Loading...
HomeMy WebLinkAboutCAG2020-046 - Original - Harkness Construction, LLC - Morrill Meadows Park Artwork Curbs & Footings - 02/03/2020 Agreement Routing Form • For Approvals,Signatures and Records Management Director KENT This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms. WASHINGTON (Print on pink or cherry colored paper) Manager/ Originator: Department: LynnOsborn for Bryan Higgins Parks Date Sent: Date Required: > 1/29/2020 Soonest possible please O L. aAuthorized to Sign: Date of Council Approval: Q ❑Director or Designee 0 Mayor n/a Budget Account Number: Grant? ❑Yes 0 No P21019 Budget? 0 Yes ❑ No Type: Vendor Name: Category: Harkness Construction LLC Contract Vendor Number: Sub-Category: O 1736483 O Project Name: Morrill Meadows Park Artwork Curbs & Footings E w = Project Details:Materials and installation of curbs and footings for outdoor art at Morrill Meadows Park a� E Agreement Amount: $41,813.64 Basis for Selection of Contractor: Bid d Start Date: 02/03/2020 Termination Date: 12/31/2020 a Local Business? []Yes O No* *If meets requirements per KCC 3.70.100,please complete"Vendor Purchase-Local Exceptions"form on Cityspace. Notice required prior to disclosure? Contract Number: ❑Yes 0 No C 2QZD_D`+ D e F Comments: 3 a, ,n 0 1A E T LAW DEPT: EC IVED c Im Date Routed to the Mayor's Office: Date Routed to the City Clerk's Office: .7 � City of Kent Office 51 tMe Mayor Visit Documents.KentWA.gov to obtain copies of all agreements KENT PUBLIC WORKS AGREEMENT between City of Kent and Harkness Construction, LLC THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Harkness Construction organized under the laws of the State of Washington, located and doing business at 45015 244th Avenue, Enumclaw, WA 98022 (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: As described in attached Exhibit A, incorporated herein, contractor shall construct concrete curbs and footings for outdoor art installations at Morrill Meadows Park according to the attached plans and specifications. Agreement does not include installation of artwork but will require some coordination with the artist to ensure a successful install. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, the Contractor shall complete the work described in Section I by December 31, 2020. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed $41,813.64, including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor eighty-five percent (85%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is appropriate. The City will pay the remaining Contract amount upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $150,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the City retain the final ten percent (10%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. PUBLIC WORKS AGREEMENT - 1 (Over$20K and No Performance Bond) B. Retaina4e. The City shall also hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. The amount retained shall be placed in a fund by the City pursuant to RCW 60.28.011(4)(a), unless otherwise instructed by the Contractor within fourteen (14) calendar days of Contractor's signature on the Agreement. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. PUBLIC WORKS AGREEMENT - 2 (Over$20K and No Performance Bond) G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause"shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. PUBLIC WORKS AGREEMENT - 3 (Over$20K and No Performance Bond) VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor shall PUBLIC WORKS AGREEMENT - 4 (Over$20K and No Performance Bond) promptly correct all defects in workmanship and materials: (1) when Contractor knows or should have known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or discovery of the defect. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period applicable to the overall work. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XI I. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's duty to defend, indemnify, and hold the City harmless, and Contractor's liability accruing from that obligation shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys'fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall PUBLIC WORKS AGREEMENT - 5 (Over$20K and No Performance Bond) be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Public Records Act. The Contractor acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington and documents, notes, emails, and other records prepared or gathered by the Contractor in its performance of this Agreement may be subject to public review and disclosure, even if those records are not produced to or possessed by the City of Kent. As such, the Contractor agrees to cooperate fully with the City in satisfying the City's duties and obligations under the Public Records Act. PUBLIC WORKS AGREEMENT - 6 (Over$20K and No Performance Bond) J. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. K. Counterparts and Signatures by Fax or Email. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. Further, upon executing this Agreement, either party may deliver the signature page to the other by fax or email and that signature shall have the same force and effect as if the Agreement bearing the original signature was received in person. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. All acts consistent with the authority of this Agreement and prior to its effective date are ratified and affirmed, and the terms of the Agreement shall be deemed to have applied. CONTRACTOR: CITY OF KENT: By: By: ` J (signature) (signatu Print Name: s,-v,-t Print Name: Dana Ralph Its �/N�. ter— Its Ma or title)DATE: �`� �.'> q DATE: i NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Jason Harkness Bryan Higgins Harkness Construction City of Kent 40515 244111 Ave. 220 Fourth Avenue South Enumclaw, WA 98022 Kent, WA 98032 253-335-1449 (telephone) (253) 856-5113 (telephone) harknessconstruction@gmail.com bhiggins@kentwa.gov APP D AS TO FORM: A L-e�Z JeLepartment Kent City Clerk P:`Planning\Morrill Meadows\Art work installation\Curbs&Footings-Harkness-CONTRACT PUBLIC WORKS AGREEMENT - 7 (Over$20K and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (01/13/2020), the bidder is not a "willful" violator, as defined in RCW 49.48.0821 of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Harkness Construction, LLC By Signatur uthorize Official* Printed Name: �•-s� -� �r Title: Date: City and State: *If a corporation, proposal must be executed in the corporate name by the president or vice- president (or any other corporate officer accompanied by evidence of authority to sign). If a co- partnership, proposal must be executed by a partner. EEO COMPLIANCE DOCUMENTS - 4 EXHIBIT A Morrill Meadows Park Concrete Curbs and Footings for Art Installation. 