CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name : Insituform Technologies, LLC.
Vendor Number: 2041590
JD Edwards Number
Contract Number:--PW GA &-azO` 5' 1VA7
Project Name: 2019 Sanitary Sewer CIPP Lining
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 3/27/19 Termination Date: 70 wor�yng ays
0I 36 !f
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Thomas Leyrer Department: PW Engineering
Contract Amount: $1,078,110.00
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order #1
AS of: 08/27/14
•
KENT
Wn5 Fib N GTG+
CHANGE ORDER NO. # 1
NAME OF CONTRACTOR: Insituform Technologies, LLC. ('Contractor")
CONTRACT NAME & PROJECT NUMBER: 2019 Sanitary Sewer CIPP Lining/18-3012
ORIGINAL CONTRACT DATE: March 27, 2019
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Remove and replace three existing sewer cleanouts to allow for the
installation of CIPP liners.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, 'Compensation," are hereby modified as follows:
Original Contract Sum, $1,078,110.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0.00
(incl. applicable WSST)
Current Contract Amount $1,078,110.00
(incl. Previous Change Orders)
Current Change Order $27,440.00
Applicable WSST Tax on this Change $2,744.00
Order
Revised Contract Sum $1,108,294.00
CHANGE ORDER - 1 OF 3
Original Time for Completion 70 working days
(insert date)
Revised Time for Completion under 70 working days
prior Change Orders
(insert date)
Days Required (f) for this Change Order 0 calendar days
Revised Time for Completion 70 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
By: By: L
(signature) ( i nat e)
Prin ame: J. hnp e-V ..0L knwr.&rs Print Name: Timot kJ. LaPorte, P.E.
Its �M..40..e- Its Public Works Director
Iq (title) t ' title)
DATE: 9�3/+y DATE: l 04-2,e(f
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent City Clerk Kent Law Department
[In this field,you may enter the electronic filepath where the contract has been saved]
CHANGE ORDER - 3 OF 3
• FILE NO: 200.2
KENT
ne CHANGE ORDER WORKSHEET NO. 1
CONSTRUCTION ENGINEERING DIVISION — PUBLIC WORKS
Project: 2019 Sanitary Sewer CIPP Lining Project No.: 18-3012
Project Engineer: Thomas Leyrer Fed-Aid No.:
Capital Projects Paul Kuehne Contractor: Insituform
Manager:
Date: 8/20/2019
I. PROPOSED CHANGE
Remove and replace three 3 existing sewer Cleanouts
II. REASON AND BACKGROUND FOR CHANGE
Removal is required to install CIPP liners per the contract documents as described in RFI 001
III. METHOD OF PAYMENT
NEW PAY ITEM(S) Not Applicable
Change Order No, - FOR ACCOUNTING USE ONLY
BCH• ITEM DESCRIPTION TOTAL QTY UNIT UNIT PRICE TOTAL ESTIMATED
NO. EST. THIS PE I COST OF ITEM
QTY
I Remove & Replace Cleanouts _ 1 1 _ LS 27,440.00 $27,440.00
_..__....._.._.._...__._.... .. —I--
I
® Independent Estimate Attached ® ! CREATE PAY ITEM ONLY— Payment to be made PAY THIS PAY ESTIMATE
-REQUIRED at a later date upon completion of work __ _..___.___._.-
.. ... _....__ ....... _ q ... - _.........
Submittals Reauired — CC. Construction Coordinator New Sub Re rd. No
DELETE EXISTING PAY ITEM(S) per 1-09.5 Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
BCH. B.I. NO. ITEM DESCRIPTION QTY UNIT UNIT PRICE COST OF ITEM
............. ......_-.....................................i__._...._._._.._._.._..__..__.._._.._.-...................... ..._......._........_......._--i-..._........_....._.........}_.._.__..._._........__...... _._..........._............_.-....._..........
._.......... ._
: t
i
.._................_...._......._
I i
Independent Estimate Attached - REQUIRED I ❑
INCREASE/DECREASE TO EXISTING PAY ITEM(S) Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
SCH. B.1. No. ITEM DESCRIPTION QTY UNIT UNIT PRICE COST OF ITEM
No.
:
Independent Estimate Attached - REQUIRED
1 REV. DATE: 3/27/18
KE NT� FILE NO: 200.2
TOTAL ESTIMATED COST OF CHANGE ORDER * $27 400.00
*Total of the cost of Item Columns
THIS PAY ESTIMATE $27 400.00
IV. WORKING DAYS
Original Contract 70 Due This Change Order* 0 Previous Total ]Q
. ... ...
