Loading...
HomeMy WebLinkAboutPW18-480 - Change Order - #2 - Prospect Construction, Inc. - 640 Pressure Zone Booster Station - 02/07/2020 Agreement Routing Form • For Approvals,Signatures and Records Management KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. WASHINGTON (Print on pink or cherry colored paper) Originator: Department: S. Anderson PW Engineering Date Sent: Date Required: > 2/24/20 N/A 0 L aAuthorized to Sign: Date of Council Approval: Q El Director or Designee ❑Mayor N/A Budget Account Number: Grant? ❑Yes O No Budget? 0 Yes ❑No Type: N/A Vendor Name: Category: Prospect Construction, Inc. Contract Vendor Number: Sub-Category: C 102445 Change Order 0 Project Name: 640 Pressure Zone Booster Station E L Project Details: Additional work required to bring PSE Power into the site which was omitted from the contract. C a, E Agreement Amount: $18,185.86 Basis for Selection of Contractor: Bid W 1 Start Date: N/A Termination Date: N/A Q Local Business? ❑Yes I] No* *If meets requirements per KCC3.70.700,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number: � o ❑Yes 0 No PW18-480 Date Received by City Attorney: Comments: a1 C 7 H .> i 0� M C tm Date Routed to the Mayor's Office: N1 Date Routed to the City Clerk's Office: adccW72373_1_20 Visit Documents.Kenfflkgov to obtain copies of all agreements • KENT W n 5 H I N G T O N CHANGE ORDER NO. #2 NAME OF CONTRACTOR: Prospect Construction, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: 640 Pressure Zone Booster Station ORIGINAL CONTRACT DATE: December 27, 2018 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,728,427.90 (including applicable alternates and WSST) Net Change by Previous Change Orders $35,619.33 (incl. applicable WSST) Current Contract Amount $2,764,047.23 (incl. Previous Change Orders) Current Change Order $16,532.60 Applicable WSST Tax on this Change $1,653.26 Order Revised Contract Sum $2,782,233.09 CHANGE ORDER - 1 OF 3 Original Time for Completion 200 working days (insert date) Revised Time for Completion under 215 working days prior Change Orders (insert date) Days Required (f) for this Change Order 15 calendar days Revised Time for Completion 230 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By:- BY: (signature) signature) Print Name: Print Name: Timothy J. LaPorte, P.E. Its , ' ^'A 'e Its Public Works Director (title) of title) DATE: Xl S/ Z1:2-0 DATE: �7�Z -r, CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) r Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 • FILE NO: 200.2 KENT CHANGE ORDER WORKSHEET NO. 2 Construction Engineering Division — Public Works Project: 640 Zone Booster Pump Station Project No.: 17-7999.4 Project Engineer: Gray & Osborne Fed-Aid No.: N/A Capital Projects Phil McConnell Contractor: Prospect Construction Manager: Date: Various I PROPOSED CHANGE Additional work required to bring PSE Power into the site IT. REASON AND BACKGROUND FOR CHANGE PSE Power work not shown on the plans, omitted from the contract and required to supply power to the building III. METHOD OF PAYMENT NEW PAY ITEM(S) Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Qty this Unit Unit Price Total Estimated Cost of Est. Qty PE Item i ......................... . . _ ......... ........................................., . ......_......_..........._.....................,. . ....... ........ . ._......... ........ .............. 1 Additional work for PSE 1 1 LS $16,532.60 $16,532.60 Ppower service ...... _.... ---_ ..................................._....__................