10600 SE 2481h Street Kent WA As part of the YMCA/Morrill Meadows Park Construction,the Kent Art commission worked with an artist to develop S outdoor art sculptures to be installed at Morrill Meadows Park. Due to timing and coordination issues the foundations and curbing were not installed as part of the project.The city is seeking bids to install concrete curbing and footings to support the art work. CONTRACTOR RESPONSIBLE FOR PROVIDING/CONSTRUCTING THE FOLLOWING: • CONCRETE CURB. • CSTC. • CITY/CONTRACTOR TO LAYOUT LOCATION PRIOR TO BEGINNING WORK. • COORDINATE WITH ARITST ON APPROVING LOCATION OF PIERS—(ARTIST WILL APPROVE LAYOUT ON SITE PRIOR TO POURING CONCRETE FOOTINGS) • SOIL EXPORT AND DISPOSAL. • COORDINATE WITH CITY ON LOCATING EXISTING IRRIGATION PRIOR TO BEGNIING WORK. • IMPORTING SOIL TO REPAIR GRADE OF SOILS ADJACENT TO CURBING AFTER CONCRETE IS INSTALLED AND APPLYING GRASS SEED. • PROTECTING ASPHALT WALKWAY FROM ANY DAMAGE FROM CONTRACTORS EQUIPMENT. • REPARING ANY DAMAGE DONE TO PARK. • SECURING WORK AREAS DURING CONSTRUTION WITH FENCING AND OTHER SIGNAGE. • LEAVING SITE CLEAN, SECURE,AND FREE FROM HAZARDS EACH NIGHT. • FINAL SITE CLEANING . NOTE THAT THE TOP OF EACH FOOTING FOR EXERCISE PIECES SHALL BE SET BELOW FINISH GRADE OF THE RESILIENT SURFACING. REBAR SHALL BE HELD DOWN MINIMUM 12" FROM TOP OF FOOTING TO ALLOW FOR WEDGE ANCHOR.ALSO PROVIDED ARE UPDATED LAYOUT LOCATIONS AND CURB DETAILS RELATIVE TO THE HMA PEDESTRIAN PATH. VERIFY CROSS SLOPE OF CONTAINED AREA DOES NOT EXCEED 2%OR AS APPROVED BY CITY. CURBS SHALL EXTEND PERPENDICULAR FROM EDGE OF PATH AND PROVIDE THE MINIMUM REQUIRED DISTANCE APPROVED (36") FROM ALL EDGES OF EACH EXERCISE PIECE. ALL CURBS SHALL BE FLUSH WITH ADJACENT SURFACES AND GRADED TO DRAIN. EXHIBIT A(Continued) LANDSCAPE ARCHITECT'S MacLeod Reckord PLLC SUPPLEMENTAL_ INSTRUCTIONS Landscape Architecture ■ Planning ■ Urban Design PROJECT: Kent YMCA& Morrill Meadows/East Hill Park ASI#88 REV-1 OWNER: City of Kent DATE:05/03/2019 CONTRACTOR: Abbott Construction The work shall be carried out in accordance with the following supplemental information issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Prior to proceeding in accordance with these instructions, indicate your acceptance of these instructions for minor changes to the Work as consistent with the Contract Documents and return a copy to the Landscape Architect. DESCRIPTION: PACKAGE INCLUDES UPDATED CONSTRUCTION DRAWINGS FOR FITNESS/EXERCISE ART PIECES, THEIR FOUNDATIONS AND RESILIENT SURFACING AS SELECTED AND TO BE INSTALLED BY CITY. NOTE THAT THE TOP OF EACH FOOTING FOR EXERCISE PIECES SHALL BESET BELOW FINISH GRADE OF THE RESILIENT SURFACING. REBAR SHALL BE HELD DOWN MINIMUM 12" FROM TOP OF FOOTING TO ALLOW FOR WEDGE ANCHOR. ALSO PROVIDED ARE UPDATED LAYOUT LOCATIONS AND CURB DETAILS RELATIVE TO THE HMA PEDESTRIAN PATH. VERIFY CROSS SLOPE OF CONTAINED AREA DOES NOT EXCEED 2% OR AS APPROVED BY CITY. CURBS SHALL EXTEND PERPENDICULAR FROM EDGE OF PATH AND PROVIDE THE MINIMUM REQUIRED DISTANCE APPROVED (36") FROM ALL EDGES OF EACH EXERCISE PIECE. ALL CURBS SHALL BE FLUSH WITH ADJACENT SURFACES AND GRADED TO DRAIN. IF PATH LAYOUT CHANGES, ADJUST FITNESS EQUIPMENT LAYOUT ACCORDINGLY. CONTRACTOR RESPONSIBLE FOR PROVIDING/CONSTRUCTING THE FOLLOWING: CONCRETE CURB CSTC PIERS—(ARTIST WILL APPROVE LAYOUT ON SITE PRIOR TO POURING CONCRETE FOOTINGS) CITY RESPONSIBLE FOR PROVIDING/INSTALLING THE FOLLOWING: SAFETY SURFACING ARTIST RESPONSIBLE FOR PROVIDING/INSTALLING: ART PIECES BOLTING TEMPLATE ATTACHMENTS: Sheets with clouding: (these sheets are attached) CONSTRUCTION DOCUMENTS FOR EXERCISE ART CONCRETE CURB DETAIL UPDATED EXERCISE ART LAYOUT ISSUED ACCEPTED BY: LANDSCAPE A CT CONTRACTOR DATE I � _ ¢ o i �i /- — _ = w w - -- - cn O w o x Q w w itr � J 201 i Ud� 1 N o I o 1 ro � I I i -hy, . { II p� a� O Ll a (Dola s M 'gW -- --�- -- - 12 __ o Sw �a g �9a & �Y 0 W 2 F- -jU a O w U ILLW a W m Q Z 0 w U ciU) m LL U Z) wO a Up W mu � U mU a a U) a v � � iw � O U F- 0 W Wu Z m U LL 2 Z W = � � LLJ � a ° o as Q � � Z)O W _ CO O Ua na era N0 CD Ucn II N06 II mU W Cfl _ v o I Z O CO W W „9-,6- a. o fill I 1=1 ' Z � CO (h J J LL g o � < Qo a COLU w �- N a ZJC) o � a � m LL cn cv w Lf) ° IL z O MN w d w w_O N Q r 2 Cc w J j CieQ C7 W W z Z=)< Df h U NV)UU�c� Q N ih I II I I - I I II 1 U_ _ ~ I 1 I II I III I � II 1 I L l�L N 3 O 6E 0'6 J7 817 N 0 �w C w the O O I 3 °InwZ wC�QO� LU°°-° LU N w°Q o��zP2 v �Ju.a0!!v S6'E Cl) Q -- O O � - (D2— m . i °UQ J I, vwZw � I. 3Q°3 I. coQ Lu 0 w w Q wwln w C) _ 3�~ � r CD U - - CL �w w m c S'E Cl) F- �,Q o --- 9L N �CL --- d Q =_ ---- -------- CN °� S'68 x ~ z0 ° --------------------- z <cow U w LL w Cie J JZ L>u �¢� Q a, J Z Q • 2 � V) O� W • ° a- J c ~ w CL QU wa 2 0 2 O se v n \? In 10 w co M O 1)X c • B u J �___ ------ < w II J ,�---------= w Q �U V) Q` O O Q Ld LLI W 1 N C "U Q N e e L o 0 Z Z d. O O 3 Q 0 o cii Q ? -- Z c `o C) e e O � � U— a� z � CL O = Q C) ti H v~i U 0'8v z w w0 m IL- S'£ =) W p e0 Z— I ZQQ�w NL,)UULifL 1 I I o v i N i i i i i i i i i i i i i i i i i i i i � Z�^ LU w w>c� N N J717 I o E Q 6'Z S.£ r- IL W N CL O CL M 3 O N � Q C� OO (A a) m - O J J Q oQ N - H i U ww o, — e a 0'Zl -b CL a o � 'I0 i � m U _Q) CN LUO 0'Z L �C1 £•p z 0 x `° LL, m r U � �Q Sod v) U Q _ p<Opw wwN Q W N >C� ---- W J C)U V) 0 Q � Q W I--- J W Q 0U V) wQ w oR m� w— W 30!� 3w �p �� �z �Q w o CLCL o O M N Qw V) IL M J NJLu - -- - --- —-- O y V IL n T Q N w O V) v m Og LL o Z c N w>� W O W CL H N Q 3 C) O CD o O� l ' >z Q _ N O LU zO Z I K Q C) 66 H % U 9, . N U Q Z_ wZ U_O S'titi = 8b �N V)C) �w w !d Q . . �z LU z- J zo 3� 3 a " OQ Q Lu J Q Vn0 C UC, J w3 CL NU ZIN �Z, Lu Q IL 'Z ww U J MQ Q'>U NO J / ) Q L W �/ IL O V II fh 1 1 w� - m ----- w ---- �W Z ------ ----- �-U ------ Oz0 -- 0OQo sa' V)=¢ Q w C14 zs 0, LIM o a J WW CL HU Q VH U 1 N `0 N 6 - a CL N 3 0 a� Q O N C ° �' O Z o Cl) `"o O O N ZO d O XN CL Q u ihV) H N U a LL,Q ) NLUZo o < S'Ob v �W CD 4k N pul- I bb 3 p J - Q W Z ACV Lu � J �>U W Q �U W W V) 3 F- J CL W J W CL .p N W N Cl) \m rr LU W ZG' m-Y 5W �--Uz ZZ 00< NUS cv Q= vU0 I I I � I z v JCL ) ? w J H Q'^ �0 QVQ JJ W W W W J Ln 3 �J N W • �Q 'pU MW 9Eo _. ... � o CN o Q L W uj "U Q N ZL _O l- 3 Q 0 Z W �° Z a) coS LL,o z Z=)< O LL 0 0 z • •• O 0 • CL Q I en i U I I I I O� t I v m 6'[Z Z 0 U. f w V) �x 0 ZN 0'Z8 LULUU 9'8 I t I 0'bb CO o1 O O N 9V Zb N Q o. 16 ch W W J Lu ~ wCpr h V V)"'' a Q N O J J \mow 11 Cl) 1 1 1 1 11 11 11 11 11 11 11 11 11 11 OCII 1✓ ^^� I..L Ln 1� c O Z8 vi N Z w O 3 IL C \ W 0 9 vQ Q �., Lu O H ci U LU vo 3 ao �OQO? Z�iv w 'vODU� >@� ww N� "'O LU o= Qw =U -i In C14 Z ILQ �Q CO O �Q W J �U V) O p ~ �w w V�Zao w� wwp w "oLU< c14Y C�3Q= _ —CL x p �v V) nw U wr \ 41 00<w� \Q J Jp� c Q�� '-m Q�Q� Cl) In V) w . p (D w/n� Qpp ccvUw .Zw QUQ J vF, >Un ^(D< O¢ p I LU W Q zpz� Q V) Q- ��3w NULLJQ UCL wCZp Q�ow � o CN a Ld W J N J N Q NN Z O H a- Q O 0 Z O C LL O _ E V a Z W Q 3 w W co H O O U I&zNZ=)¢ ¢O N !V)UUU� • • w w Z O O ~ U w v) LU �X M , 3 0 Z�CV LU W�\ w1 V Harkness Construction, LLC Estimate 45015 244th ave. Enumclaw, WA 98022 US 253-335-1449 harknessconstruction@gmail.com www.harknessconstruction.com City of Kent 850 Central Ave N Kent, WA 98032 ESTIMATE# DATE 1011 01/17/2020 DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT 01/17/2020 Construction Services MM Park Concrete per ASI 88. 1 38,012.40 38,012.40T Modified to 8"curb with 4" CSTC. Exclusions: Survey, Safety Surface, Artwork, Artwork installation/bolting. Owner to verify curb and pier locations prior to pour. SUBTOTAL 38,012.40 TAX (10%) 3,801.24 TOTAL $41 ,813.64 Accepted By Accepted Date EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 it 85 or a substitute endorsement providing equivalent coverage. 2. Automobile Liability insurance covering all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. EXHIBIT B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. / 1 ® DATE(MMIDDIYYYY) AC"Ro CERTIFICATE OF LIABILITY INSURANCE o,/2s/2o2o THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Keith Kline NAME: James E Dickinson Insurance Inc PHONE (208)773-0504 FAX (208)773-2805 AIC No Ext: A/C,No): 609 N Syringa Street AODRIess: Keith@dickinsononline.com INSURER(S)AFFORDING COVERAGE NAIC# Post Falls ID 83854 INSURERA: Scottsdale Insurance Company INSURED INSURER B: Travelers Insurance Company Harkness Construction LLC INSURER C: 45015 244th Ave SE INSURER D: INSURER E: Enumclaw WA 98022 INSURER F: COVERAGES CERTIFICATE NUMBER: CL1971103931 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR AIJULIbUtSH POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MMIDDIYYYY IY MM/DDYYY X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED CLAIMS-MADE rx-1 OCCUR PREMISES Ea occurrence) $ 100,000 MED EXP(Any one person) S 5,000 A Y CPS-3186825 04/30/2019 04/30/2020 PERSONAL aAOVINJURY s 1,000,000 GEN'LAGGREGATE LIMITAPPLIES PER. GENERAL AGGREGATE $ 2,000,000 X POLICY ❑ P JRO ❑ LOC PRODUCTS-COMP/OPAGG $ 2,000,000 ECT OTHER. S AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 Ea accident X ANYAUTO BODILY INJURY(Per person) $ B OWNED SCHEDULED BAON967284 01/05/2019 01/05/2020 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 2,000,000 A X EXCESS LAB CLAIMS-MADE XBS-0105522 07/11/2019 04/30/2020 AGGREGATE $ 2,000,000 DIED I I RETENTION$ 1 $ WORKERS COMPENSATION SPER TATUTE FORTH STOPGAP AND EMPLOYERS'LIABILITY YIN 1,000 00 A ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ NIA CPS-3186825 04/30/2019 04/30/2020 E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT S DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Re:Hogan Park Field 1 Dugout Roofs AND Morrill Meadows Park Artwork Footings Certificate holder and others when required by contract are named as additional insured for the operations of the named insured per forms CG2033 0413 and GLS448s 0215 CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN City of Kent ACCORDANCE WITH THE POLICY PROVISIONS. 