DATE. .....8 29 2019. ......... DATE: 8 29..2019
* Ex lanation Justification Re uired:
TOTAL WORKING DAYS* 70
*This Change Order+ Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Capital Projects Manager: h/�SV T/�/+/7� illy Date:
Construction Engineering Date: 1 Zo-71
Supervisor:
Construction Manager: Date: .2
2 REV. DATE:3/27/18
murraysmith
Change Order 0015ummary
Owner: City of Kent Owner's Contract No.: 18-3012
Contractor: Insituform Contractor's Project No.:
Engineer: City of Kent Murraysmith's Project No.: 19-2483
Project: 2019 Sanitary Sewer CIPP Lining
Approval of this change order is being sought to address expenses and credits that have arisen and are necessary to
complete the referenced project.This change order includes the following Change Proposal Requests(CPRs)which are
described as follows:
CPR 003:This CPR addresses the removal and replacement of three (3) sewer cleanouts within the general
extents of the project.The existing cleanouts are to be removed and disposed of by the contractor so that CIPP liners
can be installed in the existing pipe, as described in RFI 001. Following installation of the CIPP liners, each of the
cleanouts is to be replaced is accordance with Kent Standard Plan 4-7. Backfill and surface restoration are incidental to
the cleanout replacement and shall be in accordance with Kent Standard Plan 6-65. Existing survey monuments, if
disturbed, are to be replaced in accordance with Kent Standard Plan 6-72 and applicable local regulations.
Cost of CPR 003: $27,400.00
Staff has participated and reviewed all changes proposed and recommends moving forward for approval in this change
order.
H:\EVT_Projects\19\2483-Kent 2019 Sanitary Sewer CIPP Lining\02.Change Orders\001 CO-Cleanouts\001 Change Order Summary.docx
CITY OF KENT- 2019 SANITARY SEWER CIPP LINING
CHANGE PROPOSAL REQUEST 003 - REMOVE AND REPLACE CLEANOUTS
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
Item Unit Price Quantity Unit Total Amount
Mobilization $ 2,000 1 LS $ 2,000
Cleanout $ 1,500 3 EA $ 4,500
Survey& Replace Monument' $ 2,000 3 EA $ 6,000
Backfill' $ 70 120 TN $ 8,400
Asphalt Patch $ 150 34 SQ-YD $ 5,100
Subtotal $ 26,000
Tax (10%) $ 2,600
Total $ 28,600
llt is assumed that all monuments near cleanouts will be surveyed prior to work so that they can be accurately replaced
if they are disturbed.
Unit price is assumed to be the same as the bid price for CSTC
The opinion of probable cost herein is based on our perception of recent conditions at the project location.This opinion
reflects our professional opinion of costs at this time and is subject to change.Murraysmith has no control over
variances in the cost of labor,materials,equipment;nor services provided by others,contractor's means and methods
of executing the work or of determining prices,market conditions,practices or bidding strategies.Murraysmith cannot
and does not warrant or guarantee that proposals,bids,or actual construction costs will not vary from the costs
presented as shown.
Murraysmith 19-2483
murraysmi#h
CHANGE PROPOSAL REQUEST
(Not a Change Order)
CPR No.:003 CPR Date:07/03/2019
Murraysmith Job No.:19-2483 Owner Job No.:18-3012
Project Name: 2019 Sanitary Sewer CIPP Lining
Owner:City of Kent
Construction Manager: Murraysmith
Contractor:I nsitufo rm
Date Sent to Contractor:07/03/2019 Date Received from Contractor:8/6/2019
Initiated By: Engineer ❑ Owner m Contractor ❑
This CPR applies to or is related to the following:
Drawing Sheets:S&6 of 9 Specification Section: N/A RFI No.: 001 Other:
Attention: The following change in the contract on this project is proposed. Work shall not commence until authorized by the Owner.
All work shall be performed in accordance with the terms,stipulations,and conditions of the original Contract Documents. The amount
of this Change Proposal Request constitutes full compensation to the Contractor for all direct,indirect,delay impacts and all other cost
and damages whether known or unknown,arising or relating to the subject matter of this Change Proposal request. The basic contract
remains in full force and effect,except as modified by the Change Order.
This CPR will:
Decrease in Increase in
Description Contract Price Contract Price
•Remove a total of three(3)cleanouts as needed to complete
CIPP lining,replace the cleanout per Kent Standard Plan 4-7,
and restore per Kent Standard Plan 6-65.Monuments,if
disturbed,shall be replaced by a licensed surveyor per Kent
Standard Plan 6-72.Copies of standard plans are attached.
