11b This statement relates to a proposed contract with the City of Kent named 2020 Asphalt Grinding Project Number: 20-3001.2 I am the undersigned bidder or pros pectivg.-Qontractor. I represent that - WPa veee�, 6LaveDo�, participated in a previous contract or subcontract subject to the President's Executive Order #11246 (regarding equal employment opportunity) or a preceding similar Executive Order. NAME OF BIDDER BY: �— S'IGNAME/'TITLE ADDRESS (Note to Bidders: The information required in this Compliance Statement is informational only) 2020 Asphalt Grinding/Singh 1 February 19, 2020 Project Number: 20-3001.2 DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such, all contractors, subcontractors and suppliers who perform work with relation to this contract shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific contract to adhere to. An affirmative response is required on all of the following questions for this contract to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlined, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the contract; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this contract I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this contract the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the contract I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this contract, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. By: For: Title: Date: 2020 Asphalt Grinding/Singh 2 February 19, 2020 Project Number: 20-3001.2 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding contracts with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the contract. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. 2020 Asphalt Grinding/Singh 3 February 19, 2020 Project Number: 20-3001.2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the contract. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before - mentioned company was the prime contractor for the contract known as 2020 Asphalt Grinding/Project Number: 20-3001.2 that was entered into on the Date between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before -mentioned contract. By: For: Title: Date: 2020 Asphalt Grinding/Singh 4 February 19, 2020 Project Number: 20-3001.2 PROPOSAL To the City Clerk City Hall Kent, Washington 98032 The undersigned hereby certifies that L44m,�N1 J L has examined the job site and construction details of the work as outl'ned on the plans and described in the specifications for the project named 2020 Asphalt Grinding/Project Number: 20-3001.2 for the City of Kent, Washington, and has read and thoroughly understands the plans and specifications and contract governing the work embraced in this improvement and the method by which payment will be made for that work and hereby proposes to undertake and complete the work embraced in this improvement in accordance with the bid and contract, and at the following schedule of rates and prices: NOTE TO BIDDERS: 1) All bid items are described in the Kent Special Provisions (KSP) or the Standard Specifications (WSDOT). Reference the Section No. listed in this proposal, where the bid item is described. 2) Proposal items are numbered in sequence but are non -continuous. 3) Unit prices for all items, all extensions, and total amount of bid must be shown. 4) Should bid items with identically worded bid item descriptions, marked with asterisk (*), appear in more than one schedule of the proposal, the bidder must bid the same unit price on corresponding items for each schedule. If the Contractor enters different unit prices on these items, the City will unilaterally revise the bid amounts to the lowest unit price on each corresponding item and recalculate the Contractor's total bid amount. The corrected total bid amount will be used by the City for award purposes and fix the amount of the contract bond. EXAMPLE SCHEDULE I - STREET ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1006 2-03.5 100 WSDOT CU YDS Roadway Excavation, $14.00 $1,400.00 Including Haul Per CY Any bids not filled out properly may be considered non -responsive. 2020 Asphalt Grinding/Singh 5 February 19, 2020 Project Number: 20-3001.2 SCHEDULE I - SOLID WASTE UTILITY FUNDING ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1000 1-09.7 1 Mobilization (Schedule I) $ 3000 $ 'D 0-0 WSDOT LUMP SUM Per LS 1005 5-04.5 11 Planing Bituminous Pavement * KSP HALF DAYS 1010 1-04.4(1) 1 Minor Changes (Schedule I) WSDOT CALC "Common price to all bidders Pe�H� $ �,q $10,000.00** $10,000.00 Per CALC * The description of this bid item is identical to a bid item(s) found in more than one schedule. In accordance with the CONTRACT PROPOSAL - NOTE TO BIDDERS, it is required that bid items with identical bid item descriptions reflect the same unit price. Schedule I Total $ �/2-D6 2020 Asphalt Grinding/Singh 6 February 19, 2020 Project Number: 20-3001.2 SCHEDULE II - B&0 FUNDING ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 2000 1-09.7 1 Mobilization (Schedule II) $ 3eW0 $ 3 d ® o WSDOT LUMP SUM Per LS 2005 5-04.5 16 Planing Bituminous Pavement $ C75$ * KSP HALF DAYS Per D // 2010 1-04.4(1) 1 Minor Changes (Schedule II) $10,000.00** $10,000.00 WSDOT CALC Per CALC "Common price to all bidders * The description of this bid item is identical to a bid item(s) found in more than one schedule. In accordance with the CONTRACT PROPOSAL - NOTE TO BIDDERS, it is required that bid items with identical bid item descriptions reflect the same unit price. Schedule II Total $�/ 2020 Asphalt Grinding/Singh 7 February 19, 2020 Project Number: 20-3001.2 BID SUMMARY Schedule I 3 I?j2-,6 Solid Waite Utilit Funding / �� Schedule II D I &O Funding - — TOTAL BID AMOUNTY-�L.'3 (f) 2020 Asphalt Grinding/Singh 8 February 19, 2020 Project Number: 20-3001.2 CITY OF KENT SUBCONTRACTOR LIST (Contracts over $100,000) List each subcontractor, from any tier of subcontractors, that shall perform subcontract work amounting to more than 10% of the total bid contract price. List each bid item to be performed by each designated subcontractor in numerical sequence. If no subcontractors will be performing 10% or more of the work, indicate this by writing "None" and signing this form at the bottom of the page. Failure to submit a fully completed and signed subcontractor list after the time set for bid opening may disqualify your bid. Project Name: Project Number: Subcontractor Name Item Numbers Subcontractor Name Item Numbers Subcontractor Name Item Numbers Subcontractor Name Item Numbers Subcontractor Name Item Numbers Subcontractor Name Item Numbers Subcontractor Name Item Numbers 2020 Asphalt Grinding 20-3001.2 CONTRACTOR'S SIGNATURE 2020 Asphalt Grinding/Singh 9 February 19, 2020 Project Number: 20-3001.2 SUBCONTRACTOR LIST (Contracts over 1 million dollars) Name of Bidder: Project Name: 2020 Asphalt Grinding Project Number: 20-3001.2 Pursuant to RCW 39.30.060, Bidder shall list the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of heating, ventilation, and air conditioning; plumbing; and electrical, or to name itself for the work. Failure of the Bidder to submit, as part of the Bid, the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the Bidder's Bid non -responsive and, therefore, void. Heating, Ventilation, and Air Conditioning Subcontractor Name: Plumbing Subcontractor Name: Electrical Subcontractor Name: OQ �kL­ Signature of Bidder Date 2020 Asphalt Grinding/Singh Project Number: 20-3001.2 10 February 19, 2020 CONTRACTOR'S QUALIFICATION STATEMENT (RCW 39.04.350) THE CITY WILL REVIEW THE CONTRACTOR'S RESPONSES TO THIS FORM TO DETERMINE WHETHER THE BIDDING CONTRACTOR IS RESPONSIBLE TO PERFORM THE CONTRACT WORK, THIS FORM INCLUDES CRITERIA ESTABLISHED BY STATE LAW THAT MUST BE MET TO BE CONSIDERED A RESPONSIBLE BIDDER AND QUALIFIED TO BE AWARDED THIS PUBLIC WORKS PROJECT AS WELL AS SUPPLEMENTAL CRITERIA ESTABLISHED BY THE CITY THAT ARE APPLICABLE TO THIS PUBLIC WORKS PROJECT, THE BIDDER SHOULD READ AND RESPOND TO THIS FORM CAREFULLY. Indicia of contractor's responsibility inherently involve subjective determinations as to the contractor's ability to perform and complete the contract work responsibly and to the owner city's satisfaction. The city has an obligation and a duty to its citizens and its taxpayers to administer its budgets and complete its projects in a businesslike manner. Accordingly, it has a duty to exercise the type of inquiry and discretion a business would conduct when selecting a contractor who will be responsible to perform the contract work. The city's supplemental criteria are based, in large part, on the qualification statement form used by the American Institute of Architects. The city provides these criteria so as to provide the most objective framework possible within which the city will make its decision regarding the bidder's ability to be responsible to perform the contract work. These criteria, taken together, will form the basis for the city's decision that a bidder is or is not responsible to perform the contract work. Any bidder may make a formal written request to the city to modify the criteria set forth in this qualification statement, but that request may only be made within 48 hours of the date and time that the bidder first obtains the bid documents or three (3) business days prior to the scheduled bid opening date, whichever occurs first. If the city receives a modification request, it will consider any information submitted in the request and will respond before the bid submittal deadline. If the city's evaluation results in changed criteria, the city will issue an addendum establishing the new or modified criteria. If the city determines that, based on the criteria established in this statement, a bidder is not responsible to perform the contract work, the city will provide written notice of its determination that will include the city's reason for its decision. The bidder has 24 hours from the time the city delivers written notice to the bidder that the bidder is not responsible to perform the contract work to appeal the city's determination. No appeals will be received after the expiration of this 24 hour appeal period. The city may deliver this notice by hand delivery, email, facsimile, or regular mail. In the event the city uses regular mail, the delivery will be deemed complete three days after being placed in the U.S. Mail. The bidder's right to appeal is limited to the single remedy of providing the city with additional information to be considered before the city issues a final determination. Bidder acknowledges and understands that, as provided by RCW 39.04.350, no other appeal is allowed and no other remedy of any kind or nature is available to the bidding contractor if the City determines that the bidder is not responsible to perform the contract work. 2020 Asphalt Grinding/Singh 11 February 19, 2020 Project Number: 20-3001.2 If the bidder fails to request a modification within the time allowed, or fails to appeal a determination that the bidder is not responsible within the time allowed, the city will make its determination of bidder responsibility based on the information submitted. COMPLETE AND SIGN THIS FORM AS PART OF YOUR BID. FAILURE TO PROPERLY COMPLETE THIS FORM MAY ALSO RESULT IN A DETERMINATION THAT YOUR BID IS NON -RESPONSIVE AND THEREFORE VOID. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. The undersigned certifies under oath that the information provided herein is true and sufficiently complete so as no to be misleading. J SUBMITTED BY: NAME: ADDRESS: �1? �), 011� lJ �1 1 1— -q,z PRINCIPAL OFFICE: " VkAL ADDRESS: PHONE: FAX: STATUTORY REQUIREMENTS - Per state law a bidder must meet the following responsibility criteria 1. Required Responsibility Criteria 1.1 Provide a copy of your Department of Labor and Industries certificate of registration in compliance with chapter 18.27 RCW. 1.2 Provide your current state unified business identifier number. 1.3 Provide proof of applicable industrial insurance coverage for your employees working in Washington as required in Title 51 RCW, together with an employment security department number as required in Title 50 RCW, and a state excise tax registration number as required in Title 82 RCW. Providing a copy of a state of Washington "Master License Service Registration and Licenses" form is typically sufficient evidence of the requirements of this subsection. 1.4 Provide a statement, signed by a person with authority to act and speak for your company, that your company, including any subsidiary companies or affiliated companies under majority ownership or under 2020 Asphalt Grinding/Singh 12 February 19, 2020 Project Number: 20-3001.2 control by the owners of the bidder's company, are not and have not been in the past three (3) years, disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3). 1.5 Provide a signed statement, signed under penalty of perjury by a person with authority to act and speak for your company, that within the three- year period immediately preceding the bid solicitation date, your company is not a "willful" violator as defined in RCW 49.48.082, of any provisions of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. 1.6 Provide proof that a designated person or persons with your company has either received training from the department of labor and industries or an approved training provider on the requirements related to public works and prevailing wages under chapter 39.04 RCW and 39.12 RCW or provide proof that your company has completed three or more public works projects and have had a valid business license in Washington for three or more years and are exempt from this training requirement. SUPPLEMENTAL CRITERIA — Established by the City to determine bidder responsibility 2. ORGANIZATION 2.1 How many years has your organization been in business as a Contractor? 2.2 How many years has your organization been in business under its present business name? 2.2.1 Under what other or former names has your organization operated? 2.3 If your organization is a corporation, answer the following: 2.3.1 Date of incorporation: 2.3.2 State of incorporation: 2.3.3 President's name: 2.3.4 Vice-president's name(s): 2.3.5 Secretary's name: 2.3.6 Treasurer's name: 2.4 If your organization is a partnership, answer the following: 2.4.1 Date of organization: 2.4.2 Type of partnership (if applicable): 2.4.3 Name(s) of general partner(s): 2.5 If your organization is individually owned, answer the following: 2.5.1 Date of organization: 2.5.2 Name of owner: 2020 Asphalt Grinding/Singh 13 February 19, 2020 Project Number: 20-3001.2 2.6 If the form of your organization is other than those listed above, describe it and name the principals: 3. LICENSING 3.1 List jurisdictions and trade categories in which your organization is legally qualified to do business, and indicate license numbers, if applicable. 3.2 List jurisdictions in which your organization's partnership or trade name is filed. 4. EXPERIENCE 4.1 List the categories of work that your organization normally performs with its own forces. 4.2 Claims and Suits. (If the answer to any of the questions below is yes, please attach details.) 4.2.1 Has your organization ever failed to complete any work awarded to it? 4.2.2 Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? 4.2.3 Has your organization filed any law suits or requested arbitration with regard to construction contracts within the last five years? 4.3 Within the last five years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If the answer is yes, please attach details.) 4.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of project, owner, architect or design engineer, contract amount, percent complete and scheduled completion date. 4.4.1 State total worth of work in progress and under contract: 4.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the name of project, owner, architect or design engineer, contract amount, date of completion and percentage of the cost of the work performed with your own forces. 4.5.1 State average annual amount of construction work performed during the past five years: 4.6 On a separate sheet, list the construction experience and present commitments of the key individuals of your organization. 4.7 On a separate sheet, list your major equipment. 2020 Asphalt Grinding/Singh 14 February 19, 2020 Project Number: 20-3001.2 S. REFERENCES 5.1 Trade References: 5.2 Bank References: 5.3 Surety: 5.3.1 Name of bonding company: 5.3.2 Name and address of agent: 6. FINANCING 6.1 Financial Statement. After bid opening, the City may require the following financial information from any of the three apparent low bidders. If so required, the selected bidder(s) must respond with this financial information within 24 hours of the City's request for that information. The City's request for this information shall not be construed as an award or as an intent to award the contract. A bidder's failure or refusal to provide this information may result in rejection of that bidder's bid. 6.1.1 Attach a financial statement, preferably audited, including your organization's latest balance sheet and income statement showing the following items: Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses); Net Fixed Assets; Other Assets; Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes); Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings). 6.1.2 Name and address of firm preparing attached financial statement, and date thereof: 6.1.3 Is the attached financial statement for the identical organization named on page one? 6.1.4 If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent - subsidiary). 6.2 Will the organization whose financial statement is attached act as guarantor of the contract for construction? 2020 Asphalt Grinding/Singh 15 February 19, 2020 Project Number: 20-3001.2 7. SIGNATURE 7.1 Dated at this day of I�" 2020. Name of Organization: 7.2 U 49 ft I`��,� being duly sworn, deposes and says that the information provided herein is true and sufficiently complete so as not to be misleading. Subscribed and sworn b fore me this day of �% , 2020, Notary Public: My Commission Expires: ��KpTHRy� 1�th / +OTA.9 SG N% 0 i Ava LAG ' O 1111 ; WASN;���`, 2020 Asphalt Grinding/Singh 16 February 19, 2020 Project Number: 20-3001.2 > obd CD CD orb O O a cCD C �d d �SOa. zt� O IS O w r o� z- QS()S Office of the Secretary of State Corporations & Charities Division EXPRESS ANNUAL REPORT WITHOUT CHANGES BUSINESS INFORMATION Business Name: STATEWIDE PARKING LOT SERVICE INC. UBI Number: 601 356 352 Business Type: WA PROFIT CORPORATION Business Status: ACTIVE Principal Office Street Address: 33920 211TH PL SE, AUBURN, WA, 98092-2263, UNITED STATES Principal Office Mailing Address: 33920 211TH PL SE, AUBURN, WA, 98092-2263, UNITED STATES Expiration Date: 12/31/2020 Jurisdiction: UNITED STATES, WASHINGTON Formation/Registration Date: 12/13/1991 Period of Duration: PERPETUAL Inactive Date: Nature of Business: CONSTRUCTION REGISTERED AGENT RCW 23.95.410 Filed Secretary of State State of Washington Date Filed: 11/20/2019 Effective Date: 11/20/2019 UBI #: 601 356 352 Registered Agent Street Address Mailing Address Name TODD S RAYAN 114 W MAGNOLIA, CENTRALIA, WA, 98531- PO BOX 210, CENTRALIA, WA, 98531-0000, 0000, UNITED STATES UNITED STATES GOVERNORS Title Type Entity Name First Name Last Name GOVERNOR INDIVIDUAL CHAD MC GRAW This document is a public record. For more information visit www.sos.wa.Qov/corps Work Order #: 2019112000571849 -1 Received Date: 11/20/2019 Amount Received: $0.00 2288-1 STATEWIDE PARKING LOT SERVICE INC. 33920 211 TH PL SE AUBURN WA 98092-2263 - - - -DETACH BEFORE POSTING - .