220 Fourth Ave S AUTHORIZED REPRESENTATIVE Kent WA 98032 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD ENDORSEMENT SCOTTSDALE INSURANCE COMPANY® N O. ATTACHED TO AND ENDORSEMENT EFFECTIVE DATE FORM ING A PART OF NAMED INSURED AGENT NO. POLICY NUMBER (12:01 A.M.STANDARD TIMEy CPS3186825 07/18/2019 Harkness Construction LLC 46.)24 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED -OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS - COMPLETED COMMERCIAL OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART A. Section II -Who Is An Insured is amended to include as an additional insured any person or organiza- tion for whom you have performed operations when you and such person or organization agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy. Such person or organization is an additional insured only with respect to liability for "bodily injury"or"property damage"caused, in whole or in part, by "your work"at a commercial project location for that additional insured and included in the"products-completed operations hazard." However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law. 2. If coverage provided to the additional insured is required by a contract or agreement,the insurance afforded to such additional insured will not be broader than that which you are required by the con- tract or agreement to provide for such additional insured. 3. This insurance does not apply to "bodily injury"or"property damage"arising from "your work"on, in connection with or in any way relating to a "residential project." B. With respect to the insurance afforded to these additional insureds, the following is added to Sec- tion III - Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance. 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations, whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. For purposes of this endorsement, the following definitions apply: 'Residential project' means any project involving the original development or original construction, re- construction, renovation or remodeling of one or more single-family or multi-family housing units, town- houses, townhomes, residential condominiums or cooperatives, duplexes, other structures converted into condominiums or any other type of domicile intended for individual or collective residential ownership, and Includes copyrighted material of ISO Properties,Inc.,with its permission. Copyright,ISO Properties,Inc.,2012 GLS-448s(2-15) Page 1 of 2 INSURED shall include all phases of the development, construction, reconstruction, renovation or remodeling of all areas appurtenant to these structures, including but not limited to land acquisition, site improvements, exca- vation or grading of land, utilities, driveways, walkways, roadways, swimming pools, retaining walls, con- struction of any other structure, building, or common areas. 'Residential project"does not mean "your work" performed in connection with an apartment building, or "your work" performed solely on or in commercial space of"mixed-use buildings." "Mixed-use buildings" means structures and improvements thereto, which contain both residential units and commercial space. AUTHORIZED REPRESENTATIVE DATE Includes copyrighted m aterial of ISO Properties,Inc.,with its perm ission. Copyright,ISO Properties,Inc.,2012 GLS-448s(2-15) Page 2 of 2 COMMERCIAL GENERAL LIABILITY CG 20 01 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance Condi- (2) You have agreed in writing in a contract or tion and supersedes any provision to the contrary: agreement that this insurance would be pri- Primary And Noncontributory Insurance mary and would not seek contribution from any other insurance available to the additional This insurance is primary to and will not seek con- insured. tribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and CG 20 01 04 13 Copyright, Insurance Services Office, Inc., 2012 Page 1 of 1 INSURED COMMERCIAL GENERAL LIABILITY CG 20 33 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II - Who Is An Insured is amended to B. With respect to the insurance afforded to these ad- include as an additional insured any person or or- ditional insureds, the following additional exclu- ganization for whom you are performing opera- sions apply: tions when you and such person or organization This insurance does not apply to: have agreed in writing in a contract or agreement that such person or organization be added as an 1. "Bodily injury", "property damage"or"personal additional insured on your policy. Such person or and advertising injury" arising out of the ren- organization is an additional insured only with re- dering of, or the failure to render, any profes- spect to liability for "bodily injury", "property dam- sional architectural, engineering or surveying age"or"personal and advertising injury"caused, in services, including: whole or in part, by: a. The preparing, approving, or failing to 1. Your acts or omissions, or prepare or approve, maps, shop draw- ings, opinions, reports, surveys, field or- 2. The acts or omissions of those acting on your ders, change orders or drawings and behalf; specifications; or in the performance of your ongoing operations for the additional insured. b. Supervisory, inspection, architectural or engineering activities. However, the insurance afforded to such additional This exclusion applies even if the claims against insured: any insured allege negligence or other wrongdoing 1. Only applies to the extent permitted by law; in the supervision, hiring, employment, training or and monitoring of others by that insured, if the "occur- 2. Will not be broader than that which you are re- rence" which caused the "bodily injury" or "prop- quired by the contract or agreement to provide erty damage", or the offense which caused the for such additional insured. "personal and advertising injury", involved the ren- dering of or the failure to render any professional A person's or organization's status as an addi- architectural, engineering or surveying services. tional insured under this endorsement ends when your operations for that additional insured are completed. CG 20 33 04 13 Copyright, Insurance Services Office, Inc., 2012 Pagel of 2 INSURED 2. 