• Cost estimate is to be provided at a unit price per each
cleanout for all work to excavate,remove,dispose,and replace
the cleanout and to backfill and restore the area and shall
include full compensation for all associated labor,equipment, $27,440 plus tax of 2,744
and materials. for a total of$30,184
Contract Time
Estimated Change in Contract Times:
Substantial Completion Increase/Decrease 0 Days
Final Completion Increase/Decrease 0 Days
Recommendation Accept Not to Accept
(Engineer) Date
Owner Action Accepted Not Accepted �D(9
(Owner's Representative) �/D to
Contractor Action Accepted Not Accepted y j .j
(Contractor) Date
H:IEVT_Prgimis\19\2483-Kan 2019 Sanitary Sma CIPP Lining102.1 Changc Proposal Rcqumtst003-CPR_C1=outs0D3_Che,tgc Proposal Rcqumt Clcanouts.do"
Change Order Request
Kent,WA-2019 Sanitary Sewer CIPP Lining
Project: Project Number: 18-3012 Additional Working Days Required EA: -
Change Order#03 Request
Description: Dig& Replace Clean Outs(Revised)With ASE Job No. 202290
Date: 8/6/2019
Description JUM Quantity Rate Amount
Laser Cleanouts: ILS 1 1 20000.00 $20,000.00
Includes:demolition,shoring,protection,replacement, and surface restoration $0.00
$0.00
ASE Survey Reference Existing Monuments (Only) EA 3 1500.00 $4,500.00
$24,500.00
ITL Materials
Description UM Quantity Rate Amount
day $0.00
day $0.00
Material Total J $ -
LABOR
Description UNIT Quantity Price Amount
HR $0.00
HR $0.00
HR $0.00
HR $0.00
HR 1 1 $0.00
EQ
ITL EQUIP HR $0.00
HR $0.00
HR $0.00
HR $0.00
HR $0.00
day $0.00
Percent $0.00
Labor Subtotal $0.00
EQ Subtotal $0.00
EQUIPMENT, LABOR, MATERIALS -TOTAL Cost Subtotal $24,500.00
MARKUPS
Per WSDOT 1-09.6 Force Account Percent
Labor 29% $0.00
Materials 21% $0.00
EQ 21% $0.00
Sub-Varies Per Standard Spec 1-09.6(6d) 12% $2,940.00
SUBTOTAL Mark Up $2,940.00
Subtotal Cost $24,500.00
SUBTOTAL $27,440.00
State Sales Tax 10.0% $2,744.00
TOTAL AMOUNT $30,184.00
o�
0 0 aHi ew°
> s�
� o �
a
w
� "= N a
o -
rzv
ch _
is viarz s W
z.
�_
ti,ejN s S �
s =
a
Z
m
S
Y Y y C'm
N 41 O
N - U
N a
U Zi
Q�.
TI/
w i R
mI N S
i a
x -
S ld H109Z
m G _
. x ;
I
�z ld 15LSZ S
S-
R*6 6142 Ll E pw—S f C—BI Coo E C-6l,ha
o \
S
m � Z
Z
kA
\ m
`
� ZM
s ���
5 aQ 9
Is
4wabz s s f a 6 5 W �S ss s
a — O�—ss }1
x N cz
.1>z x> >c> qyp L
W_
of '�
�> Q
O � J
rn
T '
S \y'
0 Z
S W
S
� U
Li u
N Y ;o T Y C
vac
LJ
_ o0
N � 1
r:
w W=
N
.8
-
s�
I
M
IR-
I
I
0
x
�M
a
eD I N 0S a)
LS 1S lSZ s
s�
z
iz
xz Id SLSISz ss= i
M B1.6 6-Ll L •p SNYId a3x35�NINI�3d 3SNVid M10 a ww,�r•a5 pue uuo)6 tlOf-Bl pro Ll0[-BI !s0
15"
10"
v
d v
d d
a
° ° CEMENT CONC.
a ° CLASS 3000
° 3/4"SQUARES
SPACED 3/4"AS
o SEWER—CO INDICATED-HT. 1/8" 10"
N d °
1/8"RAISE- 1/2"
WIDE BORDER 9"
a
1 v
v ° n e p
2
2'-0"
a
10" Gda eel s.
9" 7 3/4" 7 3/4"
8 3/4" co ,'/'f
r, Ln
8"PVC PIPE 6"PVC
T (FOR SLEEVE) THREADED
FIBER JOINT PACKING PLUG
(OPTIONAL)
7" a0
7 3/4" '^
8 7/8" N o
— F
wa
15" 6"-450 ELL aV)
(BELL X SPIGOT) a Z)
CAST IRON RING&COVER of
CLEANOUT RING&COVER \ ,¢
u
6"WYE WATER TIGHT PLUG
6"SIDE SEWER
SEE STANDARD
PLAN 4-8
SLOPE j
z
z z NOTE: THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT
J BUT AN ELECTRONIC DUPLICATE. THE ORIGINAL,SIGNED BY
uj
SQSEP� THE ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON
1 7
m o l FILE AT THE CITY OF KENT. A COPY MAY BE OBTAINED UPON
�� of WAS& c� REQUEST.
