HomeMy WebLinkAboutPW18-473 - Change Order - #9 - Scarsella Bros., Inc. - S 228th St UPRR Grade Separation - Additional Ductile Iron Pipe - 01/10/2020 Agreement Routing Form • For Approvals,Signatures and Records Management KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. WASHINGTON (Print on pink or cherry colored paper) Originator: Department: S. Anderson PW Engineering Date Sent: Date Required: > 2/24/20 N/A 0 L CL Authorized to Sign: Date of Council Approval: a' 0 Director or Designee ❑Mayor N/A Q Budget Account Number: Grant? ❑Yes ❑ No Budget? 0 Yes ❑No Type: pe,�c',( 1 .tom- Loca i Vendor Name: Category: Scarsella Bros, Inc. Contract Vendor Number: Sub-Category: = 34547 Change Order 0 Project Name: S.228th St. UPRR Grade Separation Ground Improvements & Embankments L 0 c Project Details:Create a bid item to provide compensation to Scarsella Bros, Inc. for the *, installation of an additional 37 feet of 10-inch ductile iron pipe. C a� C Agreement Amount: $4,995 Basis for Selection of Contractor: Bid Start Date: N/A Termination Date: N/A Im Local Business? ❑Yes El No* *If meets requirements per KCC3.70.w please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number: 04(o + 0 I —� ❑Yes 0 No PW18-473 Date Received by City Attorney: Comments 01 C 3 0 a, > oc ., R C p� Date Routed to the Mayor's Office: V1 Date Routed to the City Clerk's Office: Visit Documents.KentWA.gov to obtain copies of all agreements • KENT W A 5 H I N G T O 1 CHANGE ORDER NO. # 9 NAME OF CONTRACTOR: Scarsella Bros., Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER:S. 228t" St. UPRR Grade Separation Ground Improvements & Embankments ORIGINAL CONTRACT DATE: December 20, 2018 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This change makes the following revision to the contract documents: Incorporate revised contract drawing 16, 17, 18, and 19 of 36 into the contract, relocating the DCDA for Alexander Exhibits. Create a bid item to provide compensation to Scarsella Bros, Inc. for the installation of an additional 37 feet of 10-inch ductile iron pipe. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $7,760,955.20 (including applicable alternates and WSST) Net Change by Previous Change Orders $50,018.39 (incl. applicable WSST) Current Contract Amount $7,810,973.59 (incl. Previous Change Orders) Current Change Order $4,995.00 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $7,815,968.59 CHANGE ORDER - 1 OF 3 Original Time for Completion 140 working days (insert date) Revised Time for Completion under 11 working days prior Change Orders (insert date) Days Required (f) for this Change Order 0 calendar days Revised Time for Completion 151 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: 2t 7 Jrka By: (signature) V (signature) Print Name: Print Name: Timothy J. LaPorte, P.E. Its TF�►- """xka Its Public Works Director (title) /ftitle) DATE: DATE:/G7 1 1"_ZL, CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 • FILE NO: 200.2 KENT CHANGE ORDER WORKSHEET NO. 009 Construction Management Division - Public Works Project S. 2281" St Union Pacific Railroad Project No.: 17-3003.2 Grade Separation Ground Improvements and Embankments Project Engineer: Cameron Bloomer, PE Fed-Aid No.: HLP-FMSIB-1216 (005) Owners Rep: KBA, Inc Contractor: Scarsella Bros. Inc. Date: 12/23/2019 I. PROPOSED CHANGE This Change makes the following revisions to the Contract Documents: Incorporate revised contract drawings 16, 17, 18, and 19 of 36 into the contract, relocating the DCDA for Alexander Exhibits. Create a bid item to provide compensation to SBI for the installation of an additional 37 feet of 10 Inch Ductile Iron Pipe. II. REASON AND BACKGROUND FOR CHANGE With Field Directive 004, the City issued revised drawings 16, 17, 18 and 19 of 36 to move the DCDA at the 7440 property (Alexander Exhibits) east. This was done in an effort to make truck turning movements easier on the property. In doing this, the DCDA was moved further from the connection point to their existing private fire system. Additional 10" ductile iron pipe was required to make the connection. III. METHOD OF PAYMENT NEW PAY ITEM(S) ® Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of Qty PE Item . ........ ... ......... ........................................................... .. . . .... ......................................................... ........ .......... .. ..... 10 Inch Ductile Iron Pipe for 37 37 LF $135.00 $4,995.00 Water Connection, CL 52 ........... .... ......... ....... ... ....... ..........._.. ........ _ ......... Independent Estimate Attached CREATE PAY ITEM ONLY— Payment to be made PAY THIS PAY ESTIMATE - REQUIRED at a later date upon completion of work ............ ... ............. ........ Material Submittals Required — CC: Construction Coordinator New Sub Reqrd? No 1 REV. DATE: 3/15/19 FILE NO: 200.2 KENT DELETE EXISTING PAY ITEM(S) per 1-09.5 ® NotAppllcable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. B I. No. Item Description Qty Unit ! Unit Price Cost of Item ......_.._............. ........ .._........._............�.......__................... ....... .......... ..._........... ........ ....... i .. ......................_......._..........-_............_..................__................................. ... ............ i ..................__..................... !._.............._................._.............'......_...................._..._.._................................_................_........_........._...._ -.. ............._...................... ..............__.............................................,............. I j Independent Estimate Attached - REQUIRED ! INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description Qty Unit Unit Price Cost of Item ............................................_:......................_........_.....................1.......................................................................................... ............._........._...._...........__....................................................................................................................._.__..........__....._...__........_...........................__....._.........._.........._...........__.. t i Independent Estimate Attached -REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * $4,995.00 *Total of the Cost of Item Columns ` p THIS PAY ESTIMATE 0 IV. WORKING DAYS 110 Original Contract 1413 Due This Change Order 0 Previous Total 151 ... ........ ............................................ ......._._..._..........}............. .. ......... . . .............._................_...... DATE .......... .................. . DATE:..... :..... .... ............... ................................ . * Explanation/Justification Required: This change does not impact the critical path, no days are being added with this . change. TOTAL WORKING DAYS* 151 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Cargeron Bloomer Date: 12/23/19 � 11-7 Z'5;:' Construction Supervisor: Date: 1 '�?c, ZZoConstruction Manager: ` L Date: 1 7 2 REV. DATE: 3/15/19 BROTHER IN December 12, 2019 City of Kent 220 Fourth Avenue South Kent,WA 98032 Attn: Cameron Bloomer Field Engineer KBA, Inc. RE: 07-3022 228th St. UPRR Phase 4 10"DI CI 52 for DCDA(FWD 004) SCARSELLA BROS. IS PLEASED TO SUBMIT THE FOLLOWING CHANGE ORDER PROPOSAL FOR THIS PROJECT: ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE BID AMOUNT 10"Diameter Ductile Iron,Cl 52 Watermain LF 37 S 145.00 S 5,365.00 S - S - TOTAL $ 5,365.00 NOTES: qr-�cic r�'i� Sincerely, Matthew Scarsella Project Manager FA Sheet No.: MIndependent Cost Estimate CONSTRUCTION MANAGEMENT