'Bodily injury" or "property damage"occurring C. With respect to the insurance afforded to these after: additional insureds, the following is added to Sec- a. All work, including materials, parts or tion III -Limits Of Insurance: equipment furnished in connection with The most we will pay on behalf of the additional in- such work, on the project (other than serv- sured is the amount of insurance: ice, maintenance or repairs) to be per- 1. Required by the contract or agreement you formed by or on behalf of the additional have entered into with the additional insured; insured(s) at the location of the covered or operations has been completed; or 2. Available under the applicable Limits of Insur- b. That portion of "your work" out of which ance shown in the Declarations; the injury or damage arises has been put to its intended use by any person or or- whichever is less. ganization other than another contractor This endorsement shall not increase the applicable or subcontractor engaged in performing Limits of Insurance shown in the Declarations. operations for a principal as a part of the same project. Page 2 of 2 Copyright, Insurance Services Office, Inc., 2012 CG 20 33 04 13 Page l of 19 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 01/13/2020 County Trade Job Classification Wage Holiday Overtime Note *Risk Class King Asbestos Abatement Workers Journey Level $50.86 5D 1 H View King Boilermakers Journey Level $69.04 5N 1C View King Brick Mason Journey Level $58.82 5A 1M View King Brick Mason Pointer-Caulker-Cleaner $58.82 5A 1M View King Building Service Employees Janitor $25.58 5S 2F View King Building Service Employees Traveling Waxer/Shampooer $26.03 5S 2F View King Building Service Employees Window Cleaner (Non- $29.33 5S 2F View Scaffold) King Building Service Employees Window Cleaner (Scaffold) $30.33 5S 2F View King Cabinet Makers (ln Shop) Journey Level $22.74 1 View King Carpenters Acoustical Worker $62.44 7A 4C View King Carpenters Carpenter $62.44 7A 4C View King Carpenters Carpenters on Stationary $62.57 7A 4C View Tools King Carpenters Creosoted Material $62.54 7A 4C View King Carpenters Floor Finisher $62.44 7A 4C View King Carpenters Floor Layer $62.44 7A 4C View King Carpenters Scaffold Erector $62.44 7A 4C View King Cement Masons Application of all $62.97 7A 4U View Composition Mastic King Cement Masons Application of all Epoxy $62.47 7A 4U View Material King Cement Masons Application of all Plastic $62.97 7A 4U View Material King Cement Masons Application of Sealing $62.47 7A 41J View Compound King Cement Masons Application of Underlayment $62.97 7A 4U View King Cement Masons Building General $62.47 7A 4U View King Cement Masons Composition or Kalman $62.97 7A 4U View Floors King Cement Masons Concrete Paving $62.47 7A 4U View King Cement Masons Curb Et Gutter Machine $62.97 7A 4U View King Cement Masons Curb Et Gutter, Sidewalks $62.47 7A 41.1 View 2/3/2020 Page 2 of 19 King Cement Masons Curing Concrete $62.47 7A 4U View King Cement Masons Finish Colored Concrete $62.97 7A 4U View King Cement Masons Floor Grinding $62.97 7A 4U View King Cement Masons Floor Grinding/Polisher $62.47 7A 4U View King Cement Masons Green Concrete Saw, self- $62.97 7A 4U View powered King Cement Masons Grouting of all Plates $62.47 7A 41J View King Cement Masons Grouting of all Tilt-up Panels $62.47 7A 4U View King Cement Masons Gunite Nozzleman $62.97 7A 4U View King Cement Masons Hand Powered Grinder $62.97 7A 4U View King Cement Masons Journey Level $62.47 7A 4U View King Cement Masons Patching Concrete $62.47 7A 4U View King Cement Masons Pneumatic Power Tools $62.97 7A 4U View King Cement Masons Power Chipping Et Brushing $62.97 7A 4U View King Cement Masons Sand Blasting Architectural $62.97 7A 4U View Finish King Cement Masons Screed Et Rodding Machine $62.971 7A 4U View King Cement Masons Spackling or Skim Coat $62.47 7A 4U View Cuncr eie CL7 n7 7n I AI I I I v;-, f�II 1Y; I ICI I L IY%CIZ.Ul 1� I l vvvcuI 161 VIQ I.I I IIIC VF/C I QLV I .JVL.7/I /H iV �.1- Kin� �amant 11Aacnn. lTrnwr-lina Llarhina C)narat� �A7 97 7-1 41; �' -w on Colored Slabs r King Cement Masons Tunnel Workers $62.97 7A 4U View King Divers Et Tenders Belt/Vehicle or Submersible I$116.20 7A 4C View Operator (Not Under Pressure) King Divers Et Tenders Dive Supervisor/Master $79.23 7A 4C View King Divers Et Tenders Diver $116.20 7A 4C 8V View King Divers Et Tenders Diver On Standby $74.23 7A 4C View King Divers Et Tenders Diver Tender $67,31 7A 4C View King Divers Et Tenders Manifold Operator $67.31 7A 4C View King Divers Et Tenders Manifold Operator Mixed Gas $72.31 7A 4C View King Divers Et Tenders Remote Operated Vehicle $67.31 7A 4C View Operator/Technician King Divers Et Tenders Remote Operated Vehicle $62.69 7A 4C View Tender King Dredge Workers Assistant Engineer $56.441 5D 3F View King Dredge Workers Assistant Mate (Deckhand) $56.00 5D 3F View King Dredge Workers Boatmen $56.44 5D 3F View King Dredge Workers Engineer Welder $57.51 5D 3F View King Dredge Workers Leverman, Hydraulic $58.67 5D 3F View King Dredge Workers Mates $56.44 5D 3F View King Dredge Workers Oiler $56.001 5D 3F View King Drywall Applicator Journey Level $62.44 5D 1 H View King Drywall Tapers Journey Level $62.94 5P 1 E View King Electrical Fixture Journey Level $30.59 5L 1 E View Maintenance Workers 2/3/2020 Page 3 of 19 King Electricians - Inside Cable Splicer $83.17 7C 4E View King Electricians Inside Cable Splicer (tunnel) $89.34 7C 4E View King Electricians - Inside Certified Welder $80.36 7C 4E View King Electricians - Inside Certified Welder (tunnel) $86.25 7C 4E View King Electricians - Inside Construction Stock Person $41.48 7C 4E View King Electricians - Inside Journey Level $77.55 7C 4E View King Electricians - Inside Journey Level (tunnel) $83.17 7C 4E View King Electricians - Motor Shop Journey Level $45.08 5A 1 B View King Electricians - Powerline Cable Splicer $79.60 5A 4D View Construction King Electricians - Powertine Certified Line Welder $72.98 5A 4D View Construction King Electricians - Powerline Groundperson $47.94 5A 4D View Construction King Electricians - Powerline Heavy Line Equipment $72.98 5A 4D View Construction Operator King Electricians - Powertine Journey Level Lineperson $72.98 5A 4D View Construction King Electricians - Powerline Line Equipment Operator $62.06 5A 4D View Construction King Electricians - Powerline Meter Installer $47.94 5A 4D 8W View Construction King Electricians - Powerline Pole Sprayer $72.98 5A 4D View Construction King Electricians - Powerline Powderperson $54.55 5A 4D View Construction King Electronic Technicians Journey Level $51.07 7E 1 E I View King Elevator Constructors Mechanic $94.22 7D 4A View King Elevator Constructors Mechanic In Charge $101.73 7D 4A View King Fabricated Precast Concrete All Classifications - In- $18.25 5B 1R View Products Factory Work Only King Fence Erectors Fence Erector $43.11 7A 4V 8Y View King Fence Erectors Fence Laborer $43.11 7A 4V 8Y View King Fla ers Journey Level $43.11 7A 4V 8Y View King Glaziers Journey Level $66.51 7L 1Y View King Heat Et Frost Insulators And Journeyman $76.61 5J 4H View Asbestos Workers King Heating Equipment Journey Level $85.88 7F 1 E View Mechanics King Hod Carriers Et Mason Journey Level $52.44 7A 4V 8Y View Tenders King Industrial Power Vacuum Journey Level $13.50 1 View Cleaner King Inland Boatmen Boat Operator $61.41 5B 1 K View King Inland Boatmen Cook $56.48 5B 1 K View King Inland Boatmen Deckhand $57.48 5B 1 K View King Inland Boatmen Deckhand Engineer $58.81 5B 1 K View King Inland Boatmen Launch Operator $58.89 5B 1 K View 2/3/2020 Page 4 of 19 King lintand Boatmen Mate 1 $57.311 5B I 1 K I I View King Inspection Meaning Cleaner Operator, Foamer $31.49 1 View Of Sewer Et Water Systems Operator By Remote Control King Inspection Meaning Grout Truck Operator $13.50 1 View Of Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Head Operator $24.91 1 View Of Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Technician $19.33 1 View Of Sewer Et Water Systems By Remote Control King Inspection Meaning Tv Truck Operator $20.45 1 View Of Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $62.44 7A 4C View King Ironworkers Journeyman $72.181 7N 10 View King Laborers Air, Gas Or Electric Vibrating $50.861 7A 4V 8Y View