NOTES: ,�� ` co 0r CITY OF KENT
7- N ENGINEERING DEPARTMENT
1. CAST IRON TO CONFORM TO A.S.T.M. — -3
A48-56 CLASS 30. 1 KENT 6" CLEANOUT
O p 21493 O W•a"i""Tn"
2. COVER SHALL BE OLYMPIC FOUNDRY M �0/` F�ISTER� ��
.(` �� DESIGNED DMW SCALE NONE STANDARD PLAN
1007 OR EQUIVALENT MARKED t S��NA� ��� DRAWN Beff
"SEWER-CO"OR"CO". CHECKED DATE A—7
o�c�e �F
APPROVED
September 200,%
m w z
CQ V) w Z Ln O
w U ][ V)
V) w � r'i Q H U
OZQ3 OUcev OZ Mpi =wQ
W � d
Q �din a+ Ho 9 V) z
wLU aZD d 0 w Qofw F N p U
0E) N
Lu
d C) z0 ZN NM z0 O'
V)n � O z o
Lary 3 ¢ 0 a H- �
ZMN � ry V rw Q - � MLn QS O
� O z 0 1 Ln W f U V 3 M M Z J N Z
w O (D U W Kv UO f- W
a 0w3 aN w0 mli Q . w � Ln QQ uju
w 0r- ce 00 Q x0 > w z LnU m .. p
n 491,I O (n V7 0 W (n V) W w 0 L' li J o Z
111- W 3 J QN d J J U) J N m Zt�-'� O v Q ~ O
O Q' 1I—I U � 0 Q J_ J 0 J w lL O J z w w Lou =O
II—III= LuaQL, << � a Y0 � � = W (n ¢ m � m
11=1 0
II=III= _� zZ aow L3 N 'mz avi U
Q Q coJ W o-Z. H 0 J En0- W Q'f wa d X Lu a "z
O Q a u 0 L oa
W o
Z oQ z � (n 11 ~ w
Y cezc Q u
W e '"
f 11= v -�u � zaof - a UceU g
u n �
oo QO UQ QQcn Hdlf1 x0 o
w w
IIIIII En 0
— � N M V V1 %D
III=111�
IM
111E
� III-
Q I I I� —I 1=1 I I—I i-1 —III— I ILu I� g
3 � I111 0
II� z
Lu
OO
U _
_ — 0 3
Lu
> E' M l Ill j
O w
o _ III z
a 1111�ZI I�IL—IILIIIJILII�III�IL Ln
IIIII w
I
IHIr III
Ili
Z I I I
� II77-7� N
M III= N
IIIIII Q
III _
2: U,
i�' V)
o U U
SOSE NOTE:THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT
J
o o WASH� AN ELECTRONIC DUPLICATE.THE ORIGINAL,SIGNED BY THE
E
c ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT
THE CITY OF KENT.A COPY MAY BE OBTAINED UPON REQUEST.
U !-�-3 CITY OF KENT
f (Z7 ENGINEERING DEPARTMENT
uj ��O �F 21493 � � FLEXIBLE PAVEMENT PATCHING
w STF
W KE.........NT LONGITUDINAL CUT
Z Ln FS��NAL EN�'\�
DESIGNED DWH I STANDARD PLAN
DRAWN 88 SCALE NONE
CHECKED DATE C_C C
v�Vn V V J
APPROVED
September 2009
2"BRASS
DISC
PLAN OF COVER
FINISHED GRADE
(PAVEMENT)
10 1/2"DIA. (BOTH SIDES) o
v
M 9 1/4"DIA.COVER
3/8"
Ln ; 1"
1/2" MONUMENT DETAIL
•• 3/4 8"DIA. . a
•q d_.
�1"MIN. OR 6"MAX. id
nl a
-
a p • a.
co ,
5 3/4"R
f d
�.a �•. e•' ;. q
a 4
CONCRETE CLASS 3000 BASE
10"R. 6"
NOTES:
MONUMENT
1. MONUMENT,MONUMENT CASE AND SECTION
COVER-OLYMPIC FOUNDRY WSDOT 8"x
9",PART NO. 1015 OR PRE-APPORVED
EQUAL.
2. MONUMENT POST-FOG-TITE MONUMENT
POST,OR PRE-APPROVED EQUAL. �OSE NOTE:THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT
3. THE CASTINGS SHALL BE GRAY IRON
�� of WAS& �� AN ELECTRONIC DUPLICATE.THE ORIGINAL,SIGNED BY THE
m\ ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT
CASTINGS,ASTM DESIGNATION A-48, v
O CLASS 40.THE COVER AND SEAT SHALL i O THE CITY OF KENT.A COPY MAY BE OBTAINED UPON REQUEST.
� �
BE MACHINED SO AS TO HAVE PERFECT -3 CITY OF KENT
CONTACT AROUND THE ENTIRE ENGINEERING DEPARTMENT
CIRCUMFERENCE AND FULL WIDTH OF o 21493
BEARING SURFACE. �Oc �FSISTER ��� KENT STANDARD MONUMENT.
4. WHEN THE MONUMENT, MONUMENT CASE
Fs�ONAL ENG�� ,N••"'"°'°• MONUMENT CASE AND COVER
AND COVER ARE PLACED IN CEMENT DESIGNED DWH DRAWN BB SCALE NONE STANDARD PLAN
CONCRETE PAVEMENT THE CONCRETE CHECKED DATE - 6_�r)
BASE WILL NOT BE NECESSARY. APPROVED EWNM V LL
September
Mumma )i�
REQUEST FOR INFORMATION (RFI)
RFI No.: 001 RFI Date: 5-16-19
Murraysmith Job No.: 19-2483 Owner Job No.: 18-3012
Project Name: Kent 2019 Sanitary Sewer CIPP
Owner: City of Kent
Contractor: I ns ituform
Subject: Replace Cleanouts with Manholes Opportunity
Spec Sections/Drawing Nos.: Sheet 5&9
Information Request:
Excavation of the 3 cleanouts is necessary to install the CIPP liner due to access.This presents an opportunity
to receive a quote for the city to install manholes in its place. This would provide an upstream access point for
camera insertion for maintenance, while increasing crew safety when installing the liner vs. working from a
shores access pit.
