HomeMy WebLinkAboutCity Council Meeting - Council Workshop - Agenda - 03/16/2004 Council Workshop Agenda
All Councilmembers • Julie Peterson, Council President
KENT March 16 2004
W A 5 H I N G T O N
5:30 PM — 6:15 PM
Item Description Speaker Time
1. Annual Report for Community Development Fred Satterstrom 20 min
2. Annual Report for Public Works Operations Larry Blanchard 20 min
3. Landsburg Mine Update Bill Wolinski 15 min
4. 228th St. Corridor Sound Barrier Don Wickstrom 02 min
Unless otherwise noted,the Council Workshops are held at 5:30 p.m.on the 1"and 3rd Tuesdays of each month.
Council Chambers West,Kent City Hall,220 4th Avenue South,Kent,98032-5895.
For information please contact the City Clerk's Office at(253)856-5712.
Any person requiring a disability accommodation should contact the City Clerk's Office at
(253)856-5725 in advance.
For TDD relay service call the Washington Telecommunications Relay Service at 1-800-833-6388.
S:\PUBLIC\CLERK\City Council Committee Packets\Council Workshop\WorkshopCommitteeO31604.doc
`�KENT
Public Works Operations
2003 Annual Report
Organizational Goals and Objectives
City Council Strategic Objectives
Safe
Downtown Effective Strong Community
Safety First
Transportation Valued Local
System Government Econorrry
Services
�w works city c°'�"�n
c
v�
Mission Goals
Deliver responsive, Professionalism,
a0%Preventative
efficient,antl costTact, • Maintenance;
effective 20%Reactive
Successful
administrative, Maintenance
street,water,sewer,
drainage,antl Fleet Communication
24 Hour Response
services to an
informetl community Inspect all
representing theHiring Philosophinfrastructure at
best return for the leas[once every 5
revenue spent. years
Public WorksOperations
1
Public Works Operations
Performance 2003 Annual Report
Performance Based Work Plan Budgeting
1998 1999 2000 2001 2002
Tracking NPS Utilities,Water Water Facilities Street,Admin,
Started Distribution Fleet
Performance TVPS Utilities,Water Street,Admin,
Baseline Distribution Water Facilities,
Fleet
Performance TVPS All Utilities, All
MetrICS Wa[er Operations
Distribution
The Utilities section started tracking performance in the
TV/Pump Stations subsection in 1998. Full implementation of
performance tracking for all sections was accomplished in 2002.
Public Works Operations
Process
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
Public Works Operations
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
WPPBB Process
Plan for Future Growth
Public Works Operations
2003 Annual Report
Inspect all infrastructure assets
at least once every 5 years.
80% preventative maintenance
20% reactive maintenance.
ProcessWPPBB Pubfic Works Operations
2003 Annual Report
WPPBB Process
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
Public Works Operations
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
Public Works Operations
2003 Annual Report
Infrastructure Asset Maintenance Activity Hours Freq/Yr Crew Size Hours
scheduled testing(+/-once every
Air Vacs 2years) 2 150 2 600
Main Cleaning/Flushing clean entire system every 10 years 50 14 2 to 4 2800
Main Cleaning/Pigging clean entire system every 10 years 1 4S4 1 484
- main replacements(scheduled-life
Main Replacements expectancy)small jobs 480 1 6 2880
Meter Maintenance 15 year replacement program 1.25 100 1 to 2 187
service replacements(scheduled-
Service Maintenance life expectancy) 30 20 2 to 4 1800
Valve Maintenance valve operations 1 2000 2 4000
Sample of 2004 Water Distribution Performance Standards-For example only
Public Works Operations
WPPBB Process
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
Public Works Operations
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
Public Works Operations
2003 Annual Report
Maintenance Item Description Standard Production(man hours) Average(man
hours)
