Loading...
HomeMy WebLinkAboutPW18-480 - Change Order - #1 - Prospect Construction, Inc. - 640 Pressure Zone Booster Station - 02/07/2020 Agreement Routing Form • For Approvals,Signatures and Records Management This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. KEN T W A S H I N G T O N (Print on pink or cherry colored paper) Originator: Department: S. Anderson PW Engineering Date Sent: Date Required: > 2/24/20 N/A 0 5. aAuthorized to Sign: Date of Council Approval: Q 0 Director or Designee ❑Mayor N/A Budget Account Number: Grant? ❑Yes EI No Budget? 0 Yes ❑No Type: N/A Vendor Name: Category: Prospect Construction, Inc. Contract Vendor Number: Sub-Category: 102445 Change Order 0 Project Name: 640 Pressure Zone Booster Station E 0 Project Details: Additional watermain work performed due to incorrect contract plans. C 0 E Agreement Amount: $35,619.33 Basis for Selection of Contractor: Bid i Start Date: N/A Termination Date: N/A Im a Local Business? ❑Yes 17 No* *If meets requirements per KCC3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspoce. Notice required prior to disclosure? Contract Number: ❑Yes 0 No PW18-480 Date Received by City Attorney: Comments: p1 C N •> i R Im Date Routed to the Mayor's Office: Vf Date Routed to the City Clerk's Office: ,&cW22373_1_20 Visit Documents.KentWA.gov to obtain copies of all agreements • KENT N n 5 H I H G T G n CHANGE ORDER NO. # 1 NAME OF CONTRACTOR: Prospect Construction, Inc. ('Contractor") CONTRACT NAME & PROJECT NUMBER: 640 Pressure Zone Booster Station ORIGINAL CONTRACT DATE: December 27, 2018 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Additional watermain work performed due to incorrect contract plans. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,728,427.90 (including applicable alternates and WSST) Net Change by Previous Change Orders $0.00 (incl. applicable WSST) Current Contract Amount $2,728,427.90 (incl. Previous Change Orders) Current Change Order $32,381.21 Applicable WSST Tax on this Change $3,238.12 Order Revised Contract Sum $2,764,047.23 CHANGE ORDER - 1 OF 3 Original Time for Completion 200 working days (insert date) Revised Time for Completion under 200 working days prior Change Orders (insert date) Days Required (f) for this Change Order 15 calendar days Revised Time for Completion 215 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By. By: (signature) gnature) Print Name: �').. Print Name: Timothy J. LaPorte, P.E. Its Vu ' -'-Ck 0JAu ��' Its Public Works Director (title) (title) DATE: 2i 5/ 120 2.v DATE: /207U CHANGE ORDER - 2 OF 3 i ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) c Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 K E KEG T FILE NO: 200.2 N CHANGE ORDER WORKSHEET NO. 1 Construction Engineering Division — Public Works _ Project: 640 P.Z. Booster Pump Station Project No.: 17-7999.4 Project Engineer: Gray & Osborne Fed-Aid No.: N/A Capital Projects Phil McConnell Contractor: Prospect Construction Manager Date: Various I. PROPOSED CHANGE Additional watermain work performed H. REASON AND BACKGROUND FOR CHANGE Contract plans show the existing piping incorrectly. Requiring the removal and replacement of additional existing i in , valves, fittings etc. III. METHOD OF PAYMENT NEW PAY ITEM(S) Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch No. Item Description Total Qty this Unit Unit Price Total Estimated Cost of Est. Qty PE j Item 13 Additional watermain work 1 LS i 1 $32,381.21 $32,381.21 i Independert Estimate Attached C1EATE PAY ITEM--ONLY- Payment to be made ® PAY THIS PAY ESTIMATE - REQUIRED at a later date upon completion of work - - Material Submittals Required - CC• Construction Coordinator New Sub Reqrdrd? ' No DELETE EXISTING PAY ITEM(S) per 1-09.5 N Not Applicable Change Order No. - I FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description Qty Unit Unit Price Cost of Item } Independent Estimate Attached -REQUIRED INCREASE/DECREASE TO EXISTING PAY ITEM(S) Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY --- _____.___------,------ _ — --- Sch, No B.I. No i Item Description Qty Unit — Unit Price Cost of Item - - - - - - - - EJ I i f Independent Estimate Attached - REQUIRED L 1 REV. DATE: 3/27/18 KENT FILE NO: 200.2 TOTAL ESTIMATED COST OF CHANGE ORDER * $321381.21 *Total of the Cost of Item Columns THIS PAY ESTIMATE $321381.21 IV. WORKING DAYS Original Contract . Due This Change Order* i 15 Previous Total 200 DATE: DATE: TT * QEpla nation QIstifigtion R Impacted critical path, both in scheduled work and performing the added work TOTAL WORKING DAYS* 1 215 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Capital Projects Manager: Date: / 1 it McC n 11 Construction Engineering - _ / Date: Supervisor: ��Pau Kuhne Construction Manager: �� Date: ric Connor 2 REV. DATE: 3/27/18 k 9/19/2019 Excavate for tie in 3050.13 9/20/2019 Continued excavation 1748.03 9/23/2019 Tie in and begin backfill 16511.03 9/24/2019 Backfill