HomeMy WebLinkAboutPW18-473 - Change Order - #3 - Scarsella Bros., Inc. - S 228th St UPRR Grade Separation - Additional Work - 08/21/2019 40 �. RecordsManagement KE 1 NT Document WASHINGTON CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name : Scarsella Bros., Inc. Vendor Number: 34547 JD Edwards Number Contract Number: PW18-473 Project Name: Upper Mill Creek Dam Improvements & Diversion Structure Replacement Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 12/20J18 Termination Date: 140 Working Days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Susanne Smith Department: PW Engineering Contract Amount: $7,760,955.20 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order #3 As of: 08/27/14 • KENT W n S H I N GT O.0 CHANGE ORDER NO. # 3 NAME OF CONTRACTOR: Scarsella Bros., Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER:S. 228th St. UPRR Grade Separation Ground Improvements & Embankments ORIGINAL CONTRACT DATE: December 20, 2018 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This change makes the following revision to the contract documents Sheet 25 of 36: -Delete bid item 11282 Chain Link Fence Type 3, replace with existing 8 ft. tall property fence. -Delete bid item 11295 Single 6 ft. Chain Link Walk Gate for Pond, replace with 14ft. Double Swing Chain Link Gate for Pond per Kent Standard Plan 5-23M. -Delete bid item 11281 Double 20 ft. Chain Link Gate, replace with 49 ft. Double Swing 8 ft. tall gate. Provide latching mechanism while closed and securing devices while open. -Revise 6 ft. Steel Ornamental Fence Alignment as illustrated. 2. The contract amount and time for performance provisions of Section II 'Time of Completion," and Section III, 'Compensation," are hereby modified as follows: Original Contract Sum, $7,760,955.20 (including applicable alternates and WSST) Net Change by Previous Change Orders $42,739.00 (incl. applicable WSST) Current Contract Amount $7,718,216.20 (incl. Previous Change Orders) CHANGE ORDER - 1 OF 3 Current Change Order $10,750.48 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $7,728,966.68 Original Time for Completion 140 working days (insert date) Revised Time for Completion under 0 prior Change Orders (insert date) Days Required (f) for this Change Order 0 calendar days Revised Time for Completion 140 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By (signature) (signature) Print Name: "1124G66 Print Name: Timothy ]. LaPorte, P.E. Its 'V'0%722;r Its Public Works Director (title) (titl DATE: //i9 DATE: CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 4000 • FILE NO: 200.2 KENT CHANGE ORDER WORKSHEET NO. 003 Construction Management Division — Public Works Project S. 2281h St Union Pacific Railroad Project No.: 07-3022C Grade Separation Ground Improvements and Embankments Project Engineer: Cameron Bloomer, PE Fed-Aid No.: HLP-FMSIB-1216 (005) Owners Rep: KBA, Inc Contractor: Scarsella Bros. Inc. Date: 7/26/2019 I. PROPOSED CHANGE This Change makes the following revisions to the Contract Documents: • Sheet 25 of 36: REPLACE existing plan sheet 25 of 36 with attached plan sheet 25 noted as Revision 4, dated 07/11/19. Plan changes include the following: o DELETE - Bid Item 11282 Chain Link Fence Type 3, REPLACE with in kind existing 8 foot tall property fence, limits as shown; o DELETE - Bid Item 11295 Single 6 Ft. Chain Link Walk Gate for Pond, REPLACE with 14 Ft. Double Swing Chain Link Gate for Pond per Kent Standard Plan 5-23M; o DELETE - Bid Item 11281 Double 20 Ft. Chain Link Gate, REPLACE with 49 Ft. Double Swing 8 foot tall