Loading...
HomeMy WebLinkAbout1902RESOLUTION NO. /9 Q d A RESOLUTION of the city council of the city of Kent, Washington, adopting a new resolution amending Kent City Code fees effective January 1, 2015, including business license, planning and land use application fees, as well as permit and inspection fees required to comply with the provisions of the International Building, Residential, Mechanical, Fire, and other related Codes and the Uniform Plumbing Code, which amendments shall be assessed and collected beginning in the 2015- 2016 biennial budget; and repealing Resolution No. 1867. RECITALS A. On December 13, 2011, the Kent City Council passed Resolution No. 1851, establishing, amending and adjusting various development fees. B. On January 17, 2012, the Kent City Council passed Resolution No. 1852, clarifying (1) the application of certain business license fees to multi-family dwellings and to out-of-city businesses; (2) the technology fee amount to be changed for each business license transaction; and (3) the application of technology fees to certain fire code review fees. 1 Resolution Adopting Fee Schedules C. On December 11, 2012, the Kent City Council passed Resolution No. 1867, amending business license, planning and land use application fees, as well as permit and inspection fees required to comply with the provisions of the International Building, Residential, Mechanical, Fire, and other related Codes and the Uniform Plumbing Code. E. The Kent City Council finds that in an effort to achieve a more equitable cost recovery, the fee schedules must be amended, a new Resolution needs to be adopted, and Resolution No. 1867 must be repealed. NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: RESOLUTION SECTION 1. Adopt. Business License Fees. Beginning January 1, 2015, in accordance with chapter 5.01 of the Kent City Code (KCC), annual fees for business licenses will be based on the number of full and part-time employees employed at each business with certain exceptions for multi-family apartment and condominium businesses, home occupation businesses, and contractors doing business in Kent whose physical address is outside the city of Kent. The fees shall be assessed as follows: A. Number of Employees of Business 0-24 25-49 2 Fee $100 $200 Resolution Adopting Fee Schedules 50-99 100 or more B. Multi-Family Apartments and Condominium Businesses. The business license fee for multi-family apartments and condominium businesses is based on the number of dwelling units as noted in the schedule below. The business license fees will be waived for apartments and condominiums that participate in and are in compliance with the guidelines set forth in the STAR program in accordance with chapter 5.14 KCC. Number of Multi-Family Dwelling Units Fee 2 -10 Units $100 11-50 Units $300 51 Units and above $600 C. The Home occupation business license fee is $50.00. D. Contractors doing business in Kent whose physical location is outside the city of Kent shall be assessed a $100 fee. SECTION 2. -New Fee Schedule -Permit Technology Fee. As authorized by KCC Section 3.11.010(c), beginning January 1, 2015, a technology fee for all business license transactions will be assessed in the amount of one dollar ($1) per transaction; every other fee established by this resolution will be assessed a technology fee in an amount equal to three percent (3%) of the fee or ten dollars ($10.00), whichever is greater, with the exception of the exclusions listed in Exhibit A. 3 Resolution Adopting Fee Schedules SECTION 3. -New Fee Schedule -Hearing Examiner Fees. As authorized by KCC Section 2.32.155, the fee that an applicant shall pay for any permit or approval that requires either an open or a closed record public hearing before the city's hearing examiner and the fee for any appeal of any decision or recommendation to the hearing examiner shall be in the amounts shown on Exhibits B through F. 5ECTION 4. -International Fire Code Fees Established. As authorized by KCC Section 13.01.120, the fee schedule attached as Exhibit B shall govern the monetary charges assessed by the city for reviewing and processing permit applications, for issuing permits and other approvals, and for all related inspections. SECTION 5. -International Building Code and International Residential Code -Building permit and plan review fees. Pursuant to KCC Section 14.01.090, the fees to be assessed for building permits and related inspections under the International Building Code or the International Residential Code shall be as set forth in Exhibit C which is attached and incorporated into this resolution, with the following modifications: 1. Standard plan review Fees. Whenever construction documents, as defined in the International Building Code and International Residential Code, are submitted for review pursuant to section 107 of the International Building Code or section R106 of the International Residential Code, a plan review fee equal to sixty-five (65) percent of the building permit fee shall be assessed. 2. Basic plan review fees. The basic plan review fee, after and in addition to the payment of the initial standard plan review fee set forth in subsection (1) above, shall be a fee of ninety-eight dollars and sixty-one cents ($98.61) for each permit issued upon a certified basic plan. 4 Resolution Adopting Fee Schedules Additional plan review fees shall also be assessed at a rate of one hundred thirty-two dollars and thirty-six cents ($132.36) per hour, or a portion thereof for an additional plan review required for changes, additions, or revisions to plans. 