Screed King Laborers Airtrac Drill Operator $52.441 7A 4V I 8Y View King (Laborers Ballast Regular Machine j $50.861 7A ( 4V 8Y I View King Laborers batch weighman j43.11 7A 4-v 8r View King Laborers Brick Pavers $50.86 7A 4V 8Y View King Laborers Brush Cutter $50.86 7A 4V 8Y View King Laborers Brush Hog Feeder S50.86 7A 4V 8Y View King Laborers Burner $50.86 7A 4V 8Y View King Laborers Caisson Worker $52.44 7A 4V 8Y View King Laborers Carpenter Tender $50.86 7A 4V 8Y View King Laborers Cement Dumper-paving $51.80 7A 4V 8Y View King Laborers Cement Finisher Tender $50.86 7A 4V 8Y View King Laborers Change House Or Dry Shack $50.86 7A 4V 8Y View King Laborers Chipping Gun (30 Lbs. And $51.80 7A 4V 8Y View Over) King Laborers Chipping Gun (Under 30 Lbs.) $50.86 7A 4V 8Y View King Laborers Choker Setter $50.86 7A 4V 8Y View King Laborers Chuck Tender $50.86 7A 4V 8Y View King Laborers Clary Power Spreader $51.80 7A 4V 8Y View King Laborers Clean-up Laborer $5U.86 7A I 4V 8Y I View King Laborers Concrete Dumper/Chute $51.80 7A 4V 8Y View Operator King Laborers Concrete Form Stripper $50.86 7A 4V 8Y View King Laborers Concrete Placement Crew $51.80 7A 4V 8Y View King Laborers Concrete Saw Operator/Core $51.80 7A 4V 8Y View Driller King Laborers Crusher Feeder $43.11 7A 4V 8Y View King Laborers Curing Laborer $50.86 7A 4V 8Y View King Laborers I $50.86I 7A I 4V 8Y View 2;3 2020 Page 5 of 19 Demolition: Wrecking Et Moving (Incl. Charred Material) King Laborers Ditch Digger $50.86 7A 4V 8Y View King Laborers Diver $52.44 7A 4V 8Y View King Laborers Drill Operator (Hydraulic, $51.80 7A 4V 8Y View Diamond) King Laborers Dry Stack Walls $50.86 7A 4V 8Y View King Laborers Dump Person $50.86 7A 4V 8Y View King Laborers Epoxy Technician $50.86 7A 4V 8Y View King Laborers Erosion Control Worker $50.86 7A 4V 8Y View King Laborers Faller Et Bucker Chain Saw $51.80 7A 4V 8Y View King Laborers Fine Graders $50.86 7A 4V 8Y View King Laborers Firewatch $43.11 7A 4V 8Y View King Laborers Form Setter $50.86 7A 4V 8Y View King Laborers Gabian Basket Builders $50.86 7A 4V 8Y View King Laborers General Laborer $50.86 7A 4V 8Y View King Laborers Grade Checker Et Transit $52.44 7A 4V 8Y View Person King Laborers Grinders $50.86 7A 4V 8Y View King Laborers Grout Machine Tender $50.86 7A 4V 8Y View King Laborers Groutmen (Pressure) $51.80 7A 4V 8Y View Including Post Tension Beams King Laborers Guardrail Erector $50.86 7A 4V 8Y View King Laborers Hazardous Waste Worker $52.44 7A 4V 8Y View (Level A) King Laborers jHazardous Waste Worker $51.80 7A 4V 8Y View (Level B) King Laborers Hazardous Waste Worker $50.86 7A 4V 8Y View (Level C) King Laborers High Scaler $52.44 7A 4V 8Y View King Laborers Jackhammer $51.80 7A 4V 8Y View King Laborers Laserbeam Operator $51.80 7A 4V 8Y View King Laborers Maintenance Person $50.86 7A 4V 8Y View King Laborers Manhole Builder-Mudman $51.80 7A 4V 8Y View King Laborers Material Yard Person $50.86 7A 4V 8Y View King Laborers Motorman-Dinky Locomotive $51.80 7A 4V 8Y View King Laborers Nozzleman (Concrete Pump, $51.80 7A 4V 8Y View Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Blaster, Vacuum Blaster) King Laborers Pavement Breaker $51.80 7A 4V 8Y View King Laborers Pilot Car $43.11 7A 4V 8Y View King Laborers Pipe Layer Lead $52.44 7A 4V 8Y View King Laborers Pipe Layer/Tailor $51.80 7A 4V 8Y View 2/3/2020 Page 6 of 19 King Laborers Pipe Pot Tender $51.80 7A 4V 8Y View King Laborers Pipe Reliner $51.80 7A 4V 8Y View King Laborers Pipe Wrapper $51.80 7A 4V 8Y View King Laborers Pot Tender $50.86 7A 4V 8Y View King Laborers Powderman $52.44 7A 4V 8Y View King Laborers Powderman's Helper $50.86 7A 4V 8Y View King Laborers Power Jacks $51.80 7A 4V 8Y View King Laborers Railroad Spike Puller - Power $51.80 7A 4V BY View King Laborers Raker - Asphalt $52.44 7A 4V 8Y View King Laborers Re-timberman $52.44 7A 4V 8Y View King Laborers Remote Equipment Operator $51.80 7A 4V 8Y View King Laborers Rigger/Signal Person $51.80 7A 4V 8Y View King Laborers Rip Rap Person $50.86 7A 4V 8Y View King Laborers Rivet Buster $51.80 7A 4V 8Y View King Laborers Rodder $51.80 7A 4V 8Y View King Laborers Scaffold Erector $50.86 7A 4V 8Y View King Laborers Scale Person $50.86 7A 4V 8Y View King Laborers eloper (wer 20") $51.80 7A 4xi BY y;Ay Mina I ahnrarc ClnnPr Cnravar Crin RAI 74 I 4V I RY Viaw King Laborers CYra?rlar /(nnnratal C51 Rn 7A dV BY View King Laborers Stake Hopper $50.86 7A 4V 8Y View King Laborers Stock Piler $50.86 7A 4V 8Y View King Laborers Swinging Stage/Boatswain $43.11 7A 4V 8Y View Chair King Laborers Tamper Et Similar Electric, $51.80 7A I 4V 8Y View Air Et Gas Operated Toots King Laborers Tamper (Multiple Et Self- $51.80 7A 4V 8Y View propelled) King Laborers Timber Person - Sewer $51.80 7A 4V 8Y View (Lagger, Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $50.861 7A 4V 8Y View King Laborers Topper $50.861 7A 4V 8Y View King Laborers Track Laborer $50.86 7A 4V 8Y View King Laborers Track Liner (Power) $51.80 7A 4V 8Y View King Laborers Traffic Control Laborer $46.10 7A 4V 9C View King Laborers Traffic Control Supervisor $46.10 7A 4V 9C View v: r., i, C--**-,- t5n 86 7n AX/ �v v; nn i, Lauvi ci 3 1 i i1Cn _)Nvuci v. i r� _r .ie rr' King Laborers Tugger Operator $51.80 7A 4V 8Y View King Laborers Tunnel Work-Compressed Air $120.61 7A 4V 9B View Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $125.64 7A 4V 9B View Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $129.32 7A 4V 9B View Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $135.02 7A 4V 9B View Worker 54.01-60.00 psi King Laborers $137.14 7A 4V 9B View 2/3/2020 Page 7 of 19 Tunnel Work-Compressed Air Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $142.24 7A 4V 9B View Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $144.14 7A 4V 9B View Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $146.14 7A 4V 9B View Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $148.14 7A 4V 9B View Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $52.54 7A 4V 8Y View Tender King Laborers Tunnel Work-Miner $52.541 7A 4V 8Y View King Laborers Vibrator $51.80 7A 4V 8Y View King Laborers Vinyl Seamer $50.86 7A 4V 8Y View King Laborers Watchman $39.18 7A 4V 8Y View King Laborers Welder $51.80 7A 4V 8Y View King Laborers Well Point Laborer $51.80 7A 4V 8Y View King Laborers Window Washer/Cleaner $39.18 7A 4V 8Y View King Laborers - Underground General Laborer Et Topman $50.86 7A 4V 8Y View Sewer Et Water King Laborers Underground Pipe Layer $51.80 7A 4V 8Y View Sewer Et Water King Landscape Construction Landscape $39.18 7A 4V 8Y View Construction/Landscaping Or Planting Laborers King Landscape Construction Landscape Operator $68.02 7A 3K 8X View King Landscape Maintenance Groundskeeper $17.87 1 View King Lathers Journey Level $62.44 5D 1 H View King Marble Setters Journey Level $58.82 5A 1M View King Metal Fabrication (In Shop) Fitter $15.86 1 View King Metal Fabrication (In Shop) Laborer $13.50 1 View King Metal Fabrication (1n Shop) Machine Operator $13.50 1 View King Metal Fabrication (In Shop) Painter $13.501 1 View King Metal Fabrication (In Shop) Welder $15.48 1 View King Millwright Journey Level $63.94 7A 4C View King Modular Buildings Cabinet Assembly $13.50 1 View King Modular Buildings Electrician $13.50 1 View King Modular Buildings Equipment Maintenance $13.50 1 View King Modular Buildings Plumber $13.50 1 View King Modular Buildings Production Worker $13.50 1 View King Modular Buildings Tool Maintenance $13.50 1 View King Modular Buildings Utility Person $13.50 1 View King Modular Buildings Welder $13.50 1 View King Painters Journey Level $43.40 6Z 2B View King Pile Driver Crew Tender $67.31 7A 4C View King Pile Driver Crew Tender/Technician $67.31 7A 4C View 2 3 2020 Page 8 of 19 King Pile Driver Hyperbaric Worker - $77.93 7A 4C View Compressed Air Worker 0-30.00 PSI King Pile Driver Hyperbaric Worker - $82.93 7A 4C View Compressed Air Worker 30.01 - 44.00PSI King Pile Driver Hyperbaric Worker - $86.93 7A 4C View Compressed Air Worker 44.01 - 54.00 PSI King Pile Driver Hyperbaric Worker - $91.93 7A 4C View Compressed Air Worker 54.01 - 60.00 PSI King Pile Driver Hyperbaric Worker - $94.43 7A 4C View Compressed Air Worker 60.01 - 64.00 PSI King Pile Driver Hyperbaric Worker - $99.43 7A 4C View Compressed Air Worker 64.01 - 68.00 PSI King Pile Driver Hyperbaric Worker - $101.43 7A 4C View Compressed Air Worker 68.01 - 70.00 PSI King Pile Driver Hyperbaric Worker - $103.43 7A 4C View Compressed Air Worker 70.01 71) nn hC i i /c.vv r +i King Pile Driver Hyperbaric Worker - $105.43 7A 4C View Compressed Air Worker 72.01 - 74.00 PSI King Pile Driver Journey Level $62.69 7A 4C View King Plasterers Journey Level 1 $59.421 7Q 1 1R View King Playground Et Park Journey Level $13.50 1 View Equipment Installers King Plumbers Et Pipefitters Journey Level $87.69 6Z 1G View King Power Equipment Operators Asphalt Plant Operators $69.16 7A 3K 8X View King Power Equipment Operators Assistant Engineer $65.05 7A 3K 8X View King Power Equipment Operators Barrier Machine (zipper) $68.55 7A 3K 8X View King Power Equipment Operators Batch Plant Operator: $68.55 7A 3K 8X View concrete King Power Equipment Operators Bobcat $65.05 7A 3K 8X View King Power Equipment Operators Brokk - Remote Demolition $65.05 7A 3K 8X View Equipment King Power Equipment Operators Brooms $65.05 7A 3K 8X View King Power Equipment Operators Bump Cutter $68.551 7A 3K 8X View King Power Equipment Operators Cableways $69.16 7A 3K 8X View King Power Equipment Operators Chipper $68.55 7A 3K 8X View King Power Equipment Operators Compressor $65.05 7A 3K 8X View King Power Equipment Operators Concrete Finish Machine - $65.05 7A 3K 8X View Laser Screed King Power Equipment Operators Concrete Pump - Mounted Or $68.02 7A 3K 8X View Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators $69.16 7A 3K 8X View 2/3/2020 Page 9 of 19 Concrete Pump: Truck Mount With Boom Attachment Over 42 M King Power Equipment Operators Concrete Pump: Truck Mount $68.55 7A 3K 8X View With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $68.02 7A 3K 8X View King Power Equipment Operators Cranes friction: 200 tons and $71.26 7A 3K 8X View over King Power Equipment Operators Cranes: 100 tons through 199 $69.85 7A 3K 8X View tons, or 150' of boom (including jib with attachments) King Power Equipment Operators Cranes: 20 Tons Through 44 $68.55 7A 3K 8X View Tons With Attachments King Power Equipment Operators Cranes: 200 tons- 299 tons, $70.57 7A 3K 8X View or 250' of boom including jib with attachments King Power Equipment Operators Cranes: 300 tons and over or $71.26 7A 3K 8X View 300' of boom including jib with attachments King Power Equipment Operators Cranes: 45 Tons Through 99 $69.16 7A 3K 8X View Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons $65.05 7A 3K 8X View And Under King Power Equipment Operators Cranes: Friction cranes $70.57 7A 3K 8X View through 199 tons King Power Equipment Operators Cranes: through 19 tons with $68.02 7A 3K 8X View attachments, A-frame over 10 tons King Power Equipment Operators Crusher $68.55 7A 3K 8X View King Power Equipment Operators Deck Engineer/Deck Winches $68.55 7A 3K 8X View (power) King Power Equipment Operators Derricks, On Building Work $69.16 7A 3K 8X View King Power Equipment Operators Dozers D-9 it Under $68.021 7A 3K 8X View King Power Equipment Operators Drill Oilers: Auger Type, $68.02 7A 3K 8X View Truck Or Crane Mount King Power Equipment Operators Drilling Machine $69.85 7A 3K 8X View King Power Equipment Operators Elevator And Man-lift: $65.05 7A 3K 8X View Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell $68.55 7A 3K 8X View And Gamaco 8t Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $68.02 7A 3K 8X View With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. $65.05 7A 3K 8X View With Attachments King Power Equipment Operators Grade Engineer: Using Blue $68.55 7A 3K 8X View Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/Stakeman $65.05 7A 3K 8X View 2/3/2020 Page 10 of 19 King Power Equipment Operators Guardrail Punch $68.55 7A 3K 8X View King Power Equipment Operators Hard Tail End Dump $69.16 7A 3K 8X View Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $68.55 7A 3K 8X View Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/Directional Drill $68.02 7A 3K 8X View Locator King Power Equipment Operators Horizontal/Directional Drill $68.55 7A 3K 8X View Operator King Power Equipment Operators Hydralifts/Boom Trucks Over $68.02 7A 3K 8X View 10 Tons King Power Equipment Operators Hydralifts/Boom Trucks, 10 $65.05 7A 3K 8X View Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Et $69.85 7A 3K 8X View Over King Power Equipment Operators Loader, Overhead, 6 Yards. $69.16 7A 3K 8X View But Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $68.55 7A 3K 8X View Yards King [Power Equipment Operators (Loaders, Plant Feed I $68.551 7A I 3K I 8X I View King Power Equipment Operators Loaders: Elevating Type Belt $68.02 7A 3K 8X View King Power Equipment Operators Locomotives, Att $68.55 7A 3K 8X View King Power Equipment Operators Material Transfer Device $68.55 7A 3K 8X View King Power Equipment Operators Mechanics, All, (teadmen - $69.85 7A 3K 8X ( View IW.50 Per Hour Over I. I me�iiaim-) King Power Equipment Operators Motor Patrol Graders $69.16 7A 3K 8X View King Power Equipment Operators Mucking Machine, Mole, $69.16 7A 3K 8X View Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $65.05 7A 3K 8X View Distribution Et Mulch Seeding Operator King Power Equipment Operators Outside Hoists (Elevators And $68.02 7A 3K 8X View Manlifts), Air Tuggers, Strato King Power Equipment Operators Overhead, Bridge Type $68.55 7A 3K 8X View Crane: 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $69.85 7A 3K 8X View Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $69.16 7A 3K 8X View Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $65.05 7A 3K 8X View King Power Equipment Operators Pile Driver (other Than Crane $68.55 7A 3K 8X View Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $68.021 7A 3K 8X View King Power Equipment Operators Posthole Digger, Mechanical $65.05 7A 3K 8X View King Power Equipment Operators Power Plant $65.05 7A 3K 8X View 2/3/2020 Page 11 of 19 King IPower Equipment Operators jPumps - Water 1 $65.051 7A I 3K I 8X I View King Power Equipment Operators Quad 9, Hd 41, D10 And Over $69.16 7A 3K 8X View King Power Equipment Operators Quick Tower - No Cab, Under $65.05 7A 3K 8X View 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $69.16 7A 3K 8X View Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger and Bellman $65.05 7A 3K 8X View King Power Equipment Operators Rigger/Signal Person, $68.02 7A 3K 8X View Bellman (Certified) King Power Equipment Operators Rollagon $69.16 7A 3K 8X View King Power Equipment Operators Roller, Other Than Plant Mix $65.051 7A 3K 8X View King Power Equipment Operators Roller, Plant Mix Or Multi-lift $68.02 7A 3K 8X View Materials King Power Equipment Operators Roto-mill, Roto-grinder $68.55 7A 3K 8X View King Power Equipment Operators Saws - Concrete $68.02 7A 3K 8X View King Power Equipment Operators Scraper, Self Propelled $68.55 7A 3K 8X View Under 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry $68.02 7A 3K 8X View All King Power Equipment Operators Scrapers, Self-propelled: 45 $69.16 7A 3K 8X View Yards And Over King Power Equipment Operators Service Engineers - $68.02 7A 3K 8X View Equipment King Power Equipment Operators Shotcrete/Gunite Equipment $65.05 7A 3K 8X View King Power Equipment Operators Shovel, Excavator, Backhoe, $68.02 