gate. Provide latching mechanism while closed and securing devices while open. o REVISE - 6 foot Steel Ornamental Fence Alignment as illustrated II. REASON AND BACKGROUND FOR CHANGE This change provides fencing that matches the 7418 S. 228th St property's existing condition, which was an 8' tall fence with privacy slats across the north edge of the property. The 54' gate is needed where the new access road penetrates the northern property edge, allowing vehicle access and security when needed. This change also enlarges the gate at the pond to allow vehicle access for maintenance. 1 REV. DATE: 3/15/19 • FILE NO: 200.2 KENT III. METHOD OF PAYMENT NEW PAY ITEM(S) ❑ Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of Qty 1 PE Item _ .................... .. .................__........_._,.......... ._ _ ......._....< .._...._.... . ........... 11 8' Tall Chain Link Fence with 257 LF $46.44 $11,935.08 PVC Privacy Slats ........ ...........................--. ... 11 14' Double Swing Chain Link 1 EA $1,523.20 $1,523.20 Gate for Pond .................. ............. ... ... .......................... F. ........._.._...................._. .......... ... ....-...._. 11 49' Double Swing 8' Tall Gate 1 EA $6,507.20 $6,507.20 ® Independent Estimate Attached CREATE PAY ITEM ONLY- Payment to be made ❑ PAY THIS PAY ESTIMATE -REQUIRED at a later date upon completion of work ❑.., __.. .. _...... .............. ... ...................................... Material Submittals Required - CC. Construction Coordinator New Sub Reqrd? No DELETE EXISTING PAY ITEM(S) per 1-09.5 ❑ Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description Qty Unit Unit Price Cost of Item __........_...._..._......... . ............ 1... _........._ ....---...._.... ...........:.. ........ ........ ......_.......... 11 11295 Single 6 Ft. Chain Link -1 EA $1,020 -$1,020.00 Walk Gate for Pond it 11281 Double 20 Ft. Chain -1 EA $1 920 -$1 920.00 Link Gate ❑ ❑ INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑ Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description Qty Unit i Unit Price Cost of Item .._...... .... ... ... . ....._. __........_._........ ...... ....._.... 11 11282 Chain Link Fence Type -250 LF $25.10 $6,275.00 3 ... ..'_......................................................._...._.._......................................................_-.._....... ................!............................_._._..L_......_......................................_......._............ ` i ...................._...._..-.......................................__................_._......i..............................................._.-.............__............_._............._....__....... .......... ................ ........ .........-_-......._........._._ ...._.__._- _ ........-...-.-......-................................................_..-..__.. ❑ ❑ TOTAL ESTIMATED COST OF CHANGE ORDER * $10,750.48 *Total of the Cost of Item Columns THIS PAY ESTIMATEF 0 2 REV. DATE: 3/15/19 KENT FILE NO: 200.2 IV. WORKING DAYS Original Contract 140 Due This Change Order* ! 0 Previous Total 140 ... ......... ...... ................ . ..... ......... .. . .__.__ ........ _........._. .............................. _................ DATE: DATE: . ......... ........ ._... ..... .... ... ....... . * Explanation/Justification Required: Fencing installation is not a critical path item, and no change to the working days is being made. TOTAL WORKING DAYS* 140 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Cameron Rloomer Date: 7/26/19 Construction Supervisor: Date: Construction Manager: "''. yc�% �v� Date: 3 REV. DATE: 3/15/19 BROTHERS INC. July 25,2019 City of Kent 220 Fourth Avenue South Kent,WA 98032 Attn: Cameron Bloomer Field Engineer KBA. Inc. RE 07-3022 228th St. UPRR Phase 4 COP 003-Floform Fencing SCARSELLA BROS. IS PLEASED TO SUBMIT THE FOLLOWING CHANGE ORDER PROPOSAL FOR THIS PROJECT ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE BID AMOUNT 11281 R Double 49 FT Wide x 8'Tall Chain Link Gate With Slats EA 1 $ 6,507.20 $ 6,507.20 11282 R 8 FT Chain Link Fence With PVC Vinyl Slats LF 257 S 46.44 $ 11,933.85 11295 R Double 14 FT Chain Link Gate EA 1 $ 1,523.20 $ 1,523.20 TOTAL $ 19,964.25 NOTES: Sincerely, Matthew Scarsella Project Manager KENT WASHINGTON Request for Proposal RFP 003 Project Name: S. 228`h St. Union Pacific Railroad PW Project Number: 07-3002 Grade Separation—Ground Improvements and Embankments Contractor: Scarsella Bros., Inc. Federal Aid Number: N/A Subject: Floform Off-Site Fencing Revisions Date: 712312019 Provide a cost proposal for the following proposed changes to the Contract Documents: • Sheet 25 of 36: REPLACE existing plan sheet 25 of 36 with attached plan sheet 25 noted as Revision 4, dated 07/11/19. Plan changes include the following: o DELETE - Bid Item 11282 Chain Link Fence Type 3, REPLACE with in kind existing 8 foot tall property fence, limits as shown; o DELETE - Bid Item 11295 Single 6 Ft. Chain Link Walk Gate for Pond, REPLACE with 14 Ft. Double Swing Chain Link Gate for Pond per Kent Standard Plan 5-23M; o DELETE- Bid Item 11281 Double 20 Ft.Chain Link Gate, REPLACE with 54 Ft. Double Swing 8 foot tall gate. Provide latching mechanism while closed and securing devices while open. o REVISE—6 foot Steel Ornamental Fence Alignment as illustrated Note: Buy America federal requirements continue to apply to all steel products. Measurement and Payment Please provide a cost proposal for Replace in kind existing 8 Ft. tall property fence, Per Linear Foot. Please provide a cost proposal for 14 Ft. Wide Double Swing Chain Link Gate for Pond, Per Each. Please provide a cost proposal for 54 Ft. Wide Double Swing 8 Ft. tall Property Gate, Per Each. Include illustration of proposed type with price proposal for concurrence with property owner prior to authorization. Attachment(s): • Plan Sheet 25 of 36, OFFSITE IMPROVEMENTS FLOFORM SITE PLAN, Rev. 4 dated 07/11/19 • Kent Standard Plan 5-23M, Driveway and Walk Gate for Ponds Only Date: ! Z Jason Barry, City of Kent THIS FIELD WORK DIRECTIVE DOES NOT PROVIDE FOR EITHER A TIME EXTENSION OR A CHANGE IN THE CONTRACT PRICE.LABOR,EQUIPMENT,AND/OR MATERIAL OUTLINED IN THIS FIELD WORK DIRECTIVE SHALL BE PAID BY BID ITEM(S)OR A CHANGE ORDER SHALL BE DEVELOPED FOR TIME EXTENSION OR CONTRACT PRICE INCREASES. ANY PROTEST TO THE FIELDWORK DIRECTIVE SHALL FOLLOW 1-D4.5 OF THE WSDOT STANDARD SPECIFICATIONS. TOP HINGE 14'OR 20' (180°SWING) TIE WIRES(TYP) SPACED AT 14" MAX. LATCH MECHANISM FABRIC BAND STRETCHER BAR I I TRUSS RODS CHAIN LINK FENCE `^ BOTTOM HINGE 12"ROUND (180°SWING) CONCRETE EMBEDMENT 12"ROUND CONCRETE EMBEDMENT FABRIC BAND- 6' TOP HINGE - -- (90°SWING) STRETCHER BAR CHAIN LINK FENCE NOTES: 1. ALL MATERIAL AND INSTALLATION SHALL BE PER SECTION 8-12 AND 9-16 OF THE WSDOT STANDARD SPECIFICATIONS. ' -- 2. DETAILS ARE ILLUSTRATIVE AND SHALL NOT LIMIT r, TRUSS RODS BOTTOM HINGE HARDWARE DESIGN OR POST SELECTION OF ANY TIE WIRES(TYP.) (900 SWING) PARTICULAR FENCE TYPE. SPACED AT 14" MAX. 2. COATING FOR POSTS,TOP RAIL, FITTINGS AND FABRIC SHALL BE VINYL OR POWDER COATED FROM 12"ROUND THE FACTORY.COLOR SHALL BE COMPATIBLE WITH CONCRETE THE SURROUNDING ENVIRONMENT;GREEN FOR EMBEDMENT VEGETATED,OPEN OR GRASSY AREAS; BLACK FOR WOODED OR SHADED AREAS. 