_.......................__.._._.................................. -........... . ......................................... ..._. ❑ y Independent Estimate Attached ; CREATE PAY ITEM ONLY— Payment to be made ® PAY THIS PAY ESTIMATE REQUIRED at a later date upon completion of work .. ........... ........ ................................................................._..................... Material Submittals Required — CC: Construction Coordinator New Sub Regrd7 No DELETE EXISTING PAY ITEM(S) per 1-09.5 Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description Qty Unit Unit Price Cost of Item ............................................. ............................._......._............._............................ P...................................................................................................................................................................................._............................................................................................................................................ ..... ..................................... I t ......................................................._........................................._..__...._............_........._......................................................................... ....................._ . .. ...... . I Independent Estimate Attached -REQUIRED ❑ i INCREASE/DECREASE TO EXISTING PAY ITEM(S) Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. .. Description_.............p......................................................,..........__......._.._ty...................,.................... ................... 1 REV. DATE: 3/27/18 /�• FILE NO: 200.2 KENT WA= r ....................................... ....................................................................................................................................................................... ................................................... Independent Estimate Attached -REQUIREDEl TOTAL ESTIMATED COST OF CHANGE ORDER * $16 532.60 *Total of the Cost of Item Columns THIS PAY ESTIMATE $16 532.60 IV. WORKING DAYS Original Contract 200 Due This Change Order* 15 Previous Total 215 .......... ... ............................................_... ... ............. ..........:_.......—............... ........ ........................................... ...--.................. .............._.................................................... DATE: DATE: _....:.... ..... _.......... ................ ........ .. ............................................................................................................................. ................._._..._.............. _...._..__._ * ; Explanation/Justification Required: Additional work directly impacted the critical path TOTAL WORKING DAYS* 230 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Capital Projects Manager: Date: Construction Engineering ' Date: Supervisor: 7 Construction Manager: G ��72G Date: 2 REV. DATE: 3/27/18 PSE Force Account Tally Kent Prospect org. propsal 4492 4492 4492.00 11/20/2019 5426.72 5426.72 11/21/2019 1411.35 1411.35 11/22/2019 2331.79 2331.79 9169.86 9169.86 9169.00 TBD spoils haul 180 180 dipping fees 640 640 load spoils EQ 91.74 91.74 load spoils lab 72 72 983.74 10153.E _ --- 153.6 bollards Q65 87 1 7 1887.00 Grand Total 2.6 16532 1653 4 McConnell, Phillip From: Kevin Yoakum <kyoakum@prospectconst.com> Sent: Tuesday, February 4, 2020 7:21 AM To: McConnell, Phillip Subject: RE: PS1 - PSE