7A 3K 8X View Tractors Under 15 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoe: $69.16 7A 3K 8X View Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $68.55 7A 3K 8X View Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $69.85 7A 3K 8X View Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $70.57 7A 3K 8X View Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $69.16 7A 3K 8X View King Power Equipment Operators Spreader, Topsider Et $69.16 7A 3K 8X View Screedman King Power Equipment Operators Subgrader Trimmer $68.55 7A 3K 8X View King Power Equipment Operators Tower Bucket Elevators $68.02 7A 3K 8X View King Power Equipment Operators Tower Crane Up To 175' In $69.85 7A 3K 8X View Height Base To Boom King Power Equipment Operators Tower Crane: over 175' $70.57 7A 3K 8X View through 250' in height, base to boom 2/3/2020 Page 12 of 19 King Power Equipment Operators Tower Cranes: over 250' in $71.26 7A 3K 8X View height from base to boom King Power Equipment Operators Transporters, At[Track Or $69.16 7A 3K 8X View Truck Type King Power Equipment Operators Trenching Machines $68.02 7A 3K 8X View King Power Equipment Operators Truck Crane Oiler/driver - $68.55 7A 3K 8X View 100 Tons And Over King Power Equipment Operators Truck Crane Oiler/Driver $68.02 7A 3K 8X View Under 100 Tons King Power Equipment Operators Truck Mount Portable $68.55 7A 3K 8X View Conveyor King Power Equipment Operators Welder $69.161 7A 3K 8X View King Power Equipment Operators Wheel Tractors, Farmall $65.05 7A 3K 8X View Type King Power Equipment Operators Yo Yo Pay Dozer $68.55 7A 3K 8X View King Power Equipment Operators- Asphalt Plant Operators $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $68.55 7A 3K 8X View I Inriarorni tnri Cawar R Water King Power Equipment Operators ,Batch Plant Operator, 1 $68.55 7A 3K 8X , View Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $65.05 7A 3K 8X View Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Bump Cutter $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Cableways $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Chipper $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Compressor $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Concrete Finish Machine - $65.05 7A 3K 8X View Underground Sewer Et Water Laser Screed King Power Equipment Operators- Concrete Pump - Mounted Or $68.02 7A 3K 8X View Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure King Power Equipment Operators- Concrete Pump: Truck Mount $69.16 7A 3K 8X View Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Pump: Truck Mount $68.55 7A 3K 8X View Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $68.02 7A 3K 8X View Underground Sewer Et Water King 1 $71.26 7A I 3K I 8X I View 2/3/2020 Page 13 of 19 Power Equipment Operators- Cranes friction: 200 tons and Underground Sewer Et Water over King Power Equipment Operators- Cranes: 100 tons through 199d$70. 7A 3K 8X View Underground Sewer Et Water tons, or 150' of boom (including jib with attachments) King Power Equipment Operators- Cranes: 20 Tons Through 44 7A 3K 8X View Underground Sewer Et Water Tons With Attachments King Power Equipment Operators- Cranes: 200 tons- 299 tons, 7A 3K 8X View Underground Sewer Et Water or 250' of boom including jib with attachments King Power Equipment Operators- Cranes: 300 tons and over or $71.26 7A 3K 8X View Underground Sewer Et Water 300' of boom including jib with attachments King Power Equipment Operators- Cranes: 45 Tons Through 99 $69.16 7A 3K 8X View Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons $65.05 7A 3K 8X View Underground Sewer Et Water And Under King Power Equipment Operators- Cranes: Friction cranes $70.57 7A 3K 8X View Underground Sewer Et Water through 199 tons King Power Equipment Operators- Cranes: through 19 tons with $68.02 7A 3K 8X View Underground Sewer Et Water attachments, A-frame over 10 tons King Power Equipment Operators- Crusher $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/Deck Winches $68.55 7A 3K 8X View Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Dozers D-9 Et Under $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, $68.02 7A 3K 8X View Underground Sewer Et Water Truck Or Crane Mount King Power Equipment Operators- Drilling Machine $69.85 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Elevator And Man-lift: $65.05 7A 3K 8X View Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell $68.55 7A 3K 8X View Underground Sewer Et Water And Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $68.02 7A 3K 8X View Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. $65.05 7A 3K 8X View Underground Sewer Et Water With Attachments King Power Equipment Operators- Grade Engineer: Using Blue $68.55 7A 3K 8X View Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/Stakeman $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $68.55 7A 3K 8X View Underground Sewer Et Water 2/3/2020 Page 14 of 19 King Power Equipment Operators- Hard Tail End Dump $69.16 7A 3K 8X View Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $68.55 7A 3K 8X View Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/Directional Drill $68.02 7A 3K 8X View Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/Directional Drill $68.55 7A 3K 8X View Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/Boom Trucks Over $68.02 7A 3K 8X View Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/Boom Trucks, 10 $65.05 7A 3K 8X View Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $69.85 7A 3K 8X View Underground Sewer & Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. $69.16 7A 3K 8X View Underground Sewer Et Water But Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $68.55 7A 3K 8X View Underground Sewer Et Water IYards King Power Equipment Operators- Loaders, Plant Feed $68.55 7A 3K 8X View j Underground Sewer Et Water I I I I I I +i: r r-- ..� n.. ter.. -,4- Ci.. «: T. Q.Jr CGO A-0 7A 1 1V 4v \/;o,.. r\iii6 rVHvci L-yuij�iiiciIL vlJcrawr3- waucr$: "Lc� L i,"r_, .yp2 U. kL Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $69.85 7A 3K 8X View Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Graders $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, $69.16 7A 3K 8X View Underground Sewer Et Water Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $65.05 7A 3K 8X View Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (Elevators And $68.02 7A 3K 8X View Underground Sewer Et Water Manlifts), Air Tuggers, Strato King Power Equipment Operators- Overhead, Bridge Type $68.55 7A 3K 8X View Underground Sewer Et Water Crane: 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $69.85 7A 3K 8X View Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $69.16 7A 3K 8X View Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $68.55 7A 3K 8X View Underground Sewer Et Water Mount) 2/3/2020 Page 15 of 19 King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $68.02 7A 3K 8X I View Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Power Plant $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under $65.05 7A 3K 8X View Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $69.16 7A 3K 8X View Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger and Bellman $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Rigger/Signal Person, $68.02 7A 3K 8X View Underground Sewer Et Water Bellman (Certified) King Power Equipment Operators- Rollagon $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $68.02 7A 3K 8X View Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled $68.55 7A 3K 8X View Underground Sewer Et Water Under 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry $68.02 7A 3K 8X View Underground Sewer Et Water All King Power Equipment Operators- Scrapers, Self-propelled: 45 $69.16 7A 3K 8X View Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - $68.02 7A 3K 8X View Underground Sewer Et Water Equipment King Power Equipment Operators- Shotcrete/Gunite Equipment $65.05 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoe, $68.02 7A 3K 8X View Underground Sewer Et Water Tractors Under 15 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoe: $69.16 7A 3K 8X View Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $68.55 7A 3K 8X View Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $69.85 7A 3K 8X View Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons 2/3/2020 Page 16 of 19 King Power Equipment Operators- Shovel, Excavator, Backhoes: $70.57 7A 3K 8X View Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Stipform Pavers $69.16 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $69.16 7A 3K 8X View Underground Sewer Et Water IScreedman King Power Equipment Operators- Subgrader Trimmer $68.55 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $68.02 7A 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Tower Crane Up To 175' In $69.85 7A 3K 8X View Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Tower Crane: over 175' $70.57 7A 3K 8X View Underground Sewer Et Water through 250' in height, base to boom King Power Equipment Operators- Tower Cranes: over 250' in $71.26 7A 3K 8X View Underground Sewer Et Water height from base to boom King Power Equipment Operators- Transporters, Alt Track Or $69.16 7A 3K 8X View Underground Sewer Et Water Truck Type King Power Equipment Operators- Trenching Machines $68.02 7A 3K 8X View Underground Sewer Et Water I IA King (Power Equipment Operators Truck Crane Oiler/driver - I $68.551 7A I 3K I 8X I View VIIUci Y�I VUI1U -)c VVCr U 'YYQIcI live ivi1.7 And vwcr King Power Equipment Operators- Truck Crane Oiler/Driver $68.02 7A 3K 8X View Underground Sewer Et Water Under 100 Tons King Power Equipment Operators- Truck Mount Portable $68.55 7A 3K 8X View Underground Sewer Et Water Conveyor King Power Eauioment Operators Welder 1 569.16 7A 1 3K 8X View Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmatt $65.05 7A 3K 8X View Underground Sewer Et Water Type King Power Equipment Operators- Yo Yo Pay Dozer $68.55 7A 3K 8X View Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $50.96 5A 4A View Trimmers King Power Line Clearance Tree Spray Person $48.35 5A 4A View Trimmers King Power Line Clearance Tree Tree Equipment Operator $50.96 5A 4A View Trimmers King Power Line Clearance Tree ITree Trimmer $45.54 5A 4A View I rimmers King Power Line Clearance Tree Tree Trimmer Groundperson $34.51 5A 4A View Trimmers King Refrigeration Et Air Journey Level $82.51 6Z 1G View Conditioning Mechanics King Roofers Journey Level $53.27 5A 3H View King Roofers Using Irritable Bituminous $56.27 5A 3H View Materials King Sheet Metal Workers Journey Level (Field or Shop) $85.88 7F 1 E View King Shipbuilding Et Ship Repair New Construction $36.36 7V 1 View Boilermaker 2/3/2020 Page 17 of 19 King ILhipbuitdinp, Et Ship Repair New Construction Carpenter 1 $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Crane $36.36 7V 1 View Operator King Shipbuilding Et Ship Repair New Construction Electrician $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Heat Et $76.61 5J 4H View Frost Insulator King Shipbuilding Et Ship Repair New Construction Laborer $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Machinist $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Operating $36.36 7V 1 View Engineer King ShipbuitdinQ Et Ship Repair New Construction Painter $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Pipefitter $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Rigger $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction Sheet $36.36 7V 1 View Metal King Shipbuitding & Ship Repair New Construction Shipfitter $36.36 7V 1 View King Shipbuilding Et Ship Repair New Construction $36.36 7V 1 View Warehouse/Teamster King Shipbuilding Et Ship Repair New Construction Welder / $36.36 7V 1 View Burner King Shipbuilding Et Ship Repair Ship Repair Boilermaker $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Carpenter $44.95 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Crane Operator $45.06 7Y 4K View King Shipbuilding Et Ship Repair Ship Repair Electrician $46.15 7X 4.1 View King Shipbuilding Et Ship Repair Ship Repair Heat Et Frost $76.61 5J 4H View Insulator King ShipbuitdinQ Et Ship Repair Ship Repair Laborer $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Machinist $46.15 7X 4.1 View King ShipbuitdinQ Et Ship Repair Ship Repair Operating $45.06 7Y 4K View Engineer King Shipbuilding Et Ship Repair Ship Repair Painter $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Pipefitter $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Rigger $46.15 7X 4J View King Shipbuilding & Ship Repair Ship Repair Sheet Metal $46.15 7X 4J View King Shipbuilding Et Ship Repair Ship Repair Shipwright $44.95 7X 4J View King ShipbuitdinQ Et Ship Repair Ship Repair Warehouse / $45.06 7Y 4K View Teamster King Sign Makers Et Installers Journey Level $50.90 0 1 View (Electrical) King Sign Makers Et Installers Journey Level $31.52 0 1 View (Non-Electrica() King Soft Floor Lavers Journey Level $51.07 5A 3J View King Solar Controls For Windows Journey Level $13.50 1 View King Sprinkler Fitters (Fire Journey Level $81.39 5C 1X View Protection) King Stage Rigging Mechanics (Non Journey Level $13.50 1 View Structural) King Stone Masons Journey Level $58.82 5A 1M View 2/3/2020 Page 18 of 19 King Street And Parking, Lot Journey Level $19.09 1 1 View 1SwegptLWorkers King Surveyors Assistant Construction Site $68.02 7A 3K 8X View Surveyor King Surveyors Chainman $65.05 7A 3K 8X View King Surveyors Construction Site Surveyor $69.16 7A 3K 8X View King Telecommunication Journey Level $51.07 7E 1 E View Technicians King Telephone Line Construction Cable Splicer $41.81 5A 2B View - Outside King Telephone Line Construction Hole Digger/Ground Person $23.53 5A 2B View - Outside King Telephone Line Construction Installer (Repairer) $40.09 5A 2B View - Outside King Telephone Line Construction Special Aparatus Installer 1 $41.81 5A 2B View - Outside King Telephone Line Construction Special Apparatus Installer II $40.99 5A 2B View - Outside King Telephone Line Construction Telephone Equipment $41.81 5A 2B View - Outside Operator (Heavy) Vina Tolcnhone Line Cnnctriirtinn Talanhnna Fniiinmant ("AR Q? 5A ?R ViP_w Outside Operator (Light) King Telephone Line Construction Telephone Lineperson $38.92 5A 2B View - Outside King Telephone Line Construction Television Groundperson $22.32 5A 2B View - Outside King Telephone Line CunsUULLiun Televisiuii $29.60 5A 2B View - Outside Lineperson/Installer King Telephone Line Construction Television System Technician $35.20 5A 2B View - Outside King Telephone Line Construction Television Technician $31.67 5A 2B View - Outside King Telephone Line Construction Tree Trimmer $38.92 5A 2B View - Outside King Terrazzo Workers Journey Level $54.06 5A 1M View King Tile Setters Journey Level $54.06 5A 1M View King Tile, Marble Et Terrazzo Finisher $44.89 5A 1 B View Finishers King Traffic Control Stripers Journey Level $47.68 7A 1K View King Truck Drivers Asphalt Mix Over 16 Yards $61.59 5D 4Y 8L View King Truck Drivers Asphalt Mix To 16 Yards $60.75 5D 4Y 8L View King Truck Drivers Dump Truck $60.75 5D 4Y 8L View King Truck Drivers Dump Truck Et Trailer $61.59 5D 4Y 8L View King Truck Drivers Other Trucks $61.59 5D 4Y 8L View King Truck Drivers Ready Mix Transit Mix $61.59 5D 4Y 8L View King Well Drillers Et Irrigation Irrigation Pump Installer $17.71 1 View Pump Installers King Well Drillers Et Irrigation Oiler $13.50 1 r:tView Pump Installers King Well Driller $18.00 1 View 2/3/2020 Page 19 of 19 Well Drillers tt Irrigation Pump Installers I I ( I I I 2/3/2020