DAVMTC Air Vacuum Release Maintenance Repairs 8l0 21 Ars/m 16 hrs/m
Replace/Install Wto 60 Ars/m SO hn/m
Testing Needs[o determine(2 to 0 Ars) TRO
no bachgrourM
DBOMTC Rtaw Otf Maintenance Repairs 12 to 32 Ars/ea 22 hrs/ea
Replace/Install 12 to 60 Ars/ea 51 hrs/m
Locate 2 to 8 hrs S hrs/m
DCDN$T New Constructlon Issues Walh-Nruz 2 to 16 hrs/m 9 hrs/m
Pre-cans 1 to 3 hn/m 2 hrs/m
Print Renews Field 2 to 19 hn/m a hrs/m
Office 1 to 3 hrs/m 2 hn/m
DLKDET system Lmh DetecNm contract Service Leo hrs/yr Sao hrs/yr
DMNCLN water Main cleaning Fiusning os to 2 hrs/m l.zs hrs/ea
CUM1irg(Pi99in9) TRD TRD
DMNMTC Water Main Maintenance cne<ws 2 to 4 nrs/m 3 nrs/ea
Repair 12 to 32 hrs/ea 22hrs/m
Flush Corrective 2[0 4 hrs/ea 3 hrs/ea
POMoIe 8 to I6 hrs/m 12 hrs/m
DMN$HT Water Main Shutdowns Shutdo Flushrn-on& g[0 20 M1n/m 14 hrs/m
smeaotea repiaremen[ os[o z nrs/ea 1.2s nrs/m
DMRMTC Meter Maintemnre (lo m is years)
Sample of 2004 Water Distribution Production Rates—For example only
. .BB Process
Public Works Operations
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
. .BB Process ' Public Works Operations
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
ublic Works Operations
2003 Annual Report
Work Plan
Hours Freq/Vr Crew Size Hours O.T.
LEAVE Holitlays/Floaters 576
Vacation 732
Compime Used 300
Sick Leave g00
Other Leave
Leave Total 7908
ADM Admin PW(Lake) 520
Admin.
(Super./lead/crew) 1650
Admin Total 2770
GENERA
L Traitring 675
General Shop 615
General Total 1490
To[al hrs top SS6t3
Maintenance
MAINT Category Hours Freq/Vr Crew Size
Air Vac
Maintenance 50 76 2[0 3 2000 20
Sample of 2004 Water Distribution Work Plan—For example only
■ ■BB Process Public Works Operations
KENT
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
Public Works Operations
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
Public Works Operations
2003 Annual Report
Name of Line Item To Olher
Empbyee SaUBen Description Direct M5S Prgec[s %Of Cos[ Sections Total
Mams&
Services Office Malerials-
Section 5545,378 3110 E7,416 SO EO EO 57,416
Hytlrants 8
Meters Searon 5475,872 Office Supplies-3n2 5618 f0 f0 f0 f618
Facilities
Section $435,413 Unilorms-3130 §8,318 SO SO f0 f8,318
WPPBB Process
ENT
Metl/Chem/Safety-
WaterSection $324,285 3150 f105,788 EO SO EO f105,788
Water
Vegetation CherNSafety Reim-
Section E140,519 3159 EO $0 EO SO SO
Engineering
Positions E202,306 Footl Supplies-3160 SO $g f0 f0 $0
Maint SuDWies-3180 E176,578 So f0 SO f178,578
Main[Supplies
Reim-3189 EO $0 f0 SO EO
Sand/Gravel/Asph-
3190 $16,224 $0 SO SO E76,224
Santl/Gravel/ASDh
Reim-3199 SO §0 $0 f0 $0
Fuel/Cubes-3260 §0 EO EO EO $0
FueULubes Reim-
3261 $15,204 $0 $0 $0 $15,204
Propane-3270 §1,607 $0 $0 §0 $1,607
Sample of 2004 Water Distribution Budget—For example only
Public Works Operations
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
WPPBB Process
Plan for Future Growth
P P B Process Public Works Operations
2003 Annual Report
10
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
Task Name 2005 2006
�4 �i 02 43 �6 G1 G2 G3 �4 �1 02 M
WATER
Security Vulnerability Assessment for Water
Emergency Response Plan Update
Habitat Conservation Plan-Rock Creek
Ranney Well Field Application-DOE
Water Quality j
W4400-01 MID Stage 2 By products rule �"'®•1
Consultant Report D.ue CDuk
EPCRA"Right to know" DdVOCil.k
212th Treatment Plant Operation Dye AhA
Corrosion Facility Operations CA.k
Compliance Sampling JIM D.ve Cih.k i
Stream Monitoring D. Cih.k
Water Facilities
Energy Study T1 Gws
Pump Station 3 Replacement1 Dwes1Ot1k
Pump Station 5 Gen-set Tiev°GDe•
Garrison Creek Well T.-..Gil-
Seismic Improvements-6 MG#1,Reith,&Cambridge t77 *,=M Desteoa,vn,ee��oy
Seismic Isolation Valve(s)
i
Stetson PRV Installation r T1e4O1 Gil-
Soos Creek Well Dare 61°ck
SCADA System Improvements A
Prepare Final Work Plan r°1 GDe:
Corrosion Control Facility Improvements Dave c•uk,T 1GDe.