Potential Cost Impact? YES X NO ❑ UNKNOWN ❑
Potential Schedule Impact? YES ❑ NO X UNKNOWN ❑
Date Reply Requested By: Requested
By: a4�4Date: 5-16-19
Response:
Excavate and remove the existing cleanouts as needed to install the CIPP liner. Replace the
cleanouts per City Standard Plan 4-7, attached.
Response By: Date: 64'-1/Zola
2019 SanBary Sewer CIPP 19-2483
From: Vincent,Jens<JVincent@kentwa.gov>
Sent: Thursday,August 8, 2019 6:05 AM
To: Jeff Moss; Leyrer,Thomas; Kuehne, Paul
Cc: Connor, Eric; Madfai, Mark
Subject: RE: [EXTERNAL]FW: Kent: Revised Cleanout Pricing
Please proceed.
Jens Vincent,Storm Drainage/Sewer Manager
Utilities Section I Public Works Department
220 Fourth Avenue South, Kent,WA 98032
Phone 253-856-5631 1 Cell 253-740-2885
JVincent@KentWA.gov
CITY OF KENT,WASHINGTON
KentWA.gov Facebook Twitter YouTube
PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL
From:Jeff Moss[mailto:Jeff.Moss@murraysmith.us]
Sent:Wednesday,August 07, 2019 8:23 AM
To: Leyrer,Thomas<TLeyrer@kentwa.gov>; Kuehne, Paul<PKuehne@kentwa.gov>;Vincent,Jens
<JVincent@kentwa.gov>
Cc:Connor, Eric<EConnor@kentwa.gov>; Madfai, Mark<MMadfai@kentwa.gov>
Subject: RE: [EXTERNAL]FW: Kent: Revised Cleanout Pricing
EXTERNAL EMAIL
Thank you Thomas.
Jens, are you in agreement also?We will proceed with the change at noon unless you direct otherwise.
Thank you,
-Jeff
Jeff Moss
Engineering Designer
520 Pike Street, Suite 1350, Seattle, WA 98101
P 206.462.7030
Murraysmith I www.murraysmith.us
From: Leyrer,Thomas<TLeyrer@kentwa.gov>
Sent:Tuesday,August 6, 2019 4:26 PM
To: Kuehne, Paul<PKuehne@kentwa.gov>;Vincent,Jens<JVincent@kentwa.gov>
Cc: Connor, Eric<EConnor@kentwa.gov>; Madfai, Mark<MMadfai@kentwa.gov>;Jeff Moss
<Jeff.Moss@ murraysmith.us>
Subject: RE: [EXTERNAL]FW: Kent: Revised Cleanout Pricing
Yes.
Thank you,
Thomas
From: Kuehne, Paul<PKuehne@kentwa.gov>
Sent:Tuesday,August 6, 2019 3:53 PM
To:Vincent,Jens<JVincent@kentwa.gov>; Leyrer,Thomas<TLeyrer@kentwa.gov>
Cc: Connor, Eric<EConnor@kentwa.gov>; Madfai, Mark<MMadfai@kentwa.gov>; 'Jeff Moss'
<Jeff.Moss@murraysmith.us>
Subject: FW: [EXTERNAL]FW: Kent: Revised Cleanout Pricing
Hello Jens and Thomas,
Shall the Contractor install three cleanouts ($10K each total $30K) to enable lining
the last three sections approximately 300' total to complete work in the Linda
Heights neighborhood ?
The cleanouts need to be completed next week to closeout work in the
neighborhood the following week.
Paul Kuehne, construction Engineering Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-SS6-5543 I Cell 253-740-5015
PKuehne@KentWA.gov
CITY OF KENT,WASHINGTON
From: Mike Morris [mailto:mmorris@aegion.com]
Sent:Tuesday,August 06, 2019 12:58 PM
To:Jeff Moss<Jeff.Moss@murraysmith.us>
Cc:Jeff Kreshel<Jeff.Kreshel@murraysmith.us>; Nathan Bemis<Nathan.Bemis@murraysmith.us>;Andy
Thompson <athompson@aegion.com>; Kuehne, Paul <PKuehne@kentwa.gov>
Subject: RE: [EXTERNAL]FW: Kent: Revised Cleanout Pricing
EXTERNAL EMAIL
Jeff,
If it helps, here is a version with ASE recording the monuments.This shows your before and with tax
calculations.
Sincerely,
Mike Morris I Project Manager- Pacific I Insituform Technologies, LLC
19165 SW 1191h Ave I Tualatin, OR 97062
Ph: 503.486.62741 Cell:971-645-9779 1 Fax: 503-395-1023 www.Aegion.com
mmorris@aegion.com
FA Qk�&Ufblnr. REGION
Stronger.Safer. Infrastructure:
Aegion is the parent company of Aegion Coating Services, AIISafe Services,The Bayou Companies,
Brinderson, Corrpro, Fibrwrap Construction, Fyfe Co., Insituform, MTC, Schultz, Underground Solutions
and United Pipeline Systems
Aegion Disclaimer
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are
addressed.If you are not the named addressee you should not disseminate,distribute,retain,or copy this e-mail or any attachments.If
you have received this email in error please delete and notify the sender.
