HomeMy WebLinkAboutPW17-369 - Change Order - #1 - SB Structures, LLC - LID 363: S 224th St Improvements - 12/15/2017 Records Management
KENO Document
WASH NGTON
CONTRACT COVER SHEET � �I1
This is to be completed by the Contract Manager prior to submission
to the City Clerk's Office. All portions are to be completed.
If you have questions, please contact the City Clerk's Office at 253-856-5725.
Vendor Name: SB Structures, LLC
Vendor Number: 1374695
JD Edwards Number
Contract Number: PVJ �1-77 '03-2,
This is assigned by City Clerk's Office
Project Name: S. 224th ST Improvements 84th to 88th
Description: ❑ Interlocal Agreement fiC Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 6/23/2017 Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager:Jason Bryant Department: Engineering
Contract Amount: $19,565.45
Approval Authority: ❑ Director ❑ Mayor ❑ City Council Meeting Date
Detail: (i.e. address, location, parcel number, tax id, etc.):
•
KENT
W A S H I N G T O N
CHANGE ORDER NO. #1
5t A-�UCV u2fJ, (-
LC-NAME OF CONTRACTOR: 6'1,=ra8tFWEtWFes,-4=l=G. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: LID:363 S. 224th St Improvments 841h to 88th
ORIGINAL CONTRACT DATE: June 23, 2017
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled 'Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Compensate for installation of temporary paint and tape pavement
markings on SR167. Due to recent asphalt overlays on Southbound
SR167, WSDOT requested temporary tape be placed in lieu of plastic
pavement markings. On Northbound SR 167 paint was placed in lieu
of plastic due to weather constraints.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $15,330,729.25
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0.00
(incl. applicable WSST)
Current Contract Amount $15,330,729.25
(incl. Previous Change Orders)
Current Change Order $19,565.45
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $15,350,294.70
CHANGE ORDER - 1 OF 3
Original Time for Completion 400 working days
(insert date)
Revised Time for Completion under 0
prior Change Orders
(insert date)
Days Required (f) for this Change 0 calendar days
Order
Revised Time for Completion 400 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
B B
(signaue) y,
gture)
Print ame: Print Name: Timothy J. LaPorte, P.E.
Its Public Works Director
tle)
DATE: I2-1`l�!`1 (title) DATE: ��� .(tiS/-4D/7
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
4"
1 10ENT FILE NO: 200.2
K
CHANGE ORDER WORKSHEET NO. 1
Construction Management Division - Public Works
Project: LID 363 224th St Improvements Project No.: 99-3003
Project Engineer: Garrett Inouye Fed-Aid No.:
Owners Rep: Jason Bryant Contractor: SB Structures
Date: 10/17/2017
I. PROPOSED CHANGE
Compensation for installation of temporary paint and tape pavement markings on SR 167
H. REASON AND BACKGROUND FOR CHANGE
Due to recent aspahlt overlays on Southbound SR 167, WSDOT requested temporary tape be
placed in lieu of plastic pavement markings. On Northbound SR 167 paint was placed in lieu of
plastic due to weather constraints. Net of changes the City saved $33,000. See attached
explanation.
III. METHOD OF PAYMENT
NEW PAY ITEM(S) Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch. No. Item Description Total Est. Qty this Unit Unit Price Total Estimated Cost of
Qty PE Item
- ..............__.._._..._...............__.... -----._.._..- ....-.._................-.._.__... _._Y_-_... i_.........._._ _ _
--...__._ _._..._._—_......._...__............._._.........._.....---- ti
--_ .--._.._._..._.'.._Temporary_Ta.pe._SB...SR167........__. .__._.:1............... _1....._.. _..._LS.....__. .._.._$_14�776.65 -15..600.00__..._.....
Temporary Paint NB SR 167 1 1 LS $4 789.00 -- --- $ 4 425.00 ___.......