pipe trench 5205.49 9/26/2019 Dig for tie in reducer conflict 1089.10 10/1/2019 Tie in reducer conflict 4777.43 32381.21 FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKEDrr Project Name:640 Pressure Zone Booster Pump Project No: 17-7999.4 Item No.: Date: 9/19/2019 Description of Work:Excavated for tie in work,demo'd unidentified piping, Work by Subccntractw?:No Prime Contractor:Pros Sub-Contractor: LABOR STRAIOHTTIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Houny Rate Hrs CT Rate AMOUNT Tyler Kilts LB4 3 60.34 $ 181,02 Tyler Kilts O ator 7 76.03 $ 532 21 Dillon Marshall No MatchOp2rator 10 76.03 $ 760,30 Josh Kies No Match LB4 2 60341 IN.Match $ 120.68 $ SUBTOTAL,LABOR. S 1,59421 LABOR OVERHEAD S PROFIT Q 29% S 462.32 LABOR TOTAL $ 2,056.63 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Dewnptgn Hrs Hourly Rate Hrs Stanoby RateI AMOUNT 318 Ex 210 Komatsu 3 91.741 51 22ml8I_S 386.12 303 PC 50 John Deere 7 25,03 1 6.31 S 181.52 323 Backhm John Deem 7 35.17 1 7.33 S 253,52 $ $ SUBTOTAL-EQUIPMENT S 82116 EQUIPMENT OVERHEAD 8 PROFIT @ 21% S 172.44 EQUIPMENT TOTAL $ 993.60 MATERIALS(SE R VICESIRENTALS MATERIALS/SERVICES Quantity Units I Unit Price DOLLAR AMOUNT $ $ S S $ SUBTOTAL S OVERHEAD 8 PROFIT @ 21% S TOTAL $ Verification of Hours Worked: TOTAL. $ 3,050.13 12%MARKUP (fw prime When subcontract Mork) $ Contractors Representative Date SHEET TOTAL: $ 3,050.13 Ownefs Repmsentarlve Data Comment$ f FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED NT Project Name:640 Pressure Zone Booster Station Project No:17-7999.4 Item No.: Date: 9/20/2019 Description of Work:Continued excavation for Monday tie in Wurk by Subcontractor?:No Prime Contractor:Prospoct Sub-Contractor: LABOR STRAIGHTTIME OVERTIME DOLLAR NAME CODE OCCUPATION I Him Hourly Rate Hire OT Rate AMOUNT T er Kilts L84 5 60,2$ 401.00 Josh Kitts LB4 2 602 S 401,00 Dillon Marshall No Matc Operator 5 960.2 f 160.40 $ $ SUBTOTAL-LABOR: S 1,055-30 LABOR OVERHEAD&PROFIT a 29% $ 306.04 LABOR TOTAL $ 1,301.34 EQUIPMENT EOUIPMENT OR ATTACHMENTS OPERATED $TANOBY DOLLAR Equipmen10 Equipment.D.,Aptbn Hrs Hourly Rate Hrs SfDlly Rate AMOUNT 316 Ex 210 Komatsu 3 91.74 21 22 181 S 319,58 Is S $ E SUBTOTAL-EQUIPMENT S 319-58 EQUIPMENT OVERHEAD&PROFIT(off 21% S 67.11 EQUIPMENT TOTAL f ---a l4tATER1AL3lSERVICES/RENTALS MATERIALS I SERVICES Quantity Units Unit Price DOLLAR AMOUNT E f $ E $ SUBTOTAL $ OVERHEAD$PROFIT @ 21% S P. TOTAL $ Verification of Hours Worked: TOTAL: $ 1,748.03 12%MARKUP (fo, prime when subcontract work) $ Contracwrs Reore-nt a Date SHEET TOTAL $ 1,748.03 owners Reprasenlat— D- C mments FA Sheet No.: DAILY REPORT OF ^ FORCE ACCOUNT WORKED Project Name:640 Pressure Zone Booster Staion Project No:17-7999.4 Item No.: Date: 9/2 3120 1 9 Description of Work:Cut into existIN pipe,complete tie in work,and backfill Work by SuticontractoI 7,NO Prime Contractor:Pros Sub-Contractor: LABOR STRAIGHTTIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hou Rate Hrs OT Rate AMOUNT Tyler Kitts L84 8 60.34 s482.72 Tyler Kilts O for 2 76.03 $ 152.06 Dillon Marshall O mtor 10 75.03 s 760.30 Blaine Rismoen Cannenter 8.5 71.8 $ 610,30 Is SUBTOTAL-LABOR: $ 2,00538 LABOR OVERHEAD&PROFIT @ 29% $ 587.55 LABOR TOTALS 2,586.94 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment ri Equipm scription ent De Hrs I Hourly Rate Ji Hrs IStandby Rate AMOUNT 318 Ex 210 Komatsu 8 91,74 $ 733.92 303 PC 50 John Deere 2 25.03 § 50,06 323 Backhoe John Deere 2 35,171 1 1 3 70.34 Chop Saw 1 72,001 1 1$ 72.00 Jumping Jack 1 95.00 f 95.00 SUBTOTAL-EQUIPMENT S 1.021.32 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 214,48 EQUIPMENT TOTAL S 1,235.80 MATERIALStSERVICESlRE__ MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Ductile Iron Pipe 2 each $ 1,079.69 $ 2,159.38 16'Bolt kit 3 each $ 147.00 s 441o0 16"FCA 1 each $ 1,389.05 $ 1.389.05 16'Sleeve 2 each S 338,55 $ 677.10 16"MJ kit 6 each $ 276.43 $ 10658.58 16"FL X FL Tee leach $ 1,116.94 f 1,116,94 16'FL X MJ BF Valve 1 each $ 2.830.15 $ 2,830,15 Valve Box for BF Valve 1 each s 213.99 $ 213.99 SUBTOTAL $ 100486.19 OVERHEAD&PROFIT @ 21% $ 2.202.10 TOTAL $ 12,688.29 Verification of Hours Worked: TOTAL. $ 16,511.03 12%MARKUP (for prime when subcontract work) $ Cmaactpr's Representative Date SHEET TOTAL: $ 16 511.03 0~$RepmSentatry Dale Comments FA Sheet No.: DAILY REPORT OF ^ FORCE ACCOUNT WORKED Project Name:640 Pressure Zone Booster Station Project No:17-7999A Item No.: Date: 9/24/2019 Description of Work:Backfilling pipe trench Work oy Subcontractoo.No Prime Contractor:Prospect Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Dillon Marshall 0perela 7 76.03 $ 532121 3 $ S SUBTOTAL-LABOR. S 532.21 LABOR OVERHEAD 5 PROFIT @ 29% S 154.34 LABOR TOTAL $ 696,55 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment It Equipment Description HrsHoUrty Rate Him Standby Rsle AMOUNT 318 Ex 210 Komatsu 3 91.74 4 22.18 $ 363.94 303 PC 50 John Deere 1 25,03 6 6.31 $ 