Soos Creek Aquifer Recharge
• • 11� • -• • • •
WPPBB ProcessPublicOperations„ AnnualReport
EstablishPerformance Based Work Plan Budgeting
of
Create Performance Standards
Develop Production
Prepare •
Submittalof Budget
Prepare • Work Schedule
Plan for •
11
Public Works Operations
2003 Annual Report
Performance Based Work Plan Budgeting
Establish Level of Service
Create Performance Standards
Develop Production Rates
Prepare Annual Work Plan
Submittal of Annual Budget
Prepare Detailed Work Schedule
Plan for Future Growth
Public Works Operations
2003 Annual Report
1998 2003 ° Annual
Infrastructure Units Inventory Inventory Difference Increase Growth
Water Pipeline Miles �-t5 '_63 13 7% 1.47%
Sanitary Sewer Pipeline Miles 175 187 12 7% 1.37%
Drainage System Pipeline Miles 185 226 41 22% 4.43%
Street Paving C/L Miles 198 233 35 18% 3.54%
Sq Feet 33,454,080 39,367,680 5,913,600 18% 3.54%
C/L=Centerline
SF=Square Feet
Infrastructure Replacement Value2003 Annual Report
Imp '-Public Works Operations
sPublic Works Operations
act of funding challenges2003 Annual Report
Modeling software accepts annual rating survey data and createsMEproject recommendations based on available funding. The software
also can project impact to infrastructure if MOM not
met. This particular analysis projects the loss of street oveday funding.
13
Public Works Operations
2003 Annual Report
Signs and Markings
e
Andy Hanscom
s` FIELD SPVR
Tom Kelley
� I
�k
Tom Rusbuld!
MW3
Michael Krail
MW2
Mission: To provide operations and maintenance of traffic
signs,pavement markings,guardrails and handrails to
promote safety of the pedestrian and motoring public
according to the Manual on Uniform Traffic Control Devices.
Public Works Operations
2003 Annual Report
And Hanscom � '
*t ac
Tom Kelley ,�
� e
Tom Rusbuldt
MW3
R
Michael Krail
Mwz 2003 Performance Standards
Maintenance Category Measure Est. Actual Est.
2003 2003 2004
Install New Signs Each 153 253 250
Street Signs and Markings
ENDS
Street Signs and Markings
ENT
Clean/Straighten Signs Each 1,000 1,019 1,000
Replace Missing RPMs Each 12,000 10,398 10,500
Thermoplastic Markings Pounds 8,000 13,000 18,000
Public Works Operations
2003 Annual Report
Maintenance
Bill Thomas
FIELD SPVR
Brent Collins •,
Jason Zvonec ".t
Travis Pam Jr �° � \
MW 2 ���tttrrr
Tim Kirkland
MW2
_ Mission: To provide maintenance and repairs to the
Bruce Stephens existing roadway network,including sidewalks,bridges,
hqW z and overpasses to ensure a smooth and safe travel
surface for the citizens of Kent and the
pedestrian/motoring public.
'"` Public Works Operations
2003 Annual Report
Maintenance
2003 Performance Standards
Bill rnomas Maintenance Cate o Measure Est. Actual Est.FIELD SPVR EI r'Y
Street Maintenance
Street Maintenance
2003 2003 2004
Asphalt Excavation Sq Ft 27,000 58,461 50,000
Brent collins Asphalt Overlays Sq Ft 90,450 138,247 207,000
MW4
Sidewalk Repairs Sq Ft 3,500 4,787 3,500
Jason Zvonec
15
Travis Pam Jr
MW 2
Tim Kirkland
MW 2
Bruce Stephens
MW2
c;.