- ��� STATE Off, o � � — x 2889 T STATE OF WASHINGTON Profit Corporation BUSINESS LICENSE STATEWIDE PARKING LOT SERVICE INC. 33920 211TH PL SE AUBURN, WA 98092-2263 UNEMPLOYMENT INSURANCE - ACTIVE TAX REGISTRATION - ACTIVE Issue Date: Nov 22, 2019 Unified Business ID #: 601356352 Business ID #: 001 Location: 0002 Expires: Apr 30, 2020 INDUSTRIAL INSURANCE - ACTIVE CITY ENDORSEMENTS: BELLINGHAM GENERAL BUSINESS #056655 - ACTIVE PUYALLUP GENERAL BUSINESS - NON-RESIDENT #2008760 (EXPIRES 12/31/2020) - ACTIVE LAKEWOOD GENERAL BUSINESS - NON-RESIDENT - ACTIVE ENUMCLAW GENERAL BUSINESS - NON-RESIDENT #CUST00006259 (EXPIRES 12/31/2020) - ACTIVE ISSAQUAH GENERAL BUSINESS - NON-RESIDENT #BUS06-00316 (EXPIRES 12/31/2020) - ACTIVE SUMNER GENERAL BUSINESS - NON-RESIDENT (EXPIRES 12/31/2020) - ACTIVE TUKWILA GENERAL BUSINESS - NON-RESIDENT (EXPIRES 12/31/2020) - ACTIVE FEDERAL WAY GENERAL BUSINESS - NON-RESIDENT #09-104612-00-BL (EXPIRES 12/31/2020) - ACTIVE LYNNWOOD GENERAL BUSINESS - NON-RESIDENT #006487-01-1994 (EXPIRES 12/31/2020) - ACTIVE LICENSING RESTRICTIONS: Not licensed to hire minors without a Minor Work Permit. This document lists the registrations, endorsements, and licenses authorized for the business named above. By accepting this document, the licensee certifies the information on the application was complete, true, and accurate to the best of his or her knowledge, and that business will be conducted in compliance with all applicable Washington state, county, and city regulations. Director, Department of Revenue UBI: 601356352 001 0002 STATEWIDE PARKING LOT SERVICE INC. 33920 211TH PL SE STATE OF WASHINGTON Expires: Apr 30, 2020 UNEMPLOYMENT INSURANCE - ACTIVE INDUSTRIAL INSURANCE - ACTIVE Statewide Parking lot Services, Inc. (253)630-1956 33920 2111h PI SE Auburn, WA 98092 www.statewideparkinglots.com 3/2/2020 Statewide Parking Lot Services, Inc. including any subsidiary companies or affiliated companies under majority ownership or under control by the owners of the bidder's company, are not and have not been in the past three (3) years, disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.65 (3). AAI . Chad Graw Owner Statewide Parking Lot Services, Inc. (253)630-1956 33920 2111h PI SE Auburn, WA 98092 www.statewideparkinglots.com 3/2/2020 Statewide Parking Lot Services, Inc. including any subsidiary companies or affiliated companies under majority ownership is not a "willful" violator as defined in RCW 49.48.082 of any provisions of chapters 49.46, 49.48 or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through civil judgment entered by a court of limited or general jurisdiction. Chad McGraw Owner Statewide Parking lot Services, Inc. (253)630-1956 33920 2111h PI SE Auburn, WA 98092 www.statewideparkinglots.com 3/2/2020 Statewide Parking Lot Services, Inc. has been in business for 29 years. We have completed over 3 public works projects and have had a valid business license in Washington for 3 or more years. Public works -many jobs for King County Library, City of Auburn, City of Seattle and Seattle Parks (please ask for references if need be). Chad McGraw L' Owner Statewide Parking Lot Services, Inc. (253)630-1956 33920 2111h PI SE Auburn, WA98092 t www.statewideparkinglots.com 2.1 29 years 2.2 29 years 2.2.1 none 2.3 yes, it is a corporation 2.3.1 1991 2.3.2 Washington 2.3.3 Chad McGraw 2.3.4 Chad McGraw 2.3.5 Chad McGraw 2.3.6 Chad McGraw 2.4 n/a 2.5 n/a 2.6 n/a 3.1 Washington and Oregon 3.2 Washington and Oregon 4.1 Parking lot cleaning, grinding, asphalt, concrete, seal coating and striping 4.2 No 4.2.1 no 4.2.2 no 4.2.3 no 4.3 no 4.4 AA Asphalting, various patch work for PSE, $150,000/monthly, on -going City of Seattle (Seattle Parks & Rec), $150,000 expected completion 7/1/2020 Fred Meyer, Beaverton, $1,000,000 expected completion 6/1/2020 Misc. small jobs on the schedule, $250,000 4.4.1 Approx. $1,500,000 4.5 Boeing snow damage $300,000 completion 4/1/2019 Fred Meyer, Canby $995,000 completion 6/15/2019 Fred Meyer, Gresham, $485,000 completion 9/1/2019 Kimco, various locations, $750,000 completion 10/1/2019 AA Asphalting -various patching for PSE, $500,000 4.5.1 Average annual amount: $6,000,000 4.6 Chad McGraw-Owner/Co-owner and Estimator for 29 years Chad Jordison-General Manager 3 year Dave Chamberlin -Superintended for 17 years Sarah Long -Operations Manager for 6 years Eric Kizziah-Asphalt Foreman for 15 years 4.7 See attached equipment list 5.1 Brent Collins -City of Kent-253-856-5600 Tim Anderson -Fred Meyer-503-550-0122 Terri Mezgebu-425-274-6819 Boeing -Ray Rimorin-425-330-1807 5.2 Chase -Kale Wahler-425-590-4628 Year Mfg Model Description 2007 Wacker Plate Compactor 2013 18" Cold Planer 2009 SP9950 V IN SnowEx Salt Spreader 2012 Cold Planer 30" Case 30" Cold Planner 2013 Bomac BM1300 52" grinder 2014 Volvo ECR88 Excavator 2017 Case DV36 Asphalt Roller 2017 30" cold planner 2016 Pressure Pi 3500 Steam Cleaners 2017 Compact P 5300 Leeboy Paver Plate Compactor 2018 John Deere 35G Compact Excavator 2018 Dynapac CC1000 Asphalt Compactor 2018 Dynapac CC900 Ashpalt Compactor 2018 John Deere 60G Excavator 2017 Bomag 1300/30 Grinder 2018 Carlson CP100-II Deluxe Paver 2019 Case TV450 Loader Serial # 7576 C11953 M 1-150409 C12107 C12107 B M 1300071 428 N H NTV0117 C12911 & 3997 16-11459-REAR 5300-172524 BGF124992 1FF035GXAHK281355 10000360KJA021781 10000358UA021777 1FF060GXCJJ289443 83600054 537CB8T KN M459801 5.3 Surety 5.3.1. Bonding Company -Western National Insurance 5.3.2. Julie Cracker Hentschell & Associates, Inc. 1436 So. Union Avenue Tacoma, Washington 98405-1925 BIDDER RESPONSIBILITY CRITERIA Statement that Bidder Has Not Been Disqualified This statement is required by state law (RCW 39.04.350(1)(d)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (March 10, 2020), the bidder has not been disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). Bidder's -Busin ss Name Signature of Authorized Official* Chi Printed Name Title Date City State * If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co -partnership, proposal must be executed by a partner. 2020 Asphalt Grinding/Singh 17 February 19, 2020 Project Number: 20-3001.2 BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (March 10, 2020), the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. S11I Bidder's Business Name LJG Signature f Authorized Official* ft 0 �W4 Printed Name Title h- Olt � �4/ YV\- Date City State * If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co -partnership, proposal must be executed by a partner. 2020 Asphalt Grinding/Singh 18 February 19, 2020 Project Number: 20-3001.2 PROPOSAL SIGNATURE PAGE The undersigned bidder hereby proposes and agrees to start construction work on the Contract, if awarded to him/her, on or before ten (10) calendar days from the date of the Notice to Proceed, and agrees to complete the Contract by October 16, 2020. The undersigned bidder hereby agrees to submit all insurance documents, performance bonds and signed contracts within ten (10) calendar days after City awards the Contract. The City anticipates issuance of the Notice to Proceed on the day of the preconstruction meeting. No bidder may withdraw his/her bid for a period of sixty (60) calendar days after the day of bid opening. The required bid security consisting of a bid bond, cashier's check or cash in an amount equal to 5% of the total amount is hereto attached. Notice of acceptance of this bid or request for additional information shall be addressed to the undersigned at the address stated below. Receipt of Addendum No.'s to the plans and/or specifications is hereby acknowledged. Failure to acknowledge receipt of the addenda may be considered an irregularity in this proposal. By signing this Proposal Signature Page, the undersigned bidder agrees to accept all contract forms and documents included within the bid packet and to be bound by all terms, requirements and representations listed in the bid documents whether set forth by the City or by the Bidder. DATE NAME O ° BII� ER � Sign ure of Aut orized Representative , (Print Name and Titlbm'e)11 js�- Addres 6,N), LA/4 2020 Asphalt Grinding/Singh 19 February 19, 2020 Project Number: 20-3001.2 lk".161 0 1 11111AW91 KNOW ALL MEN BY THESE PRESENTS: That we, Statewide Parking Lot Services, Inc. , as Principal, and Western National Mutual Insurance Company , as Surety, are held and firmly Five Percent (5%) of the - bound unto the CITY OF KENT, as Obligee, In the penal SUM Of Total Amount Bid Dollars, for the payment of which the Principal and the Surety bond themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. The condition of this obligation is such that if the Obligee shall make any award to the Principal for 2020 Asphalt Grinding/Project Number: 20-3001.2 According to the terms of the proposal or bid made by the Principal thereof, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the invitation to bid, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damaged, the amount of this bond. SIGNED, SEALED AND DATED THIS 10th DAY OF March 2020. Statewide arki Lot Services, Inc. > By. -,- PRINCIPAL c s, aa,reer: 9 ,. *.. Western National Mutual Insurance Comgan�'�� r,�4�•+,'•, By: SUR Y Julie Craker, Attorney-inia—v J 9 A' .•.. ! . `y. i Received return of deposit in the sum of 2020 Asphalt Grinding/Singh 20 February 19, 2020 Project Number: 20-3001.2 W WESTERN NATIONAL 7rie minrinnship nmiPany POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Western National Mutual Insurance Company, a Minnesota mutual insurance company, does make, constitute and appoint: Julie Craker, Joanne Reinkensmeyer and Thomas Hentschell (Hentschell & Associates, Inc. #9445) Its true and lawful Attorney(s)-in-Fact, with full power and authority for and on behalf of the Company as surety, to execute and deliver and affix the seal of the Company thereto (if a seal is required) bond, undertakings recognizances or other written obligations in the nature thereof, (other than bail bonds, bank depository bonds, mortgage deficiency bonds, mortgage guaranty bonds, guarantees of installment paper and note guaranty bonds, self-insurance workers compensation bonds guaranteeing payment of benefits, hazardous waste remediation bonds or black lung bonds), as follows: All written instruments in an amount not to exceed an aggregate of Seven Million Five Hundred Thousand and 00/100 ($7,500,000) for any single obligation, regardless of the number of instruments issued for the obligation. and to bind Western National Mutual Insurance Company thereby, and all of the acts of said Attorneys -in -Fact, pursuant to these presents, are ratified and confirmed. This appointment is made under and by authority of the board of directors at a meeting held on September 28, 2010. This Power of Attorney is signed and sealed by facsimile under and by the authority of the following resolutions adopted by the board of directors of Western National Mutual Insurance Company on September 28, 2010: - RESOLVED that the president, any vice president, or assistantvce president in conjunction with the secretary or anyAisistant secretary, may appoint attorneys -in -fact or agents with authority as defined or limited in the instrument evidencing the appointment h each case, for and on behalf of the company to execute and deliver and affix the seal of the Company to bonds, undertakings, recognizances, and suretyship obligations of all kinds, and said officers may remove any such attorney -in -fact or agent and revoke any Power of Attorney previously granted to such person. RESOLVED FURTHER that any bond, undertaking, recognizance, or suretyship obligation shall be valid and binding upon the Company (i) when signed by the president, any vice president or assistant vice president, and attested and sealed (if a seal be required) by any secretary or assistant secretary; or (ii) when signed by the president, any vice president or assistant vice president, secretary or assistant secretary, and countersigned and sealed (if a seal be required) by a duly authorized attorney -in -fact or agent-, or (iii) when duly executed and sealed (if a seal be required) by one or more attorneys -in -fact or agents pursuant to and within the limits of the authority evidenced by the Power of Attorney issued by the Company to such person or persons. RESOLVED FURTHER that the signature of any authorized officer and the seal of the company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company-, and such signature and seal when so used shall have the same force and effect as though manually affixed. IN WITNESS WHEREOF, Western National Mutua insurance Company has caused these presents to be signed by if proper officer and its corporate seal to be affixed this 16th day of December 2015. P ONPPSE Jon R. Hebeisen, Secretary Larry A. Byers, Sr. Vice President STATE OF MINNESOTA, COUNTY OF DAKOTA On this 16th day of December, 2015, personally came before me, Jon R. Hebeisen and Larry A. Byers and to me known to be the individuals and officers of the Western National Mutual Insurance Company who executed the above instrument, and they each acknowledged the execution of the same, and being by me duly sworn, did severally dispose and say-, that they are the said officers of the corporation aforesaid, and that the seal affixed to the above instrument is the seal of the corporation, and that said corporate seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority of the board of directors of said corporation. JENNIFER A YOUNG "itiTARY PUBLIC - MINNESOTA MY COMMISS GIN EXPIRES 01,1312021 Jennifer A. Young, Notary Public My commission expires January 31,2021 CERTIFICATE I, the undersigned, assistant secretary of the Western National Mutual Insurance Company, a Minnesota corporation, CERTIFY that the foregoing and attached Power of Attorney remains in full force and has not been revoked-, and furthermore, that the Resolutions cf the board of directors set forth in the Power of Attorney, are now in force. Signed and sealed at the City of Edina, MN this `` g y � �-�� day of r� U �6 Jennifer A. Young, Assistan+. Saaeta, y . C 00 C _ Y a o °' o f 3— ° c V 0 Q C a N a Y^ o °: o f v 3— ° .. r v s o w a aCL p 0 _o v a� 3 aLLrn ¢ pi LL Q co oi O Od N o -a O O uaO la7 -� o t>> S V Q Q m:D E ua Q QN � F H Q Ya . . . . . . . . . . . . . Y a . . . . . . . . . . . . . Y O O c L Y m Y _ 0 o CL Y a 0 o E 3= .. Q o o Y a S.o a"3 a"ta` ¢ ac v - i.o a« o �' c !� c o v `c n v .n �i E c '« c '� o o o vi w F H U : C -o E c `u '0 0 c c y r [2>> = V Q Q O Q F- 2 2 Q F L i CITY OF KENT COMBINED DECLARATION FORM: NON -COLLUSION, MINIMUM WAGE NON -COLLUSION DECLARATION I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States that the following statements are true and correct: umb 1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. 2. That by signing the signature page of this proposal, I am deemed to have signed and to have agreed to the provisions of this declaration. MINIMUM WAGE AFFIDAVIT FORM I, the undersigned, having duly sworn, deposed, say and certify that in connection with the performance of the work of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of such work not less than the prevailing rate of wage or not less than the minimum rate of wage as specified in the principal contract; that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. 2020 Asphalt Grinding Project Number: 20-3001.2 SIGNATUR'f OF A NAME OF PROJECT NAME OF BIDDER'S FIRM ORIZEO REPRESENTATIVE OF BIDDER 2020 Asphalt Grinding/Singh 21 February 19, 2020 Project Number: 20-3001.2 This change order form is for example purposes only. By submitting a bid, the bidder agrees to be bound by the terms of this change order form for any change orders. CHANGE ORDER NO. [Enter # 1, 2, 3, etc.] NAME OF CONTRACTOR: [Insert Company Name] ("Contractor") CONTRACT NAME & PROJECT NUMBER: [Insert Name of Original Contract & Project #, if applicable] ORIGINAL CONTRACT DATE: [Insert Date Original Contract was Signed] This Change Order amends the above -referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: [Insert detailed description of additional materials, services, etc., that are needed which necessitate this change order - Be as detailed as possible. You may also refer to an attached exhibit, but clearly identify the exhibit by title and date] 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $ (including applicable alternates and WSST) Net Change by Previous Change Orders $ (incl. applicable WSST) Current Contract Amount $ (incl. Previous Change Orders) Current Change Order $ Applicable WSST Tax on this Change Order $ Revised Contract Sum $ 2020 Asphalt Grinding/Singh 22 February 19, 2020 Project Number: 20-3001.2 Original Time for Completion (insert date) Revised Time for Completion under prior Change Orders (insert date) Days Required (f) for this Change working days Order Revised Time for Completion (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent Special Provisions and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above -referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: ( 'gnat e) j 66Z'- (signature) Print Name: � 0 /�1JtN Print Name: Timothy J. LaPorte, P.E. Its rt)4 A-� A �:44 --- Its Public Works Director (title) DATE: ZU v (title) DATE: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department 2020 Asphalt Grinding/Singh 23 February 19, 2020 Project Number: 20-3001.2 BIDDER'S CHECKLIST The following checklist is a guideline to help the Contractor make sure all forms are complete. The bidder's attention is especially called to the following forms. Failure to execute these forms as required may result in rejection of any bid. Bidder's Package should include the following: Bid Document Cover Sheet filled out with Bidder's Name ....................❑ Orderof Contents................................................................................. ❑ Invitationto Bid................................................................................... ❑ Contractor Compliance Statement........................................................ ❑ Date............................................................................................ ❑ Have/have not participated acknowledgment .............................❑ Signature and address................................................................❑ Declaration - City of Kent Equal Employment Opportunity Policy ........❑ Date and signature..................................................................... ❑ AdministrativePolicy........................................................................... ❑ Proposal............................................................................................... ❑ First line of proposal - filled in ................................................... ❑ Unit prices are correct................................................................❑ Bid the same unit price for asterisk (*) bid items .......................❑ Subcontractor List (contracts over $100K)..........................................❑ Subcontractors listed properly .................................................... ❑ Signature.................................................................................... ❑ Subcontractor List (contracts over $1 million) .....................................❑ Subcontractors listed properly ....................................................❑ Date and signature..................................................................... ❑ Contractor's Qualification Statement ................................................... ❑ Complete and notarized..............................................................❑ Statement that Bidder Has Not Been Disqualified ................................❑ Certification of Compliance with Wage Payment Statutes ....................❑ Proposal Signature Page......................................................................❑ All Addenda acknowledged......................................................... ❑ Date, signature and address....................................................... ❑ BidBond Form..................................................................................... ❑ Signature, sealed and dated .......................................................❑ Powerof Attorney....................................................................... ❑ (Amount of bid bond shall equal 50/o of the total bid amount) Combined Declaration Form................................................................. ❑ Signature.................................................................................... ❑ ChangeOrder Form.............................................................................. ❑ Bidder's Checklist................................................................................ ❑ The following forms are to be executed after the Contract is awarded: A) CONTRACT This agreement is to be executed by the successful bidder. B) PAYMENT AND PERFORMANCE BOND To be executed by the successful bidder and its surety company. The following form is to be executed after the Contract is completed: A) CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT To be executed by the successful bidder AFTER COMPLETION of this contract. 2020 Asphalt Grinding/Singh 24 February 19, 2020 Project Number: 20-3001.2 N Bond No. 39028 PAYMENT AND PERFORMANCE BOND KENT TO CITY OF KENT WAsk.'NO7PN KNOW ALL MEN BY THESE PRESENTS: That we, the undersigned, Statewide Parking Lot Services, Inc. as Principal, and western National Mutual Insurance Company a Corporation organized and existing under the laws of the State of Washington, as a Surety Corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of $85,265.00 , together with any adjustments, up or down, in the total contract price because of changes in the contract work, for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. This obligation is entered into in pursuance of the statutes of the State of Washington, and the Codes and Ordinances of the CITY OF KENT. Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to a motion, duly made, seconded and passed by the City Council of the City of Kent, King County, Washington, the Mayor of the City of Kent has let or is about to let to the above bounden Principal, a certain contract, the said contract providing for construction of 2020 Asphalt Grinding/Project Number: 20-3001.2 (which contract is referred to herein and is made a part hereof as though attached hereto), and WHEREAS, the Principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for in the manner and within the time set forth: NOW, THEREFORE, for non-FHWA projects only, if the Principal shall faithfully perform all the provisions of said contract in the manner and within the time herein set forth, or within such extensions of time as may be granted under the said contract, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work and shall indemnify and hold the CITY OF KENT harmless from any damage or expense by reason of failure of performance as specified in said contract or from defects appearing or developing in the material or workmanship provided or performed under said contract, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their separate seals. The name and corporate seal (if required by law) of each corporate party is hereto affixed and duly signed by its undersigned representatives pursuant to authority of its governing body. 2020 Asphalt Grinding/Singh 25 February 19, 2020 Project Number: 20-3001.2 Xil TWO WITNESSES: lleo7j 'mot of PRINT NAME DATE: 3— a3 ` aQ .ORPORATE SEAL: � "•. , y Statewide Parking Lot Services, Inc. PRINCIPAL (enter principal's name above) BY: TITLE: VI DATE: ►I 1-2 CORPORATE SEAL: Western National Mutual Insurance Company SURETY BY: Ju ie Craker DATE: 03/23/2020 TITLE: Attorney -in -Fact ADDRESS: PO Box 1463 Minneapolis, MN 55440 CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) cre ar f t eCorporation named as Principal in the within Bond; that rl Who signed the said bond on behalf of the Principal �- of the said Corporation; that I know his signature theret6 is genuine, and that said Bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. SECRETARY OR ASSISTANT SECRETARY 2020 Asphalt Grinding/Singh 26 February 19, 2020 Project Number: 20-3001.2 W WasTQRN NATIONAL The nWirt hip—.P..y POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Western National Mutual Insurance Comfy, a Minnesota mutual insurance company, does make, constitute and appoint: Julie Craker, Joanne Reinkensmeyer and Thomas Hentschell (Hentschell & Associates, Inc. #9445) Its true and lawful Attorney(s)-in-Fact, with full power and authority for and on behalf of the Company as surety, to execute and deliver and affix the seal of the Company thereto (if a seal is required) bond, undertakings recognizances or other written obligations in the nature thereof, (other than bail bonds, bank depository bonds, mortgage deficiency bonds, mortgage guaranty bonds, guarantees of installment paper and note guaranty bonds, self-insurance workers compensation bonds guaranteeing payment of benefits, hazardous waste remediation bonds or black lung bonds), as follows: All written instruments in an amount not to exceed an aggregate of Seven Million Five Hundred Thousand and 00/100 ($7,500,000) for any single obligation, regardless of the number of instruments issued for the obligation. and to bind Western National Mutual Insurance Company thereby, and all of the acts of said Attorneys -in -Fact, pursuant to these presents, are ratified and confirmed. This appointment is made under and by authority of the board of directors at a meeting held on September 28, 2010. This Power of Attorney is signed and sealed by facsimile under and by the authority of the following resolutions adopted by the board of directors of Western National Mutual Insurance Company on September 28, 2010: RESOLVED that the president, any vice president, or assistant vice president in conjunction with the secretary or any assistant secretary, may appoint attorneys -in -fact or agents with authority as defined or limited in the Instrument evidencing the appointment in each case, for and on behalf of the company to execute and deliver and affix the seal of the Company to bonds, undertakings, recognizances, and suretyship obligations of all kinds, and said officers may remove any such attorney -in -fact or agent and revoke any Power of Attorney previously granted to such person. RESOLVED FURTHER that any bond, undertaking, recognizance, or suretyship obligation shall be valid and binding upon the Company (i) when signed by the president, any vice president or assistant vice president, and attested and sealed (if a seal be required) by any secretary or assistant secretary; or (ii) when signed by the president, any vice president or assistant vice president, secretary or assistant secretary, and countersigned and sealed (if a seal be required) by a duly authorized attorney -in -fact or agent; or (iii) when duly executed and sealed (if a seal be required) by one or more attorneys -in -fact or agents pursuant to and within the limits of the authority evidenced by the Power of Attorney issued by the Company to such person or persons. RESOLVED FURTHER that the signature of any authorized officer and the seal of the company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship -obligations of the Company; and such signature and seal when so used shall have the same force and effect as though manually affixed. 