Change Order EXTERNAL EMAIL Phil, Looks good, I agree. Thanks Kevin Yoakum, PE ROSPECT CONCTR(kCTiON, INC, Cell (425)985-9636 Ph. (253)446-1600 Fx. (253)446-1601 From: McConnell, Phillip <PMcConnell@kentwa.gov> Sent:Tuesday, February 04, 2020 6:45 AM To: Kevin Yoakum <kyoakum@prospectconst.com> Subject: PS1 - PSE Change Order Kevin, I've attached my tally of the PSE change order including the bollards. Please review, comment and or approve. Phil McConnell, Capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5542 1 Cell 253-261-5685 pmcconnell@KentWA.QOV CITY OF KENT, WASHINGTON KentWA.gov Facebook YouTube PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL 1 FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED �_ T Project Name: 640 Pressure Zone Booster Station Project No: 17-7999.4 Item No.: Change Order 2 Date: 11/20/2019 Description of Work: Existing conduit intercept point incorrect bid rice ....sawcut and excavate into driveway to intercept conduit at new point Work by Subcontractor?: NO Prime Contractor: Prospect Construction Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Tyler operator 4 76.03 1 101.77 S 405.89 Skip carpenter foreman 4 77.01 1 105.6 $ 413.64 Blaine carpenter apptrentice 2 56.21 $ 112.42 $ S SUBTOTAL-LABOR: S 931.95 LABOR OVERHEAD&PROFIT @ 29% $ 270.27 LABOR TOTAL $ 1,202.22 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT Forklift 2 48.01 $ 96.02 JD 50 mini excavator 4 25.03 $ 100.12 $ S - SUBTOTAL-EQUIPMENT S 196.14 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 41.19 EQUIPMENT TOTAL $ 237.33 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Best Parking Lot Vacotr 1 EA $ 2.795.00 S 2,795.00 cutoff saw rental AA Rentals 1 EA $ 126.50 S 126.50 steel sheet rental Sunbelt Rentals Inv#96268365-0001 1 EA S 373.68 S 373.68 S - SUBTOTAL $ 3,295.18 OVERHEAD&PROFIT @ 21% $ 691.99 TOTAL $ 3,987.17 Verification of Hours Worked: TOTAL: $ 5,426.72 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 5,426.72 Owner's Representative Date Comments FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED �_ T Project Name: 640 Pressure Zone Booster Station Project No: 17-7999.4 Item No.: Change Order 2 Date: 11/21/2019 Description of Work: Supply and install shoring. Begin backfilling addition dig area Work by Subcontractor?: NO Prime Contractor: Prospect Construction Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Tyler laborer 5.5 76.03 $ 418.17 Skip carpenter-foreman 6 77.01 $ 462.06 $ SUBTOTAL-LABOR: $ 880.23 LABOR OVERHEAD&PROFIT @ 29% $ 255.27 LABOR TOTAL $ 1,135.50 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT JD 50 4 25.03 $ 100.12 compactor 4 6.95 $ 27.80 Is Is - SUBTOTAL-EQUIPMENT $ 127.92 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 26.86 EQUIPMENT TOTAL $ 154.78 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT sand 3.79 tns $ 26.40 $ 100.06 Is Is - SUBTOTAL $ 100.06 OVERHEAD&PROFIT @ 21% $ 21.01 TOTAL $ 121.07 Verification of Hours Worked: TOTAL: $ 1,411.35 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 1,411.35 Owner's Representative Date Comments FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED �••� �_ T Project Name: 640 Pressure Zone Booster Station Project No: 17-7999.4 Item No.: Change Order Date: 11/22/2019 Description of Work: backfilling of PSE trench Work by Subcontractor?: NO Prime Contractor: Prospect Construction Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs I OT Rate AMOUNT Tyler laborer 5 76.06 $ 380.30 Skip carpenter-foreman 5 77.01 $ 385.05 Blaine