3. Administration of basic plans. Basic plans shall be administered as follows: a. "Basic plans" are defined as complete plans for an entire detached single family residential building, approved as such by the building official, which: (i) Are clearly marked as being approved and certified as "basic" by the building official; (ii) Bear the author's (including, but not limited to, architect, engineer, or others) acknowledgment and approval of the plans submitted for use in the construction of a number of buildings, without any limitation of quantity or location. If any portion is designed by a licensed architect or engineer, this acknowledgment shall bear the author's stamp and signature. (iii) Basic plan review fees shall apply only to detached single family residential buildings and shall apply only to the originating owner or applicant. (iv) Changes to basic plans that alter the exterior dimensions or structure of the building shall be treated as a new permit application. follows: b. The process for administering basic plans shall be as 5 Resolution Adopting Fee Schedules (i) Any person may apply for plan review and certification of a basic plan by filing an application for such plan review and certification, along with two (2) or more complete sets of plans and the standard plan review fee. (ii) Upon completion and approval of plan review, the applicant shall provide reproducible copies of complete, approved plans to the building official. c. The city's building official is authorized and empowered to interpret and determine the applicability and administration of the provisions of this section. SECTION 6. -International Mechanical Code -Mechanical permit and plan review fees. Pursuant to KCC Section 14.01.090, the fees to be assessed for mechanical permits issued for the installation of mechanical equipment under the International Mechanical Code or the International Residential Code, as may be applicable, shall be as set forth in Exhibit D, which is attached and incorporated into this resolution, with the following modifications: 1. Standard plan review fees. Whenever construction documents, as defined in the International Mechanical Code or the International Residential Code, are submitted for review pursuant to section 106 of the International Mechanical Code or section R106 of the International Residential Code, a plan review fee equal to twenty-five (25) percent of the mechanical permit fee shall be assessed. SECTION 7. -Uniform Plumbing Code -Plumbing permit and plan review fees. Pursuant to KCC Section 14.01.090, the fees to be assessed for plumbing permits issued for the installation of plumbing equipment under the Uniform Plumbing Code or the International Residential Code, as 6 Resolution Adopting Fee Schedules may be applicable, shall be as set for in Exhibit E, which is attached and incorporated into this Resolution, with the following modifications: 1. Whenever construction documents, plans, specifications, engineering calculations, diagrams or other data are submitted for review pursuant to section 103 of the Uniform Plumbing Code or section R106 of the International Residential Code, a plan review fee equal to twenty-five (25) percent of the plumbing permit fee shall be assessed. SECTION 8. -Construction. Land Use and Development Fees. Pursuant to chapters 6.03, 6.06, 6.07, 7.02, 7.04, 11.06, 12.01, and other authorizations elsewhere in the Kent City Code, the applications, permits, approvals, review, inspection and other fees for various construction, land use and development actions shall be as shown in the attached Exhibit F. SECTION 9. Annual Consumer Price Index (CPil Adjustment. On the first day of each calendar year, all fees, rates and charges established in this resolution will adjust by the Consumer Price Index (CPI), specifically the CPI-W Seattle-Tacoma-Bremerton, measured from June 1 through June 1, if the CPI-W reflects an upward adjustment from the previous annual June to June period. This section and its related CPI adjustments will not apply, however, to any Section 1 Business License fees and Section 2 Permit Technology fees. SfCTION 10. Repealer. Resolution No. 1867 is hereby repealed in its entirety; provided, however, that Resolution No. 1867, and the fees established by that resolution, shall remain in full force and effect until the date the new fees are assessed and collected in accordance with this resolution. 