1NITNESS WHEREOF, Western National Mutual Insurance Company has caused these presents to be signed by its proper officer and corporate seal to be affixed this 16th day of December , 2015. •SEALa Jon R. Hebeisen, Secretary Larry A. Byers, Sr. Vice President STATE OF MINNESOTA, COUNTY OF DAKOTA On this 16th day of December_ 2015, personally came before me, Jon R. Hebeisen and Larry A. Byers and to me known to be the individuals and officers of the Western National Mutual Insurance Company who executed the above instrument, and they each acknowled_qed the execution of the same, and being by me duly sworn, did severally dispose and say; that they are the said officers of the corporation aforesaid, and that the seal affixed to the above instrument is the seal of the corporation, and that said corporate seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority of the board of directors of said corporation. r..�....re...md. JENNIFER A YOUNG NOTARY PUBLIC • MINNESOTA MY COMMISSION EXPIRES 01,111 02' Jennifer A. Young, Notary Public My commission expires January 31,2021 CERTIFICATE I, the undersigned, assistant secretary of the Western National Mutual Insurance Company, a Minnesota corporation, CERTIFY that the foregoing and attached Power of Attorney remains in full force and has not been revoked; and furthermore, that the Resolutions of the bioara of directors set forth in the Power of Attorney, are now in force. 'AL: Signed and sealed at the City of Edina, MN this,` day of Ch ' �t Jennifer A. Young, Assistant Secretary C s L O O m C Y a A c a E W V N y a CLp o .a F- 9 4 t L m Y Cq 3 LL t7 c Y'v LoC a a ¢ i a v��� w U C y Ya.............' L y a o 0 rao O N C C' a O� C O C Y• U a 0kE cu.> C.y O S V ¢¢v�iFw��FF�� C CONTRACT THIS AGREEMENT, is entered into T weenh CITY OF KE_ ITT, a Washington municipal corporation (`City"), and3 YV organized under the -laws of he S t f , located and doing business at <tq WAAN VAG ("Contractor"). WITNESS: In consideration of the terms and conditions contained in this Agreement and in the project documents, plans, and specifications all of which are a part of this Agreement, the parties agree as follows: The Contractor shall do all work and furnish all tools, materials, and equipment for: 2020 Asphalt Grinding/Project Number: 20-3001.2 in accordance with and as described in the Contract and shall perform any alterations in or additions to the work provided under the Contract and every part thereof. The Contract shall include all project specifications, provisions, and plans; the City's general and special conditions; the 2020 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations, if applicable ("Standard Specifications"); the City's bid documents; and the Contractor's response to the City's bid. The Contractor is responsible to obtain copies of the 2020 WSDOT Standard Specifications including the latest amendments issued by WSDOT as of the date of bid opening. Unless otherwise directed by the City, work shall start within ten (10) days after the City issues its Notice to Proceed and be completed by October 16, 2020. The Contractor shall provide and bear all expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing all the work provided for in the Contract, except where the specifications allocate that responsibility to the City. 2. The City hereby promises and agrees with the Contractor to employ, and does employ, the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the Contract and the terms and conditions herein contained and hereby contracts to pay for the same according to the Contract and the schedule of unit or itemized prices provided by Contractor in its response to the City's bid, at the time and in the manner and upon the conditions provided for in the Contract. 3. The Contractor for itself, and for its heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all covenants herein contained upon the part of the Contractor. 4. It is further provided that no liability shall attach to the City by reason of entering into this contract, except as expressly provided herein. 2020 Asphalt Grinding/Singh 27 February 19, 2020 Project Number: 20-3001.2 5. Contractor shall defend, indemnify, and hold the City, its officers, officials, employees, agents, volunteers and assigns harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this contract, except for injuries and damages caused by the sole negligence of the City. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this contract. 6. Contractor agrees, upon the City's written demand, to make all books and records available to the City for inspection, review, photocopying, and audit in the event of a contract related dispute, claim, modification, or other contract related action at reasonable times (not to exceed three (3) business days) and at places designated by the City. 7. The Contractor shall procure and maintain, during the term of construction and throughout the specified term of maintenance, insurance of the types and in the amounts described in Exhibit A attached and incorporated by this reference. 8. Contractor is responsible for locating any underground utilities affected by the work and is deemed to be an excavator for purposes of RCW Ch. 19.122, as amended. Contractor shall be responsible for compliance with RCW Ch. 19.122, including utilization of the "one call" locator service before commencing any excavation activities. 2020 Asphalt Grinding/Singh 28 February 19, 2020 Project Number: 20-3001.2 CITY OF KENT BY: DANA RALPH, MAYOR DATE: LA' q ( L 0 ATTJEST: , "aL 0 - KE uc" KIMBERL A. KOMOTO, CITY CLERK APPROVED AS TO FORM: KENT LAW DEPARTMENT CONTRACTOR BY: 0, 1) V m [!/,A v, av PRINT NAME: 2020 Asphalt Grinding/Singh 29 February 19, 2020 Project Number: 20-3001.2 EXHIBIT A INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 or its equivalent, with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. The Commercial General Liability insurance shall be endorsed to provide the Aggregate per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an Additional Insured under the Contactor's Commercial General Liability insurance policy with respect to the work performed for the City. All endorsements adding Additional Insureds shall be issued on form CG 20 10 11 85 or a form deemed equivalent, providing the Additional Insureds with all policies and endorsements set forth in this section. 2. Automobile Liability insurance covering all owned, non -owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. 2020 Asphalt Grinding/Singh 30 February 19, 2020 Project Number: 20-3001.2 L-A EXHIBIT A (Continued) 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Contractor's Insurance for other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. ..y The Contractor and the City waive all rights against each other any of their Subcontractors, Sub -subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. 2020 Asphalt Grinding/Singh 31 February 19, 2020 Project Number: 20-3001.2 EXHIBIT A (Continued) Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. 2020 Asphalt Grinding/Singh 32 February 19, 2020 Project Number: 20-3001.2 A�Rbr CERTIFICATE OF LIABILITY INSURANCE FDATE (MMIDD NYY 20Y) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Terri McDonald PHONE (253) 272-1151 FAX (253)2/2-1225 A/C No Ext : A/C, No HENTSCHELL & ASSOC INC 1436 S. Union Ave. EMAIL terrim@hentschell.com ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # INSURERA:The Travelers Indemnity Co 25666 Tacoma WA 98405-1925 INSURED INSURERB:The Charter Oak Fire Insurance Co. 25615 INSURER C: Travelers Property Casualty Co of Am 25674 Statewide Parking Lot Services, Inc. INSURER D: Westchester Surplus Lines Co. 10172 33920 211th Place S E INSURER E : INSURER F: Auburn WA 98092 COVERAGES CERTIFICATE NUMBER: GL/AU/XS/Prof/Poll REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FORTH E POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF MM/DD/YYYY POLICY EXP MM/DD/YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A CLAIMS -MADE ❑X OCCUR DAMAGE(RENTED PREMISESS Ea occurrence $ 300,000 X MED EXP(Any one person) S 10,000 Employers Liability X C06N483325 9/15/2019 9/15/2020 (WA Stop Gap) PERSONAL BADV INJURY $ 1,000,000 GEN'LAGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 PRO- LOC POLICY 7 JECT PRODUCTS - COMP/OPAGG $ 2,000,000 Employee Benefits $ 1,000,000 OTHER. AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident S 1,000,000 X BODILY INJURY (Per person) S $ ANYAUTO ALL OWNED SCHEDULED AUTOS AUTOS X 810911455013 9/15/2019 9/I5/2020 BODILY INJURY (Per accident) $ NON -OWNED HIREDAUTOS AUTOS PROPERTY DAMAGE Per accident $ Medical payments $ X UMBRELLALIAB x OCCUR EACH OCCURRENCE $ 2,000,000 AGGREGATE $ 2,000,000 C EXCESS LAB CLAIMS -MADE DED I X I RETENTION S 10,000 $ CUP3L408901 9/15/2019 9/15/2020 WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN PERT X OTH- STUTE ER E.L. EACH ACCIDENT $ ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? ❑NIA WASHINGTON STATE FUND E.L. DISEASE - EA EMPLOYEE S (Mandatory in NH) If yes, describe under E.L. DISEASE -POLICY LIMIT $ DESCRIPTION OF OPERATIONS below D Poll/Prof/ Ded $5,000 G24318060008 9/15/2019 9/15/2020 Agg/Occur 2mil/lmil C Installation Floater 602545123 8/21/2019 9/15/2020 Limit/Ded 50,000/1,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Re: R20112 grinding contract CERTIFICATE HOLDER CANCELLATION NYoshitake@kentwa.gov City of Kent 220 Fourth Ave Kent, WA 98032 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE erri McDonald/TDM u 4 ,1 �'dk 1988-2014 ACORD ACORD 25 (2014/01) The ACORD name and logo are registered marks of ACORD INS025 (201401) All rinhtc rpsprvarl COMMENTS/REMARKS Blanket Additional Insured applies when called for by written contract or agreement per forms CGD246 (04-19); CGD316 (02-19); CAT474 (08-17) AND CAT353 (08-17). Excess follows form. I OFREMARK COPYRIGHT 2000, AMS SERVICES INC. I COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO EXTENSION ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. GENERAL DESCRIPTION OF COVERAGE — This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general coverage description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this endorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered. A. BROAD FORM NAMED INSURED B. BLANKET ADDITIONAL INSURED C. EMPLOYEE HIRED AUTO D. EMPLOYEES AS INSURED E. SUPPLEMENTARY PAYMENTS — INCREASED LIMITS F. HIRED AUTO — LIMITED WORLDWIDE COVERAGE — INDEMNITY BASIS G. WAIVER OF DEDUCTIBLE — GLASS PROVISIONS A. BROAD FORM NAMED INSURED The following is added to Paragraph A.1., Who Is An Insured, of SECTION II — LIABILITY COVERAGE: Any organization you newly acquire or form during the policy period over which you maintain 50% or more ownership interest and that is not separately insured for Business Auto Coverage. Coverage under this provision is afforded only until the 180th day after you acquire or form the organization or the end of the policy period, whichever is earlier. B. BLANKET ADDITIONAL INSURED The following is added to Paragraph c. in A.1., Who Is An Insured, of SECTION II — LIABILITY COVERAGE: This includes any person or organization who you are required under a written contract or agreement between you and that person or organization, that is signed by you before the "bodily injury" or "property damage" occurs and that is in effect during the policy period, to name H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF USE — INCREASED LIMIT I. PHYSICAL DAMAGE — TRANSPORTATION EXPENSES — INCREASED LIMIT J. PERSONAL EFFECTS K. AIRBAGS L. NOTICE AND KNOWLEDGE OF ACCIDENT OR LOSS M. BLANKET WAIVER OF SUBROGATION N. UNINTENTIONAL ERRORS OR OMISSIONS as an additional insured for Liability Coverage, but only for damages to which this insurance applies and only to the extent of that person's or organization's liability for the conduct of another "insured". C. EMPLOYEE HIRED AUTO 1. The following is added to Paragraph A.1., Who Is An Insured, of SECTION II — LIABILITY COVERAGE: An "employee" of yours is an "insured" while operating an "auto" hired or rented under a contract or agreement in that "employee's" name, with your permission, while performing duties related to the conduct of your business. 2. The following replaces Paragraph b. in B.5., Other Insurance, of SECTION IV — BUSINESS AUTO CONDITIONS: b. For Hired Auto Physical Damage Coverage, the following are deemed to be covered "autos" you own: CA T3 53 08 17 © 2016 The Travelers Indemnity Company. All rights reserved. Page 1 of 4 Includes copyrighted material of Insurance Services Office, Inc. with its permission COMMERCIAL AUTO (1) Any covered "auto" you lease, hire, liability company) or members of their rent or borrow; and households. (2) Any covered "auto" hired or rented by (1) With respect to any claim made or "suit" your "employee" under a contract in brought outside the United States of that individual "employee's" name, America, the territories and possessions with your permission, while of the United States of America, Puerto performing duties related to the Rico and Canada: conduct of your business. (a) You must arrange to defend the However, any "auto" that is leased, hired, "insured" against, and investigate or rented or borrowed with a driver is not a settle any such claim or "suit" and covered "auto". keep us advised of all proceedings D. EMPLOYEES AS INSURED and actions. The following is added to Paragraph A.1., Who Is (b) Neither you nor any other involved An Insured, of SECTION II — LIABILITY "insured" will make any settlement COVERAGE: without our consent. Any "employee" of yours is an "insured" while (c) We may, at our discretion, participate using a covered "auto" you don't own, hire or in defending the "insured" against, or borrow in your business or your personal affairs. in the settlement of, any claim or "suit". E. SUPPLEMENTARY PAYMENTS — INCREASED LIMITS (d) We will reimburse the "insured": 1. The following replaces Paragraph A.2.a.(2), (i) For sums that the "insured" of SECTION II — LIABILITY COVERAGE: legally must pay as damages because of "bodily injury" or (2) Up to $3,000 for cost of bail bonds "property damage" to which this (including bonds for related traffic law insurance applies, that the violations) required because of an "insured" pays with our consent, "accident" we cover. We do not have to but only up to the limit described furnish these bonds. in Paragraph C., Limit Of 2. The following replaces Paragraph A.2.a.(4), Insurance, of SECTION II — of SECTION II — LIABILITY COVERAGE: LIABILITY COVERAGE; (4) All reasonable expenses incurred by the (ii) For the reasonable expenses "insured" at our request, including actual incurred with our consent for your loss of earnings up to $500 a day investigation of such claims and because of time off from work. your defense of the "insured" F. HIRED AUTO — LIMITED WORLDWIDE against any such "suit", but only COVERAGE — INDEMNITY BASIS up to and included within the limit The following replaces Subparagraph e. in described in Paragraph C., Limit Paragraph B.7.. Policy Term, Coverage Of Insurance, of SECTION II — Territory, of SECTION IV — BUSINESS AUTO LIABILITY COVERAGE, and not CONDITIONS: in addition to such limit. Our duty e. Anywhere in the world, except any country or to make such payments ends jurisdiction while any trade sanction, when we have used up the embargo, or similar regulation imposed by the applicable limit of insurance in United States of America applies to and payments for damages, prohibits the transaction of business with or settlements or defense expenses. within such country or jurisdiction, for Liability (2) This insurance is excess over any valid Coverage for any covered "auto" that you and collectible other insurance available lease, hire, rent or borrow without a driver for to the "insured" whether primary, excess a period of 30 days or less and that is not an contingent or on any other basis. "auto" you lease, hire, rent or borrow from (3) This insurance is not a substitute for any of your "employees", partners (if you are required or compulsory insurance in any a partnership), members (if you are a limited country outside the United States, its Page 2 of 4 O 2016 The Travelers Indemnity Company. All rights reserved. CA T3 53 08 17 Includes copyrighted material of Insurance Services Office, Inc. with its permission territories and possessions, Puerto Rico and Canada. You agree to maintain all required or compulsory insurance in any such country up to the minimum limits required by local law. Your failure to comply with compulsory insurance requirements will not invalidate the coverage afforded by this policy, but we will only be liable to the same extent we would have been liable had you complied with the compulsory insurance requirements. (4) It is understood that we are not an admitted or authorized insurer outside the United States of America, its territories and possessions, Puerto Rico and Canada. We assume no responsibility for the furnishing of certificates of insurance, or for compliance in any way with the laws of other countries relating to insurance. G. WAIVER OF DEDUCTIBLE — GLASS The following is added to Paragraph D., Deductible, of SECTION III — PHYSICAL DAMAGE COVERAGE: No deductible for a covered "auto" will apply to glass damage if the glass is repaired rather than replaced. H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF USE — INCREASED LIMIT The following replaces the last sentence of Paragraph AA.b.. Loss Of Use Expenses, of SECTION III — PHYSICAL DAMAGE COVERAGE: However, the most we will pay for any expenses for loss of use is $65 per day, to a maximum of $750 for any one "accident'. I. PHYSICAL DAMAGE — TRANSPORTATION EXPENSES — INCREASED LIMIT The following replaces the first sentence in Paragraph A.4.a., Transportation Expenses, of SECTION III — PHYSICAL DAMAGE COVERAGE: We will pay up to $50 per day to a maximum of $1,500 for temporary transportation expense incurred by you because of the total theft of a covered "auto" of the private passenger type. J. PERSONAL EFFECTS The following is added to Paragraph AA., Coverage Extensions, of SECTION III — PHYSICAL DAMAGE COVERAGE: COMMERCIAL AUTO Personal Effects We will pay up to $400 for "loss" to wearing apparel and other personal effects which are: (1) Owned by an "insured"; and (2) In or on your covered "auto". This coverage applies only in the event of a total theft of your covered "auto". No deductibles apply to this Personal Effects coverage. K. AIRBAGS The following is added to Paragraph B.3., Exclusions, of SECTION III — PHYSICAL DAMAGE COVERAGE: Exclusion 3.a. does not apply to "loss" to one or more airbags in a covered "auto" you own that inflate due to a cause other than a cause of "loss" set forth in Paragraphs A.1.b. and A.1.c., but only: a. If that "auto" is a covered "auto" for Comprehensive Coverage under this policy; b. The airbags are not covered under any warranty; and c. The airbags were not intentionally inflated. We will pay up to a maximum of $1,000 for any one "loss". L. NOTICE AND KNOWLEDGE OF ACCIDENT OR LOSS The following is added to Paragraph A.2.a., of SECTION IV — BUSINESS AUTO CONDITIONS: Your duty to give us or our authorized representative prompt notice of the "accident' or "loss" applies only when the "accident' or "loss" is known to: (a) You (if you are an individual); (b) A partner (if you are a partnership); (c) A member (if you are a limited liability company); (d) An executive officer, director or insurance manager (if you are a corporation or other organization); or (e) Any "employee" authorized by you to give notice of the "accident" or "loss". M. BLANKET WAIVER OF SUBROGATION The following replaces Paragraph A.5., Transfer Of Rights Of Recovery Against Others To Us, of SECTION IV — BUSINESS AUTO CONDITIONS: CA T3 53 08 17 © 2016 The Travelers Indemnity Company. All rights reserved. Page 3 of 4 Includes copyrighted material of Insurance Services Office, Inc. with its permission COMMERCIAL AUTO 5. Transfer Of Rights Of Recovery Against Others To Us We waive any right of recovery we may have against any person or organization to the extent required of you by a written contract signed and executed prior to any "accident" or "loss", provided that the "accident' or "loss" arises out of operations contemplated by such contract. The waiver applies only to the person or organization designated in such contract. N. UNINTENTIONAL ERRORS OR OMISSIONS The following is added to Paragraph B.2., Concealment, Misrepresentation, Or Fraud, of SECTION IV — BUSINESS AUTO CONDITIONS: The unintentional omission of, or unintentional error in, any information given by you shall not prejudice your rights under this insurance. However this provision does not affect our right to collect additional premium or exercise our right of cancellation or non -renewal. Page 4 of 4 © 2016 The Travelers Indemnity Company. All rights reserved. CA T3 53 08 17 Includes copyrighted material of Insurance Services Office, Inc. with its permission COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED - PRIMARY AND NON-CONTRIBUTORY WITH OTHER INSURANCE This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM PROVISIONS 1. The following is added to Paragraph A.1.c., Who Is An Insured, of SECTION it — LIABILITY COVERAGE: This includes any person or organization who you are required under a written contract or agreement between you and that person or organization, that is signed by you before the "bodily injury" or "property damage" occurs and that is in effect during the policy period, to name as an additional insured for Liability Coverage, but only for damages to which this insurance applies and only to the extent of that person's or organization's liability for the conduct of another "insured". The following is added to Paragraph B.5., Other Insurance of SECTION IV — BUSINESS AUTO CONDITIONS: Regardless of the provisions of paragraph a. and paragraph d. of this part 5. Other Insurance, this insurance is primary to and non-contributory with applicable other insurance under which an additional insured person or organization is the first named insured when the written contract or agreement between you and that person or organization, that is signed by you before the "bodily injury" or "property damage" occurs and that is in effect during the policy period, requires this insurance to be primary and non-contributory. CA T4 74 08 17 © 2016 The Travelers Indemnity Company. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc. with its permission. COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. XTEND ENDORSEMENT FOR CONTRACTORS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART GENERAL DESCRIPTION OF COVERAGE — This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to this Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general coverage description only. Read all the provisions of this endorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered. A. Who Is An Insured — Unnamed Subsidiaries C. Incidental Medical Malpractice B. Blanket Additional Insured — Governmental D. Blanket Waiver Of Subrogation Entities — Permits Or Authorizations Relating To E. Contractual Liability — Railroads Operations F. Damage To Premises Rented To You PROVISIONS a. An organization other than a partnership, joint A. WHO IS AN INSURED — UNNAMED venture or limited liability company; or SUBSIDIARIES b. A trust; The following is added to SECTION II — WHO IS as indicated in its name or the documents that AN INSURED: govern its structure. Any of your subsidiaries, other than a partnership, B. BLANKET ADDITIONAL INSURED — joint venture or limited liability company, that is GOVERNMENTAL ENTITIES — PERMITS OR not shown as a Named Insured in the AUTHORIZATIONS RELATING TO OPERATIONS Declarations is a Named Insured if: a. You are the sole owner of, or maintain an ownership interest of more than 50% in, such subsidiary on the first day of the policy period; and b. Such subsidiary is not an insured under similar other insurance. No such subsidiary is an insured for "bodily injury" or "property damage" that occurred, or "personal and advertising injury" caused by an offense committed: a. Before you maintained an ownership interest of more than 50% in such subsidiary; or b. After the date, if any, during the policy period that you no longer maintain an ownership interest of more than 50% in such subsidiary. For purposes of Paragraph 1. of Section II — Who Is An Insured, each such subsidiary will be deemed to be designated in the Declarations as: The following is added to SECTION II — WHO IS AN INSURED: Any governmental entity that has issued a permit or authorization with respect to operations performed by you or on your behalf and that you are required by any ordinance, law, building code or written contract or agreement to include as an additional insured on this Coverage Part is an insured, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" arising out of such operations. The insurance provided to such governmental entity does not apply to: a. Any "bodily injury", "property damage" or "personal and advertising injury" arising out of operations performed for the governmental entity; or b. Any "bodily injury" or "property damage" included in the "products -completed operations hazard". CG D3 16 02 19 © 2017 The Travelers Indemnity Company. All rights reserved. Page 1 of 3 Includes copyrighted material of Insurance Services Office, Inc., with its permission. COMMERCIAL GENERAL LIABILITY C. INCIDENTAL MEDICAL MALPRACTICE 1. The following replaces Paragraph b. of the definition of "occurrence" in the DEFINITIONS Section: b. An act or omission committed in providing or failing to provide "incidental medical services", first aid or "Good Samaritan services" to a person, unless you are in the business or occupation of providing professional health care services. 2. The following replaces the last paragraph of Paragraph 2.a.(1) of SECTION II — WHO IS AN INSURED: Unless you are in the business or occupation of providing professional health care services, Paragraphs (1)(a), (b), (c) and (d) above do not apply to "bodily injury" arising out of providing or failing to provide: (a) "Incidental medical services" by any of your "employees" who is a nurse, nurse assistant, emergency medical technician or paramedic; or (b) First aid or "Good Samaritan services" by any of your "employees" or "volunteer workers", other than an employed or volunteer doctor. Any such "employees" or "volunteer workers" providing or failing to provide first aid or "Good Samaritan services" during their work hours for you will be deemed to be acting within the scope of their employment by you or performing duties related to the conduct of your business. 3. The following replaces the last sentence of Paragraph 5. of SECTION III — LIMITS OF INSURANCE: For the purposes of determining the applicable Each Occurrence Limit, all related acts or omissions committed in providing or failing to provide "incidental medical services", first aid or "Good Samaritan services" to any one person will be deemed to be one "occurrence". pharmaceuticals committed by, or with the knowledge or consent of, the insured. 5. The following is added to the DEFINITIONS Section: "Incidental medical services" means. a. Medical, surgical, dental, laboratory, x-ray or nursing service or treatment, advice or instruction, or the related furnishing of food or beverages; or b. The furnishing or dispensing of drugs or medical, dental, or surgical supplies or appliances. 6. The following is added to Paragraph 4.b., Excess Insurance. of SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS: This insurance is excess over any valid and collectible other insurance, whether primary, excess, contingent or on any other basis, that is available to any of your "employees" for "bodily injury" that arises out of providing or failing to provide "incidental medical services" to any person to the extent not subject to Paragraph 2.a.(1) of Section II — Who Is An Insured. D. BLANKET WAIVER OF SUBROGATION The following is added to Paragraph 8., Transfer Of Rights Of Recovery Against Others To Us, of SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS: If the insured has agreed in a contract or agreement to waive that insured's right of recovery against any person or organization, we waive our right of recovery against such person or organization, but only for payments we make because of: a. "Bodily injury" or "property damage" that occurs; or b. "Personal and advertising injury" caused by an offense that is committed; 4. The following exclusion is added to subsequent to the execution of the contract or Paragraph 2., Exclusions, of SECTION I — agreement. COVERAGES — COVERAGE A — BODILY E. CONTRACTUAL LIABILITY — RAILROADS INJURY AND PROPERTY DAMAGE LIABILITY: 1. The following replaces Paragraph c. of the Sale Of Pharmaceuticals definition of "insured contract" in the "Bodily injury" or "property damage" arising DEFINITIONS Section: out of the violation of a penal statute or c. Any easement or license agreement; ordinance relating to the sale of Page 2 of 3 © 2017 The Travelers Indemnity Company. All rights reserved. CG D3 16 02 19 Includes copyrighted material of Insurance Services Office, Inc., with its permission. 2. Paragraph f.(1) of the definition of "insured contract' in the DEFINITIONS Section is deleted. F. DAMAGE TO PREMISES RENTED TO YOU The following replaces the definition of "premises damage" in the DEFINITIONS Section: "Premises damage" means "property damage" to: COMMERCIAL GENERAL LIABILITY a. Any premises while rented to you or temporarily occupied by you with permission of the owner; or b. The contents of any premises while such premises is rented to you, if you rent such premises for a period of seven or fewer consecutive days. CG D3 16 02 19 © 2017 The Travelers Indemnity Company. All rights reserved. Page 3 of 3 Includes copyrighted material of Insurance Services Office, Inc., with its permission. COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED (Includes Products -Completed Operations If Required By Contract This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PROVISIONS The following is added to SECTION If — WHO IS AN INSURED: Any person or organization that you agree in a written contract or agreement to include as an additional insured on this Coverage Part is an insured, but only: a. With respect to liability for "bodily injury" or "property damage" that occurs, or for "personal injury" caused by an offense that is committed, subsequent to the signing of that contract or agreement and while that part of the contract or agreement is in effect; and b. If, and only to the extent that, such injury or damage is caused by acts or omissions of you or Your subcontractor in the performance of "your work" to which the written contract or agreement applies. Such person or organization does not qualify as an additional insured with respect to the independent acts or omissions of such Person or organization. The insurance provided to such additional insured is subject to the following provisions: a. If the Limits of Insurance of this Coverage Part shown in the Declarations exceed the minimum limits required by the written contract or agreement, the insurance provided to the additional insured will be limited to such minimum required limits. For the purposes of determining whether this limitation applies, the minimum limits required by the written contract or agreement will be considered to include the minimum limits of any Umbrella or Excess liability coverage required for the additional insured by that written contract or agreement. This provision will not increase the limits of insurance described in Section III — Limits Of Insurance. b. The insurance provided insured does not apply to: CG D2 46 0419 (1) Any "bodily injury", "property damage" or "personal injury" arising out of the providing, or failure to provide, any professional architectural, engineering or surveying services, including: (a) The preparing, approving, or failing to Prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders or change orders, or the preparing, approving, or failing to prepare or approve, drawings and specifications; and (b) Supervisory, inspection, architectural or engineering activities. (2) Any "bodily injury' or "property damage" caused by "your work" and included in the "products -completed operations hazard" unless the written contract or agreement specifically requires you to provide such coverage for that additional insured during the policy period. c. The additional insured must comply with the following duties: (1) Give us written notice as soon as practicable of an "occurrence" or an offense which may result in a claim. To the extent possible, such notice should include: (a) How, when and where the "occurrence" or offense took place; (b) The names and addresses of any injured persons and witnesses; and (c) The nature and location of any injury or damage arising out of the "occurrence" or offense. to such additional (2) If a claim is made or "suit" is brought against the additional insured: O 2018 The Travelers Indemnity Company, All rights reserved. Page 1 of 2 COMMERCIAL GENERAL LIABILITY (a) Immediately record the specifics of the claim or "suit" and the date received; and (b) Notify us as soon as practicable and see to it that we receive written notice of the claim or "suit' as soon as practicable. (3) Immediately send us copies of all legal papers received in connection with the claim or "suit", cooperate with us in the investigation or settlement of the claim or defense against the "suit", and otherwise comply with all policy conditions. (4) Tender the defense and indemnity of any claim or "suit" to any provider of other insurance which would cover such additional insured for a loss we cover. However, this condition does not affect whether the insurance provided to such additional insured is primary to other insurance available to such additional insured which covers that person or organization as a named insured as described in Paragraph 4., Other Insurance, of Section IV — Commercial General Liability Conditions. Page 2 of 2 © 2018 The Travelers Indemnity Company. All rights reserved. CG D2 46 04 19 Lr-u KENT SPECIAL PROVISIONS TABLE OF CONTENTS PAGE DIVISION 1 GENERAL REQUIREMENTS ..................................... 1-1 1-01 Definitions and Terms ...................................................... 1-1 1-02 Bid Procedures and Conditions .......................................... 1-2 1-03 Award and Execution of Contract ....................................... 1-5 1-04 Scope of the Work.......................................................... 1-5 1-05 Control of Work.............................................................. 1-7 1-06 Control of Material.......................................................... 1-10 1-07 Legal Relations and Responsibilities to the Public ................. 1-10 1-08 Prosecution and Progress ................................................. 1-16 1-09 Measurement and Payment .............................................. 1-20 DIVISION 2 EARTHWORK.......................................................... 2-1 2-02 Removal of Structures and Obstructions ............................. 2-1 DIVISION 5 SURFACE TREATMENTS AND PAVEMENTS .............. 5-1 5-04 Hot Mix Asphalt.............................................................. 5-1 LOCATION MAP AND CROSS SECTION DETAILS .............................. A-1 PREVAILING WAGE RATES.............................................................. A-2 2020 Asphalt Grinding/Singh February 19, 2020 Project Number: 20-3001.2 Nx 4s KENT SPECIAL PROVISIONS The Kent Special Provisions ('Kent Special Provisions" or "KSP") modify and supersede any conflicting provisions of the 2020 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations ("WSDOT Standard Specifications"). Otherwise all provisions of the WSDOT Standard Specifications shall apply. All references in the WSDOT Standard Specifications to the State of Washington, its various departments or directors, or to the contracting agency, shall be revised to include the City and/or City Engineer, except for references to State statutes or regulations. Finally, all of these documents are a part of this contract. DIVISION 1 - GENERAL REQUIREMENTS 1-01 DEFINITIONS AND TERMS SECTION 1-01.1 IS SUPPLEMENTED BYADDING THE FOLLOWING: 1-01.1 General When these Kent Special Provisions make reference to a "Section," for example, "in accordance with Section 1-01," the reference is to the WSDOT Standard Specifications as modified by these Kent Special Provisions. SECTION 1-01.2(2) IS SUPPLEMENTED BYADDING THE FOLLOWING: 1-01.2(2) Items of Work and Units of Measurement EA Each Eq. Adj. Equitable Adjustment FA Force Account HR Hour M GAL Thousand gallons NIC Not In Contract SF Square Feet SECTION 1-01.3, "CONTRACT" DEFINITION, IS DELETED AND REPLACED WITH THE FOLLOWING: 1-01.3 Definitions Contract The written agreement between the Contracting Agency and the Contractor. It describes, among other things: 1. What work will be done, and by when; 2. Who provides labor and materials; and 2020 Asphalt Grinding/Singh 1 - 1 February 19, 2020 Project Number: 20-3001.2 3. How Contractors will be paid. The Contract includes the Contract (agreement) Form, Bidder's completed Proposal Form, Kent Special Provisions, Contract Provisions, Contract Plans, WSDOT Standard Specifications (also including amendments to the Standard Specifications issued by WSDOT as of the later date of bid advertisement or any subsequent addenda), Kent Standard Plans, Addenda, various certifications and affidavits, supplemental agreements, change orders, and subsurface boring logs (if any). Also incorporated in the Contract by reference are: 1. Standard Plans (M21-01) for Road, Bridge and Municipal Construction as prepared by the Washington State Department of Transportation and the American Public Works Association, current edition; 2. Manual on Uniform Traffic Control Devices for Streets and Highways, current edition, and; 3. American Water Works Association Standards, current edition; 4. The current edition of the `National Electrical Code." Responsibility for obtaining these publications rests with the Contractor. SECTION 1-01.3, "DEFINITIONS" IS SUPPLEMENTED BY ADDING THE FOLLOWING DEFINITION: Incidental Work The terms "incidental to the project," `incidental to the involved bid item(s)," etc., as used in the Contract shall mean that the Contractor is required to complete the specified work and the cost of such work shall be included in the unit contract prices of other bid items as specified in Section 1-04.1 (Intent of the Contract). No additional payment will be made. 1-02 BID PROCEDURES AND CONDITIONS SECTION 1-02.1 IS DELETED AND REPLACED WITH THE FOLLOWING; 1-02.1 Qualification of Bidders Bidders shall be qualified by ability, experience, financing, equipment, and organization to do the work called for in the Contract. The City reserves the right to take any action it deems necessary to ascertain the ability of the Bidder to perform the work satisfactorily. This action includes the City's review of the qualification information in the bid documents. The City will use this qualification data in its decision to determine whether the lowest responsive bidder is also responsible and able to perform the contract work. If the City determines that the lowest bidder is not the lowest responsive and responsible bidder, the City reserves its unqualified right to reject that bid and award the 2020 Asphalt Grinding/Singh 1 - 2 February 19, 2020 Project Number: 20-3001.2 contract to the next lowest bidder that the City, in its sole judgment, determines is also responsible and able to perform the contract work (the "lowest responsive and responsible bidder"). SECTION 1-02.2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.2 Plans and Specifications Upon awarding the Contract, the City shall supply to the Contractor, for its own use, up to ten (10) copies of the plans and specifications. If the Contractor requests more than ten (10) copies, the City may require the Contractor to purchase the additional sets. SECTION 1-02.5 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.5 Proposal Forms Prospective bidders may obtain Bid Documents including a "Bid Proposal" for the advertised project by downloading at no charge at KentWA.gov/doing-business/bids-procurement; however, a prospective bidder remains responsible to obtain Bid Documents, even if unable to download all or any part of the documents, whether or not inability to access is caused by the bidder's or the City's technology. SECTION 1-02.6 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-02.6 Preparation of Proposal It is the Bidder's sole responsibility to obtain and incorporate all issued addenda into the bid. In the space provided on the Proposal Signature Page, the Bidder shall confirm that all Addenda have been received. All blanks in the proposal forms must be appropriately filled in. SECTION 1-02.6 IS SUPPLEMENTED BY ADDING THE FOLLOWING TO THE LAST PARAGRAPH: Proposals must contain original signature pages. FACSIMILES OR OTHER FORMS OF ELECTRONIC DELIVERY ARE NOT ACCEPTABLE AND ARE CONSIDERED NON -RESPONSIVE SUBMITTALS. SECTION 1-02.