carpenter-apprentice 2 56.21 $ 112.42 $ $ SUBTOTAL-LABOR: $ 877.77 LABOR OVERHEAD&PROFIT @ 29% $ 254.55 LABOR TOTAL $ 1,132.32 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT JD 50 4 25.03 $ 100.12 compactor 4 6.96 $ 27.84 $ $ SUBTOTAL-EQUIPMENT $ 127.96 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 26.87 EQUIPMENT TOTAL $ 154.83 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Gborrow(19x2.5x5=237.5CFx120=28500/2000=14.25 tons 14.25 tons $ 22.05 $ 314.21 Gborrow 15.5x2.5x1.5=58.13x120=6975lbs/2000=3.49 3.49 tons $ 22.05 $ 76.95 Shoring Rental Cascade 1 EA $ 472.18 1 $ 472.18 Is - SUBTOTAL $ 863.34 OVERHEAD&PROFIT @ 21% $ 181.30 TOTAL $ 1,044.64 Verification of Hours Worked: TOTAL: $ 2,331.79 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 2,331.79 Owner's Representative Date Comments Q1 O ti Cl) Ln z- N C-) O 41 N T7 p 6 4 Il o ti M Ln I,- ti CD ti CD EA tq EA EST , J LO I- r- M N 0 0 0 (D C:) O O C:) C) C:)u- Ef} 613 EA EA 6r) ff3 C M M M M M M M co co co co M C Ef3 EPr 69 69 ffl tf? Q r- � O Ln F- N co Ln f� (n Efl cq U) 64 Gq EA CO V- fQ-- N M V CO � co W 0 0 0 0 0 0 U- fA EA tf3 ER Ef} fA Q M O Cfl O M B U v CO W. M. -. N LL N M M Ln '13- CO 64 EA to EA H) (f) N L to M co co N 1* p) U- t0 h O N h 0 Ry N ER tR to EA EST v> > N d � a CO d N N N N m co M Ln Ln Ln Ln O O S CO co Cfl co N N Ll.. EA fA Ef3 Ef3 EA EA d N M O LO V N CO "T Ln � Ln M Ef3 to 6'A EFT EA 69l CN Q a. Q 0 J Ln U r 4t Z Q E- O c n O O ~O C N O O y o0 1- � L U n0 M E d d y O a+ Q Q U- .Q O R O fl ` O L tC J Q NU- +., d m d C d C L ++ U C U - d - d p CL6 Q O = N CL d Q N to Q N CZ CL LCL p E �p R U U QO d W U U U 01 Pa Spreadsheet Report Page t PSE Vault Additional Work 11172019 11:21 AM ON IA Project name PSE Vaea AO M-1 Won, hbor rate table K gC..t,060118 Equipmem rate table Eq.BWe Baok07-a Repot/formal s..by'AuemW/ 'Omait wmmery Prim sort level odes E# ,aanrem e: PCI Spreadsheet Report Page 2 PSE Vault Additional Work 11171201911:21 AM §bo1,- GasopiWn Notes ".TdkeoRiittaeltli �y Labot Plioe dJt dulnF fAatedN Pftda= Matsdq� Mgllnt Sub Am (ir Equip PMGe EQM@Anlwpt DMer RdOsOtMf Amount Toad Amount' _, •(' i19 Vault. Ezravala P'A(11'z11'v45'Deep)BLoatl oul 400 hr 8000 12931 mr 516 Trucks De 180.0Mix a bx e00 B00 2.50 m 90.00 lea 226 - 22fi .-M DSBD6wllh Native 2.00 M d.w 128.3)mr 259 - - - n.0/mr 50 30B SIB Betltlin 3.00 5).301 1. Bare Plate Co Mw '.00 M - - - 3.62 ar 4 - d CowtlMM MLooalioruDalWery wkh PSE .W M 2.000 11636 Mr 116 - - - - 116 Vaults Work Pb for PSE Vault 14.000 B80 397 164 too 2,241 Vauna 0Y6'Wwk PA EWbM1830dof Uerlah 3.90 hr 1 .000 1293)mr 653 - 25.01 Tr 6t - 560 BacMlA SendBwAM1 Nalive 2..hr 0.000 129.3)Mr 259 - - 25.01 Mr 50 309 I 9antl 30Y324n20'D 5.50 52a0 290 - - - 290 Dare Pble Dom actor tw hr - - - 3.62 9a d - 41 ''. Sl8 Betldin PA I. a"./ 19 Gravel e000v♦ffi roadweY d.f0 q - - M.00/w 2. Vaults 45,4'Work Pit and 301f of trend,. 11.000 711 612 141 1,3s1 Ex above Estimate Totals Description Alnadnt Totals t oom Rd* Labor 1.802 2s—Ma Malarial 909 3Eouiomanl 2. 13.500 hn .her B00 3,806 9,606 Markup-labor 665 3a.000 X Mekuo-Maleriak 359 21 n00 X 12—Markup-Eauiomanl 62 % Merkuo-9uba 12%<25k 2A11U% M a-san.lo% look 1%a Merkuo-euba)%>t00k 888 6,692 road 4,492 it 0v 4 K m x ;tea @�iid(rm� � �� Ufilfkt C�iI� s� \IK n : - EMM M�w) ,fOv rwt Goal n ��hip rid � �� � E �.� �� 'ems ni" �[I Nll tr Sw i "ON t�� �� mg- FS TooNlyll 16u` I I � �,. Wd RIM I r, nI a ,r !