62.89 323 Backhoe John Deere 3 36,17 4 7933 S 137.83 S $ SUBTOTAL-EQUIPMENT $ 564.66 EQUIPMENT OVERHEAD 5 PROFIT @ 21% $ 118,58 EQUIPMENT TOTAL $ 683.24 MATERiALS/SERVICES(RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Export Native 100 tons $ 17.15 S 1,715.00 Bedding 5/8 crushed 30 tons S 23.50 S 705.00 Gravel Barrow 6 bads $ 125.00 $ 750,00 $ $ SUBTOTAL $ 3,17000 OVERHEAD$PROFIT®21% $ 665.70 TOTAL $ 3,835.70 Verification of Hours Worked: TOTAL. $ 5,205.49 12%MARKUP (for prime when suncontract work) $ Coetraaors Representative Data SHEET TOTAL: S 5,205.49 owners Represenw a Date Comments . ........... ............. FA Sheet No.: DAILY REPORT OF ^ FORCE ACCOUNT WORKEDN Project Name:640 Pressure Zone Bosster Station Project No:17-7999.4 Item No.: Date: 9/26/2019 Description of Work:D12 for tie in reducer conflict Work by Subcontractor? No Prime Contractor:Prospect Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs I Hourly Rate HIM OT Rate AMOUNT Dillon Marshall operator 4 7603 S 304.12 Tyler Kitts LB4 4 60.34 $ 241.36 $ $ SUBTOTAL-LABOR. $ 545,48 LABOR OVERHEAD&PROFIT @ 29% $ 158.19 LABOR TOTAL ; 703.67 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description 15 1 Hourly Rate I Hire 15tandby Rate AMOUNT 318 Ex 210 Komatsu 2 91.14 S 183.48 303 PC 50 John Deere 2 25.F $323 �.� Backhoe John Oeere 2 35.17 2 Z33 $ 85.00 $ S SUBTOTAL-EQUIPMENT $ 318�54 EQUIPMENT OVERHEAD;PROFIT a 21Ye S 6689 MATERIAL S/SE RVIC ESlRENTALS EQUIPMENT TOTAL ; 385.43 MATERIALS/SERVICES Quantity Units Unit Pnce DOLLAR AMOUNT $ S $ S $ SUBTOTAL $ OVERHEAD 8 PROFIT @ 21% $ 4 TOTAL $ Verification of Hours Worked: TOTAL: $ 1,089.10 12%MARKUP Ira prime when subcontract work) $ Contractors RepresantaM Date SHEETTOTAL $ 1,089.10 Owner's Repreaemati. Dale Comments ......_.__._.._..... FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED Project Name:640 Pressure Zone Booster Station Project No:17.7999.4 Item No.: Date: 10/t/2019 Description of Work:Tie in reducer conflict Work by Subcontractor':No Prime Contractor Prospect Sub-Contractor. LMOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION His Rate Hrs OT Rate AMOUNT DIAOn Marshall O rator 4 76.03 T ler Kitts LB4 $ 12 3.5 fi0.34 $ 211 11.19 Isaac Smith No Matc Lail 4 60,34 $ 241.36 S S SUBTOTAL-LABOR: $ 75667 LABOR OVERHEAD&PROFIT a 29% S 219.43 IABOR TOTALS 976.10 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment k EquVpmers Desorlption Hrs Hourly Rate Hrs SW dby Rats AMOUNT 318 Ex 210 Komatsu 3.5 91.74 $ 321.09 303 PC 50 John Deere o5 25.03 $ 12.52 323 Bachce John Deere $ $ S SUBTOTAL-EQUIPMENT S 333.61 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 70.06 EQUIPMENTTOTAL S 403.67 AAATERtAL3lSERVIC ESJRENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Bedding native ez native v tons S 23.50 $ 25850 D benackfll 32 tons S 17,15 S 548.80 76'45 45 bend 1 3 376.10 S 376 10 16'blind flange 1 S 50129 $ 501,29 I'llmige.Bolt kit 2 S 147.00 S 294,00 MJ bolt kit 3 S 276.43 S 829.29 SUBTOTAL S 2,807.96 OVERHEAD&PROFIT 21% $ 589.68 TOTAL S 3,397.66 Verification of Hours Worked: TOTAL S 4,77743 12%MARKUP (tor prime whE sebconhact v rk) $ C.0—W.Ramie meek' Date SHEET TOTAL: $ 4,777.43 Owners Representative Dale Comments FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED E�_ T Project Name: 640 Booster Station Project No: 17-7999.4 Item No.: Date: 9/20/2019 Description of Work: Continued excavation for Monday tie in Work by Subcontractor?: Prime Contractor: Prospect Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Tyler Kilts LB4 Pipe Layer 5 80.2 $ 401.00 Dillon Marshall OP2 Operator 5 98.78 $ 493,90 Josh Kilts LB4 Pipe Layer 2 80.2 $ 160.40 $ SUBTOTAL-LABOR: $ 1,055.30 LABOR OVERHEAD&PROFIT @ 29% $ 306.04 LABOR TOTAL $ 1,361.34 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 318 Ex 210 Komatsu 3 91.74 2 22.18 $ 319.58 S - S S - SUBTOTAL-EQUIPMENT S 319.58 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 67.11 EQUIPMENT TOTAL $ 386.69 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT 16"flange bolt kit 2 $ - 16"blind flange 1 $ MJ follower and bolt kit 3 S - 16°45 bend 1 S $ SUBTOTAL $ OVERHEAD&PROFIT @ 21% $ TOTAL $ - Verification of Hours Worked: TOTAL: $ 1,748.03 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 1,748.03 Owners Representative Date Comments FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED �--� �- T Project Name: 640 Booster Station Project No: 17-7999.4 Item No.: Date: 9/23/2019 Description of Work: Cut into existing pipe, complete tie in work. and backfill Work by Subcontractor?: Prime Contractor: Prospect Sub-Contractor-.-- LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Tyler Kilts LB4 8 60.34 $ 482.72 Dillon Marshall Operator 10 76.03 $ 760.30 Blaine Rismoen Carpenter 8.5 71.8 $ 610.30 Tyler Kilts Operator 2 76.03 S 152,06 $ SUBTOTAL-LABOR: $ 2.005.38 LABOR OVERHEAD&PROFIT @ 29% $ 581.56 LABOR TOTAL $ 2,586.94 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 318 Ex 210 Komatsu 8 91.74 $ 733.92 303 PC 50 John Deere 2 25.03 $ 50.06 323 Backhoe John Deere 2 35.17 $ 70.34 Chop Saw 1 72.001 $ 72.00 Jumping Jack i 1 95,001 1 1 $ 95.00 SUBTOTAL-EQUIPMENT $ 1,021.32 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 214.48 EQUIPMENT TOTAL $ 1,235.80 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Ductile Iron Pipe 2 each $ 1,079.69 $ 2,159.38 16"bolt kit 3 each $ 14700 S 441.00 16"FCA 1 each $ 1.389,05 $ 1,389.05 16"sleeve 2 each $ 338.55 $ 677.10 16"FL X FL Tee 1 each $ 1,116.94 $ 1,116,94 16"MJ kit 6 each $ 276.43 S 1,658.58 16"FL X MJ BF Valve 1 each $ 2,830,15 $ 2,830.15 Valve Box for BF valve 1 each $ 213.99 S 213.99 SUBTOTAL $ 10,486.19 OVERHEAD&PROFIT @ 21% $ 2,202.10 TOTAL $ 12,688.29 Verification of Hours Worked: TOTAL $ 16,511.03 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 16,511.03 Owner's Representative Date Comments FA Sheet No.: DAILY REPORT OF 40 FORCE ACCOUNT WORKED K NT Project Name: 640 Booster Station Project No: 17-7999.4 Item NO.: Date: 9/24/2019 Description of Work: Backfilling pipe trench Work by Subcontractor?: Prime Contractor: Prospect Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Dillon Marshall Operator 7 76.03 $ 532.21 $ $ $ SUBTOTAL-LABOR: $ 532.21 LABOR OVERHEAD&PROFIT @ 29% $ 154.34 LABOR TOTAL $ 686.55 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 318 Ex 210 Komatsu 3 91.74 4 22.18 S 363.94 303 PC 50 John Deere 1 25.03 6 6.31 $ 62.89 323 Backhoe John Deere 3 35.17 4 7.33 S 134.83 $ SUBTOTAL-EQUIPMENT $ 561.66 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 117.95 EQUIPMENT TOTAL $ 679.61 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Export Native 6 loads $ 125,00 S 750.00 Bedding 5/8 crushed 30 tons $ 23.50 $ 705.00 Gravel Borrow 100 tons $ 17.15 $ 1,715.00 S - $ 2,830.15 SUBTOTAL S 3,170.00 OVERHEAD&PROFIT @ 21% $ 665,70 TOTAL $ 3,835.70 Verification of Hours Worked: TOTAL: $ 5,201,86 12%MARKUP (for prime when subcontract work) $ Contractors Representative Date SHEET TOTAL: $ 5,201.86 Owner's Representative Date Comments FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED �_ T Project Name: 640 Booster Station Project No: 17-7999.4 Item No.: Date: 9/26/2019 Description of Work: Dig for tie in reducer conflict Work by Subcontractor?: Prime Contractor: Prospect Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Dillon Marshall Operator 4 76.03 $ 304.12 Tyler Kilts LB4 4 60.34 $ 241,36 $ SUBTOTAL-LABOR: $ 545.48 LABOR OVERHEAD&PROFIT @ 29% $ 158.19 LABOR TOTAL $ 703.67 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 318 Ex 210 Komatsu 2 91.74 $ 183.48 303 PC 50 John Deere 2 25.03 $ 50.06 323 Backhoe John Deere 2 35 17 2 7.33 $ 85.00 $ $ - SUBTOTAL-EQUIPMENT $ 318.54 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 66.89 EQUIPMENT TOTAL $ 385.43 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT is S - $ SUBTOTAL OVERHEAD&PROFIT @ 21% $ TOTAL $ Verification of Hours Worked: TOTAL: $ 1,089.10 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 1,089.10 Owner's Representative Date Comments FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED �_ T Project Name: 640 Booster Station Project No: 17-7999.4 Item No.: Date: 10/1/2019 Description of Work: Tie in reducer conflict Work by Subcontractor?: Prime Contractor: Prospect Sub-Contractor: LABOR STRAIGHTTIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Dillon Marshall Operator 4 76.03 $ 304.12 Tyler Kilts LB4 3.5 60.34 $ 211.19 Isaac Smith LB4 4 60.34 $ 241.36 $ SUBTOTAL-LABOR: $ 756.67 LABOR OVERHEAD&PROFIT @ 29% $ 219.43 LABOR TOTAL $ 976.10 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 318 Ex 210 Komatsu 3,5 91.74 $ 321_09 303 PC 50 John Deere 0.5 25.03 $ 12.52 $ SUBTOTAL-EQUIPMENT $ 333.61 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 70.06 EQUIPMENT TOTAL $ 403.67 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT Bedding 11 tons $ 23.50 S 258.50 export native ? Gravel Borrow backfill 32 tons $ 17.15 $ 548.80 16"45 bend 1 each $ 376.10 S 376.10 16"blind flange 1 each $ 501.29 S 501,29 Flange bolt kit 2 each $ 147.00 $ 294.00 MJ bolt kit 3 each $ 276.43 $ 829.29 SUBTOTAL $ 2,807.98 OVERHEAD&PROFIT @ 21% $ 589.68 TOTAL $ 3,397.66 Verification of Hours Worked: TOTAL: $ 4,777.43 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 4,777.43 Owner's Representative Date Comments FA Sheet No.: DAILY REPORT OF FORCE ACCOUNT WORKED �- T Project Name: 640 Pressure Zone Booster Station Project No: 17-7999.4 Item No.: Date. 9/19/2019 Description of Work: Excavated for tie in work, deni unidentified piping Work by Subcontractor? Prime Contractor: Prospect Construction Sub-Contractor: LABOR STRAIGHT TIME OVERTIME DOLLAR NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT Tyler Kilts LB4 3 60.34 $ 181.02 Tyler Kilts Operator 7 76.03 $ 532.21 Dillon Marshall Operator 10 76.03 $ 760.30 Josh Kilts LB4 2 60.34 $ 120.68 $ SUBTOTAL-LABOR: $ 1.594,21 