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.7 Bid Deposit A deposit of at least 5 percent of the total Bid shall accompany each Bid. This deposit may be cash, cashier's check, or a proposal bond (Surety bond). Any proposal bond shall be on the City's bond form and shall be signed by the Bidder and the Surety. A proposal bond shall not be conditioned in any way to modify the minimum 5-percent required. The Surety shall: (1) be registered with the Washington State Insurance Commissioner, and (2) appear on the current Authorized 2020 Asphalt Grinding/Singh 1 - 3 February 19, 2020 Project Number: 20-3001.2 Insurance List in the State of Washington published by the Office of the Insurance Commissioner. The failure to furnish a Bid deposit of a minimum of 5 percent with the Bid shall make the Bid nonresponsive and shall cause the Bid to be rejected by the Contracting Agency. SECTION 1-02.9 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.9 Delivery of Proposal All bids must be sealed and delivered in accordance with the "Invitation to Bid." Bids must be received at the City Clerk's office by the stated time, regardless of delivery method, including U.S. Mail. SECTION 1-02.10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.10 Withdrawing, Revising, or Supplementing Proposal After submitting a Bid Proposal to the Contracting Agency, the Bidder may withdraw or revise it if: 1. The Bidder submits a written request signed by an authorized person, and 2. The Contracting Agency receives the request before the time for opening Bids. The original Bid Proposal may be revised and resubmitted as the official Bids Proposal if the Contracting Agency receives it before the time for opening Bids. SECTION 1-02.11 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.11 Combination and Multiple Proposals No person, firm or corporation shall be allowed to make, file, or be interested in more than one bid for the same work unless alternate bids are specifically called for; however, a person, firm, or corporation that has submitted a subproposal to a bidder, or that has quoted prices of materials to a bidder is not disqualified from submitting a subproposal or quoting prices to other bidders or from making a prime proposal. SECTION 1-02.13 IS REVISED BY DELETING ITEM 1(a) AND REPLACING ITEM 1(a) WITH THE FOLLOWING: 1-02.13 Irregular Proposals a. The bidder is not prequalified when so required. SECTION 1-02.14 IS REVISED BY DELETING ITEM 3 AND REPLACING WITH THE FOLLOWING: 2020 Asphalt Grinding/Singh 1 - 4 February 19, 2020 Project Number: 20-3001.2 1-02.14 Disqualification of Bidders 3. The bidder is not qualified for the work or to the full extent of the bid. 1-03 AWARD AND EXECUTION OF CONTRACT SECTION 1-03.1 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SECOND PARAGRAPH IN THAT SECTION: 1-03.1 Consideration of Bids The City also reserves the right to include or omit any or all schedules or alternates of the Proposal and will award the Contract to the lowest responsive, responsible bidder based on the total bid amount, including schedules or alternates selected by the City. SECTION 1-03.2 IS REVISED BY REPLACING "45 CALENDAR DAYS" WITH "60 CALENDAR DAYS" RELATING TO CONTRACT AWARD OR BID REJECTION. 1-03.2 Award of Contract SECTION 1-03.3 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.3 Execution of Contract No claim for delay shall be granted to the Contractor due to its failure to submit the required documents to the City in accordance with the schedule provided in these Kent Special Provisions. SECTION 1-03.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.7 Judicial Review Any decision made by the City regarding the award and execution of the contract or bid rejection shall be conclusive subject to the scope of judicial review permitted under Washington State Law. Such review, if any, shall be timely filed in the King County Superior Court, located in Kent, Washington. 1-04 SCOPE OF THE WORK SECTION 1-04.1(2) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.1(2) Bid Items Not Included in the Proposal The Contractor shall include all costs of doing the work within the bid item prices. If the contract plans, contract provisions, addenda, or any other part of the contract require work that has no bid item price in the proposal form, the entire cost -of labor and materials required to perform that work shall be incidental and included with the bid item prices in the contract. 2020 Asphalt Grinding/Singh 1 - 5 February 19, 2020 Project Number: 20-3001.2 SECTION 1-04.2 IS SUPPLEMENTED BY ADDING THE WORDS, "KENT SPECIAL PROVISIONS, KENT STANDARD PLANS" FOLLOWING THE WORDS, "CONTRACT PROVISIONS" IN THE FIRST SENTENCE OF THE FIRST PARAGRAPH. SECTION 1-04.2 IS REVISED BY DELETING ITEMS 1 THROUGH 7 IN THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING 8 ITEMS: 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda 1. Approved Change Orders 2. The Contract Agreement 3. Kent Special Provisions 4. Contract Plans 5. Amendments to WSDOT Standard Specifications 6. WSDOT Standard Specifications 7. Kent Standard Plans 8. WSDOT Standard Plans SECTION 1-04.4 IS REVISED BY DELETING THE THIRD PARAGRAPH (INCLUDING SUBPARAGRAPHS A AND B). SECTION 1-04.4 IS REVISED BY DELETING THE FIFTH PARAGRAPH AND REPLACING IT WITH THE FOLLOWING: 1-04.4 Changes For Item 2, increases or decreases in quantity for any bid item shall be paid at the appropriate bid item contract price, including any bid item increase or decrease by more than 25 percent from the original planned quantity. SECTION 1-04.4 IS REVISED BY DELETING THE EIGHTH PARAGRAPH (NEXT TO THE LAST PARAGRAPH) AND REPLACING WITH THE FOLLOWING: Within 14 calendar days of delivery of the change order the Contractor shall endorse and return the change order, request an extension of time for endorsement or respond in accordance with Section 1-04.5. The Contracting Agency may unilaterally process the change order if the Contractor fails to comply with these requirements. Changes normally noted on field stakes or variations from estimated quantities, will not require a written change order. These changes shall be made at the unit prices that apply. The Contractor shall respond immediately to changes shown on field stakes without waiting for further notice. SECTION 1-04.6 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.6 Variation in Estimated Quantities 2020 Asphalt Grinding/Singh 1 - 6 February 19, 2020 Project Number: 20-3001.2 Payment to the Contractor will be made only for the actual quantities of Work performed and accepted in conformance with the Contract. SECTION 1-04.9 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.9 Use of Private Properties Staging and storage locations needed for the Project must be properly permitted for that use. Limits of construction are indicated or defined on the plans. The Contractor shall confine all construction activities within these limits. If a staging and storage area is shown on the plans, the City will obtain all permits and approvals necessary for the Contractor's use. Whether the City does or does not provide a staging area, if the Contractor selects its own staging and storage area(s), it is the Contractor's sole responsibility to obtain all necessary permits/approvals to use the private property, specifically including, without limitation, all permits or approvals subject to State Environmental Policy Act, Shoreline Management Act, and critical areas regulations. Before using any other property as a staging or storage area (or for any other use), the Contractor shall thoroughly investigate the property for the presence of critical areas, buffers of critical areas, or other regulatory restrictions as defined in Kent City Code, county, state or federal regulations, and the Contractor shall provide the City written documentation that the property is not subject to other regulatory requirements or that the Contractor has obtained all necessary rights of entry, permits and approvals needed to use the property as the Contractor intends. Upon vacating the private property, the Contractor shall provide the City written verification that it has obtained all releases and/or performed all mitigation work as required by the conditions of the permit/approval and/or agreement with the property owner. The Contractor shall not be entitled to additional compensation or an extension of the time of completion of the Contractor for any work associated with the permitting, mitigation or use of private property. SECTION 1-04.11 ITEM 2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.11 Final Cleanup 2. Remove from the project all unapproved and/or unneeded material left from grading, surfacing, paving, or temporary erosion control measures. 1-05 CONTROL OF WORK SECTION 1-05.4 IS REVISED BY DELETING THE LAST FOUR PARAGRAPHS. 2020 Asphalt Grinding/Singh 1 - 7 February 19, 2020 Project Number: 20-3001.2 SECTION 1-05.4 IS REVISED BY ADDING A PARAGRAPH AFTER PARAGRAPH 7 1-05.4 Conformity With and Deviations From Plans and Stakes To the extent a conflict exists between the requirements of WSDOT Section 1-05.4 and Kent Special Provision Section 1-05.8, the requirements of KSP Section 1-05.8 will prevail. SECTION 1-05.7 IS SUPPLEMENTED BY ADDING THE FOLLOWING 1-05.7 Removal of Defective and Unauthorized Work If the Contractor fails to remedy defective or unauthorized work within the time specified by the Engineer, or fails to perform any part of the work required by the contract, the Engineer may provide the Contractor written notice establishing a date after which the City will correct and remedy that work by any means that the Engineer may deem necessary, including the use of City forces or other contractors. If the Engineer determines that the Contractor's failure to promptly correct any defective or any unauthorized work creates a situation that could be potentially unsafe or might cause serious risk of loss or damage to the public, the Engineer may have the defective and unauthorized work corrected immediately, have the rejected work removed and replaced, or have the work the Contractor refuses to perform completed by using City or other forces. Direct and indirect costs incurred by the City attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment may be deducted by the Engineer from monies due, or to become due, the Contractor. Direct and indirect costs shall include, without limitation, compensation for additional professional services required, compensation and engineering and inspection services required, and costs for repair and replacement of work of others destroyed or damaged by correction, removal, or replacement of the Contractor's unauthorized work. No increase in contract time or compensation will be allowed because of the delay in the performance of the work attributable to the exercise of the City's rights provided by this section nor shall the exercise of this right diminish the City's right to pursue any other remedy available under law with respect to the Contractor's failure to perform the work as required. SECTION 1-05.10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-05.10 Guarantees In addition to any other warranty or guarantee provided for at law or in the parties' contract, the Contractor shall furnish to the Contracting Agency any guarantee or warranty furnished as a customary trade 2020 Asphalt Grinding/Singh 1 - 8 February 19, 2020 Project Number: 20-3001.2 practice in connection with the purchase of any equipment, materials, or items incorporated into the project. Upon receipt of written notice of any required corrective work, the ri Contractor shall pursue vigorously, diligently, and without disrupting city facilities, the work necessary to correct the items listed in the notice. Approximately sixty (60) calendar days prior to the one year anniversary of final acceptance, the Contractor shall be available to tour the project, with the Engineer, in support of the Engineer's effort to establish a list of corrective work then known and discovered. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE FIRST PARAGRAPH: 1-05.13 Superintendents, Labor, and Equipment of Contractor Within ten (10) days of contract award, the Contractor shall designate the Contractor's project manager and superintendent for the contract work. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE THIRD PARAGRAPH (AS PRINTED IN THE 2020 WSDOT STANDARD SPECIFICATIONS): If at any time during the contract work, the Contractor elects to replace the contract manager or superintendent, the Contractor shall only do so after obtaining the Engineer's prior written approval. THE LAST PARAGRAPH OF 1-05.13 IS DELETED AND REPLACED WITH THE FOLLOWING: Whenever the City evaluates the Contractor's qualifications or prequalifications pursuant to Section 1-02.1 or RCW 47.28.070, the City may take these or other Contractor performance reports into account. SECTION 1-05.14 IS SUPPLEMENTED BYADDING THE FOLLOWING: 1-05.14 Cooperation With Other Contractors Details of known projects are as follows: N/A SECTION 1-05IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS; 1-05.16 Water and Power The Contractor shall make necessary arrangements, and shall bear the costs for power and water necessary for the performance of the work, unless the Contract includes power or water as bid items, or unless otherwise provided for in other bid items. 2020 Asphalt Grinding/Singh 1 - 9 February 19, 2020 Project Number: 20-3001.2 1-05.17 Oral Agreements No oral agreement or conversation with any officer, agent, or employee of the City, either before or after execution of the contract, shall affect or modify the terms or obligations contained in any of the documents comprising the contract. Such oral agreement or conversation shall be considered unofficial information and in no way binding upon the City, unless subsequently recorded and/or put in writing and signed by an authorized agent of the City. 1-06 CONTROL OF MATERIAL SECTION 1-06.2(2) IS DELETED IN ITS ENTIRETY. 1-06.2(2) Statistical Evaluation of Materials for Acceptance SECTION 1-06 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-06.7 Submittals 1-06.7(1) Submittal Procedures All information submitted by the Contractor shall be clear, sharp, high contrast copies. Contractor shall accompany each submittal with a letter of transmittal containing the following information: 1. Contractor's name and the name of Subcontractor or supplier who prepared the submittal. 2. The project name and identifying number. 3. Each new submittal shall be sequentially numbered (1, 2, 3, etc.). Each resubmittal shall include the original number with a sequential alpha letter added (1A, 1B, 1C, etc.). 4. Description of the submittal and reference to the Contract requirement or technical specification section and paragraph number being addressed. 5. Bid item(s) where product will be used. 1-06.7(4) Proposed Equivalents The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed equivalent with or without cause. 11-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-07.2 State Taxes SECTION 1-07.2(1) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-07.2(1) State Sales Tax: WAC 458-20-171—Use Tax 202C Asphalt Grinding/Singh 1 - 10 February 19, 2020 Project Number: 20-3001.2 Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to use tax under Section 1-07.2(1) in the proposal bid items. SECTION 1-07.2(2) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-07.2(2) State Sales Tax: WAC 458-20-170—Retail Sales Tax Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to retail sales tax under Section 1-07.2(2) in the proposal bid items. SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.6 Permits and Licenses The City has obtained the following permits: None SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPHS AFTER THE LAST PARAGRAPH: A copy of each permit and/or license obtained by the Contractor shall be furnished to the City. Approved permits shall be furnished to the City upon completion of the project and prior to final acceptance. The Contractor shall promptly notify the City in writing of any variance in the contract work arising from the issuance of any permit. 1-07.9 Wages SECTION 1-07.9(1) IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SIXTH PARAGRAPH: 1-07.9(1) General To the extent allowed by law, the wage rates that will be in effect during the entire contract work period are those in effect on the day of bid opening, unless the City does not award the Contract within six months of the bid opening. SECTION 1-07.9(3) IS DELETED AND REPLACED WITH THE FOLLOWING: FOLLOWING: 1-07.9(3) Apprentices All contracts with an estimated construction cost greater than $1,000,000 (one million dollars) shall require that no less than 15 percent of the labor hours performed by workers subject to prevailing 2020 Asphalt Grinding/Singh 1 - 11 February 19, 2020 Project Number: 20-3001.2 wages employed by the contractor or its subcontractors be performed by apprentices enrolled in a state -approved apprenticeship program. Definitions For the purposes of this specification, the following definitions apply: 1. Apprentice Utilization Requirement is expressed as a percentage of the project Labor Hours performed by Apprentices. 2. Labor Hours are the total hours performed by all workers receiving an hourly wage who are directly employed on the project site including hours performed by workers employed by the prime Contractor and all Subcontractors. Labor Hours do not include hours performed by foremen, superintendents, owners, and workers who are not subject to prevailing wage requirements. 3. Apprentice is a person enrolled in a State -approved Apprenticeship Training Program. 4. State -approved Apprenticeship Training Program is an apprenticeship training program approved by the Washington State Apprenticeship Council. 5. Good Faith Effort is a demonstration that the Contractor has strived to meet the Apprenticeship Utilization Requirement including but not necessarily limited to the specific steps as described elsewhere in this specification. Plan The Contractor shall submit an `Apprentice Utilization Plan" within 30 calendar days of Notice of Award, demonstrating how they intend to achieve the Apprentice Utilization Requirement. The plan shall be updated and resubmitted as appropriate as the Work progresses. The intent is to provide the City with enough information to track progress in meeting the utilization requirements. Reporting The Contractor shall submit a "Monthly Apprentice Reporting Form" on a monthly basis. The report shall be submitted to the City by the last working day of the subsequent month, until the Physical Completion Date. The date reported shall be cumulative to date and consolidated to include the Contractor and all Subcontractors. At the Contractor's request, the Engineer may suspend this reporting requirement during periods of minimal or no applicable work activities on the project. The Contractor shall submit documentation of their Good Faith Effort if: (1) they are unable to provide a plan demonstrating how they intend to meet the Apprentice Utilization Requirement; or (2) the project has been completed without meeting the Apprentice Utilization Requirement. Contacts The Contractor may obtain information on State -approved Apprenticeship Training Programs by contacting the Department of Labor and Industries at: Specialty Compliance Services Division, Apprenticeship Section, P.O. Box 44530, Olympia, WA 98504-4530 or by phone at (360) 902-5320. 2020 Asphalt Grinding/Singh 1 - 12 February 19, 2020 Project Number: 20-3001.2 Compliance In the event that the Contractor is unable to accomplish the Apprentice Utilization Requirement, the Contractor shall demonstrate that a Good Faith Effort has been made as described within this specification. Failure to comply with the requirements as specified is subject to penalties for noncompliance as set forth in KCC 6.01.030(E). Good Faith Efforts In fulfilling the Good Faith Effort, the Contractor shall perform and, when appropriate, require its Subcontractors to perform the following steps: 1. Solicit Apprentice(s) from State -approved Apprenticeship Training Program(s). 2. Document the solicitation and, in the event Apprentice(s) are not available, obtain supporting documentation from the solicited program(s). 3. Demonstrate that the plan was updated as required within this specification. 4. Provide documentation demonstrating what efforts the Contractor has taken to require Subcontractors to solicit and employ Apprentice(s). In the event that the preceding steps have been followed, the Contractor may also supplement the Good Faith Efforts documentation with the following documentation: 5. Submit documentation demonstrating successful Apprentice utilization on previous contracts. 6. Submit documentation indicating company -wide Apprentice utilization efforts and percentages of attainment. Payment Compensation for all costs involved with complying with the conditions of this specification is included in payment for the associated Contract items of work. 1-07.13 Contractor's Responsibility for Work SECTION 1-07.13(4) IS REVISED BY DELETING THE SECOND SENTENCE OF THE FIRST PARAGRAPH AND DELETING THE LAST PARAGRAPH. 1-07.13(4) Repair of Damage SECTION 1-07.14 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE BEGINNING OF THAT SECTION: 1-07.14 Responsibility for Damage To the extent a conflict exists between the terms of this Section 2020 Asphalt Grinding/Singh 1 - 13 February 19, 2020 Project Number: 20-3001.2 1-07.14 and Section 5 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. 1-07.15 Temporary Water Pollution Prevention SECTION 1-07.15(1) IS REVISED BY ADDING THE FOLLOWING PARAGRAPH AFTER THE LAST PARAGRAPH: 1-07.15(1) Spill Prevention, Control, and Countermeasures Plan When the proposal form includes multiple bid schedules and the "SPCC Plan" bid item is present in only one bid schedule, the lump sum payment item for the "SPCC Plan" in that one schedule will apply to all bid schedules for all costs associated with creating and updating the accepted SPCC Plan, and all costs associated with the setup of prevention measures and for implementing the current SPCC Plan as required by this Specifications. SECTION 1-07.17IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE END OF THE SECOND PARAGRAPH: 1-07.17 Utilities and Similar Facilities If a utility is known to have or suspected of having underground facilities within the area of the proposed excavation and that utility is not a subscriber to the utilities underground location center, the Contractor shall give individual notice to that utility within the same time frame prescribed in RCW 19.122.030 for subscriber utilities. SECTION 1-07.17 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-07.17(3) Utility Markings Once underground utilities are marked by the utility owner or its agent, and/or once new underground facilities have been installed by the Contractor, the Contractor/excavator is responsible to determine the precise location of underground facilities that may conflict with other underground construction. The Contractor shall maintain the marks or a record of the location of buried facilities for the duration of time needed to avoid future damage until installation of all planned improvements at that location is complete. 