� w,er h ,a. � Extra Trenching In Roadway (19LF in length,trench width 30") 56"depthx19'Lx30"W Gravel Borrow 8.2 1 CY I 16.4 Tns 16" depthxl9'x30"w Sand 2.3 1 CY 1 4.7 1 Tns Note" Conduit 6' deep instead of 4' per orignal estimate 12"depthx20'x30" Gravel Borrow 1.9 CY 3.7 ITns Export Take sum of import materials above *1.35 Expansion 16.75 Cy 2 ea Export Loads ,MR ,k R w.. aT TA u �t 'thank you for Your usln li rtan i�¢rrr �nzJ s.i�111twyrsr 7�n9rrrl; 19��i d 010,40irriea=h0fit'of 1141,014 �r <[lops toubtt W r n�dE[i��rr tF+a i a Ttrf Hilo avco lia i I{tAi}t}li tAt 4q -T t ljpd of Al�'aYa'�I(t;ca will 4s�Y5'ti�I. 0 itd4 �'�pitH�{ lda� ttt�4atv�4i,y3tk�t,cvi�milati,rtli9fihft (�� rmi � n�. ioM r.. "1 a «F; INVOICE SEND ALL PAYMENTS TO: SUNBELT RENTALS, INC. INVOICE NO. 96268365-000 1 po Box 409211 ATLANTA, GA 30384-9211 LT 316076 SUMBIE RENTALS 11/22/19 1 of 1 INVOICE TO WAYNE, WAYNE 96268365 1 oz•5383•6677 PROSPECT CONSTRUCTION INC ATTN A/P 116 23RD ST SE 175 PUYALLUP WA 98372-4116 nll�il��l��ll�ll��llil�lil�l�rlil�nllilrlllil�llhl���ll�lrl� 640 BOOSTER STATION JOB ADDRESS 640 BOOSTER STATION PACIFIC WA SHORING PC1302 11300 SE 236TH PL 799 VALENTINE AVE SE KENT, WA 98031 PACIFIC, WA 98047 2124 360-481-8293 253-987-7555 QTY EQUIPMENT # Min Day Week 4 Week Amount 13 22" - 36" HYD VERTICAL SHORE CYLINDER 13.00 13.00 33.00 98.00 169.00 Billed from 11/21/19 thru 11/22/19 5 34" - 55" HYD VERTICAL SHORE CYLINDER 13.00 13.00 39.00 117.00 6N%00 26 1 1/2' VERTICAL SHORE ALUMINUM RAIL N/C 10 1 1/2' VERTICAL SHORE ALUMINUM RAIL 9 STRUCTURAL BOARD 4FT X 8FT 8.00 8.00 54.00 62.00 14.00 1 5 GALLON PLASTIC HAND PUMP 18.00 15.00 14.00 145.00 15.00 1 REMOVAL HOOK - 48 5.00 5.00 15.00 45.00 5.00 1 RELEASE TOOL - 48" 5.00 5.00 15.00 45.00 5.00 24.00 4 4'x6' 3/4" FINNFORM 6.Rental sub-total : 54.00 340.00 Re FINAL BILL: 11/21/19 11:00 AM THRU 11/22/19 08:47 AM. � 9q - Gr v 34 0.00 33.68 REMIT TO: _ e � . SUNBELT RENTALS, INC. NET DUE UPON RECEIPT • • 373.68 PO BOX 409211 Invoices not paid within 30 days may be subject INVOICE ���17Y ear�cr�t� Srftce 1945 PO Box 487 CORS LIS Sumner,WA 98390 Invoice#: 229422 Date: 11l22l19 RES0URC�S �,� 253-826-8010 18191 ,5O AR@CorlissResources.com Customer No: 640 PRESSURE ZONE �"?r` GAT S 0 TOt Job 000037: BOOSTER PO#: Delivered To: 11300 SE 236TH PL Sold To: PROSPECT CONSTRUCTION INC KENT,WA AP@PROSPECTCONST.COM PUYALLUP.WA 98372 US Mad Tax SKU Description Qty UOM Unit Price Total Code Tax Total -.. -a.-. m_ .. Sale Date: 11122/2019 PO#: 30.39 TN 22,0500 670.10 Resale 0.00 670.10 5002970 2 SCR GRAVEL BORROW SOLO 670.10 0.00 670.10 Total: Cust Job: 000037 Total Invoice: 670.10 0.00 670.10 Tickets; 101-240427. 101-240445 I S J> 0't 0 31,E C70, G Payment Type: On Account Total: 670.10 2 Pay Terms Net 46 days .. Seattle Yard: (206) 624-1422 4ci!� Admin Office: (503) 363-0906 Cascade ety LLC Fax: (503) 485-0823 Remit to: PO Box 17847 Salem, OR 97305 www.cascadetrenchsafety.com companygpformation FINAL INVOICE Prospect Construction Inc Print Date: ^11/26/2019 116 23RD St Se Invoice Date: 1 1/26/201 9 Puyallup WA 98372 Invoice Number: 603738 Start Date: 11/20/2019 Start Time: 11:00 AM Returned: 11/22/2019 Job Information , Terms: Net 30 175/Kent Booster Pump Station Shipped Via: Best Way 11300 Se 236TH PI Kent WA 98031 Wayne 253.261.0756 Price Per Unit Totals City Item Description Item# Weight Total Wf Day Week 4 Week Ext Amt Discount Total 2 8X10 STEEL PLATE P810 3268 6536 29.60 62.40 125.60 156.00 •31.20 124,80 From: 11/20/19 11:00 AM Off-Rent Date;1 1122119 5:00 PM '""Sn#018,629•" 1 PLATE LIFT TOOL PLFT a 0 9,60 23.20 57.60 29.00 -5.80 23.20 From: 11/20/19 11:00 