LABOR OVERHEAD&PROFIT @ 29% $ 462.32 LABOR TOTAL $ 2,056.53 EQUIPMENT EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT 318 Ex 210 Komatsu 3 91.74 5 22.18 $ 386.12 303 PC 50 John Deere 7 25.03 1 6.31 $ 181.52 323 Backhoe John Deere 7 35.17 1 7.33 $ 253.52 S - S - SUBTOTAL-EQUIPMENT $ 821.16 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 172.44 EQUIPMENT TOTAL $ 993.60 MATERIALS/SERVICES/RENTALS MATERIALS/SERVICES Quantity Units Unit Price DOLLAR AMOUNT S - S S - S - $ SUBTOTAL S OVERHEAD&PROFIT @ 21% $ TOTAL $ - Verification of Hours Worked: TOTAL: $ 3,050.13 12%MARKUP (for prime when subcontract work) $ - Contractor's Representative Date SHEET TOTAL: $ 3,050.13 Owner's Representative Date Comments Corporate Office 3633 H.D. FOWLER PO Box660th PBeE vue,WA 8M Ste 100, 90160A98006 COMPANY Phone 425-654-88M'Fax 425-641-8885 REMIT:PO Box 84368,Seattle,WA 98124 Pacific Branch —_ Invoice 1417 Thornton Avenue SW Pacific,WA 98047 Number 15276424 PADS (253)863--8600 Fax(253)863.8681 11300 SE 236TH PL FT-2 'I1il till l""'illl1li1l I'll'II'III'�II'lllll'llll�l'�I'I'��' ROSPECT CONSTRUCTION INC 6 23rd St SEyallup WA 98372-4116 Order# Inv Date: Order Writer: 0641845 09112/19 Kairni Andres-Kemakau Terms: NET 10TH PROX Due: 10/10/19 POIJOB: C/O WORK Qty Cty Part --- -._ .- Unit --Extended E taaas note:ow co rporota,Piuotle nurltper i has changed If you'have arty t7uol:Uone regarding payables or receivables Cali . corparale at�xs-ssa,asac, 6 a, EA 16'WEDGE ACTION W KIT FOR DI PIPE WBOLTS, 276.430 552.86 I WEDGE ACTION GLAND&GASKET(BOXED WITH BLACK LETTERING) 3 0 EA RFCA 17.40 ASSEMBLED RESTRAINT,SBR,SHOP 1389.050 1389.05 COAT,3168S B&N,NCI -T4,M 1-7 Sub total 1,941.91 "Remittance Address" EFT Routing:121000248 Freight 0.00 PO Box 84368,Seattle,WA 98124-5668 EFT Bank No:418 545 3362 Tax 0.00 Serving the P.,16,Northwest since 1911 0rand Total 1,941.91 v+wve:tWfaalcrcom - Corporate Office 3633 136th PI SE,Ste 100,Bellevue,WA 98006 H.Q. FOWLER PO Box 160,Bellevue,WA 98009-0160 COMPANY Phone 425-654-8800'Fax 425-641-8885 REMIT:PO Box 84368.Seattle,WA 98124 Pacific Branch 1417 Thornton Avenue SW Invoice Paoilic,WA 98047 Number 15263568 PADS (253)663-8600 Fax(253)86"681 SEP A 5 2,0119 S 165780 11300 SE 236TH PL f/ 'ImRuulll��"'uillhluu'Il�lll'llrlhll�llllll�h�l�ll' T-1 PROSPECT CONSTRUCTION INC KENT WA 98031 116 23rd St SE Puyallup WA 98372.4116 Order# _:0at�Kalmi 0641845 / makau Terms: NET 10TH PR 'X Due: 09/10/19 PO/JOB: C/O WORK FOB: FACTORY ship Via: VENDOR'S CHOICE KENT 640 PRESSURE ZONE BOOS City qty Part# Unit _ -Extended Line Ship'd SO'd UoM Description Price Price Please note:our Corporate phone number has changed,lif you have any questions regarding payables or receivables call Corporate at 425.654.8800. 12 1 0 EA 16"DI MJ X FLG ADAPTER,C/L,ASPHALT COATED 365.380 365.38 10 1 0 EA 16'DI MJ 45 DEGREE ELBOW,C/L,ASPHALT 376.010 376.01 COATED 5 1 0 EA 16'DI MJ SLEEVE,C/L,ASPHALT COATED 338.550 338.55 1 1t 0 EA 16'DI TEE,FLG X FLG,C/L,ASPHALT COATED 1116.940 1116.94 !Z � Sub total 2,196.88 "Remittance Address" EFT Routing:121000248 Freight 0.00 PO Box 84368,Seattle,WA 96124-5668 EFT Bank No:418 545 3362 Tax 0.00 CHRI TIAN VERBRUGHHE Serving the Pacific NDrthwast since 1911 Grand Total 2,196.88 vaww.Fdtewfar.aom Corporate Office 3633 136th PI SE,Ste 100,Bellevue,WA 98006 H.D. FOWLER PC BOX 160.Bellevue,WA98009-0160 COMPANY Phone 425-654-8800'Fax 425-641-8885 j -- REMIT:PO Box 84368,Seattle,WA 98124 Pacific Branch Invoice 1411 Thornton Avenue SW Pacific,WA 47 Number 15291300 PADS (253)863-8600 Fax(253)863-8681 #165780 11300 SE 236TH PL 1 t 'III'IIIIIIIII""'III1111it1'11'11'1 11'11 Jill'1I'I'll' T-1 PROSPECT CONSTRUCTION INC KENT WA 98031 j 116 23rd St SE Puyallup WA 98372-4116 Order# Inv Date: Order Writer: 0645306 09/27/19 Kaimi Andres-Kamakau Terms: NET 10TH PROX Due: 10/10/19 POIJOB: 16"BLIND FLANGE FOB:FACTORY Ship Via: VENDOR'S CHOICE KENT 640 PRESSURE ZONE BOOST Q<Y QtY Part11 --- —_.-unit --Extended Una Ship'd BO'd UoM Description Price Price teess'natq;err Corparate phone number has cAanged,ttyou have WV questions ragerdtno pfyabtso or r9' able*call ___G�orporaUat425•bf,4-998R. 1 t 0 EA 16"01 BLIND FLANGE,ASPHALT COATED 501.290 501.29 Phase# M Job ApprBY 041.AcU1ur11� Amount.jt9f.�q _— Sub total 501,29 "Remittance Address'" EFT Routing:121000248 Freight 0.00 PO Box 84368.Seattle,WA 98124-5668 EFT Bank No:418 545 3362 Tex 0.00 CHRI JAN V Serving the Pacific Northwest since 1911 Grand Total 501.29 www.hd(at+iercom 'a21l2019 h,,,,PW Jed it r,"-T/w H.opoc Son by. Distance Rods 4 Meltability Fail—Wry 04M(1139 ml) 1715 S 352M St Fedora?Way.WA 98003 Ph—(2B3)831-9200 i Sou0roendorY4705(3.81 hill Salo S lam at 2 ks Stock forRant Tukeila,WA 98188 Ph—(206).57"200 Landar?F4702(13.82 mo 2701 Utah Ava South 2 k,Stork for Rent Saeraa,WA98134 Ph_.:(206)467-9200 1 2 3 Y 1__ G Search a Diftwent Arw 98037 Z PRODUCT FEATURES Powered try Wacker Neuson's exclusive WM 80 engine specifically designed for tough rammer applice6ons and meets all EPA and European emission standards • Integrated fuel valve and gas lever provide simple operation and easy starting • Optimized guide handle reduces vibration,improving operates comfort ntysJh...