Project Name: 228th Ph 4 Project No: 17-3003.2 Item No.: Date: 12/12/2019 Description of Work: Additional 10" DIP for Fire Connection 7440 Work by Subcontractor?: (mark "x"if yes) Prime Contractor: Scarsella Bro's, Inc. Sub-Contractor: G and G Incorporated Items/Cost MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT PRICE AMOUNT Pipe Layer 3 Hr $ 60.00 $ 180.00 Operator 6 Hr $ 72.00 $ 432.00 Foreman 3 Hr $ 75.00 $ 225.00 Excavator 3 Hr $ 105.00 $ 315.00 Loader 3 Hr $ 80.00 $ 240.00 Foreman Truck 3 Hr $ 30.00 $ 90.00 10" Pipe Materials,fittings,etc. Domestic 37 LF $ 45.00 $ 1,665.00 $ - Pro-Vac Vactor Truck Excavation 3 Hr $ 195.00 $ 585.00 SUBTOTAL-MATERIALS $ 3,732.00 MATERIALS OVERHEAD 8 PROFIT @ 21% $ 783.72 TOTAL 4,515.72 Verification of Hours Worked: TOTAL: $ 4,515.72 ... .......... . . ... . ....... ... . . ... ............................................. 12%MARKUP(for prime when subcontract work) Contra.... ctor's..Re....pre..sentativ........ e(printed.. ....... .n..am..e) SHEET TOTAL: $ 4,515.72 s.... . .. "'"' ........................... . ..................................................... Contracto...... .rr's Rep.. resentative Signature........ Date Prime Markup on Subcontractor: er's ......R........epresentativ..................... ( .printe..........n.....me...).................................................. 12%: <$25,000 Owne d a 10%: $25,000 to$100,000 O..........wner's..........Representative...................Signature.......................................ate................................ 7%: >$100,000 D Pay Estimate Entered: ❑ If checked,this work is in dispute. By signing this form, parties are Date: agreeing to the time and effort needed to accomplish the task. By Entitlement to be determined at a later date. 1 of 1 P-13 (Rev. 7/12) Cameron Bloomer From: Matthew Scarsella <matthew.s@SCARSELLABROS.com> Sent: Friday, December 13, 2019 10:43 AM To: Cameron Bloomer Cc: Barry, Jason; Nick Venema Subject: RE: DCDA 10 In DI Cl 52 Yes that works. Thanks, Matt Scarsella Bros., Inc. Matthew Scarsella, P.E. I Project Manager P.O. Box 68697 Seattle,Washington 98168-0697 o: (253) 872-7173 1 c: (206) 817-2765 matthew.s@scarsellabros.com From: Cameron Bloomer<cbloomer@kbacm.com> Sent: Friday, December 13, 2019 10:35 AM To: Matthew Scarsella<matthew.s@SCARSELLABROS.com> Cc: Barry,Jason<JBarry@kentwa.gov>; Nick Venema<nick.v@SCARSELLABROS.com> Subject: RE: DCDA 10 In DI Cl 52 Hello Matt, My ICE is attached, I came in around $4500 and assumed 3 hours of crew time. Note there are the same number of bends and the connection was already included in the item, so its just putting in the 37'. Can you meet us in the middle at$135 per LF,$4,995 total? Cameron Bloomer, PE C 206.819.7148 1 cbloomer@kbacm.com KBA, Inc. I Construction Management Specialists I www.kbacm.com From: Matthew Scarsella<matthew.s@SCARSELLABROS.com> Sent:Thursday, December 12, 2019 3:16 PM To: Cameron Bloomer<cbloomer@kbacm.com> Cc: Barry,Jason<J Barry@ kentwa.gov>; Nick Venema<nick.v@SCARSELLABROS.com> Subject: DCDA 10 In DI Cl 52 Cameron, Attached is a price per LF for the additional 10" DI Cl 52 Watermain at the DCDA. Thanks, Matt 1 B Matthew Scarsella, P.E. ercxrs Project Manager, SB Structures, LLC A PO Box 68847 Seattle,Washington 98168 O 253.872.6750 M 206.817.2765 E matthew.sCascarsellabros.com 2 KENT W ASM i NG r ON Field Work Directive FWD 004 Project Name: S. 22Sth St. Union Pacific Railroad PW Project Number: 07-3022 Grade Separation—Ground Improvements and Embankments Contractor: Scarsella Bros., Inc. Federal Aid Number: HLP-FMSIB- 1216(005) Subject: Relocate DCDA, Air/Vac, Hydrant at Date: 410912019 7440 and meter/RPBA at 15+46.1 Scope: Make the following changes to the Contract Documents: I • Contract Drawings 13, 14, 16, and 19 (see attached) o Relocate the Water Meter and