Vegetation
_ Management Public Works Operations
KENT
2003 Annual Report
�$E�Z - a.' Mike Pulliam
L` � FIELD SPVR
's Mike Bmntlage
y MW4
� �b ScoK Schroetler
- q.`-. Jerry HcePPner
_ rtw3
Kyle Kelly
M1NN 3
Mission: To provide vegetation management
control of grasses,weeds,dangerous trees,and Dean Loucks
noxious weeds along roadside shoulders and ditches IJW 2
as well as bio-swales,retentionldetention holding
ponds,and includes the landscaping and lawn JOeQOdga
M1nR
maintenance of the lagoons,wetlands,stormisewer _
pump stations,water facility sites,and the renovation m�n,az Phial
of unsightly areas to enhance the image of Kent. '''W
Mikc Harrell
riW 2
Vegetation
_ Management Public Works Operations
2003 Annual Report
16
Vegetation
Mike Pulliam
FIELD SPVR
2003 Performance Standards Mike Bmntlage
M1RV°
Dept Maintenance Measure Est. Actual Est. swlscnr«rker
Category 2003 2003 2004 ''TN°
Jerry HceppnH
Street Mowing&Trimming Sq Ft 8,500,000 6,015,000 0 1•'wJ
Kyle KeNy
Water Mowing&Trimming Sq Ft 6,500,000 18,443,170 16,000,000 "'w'
Impound Mowing Sq Ft 6,500,000 6,577,600 0 pean Loucks
rnw z
Drainage Sidearm Mowing Sq Ft 15,000,000 9,042,568 12,000,000 Jce Cotliga
raw z
All Total Mowing& Sq Ft 88,486,972 86,806,959 91,437,897 mon sPhi¢I
Trimming M1+w�
Mike Harrell
M11W 2
Water Distribution
• Public Works Operations
2003 Annual Report
Water
MainslServices „� �„�„ � -
:Phil McConnell ;/T(.�. �� `yy+k
Tim Slegrrer — � >
Mwa _
Pat Alconcel �� -'
MW3 s�
Jaso�NR311er Mission: To deliver dependable,safe,and clean drinking
water to the consumer through the operation of the water
distribution system including maintenance of main lines,water
Brandon Lynch services,and other appurtenances used in the distribution of
MW 3
the City of KenYs water for customer consumption and fire
suppression.
Erik Peterson
MW 2
Antlrew Raeburn
MW 2
Distribution
Public Works Operations
2003 Annual Report
7
Mains/Services
2003 Performance Standards
Phll McConnell
FIELD SPVR
Maintenance Category Measure Est. Actual Est.
2003 2003 2004
Tim Stegner
Mw" Water Main Shutdowns Each 16 18 30
Customer Service Requests Each 425 404 425
Pat Alconcel
ntws New Construction Support Hours 110 676 360
Main Flushes Each 209 976 502
Jason Roller
Mwa Main CleaninglCubing Lin Ft 50,000 29,894 90,000
hIW 3 _ t.
Erik Peterson1 -
17
Antlrew Raebum '+._.
rnw z
Water Distribution
• • Public Works Operations
2003 Annual Report
Water
� w Hydrants/Meters
�s4%� ) Steve Reynolds
'� �1 - FIELD SPVR
♦ � �r " (Vacant)
Paul Johnson
MW3
-- "'�` Randy Pulkrabek
MW3
Mission: Provide quick and accurate response to
city locate requests,insure the accuracy of large
meters to measure consumer water consumption, Elbert Engl;sn
maintain hydrants in operational use to assure Mwz
availability of fire suppression,and provide support
for new construction projects by taking purity
samples and setting small meters.
Distribution
• Hydrants/Meters blic Works Operations
2003 Annual Report
18
2003 Performance Standards HydrantsJMeters
Steve Reynolds
Maintenance Category Measure Est. Actual Est. FIELD SPVR
2003 2003 2004
Utility Locates Performed Each 4,000 3,976 3,953
(Vacant)
Fire Hydrant Operations Each 1,300 1,024 1,300 Mwa
Fire Hydrant Maintenance Each 1,000 410 250
New Meter Installations Each 178 102 185 (Vacant)
MW4
Paul Johnson
MW3
t MW2
QualityWater Public Works Operations
2003 Annual Report
OK-
00
Water
Water Quality
Mission: To provide the delivery of dependable,safe,and clean
Dave Cihak drinking water to the consumer,through monitoring,operating,testing,
FIELD SPVR sampling,and controlling water sources and supplies following the
requirements set forth in federal,state,and local drinking water
regulations.