1-07.17(4) Payment All costs to comply with subsection 1-07.17(3) and for the protection and repair of all identified or suspected underground utilities specified in RCW 19.122 are incidental to the contract and are the responsibility of the Contractor/excavator. The Contractor shall include all related costs in the unit bid prices of the contract. No additional time or 2020 Asphalt Grinding/Singh 1 - 14 February 19, 2020 Project Number: 20-3001.2 monetary compensation shall be made for delays caused by utility re- marking or repair of damaged utilities due to the Contractor's failure to maintain marks or to locate utilities in accordance with this section. 1-07.17(5) Notification of Excavation Within ten business days but not less than two business days prior to the commencement of excavation, the Contractor shall provide written notice (or other form of notice acceptable to the Engineer) to all owners of underground facilities, whether public or private, that excavation will occur, and when excavation will occur. 1-07.17(6) Site Inspection Contractor warrants and represents that it has personally, or through its employees, agents and/or subcontractors, examined all property affected by this project and that it is knowledgeable of specific locations for water, gas, telephone, electric power and combined sewerage utilities within those areas. The following list of contacts is provided only as a convenience to the Contractor. It may not be accurate and may not constitute a complete list of all affected utilities. CenturyLink Gabrielle Skorupa 206-305-4395 Puget Sound Energy Gas Glenn Helton 253-395-6926 425-559-4647 (cell) Verizon Scott Christenson 425-636-6046 425-471-1079 (cell) Comcast Aaron Cantrell 206-510-4222 (cell) Aaron Cantrel2corincast.com Puget Sound Energy Power Hong Nguyen 425-449-6609 (cell) hgn_q.Nqu;yenf pse.com SECTION 1-07.18 IS REVISED BY ADDING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.18 Public Liability and Property Damage Insurance To the extent a conflict exists between the terms of this Section 1- 07.18 and the insurance requirements in Section 7 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. 2020 Asphalt Grinding/Singh 1 - 15 February 19, 2020 Project Number: 20-3001.2 SECTION 1-07.24 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.24 Rights of Way Street right of way lines, limits of easements and limits of construction are indicated or defined on the plans. The Contractor's construction activities shall be confined within these limits, unless arrangements for use of private property are made. It is anticipated that the City will have obtained all right of way, easements or right of entry agreements prior to the start of construction. Locations where these rights have not been obtained will be brought to the Contractor's attention prior to start of construction. The Contractor shall not proceed with any portion of the work in areas where right of way, easements or rights of entry have not been acquired until the Engineer certifies to the Contractor that the right of way or easement is available or that the right of entry has been received. SECTION 1-07.26 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.26 Personal Liability of Public Officers Neither the City, the Engineer, nor any other official, officer or employee of the City shall be personally liable for any acts or failure to act in connection with the contract, it being understood that, in these matters, they are acting solely as agents of the City. 11-08 PROSECUTION AND PROGRESS SECTION 1-08 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 1-08.0 Preconstruction and Preconstruction Conference The Engineer will furnish the Contractor with up to ten (10) copies of the plans and specifications. Additional documents may be purchased from the City at the price specified by the City or in the Invitation to Bid. Prior to undertaking each part of the work, the Contractor shall carefully study and compare the Contract and check and verify all pertinent figures shown and all applicable field measurements. The Contractor shall promptly report in writing to the Engineer any conflict, error or discrepancy that the Contractor discovers. After the Contract has been executed, but prior to the Contractor beginning the work, a preconstruction conference will be held with the Contractor, the Engineer and any other interested parties that the City determines to invite. The purpose of the preconstruction conference will be: 1. To review the initial progress schedule. 2020 Asphalt Grinding/Singh 1 - 16 February 19, 2020 Project Number: 20-3001.2 2. To establish a working understanding among the various parties associated or affected by the work. 3. To establish and review procedures for progress payment, notifications, approvals, submittals, etc. 4. To verify normal working hours for the work. 5. To review safety standards and traffic control. 6. To discuss any other related items that may be pertinent to the work. The Contractor shall prepare and submit for approval, at or prior to the preconstruction conference the following: 1. A price breakdown of all lump sum items. 2. A preliminary construction schedule. 3. A list of material sources for approval, if applicable. 4. Schedule of submittals. (See 1-06.6(2)) 5. Temporary Erosion/Sedimentation Control Plan (TESCP) for approval. 6. Traffic Control Plan (TCP) for approval. 7. Request to sublet, for approval by the Engineer, of all subcontractors. SECTION 1-08.4 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-08.4 Notice to Proceed, Prosecution and Hours of Work Notice to Proceed will be given after the contract has been executed and the contract bond and evidence of required insurance have been approved by and filed with the City. Unless otherwise approved in writing by the Engineer, the Contractor shall not commence the work until the Notice to Proceed has been given by the Engineer. The Contractor shall commence construction activities on the Project Site within ten working days of the Notice to Proceed Date. The Work thereafter shall be prosecuted diligently, vigorously, and without unauthorized interruption until physical completion of the work. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time(s) specified in the Contract. Except in the case of emergency or unless otherwise approved by the Engineer, the normal straight time working hours for the Contractor shall be any consecutive 8 hour period between 7:00 a.m. and 6:00 p.m. Monday through Friday, unless otherwise specified in the Kent Special Provisions, with a 5-day work week, plus allowing a maximum one -hour lunch break in each working day. The normal straight time 8-hour working period for the contract shall be established at the preconstruction conference or prior to the Contractor commencing work. If a Contractor desires to perform work on holidays, Saturdays, Sundays, or before 7:00 a.m. or after 6:00 p.m. on any day, the Contractor shall apply in writing to the Engineer for permission to work 2020 Asphalt Grinding/Singh 1 - 17 February 19, 2020 Project Number: 20-3001.2 those times. The Contractor shall notify the Engineer at least 48 hours in advance (72 hours in advance for weekend work) so that the Inspector's time may be scheduled. Permission to work longer than an 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. For any work outside of normal straight time working hours that requires city surveyors, all reasonable efforts shall be made by the Contractor to allow time for surveying to be completed during normal straight time hours. If city surveyors are required to work other than normal straight time hours at the convenience of the Contractor, all such work shall be reimbursed by the Contractor. Permission to work between the hours of 10:00 p.m. and 7:00 a.m. during weekdays and between the hours of 10:00 p.m. and 9:00 a.m. on weekends or holidays may also be subject to noise control requirements. Approval to continue work during these hours may be revoked at any time the Contractor exceeds the City's noise control regulations or the city receives complaints from the public or adjoining property owners regarding noise from the Contractor's operations. The Contractor shall have no claim for damages or delays should this permission be revoked for these reasons. The Engineer may grant permission to work Saturdays, Sundays, holidays or other than the agreed upon normal straight time working hours, but may be subject to other conditions established by the City or Engineer. These conditions may include, but are not limited to the following: hours worked by City employees; impacts to the construction schedule; or accommodations to adjoining properties affected by the contract work. 1-08.4(A) Reimbursement for Overtime Work of City Employees Following is a non-exclusive list of work that may require Contractor reimbursement for overtime of City employees. The City will bill the Contractor at the OVERTIME RATE in order for locate crews to complete other work. If the locate request is for nights, weekend, holidays or at other times when locate crews are not normally working, all locate work and expenses, including travel, minimum call out times, and/or Holiday premiums will be borne by the Contractor. 1. Locate work required to re-establish marks for City -owned underground facilities that were not maintained or recorded by the Contractor in accordance with RCW 19.122.030. 2. Work required by city survey crew(s) as the result of reestablishing survey stakes or markings that were not maintained or recorded by the Contractor or other work deemed to be for the convenience of the Contractor and not required of the City by the contract. 3. Work required by City personnel or independent testing laboratories to re -test project materials, utility pressure or vacuum tests, camera surveys or water purity tests as the result of initial test failure on the part of the Contractor. 2020 Asphalt Grinding/Singh 1 - 18 February 19, 2020 Proje°ct Number: 20-3001.2 1-08.4(B) General The City allocates its resources to a contract based on the total time allowed in the contract. The City will accept a progress schedule indicating an early physical completion date but cannot guarantee the City resources will be available to meet the accelerated schedule. No additional compensation will be allowed if the Contractor is not able to meet its accelerated schedule due to the unavailability of City resources or for other reasons beyond the City's control. Unless previously approved by the Engineer, the original and all supplemental progress schedules shall not conflict with any time and order -of -work requirements in the contract. If the Engineer deems that the original or any necessary supplemental progress schedule does not provide adequate information, the City may withhold progress payments until a schedule containing needed information has been submitted by the Contractor and approved by the Engineer. The Engineer's acceptance of any schedule shall not transfer any of the Contractor's responsibilities to the City. The Contractor alone shall remain responsible for adjusting forces, equipment, and work schedules to ensure completion of the work within the times specified in the contract. SECTION 1-08.5 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-08.5 Time for Completion Contract time shall begin on the day of the Notice to Proceed. The Contract Provisions may specify another starting date for Contract time, in which case, time will begin on the starting date specified. SECTION 1-08.6 IS REVISED BY DELETING THE FIFTH, SIXTH, AND SEVENTH PARAGRAPHS AND REPLACING WITH THE FOLLOWING: 1-08.6 Suspension of Work If the performance of all or any part of the Work is suspended for an unreasonable period of time by an act of the Contracting Agency in the administration of the Contract, or by failure to act within the time specified in the Contract (or if no time is specified, within a reasonable time), the Engineer will make an adjustment for any increase in the cost or time for the performance of the Contract (excluding profit) necessarily caused by the suspension. However, no adjustment will be made for any suspension if (1) the performance would have been suspended by any other cause, including the fault or negligence of the Contractor, or (2) an equitable adjustment is provided for or excluded under any other provision of the Contract. 2020 Asphalt Grinding/Singh 1 - 19 February 19, 2020 Project Number: 20-3001.2 If the Contactor believes that the performance of the Work is suspended for an unreasonable period of time and such suspension is the responsibility of the Contracting Agency, the Contractor shall immediately submit a written notice of protest to the Engineer as provided in Section 1-04.5. No adjustment shall be allowed for any costs incurred more than 10 calendar days before the date the Engineer receives the Contractor's written notice to protest. In any event, no protest will be allowed later than the date of the Contractor's signature on the Final Pay Estimate. The Contractor shall keep full and complete records of the costs and additional time of such suspension, and shall permit the Engineer to have access to those records and any other records as may be deemed necessary by the Engineer to assist in evaluating the protest. The Engineer will determine if an equitable adjustment in cost or time is due as provided in this Section. The equitable adjustment for increase in costs, if due, shall be subject to the limitations provide in Section 1-09.4, provided that no profit of any kind will be allowed on any increase in cost necessarily caused by the suspension. SECTION 1-08.7 MAINTENANCE DURING SUSPENSION IS REVISED BY DELETING THE FOURTH AND SIXTH PARAGRAPHS. 1-09 MEASUREMENT AND PAYMENT SECTION 1-09.7 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-09.7 Mobilization Mobilization shall also include moving any and all personnel, materials and equipment from one site to another as specified in the Contract documents. SECTION 1-09.9 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 1-09.9(2) City's Right to Withhold Certain Amounts In addition to the amount that the City may otherwise retain under the Contract, the City may withhold a sufficient amount of any payments otherwise due to the Contractor, including nullifying the whole or part of any previous payment, because of subsequently discovered evidence or subsequent inspections that, in the City's judgment, may be necessary to cover the following: 1. The cost of defective work not remedied. 2. Fees incurred for material inspection, and overtime engineering and inspection for which the Contractor is obligated under this Contract. 3. Fees and charges of public authorities or municipalities. 4. Liquidated damages. 5. Engineering and inspection fees beyond Completion Date. 2020 Asphalt Grinding/Singh 1 - 20 February 19, 2020 Project Number: 20-3001.2 3 6. Cost of City personnel to re-establish locate marks for City -owned facilities that were not maintained by the Contractor in accordance with RCW 19.122.030 (3). 7. Additional inspection, testing and lab fees for re -doing failed, water, other utility tests. SECTION 1-09.11(3) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.11(3) Time Limitations and Jurisdiction This contract shall be construed and interpreted in accordance with the laws of the State of Washington. The venue of any claims or causes of action arising from this contract shall be exclusively in the Superior Court of King County, located in Kent, Washington. For convenience of the parties to this contract, it is mutually agreed that any claims or causes of action which the Contractor has against the City arising from this contract shall be brought within 180 days from the date of Final Acceptance of the contract by the City. The parties understand and agree that the Contractor's failure to bring suit within the time period provided shall be a complete bar to any such claims or causes of action. It is further mutually agreed by the parties that when any claims or causes of action that a Contractor asserts against the City arising from this contract are filed with the City or initiated in court, the Contractor shall permit the City to have timely access to any records deemed necessary by the City to assist in evaluating the claims or actions. SECTION 1-09.13 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.13 Final Decision and Appeal All disputes arising under this contract shall proceed pursuant to Section 1-04.5 and 1-09.11 of the WSDOT Standard Specifications and any Kent Special Provisions provided for in the contract for claims and resolution of disputes. The provisions of these sections and the Kent Special Provisions must be complied with as a condition precedent to the Contractor's right to seek an appeal of the City's decision. The City's decision under Section 1-09.11 will be final and conclusive. Thereafter, the exclusive means of Contractor's right to appeal shall only be by filing suit exclusively under the venue, rules and jurisdiction of the Superior Court of King County, located in Kent, Washington, unless the parties agree in writing to an alternative dispute resolution process. 2020 Asphalt Grinding/Singh Project Number: 20-3001.2 1-21 February 19, 2020 DIVISION 2 - EARTHWORK 22-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS S&CTION 2-02.1 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 2-02.1 Description This work also includes the repair of adjacent improvements that were not designated for removal, but that were damaged by the Contractor's operations. 2020 Asphalt Grinding/Singh 2 - 1 February 19, 2020 Project Number: 20-3001.2 DIVISION 5 - SURFACE TREATMENTS AND PAVEMENTS NOTE: If the contract also includes underground utility construction, permanent surface treatments and pavements shall not be placed until an as -built survey and testing of the new underground utilities have been completed. Verification that utility construction conforms to the line and grade requirements of Section 7-08.3(2)B of the WSDOT Standard Specifications shall be made by the Engineer prior to authorizing paving to begin. Also, each new utility must pass all appropriate tests specified herein for the type of utility prior to paving. 5-04 HOT MIX ASPHALT SECTION 5-04 IS DELETED AND REPLACED IN ITS ENTIRETY WITH THE FOL L O WING; 5-04.3(14) Planing Bituminous Pavement The planed material shall become the property of the City. SECTION 5-04.5 IS DELETED AND REPLACED WITH THE FOLLOWING: 5-04.5 Payment Payment will be made in accordance with Section 1-04.1, for the following bid items when they are included in the Proposal: The unit contract price per half day for "Planing Bituminous Pavement" constitutes complete compensation for all materials, tools, equipment and labor necessary or incidental to plane the asphalt concrete pavement as specified on the plans or as directed by the Engineer. The time associated with moving the equipment will not be included in the half day time for planing bituminous pavement. Payment shall be made upon actual half days of work time, regardless of the full planing capacity of the equipment used. City crews will replace the removed asphalt following the planing. No payment will be made for work beyond the half day unless authorized in writing by the Engineer. Throughout the project, each working day may include a single half -day shift, two half -day shifts (morning and afternoon), or no half -day shifts. A half day is defined as four hours of asphalt planing, not including equipment setup, transport, fueling, filling with water, or maintenance time or other similar activities. If the City directs the Contractor to begin a half -day shift, the City will compensate the Contractor for a complete half -day shift even if the City stops the shift in fewer than four hours. 2020 Asphalt Grinding/Singh 5 - 1 February 19, 2020 Project Number: 20-3001.2 The City will notify the Contractor at least 48 hours in advance of the anticipated schedule. The City will provide traffic control, trucks for hauling planed material and sweeping. The Contractor will provide a planing machine capable of planing 2,000 square yards in a 4-hour period, operators and spotters as needed-t-6 operate the planer. 