7 Resolution Adopting Fee Schedules SECTION 11. -Severability. If any section, subsection, paragraph, sentence, clause or phrase of this resolution is declared unconstitutional or invalid for any reason, such decision shall not affect the validity of the remaining portions of this resolution. SECTION 13. -Effective Date. This resolution shall take effect and be in force on January 1, 2015. PASSED at a regular open public meeting by the city council of the city of Kent, Washington, this 16th day of December, 2014. CONCURRED in by the mayor of the city of Kent this 16th day of December, 2014. ATTEST: APPROVED AS TO FORM: ~"-f'7;A te.lt-~ TO BRUBAKER, CITY ATTORNEY 8 Resolution Adopting Fee Schedules I hereby certify that this is a true and correct copy of Resolution No. ~-"'--'"":-, passed by the city of Kent, Washington, the 9 Resolution Adopting Fee Schedules Exhibit A Technology Fee Exceptions Excluded from technology fees: 1. Fire permit fees for fireworks stands or displays; 2. Appeals; 3. Code text amendments, comprehensive plan map or text amendments, pre-application conferences, public notice boards and zone map amendments (rezones) under Exhibit "F" of this resolution; and 4. Fees listed under "Other inspections and Fees" in Exhibits "B," "C," "D," and "E" of this resolution, except that a technology fee will be assessed and collected for each Adult Family Home licensing inspection under Exhibit "C." Exhibit "B" tY o ent 1re erm1 Cit f K F" P "t F ees Permit Issuance Fees: Fee Issuance of each annual operational permit under the fire code Hazardous Materials or High-piled storage permits $227.54 All other permits $113.77 Issuance of each annual fire protection system permit, per building $134.45 Issuance of a residential home heating fuel tank removal permit, per application $184.30 Issuance of a fireworks permit for a fireworks stand, per application $100.00* Issuance of a fireworks permit for a fireworks display, per application $113.77* • rate fixed by state regulations Development Plan Review and Permit Fees: Fee Fire Prevention Construction Permits- Plan Review Fee 65% of permit fee Permit Fee Per Permit Fee Valuation Table Total Value of Project Permit Fee $1.00 to $500.00 $63.33 $501.00 to $2,000.00 $63.33 for the first $500.00, plus $8.26 for each additional $100.00, or fraction thereof, to and including $2,000.00. $2,001.00 to $25,000.00 $187.27 for the first $2,000.00, plus $37.80 for each additional $1,000.00, or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 $ 1,056.57 for the first $25,000.00, plus $27.28 for each additional $1 ,000.00, or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $ 1,738.68 for the first $50,000.00, plus $18.91 for each additional $1 ,000.00, or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $ 2,684.13 for the first $100,000.00, plus $15.15 for each additional $1 ,000.00, or fraction thereof, to and including $500,000.00. $500,001.00 to $1,000,000.00 $8,745.82 for the first $500,000.00, plus $14.36 for each additional $1 ,000.00, or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up $15,924.29 Rev1ew of Building Permits Single-Family Plan Review 25.9% of the building permit fee Commercial Plan Review 35.2% of the building permit fee Review of Land Use Applications- Sou ndary Line Adjustment $138.79 Binding Site Plan $227.54 Short Subdivision $227.54 Other Site Plan Reviews $111.50 Exhibit "B" -Continued City of Kent Fire Permit Fees Preliminary Plat $753.15 Residential Variances $88.74 Other Project Approvals $134.24 SEPA Checklist $161.55 SEPA Checklist as Part of a Project $81.91 Requiring Hearing Examiner Approval $241 '19 Other Inspections and Fees: Fee Each hydrant flow request (Two hour minimum) $142.74 per hour Initial fire and life safety inspection for new business, per application $111,70 Inspections outside of normal business hours (Two hour minimum charge) $142.74 per hour Additional inspections required: • when a construction inspection is not complete or fails to pass inspection; • when required corrections on an operational permit or fire inspection system permit have not been corrected by the second inspection; • when work is not accessible; • when work is not ready by scheduled inspection time; • when the construction permit or approved plans are not made readily available; • when the project requires multiple inspections for phased construction; • when requesting Temporary Certificate of Occupancy (TCO) or Certificate of Occupancy (CO) approval; or • when requesting inspections required for licensing and/or certifications. (One hour minimum charge). $142.74 per hour Additional plan review required by: • re-submittals*, 0 changes, • deferred submittals, 0 additions, or revisions to plans. 'One re-submittal will be included in the plan review fee. (One hour minimum charge) $142.74 per hour Hazardous material inventory statement, management plan, or facility closure plan review and approvaL (Two hour minimum charge) $142.74 per hour Code Modification or Alternative Materials and Methods Request (Three hour minimum charge) $142.74 per hour Appeal filing fee $331.65 Penalty Fees: Fee Failing to mark or maintain the marking of a designated fire lane. $206.09 Exhibit "C" City of Kent Building Permit Fees Total valuation determined by building official Permit Fee Assessed $1.00 to $500.00 $36.11. $501.00 to $2,000.00 $36.11 for the first $500.00, plus $4.70 for each additional $100.00, or fraction thereof, to and including $2,000.00. $2,001.00 to $25,000.00 $106.61 for the first $2,000.00, plus $21.56 for each additional $1 ,000.00, or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 $602.49 for the first $25,000.00, plus $15.56 for each additional $1 ,000.00, or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $991.49 for the first $50,000.00, plus $10.78 for each additional $1 ,000.00, or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $1,530.49 for the first $100,000.00, plus $8.64 for each additional $1 ,000.00, or fraction thereof, to and includihg $500,000.00. $500,001.00 to $1,000,000.00 $4,986.49 for the first $500,000.00, plus $7.28 for each additional $1 ,000.00, or fraction thereof, to and including $1 ,000,000.00. $1,000,001.00 and up $8,626.49 for the first $1 ,000,000.00, plus $4.86 for each additional $1,000.00, or fraction thereof. Other Inspections and Fees: For inspections outside of normal business hours and Adult Family Home licensing inspections (minimum charge-two hours) ............................ $132.36 per hour Reinspection fees assessed when work for which an inspection is requested is not complete, when required corrections have not been made, when work is not accessible, or when the permit or approved plans are not made readily available.......................................................... .. $132.36 per hour Additional plan review required by changes, deferred submittals, additions, or revisions to plans ......................................................................... $132.36 per hour Investigation fee when work is commenced prior to obtaining required Building, mechanical, or plumbing permit.............................. ................... . 100% of permit fee Appeal filing fee ............................................................................................................... $307.53 Exhibit "D" City of Kent Mechanical Permit Fees Permit Issuance Fees: 1. For the issuance of each mechanical permit... ..................................................... $41.52 2. For issuing each supplemental permit for which the original permit has not expired, been canceled, or finalized ................................................................... $12.98 Unit Fee Schedule: 1. For each forced-air or gravity-type furnace or boiler, including duct$ and vents attached, up to and including 100,000 Btulh (29.3 kW) ........................................ $25.96 2. For each forced-air or gravity-type furnace or boiler, including ducts and vents attached, over 100,000 Btulh (29.3 kW) ............................................................... $33.73 3. For each floor furnace, suspended heater, recessed wall heater or floor-mounted heater, including vent ............................................................................................ $25.96 4. For each appliance vent not included in an appliance permit ............................... $12.98 5. For repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including controls, regulated by the mechanical code or residential code ........................................................................................ $24.65 6. For each boiler or compressor: • to and including 3 horsepower (1 0.6 kW), or each absorption system to and including 100,000 Btulh (29.3 kW) .................................... $25.96 • over 3 horsepower (10.6 kW) to and including 15 horsepower (52.7 kW), or each absorption system over 100,000 Btulh (29.3 kW) to an including 500,000 Btulh (146.6 kW) ................................................ $48.01 • over 15 horsepower (52.7 kW) to and including 30 horsepower ( 105.5 kW), or each absorption system over 500,000 Btu/h (293. 1 kW) to and including 1,000,000 (293.1 kW) .................................................... $66.17 • over 30 horsepower (1 05.5 kW) to and including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btulh (293.1 kW) to and including 1,750,000 (512.9 kW) .................................. $98.61 over 50 horsepower (176 kW) or each absorption system over 1,750,000 Btu/h (512.9 kW) ................................................................... $164.79 7. For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4,719 Lis), including ducts attached thereto, which is not a portion of factory assembled appliance or unit for which a permit is required .................. $19.46 • over 10,000 cfm (4,719 Lis) ..................................................................... $33.73 8. For each evaporative cooler other than portable type ........................................... $19.46 9. For each ventilation fan connected to a single duct .............................................. $12.98 10. For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit.. ................................................... $19.46 11. For each hood served by mechanical exhaust, including the ducts for such hood ......................................................................................................... $19.46 12. For each domestic-type incinerator ....................................................................... $33.73 13. For each commercial or industrial-type incinerator ............................................... $25.96 Exhibit "D" -Continued City of Kent Mechanical Permit Fees Unit Fee Schedule (cont.): 14. For each mechanical appliance or piece of equipment regulated by the mechanical code or the residential code, not classed in other appliance categories, or for which no other fee is listed in this table .................................... $19.46 15. For each fuel gas or fuel oil piping system of one to five outlets .......................... $10.38 16. For each additional piping system outlet, per outlet... ............................................. $3.89 Other Inspections and Fees: For inspections outside of normal business hours (minimum charge-two hours) .......................................................................... $132.29 per hour Reinspection fees assessed when work for which an inspection is requested is not complete, when required corrections have not been made, when work is not accessible, or when the permit or approved plans are not made readily available .......................................................................... $132.29 per hour Additional plan review required by changes, deferred submittals, additions, or revisions to plans .......................................................................... $132.29 per hour Investigation fee when work is commenced prior to obtaining required building, mechanical, or plumbing permit.. ..................................................... 