(Vaea nt)
Heather McIntosh €
MW 3
9
Heather Martin
Quality + Public Works Operations
2003 Annual Report
19
Water Quality _
t
Dave Ghak "�' g.N
FIELD SPVR '
(Vacant)
� -12 9'ZSAK
MW3
Heather Martin
MW2
- 2003 Performance Standards
Maintenance Category Measure Est. Actual Est.
2003 2003 2004
Well Depth Soundings Each 32 1,286 1,300
Chemical Feed Each 24 124 125
Equipment Maintenance
Water Quality Complaints Each 52 25 52
Treatment Runs Each 260 1,361 1,560
Public Works Operations
2003 Annual Report
Facilities
[� Trevor Giles
CI��Y O EN FIELDSPVR
Kevin Swinfortl
-1�; }q} ELECICTL TECH
� Y
MW 3
MW 3
Mission: To deliver dependable,safe,and clean
drinking water to the consumer through the
operation of various sources,pump stations, Ron Halverson
pressure reducing stations,and monitor these CTL CTR SPEC
facilities via the conVol center at the Operations
facility. Also,provide dispatching for other
Operations sections during normal work hours and
emergencies.
ublic Works Operations
2003 Annual Report
Facilities
2003 Performance Standards
Trevor Giles
Maintenance Category Measure Est. Actual Est. FIELDSPVR
2003 2003 2004
External Power Maint Each 10 103 24
Kevin Swinfortl
Building Maintenance Each 80 264 104 ELECICTL TECH
Valves/PRV Maint Each 19 97 52
Monthly Station Checks Each 36 124 120 Jim Reed
MW 3
Shawn Ralph
MW 3
Ron Halverson
Water Facilities
�KWater Facilities
ENT
CTL CTR SPEC
jl
1
20
TV/• a Station Maintenance
Public Works Operations
2003 Annual Report
N/PS Maintenance
Q rs z! �RC11IT PIPELINE INS
Tom Iverson
FIELD SPVR
7
Jens Vincent
FACILITES SPEC
Rob Lovell
FACILITIES SPEC
2� 8:55AM
- Gary Niemann
MW3
Mission: To provide operations and maintenance of the sanitary
sewer/storm drainage systems including closed circuit video of
the sewer/drainage piping system and maintenance of pump
stations used in the collection of wastewater and storm water
from residential,commercial,and industrial users within the City
of Kent service area. This section is intended to provide
information for a preventative maintenance program whereby
each foot of pipe and all structures are inspected a minimum of
once every five years.
TV/Pump Station Public Works Operations
KENT
2003 Annual Report
NIPS Maintenance
>! Q
Tom Iverson
r;� - _ FIELD SPVR
t"
,. Jens Vincent
FACILITES SPEC
Rob Lovell
FACILITIES SPEC
2003 Performance Standards Gary Niemann
MW3
Maintenance Measure Est. Actual Est.
Category 2003 2003 2004
Inspect Pipeline Lin.Ft 300,000 244,103 300,000
Sewer Hourly FUHour 250 416 250
Production
21
Drainage Hourly FUHour 150 241 150
Production
Sanitary Sewer Maintenance Public Works Operations
2003 Annual Report
��K!kW T Sanitary Sewer Maintenance
Sewer Maintenance
Dick Jaslowski ���?� i
FIELD SPVR - S
MW4
Mike Hobbs � � `
Aaron McConnep �.;,,
MW 2 r
Mission: To provide operations and maintenance of the
AnthMW ones sanitary sewer systems including maintenance of mainlines,
pump stations,and other facilities used in the collection and
disposal of wastewater from residential,commercial,and
industrial users within the Kent sewer franchise area.
Public Works Operations
2003 Annual Report
Sewer Maintenance
2003 Performance Standards
Dick Jaslowski
FIELD SPVR
Maintenance Measure Est. Actual Est.