2020 Asphalt Grinding/Singh 5 - 2 February 19, 2020 Project Number: 20-3001.2 N LOCATION MAP AND CROSS SECTION DETAILS 2020 Asphalt Grinding/Singh A - 1 February 19, 2020 Project Number: 20-3001.2 CITY OF KENT 2O2O ASPHALT GRINDING LOCATIONS Priority Street Name - Location Description Work Type Schedule 1 S 228 St - 166 ft E of Lakeside Blvd E to 1100 ft E of Lakeside Blvd Grinding Schedule ll 2 Alder Ln - Central Av S to MaDle Ln S Longitudinal and Transverse Schedule I 3 West Valley Highway - 5E 262 5t to 5 277 5t Grinding Schedule ll 4 111 Av SE - 60 ft S of End of Street to 758 ft N of SE 256 St Longitudinal and Transverse Schedule I 5 MilitarV Rd - 398 ft N of Miliiary Rd S to Reith Rd Grinding Schedule ll 6 S 252 St - Canyon Dr to 328 ft E of Canvon Dr Longitudinal and Transverse Schedule I 7 SE 240 St - 140 Av SE to 148 Av SE Grinding Schedule ll 7 148 Av SE - SE 244 St to 148 Lan SE (Private Rd)Grinding Schedule ll 8 137 Av 5E - End of Street (N) to SE 240 5t Grinding Schedule I 8 5E 239 St - End of Street {W) to 137 Av 5E Grinding Schedule I 9 1_16 Av SE - 137 ft N of SE 231 Pl to SE 234 Pl Grinding Schedule ll 10 SE 248 St - 104 Ave SE to 180 ft E of 107 Ave SE Grinding Schedule ll 10 SE 248 St - 115 Ave SE to 330 ft E of 116 Ave SE Longitudinal and Transverse Schedule ll 11 144 Av SE - SE Kent Kangley Rd to SE 276 Pl Grinding Schedule I t2 SE 230 St - 132 Av SE to L34 Av 5E Longitudinal and Transverse Schedule I LZ 134 Av 5E - End of Street (N) to 5E 230 St Longitudinal and Transverse Schedule I 13 132 Av SE - 134 Ft N of SE 236 Pl to SE 240 St Grinding Schedule I L4 SE 210 St - 120 Pl SE to End of Street (East)Longitudinal and Transverse Schedule I L4 SE 209 St - 120 Pl SE to End of Street (East)Longitudinal and Transverse Schedule I t4 120 Pl SE - SE 208 St to 210 Pl Longitudinal and Transverse Schedule I 15 140 Av SE - 687 ft N of SE 236 Pl to SE 237 Pl Longitudinal and Transverse Schedule I i)180 S x. Loo -o -a. o) \ 1I II I I I T] M. o G I,IJ 0) N @,' o' 6(o z c) smes U) o( (o: II IIL . : :i.a. a::: '.i I q9 o vN ttiii titi 1: S2 :,1 , ..:: (Jl 6.) iil' ith st {{ Meeker St i a li ,lil-: Lake Fe I ),.. , r! rlilis,2il ii :l:i t: :l ::1,,:,..! rr'I rl ri i :1, rir; ,! I l I ill l I :: , . :] i j I :i:l 'r 'l .71 _0) s = :i ,. .i. ;:1 .: al(Uo,:o M Gri ndAsphalt ing\60 n\61.1 Maps\2020 Asphalt Grinding.mxdDesDocument Path: P:\Public\PROJ i:t; 1 WESTBOUND LANE ONLY NOTE: ,1. LONGITUDINAL PLANING WILL BE PER DETAIL NO. 1 2. TRANSVERSE PLANING WILL BE PER DETAIL NO. 2 3. GRINDING WILL BE PER DETAIL NO. 3 : I Llll v), Oi>l \i(o't!a c)ia Ow ,rl 'l :, i r,:ri l 1!i :,., , i :' I i' li Q+:.;r: i r i . .ir i r,l.,ir,',r,, t,.:. :l:i :, I :1,.' -: :7ii i: o?:! :l I : ;i i rli i i.: i,j ,l :t .. .,, ' .l :, :i '. 1 : .i @ F tI]a, q)): c{: tlja .0) (o ii, 'j ,; .l :'lll r il !l:l ljll l'1, ir l .:! i I 300-s.L : t: ii :: :i il I ItI Ii t SE 256 St SE 240 St SE 208 St I @ \, l l : l @ 1248 - ti:) I 1 i ! ti :t:' .1 :i 1:i l I : t:: uJa Qd . IUa c) $N q) N l.r) a c) $ strz8ji'lj'j li i i i 1SiL. BSt Legend PRIORITY ru ASPHALT GRINDING CI Printed 211312020 1 1.50 0.25 0.5 Miles NORTHBOUND LANE ONLY SOUTHBOUND LANE ONLY S224SE i KENT CONDITION A: AT CURB AND GUTTER OVERLAY BY CITY CREW EXISTING MATCH EXISTING GRADE TAPERED PLANING SLOPE Vao 10 PLANING DEPTH, 2INCH EXISTING CURB AND GUTTER (TYP) CONDITION B: AT CURBING EXISTING CURBING MATCH EXISTING PAVEMENT GRADE OVERLAY BY CITY CREW TAPERED PLANING PLANING DEPTH, 2 INCH SLOPE VARIES LL 'EXISTING PAVEMENT I E PLANING WIDTH, 10 FEET EXISTING PAVEMENT DETAIL I LONGITUDINAL TAPERED PLANING (NTS) NO. 1 OVERLAY BY CITY CREW * EXISTING MATCH EXISTING PAVEMENT GRADE TAPERED PLANING SLOPE VARIES DETAIL I TRANSVERSE TAPERED PLANING (NTS) NO. 2 EXISTING PAVEMENT DEPTH VARIES PLANING DEPTH, 2 INCH EXISTING PAVEMENT EXISTING PAVEMENT DEPTH VARIES GRINDING, 10 FOOT GRINDING DEPTH, 2 INCH EXISTING PAVEMENT Maw HMA INLAY BY CITY CREW DETAIL I ASPHALT GRINDING (NTS) NO. 3 1e3 1E EXISTING PAVEMENT 30 INF CH MIN TYP DETAIL I PAVEMENT REPAIR (NTS) NO. 4 "EXISTING PAVEMENT DEPTH VARIES Z w 2 INCH P: 2 U)w w 2 INCH , — — — — a 12INCH DEPTH CSTC PAVEMENT REPAIR (BY CONTRACTOR) "EXISTING PAVEMENT DEPTH VARIES CITY OF KENT PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION • 2020 ASPHALT GRINDING PROJECT KENT CROSS SECTION DETAIL Wwe 1—T.W DATE: 10/26/2018 SCALE: NONE 0+ PREVAILING WAGE RATES 2020 Asphalt Grinding/Singh A - 2 February 19, 2020 Project Number: 20-3001.2 I L4%J%- 1 VI 1V State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 03/10/2020 County Trade yob Classification Holiday Overtime Note Class King Asbestos Abatement Workers Journey Level $50.86 5D 1 H View King Boilermakers Journey Level $69.29 5N 1C View King Brick Mason Journey Level $58.82 5A -1 M View King Brick Mason Pointer -Caulker -Cleaner $58.82 5A 1M View King Building Service Employees Janitor $25.581 5S 2F View King Building, Service Employees Traveling Waxer/Shampooer $26.031 5S 2F View King BuildinpService Employees Window Cleaner (Non -Scaffold) $29.331 5S 2F View King BuildinR Service Em to)ees Window Cleaner (Scaffold) $30.33 5S 2F View King Cabinet Makers (in Shop, Journey Level $22.74 1 View -' King Carpenters Acoustical Worker $62.44 7A 4C View King Carpenters Carpenter $62.44 7A 4C View King Carpenters Carpenters on Stationary Tools $62.571 7A 4C View King Carpenters Creosoted Material $62.541 7A 4C View King Carpenters Floor Finisher $62.441 7A 4C View King Carpenters Floor Layer $62.44 7A 4C View King Carpenters Scaffold Erector $62.44 7A 4C View King Cement Masons Application of all Composition Mastic $62.97 7A 41J View King Cement Masons Application of all Epoxy Material $62.47 7A 41J View King Cement Masons Application of all Plastic Material $62.97 7A 41J View King Cement Masons Application of Sealing Compound $62.47 7A 4U View King Cement Masons Application of Underlayment $62.97 7A 41J View King Cement Masons Building General $62.47 7A 41J View King Cement Masons Composition or Kalman Floors $62.97 7A 4U View King Cement Masons Concrete Paving $62.47 7A 41J View King Cement Masons Curb Et Gutter Machine $62.97 7A 41J View King Cement Masons Curb Et Gutter, Sidewalks $62.47 7A 41J View King Cement Masons Curing Concrete $62.47 7A 41J View King Cement Masons Finish Colored Concrete $62.97 7A 41J View King Cement Masons Floor Grinding $62.97 7A 41J View King Cement Masons Floor Grinding/Polisher $62.47 7A 41J View King Cement Masons Green Concrete Saw, self- powered $62.97 7A 41J View King Cement Masons Grouting of all Plates $62.47 7A 41J View King Cement Masons Grouting of all Tilt -up Panels $62.47 7A 41J View I- . . - - / / r - . - - - - - - 1. - • I - - - I - - 1 _. / - \ . . - - - . - _. I Uyl.. L VI 1lJ King Cement Masons Gunite Nozzleman $62.971 7A 4U View King Cement Masons Hand Powered Grinder $62.97 7A 4U View King Cement Masons Journey Level $62.47 7A 41J View King Cement Masons Patching Concrete $62.47 7A 4U View King Cement Masons Pneumatic Power Tools $62.97 7A 41J View King Cement Masons Power Chipping Et Brushing $62.97 7A 4U View King Cement Masons Sand Blasting Architectural Finish $62.97 7A 41J View King Cement Masons Screed Et Rodding Machine $62.97 7A 4U View King Cement Masons Spackling or Skim Coat Concrete $62.47 7A 4U View King Cement Masons Troweling Machine Operator $62.97 7A 4U View King Cement Masons Troweling Machine Operator on Colored Slabs $62.97 7A 4U View King Cement Masons Tunnel Workers $62.97 7A 4U View King Divers Et Tenders Bell/Vehicle or Submersible Operator (Not Under Pressure) $116.20 7A 4C View King Divers a Tenders Dive Supervisor/Master $79.23 7A 4C View King Divers £t Tenders Diver $116.20 7A 4C 8V View King Divers Et Tenders Diver On Standby $74.23 7A 4C View King Divers Et Tenders Diver Tender $67.31 7A 4C View King Divers a Tenders Manifold Operator $67.31 7A 4C View King Divers Et Tenders Manifold Operator Mixed Gas $72.31 7A 4C View -' King Divers Et Tenders Remote Operated Vehicle Operator/Technician $67.31 7A 4C View King Divers Et Tenders Remote Operated Vehicle Tender $62.69 7A 4C View King Dredge Workers Assistant Engineer $56.44 5D 3F View King Dredge Workers Assistant Mate (Deckhand) $56.001 5D 3F View ,. King Dredge Workers Boatmen $56.44 5D 3F View King Dredge Workers Engineer Welder $57.51 5D 3F View King Dredge Workers Leverman, Hydraulic $58.67 5D 3F View King Dredge Workers Mates $56.44 5D 3F View King Dredge Workers Oiler $56.001 5D 3F View King Drywall Applicator Journey Level $62.441 5D 1 H View King Drywall Tapers Journey Level $62.811 5P 1 E View ' King Electrical Fixture Maintenance Journey Level $31.99 5L 1 E View Workers King Electricians - Inside Cable Splicer $87.22 7C 4E View King Electricians - inside Cable Splicer (tunnel) $93.74 7C 4E View King Electricians - inside Certified Welder $84.261 7C 4E View King Electricians - Inside Certified Welder (tunnel) $90.47 7C 4E View King Electricians - Inside Construction Stock Person $43.18 7C 4E View King Electricians - Inside Journey Level $81.30 7C 4E View King Electricians - Inside Journey Level (tunnel) $87.22 7C 4E View King Electricians - Motor Shop Journey Level $47.531 5A 1 B View King Electricians - Powerline Construction Cable Splicer $82.39 5A - 4D - View King Electricians - Powerline Construction Certified Line Welder $75.64 5A 4D View King Electricians - Powerline Construction Groundperson $49.17 5A 4D View ` King Electricians - Powerline Construction Heavy Line Equipment Operator $75.64 5A 4D View King Journey Level Lineperson $75.64 5A 4D View I Uyt. .r V I 1 V Electricians - Powerline Construction King Electricians - Powerline Construction Line Equipment Operator $64.54 5A 4D View j King Electricians - Powerline Construction Meter Installer $49.17 5A 4D 8W View King Electricians - Powerline Construction Pole Sprayer $75.64 5A - 4D - View '- King Electricians - Powerline Construction Powderperson $56.49 5A 4D View King Electronic Technicians Journey Level $53.57 7E 1 E View King Elevator Constructors Mechanic $97.31 7D 4A View King Elevator Constructors Mechanic In Charge $105.06 7D 4A View King Fabricated Precast Concrete Alt Classifications - In -Factory Work Only $18.25 5B 1 R View Products King Fence Erectors Fence Erector $43.11 7A 4V 8Y View King Fence Erectors Fence Laborer $43.11 7A 4V 8Y View King Ftag ers Journey Level $43.11 7A 4V 8Y View King Glaziers Journey Level $66.51 7L 1Y View King Heat Et Frost Insulators And Journeyman $76.61 5J - 4H - View Asbestos Workers King Heating Equipment Mechanics Journey Level $85.88 7F 1 E View King Hod Carriers Et Mason Tenders Journey Level $52.44 7A 4V 8Y View King Industrial Power Vacuum Cleaner Journey Level $13.501 1 View King Inland Boatmen Boat Operator $61.411 5B 1 K View King Inland Boatmen Cook $56.48 5B 1K View King Inland Boatmen Deckhand $57.48 5B 1 K View King inland Boatmen Deckhand Engineer $58.81 5B 1 K View `King Inland Boatmen Launch Operator $58.89 5B 1 K View King Inland Boatmen Mate $57.31 5B 1 K View King Inspection/Cleaning/Seating Of Cleaner Operator, Foamer Operator $31.49 1 View Sewer Et Water Systems By Remote Control King Inspection / Cleaning/ Sealing Of Grout Truck Operator $13.50 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seating Of Head Operator $24.91 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seating Of Technician $19.33 1 View Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Seating Of Tv Truck Operator $20.45 1 View Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $62.44 7A 4C I View King Ironworkers Journeyman $73.73 7N 10 View King Laborers Air, Gas Or Electric Vibrating Screed $50.86 7A 4V 8Y View King Laborers Airtrac Drill Operator $52.44 7A 4V 8Y View King Laborers Ballast Regular Machine $50.861 7A 4V 8Y I View King Laborers Batch Weighman $43.111 7A 4V 8Y View King Laborers Brick Pavers $50.86 7A 4V 8Y View King Laborers Brush Cutter $50.86 7A 4V 8Y View I U -j %- -T %J I L %J King Laborers Brush Hog Feeder $50.861 7A 4V 8Y View King Laborers Burner $50.861 7A 4V 8Y View King Laborers Caisson Worker $52.44 7A 4V 8Y View King Laborers Carpenter Tender $50.86 7A 4V 8Y View King Laborers Cement Dumper -paving $51.80 7A 4V 8Y View King Laborers Cement Finisher Tender $50.86 7A 4V 8Y View King Laborers Change House Or Dry Shack $50.861 7A 4V 8Y View King Laborers Chipping Gun (30 Lbs. And Over) $51.80 7A 4V 8Y View King Laborers Chipping Gun (Under 30 Lbs.) $50.86 7A 4V 8Y View King Laborers Choker Setter $50.86 7A 4V 8Y View King Laborers Chuck Tender $50.86 7A 4V 8Y Vie King Laborers Clary Power Spreader $51.801 7A 4V 8Y View King Laborers Clean-up Laborer $50.861 7A 4V 8Y View King Laborers Concrete Dumper/Chute Operator $51.80 7A 4V 8Y View King Laborers Concrete Form Stripper $50.86 7A 4V 8Y View King Laborers Concrete Placement Crew $51.80 7A 4V 8Y View King Laborers Concrete Saw Operator/Core Driller $51.80 7A 4V 8Y View King Laborers Crusher Feeder $43.11 7A 4V 8Y View King Laborers Curing Laborer $50.86 7A 4V 8Y View King Laborers Demolition: Wrecking Et Moving (Incl. Charred Material) $50.86 7A 4V 8Y View King Laborers Ditch Digger $50.861 7A 4V 8Y View King Laborers Diver $52.44 7A 4V 8Y View King Laborers Drill Operator (Hydraulic, Diamond) $51.80 7A 4V 8Y View King Laborers Dry Stack Walls $50.86 7A 4V 8Y View King Laborers Dump Person $50.861 7A 4V 8Y View King Laborers Epoxy Technician $50.86 7A 4V 8Y View King Laborers Erosion Control Worker $50.86 7A 4V 8Y View King Laborers Fatter Et Bucker Chain Saw $51.80 7A 4V 8Y View King Laborers Fine Graders $50.861 7A 4V 8Y View King Laborers Firewatch $43.11 7A 4V 8Y View King Laborers Form Setter $50.86 7A 4V 8Y View King Laborers Gabian Basket Builders $50.86 7A 4V 8Y View King Laborers General Laborer $50.86 7A 4V 8Y Vie King Laborers Grade Checker Et Transit Person $52.44 7A 4V 8Y View King Laborers Grinders $50.86 7A 4V 8Y View King Laborers Grout Machine Tender $50.86 7A 4V 8Y View King Laborers Groutmen (Pressure) Including Post Tension Beams $51.80 7A 4V 8Y View King Laborers Guardrail Erector $50.86 7A 4V 8Y Vie King Laborers Hazardous Waste Worker (Level A) $52.44 7A 4V 8Y View King Laborers Hazardous Waste Worker (Level B) $51.80 7A 4V 8Y View I King Laborers Hazardous Waste Worker (Level C) $50.86 7A I 4V 8Y View King Laborers High Scaler $52.44 7A 4V 8Y View King Laborers Jackhammer $51.80 7A 4V 8Y View King Laborers Laserbeam Operator $51.80 7A 4V 8Y View 1 4 %4 %- J V I -L 11 King Laborers Maintenance Person $50.861 7A 4V 8Y View King Laborers Manhole Builder-Mudman $51.801 7A 4V 8Y View King Laborers Material Yard Person $50.861 7A 4V 8Y View King Laborers Motorman -Dinky Locomotive $51.801 7A 4V 8Y View King Laborers Nozzleman (Concrete Pump, Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Blaster, Vacuum Blaster) $51.80 7A 4V 8Y View King Laborers Pavement Breaker $51.80 7A 4V 8Y View King Laborers Pilot Car $43.111 7A 4V 8Y View King Laborers Pipe Layer Lead $52.441 7A 4V 8Y View King Laborers Pipe Layer/Tailor $51.801 7A 4V 8Y View King Laborers Pipe Pot Tender $51.80 7A 4V 8Y View King Laborers Pipe Reliner $51.80 7A 4V 8Y View King Laborers Pipe Wrapper $51.80 7A 4V 8Y View King Laborers Pot Tender $50.86 7A 4V 8Y View King Laborers Powderman $52.44 7A 4V 8Y View King Laborers Powderman's Helper $50.86 7A 4V 8Y View King Laborers Power Jacks $51.80 7A 4V 8Y View King Laborers Railroad Spike Puller - Power $51.80 7A 4V 8Y View King Laborers Raker - Asphalt $52.441 7A 4V 8Y View. King Laborers Re-timberman $52.44 7A 4V 8Y View King Laborers Remote Equipment Operator $51.80 7A 4V 8Y View King Laborers Rigger/Signal Person $51.80 7A 4V 8Y View King Laborers Rip Rap Person $50.86 7A 4V 8Y View King Laborers Rivet Buster $51.801 7A 4V 8Y View King Laborers Rodder $51.80 7A 4V 8Y View King Laborers Scaffold Erector $50.86 7A 4V 8Y View King Laborers Scale Person $50.86 7A 4V 8Y View King Laborers Sloper (Over 20") $51.80 7A 4V 8Y View King Laborers Sloper Sprayer $50.86 7A 4V 8Y View King Laborers Spreader (Concrete) $51.80 7A 4V 8Y View King Laborers Stake Hopper $50.86 7A 4V 8Y View ' King Laborers Stock Piler $50.86 7A 4V 8Y View King Laborers Swinging Stage/Boatswain Chair $43.11 7A 4V 8Y View ' King Laborers Tamper Et Similar Electric, Air Et Gas Operated Tools $51.80 7A 4V 8Y View King Laborers Tamper (Multiple Et Self- propelled) $51.80 7A 4V 8Y View King Laborers Timber Person - Sewer (Lagger, Shorer Et Cribber) $51.80 7A 4V 8Y View King Laborers Toolroom Person (at Jobsite) $50.861 7A 4V 8Y View King Laborers Topper $50.86 7A 4V 8Y View King Laborers Track Laborer $50.86 7A 4V 8Y View King Laborers Track Liner (Power) $51.80 7A 4V 8Y View King Laborers Traffic Control Laborer $46.10 7A 4V 9C View King Laborers Traffic Control Supervisor $46.101 7A 4V 9C View King Laborers Truck Spotter $50.86 7A 4V 8Y View King Laborers Tugger Operator $51.80 7A 4V 8Y View I u y %- %J V I 1 V King Laborers Tunnel Work -Compressed Air Worker 0-30 psi $120.61 7A 4V 9B View King Laborers Tunnel Work -Compressed Air Worker 30.01-44.00 psi $125.64 7A 4V 9B View King Laborers Tunnel Work -Compressed Air Worker 44.01-54.00 psi $129.32 7A 4V 9B View King Laborers Tunnel Work -Compressed Air Worker 54.01-60.00 psi $135.02 7A 4V 9B View King Laborers Tunnel Work -Compressed Air Worker 60.01-64.00 psi $137.14 7A 4V 9B View King Laborers Tunnel Work -Compressed Air Worker 64.01-68.00 psi $142.24 7A 4V 9B View King Laborers Tunnel Work -Compressed Air Worker 68.01-70.00 psi $144.14 7A 4V 9B View King Laborers Tunnel Work -Compressed Air Worker 70.01-72.00 psi $146.14 7A 4V 9B View King Laborers Tunnel Work -Compressed Air Worker 72.01-74.00 psi $148.14 7A 4V 9B View King Laborers Tunnel Work-Guage and Lock Tender $52.54 7A 4V 8Y View King Laborers Tunnel Work -Miner $52.541 7A 4V 8Y View King Laborers Vibrator $51.80 7A 4V 8Y View King Laborers Vinyl Seamer $50.86 7A 4V 8Y View King Laborers Watchman $39.18 7A 4V 8Y View I King Laborers Welder $51.80 7A 4V 8Y View King Laborers Well Point Laborer $51.80 7A 4V 8Y View King Laborers Window Washer/Cleaner $39.18 7A 4V 8Y View King Laborers - Underground Sewer a General Laborer Et Topman $50.86 7A 4V 8Y View Water King Laborers - Underground Sewer Et Pipe Layer $51.80 7A - 4V 8Y - View Water King Landscape Construction Landscape Construction/Landscaping Or Planting Laborers $39.18 7A 4V 8Y View King Landscape Construction Landscape Operator $68.02 7A 3K 8X View King Landscape Maintenance Groundskeeper $17.871 1 View King Lathers Journey Level $62.44 5D 1 H View King Marble Setters Journey Level $58.82 5A 1M View King Metal Fabrication (In Shop) Fitter $15.86 1 View King Metal Fabrication (In Shop) Laborer $13.50 1 View King Metal Fabrication (In Shop} Machine Operator $13.501 View King Metal Fabrication (In Shop} Painter $13.501 View King Metal Fabrication (in Shop) Welder $15.48 1 View ' King Millwright Journey Level $63.94 7A 4C View King Modular Buildings Cabinet Assembly $13.50 1 View King Modular Buildings Electrician $13.50 1 View King Modular Buildings Equipment Maintenance $13.501 View King Modular Buildings Plumber $13.50 1 View King Modular Buildings Production Worker $13.50 1 View King Modular Buildings Tool Maintenance $13.50 1 View King Modular Buildings Utility Person $13.50 1 View King Modular Buildings Welder $13.50 1 View King Ipainters Journey Level $43.40 6Z 2B View I U'j %- I VI -L %j King Pile Driver Crew Tender 1 $67.311 7A 4C View King Pile Driver Crew Tender/Technician $67.311 7A 4C View King Pile Driver Hyperbaric Worker - Compressed Air Worker 0-30.00 PSI $77.93 7A 4C View King Pile Driver Hyperbaric Worker - Compressed Air Worker 30.01 - 44.00 PSI $82.93 7A I 4C View King Pile Driver Hyperbaric Worker - Compressed Air Worker 44.01 - 54.00 PSI $86.93 7A 4C View King Pile Driver Hyperbaric Worker - Compressed Air Worker 54.01 - 60.00 PSI $91.93 7A 4C View King Pile Driver Hyperbaric Worker - Compressed Air Worker 60.01 - 64.00 PSI $94.43 7A 4C View King Pile Driver Hyperbaric Worker - Compressed Air Worker 64.01 - 68.00 PSI $99.43 7A 4C View King Pile Driver Hyperbaric Worker - Compressed Air Worker 68.01 - 70.00 PSI $101.43 7A 4C View King Pile Driver Hyperbaric Worker - Compressed Air Worker 70.01 - 72.00 PSI $103.43 7A I 4C View King Pile Driver Hyperbaric Worker - Compressed Air Worker 72.01 - 74.00 PSI $105.43 7A 4C View King Pile Driver Journey Level $62.69 7A 4C Vie King Plasterers Journey Level $59.42 1 R View King Journey Level $13.50 1 View installers King Plumbers Ft Ejp�tfitters Journey Level $89.191 6Z .1 G View King Power Equipment Operators Asphalt Plant Operators $69.16 7A 3K 8X View King Power Equipment Operators Assistant Engineer $65.05 7A 3K 8X View King Power Equipment Operators Barrier Machine (zipper) $68.55 7A 3K 8X View King Power Equipment Operators Batch Plant Operator: concrete $68.55 7A 3K 8X View King Power Equipment Operators Bobcat $65.05 7A 3K 8X View King Power Equipment Operators Brokk - Remote Demolition Equipment $65.05 7A 3K 8X View King Power Equipment Operators Brooms $65.05 7A 3K 8X View King Power Equipment Operators Bump Cutter $68.55 7A 3K 8X View King Power Equipment Operators Cableways $69.16 7A 3K 8X View King Power Equipment Operators Chipper $68.55 7A 3K 8X View King Power Equipment Operators Compressor $65.05, 7A 3K 8X View King Power Equipment Operators Concrete Finish Machine - Laser Screed $65.05 7A 3K E View King Power Equimfent_q2erators Concrete Pump - Mounted Or Trailer High Pressure Line Pump Pump High Pressure $68.02 7A 3K 8X View King Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Over 42 M $69.16 7A 3K 8X View King Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Up To 42m $68.55 7A 3K 8X View King Power Equipment Operators Conveyors $68.02 7A 3K 8X I View King Power Eguipment Operators Cranes friction: 200 tons and over $71.26 7A 3K 8X View King Power Equipment Operators Cranes: 100 tons through 199 tons, or 150'of boom (including jib with attachments) $69.85 7A 3K 8X View King Power Equipment Operators Cranes: 20 Tons Through 44 Tons With Attachments $68.55 7A 3K 8X View '"y%_°"' J.° King Power Equipment Operators Cranes: 200 tons- 299 tons, or 250'of boom including jib with attachments $70.57 I 7A 3K 8X I View King Power Equir)ment Operators Cranes: 300 tons and over or 300' of boom including jib with attachments $71.26 7A 3K 8X View King Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) $69.16 7A 3K 8X View King Power Equii)ment Operators Cranes: A -frame - 10 Tons And Under $65.05 7A 3K 8X View King Power Eauipment Operators Cranes: Friction cranes through $70.57 7A 3K 8X View King Power Equipment Operators Cranes: through 19 tons with attachments, A -frame over 10 tons $68.02 7A 3K 8X View King Power Equir)ment Operators Crusher $68.55 7A .3K 8X View King Power Eq!j��� Deck Engineer/Deck Winches $68.551 7A 3K 8X View King Derricks, On Building Work $69.16 7A 3K 8X View King Power Eguipment Operators Dozers D-9 Et Under $68.02 7A 3K 8X View King Power Eouii)ment Operators Drill Oilers: Auger Type, Truck Or Crane Mount $68-02 7A 3K 8X View King Power Eguipment Operators Drilling Machine $69.85 7A 3K 8X View King Power Equipment Operators Elevator And Man-tift: Permanent And Shaft Type $65.05 7A 3K 8X View King Power Equipment Operators Finishing Machine, Bidwell And Gamaco Et Similar Equipment $68.55 7A 3K 8X View King Power Equipment Operators Forklift: 3000 Lbs And Over With Attachments $68.02 7A 3K 8X View King Power Equipment Operators Forklifts: Under 3000 Lbs. With Attachments $65.05 7A 3K 8X View King Power Equipment Operators Grade Engineer: Using Blue Prints, Cut Sheets, Etc $68.55 7A 3K 8X View King Power Equipment Operators Gradechecker/Stakeman $65.051 7A 3K 8X View King Power Eguipment Operators Guardrail Punch $68.55 7A 3K 8X View King PoweLfg2jaMfnj Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. Et Ove $69.16 7A 3K 8X View _Qa��r� King Power EquipMfpI Operators Hard Tail End Dump Articulating Off -road Equipment Under 45 Yards $68.55 7A 3K LX Vie King Power Equipment Operators Horizontal / Directional Drill Locator $68.02 7A I .3K 8X View King Power Equipment Operators Horizontat/Directionat Drill Operator $68.55 7A 3K 8X View King Power Equipment Operators Hydralifts/Boom Trucks Over 10 Tons $68.02 7A 3K 8X View King Power Equipment Operators Hydratifts/Boom Trucks, 10 Tons And Under $65.05 7A 3K 8X View King Power Equipment Operators Loader, Overhead 8 Yards. Et Over $69.85 7A 3K 8X View King Power Equipment Operators Loader, Overhead, 6 Yards. But Not Including 8 Yards $69.16 7A 3K 8X View King Power Equipment Operators Loaders, Overhead Under 6 Yards $68.55 7A 3K I LX t___View King Power Equipment Operators Loaders, Plant Feed $68.55. 