100% of permit fee Appeal filing fee ................................................................................................................ $307.53 Exhibit "E" City of Kent Plumbing Permit Fees Permit Issuance Fees: 1. For the issuance of each plumbing permit. .. .................................................. $36.33 2. For issuing each supplemental permit for which the original permit has not expired, been canceled or finalized ....................................................................... $19.46 Unit Fee Schedule: 1. For each plumbing fixture on one trap or a set of fixtures on one trap, including water, drainage piping and backflow protection therefore ............................................... $12.98 2. For each building sewer and each trailer park or mobile home park sewer ......... $25.96 3. Rainwater systems-per drain (inside building) ..................................................... $12.98 4. For each water heater and/or vent ........................................................................ $12.98 5. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen-type grease interceptors functioning as fixture traps ................................ $12.98 6. For each installation, alteration or repair of water piping and/or water treating equipment, each .................................................................................................... $12.98 7. For each repair or alteration of drainage or vent piping, each fixture ................... $12.98 8. For each lawn sprinkler system on any one meter including backflow protection devices therefore ................................................................................................... $12.98 9. For atmospheric-type vacuum breakers not included in item 8: . 1 to 5 vacuum breakers ............................................................................ $10.38 over 5 vacuum breakers, each ................................................................... $3.89 10. For each backflow protective device other than atmospheric-type vacuum breakers: 2 inch (51 mm) diameter or smaller .......................................................... $12.98 over 2 inch (51 mm) diameter .................................................................. $25.96 11. For each graywater or reclaimed water system .................................................... $73.37 12. For each medical gas piping system for a specific gas: 1 to 5 inlets/outlets ............................................................................................... $89.54 over 5 inlets/outlets, each .................................................................................... $10.38 Other Inspections and Fees: For inspections outside of normal business hours (minimum charge-two hours)...... .. .......................................................... $132.29 per hour Reinspection fees assessed when work for which an inspection is requested is not complete, when required corrections have not been made, when work is not accessible, or when the permit or approved plans are not made readily available .......................................................................... $132.29 per hour Additional plan review required by changes, deferred submittals, additions, or revisions to plans.. .. .............................................................. $132.29 per hour Investigation fee when work is commenced prior to obtaining required building, mechanical, or plumbing permit.. ..................................................... 100% of permit fee Appeal filing fee ............................................................................................................... $307.53 Exhibit "F" City of Kent Planning, Development Engineering. Public Works, and Land Use Review Fees Table 1 Development Public Planning Engineering Works Permit Application Type Fee Fee Fee Total Fees Notes Accessory Dwelling Unit $72 $0 $0 $72 (1) Administrative Determination Letter $134 $0 $0 $134 Appeal of Administrative Interpretation I Decision $287 $0 $0 $287 Appeal of SEPA Determination $287 $0 $0 $287 Appeal of Short Plat $287 $0 $0 $287 Binding Site Plan -Preliminary $720 $2,795 $0 $3,515 Binding Site Plan Modification $431 1 $576 $776 $0 $1,2081$1,352 (2) (10) Code Text Amendment $720 I $2,159 $0 $0 $720 I $2,159 (11) Combining Districts $2,159 $0 $0 $2,159 (10) Comprehensive Plan Map Amendment $2,159 $0 $0 $2,159 (10) Comprehensive Plan Text Amendment $2,159 $0 $0 $2,159 (10) Concept Meeting Review No charge No charge No charge Conditional Use $2,877 $776 $0 $3,653 (13) Document Recording Fees Actual cost Actual Cost (20) (3} Downtown Design Review $2871 $720 $78 1 $155 $0 $365 I $875 (14) Hearing Examiner-Conduct of