Category 2003 2003 2004
Mike Cole
Mwa Pipeline Cleaning Lin.Ft 300,000 487,173 300,000
Inspect,Repair,Clean, Each 1,500 1,641 4,300
Mike Hobbs Replace Manhole22
Mwa Pipeline Cleaning FUHour 250 463 250
Hourly Production
Aaron McConnell
MW2
Anthony Jones `� ''
MW2
�� A
Drainage Maintenance
Public Works Operations
2003 Annual Report
ir
��"'"'"' < Drainage Maintenance
Rich Marshall
I
8i11 Looney
MW4
rJ
Jesse Mitchell
MW3
� .. �B. Mark Pitts
MW2
Mission: To provide operations and maintenance of the cit 's storm Lake Larson
y MW 2
drainage system including bio-swales,detentionlretention ponds,creek
conveyances,roadside and large ditches,manholes,catch basins,and
piping systems while meeting federal,state,and local regulations. The John Alariege
program is designed to prevent the flooding of streets and private MW z
properties while providing for safe collection and discharge of storm water
into city and state waterways. oa�ia J.Davis
MW2
Drainage
ag_ Public Works Operations
KENT
2003 Annual Report
_ Drainage Maintenance
fl
_ s I� xF`�', Rich Marshall
4 R � ',= FIELD SPVR
{ { Bill Looney
MW4
MW3
MW S
2003 Performance Standards
Mark P,tts
Maintenance Measure Est. Actual Est. Mwz
Category 2003 2003 2004
Luke Larson
MWZ
Pipeline Cleaning Lin.Ft 150,000 194,348 125,000
Manhole Cleaning Each 85 367 375 John Aldridge
23
Catch Basin Cleaning Each 140 234 200 MW z
Pipeline Cleaning FUHour 200 377 200
Hourly Production Davio J.Davis
MW 2
Public Works Operations
Inspection Servi2003 Annual Report
, Private facilities
F
.,� - Lyle Bush
' - STORMIDRAIN
" k,,,. Laura Haren
STORMIDRAIN
tr FACINSP
- STORMIDRAIN
FAC INSP
R
Cross Connection
Mission: Inspect all backflow prevention,storm drainage,and control Inspectors
grease interceptors at commercial and multi-family residential
properties within the City of Kent to initiate improvement,repair,
and cleaning to bring them into compliance with federal,state,
and regulations.The ultimate goal of this program is to protect -.
the potable water system from contamination due to cross- John siz�inore �;
connections,reduce flooding potential,improve water quality, cc w�P
and enhance wildlife habitat within the City of Kent service area.
Public Works Operations
Inspection Servi2003 Annual Report
Private Facilities
24
2003 Performance Standards Inspectors
Maintenance Category Measure Est. Actual Est.
2003 2003 2004
Inspections Per Inspector Each 150 246 130 Lyle Bush
STORMIDRAIN
New Inspections Init. Each 200 230 200 FAC INSP
Compliance % 100% 100% 100°!0
Laura Haren
STORMIDRAIN
FACINSP
- � � t"( Chris VanHoof
STORMIDRAIN
FACINSP
.,. Cross Connection
t � � Controllnspectors
John Sizemore
CC INSP
Public Works Operations
2003 Annual Report
Mission: Support all divisions
within Public Works Operations
with a variety of services including
project management,design,plan
review,cost estimating,pavement � `»oil
network analysis,
inspection/monitoring of street
network,street surface treatment 1 j{
project recommendations and
monitoring,CIP proposals,GIS _
map generation,computer `
application support,Hansen
system administration,reporting,
systems integration,and
programming. Other functions '``
include training and safety
coordination,and emergency EngineeringlTechnical Services
management planning through
HOC adminlStratlOn. Dave Brock
ENG SPVR
Levin Conway Gary VanAuken Alex Senecaut
SYSTEMS PAVEMENT MGT TECHNICAL SVS.
ANALYST ANALYST COORDINATOR
'==:Public Works Operations
2003 Annual Report
2003 Performance Standards
Maintenance Category Measure Est. Actual Est.
2003 2003 2004
Engineering/Technical Services
Ad IIL
�KENT Engineering/Technical Services
Projects Reviewed Each 75 64 75
Work Order Items Each 100,000 126,600 130,000
Customer Service Responses Each 2,000 1,589 2,000
f.
S
MRC
tmwr -..... .
EngineeringlTechnical Services
aut1 I • • Dave Brock
.1taP,6tat1. -- ENG SPVR
NSEN
METHODS
ANALYST ANALYST COORDINATOR
Levin Conway Gary VanAuken Alex Senecaut
• SYSTEMS PAVEMENT MGT TECHNICAL SVS.