3. SEE STANDARD PLAN 5-22 FOR FENCE DETAIL. NOTE:THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT AN ELECTRONIC DUPLICATE.THE ORIGINAL,SIGNED BY THE S�oF WY ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT �11 r THE CITY OF KENT.A COPY MAY BE OBTAINED UPON REQUEST. i CITY OF KENT ENGINEERING DEPARTMENT • DRIVEWAY AND WALK GATE KENT 38296 4 -••» "a,o. FOR PONDS ONLY GIST✓ � DESIGNED CITY OF KENT �/SSrI�NAL �'��^y1 DRAWN CITY OF KENT SCALE NONE STANDARD PLAN CHECKED DATE APRIL 201E 5-23M APPROVED � � ED N�zNF I OZ� Y W am c ZttQ ow wp N"g -h / 0 aQaN a Wm I p; LLJ N o 231 Nam ff dw�¢zw z .- I Z Q�� OO J30 <aN n W V,to IL ofz o W� >O= _ u� Z?oo I _~..I Nd 2 no o sad I I Q =�Q i �$x mm I I x a0 NZ� xN3. NFL I Wo I ' In o O w ^ W� Z Z J g m �aN� Za- / w V Q O > o a m �O=h o� zYe� a� i <=e an WWp .I NCPI w3 ;VlN h0 �� " J LL W w I jai .Ni v a �ws O o 3 NI w Z Q N�w N J I \� �� a� - r �< rc vwia w� ro �ao Z< I I J oQm I w V 3c 7!' �xNH - I � .. � �� \ \ m S •- C Li6. LU N - z N w a �s - _ o W J _ � �N�LL 'm sd � oe n� o I Y• •- K o I I 3 I ¢ _ rc ¢ W w L.___ ��_ .LB 6S.00 .0 I Z !n �' • o o I �'TN 3,BL. N - _ I 00 01 = I�a9 I /ppn S'r°I U S. N - m Jew U SFz JZUfY Q iH lz g%= I � ` <-Ij o°'� �aeo iI V • �rc 34 jn N " m e N _ ¢rcQ4 1 +T o Nn NN awmm Y^ aN 04 O-NO II �w a Iw+'� Z Z Om00.�0. ¢O Z I <O w Z0 74 U Z ^ Y I m0 Op"O O \n ¢ti m v a �I w =� o4w II �\ o #o p z o IIi o u 3zw - III � a�� II a oa n oN 'Pe:• .'�,�a°o o w w ' 3 9 n. �o o 1• ap oo nN' oo S W fr3 W .. I� ZWy +10 locp jF01 N n U a y P S a I - _ ••� I yN❑ $ pm u 5 ~e zaY ry± 8 O ZW o 55 10 n •I. - lN� ° +a +e VIO w�` MO O <N ry _ ^ o O FA Sheet No.: Independent Cost Estimate i' CONSTRUCTION MANAGEMENT Project Name: East Valley Highway Preservation Project No: 17-3003.2 Item No.: Date: 7/25/2019 Description of Work: RFP 003-Floform offsite fencing Work by Subcontractor?: (mark"x"if yes) Prime Contractor: Scarsella Bro's, Inc. Sub-Contractor: G and G Incorporated MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT PRICE AMOUNT 8'tall slatted fencing $ - BI 1276 cost$25.10 for 6' non-slatted 225 LF $ 43.38 $ 9,760.50 estimate 25%additional cost for inceased height=+$6.28 $ - Slat material—10$ per foot via lowes website, assume 2$ per foot $ 14' Double Swing Chain Link Gate, replacing single 6'walk gate. 1 $ 2,380.00 $ 2,380.00 single 6'walk gate is$1020, assume double gate cost scales $ - 54' double swing 8"tall gate 1 $ 7,776.00 $ 7,776.00 Cantilever will require heavy duty materials, increase cost 25% $Hight increase cost 25% $ base cost on double 20'gate, $1,920 $ - SUBTOTAL-MATERIALS $ 19,916.50 MATERIALS OVERHEAD&PROFIT @ 21% $ 2,389.98 SUBCONTRACTOR TOTAL 22,306.48 Verification of Hours Worked: TOTAL: #REF! 12%MARKUP(for prime when subcontract work) --------------------------------------------- Contractor's Representative(printed name) SHEET TOTAL: #REF! Contractor's Representative Signature Date Prime Markup on Subcontractor: Ow ---ne-r'-s -R- -----epresentative----(p-ri --nted name---)----------------------- 12%: <$25,000 10%: $25,000 to$100,000 ---------------- ------------ ------------------------ 7%: >$100,000 Owner's Representative Signature Date Pay Estimate Entered, If checked,this work is in dispute. By signing this form, parties are Date: agreeing to the time and effort needed to accomplish the task. By: Entitlement to be determined at a later date. 1 of 1 P-13 (Rev. 7/12)