Loading...
HomeMy WebLinkAboutCAG2020-001 - Change Order - #7 - Mike McClung Construction - Riverbend Driving Range Improvements Phase 1 - 03/04/2020 Agreement Routing Form • For Approvals,Signatures and Records Management This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. KEN T WASHINGTON (Print on pink or cherry colored paper) Originator: Department: LynnOsborn for Parks Date Sent: Date Required: 0 03/02/2020 Soonest possible please L. Q Authorized to Sign: Date of Council Approval: Q0 Director or Designee ❑Mayor 12/10/2019 (orig. agmt.) Budget Account Number: Grant? ❑Yes 0 No G20031 Budget? 0 Yes ❑ No Type: Vendor Name: Category: Mike McClung Construction Commpany Contract Vendor Number: Sub-Category: C 384333 Change Order 0 Project Name: Riverbend Driving Range Improvements Phase 1 - £ Change Order 7 L 0 = Project Details:CO 7, trench installation per ASI sections, $36,800.00 C 0 C Agreement Amount: $1,490,970.30-NEW Basis for Selection of Contractor: Bid 1 Start Date: Jan. 2020 Termination Date: 4/17/2020 - NEW Q Local Business? ❑Yes O No* *If meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce. Notice required prior to disclosure? Contract Number: Ord fi L) 1 -7 ❑Yes I]No CAG2020-001 Date Received by City Attorney: Comments: p1 C 3 0 cc •� i QJ 3 C ON Date Routed to the Mayor's Office: V1 Date Routed to the City Clerk's Office: dd«W22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements KENT W A S N I N G T G N CHANGE ORDER NO. 7 NAME OF CONTRACTOR: McClung Construction Co. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Riverbend Driving Range Improvements - Phase 1 ORIGINAL CONTRACT DATE: 1 02/2020 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: 6'Wx44'L Infi►tration Trench as per ASI-1.3 (1/31/20), ASI-1.4 (1/30/20) and ASI-1.5 (1/23/20) 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $1,417,130.00 (including applicable alternates and WSST) Net Change by Previous Change Orders $33,360.30 (incl. applicable WSST) Current Contract Amount $1,450,490.30 (incl. Previous Change Orders) Current Change Order $36,800.00 Applicable WSST Tax on this Change $3,680.00 Order Revised Contract Sum $1,490,970.30 CHANGE ORDER - 1 OF 3 Original Time for Completion 4/5/2020 (insert date) Revised Time for Completion under 4/10/2020 prior Change Orders (insert date) Days Required (t) for this Change 7 calendar days Order Revised Time for Completion 4/17/2020 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: ? CITY OF KENT: l By: B Lure) (signature) Print �ame: � Sc ��(CZ"V t Name: Julie Parascondola Its ttid�- its Parks, Rec.&Comm.Svcs. Director DATE: A.6/O-�6LV DATE: i CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) i tL Kent Law Department � d/�T,f JJulia(in this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3