Aegion
From:Jeff Moss<Jeff.Moss@murraysmith.us>
Sent:Tuesday,August 06, 2019 11:55 AM
To: Kuehne, Paul<PKuehne@kentwa.gov>
Cc:Jeff Kreshel<Jeff.Kreshel@murraysmith.us>; Nathan Bemis<Nathan.Bemis@murraysmith.us>; Mike
Morris<mmorris@aegion.com>;Andy Thompson<athompson@aegion.com>
Subject: [EXTERNAL]FW: Kent: Revised Cleanout Pricing
Hello Paul,
Please see the revised pricing for cleanout replacement attached. Note that I mis-remembered the cost
of the monument survey when we spoke yesterday, it is$1500 each, not$1500 for all three, so the total
cost is$27,440 with markup but before tax.
Please confirm if the proposal is acceptable as soon as possible since Insituform needs to proceed
immediately to avoid impact to the schedule.
Let me know if you have any questions,
-Jeff
Jeff Moss
Engineering Designer
520 Pike Street, Suite 1350, Seattle, WA 98101
P 206.462.7030
Murraysmith I www.murraysmith.us
From: Mike Morris<mmorris@aegion.com>
Sent:Tuesday,August 6, 2019 11:31 AM
To:Jeff Moss<Jeff.Moss@murraysmith.us>
Cc: Andy Thompson<athompson@aegion.com>
Subject: Kent: Revised Cleanout Pricing
Jeff,
Please find our understanding regarding digging the Cleanouts and the preferred option given the fixed
costs already incurred.
• Revised Worksheet attached. Between Laser and ITL, we will cover the other$40k
• The Survey costs are in addition and presented previously under a separate Worksheet Request.
• Work is schedule to begin late this week so time is of the essence. Please confirm acceptance
ASAP with Contract change order paperwork to follow.
Any questions, please advise immediately as we are proceeding forward as discussed.
Sincerely,
Mike Morris I Project Manager- Pacific I Insituform Technologies, LLC
19165 SW 1191h Ave I Tualatin, OR 97062
Ph:503.486.62741 Cell:971-645-9779 1 Fax: 503-395-1023 www.Aegion.com
mmorris@aegion.com
PFA
IAEGION'
•
Stronger,Safer.Infrastructure:
Aegion is the parent company of Aegion Coating Services, AIISafe Services,The Bayou Companies,
Brinderson, Corrpro, Fibrwrap Construction, Fyfe Co., Insituform, MTC,Schultz, Underground Solutions
and United Pipeline Systems
Aegion Disclaimer
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are
addressed.If you are not the named addressee you should not disseminate,distribute,retain,or copy this e-mail or any attachments.If
you have received this email in error please delete and notify the sender.
Aegion
Aegion Disclaimer
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are
addressed.If you are not the named addressee you should not disseminate,distribute,retain,or copy this e-mail or any attachments.If
you have received this email in error please delete and notify the sender.
At Aegion,we care about your privacy and have taken appropriate measures to ensure that the data you have provided to us is secure.To
learn more about how we comply with privacy laws and,as a result,care for the security and privacy of personal data we collect from
you,visit this page to view our privacy policies and notices.
Aeizion
murray General Daily Progress Report
Kent 2019 Sanitary Sewer CIPP Lining-Access Road Work
Project Name(Section) Contract No.
City of Kent 19-2483
Location(alignment,station,roadway,bridge no.) Murraysmith Project No.
Laser(subcontractor) Larry Peters Supervisor Present? ❑■ Yes ❑ No
Contractor/Subcontractor On-Site Supervisor
Clear Fair Cloudy Shower Rain Snow The first four columns are fixed and cannot be changed.In each of the remaining columns,please enter a heading
0 0 ❑ ❑ ❑ ❑ specific to your job(e.g.,Trainees,Backhoe,Flaggers)and record the numbers used by each contractor or sub.
TEMP 10-32 32-50 50-70 70-83 Over83
❑ ❑ ❑ 0 ❑
WIND still Low Med High
❑ 0 ❑ ❑
HUMIDITY Dry Low Med High "
❑ 0 ❑ ❑ "
o
0 6
0
n a a v o
n O H o
Larry Peters 7.5 X
Erik Johnson 7.5 X
Eddy Partida 7.5 IX::
Dan Tuff 7.5 XBret Lane 1.0
;Location and/or Description of Work Estimated Quantities
Bid item No.
Clean Out K37(S 251st St) Excavated and Removed Clean out
Clean Out K49(S.248th PI.) Started the Excavation and Removal of Clean out7
■
All traffic control items have been inspected and found to be satisfactory ❑Yes �■ No(if no,explain below)
No traffic control plans for clean out excavation and removal was submitted. Implemented traffic control
included Road Work Ahead signs and traffic cones around equipment.
xMEM
(1) 14cy Mach Dump Truck, (1) 85G Excavator, (1) equipment trailer, (1) F250 truck, (1) F350 truck.