I�1�
. •ministrative Services
Public Works Operations
KENT
2003 Annual Report
Administrative Services
Renee Bystedt
ADMIN SVS SPVIf;:
Tammy Johnson Gwen Abraham Madelyn Phiel Stephanie Anderson
ACCT TECH CCT SVCS Assr ADMIN SEC 1 SYSTEM SUPPORT
SPECIALIST
Mission: To provide Public Works
�'�� Operations with quality administrative
support in the areas of payroll
f administration,accounting,accounts
payable,clerical assistance,front
�;, � � desk/phone coverage,Hansen support,
and personnel/benefits changes.
ra
Administrative
Public Works Operations
26
2003 Annual Report
Administrative Services
Renee Bystedt
ADMIN SVS SPVR
Tammy Johnson Gwen Abraham Madelyn Phiel Stephanie Anderson
ACCT TECH CCT SVCS nssi ADMIN SEC 1 SYSTEM SUPPORT
SPECIALIST
2003 Performance Standards
Maintenance Category Measure Est. Actual Est.
2003 2003 2004
Purchase Orders Processed Each 2,250 2,166 2,250
Customer Calls Received Each 1,900 1,966 2,200
Hansen Work Orders Each 25,000 22,229 25,000
Hansen Work Order Entries Each 100,000 74,453 75,000
Public Works Operations
2003 Annual Report
Warehouse _ �"
Frank Olson ��'�
Stephen Craigw Juan Carlos Y
MW 3 Johnson t
t-�n
Mission: The warehouse provides inventory control,
small equipment servicing,equipment check-out and
parts ordering/receiving for Public Works and Parks
Maintenance.
Public Works Operations
2003 Annual Report
a �
Warehouse , � e,
s
Frank Olson ;. z R
FIELD SPVR .:,`.c.
Stephen Craigue Juan Carlos "" -
Johnson
MW1
2003 Performance Standards
Maintenance Category Measure Est. Actual Est.
2003 2003 2004
Purchase Orders Each 1,350 1,286 1,200
Warehouse Customers Each 8,750 9,046 9,000
Pickup and Delivery Each 650 629 630
Inventory Audit Results % New -0.98% <+-5.0%
Public Works Operations
2003 Annual Report
Fleet Services
AIIte ConraO
FLEET MGR
— I
panne Sullivan
ACCTG TECN
Veh M[c
BraO Haytloek +�
FIELD SPVR
T�
Patnck Sims
MEC MANIC 2
Robert Slone E
MECHANIC 2
wyld Schonnmih Fleet Services supports all the City's transportation
MECHANIC 2
requirements by managing and maintaining a safe,
Corey Renick efficient,cost effective diversified fleet of vehicles and
MECHANIC$ construction equipment. Responsibilities include a radio
communication repair shop and financial management of
BryhlWe all vehicle and equipment acquisitions. This inGudes life
cycle planning,competitive rental rates,excellent
WayneG."�"� customer service,and shop management of a vehicle
RADIO 1ECH
repair facility.
Public Works Operations
2003 Annual Report
F teat Services
A1=Conrad Ir
FLEE7 MGR �'
Glarine$u11WY1 i �
ACCTG TECH
Veh Mtc *
t
BrM Haytlock
FIELD SPVR
Pamck Sims -
MECHANIC 2
2003 Performance Standards
Robert Slone
MECHANIC 2
Maintenance Category Measure Actual Actual Est.
2002 2003 2004
Davitl Schoneman
MECHANIC P
Total Number of Units each 1,057 1,347 1,38a
Maintained
Corey Renick
MECHAwcz Total Hours Worked Hours New Measures 14,156 14,216
Bryan Bond Preventative Maintenance Hours New Measures 3,712 3,482
hM12 (Scheduled)
Wayne Gllbed4 Repairs and Maintenance Hours New Measures 3,430 3,768
RADIO TECN (Unscheduled)
Performance
_ • Public Works Operations
Generation
' `':, 2003 Annual Report
Job Costinei
Total
Job Cost
Equipment Materials Labor
® ■ In \ \
Production,work hours,and costs for all aspects
of Public Works Operations are compiled to
generate a total cost picture for all services and
activities.
Public Works Operations
Inventory P.yroll
2003 Annual Report
WashinWSQA
gton State Quality Award
• Submitted November 2003
29
• Site Visit March 15 — March 17
• WSQA Award Levels
Public Works Operations
2003 Annual Report
Public Works Operations
2003 Annual Report