•..homadewcmm/tmLwck..nauJumv��+9-1adu5zUlooD5.a9! 213 � b lamn019 light- i*n Corcrsu Gu Sawi3' The Home D4pot INFO & GUIDES SAFETY Pionutl Marwai dNa1 You wig n er mf AdobO A=MW Ram b view PDF doaanatb. {}�/�f�\Z\/\J2 G—ioed a fnn wpy Bpm dw Adpbe Web sib. Do" S."Shop Ear Piotectlon Eye 0t—, Op". R",,d Req—d Pmb— Re — Ietlpma Ro &W SPECIFICATIONS Aswntsm Oepdt tin.) 10 In AsaembW WWN(fn.) 33 in A—T Otm H.VV(in.) 18 in WSIQN(b.) 33.9 b a[ i F.W Type G.." Bode Dbalebr(Y1,) 12 y QPoMp OpN(in) 4,75 htY+✓/'..w.MmdePetmNtoW eudt�anbVlight+.ayht{omen-GaeSew 1]/3 77.YvWsu 313 Ly'ry CONC QUA st 19dS RFT� INVOICE C O R LI S S PO Box 487 Sumner,WA 98390 Invoice 218284 9 RESOURCES N� 253-828-8010 Date: 09/25/19 CC?FCATt S.TOe50 ARQGodissResources.cam Customer No; 18191 Job 000037: 040 PRESSURE ZONE BOOSTER PO a: gold To: PROSPECT CONSTRUCTION INC Dellvered To: 11300 SE 236TM PL AP@PROSPECTCONST COM KENT.WA PUYALLUP,WA 98372 US Mau Tax SKU Dsecrtptkoa _ _... .aY UOM Unit Pdcs Total Cods Tax Total PO k: 5410 oats: 09125Y1019 11000394 EXPT WlIMPT TRANS BY LOAD 600 LO 1250000 75000 Resale 000 75000 11000396 EXPT W!IMPT SO BY LOAD 100 LD 900000 9000 Resale 0.00 9000 W970 7 SCR GRAVEL BORROW TRAIN 207 40 TN 14,6500 3.031141 Resale 0 W 3,038 41 PREVWAGE9 PREVAILING WAGEUPC21ARGE 20740 TN 25000 51853 Resale 000 51853 Total: Cust Job: 000037 4,390.94 0.00 4,394.94 Toteltnvolce: 4,328.94 0.00 4,396.04 Tickets:101.233392,104-470418,10"70469,10447D535,104-470612,104470629.105-490478 Job4 t7S' 17,5` Appr.By GIL Accoun! 13 s8 S3 1nlaunt Payment Typo: On Account 2 pry Tans Nat 4a days Tool: 4,3ea.e4 1. f Cain Bolt&Gasket,Inc. Invoice Dal. Page Sep 2k 2019 1 7724 7th Avenue South Invoke Number Sealtie,WA,98108 169558 Phone: 206-763-6460 Fax: 206-763-6878 i Sbta To: Win To' PROSPECT CONSTRUCTION VROSKCI CONSTRUCTION apaprospeciconsl com apaprospe"Const com 116 23RD ST SL 116 23RD ST SE PUVALLUP,WA PUVALLUP,WA 98372 98372 Order No, Order Date Customer No, Salespe— PO Number Ship Via Terms 156479 Sep 23.2019 PRCOWA RiCHAR 175-KVCAINI NET030 City. My-I Ord. Shp. BI0 Isom Number Dualptlon UnR Price UOM Extended Price 4ww 4.wot O.q)vq FAS-BBK16OA450 18 X 1500 316SS BOLT KIT 46336 60M 0OW0 GAS•EP81180 16 X 1500 FF VII F.OPM M No 8700 2.0000 2 000{C,ow FAS-ORKMOA325 6 X 1500 316SS BOLT KIT 23:36 EA 46 72 3 00W 3 CWy UM GAS-EPBI060 6 X 1500 FF 118 EPDM 365 FA 10,95 Due Oat. Amount Due Discount Date Dlec.Amount Oct 24,2019 508 03 ep — 0 SA FIG,.:«v=i�i <. comments; Tax summary: Subtotal 808,0J Total salsa tax 0.00 OE0001 000 (� Total amount 606.03 7,�j Less payment 0.00 �yy Lau pmL One 0.00 1 Amount due BOB.OJ {(4 { Bid No:E398308 Page 1 of 1 t i j H.D. FOWLER l COMPANY Customer: BIDDING CONTRACTORS Estimate: E398308 Estbnator: KaimiAndres-Kamakau Bid Date: 10/22/2019 Job Name: VALVE BOX Location: KENT,WA i Line QtY UoM Description Unit Price Extended Price 1 1 EA 36"VALVE BOX BASE 27.17 27.17 2 1 EA 13"VALVE BOX TOP 940E SLIP TYPE 41.11 41.11 3 1 EA LIE)FOR 940 VALVE BOX DEEP SKIRT MARKED"WATER" 10,56 10.56 4 1 EA VALVE STEM EXTENSION,3'0"LONG,3/4"SOLID STEEL ROD,2"NUT X 2" 65.71 65.71 SOCKET 5 1 EA S"X S'SINGLE HUB SOIL PIPE 69.44 69.44 Approximate Total 213.99 I s H.D. FOWLER COMPANY PO Box 160 Bellevue,WA'98009-0160 i E To: CHRISTIAN VERBRUGGHE From: Kaimi Andres-Kamakau overbrugghe@prospeotconst.com Phone:(360)651-1438 x3142 PROSPECT CONSTRUCTION INC 08/28/19 09:06.36am Order Acknowledgement Nan-Stocks,Special Orders or Engineered items may not be returnable.Those that are returnable are subject to a minimum 25%restock tee.Some orders may also have applicable freight charges not shown on this Order Acknowledgement. Your PO: C/O WORK Project: KENT 640 PRESSURE ZONE BOOSTER STATION Ordered By: CHRISTIAN VERBRUGHHE Order Date: 08/28/19 Est,Ship Date: 09/06/19 Order#: 06418462 Shipping From: Pacific Warehouse Ship VIA: OUR TRUCK Freight Terms: Line# Item Unit Qty Price Ext.Price Tax 1 16"CL 52 DI PIPE TJ 18,25'LENGTH ASPHALTIC FT 18,25 59.16 1,079.67 T COATED ANSI/AWWA C151/A21.51 AND CEMENT LINED ANSI/AWWA C104/A21.4 WITH SBR GASKET Total 1,079.67 Freight 0.00 Tax 0.00 Grand Total 1,079.67 r a � a w ! ( I 1�w j� r iw,ggwr�qrnrr`n� r r +. �gYar+ i b� S�rww r E .Mlw• �ww, � i. f1 KMJIFl.N .-. Y ` 9 i �1 wll+�i .._ _._t .�, i.. ;. « {'r'7�i ._.____ .__.�ii7'b.h¢ai rtii'GWI• MNII MtCM M4 Y.1 E WORK ORDER 20752 ReNu Recycling INVOICE: B 169999 A DNielon DI N*MStar CO,LP .J Branch Office:1160 304th An SE I IeaequaN WA 91027 Remit To:11/0 3041h An SE I laaqush,WA 98027 9 Period 1016/2019.1011212019 T:if"444.7311 F:0"735-7153 ien.r.xn,r rNn„arr naebar. saw,rnq.a.,rm. wro Ken(Booster Pump 54380 2013.676 PROSPECT CONSTRUCTION,INC 116 23RD ST SE 10/12/2019 PUYALLUP,WA 98372 xdwerwr. na=t t..: u.:o,arr Jan n,„nrr. wDn,. 