Hearing and Preparation of Decision Actual cost Actual cost (16) Hourly rate $134 $155 $148 NIA Lot Line Adjustment $431 $621 $592 $1,644 Lot Line Elimination $144 $155 $148 $448 Mixed Use Design Review $720 $155 $0 $875 (14) $720 + $875 + Multi-Family Design Review $15lunit $155 $0 $15lunit (14} Multi-Family Dwelling Tax Exemption - Application $1,336 $0 $0 $1,336 Multi-Family Dwelling Tax Exemption -Final Application $1,336 $0 $0 $1,336 (17) Multi-Family Tax Exemption Appeal - Conditional, Final, Extension $287 $0 $0 $287 Multi-Family Tax Exemption Extension of Conditional Certificate $67 $0 $0 $67 Multi-Family Tax Exemption -Contract Amendment $668 $0 $0 $668 $3,597 + $9,343 + Planned Unit Development Plan $67lunit $5,746 $0 $671unit $311 I Planned Unit Development Plan Modification $359 1 $1,079 $1,242 $0 $670 1 $2,322 (4) Exhibit "F" City of Kent Planning. peyelopment Engineering. Public Works. and Land Use Revjew Fees Table 1 Development Planning Engineering Public Permit Application Type Fee Fee Works Fee Total Fees Notes Plat Modification/ Alteration Minor: 1/4 of plat Minor: 1f4 of Minor/Major fee plat fee Major: 1J2 of plat Major: 1f2 of fee plat fee (15) Pre-Application Conference $359 $0 $0 $359 Public Notice Actua I cost of publication (20) Public Notice Board $144 $0 $0 $144 (5) SEPA Checklist $359 1 $1,007 $463 I $776 $0 $822 I $1,783 (6) SEPA Modification $1091 $359 $78 I $155 $0 $187 I $515 (7) SEPA Exempt Determination $134 $0 $0 $134 SEPA Environmental Impact $2,877 + Statement $2,877 + deposit $0 $0 deposit (B) Shoreline Conditional Use $1,726 $446 $0 $2,192 (13) Shoreline Exempt Determination $287 $155 $0 $442 Shoreline Substantial Development $1,439 $466 $0 $1,905 Shoreline Variance $1,079 $466 $0 $1,545 (13) Short Plat (2-4 lots) -Preliminary Plat $1,079 $1,553 $0 $2,632 Short Plat (5-9 lots) -Preliminary $5,672 + Plat $2,877 + $72llot $2,795 $0 $72/lot Short Plat-Final Plat or Final Binding $4,895 + Site Plan $2,159 + $29/lot $1,553 $1,183 $2911ot Sign Permit $216 $78 $0 $294 (18) Special Home Occupation Permit $431 $0 $0 $431 (13) $10,782 + Subdivision -Preliminary Plat $5,036 + $72llot $5,746 $0 $72/lot $10,612 + Subdivision -Final Plat $2,879 + $29llot $4,193 $3,540 $29/lot $1441 $359 I $78 I $155 I $223 I $515 I Temporary Use $216 $78 $0 $294 (9) Temporary Sign $109 $0 $0 $109 Variance -Administrative $431 $155 $0 $586 Variance -Single Family Dwelling $431 $78 $0 $509 (13) Variance -Sign & Other than Single Family Dwelling $2,877 $155 $0 $3,032 (13) WTF Administrative Permit $431 $0 $0 $431 WTF Conditional Use $2,877 $311 $0 $3,187 Zone Map Amendment (Rezone) $2,877 $0 $0 $2,877 (10) $74.66 I (12a- $38.82 I $149.32 I 12e) Zoning Permit I Site Plan Review $361 $72 I value $77.65 I value $0 value (14) TABLE 1 NOTES: Exhibit "F" City of Kent Planning, Development Engineering. public Works. and Land Use Review Fees Table 1 Two (2) re-submittals of the plans are included with the review fees described in Table 1. Additional re-submittal reviews, whether attributed to the application's action or inaction, shall be charged at the hourly rate listed in Table 1. (1) The fees are applicable for an attached accessory dwelling unit, an interior accessory dwelling unit or for a detached accessory dwelling unit in a single- family residential zone. The fee includes the cost of the Planning Services Office recording of the accessory dwelling unit covenant documents with King County. An accessory living quarters in a commercial or industrial zone is subject to the applicable construction value-based fee. (2) Any changes to an approved, but unrecorded Binding Site Plan is subject to the $431 fee for a modification to a Binding Site Plan. Any changes to a recorded Binding Site Plan are subject to the $576 fee for a modification to a Binding Site Plan. (3) The planning $287 and engineering $78 review fees are applicable to minor alterations and improvements. The planning $720 and engineering review $155 fees are applicable to all new buildings, redevelopment, and major alterations and improvements. ( 4) Any minor change to an approved Planned Unit Development Plan is subject to the planning $359 and engineering review $311 fees for a modification. Any major change to an approved Planned Unit Development Plan is subject to the planning $1,079 and engineering review $1,242 fees for a modification. (5) The Planning Director has the authority to change this fee as needed to cover City expenditures. (6) The planning $359 and engineering review $463 fees are applicable only to SEPA review of construction of one single family dwelling on an individual parcel. All other SEPA checklist applications are subject to both the planning $1,007 fee and the engineering review $776 fee. (7) The planning $109 and engineering review $78 fees are applicable only to modifications to a SEPA determination for one single family dwelling on an individual parcel. All other modifications to a SEPA determination are subject to the planning $359 and engineering review $155 fees. (8) $2,877 fee plus a deposit, equal to the estimated cost of contract services necessary to complete the EIS process, must be submitted to the city. Planning Engineer Exhibit "f" City of Kent Planning. Development Engineering. Public Works. and Land Use Review fees Table 1 Revjew (9) Temporary Use Permits 0-30 days .......................... $144 $ 78 31-90 days ........................ $359 $155 Extensions beyond 90 days .. $216 $ 78 (10) Application requires public hearings. If multiple permit applications which require the same hearing procedure are submitted at the same time, the applicant will be charged the full fee for the permit application with the highest fee and 50% of the established fee for each of the other permits eligible for a consolidated review and hearing. (11) The $720 fee is applicable to amendments to Single Family Residential zones only. Amendments to all other zoning districts or sections of the zoning code are subject to the $2,159 fee. (12) a) b) c) The $36 fee is applicable for Minor Single Family Dwelling Construction on an existing dwelling such as a deck, minor addition of less than 25% of existing floor area, interior remodel or accessory building of 500 square feet or less on the same lot as the existing dwelling. The Development Engineering review fee for the site plan review for these permits is $38.82. The $72 fee is applicable for Major Single Family Dwelling Construction on an existing dwelling such as major addition of more than 25% of existing floor area or an accessory building of more than 500 square feet on the same lot as the existing dwelling. The Development Engineering review fee for the site plan review for these permits is $77.65. All new single family dwelling construction in a residential zone is subject to the following fee schedule: Building Services Construction Valuation Planning Fee $0-$74,999 ................................... $ 72 $75,000-$124,999 ........................... $144 $125,000-$224,999 ....................... $287 Over $225,000 ................................ $431 Engineer Eng. R~vl~w Io&Oa Fee Fee $389 $143 $389 $143 $389 $143 $389 $143 d) All new buildings, tenant improvements, an accessory living quarters in a commercial or industrial zone and other construction and development activity, other than single family dwelling construction, is subject to the following fee schedule: Exhibit "E" City of Kent Planning, Development Engineering, Public Works, and Land Use Review Fees Table 1 Building Services Construction Valuation Planning Fee $0 -$99,999 ··································· $ 480 $100,000-$249,999 ......................... $ 959 $250,000 -$499,999 ....................... $1,439 $500,000-$999,999 ....................... $1,918 $1,000,000-$4,999,999 .................. $2,877 $5,000,000 -$10,000,000 ................ $3,837 Over $10,000,000 ............................ $4,796 Engineer Eng. Review Insp. Fee Fee $466 $72 $466 $72 $466 $72 $466 $72 $466 $72 $466 $72 $466 $72 e) The zoning permit fee for those development projects for which no building permit is required but which requires site plan review and a zoning permit, shall be based on the value of the proposed development to be undertaken. The value of the proposed construction/ development shall be determined based on professional estimates by a licensed engineer, architect, landscape designer or contractor. These estimates may include, but are not limited to, grade and fill of the site, paving, placement of utilities, lighting, landscaping, and other site improvements. The combined total of the cost estimates for all development on the site shall be the established value basis for the zoning permit fee [as listed in 12c or 12d categories above as appropriate]. (13) Application requires a public hearing before the Hearings Examiner. If multiple permit applications which require a Hearing Examiner decision are submitted at the same time, the applicant will be charged the full fee for the permit application with the highest fee and 50% of the established fee for each of the other permits eligible for a consolidated review and hearing. (14) Application fees may be reduced by 75% if the application is for a mixed-use building. Fee reduction applies to site plan review/zoning permit, mixed use design review, multi-family design review and downtown design review. Fee waivers do not apply to SEPA, short plat, subdivision or other permit requests associated with the development of a site, nor does fee reduction apply to mixed use development where the commercial and residential uses are not located within the same building. (15) Plat alteration fees are determined after review whether the changes requested are minor or major. A minor change is done administratively and the fee is 25% of the cost of the original preliminary plat fee. A major change requires a public hearing or meeting and the fee is 50% of the cost of Exhibit "F" Citv of Kent Planning, Development Engineering. Public Works. and Land Use Review Fees Table 1 the original preliminary plat fee. A public notice board is required for a major alteration. (16) For applications that require a public hearing before the city's Hearing Examiner, the project applicant is responsible for 100% of the Hearing Examiner's hourly fee and associated expenses. Payment in full shall be submitted to the City prior to release of the Hearing Examiner's decision. This requirement shall not apply to appeal hearings. (17) These funds are distributed to the King County Assessor's Office by the City. (18) The engineering fee only applies to freestanding signs, not wall mounted signs. (19) The applicant shall pay all document recording fees charged by King County, and all administrative fees