....._.._.._..._..----.._.._.-t --- — $
......................__.__......_...._........__..._y_._..._—..__..._......—..._...a.._...._..._......_.._.._.__..__J.._..__.....................__--...__._......_..............._......................__.._..._...__i...._.—__._.............,........................................................_............
Independent Estimate Attached ' LJ CREATE PAY ITEM ONLY- Payment to be made PAY THIS PAY ESTIMATE
-REQUIRED at a later date upon completion of work
... .. _._._._._._.....
.._.
Material Submittals Reauired -C • Construction Coordinator New Sub Re4 rd? No
DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
Sch_No. -B.I.No. - Item Description Qty Unit Unit Price Cost of Item
......_..__.__....._.__..__..:.__._-..._........._._-__..:..--------.._..----..---...__..._....._._._._._..---------..._......__.__.__.._........._.._....__......_....
....._I.................__....._........ ---....---............__.............._._ ......................_..._._... _.._.__...------ ......
............._......._............_.._.._.................................._...........:......................................._.........................__.._. ...._----................................................i................_. _i....................-------....................._..__—_...__—_.._._...._._..._._......._............_.._...__._.
❑ Independent Estimate Attached - REQUIRED
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable
Change Order No, _ FOR ACCOUNTING USE ONLY
Sch. No B I No. Item Description Qty Unit Unit Price Cost of Item
_..._......._-. ---- - +— ----------
.._......._.. ........._....._
---.._..........
- ._..._...._. - -- _ ----- -----------._._..._._........
1 REV. DATE: 4/01/10
(CENT FILE NO: 200.2
.....
-.,_.._.---------
_r__..W _ ,o.
® Independent Estimate Attached - REQUIRED
TOTAL ESTIMATED COST OF CHANGE ORDER * $19,565.45
*Total of the Cost of Item Columns
THIS PAY ESTIMATE L $19,565.45
IV. WORKING DAYS
Original Contract 400 Due This Change Order* Q Previous Total 400......... ....._...
....— -----------..................
DATE 1 17 17 _... ..................... .... . .... DATE• ]Q117/17
* Exolanation/JustificaiL&UBS&ULLgL On critical path for project completion
TOTAL WORKING DAYS* 400
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Prepared By: Date:
Ja n Bryan
Construction Supervisor: _ ,.�.% Date:
PaUIX hne
Construction Manager: � y Date:
Eric Connor
2 REV. DATE: 4/01/10
Q
� J
-Fooco 00 coo 00 00 0 0
� 0 N Ln O M � 00 O � O M M O M M
cc �
0 c 1 Ln r' O 00 ` B O O O O 00 0 0p Ln
CO O N
1.0 lD O N M O Ln O N m Ln Ln Ln
41 LT Ln O V!)- tD { t\ Ln (n (Pr O M M +-{ I�
{ *i N f N N Ln Ln M
iA- i& M
m
fib
v 0 0 0 0 coo 0
•L N N Ln O Ln N N O
d M M O 3• M M 0
ER fPr 1& 0 1& {pr fPr 0
U U U >
coFC C C
Ln Ln Ln O O Ln O O O O O O O Ln O Ln
CO 0) CO O O lD M O M O O O M lD 00
0 Ln M O O l0 O 00 In Ln O CO 0 CO
N N 01 M O N Ln o 00 Ln Ln oo N CO
ll
fu { ri
4- �}
O
�zrA� Ln Ln Ln O O Ln O O O O O
.y O 0 O \-, 1. F, d - 0 O 0
] i N O ZO O O O O Ln
{{} 4A J& Ln 0 'i& tn- ifs Ln Ln I-, V
n M N N . 4 Id
tq- iA- J& 4V� a
c c c
J J J = LU _I J J = = Lu
Ct N 00 [t N
Ct M M
O Ln N
Ln r-i o It N N
0 00 M O M 0
O
d d -0
cu a Q' E
L L Vn Ln L L
a v3: Ln
a) - - - a 0 