253-446-WO 253-445.1801 it,tl.,Dln J -441— )eadrfwa..r. 8iW}l«aar. Tema: 11300 SE 2361h PI Karl WA 98031 Chnslor Net 30 DDIV, Uxa 5lxe aaa Mntdel a. 1—*1 Drl.er unit •i:n •Fed .Creme 00" ien 1'olel e1e C'b.xes fiurthre Real 10111/2019 20 Yard CommingledlDebos 6206 2076 Stcneeumer $635.00 $000 $1000 $100 $6.46.00 Non-Taxable $635.00 Taxable $10.00 Tax $1.00 vf,�rrN1'.t7,lt �'f�t2+i;FY�/Fyltr7(tfG{ �t Invoice Total $646.00 Description of Extra Charges and Credits 0-1pabn (imtr VoM aae Tbnl ndkYnN(IZ:1 ae,Ner<ree,b rm appUrd m a ter-lien naps inr)rrt tldrn,ed,.iM.rtDen ab.rx.aefrrt.rr Nr J.,r.ntl ee.nur.br ••D.ayasa 0.rm.r eMarur.ere<.dr}ert,e arre aM ierd.+aea i'tease PF ,lob 49pf.By—­G.A.Acc;L;u;.i._...__ ,bunt Page I nr I Corporate Office 3633 1361h PI SE,Ste 100,BOIlovuo;WA 98006 H.D. FOWLER PO Box 160,Bellevue,WA 9SON-0160 _. COMPANY Phone 425-654-8800-Fax 425-641-88B5 REMIT:PO Box 84368,Seattle,WA 98124 Pacific Branch -.-- Invoice 1417 Thornton Avenue SW Number 15264214 PADS (253)863-8600 Fax(253)863-8681 #{65780 11300 SE 236TH PL y 'In'Ilnnln"''�nlll'Ilu'uvl'IIr1414i1'1411rlrrll� T-1 PROSPECT CONSTRUCTION INC KENT WA 98031 116 23rd St SE Puyallup WA 98372-4116 Order# Inv Date; Order Writer: 0641845 08/30/19 Kaimi Andres-Kamakau Terms: NET 10TH PROX Due: 09/10/19 PONOB; C/O WORK FOB: FACTORY ship Via: VENDOR'S CHOICE KENT 640 PRESSURE ZONE BOOST city city Part#. Unit Extended Line St11P'd BO'd UOM Doscriplion Prca Price Please note:our Corporate Phone number has changed.If you have any questions regarding payables or receivables call ; Corporate at425454.8800. 7 1 0 EA 16-DI MJ SLEEVE,C/L,ASPHALT COATED 338.550 338.55 11$' 3-3 IRS S" Sub total 338.55 k "Rernittanco Address'* EFT Routing;121000248 Freight 0.00 Et PO BOX 84368,Seattle,WA 98124-5668 EFT Bank No:418 545 3362 Tax 0.00 CHRI TIANVERBRUGHHE 5erving the Pacific Northweatsince1g11 Grand Total 338.55 www,hdfowkarentn VI-Ty CO:VC-j; sfr,a, 7f)J:a FrF INVOICE CPO L TS L+ PO Box 487 ,L �.7 Sumner,WA 98390 invoice#: 21830.5 f�.. PFS0}{.7j24:-I'S 253826-6010 Datr 09I18l19 Gj {,�T S ��� � ARQCodissResourcescorn Customer No: 18191 Job 000037: 640 PRESSURE ZONE BOOSTER PO 0: Sold To: PROSPECT CONSTRUCTION INC Delivered To: 11300 SE 238TH PL AP@PROSPECTCONST COM KENT,WA PUYALLUP,WA 98372 US Mali Tax SKU Description Qty UOM Unit Price Total Code Tax Total PO 0: Sail Date: 09116,2019 11000394 EXPT WI IMPT TRANS BY LOAD 600 LD 1250000 75000 Re5aie 000 75000 4003927 543 CR MINUS TRANS CSTC 12003 TN 21 DODO 262063 Resale 000 2.52063— 4003938 4X6 QUARRY SPALLS TRANS 3263 TN 27 75M 90548 Resale 000 90548— 5CO4970 2'SCR GRAVEL BORROW TRAN 2950 TN 14M 43210 Resale 000 43218+ PREVWAGE9 PREVAILING WAGE UPCHARGE 18216 TN 25000 45541 Resae _ 000 45541 Total: Cuat Job: 000037 Q063.70 0 00 5.06310 Total lnvocs: 5,062.70 0,00 S,D53.70 Tickets.10"69428,1D4-469497,104-469500.104-469510,104-469583,104-469592 15,01OZb'31 b G 6-0264M SO-0Z6-'3ZS- s0 7� ,zS I a 17S izoS ul Payment Type: On Account 2 Pry Tema Ne145 days Total: 5,063.T0 10/21/2019 Light-weght Cwcrete Gas Saw 12'-The Home Depot ., OO To See Inventory choose A Store Search g cart 10 aems b Hilti :cateyorr aor group#a5 Light-weight Concrete Gas Saw 12" DESCRIPTION Model#3564773 • This gas saw offers superior performance,balance and jobsite safety while weighing only 21.7 lbs. • Common applications include masonry work,metalwork,laying pavers,landscaping.cutting out openings in brick or concrete walls,road construction and pool work A b� Rental Pricing for: seutncenter 1114a705)(3.e1 ml) @5� 4-Hour ONO `��•� (Minknum $2�.� ) Per Week $72.00 Per Day $864•00 a Weeks This tool requires a$150.00 deposit. Store Availability Visit the Tool Rental Center to complete the rental transaction, lair updated Oct.21,2019,2:52 PM EST. Vn J/www.homedeporcymttool-beck-.enta'rligM-wegM{onatta Ge Saw-12/3563773/Inden.html r7y 1021/2019 lightweight Cwicrete G.Saw 12'-Tha Ho Dar M Surit 1YY' Distance PMdUot AvallWfley SooMc.M.r N4705(3 61 7 6810 S 18RM St T.Kiv",WA 98188 Ph—(20(h575-8200 2 CWA gtMWA 14737(6.33 N) nrt Z7027 1851h Aw 5. 1 In Shook for R Covington,WA 96042 Phone:(253)638-0Z58 L..W 44T02(13.82 min) 2701 Utah Aw South 1 In Stock for Pr Seems,WA 96133 Pinion.:(208)467-9200 T 3 Pal PRODUCT FEATURES • Weighing in at only 21.7 pounds,the light weight makes this tool perfect for wall and above the waist cutting applications • Blade brake technology stops blade in less than 10.seconds • Used horizontal or vertical up to 4 314"deep • Easy starting,unique auto choke system M'D✓/wwv.hwnedepocrarrthodv�d-nndVtighr-wa5kc{oncrataGsLw-12/3561]7 ndexhbnl 2/3 1012IM19 Jumpirg Jack Rand-TM H—Dapw O7o Sea InvA 31 Stare arctore Choose A Seh p Cart i o kems d Wacker NeUSOn Sates Americas 1 eaewnaoe ynae Rsor Jumping Jack DESCRIPTION y, 1 Mode(#5200000642 Aar•_.. �-. - p* Compacts Gay and dirt " Ideal for small,confined spaces such as