charged by the title company for processing. Payment in full shall be submitted to the City before documents are sent for recording. (20) For applications that require public notice, the applicant shall reimburse the City for 100% of publication and mailing costs. Reimbursement shall be paid to the City prior to issuance of the final decision. Exhibit "F" City of Kent planning. pevelopment Engineering. public Works. and Land Use Review Fees Table 2 Inspection 1 Permit APPlication Type Review/Intake Fee Issuance Fee Total Fee Notes $3,845/$12,128/$37' 1 Civil Construction -Non-Residential $4 9691$15 6851$47 675 23 $8 8151$27 8131$84 798 ll.al Civil Construction -Minor $6211 $1 398 $444 I $1 183 $1 065 I $2 581 (l.b) Civil Construction -Plats $14 908 I $28 730 $11 5361 $22 333 $26 444 I $51 062 (l.c) Civil Construction -Short Plats $1 864 I $4 814 $1 331/ $4 845 $3 195 ( $8 660 (l.d) Critical Areas -Reasonable Use or Variance $2 174 $0 $2174 Critical Areas -Monitorina Reoort $7 854 $0 $854 (2.b) Critical Areas Delineation Report Review $1 708 $0 $1 708 (2.al Critical Areas Conceptual Mitigation Plan $1 553 $0 $1 553 (2.a) Critical Areas -Final Mitigation Plan $2 329 $1 775 $4 104 (2.a) Demolition Permit j;311 $296 $606 Deviation Request to Construction Standards $669 $148 $847 Grade and Fill -Major-Tier 1 $621 $887 $1 509 (3.a) Grade and Fill -Major-Tier 2 $932 j;1 183 $2 115 C3.a)_ Grade and Fill -Maior-Tier 3 $1 242 $2 366 $3 609 (3.a) Grade and Fill -Maior -Tier 4 $1 553 $3 550 $5103 (3.a) Grade and Fill -Minor $466 $444 $910 (3.al Grade and Fill -Minor (SF Only) $155 $148 $303 (3.b) Hearing Examiner Actual Cost Actual Cost (4) Hourly Rate $155 $148 Recording Fees Actual Cost Actual Cost [5) Sewer-Certificate of Avallabllitv $233 $74 $307 Sewer -Permit $78 $370 $447 (6) Street Cut Permits $311 $444 $754 (7) Street Use Permits $155 $222 $378 Water-Certificate of Availability $233 $74 $307 Water -Permit $78 $370 $447 Water Backflow Insoection $0 $148 $148 Backflow Prevention Assembly Annual Administrative Fee $0 $83 $83 Exhibit "F" City of Kent Planning, Development Engineering. Public Works, and Land Use Review Fees Table 2 TABLE 2 NOTES: Two (2) re-submittals of the plans are included with the review fees described in Table 2. Additional re-submittal reviews, whether attributed to the application's action or inaction, shall be charged at the hourly rate listed in Table 2. (1) Civil Construction a. Applies to work with a construction valuation of $60,000 or greater with the following sub-categories: NQD-R~:!id~nti5JI Tj~r ~QD:ltn.!!;ti2D Valuati2ll Small $60 000 -$199 999 Medium $200 000 -$1 099 999 Large >I= $1 100 000 b. Applies to work, residential or non-residential, with a construction valuation of less than $60,000. The lower fee applies to work with valuations less than $20,000.00. c. The lower fee applies to plats 39 lots and less. d. The lower fee applies to short plats 4 lots and less. (2) Critical Areas (a) Review fees for a single family residential parcel only may be reduced by 25%. (b) Monitoring reports are required yearly for the required monitoring period. Fee assumes one site visit to verify report findings and one letter of acceptance from the city. Additiona I reviews will be billed at the hourly rate. (3) Grade and Fill Exhibit "F" City of Kent Planning. Development Engineering. public Works. and Land Use Beyjew Fees a. follows: Table 2 The quantities and review thresholds for Grade and Fill permits are as Grade and Fill Quantity Cleared or New or Replaced Tier Disturbed Area Hard Surface 0 cy-49 cy 0 sf-6,999 sf 0 sf-1999 sf 0 50 C}'_-499 cy 7,000 sf-<3/4 acre 2 000 sf -4,999 sf Minor 500 cy-4,999 cy 3/4 ac-<1 ac 5,000 sf-<1 ac 1 5,000 cy -49,999 cy 1 ac-<2.5 ac 1 ac-<2.5 ac 2 50,000 cy-99,999 cy 2.5 ac-<5 ac 2.5 ac -<5 ac 3 100,000 cy and larger 5 ac and larger 5 ac and larger 4 b. The Minor Single Family Grade and Fill fees apply to work performed on one single family residential parcel of 6,999 sf or less only. Short Plats, Plats, and other projects spanning multiple parcels fall into the other categories. (4) For applications that require a public hearing before the city's Hearing Examiner, the project applicant is responsible for 100% of the Hearing Examiner's hourly fee and associated expenses. Payment in full shall be submitted to the City prior to release of the Hearing Examiner's decision. This requirement shall not apply to appeal hearings. (5) The applicant shall pay all document recording fees charged by King County and all administrative fees charged by the title company for processing. Payment in full shall be submitted to the City before documents are sent for recording. (6) Side sewer permit Inspection I Issuance Fee may be reduced by 50% if the work is an emergency repair only. New installations, grease interceptors, and similar work is subject to the full fee listed in the table. (7) Street Cut Permit Review and Inspection Fees may be reduced by 50% if the following criteria are met: a. The location of the work is behind the curb and gutter (if any), or outside the pavement surface (if no curb and gutter exist), and b. The size of the disturbed area is 50 square feet or less, and c. The work is in front of a single family residential zoned parcel only, and d. There is no traffic control plan required, and e. The work is not being done by a franchised utility company.