■
None installed
Nathan Bemis
Prepared by Project Inspector Project Inspector Signature
Prepared by Project Manager Project Manager Signature
DaV Q Sunday Q Monday Q Tuesday O Wednesday Q Thursday O Friday Q Saturday 08/12/2019
Shift
Work Date
1
murraysmi h
■
Cold patch mix
■
None
■
Include condition of roadway;important discussions with contractors regarding rejected work or materials and reasons;delays,difficulties,accidents,utility damage
and other unusual conditions and events;arrivals and departures of major equipment,visitors.
LASER General Notes:
- Work started at 8:45am and completed at 4:15pm.
- Work involved excavating and removing clean out K38 and started the excavation and removal of clean
out K49 required to support lining of the associated sewer mains.
- Spoke with Laser about removing the hog fuel located in the park early this week.
Nathan Bemis
Prepared by Project Inspector Project Inspector Signature
Prepared by Project Manager Project Manager Signature
Day O Sunday (# Monday Q Tuesday O Wednesday Q Thursday O Friday Q Saturday 08/12/2019
Shift
Work Date
2
Al
lop—
murraysmfth General Daily Progress Report
ion."
Kent 2019 Sanitary Sewer CIPP Lining-Access Road Work
Project Name(Section) Contract No.
City of Kent 19-2483
Location(alignment,station,roadway,bridge no.) Murraysmith Project No.
Laser(subcontractor) Larry Peters Supervisor Present? ❑■ Yes ❑ No
Contractor/Subcontractor On-Site Supervisor
Clear Fair Cloudy Shower Rain snow The first four columns are fixed and cannot be changed.In each of the remaining columns,please enter a heading
Q ❑ ❑ ❑ ❑ ❑ specific to your job(e.g.,Trainees,Backhoe,Flaggers)and record the numbers used by each contractor or sub.
TEMP 10-32 32-50 50-70 70-83 Over83
❑ ❑ ❑ 0 ❑
WIND Still Low Med High
❑ 0 ❑ ❑
HUMIDITY Dry Low Med High
❑ El ❑ ❑ "o n
A ° E
o. m u a a
Q
O
Larry Peters 9.75 X
Erik Johnson 9.75 X
Eddy Partida 9.75 X
Dan Tuff 9.75 X
Bret Lane 9.75 X
Location and/or Description of Work Estimated Quantities
Bid Item No. m w Total
Clean Out K49(S.248th PI.) Completed Excavation and Removal of Cleanout
Clean Out at the End of 249th PI.S. Excavated and Removed Cleanout
to(s) �■ Yes ;r
All traffic control items have been inspected and found to be satisfactory ❑ Yes 0 No(if no,explain below)
No traffic control plans for clean out excavation and removal was submitted. Implemented traffic control
included Road Work Ahead and Steel Plate On Roadway signs as well as traffic cones around equipment.
Equipment Photo(s) E Yes No
(1) 14cy Mach Dump Truck, (1) 85G Excavator, (1) 35ft equipment trailer, (1) generator (1) F450 Truck (1)
F350 Truck.
Erosion Control Monitoring(slope stability,drainage,turbidity,permits,etc.) Photo(s) ■
None installed
Nathan Bemis
Prepared by Project Inspector Project Inspector Signature
Prepared by Project Manager Project Manager Signature
DaV O Sunday O Monday # Tuesday O Wednesday O Thursday O Friday O Saturday 08/13/2019
Shirt
Work Date
1
murraysmiPth
■
Cold patch mix
■
None
■
Include condition of roadway;important discussions with contractors regarding rejected work or materials and reasons;delays,difficulties,accidents,utility damage
and other unusual conditions and events;arrivals and departures of major equipment,visitors.
LASER General Notes:
- Work started at 7:00am and completed at 4:45pm.
- Work involved completing the excavation and removal of cleanout K49 started yesterday (8/12) and
excavation and removal of cleanout at the end of 249th Pl. S. required to support lining of the associated
sewer mains.
- 9:45 spoke by phone with Laser (Brent Lane), where he requested a representative from the City Parks to
dept. meet at Linda Heights Park to discuss the removal of hog fuel and restoration of the park access. I
set up a meeting with Scott Swanson for 8/14 at 7am. Items also discussed involved: (1) Laser providing a
new cleanout base cover and covers, (2) cleanout backfill will be 5/8inch recycled material, (3) the cleanout
concrete collar will match existing grade per city std. detail, (4) process for billing hog fuel, I directed Brent
to speak with Insituform (Mike Morris).
- Per email from Insituform (Mike Morris) P&D Logging will be on site tomorrow (8/14) to remove the two
identified trees along the access road.
Nathan Bemis
Prepared by Project Inspector Project Inspector Signature
Prepared by Project Manager Project Manager Signature
Day y 0 Monday 08/13/2019
Q y QQ Tuesday Q Wednesday � Thursday � Friday � Saturday
Shift
Work Date
2
mirrrraysmith General Daily Progress Report
Kent 2019 Sanitary Sewer CIPP Lining-Cleanout Work
Project Name(Section) Contract No.