trenches and foundations • No-mix oil-Injected system and shook reduction handle simplify operation and improve comfort for operator u c� w� Rental Pricing for: s.e.rat lrhy pnssl less mil I � Q`(� rr��rr�� 4-Hour $�.3a�M��n/yn� ti! ai^a7•Vv (Minimum) Q/dOtJ.W Per Week 1 $95A0 Per Oay $1,140.00 4Weeks This tool requires a$150.00 deposit. Store Availability Visit the Tool Rental Center to complete the rental transaction. Lest updated Oct.27,M9.2,52 PM EST. hs�sl/vww Mmadpotcomhoobvuck-renuVJ�mpby.JacW52000006c2/ 1/3 10/2V7pi9 Ju peg Jack cereal-Tha Ham Depot INFO & GUIDES SAFETY Pmapa M.nuai Y Ym wa need Adobe®A—ba4O Reader b view PM dooenerpa. Cotndpad.hee.wy Porn tM Ache.W.b t.. DoH91 sRrarsl>�s cwroa ov,•asc �ewbnd R.vuv.a Indeas SPECIFICATIONS Aeaeobled Depth(in.) 26.5 r Aeaerrblad Height M.l 37 it x Assewbl.d Width(In.) 13.5 in W-190(Ibe.) 131 be a htWs//www.hamdapa.cmNoo4bt�hvmroUJunipiMNadr/520tldOdM]/ y3 Corporate Office 3633 136th PI SE,Ste 100,Bellevue,WA 98006 H.D. FOWLER PO Box 160,Bellevue,WA 98009.0160 COMPANY Phone 425-654-8800'Fax 425-641-8885 �— REMIT:PO Box 84368,Seattle,WA 98124 Pacific Branch 1417 Thornion Avenue SW ...... Invoice Pacilic,WA 98047 Number 15271100 PAWH (253)663.8600 Fax(253)063-8681 Y rR4Ian 11300 SE 236TH PL 2/ 'III'lllllllll""'1111111111'II'II'III'III'Illll'II{III'II'I'II' T-2 PROSPECT CONSTRUCTION INC 116 23rd St SE Order# Inv Date: order Writer: Puyallup WA 98372-4116 06418461 nq no/ o K imi Andras-Kamakaii Terms: NET 10TH PROX bus: 10/10/19 PO/JOB: C/O WORK " Ship 47a 0ikA7&I ICK K-%1-5iAL1-P.3E c oty aty Part# Unit Extended AO%ise nob:our Corporate phone number has changed.If you have any questions rogardfng payables or recehablas call �k 1 Corporate at 425454.6800. 1 18.25 0 FT 16"CL 52 DI PIPE TJ 18.25'LENGTH ASPHALTIC 59.160 1079.67 COATED ANSI/AWWA C151/A21.51 AND CEMENT LINED ANSI/AWWA C104/A21.4 WITH SBR GASKET So t0-r DZ IDS II o7 q,61 Sub total 1,079.67 Remittance Address" EFT Routing:121000248 Freight 0.00 PO Box 84368.Seattle,WA 98124-5668 EFT Bank No:418 545 3362 Tax 0.00 Serving the Pacific Northwest since 1911 Grand Total 1,079.67 www hdfowler.com Corporate Office 3633136th PI SE,Ste 100,Bollavue,WA 98006 H.D. FOWLER PO Box 160,Bellevue,WA 98009.0160 FOCOMPANY Phone 425-654-8800•Fax 425-641-8885 REMIT:PO Box 84368,Seattle,WA 98124 Pacific Branch Invoice 1417 Thornton Avenue SW 15288616 PAWH (253)Pacific,WA 96047 Number 253)883-8600 Fax 253 863-8881 #165780 11300 SE 236TH PL 1 'ail'i�llll�H�r"'llll�ll�ll'II'It'I�I'�II'lllli'llll�l'�I't'��' T-3 PROSPECT CONSTRUCTION INC KENT WA 98031 116 23rd St SE Puyallup WA 98372-4116 Orderll 71nv Data: Order Writer: 06448169/25/19 Kaimi Andres-Kamakau Terms: NET 10TH PROX Due: 10/10/19 POMOB: PO 175-KYHD1 FOB: H.D.FOWLER COMPAN Ship via: OUR TRUCK KENT 640 PRESSURE ZONE BOOST QtY_C11Y___. _ part#.. Unit. Extended Line Ship'd B(Yd UoM Description price Price site-note.oOrCorporata phone number has changed if you have any questions regarding P&Yabtes or receivables call corporate at QM5"800, 1 EA 16"W SLEEVE LNG PATTERN DI,AWWA C153 LESS 353.800 1061.40 ACCESSORIES(172 LBS) Phase tt .fob u f 7: - _ Appr,By [/,�L/�fGn_Account An¢?4n! I C) 1"i Sub total 1,061.40 "Remittanoo,Address EFT Routing;121000248 Freight 0,00 PO Box 84368,.Seattle,WA 98124-5668 EFT Bank No:418 545 3362 Tax 0.00 OT 261 Serving the Pacific Northwest since 1911 Grand Total 1,061.40 www.hdfowFercam Corporate Office 3633 136th PI SE,Ste 100,Bellevue.WA 98006 )tj 1R) N.D. FOWLER PO Box 160,Bellevue.WA 98M.0160 6 [V I COMPANY Phone 425-654-8800'Fax 425-641-8885 _ REMIT:PO Box 94368,Seattle,WA 98124 Pacific Branch Invoice 1417 Thomton Avenue SW Pacific,WA ge047 Number 5277601 PADS (253)863-8600 Fax(253)663-M81 i 4 t65T 11300 SE 236TH PL 3i. 'ail'i�llll�ll""'IIII�II�II'II'II'I�I'�II'Ilill'Iltl�l'�I'1'��' T-2 PROSPECT CONSTRUCTION INC KENT WA 9 1 116 23rd St SE Puyallup WA 98372-4116 Order# Inv Date: Order Writer: 0641845 09/13/19 Kaimi Andres-Karnakau Terms: NET 10TH PROX Due: Ll 0/19 PO/JOB: C/O WORK FOB: FACTORY Shi VNDOR'S CHOICE KENT 640 PRESSURE ZONE B ST - -- - Qty-- Qty ---Part O -- —-- -- - — -- -Unit- Extended Litre Shi'd O'd 11o1W Desert tlon Price Price ade note:our Corporate phone number. t>me oodl#f}rou,hatvaoiy.i�tiestiane t rayardtre Payable*orraaetvabtes call � .-�ccr�ors"r't�rta��e54-saoa 8 r 0 EA 16'WEDGE ACTION MJ KIT FOR DI PIPE W/BOLTS, 276.430 552.86 WEDGE ACTION GLAND&GASKET(BOXED WITH BLACK LETTERING) 9 ds EA I S'WEDGE ACTION MJ KIT FOR DI PIPE W/BOLTS, 276.430 276.43 WEDGE ACTION GLAND&GASKET(BOXED WITH BLACK LETTERING) 11 ;L 0 EA 16'WEDGE ACTION MJ KIT FOR DI PIPE W/BOLTS, 276.430 276.43 WEDGE ACTION GLAND&GASKET(BOXED WITH BLACK LETTERING) ttb� 7� Sub total 1,105.72 "Remittance Address" EFT Routing:121000248 Freight 0.00 PO Box 84368.Seattle,WA 90124-5568 EFT Bank No:418 545 3362 Tax 0.00 CHRI IANVERBRUGHHE Servin9 the Pacific Northwgst since 1911 Grand Total 1,105.72 wwrrhdfowler:cwm