HomeMy WebLinkAboutPW18-473 - Change Order - #2 - Scarsella Bros., Inc. - S 228th St UPRR Grade Separation - Special Structure Excavation Class A - 08/21/2019 Records Management KENT Document W A S H I N G T O N CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name : Scarsella Bros., Inc. Vendor Number: 34547 JD Edwards Number Contract Number: PW18-473 Project Name: Upper Mill Creek Dam Improvements & Diversion Structure Replacement Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 12/20P Termination Date: 140 Working Days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Susanne Smith Department: PW Engineering Contract Amount: $7,760,955.20 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order #2 As of: 08/27/14 V� • KENT W A 5 H I N G T 0 N CHANGE ORDER NO. # 2 NAME OF CONTRACTOR: Scarsella Bros., Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBERS. 228th St. UPRR Grade Separation Ground Improvements & Embankments ORIGINAL CONTRACT DATE: December 20, 2018 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This change makes the following revision to the contract documents: Add a new bid item to schedule 10 titled 'Special Structure Excavation, Class A'. This item pays for excavation and stockpiling of native material for use as backfill in the structural earth walls. Re-use of this native material saves the City in hauling and disposal costs. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $7,760,955.20 (including applicable alternates and WSST) Net Change by Previous Change Orders $0.00 (incl. applicable WSST) Current Contract Amount $7,760,955.20 (incl. Previous Change Orders) Current Change Order $-42,739.00 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $7,718,216.20 CHANGE ORDER - 1 OF 3 Original Time for Completion 140 working days (insert date) Revised Time for Completion under 0 prior Change Orders (insert date) Days Required (f) for this Change Order 0 calendar days Revised Time for Completion 140 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: 44A00> E-� By: (signature) (signature) Print Name: Name: Timothy 1. LaPorte, P.E. Its A7427- I Its Public Works Director (title) we) DATE: Z IZI9 DATE:T 201 g CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) A Kent City Clerk Kent Law Department [In this field,you may enter the electronic filepath where the contract has been saved] CHANGE ORDER - 3 OF 3 FILE NO: 200.2 KENT CHANGE ORDER WORKSHEET NO. 002 Construction Management Division - Public Works Project S. 2281h St Union Pacific Railroad Project No.: 17-3003.2 Grade Separation Ground Improvements and Embankments Project Engineer: Cameron Bloomer, PE Fed-Aid No.: HLP-FMSIB-1216 (005) Owners Rep: KBA, Inc Contractor: Scarsella Bros, Inc. Date: 7/22/2019 I. PROPOSED CHANGE This Change makes the following revisions to the Contract Documents: Add a new bid item to schedule 10 titled 'Special Structure Excavation, Class A'. This item pays for excavation and stockpiling of native material for use as backfill in the structural earth walls. II. REASON AND BACKGROUND FOR CHANGE The existing native material under the roadway was tested and found to be suitable to re-use onsite as Gravel Borrow for Structural Earth Wall. The City requested a cost proposal from the contractor to excavate and stockpile the material onsite instead of hauling offsite and disposing of it. Re-use of this native material saves the City hauling and disposal costs, totaling an estimated $45,000. The reduction in hauling also reduces carbon emissions, lowering the projects carbon footprint. III. METHOD OF PAYMENT NEW PAY ITEM(S) Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of Qty PE Item __ _.._`_...__.._._.......__ ....... __..._..._..........._....- 10 Special Structure Excavation CY __._. $10.00 ,9'�0 Class A i222(, C� ------_._ ..... __. ........._ __ - ._....__....._.._....._.._._.. _......... . 22 2tQ z — ...... Independent Estimate Attached CREATE PAY ITEM ONLY - Payment to be made PAY THIS PAY ESTIMATE -REQUIRED at a later date upon comp -completion of work _..-- .__.... - _. _.....__._ ...._.... .._...._.......... Material Submittals Required - Cc' st Conruction Coordinator New-Sub-- Regrd? No DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch No B I No. Item Description Qty Unit Unit Price Cost of Item _.....:..........._........._......._..-_._,._.__... _......._..._................_........:---------------------.._....._..... -----...._.._...._.._..__....._.. 1 REV. DATE: 3/15/19 KENT FILE NO: 200.2 ._...._.................... ro� ..............................._...................._.._...._..........__.............._._._..._..._............._._.._.........__.................................._........._......._................-t--..................................._...._ . Independent Estimate Attached -REQUIRED INCREASE/DECREASE TO EXISTING PAY ITEM(S) Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch. No. B.I.No. Item Description Qty Unit Unit Price Cost of Item -?-._....-- .......... _. _ - __:.........._........_..__..__;..__.... . ..._.............. ..... 10 _ 10000 Structure Excavation -2000 CY 32.50 -$65,000 Class A Incl. Haul ..........--_................... .........._..._......_............... ......_..._.........._�......_..... .._.._._..- - - ....._...-.-.._.... .._---.............................---------------._. _....._..-------..........._._._..._............._. _............_................................... _...----- Independent Estimate Attached - REQUIRED TOTAL ESTIMATED COST OF CHANGE ORDER * $ *Total of the Cost of Item Columns THIS PAY ESTIMATE 0 IV. WORKING DAYS Original Contract 140 Due This Change Order* 0 Previous Total 140 DATE:..__.._.......__.............._......... ......._..._..............._...._...._..._ ._._.._....--..._._..._.._..---.................._......_................-----.._.................._.....—.........__._._...._....w-DATE:._._................................__........................_............__...._......_....................._.._.__....-------------------- *-..._.._...__....... .,._--......_..__...__._..._ ...........—.._...._.....--.._..._....._....---.....---............_.._._....__.....__..._..---.._................_...__...._..._._.._..... _ .....__............_._..._.__............._............_....... ..... - - -- Explanation/Iustification Required: Because hauling of material is not critical path, this change has no time effect and no days are being added or subtracted with this change. TOTAL WORKING DAYS* l 140 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: CVneron Blo mer Date: 7/22/19 �3 $ 7 AAA Construction Supervisor: - Date: i Construction Manager: / k_ /"�-�ryLri' Date: 2 REV. DATE: 3/15/19 June 18,2019 City of Kent 220 Fourth Avenue South Kent,WA 98032 Attn: Cameron Bloomer Field Engineer KBA, Inc. RE: 07-3022 228th St. UPRR Phase 5 Special Structure Excavation Cl.A SCARSELLA BROS. IS PLEASED TO SUBMIT THE FOLLOWING CHANGE ORDER PROPOSAL FOR THIS PROJECT: ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE BID AMOUNT NEW Special Structure Excavation Cl.A CY 2,000 S 10.00 $ 20,000.00 10050 Structure Excavation Class A Incl. Haul--Delete 2,000 CY CY 2,000 $ 32.50 $ 65,000.00 TOTAL $ (45,000.00) NOTES: 1. Assume 2,000 CY of suitable native material for reuse onsite. "Special Structure Excavation Cl.A", per cubic yard, is payment to excavate and stockpile native material. Material placement will be paid by other bid items. Sincerely, Matthew Scarsella Project Manager