AM Off-Rent Date:11/22/1 9 5:00 PM Safes Items: 1.00 Cts Delivery CTS DELIVE 125.00 125.00 125,00 1.25 Cts Pickup CTS PICKUP 125.00 156.25 156.25 -•-Payments-�•-- 4-of 0- oil Rentals 148.00 Sales 281.25 Delivery/Other 0.00 • Rental Charges accrue from On-Rent date,except for minimum billing terns. Damage Waiver 0.00 • Effective January 1st,2016 all rentals are billed at a 1 week minimum. Env.Charges 0.00 • All equipment called OH-Rent must be out of use and gathered all in one place for pick up. Sales Tax 42.93 Customer Representative's signature ackrlcwledges that instructions have been given by Cascade Trench Total 472.18 Safety,LLC,on We methods of operation and that Cascade Safety Guidelines or Tab Data have been received for each type of equipment included on this order. Amount Billed 472.18 This agreement is subject to all terms and conditions stated on the reverse side hereof. I have read these terms and conditions and agree thereto. Page Number.1 Accepted By:_.- �..._— �.�...-m.-..�,. 1 I/26/19 14:32:48 RCH (Authorized Customer Representative's Signature) Date (Print Name) BEST PARKING LOT CLEANING INC Invoice Number: 2 412 INTER AVE V1857 94 PUYALLUP, WA 98372 Invoice Date: Nov 21, 2019 Voice: 800-310-7406 Fax: 253-770-0724 Invoice Page: 1 Bill To: PROSPECT CONSTRUCTION, INC. Job Site: 177 116 23RD ST SE LOWER RUSS ROAD PUYALLUP, WA 98372 KENT Customer ID Customer PO Payment Terms Due Date PROSPECTI9 Net 30 Days 12/21/19 Job Slip#/ Description Hours Price Net EEDUCI 8.00 210.00 11680.00 OVERTIME 1 & 1/2 EDUCTOR & OPERATOR EDUC` 1.00 250.00 250.00 E DISPOSAL OF MATERIALS $178.20 PER YARD <Eac 4 .00 178.20 712.80 i ($110.00/ton) DISPOSAL OF LIQUID BY GALLON-STORM DISP 400.00 0.38 152.00 Subtotal 2, 794.80 TERMS: NET 30 DAYS MONTHLY FIN CHRG = 1.75% Sales Tax Total Invoice Amount 2,7 94.8 0 PLEASE SHOW INVOICE NUMBER WITH YOUR PAYMENT Payment/Credit Applied ALL INVOICE DISPUTES MUST BE SUBMITTED TOTAL 2,794. 80 IN WRITING PRIOR TO INVOICE DUE DATE KENT EX 0.00 - Seattle 206-382-9340 �,�ittuw�xt Tacomp 253-863-3330 JOB SLIP# V Puyallup 253-841-7406 www.bestparkinglot.com EDUCTOR AND CAMERA TRUCK CUSTOMER NAME: JOB NAME: WATER UP LOCATION: LOCATION: DUMPING LOCATION : CITY: , DISPATCHED BY: JOB PHONE: REQUESTED BY: ON DATE: JOB NUMBER PO NU BER-------------E-D—U-C-70 R OPEFFATOR '-L/VB­0 RER PORTAL ZONE ON JOB OFF JOB P P" "ZONE 7571 3 HOUR MIN DESCRIPTION OF SERVICES: t,' V\ I ,r 77 Circle Site Portal charge Yard Puyallbp,, Woodinville Zone Charge 1= 1 .5/.5 3=2 (1.0/1.0) 4=2.5 (1.25/1.25) 5= 3 1.5/1.5) 6= Outside EDUCTORS: CAMERA TRUCK NUMBER: SPILL RESPONSE: SPECIALTY HEADS PUSH BIO DEGREASER POTHOLING LATERAL LAUNCH BIO ABSORBENT TYPE 2 CBS DYE SPILL KIT TYPE 1 CBS CD PPE CONFINED SPACE ENTRY THUMB DRIVE BOOMS CB SOCKS REPORTS OTHER PRODUCTS HOSE PER FT POND CLEANING ROOTCUTTING BOOMS OTHER SERVICES ALL DEBRIS HAULED OFF IS SUBJECT TO A PER YARD FEE$45-$178.20 AND UP r< Loads of Fresh water to Bill: {{ }} t Dump location r l € #t Type of Matenalt #_ r (So4ids)Yards a!OiTposal (Liquids)Gallons of Disposal_ C (If available)SIGNED BY: VACTORS"CCTV' SWEEPERS'VACUUMS• WATER TRUCKS'PRESSURE WASHING DE-ICING`PLOWING'DISPOSAL'SPILL RESPONSE After 30 days 1.75%per month interest will be charged.'Signature of this invoice will be considered your notice of our intent to lien, Office use only: Credit Card COD On Account T&M Quote Sales Person Best Parking Lot Cleaning Inc. 2412 Inter Ave Puyallup, WA 98372 1-800-310-7406 White-Original Yellow-Remittance Pink-Contractors Copy