RBPA at Sta. 15+46.1,57.1' R as shown. o Relocate the Fire Hydrant Assembly,Water Service Air/Vac Vault and the DCDA on 7440 S. 228'h Street as shown. Measurement and Payment: Please provide a cost proposal for the additional 10" CL 52 DI water main necessary to move the hydrant at 7440. Existing bid items to be used for the other revisions. Attachment(s): Revisions to drawings 13, 14, 16, and 19. Contractor Acknowledgement: By: Date: _ , /Z /q Matthew Scarsella, Project Manager Ow r Approval: By: Date: to I I Jason Barry, City of Kent By: _ ryr• Date: 30 I Eric Connor, City of Kent THIS FIELD WORK DIRECTIVE DOES NOT PROVIDE FOR EITHER A TIME EXTENSION OR A CHANGE IN THE CONTRACT PRICE.LABOR,EQUIPMENT,AND/OR MATERIAL OUTLINED IN THIS FIELDWORK DIRECTIVE SHALL BE PAID BY BID ITEM(S)OR A CHANGE ORDER SHALL BE DEVELOPED FOR TIME EXTENSION OR CONTRACT PRICE INCREASES. ANY PROTEST TO THE FIELDWORK DIRECTIVE SHALL FOLLOW 1-04.5 OF THE WSDOT STANDARD SPECIFICATIONS. T 4L 133HS 33S OS+£Z 'V15 0 0 0 0 0 0 0 ,� (0 to 0 M N76 j tt 133HS 33S OS+£Z 'V1S a QZ O W �W sl I xe +. u !f � '>axs Vk'� z II I rF f �N ! :I z 5 ,�, O. `N I < rc< a z ^a3Vx ;� ( I ,. ��o�;Z ;I w ffis ,e o aim g gooam k� ^k r5 1� d�za I }.. WWV x ym R n77€ H- I 1z a K W= W i i a3e;s 0 r a >>j '^ 6oz Inds ry N0„�, N I Y1lOii 9 j S r� N r< ( I I I ro c o i p00 co �Az+ � a+o a a md� �.. I I Y o u may, v ..¢N$ YQ �� I , 4� g8'—i ® � La ii o I �r, s -------------__--__ _ H!W kr i 4 N i IN n ————--————— �-- �— b Z-t� T�-} F '-I --b TV81 NV8ana31Hl 1 o0 - � <n 1 10< �i i s rl I #-ice d t € g ZL 133HS 33S OS+gL 'V1S ZL 133HS 33S 094 'Vl I , I a 1 ^ o LL F ---- Go c z -_�Tld'- I O o O o 0 o O O r O O O O O O O D�pl V♦ I� <O •A d M N � J' m NIVA N31VM H1210N ON3 NIVNI M31VM H12lON ON3 zm a / 5Tz p o U ' O�a i N < w w3 >cSim n �FR'r Vl�m_ yK< amU a 3 u O � z 3 hwQ 3 w — N w ¢W 2 nm S 3AV HAL ?W'o�i ;r > a - - ��zs cnQ. '^Q.o r I mmomo� ._. __L_._.. • a•nu.. � - 2iv'�-r iv N� wi9 wis 99 x! �- COm o 4 de 61.1 Ln AN y - o O�n�— • ` W w m m Dix o _ 0. _ , r I n——— '� VI eis iv o �zM g wZ — Zy3 gN to zl # b N .-�2 N .::-. Wic� SN eq way C N i m g m I a FU < H o a � , I �; � o - ----..... �n S o o 9. 1 ,.) � _!S 0 /IMJL$.Ll M3Ncn t;a Nw inm--U ■■�I, '� o Z. ¢ G aJ < mn Y I u 3.m--° .zr xw nh+-z r �g�1 a F gi N �i' p a ( I I 1 F ifaz_ 3: 1 �m N - d— w FFE m a�W olio SGg,. m m rw o wNR r W - �_ aw" a && o m =, t= ra zi n ♦W N Y 3 - 1---- -_ l YA W fqV �dl £t 133HS 33S OS+£Z 'V1S £t 133HS 33S OS+£Z 'V1S 3 " 8) mw� e: 0 0 - sum o e --•-tee-� - �W I j r„' ��� ----:-----�- �.__._._. _._._.... M ZU u�imm; 1 ow N tlrc k � a w� ao«0 W < , _ m w -- ---- w Ito <`� Wz 11mW�g ZO oaomN I »�% N I �mas Y nn •-s I � •Nq �"oA O 0 0 0 0 0 0 0 a w O O O O O O QAI IAai a M N n • L t 133HS 33S 09+S t Ll 133HS 33S OS+SI 'V1S �f m N °�tza a J- 3 3i w r < L;v z � r N P 0 in I I — co a uo�>a a vM c o =-3 £ ?O� c iL W. i� j w r. :n fi ---- < \ W h: _ n r ; o Sao rca E 1 m g o,> I 3 Y$o z - � o u SJlin 'w z _ g . J� Soxae z s moo `-'a< I RxR 8 I gl�000 aaam =z i oa 8 + r T iX F� >i r� cas x: t_ ! z a w R. 71 ? a "R an _ oi 3a4�� U 1 U ��� ,^I I YF 1•I� Cz 1 ^ <� ! S n"�� Xis - 1 � w og�a n o z n oN Uv) < pw R nm a /// i a: am�Ni ��, „ s _ate_� �� A .1— o 0 0 0 o �i r NIVMI 831YM 2iO3 'PL 133HS 33S w� s c $ 51whe�o G FU q _ b <az 'wwiFHa Svi aZN < Q � j w Ora < I xo"3"" 3 a 7 - CZ= 3 I �W� t j w r i O z V~1 IL 3 I in = c~a0i i a N z Q E i{ �o 04 C-4 a NN W t cc m I p� I W^ m Rs I 3< I - 0' I I I 9NITIM Ol < x o Q U I < � Q s 15 C YC� Y'C 'm � a uC7 . y a YCK lU of IWGH I! 5 S 5<U �rc�Q I az z x� 3w Or 1J113- �tl ffI � � � ��zo I ivr6 � — i W ��• LLJ W •� w j e w� + IJ - n - - N g co i <9 I O x Im I ( 0Oo N a N I � N y N m pp b� co N < Q y 004 r o I QZQ D O Y Jo S a� - F I I S� gb I m z z$sH8"$$S9 F w. 05luln2 H I 3$ Fla-z z s NIVW d31VM 803 fit 133HS 33S n