7A 3K LX View . . . ' ', . '. - ' . . ' ... . . I uyt, ./ VI 1V King Power Equipment Operators Loaders: Elevating Type Belt $68.021 7A 3K 8X I View King Power Equipment Operators Locomotives, All $68.55 7A 3K 8X View King Power Equipment Operators Material Transfer Device $68.55 7A 3K 8X View King Power Equipment Operators Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) $69.85 7A 3K 8X View King Power Equipment Operators Motor Patrol Graders $69.16 7A 3K 8X View King Power Equipment Operators Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And/or Shield $69.16 7A 3K 8X View King Power Equipment Operators Oil Distributors, Blower Distribution Et Mulch Seeding Operator $65.05 7A 3K 8X View King Power Equipment Operators Outside Hoists (Elevators And Manlifts), Air Tuggers, Strato $68.02 7A 3K 8X View King Power Equipment Operators Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $68.55 7A 3K 8X View King Power Equipment Operators Overhead, Bridge Type: 100 Tons And Over $69.85 7A 3K 8X View King Power Equipment Operators Overhead, Bridge Type: 45 Tons Through 99 Tons $69.16 7A 3K 8X View King Power Equipment Operators Pavement Breaker $65.05 7A 3K 8X View King Power Equipment O erators Pile Driver (other Than Crane Mount) $68.55 7A 3K 8X View King Power Equipment Operators Plant Oiler - Asphalt, Crusher $68.02 7A 3K 8X View King Power Equipment Operators Posthole Digger, Mechanical $65.05 7A 3K 8X View King Power Equipment Operators Power Plant $65.05 7A 3K 8X View King Power Equipment Operators Pumps - Water $65.05 7A 3K 8X View King Power Equipment Operators Quad 9, Hd 41, D10 And Over $69.16 7A 3K 8X View King Power Equipment Operators Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $65.05 7A 3K 8X View "King Power Equipment Operators Remote Control Operator On Rubber Tired Earth Moving Equipment $69.16 7A 3K 8X View King Power Equipment Operators Rigger and Bellman $65.05 7A 3K 8X View King Power Equipment Operators Rigger/Signal Person, Bellman (Certified) $68.02 7A 3K 8X View King Power Equipment Operators Rollagon $69.16 7A 3K 8X View King Power Eguipment Roller, Other Than Plant Mix $65.051 7A 3K 8X View ` King Power Equipment Operators Roller, Plant Mix Or Multi -lift Materials $68.02 7A 3K 8X View King Power Equipment Operators Roto-mill, Roto-grinder $68.55 7A 3K 8X View King Power Equipment Operators Saws - Concrete $68.02 7A 3K 8X View King Power Equipment Operators Scraper, Self Propelled Under 45 Yards $68.55 7A 3K 8X View King Power E ui ment Operators Scrapers - Concrete Et Carry All $68.02 7A 3K 8X View .' King Power Equipment O erators Scrapers, Self-propelled: 45 Yards And Over $69.16 7A 3K 8X View e King Power Equipment Operators Service Engineers - Equipment $68.02 7A 3K 8X View King Power Equipment Operators Shotcrete/Gunite Equipment Shovel, Excavator, Backhoe, Tractors Under 15 Metric Tons $65.05 $68.02 7A 7A 3K 3K 8X 8X View View King Power Equipment Operators King Power Equipment Operators Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $69.16 7A 3K 8X View King Power Equipment Operators $68.55 7A 3K 8X View I Ut-j%-. L%J VI 1 V Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $69.85 7A 3K 8X View King Power Equipment Operators Shovel, Excavator, Backhoes: Over 90 Metric Tons $70.57 7A 3K 8X View King Power Equipment Operators Slipform Pavers $69.16 7A 3K 8X View King Power Equipment Operators Spreader, Topsider Et Screedman $69.16 7A 3K 8X View King Power Equipment Operators Subgrader Trimmer $68.551 7A 3K 8X View King Power Equipment Operators Tower Bucket Elevators $68.02 7A 3K 8X View King Power Equipment Operators Tower Crane Up To 175' In Height Base To Boom $69.85 7A 3K 8X View King Power Equipment Operators Tower Crane: over 175' through 250' in height, base to boom $70.57 7A 3K 8X View King Power Equipment Operators Tower Cranes: over 250' in height from base to boom $71.26 7A 3K 8X View King Power Equipment Operators Transporters, All Track Or Truck Type $69.16 7A 3K 8X View King Power Equipment Operators Trenching Machines $68.02 7A 3K 8X View King Power Equip Lent Operators Truck Crane Oiler/driver - 100 Tons And Over $68.55 7A 3K 8X View King Power Equipment Operators Truck Crane Oiler/Driver Under 100 Tons $68.02 7A 3K 8X View -' King Power Equipment Operators Truck Mount Portable Conveyor $68.55 7A 3K 8X View King Power Equipment Operators Welder $69.161 7A 3K 8X View King Power Equipment Operators Wheel Tractors, Farman Type $65.05 7A 3K 8X View King Power Equipment Operators Yo Yo Pay Dozer $68.55 7A 3K 8X View King Power Equipment Operators- Asphalt Plant Operators $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $68.55 7A — 3K — 8X View Underground Sewer Et Water King Power EE uipment Operators- Batch Plant Operator, Concrete $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Bobcat $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition Equipment $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Brooms $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Bump Cutter $68.55 7A 3K 8X View Underground Sewer Er Water King Power Equipment Operators- Cableways $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators Chipper $68.55 7A — 3K — 8X View Underground Sewer Water King Power Equipment Operators- Compressor $65.05 7A — 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Concrete Finish Machine - Laser Screed $65.05 7A 3K 8X View Underground Sewer & Water King Power Equipment Operators- Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure $68.02 7A 3K 8X View Underground Sewer Et Water ."'J%- ^.L ". ^" King Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Over 42 M $69.16 7A I 3K IX I View King Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Up To $68.55 7A 3K 8X View Underp,round Sewer & Water King Power Eguipment �Q�ator�s- Conveyors $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equil)ment Operators- Cranes friction: 200 tons and over $71.26 7A 3K 8X View Under ound Sewer Et Water King Power Equipment Q22rators- Cranes: 100 tons through 199 tons, or 150' of boom (including jib with attachments) $69.85 7A 3K 8X View King Cranes: 20 Tons Through 44 Tons With Attachments $68.55 7A 3K 8X View Underuound Sewer Et Water King Power EguipMenLOperators- Cranes: 200 tons- 299 tons, or 250'of boom including jib with attachments $70.57 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Cranes: 300 tons and over or 300' of boom including jib with attachments $71.26 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, Under 150'Of Boom (including Jib With Attachments) $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Cranes: A -frame - 10 Tons And Under $65.05 7A I 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Cranes: Friction cranes through 199 tons $70.57 7A 3K 8X View Underground Sewer Et Water King Power EquiQment Operators- Cranes: through 19 tons with attachments, A -frame over 10 tons $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Crusher $68.55 7A 3K M View Unde,,g,round Sewer Et Water King Power Equipment Operators- Deck Engineer/Deck Winches (power) $68.55 7A IK 8X View Undera,round Sewer Et Water King Derricks, On Building Work $69.16 7A 3K LX Ki�ew JI Underground Sewer Et Water King Power Eguipment Operators- Dozers D-9 Et Under $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment gpf rators- Drill Oilers: Auger Type, Truck Or Crane Mount $68.02 7A 3K 8X View Underground Sewer Et Water King Power Eguipment Operators- Drilling Machine $69.85 7A 3K 8X View King Power Equipment Operators- Elevator And Man-tift: Permanent And Shaft Type $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Finishing Machine, Bidwell And Gamaco Et Similar Equipment $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment gp��rators- Forklift: 3000 1 bs And Over With $68.02 7A 3K 8X View King Power EquiDment Operators- Forklifts: Under 3000 Lbs. With $65.05 7A 3K 8X View King Power Equipment Operators- Grade Engineer: Using Blue Prints, Cut Sheets, Etc $68.55 7A 3K 8X View Undero-round Sewer Et Water King Power Equipment Operators- Gradechecker/Stakeman $65.05 7A 3K 8X View Underuound Sewer & Water King Guardrail Punch $68.55 7A 3K 8X View I U lj %_ L Z_ %.j I L %_0 Power Equipment Operators- Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. It Over I Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump Articulating Off -road Equipment Under 45 Yards $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Horizontal/ Directional Drill Locator $68.02 I 7A 3K 8X View Underground Sewer Ft Water King Power Equipment Operators- Horizontal/ Directional Drill Operator $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Hydratifts/Boom Trucks Over 10 Tons $68.02 7A 3K 8X I View Underground Sewer Et Water King Power Equipment Operators- Hydralifts/Boom Trucks, 10 Tons And Under $65.05 7A 3K 8X View Under round Sewer Et Water King Power Equipment Operators- Loader, Overhead 8 Yards. Et Over $69.85 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead, 6 Yards. But Not Including 8 Yards $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Loaders, Overhead Under 6 Yards $68-55 7A 3K 8X View Undero,round Sewer 8: Water King Power Equipment Operators- Loaders, Plant Feed $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) $69.85 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Graders $69.16 7A 3K 8X View Underground Sewer a Water King Power Equipment Operators- Mucking Machine, Mote, Tunnel Drill, Boring, Road Header And/or Shield $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Oil Distributors, Blower Distribution Et Mulch Seeding Operator $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Outside Hoists (Elevators And Mantifts), Air Tuggers, Strato $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $68.55 7A 3K 8X View Underground Sewer Water King Power Equipment Operators- Overhead, Bridge Type: 100 Tons And Over $69.85 7A 3K 8X View Undermund Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type: 45 Tons Through 99 Tons $69.16 7A 3K 8X View Underp-round Sewer Et Water King Power Equipment Operators- Pavement Breaker $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane Mount) $68.55 7A 3K 8X View Undera,round Sewer Et Water King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Posthote Digger, Mechanical $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Power Plant I $65.05 I 7A 3K I 8X I View I ,Underg,round Sewer a Water King I IPumps - water 1 $65.05 7A I IK I LX I View I U %J %. .L ✓ V I 1 lJ Power Equipment Operators - Quad 9, Hd 41, D10 And Over $69.16 7A — 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $65.05 7A 3K 8X View Underground Sewer Et Wafter King Power Equipment Operators- Remote Control Operator On Rubber Tired Earth Moving Equipment $69.16 7A 3K 8X View Underground Sewer Water King Power Equipment Operators- Rigger and Bellman $65.05 7A — 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators- Rigger/Signal Person, Bellman (Certified) $68.02 7A — 3K — 8X — View Underground Sewer Et Water King Power E ui ment Operators- Rollagon $69.16 7A — 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators Roller, Other Than Plant Mix $65.05 7A — 3K — 8X — View .' Underground Sewer Et Water King Power E ui ment O erators Roller, Plant Mix Or Multi -lift Materials $68.02 7A — 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators- Roto-mill, Roto-grinder $68.55 7A — 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $68.02 7A — 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under 45 Yards $68.55 7A 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators- Scrapers - Concrete Et Carry All $68.02 7A 3K 8X View Underground Sewer £t Water King Power Equipment Operators- Scrapers, Self-propelled: 45 Yards And Over $69.16 7A — 3K — 8X — View Under,ground Sewer Et Water King Power Equipment Operators- Service Engineers - Equipment $68.02 7A — 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators- Shotcrete/Gunite Equipment $65.05 7A — 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoe, Tractors Under 15 Metric Tons $68.02 7A 3K 8X View Underground Sewer Water King Power Equipment Operators- Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $69.16 7A 3K 8X View Under round Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $69.85 7A 3K 8X View Under rg ound Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes: Over 90 Metric Tons $70.57 7A 3K 8X View Under round Sewer Et Water King Power Equipment Operators- Slipform Pavers $69.16 7A — 3K — 8X — View Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et Screedman Subgrader Trimmer $69.16 $68.55 7A — 7A — 3K — 3K — 8X — 8X — View View Underground Sewer Et Water King Power Equipment Operators- Underground Sewer & Water King Power Equipment Operators- Tower Bucket Elevators Tower Crane Up To 175' In Height Base To Boom $68.02 $69.85 7A 7A 3K — 3K 8X 8X View View m Underground Sewer Et Water King Power Equipment Operators- Underground Sewer Et Water King Power Equipment Operators- Tower Crane: over 175' through 250' in height, base to boom $70.57 7A 3K 8X View Underground Sewer Et Water I U'j t- -L -T VI L W King Power Equipment Operators- Tower Cranes: over 250' in height from base to boom $71.26 I 7A 3K 8X I View Underground Sewer Et Water King Power Equipment Operators- Transporters, All Track Or Truck Type $69.16 7A 3K 8X View UndeEgL21!nd Sewer Water King Power Equipment Operators- Trenching Machines $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators Truck Crane Oiler/driver - 100 Tons And Over $68.55 7A 3K 8X View Underground Sewer a Water King Power Equipment Operators- Truck Crane Oiler/Driver Under 100 Tons $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Truck Mount Portable Conveyor $68.55 7A - 3K - 8X View Underground Sewer Et Water King Power Equipment Operators- Welder $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmatt Type $65.05 7A 3K 8X View Underground Sewer It Water King Power Equipment Operators- Yo Yo Pay Dozer $68.55 7A 3K 8X View Underground Sewer & Water King Power Line Clearance Tree Trimmers Journey Level In Charge $53.10 5A 4A View King Power Line Clearance Tree Trimmers Spray Person $50.40 5A 4A View King Power Line Clearance Tree Trimmers Tree Equipment Operator $53.10 5A 4A View King Power Line Clearance Tree Trimmers Tree Trimmer $47.48 5A 4A I View King Power Line Clearance Tree Trimmers Tree Trimmer Groundperson $36.10 5A 4A View King Refrigeration Et Air Conditioning Journey Level $84.01 6Z 1G View Mechanics King Residential Brick Mason Journey Level $58.82 5A 1M View King Residential Carpenters Journey Level $32.06 1 View King Residential Cement Masons Journey Level $29.25 1 View King Residential Drywall Applicators Journey Level $46.43 7A 4C View King Residential Drywall Tapers Journey Level $47.041P 5P 1E View King Residential Electricians Journey Level $36.01 1 View King Residential Glaziers Journey Level $45.90 7L 1H View King Residential Insulation Applicators Journey Level $29.87 1 View King Residential Laborers Journey Level $26.18 1 View King Residential Marble Setters Journey Level $27.38. 1 View King Residential Painters Journey Level $27.80 1 View King Residential Plumbers & Pi2efitters Journey Level $39.43 1 View King Residential Refrigeration Et Air Journey Level $54.12 5A IIG View Conditioning Mechanics King Residential Sheet Metal Workers Journey Level (Field or Shop) $51.89 7F 1 R View King Residential Soft Floor Lavers Journey Level $51.07, 5A 3.1 View King Residential Sprinkler Fitters (Fire Journey Level $50.89 5C 2R View Protection) King Residential Stone Masons Journey Level $58.821 5A im View King Residential Terrazzo Workers Journey Level $54.061 5A .1-A View King Residential Terrazzo/Tile Finishers Journey Level $24.39 1 View King Residential Tile Setters Journey Level $21.04 1 View I U Vj %. L -1 V I -L %J King Roofers Journey Level 1 $55.021 5A 3H View King Roofers Using Irritable Bituminous Materials $58.02 5A 3H View King Sheet Metal Workers Journey Level (Field or Shop) $85.88 7F 1 E View King Shipbuildinp, Et Ship Repair New Construction Boilermaker $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Carpenter $36.361 7V 1 View King Shipbuilding Ship Repair New Construction Crane Operator $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Electrician $36.36 7V 1 View King Shi building Shi Re air New Construction Heat Et Frost Insulator $76.61 5-1 4H View King Shipbuilding Et Ship Repair New Construction Laborer $36.361 7V I View King Shipbuilding Et Ship Repair New Construction Machinist $36.36 7V I View King Shipbuilding Ship Repair New Construction Operating Engineer $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Painter $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Pipefitter $36.36 7V 1. View King Shipbuilding Et Ship Repair New Construction Rigger $36.36 7V 1 View King Shipbuilding Et Ship New Construction Sheet Metal $36.36, 7V 1 View King Shipbuilding Et Ship Repair New Construction Shipfitter $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Warehouse/Teamster $36.36 7V 1 View King Shipbuilding, 8t Ship Repair New Construction Welder Burner $36.36 7V 1 View King ShiLbuilding. Et ShJ2 Repair Ship Repair Boilermaker $46.15 7X 4-1 View King Shipbuilding Ship Repair Ship Repair Carpenter $44.95 7X 4J View King Shipbuilding Et Ship Ship Repair Crane Operator $45.061 7Y 4K View King Shipbuilding Et Ship_Rair Ship Repair Electrician $46.22 7X 4J View King Shipbui[dina, Et Ship Repair Ship Repair Heat Et Frost Insulator $76.61 5J 4H View King Shipbuilding Et Ship Repair Ship Repair Laborer $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Machinist $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Operating Engineer $45.06 7Y 4K View King Shipbuilding- Et Ship Repair Ship Repair Painter $46.15 7X 4J View King Shi buildin Et Shi Re air Ship Repair Pipefitter $46.15 7X 4-1 View King Shipbuilding Et Ship Repair Ship Repair Rigger $46.15, 7X 4-1 View King Shipbuilding F± Ship Ship Repair Sheet Metal $46.151 7X 4J View King ShipbuildingShip Et Ship Repair - Repair Shipwright $44.95 7X 4-1 View King Shipbuilding Et Ship Repair Ship Repair Warehouse Teamster $45.06 7Y 4K View King Sign Makers Et Installers JELec�trical Journey Level $49.44 0 1 View King SignMakers Et Installers (Non- Journey Level $31.96 0 1 View Electricals King Soft Floor Layers Journey Level $51.07 5A 3J View King Solar Controls For Windows Journey Level $13.50 1 View King Sprinkler Fitters (Fire Protection) Journey Level $82.391 5C -1 x View King Stage Rigging Mechanics (Non Journey Level $13.50 1 View 9EqqgEgil King Stone Masons Journey Level $58.82 5A 1M View King Street And Parking Lot Sweeper Journey Level $19.09 1 View Workers King Surveyors ,Surveyor Assistant Construction Site $68.02 7A 3K 8X View I U kj %- L %J VI L %..P King Surveyors I Cha nman 1 $65.051 7A 3K 8X View King Surveyors Construction Site Surveyor $69.16 7A 3K 8X View King Telecommunication Technicians Journey Level $53.57 7E 1E View King Telephone Line Construction - Cable Splicer $41.81 5A 2B View Outside King Telephone Line Construction - Hole Digger/Ground Person $23.53 5A 2B Vie Outside King Telephone Line Construction - Installer (Repairer) $40.09 5A 2B View Outside King Telephone Line Construction - Special Aparatus Installer 1 $41.81 5A I 2B View Outside King Telephone Line Construction - Special Apparatus Installer 11 $40.99 5A 2B View Outside King Telephone Line Construction - Telephone Equipment Operator (Heavy) $41.81 5A 2B View Outside King Telephone Line Construction - Telephone Equipment Operator (Light) $38.92 5A 2B View Outside King Telephone Line Construction - Telephone Lineperson $38.92 5A 2B View Outside King Telephone Line Construction - Television Groundperson $22.32 5A 2B View Outside King Telephone Line Construction - Television Lineperson/Instatter $29.60 5A I 2B View Outside King Telephone Line Construction - Television System Technician $35.20 5A 2B View Outside King Telephone Line Construction - Television Technician $31.67 5A 2B View Outside King Telephone Line Construction - Tree Trimmer $38.92 5A 2B View Outside King Terrazzo Workers Journey Level $54.061 5A 1M View King Tite Setters Journey Level $54.06 5A 1M View King Tile, Marble Et Terrazzo Finishers Finisher $44.89 5A 1B View King Traffic Control Stripers Journey Level $47.68 7A 1K View King Truck Drivers Asphalt Mix Over 16 Yards $61.59 5D 4Y 8L View King Truck Drivers Asphalt Mix To 16 Yards $60.751 5D 4Y 8L View King Truck Drivers Dump Truck $60.75 5D 4Y 8L View King Truck Drivers Dump Truck it Trailer $61.59 5D 4Y 8L View King Truck Drivers Other Trucks $61.59 5D 4Y 8L View King Truck Drivers - Ready Mix Transit Mix $61.591 5D 4Y 8L View King Well Drillers 8t Irrigation Pump Irrigation Pump Installer $17.71 1 View Installers King Well Drillers Et Irrigation Pum Oiler $13.50 1 View Installers King Well Drillers Et Irrigation Pump Well Driller $18.00 1 View Installers