City of Kent 19-2483
Location(alignment,station,roadway,bridge no.) Murraysmith Project No.
Laser(subcontractor) Erik Johnson Supervisor Present? ❑■ Yes No
Contractor/Subcontractor On-Site Supervisor
Number of Personnel and Major, nt
Clear Fair Cloudy Shower Rain Snow The first four columns are fixed and cannot be changed.In each of the remaining columns,please enter a heading
E Q ❑ ❑ ❑ ❑ specific to yourjob(e.g.,Trainees,Backhoe,Flaggers)and record the numbers used by each contractor or sub.
TEMP '�z sz❑-so so❑-�o 7�s was
El
WIND Still Low Med High
❑ 0 ❑ ❑
HUMIDITY Dry Low Med High H
❑ E ❑ ❑ a
s v
o a n a
n O IE a -0
Larry Peters 9.5 X
Erik Johnson 9.5 X
Eddy Partida 9.5 X
Dan Tuff 9.5 X
Andy Baias 9.5 1 1 X
Location and/or Description of Work Estimated Quantities
Bid Item No. This Date sa
Cleanout K37(S.251st St.) Backfilled,Compacted and Formed Concrete Collar
Cleanout K49(S.248th Pl.) Backfilled and Compacted Cleanout
Cleanout at the End of 249th PI.S. Secured area for Insitufonn work
Temporary Traffic Control Photo(s) Yes No
All traffic control items have been inspected and found to be satisfactory ❑ Yes LE] No(if no,explain below)
No traffic control plans for clean out excavation and removal was submitted. Implemented traffic control
included Road Work Ahead and Steel Plate On Roadway signs as well as traffic cones around equipment.
x
(1) 14cy Mach Dump Truck, (1) 85G Excavator, (1) 35ft equipment trailer, (1) F450 Truck (1) F350 Truck.
(1) 310SK Deere front end loader with attached hoe pack compactor, (1) tow behind water trailer.
Photq(s) Yes-, �■ No
None installed
Nathan Bemis
Prepared by Project Inspector Project Inspector Signature
Prepared by Project Manager Project Manager Signature
DaV O Sunday O Monday Q Tuesday # Wednesday O Thursday Q Friday Q Saturday 08/14/2019
Shift
Work Date
1
marraysmith
■
44.06 tons (14.99+14.66+14.41) of 3/4th backfill [Renton Concrete Recyclers - Load Ticket: 22060]
Quickrete high strength concrete mix (4000 psi)
■
None
■
Include condition of roadway;important discussions with contractors regarding rejected work or materials and reasons;delays,difficulties,accidents,utility damage
and other unusual conditions and events;arrivals and departures of major equipment,visitors.
LASER General Notes:
- Work started at 7:00am and completed at 4:30pm.
- Work involved backfilling, compacting and forming concrete collars for cleanouts K37 and K49.
- Backfill was placed in 1-2 ft lifts and compacted with the hoe-pack. Where the hoe-pack was unable to be used, a
jumping jack and 6-12 inch lifts were used.
-After requests from contractor to consider alternative cleanout collar shape, MS approved a round concrete collar
vs square. The alternative was discussed and approved by the City.
- Meeting at Linda Heights Park was rescheduled from 7:00am to 10:00am. Attended by Erik Johnson (Laser), Scott
Swanson (City of Kent- Parks Dept.) and myself. The goal was to ensure Laser knew how the City wanted the park
restored. Below are the items requested by the city to restore the park to preconstruction condition:
•All the hog fuel needs to be removed.
• Any soil and sod that has been disturbed needs to be leveled.
• 2-3 inches of top soil (per spec) needs to be placed along the impacted area.
• Grass seed (per spec) needs to be spread along impacted area and incorporated into the top soil.
•After restoration has been completed, the irrigation system will be tested and any damage will need to be repaired.
Nathan Bemis
Prepared by Project Inspector Project Inspector Signature
Prepared by Project Manager Project Manager Signature
Day O Sunday O Monday Q Tuesday Q Wednesday O Thursday Q Friday Q Saturday 08/14/2019
Shift
Work Date
2
mivrraysm9h General Daily Progress Report
Kent 2019 Sanitary Sewer CIPP Lining-Cleanout Work
Project Name(Section) Contract No.
City of Kent 19-2483
Location(alignment,station,roadway,bridge no.) Murraysmith Project No.
Laser(subcontractor) Erik Johnson Supervisor Present? ❑■ Yes No
Contractor/Subcontractor On-Site Supervisor
Number of Personnel and Major Equipment
Clear Fair Cloudy Shower Rain Snow The first four columns are fixed and cannot be changed.In each of the remaining columns,please enter a heading
0 0 ❑ ❑ ❑ ❑ specific to yourjob(e.g.,Trainees,Backhoe,Flaggers)and record the numbers used by each contractor or sub.
TEMP 10❑-32 32❑-SO so❑ao 70❑-83 w�a3
WIND Still Low Med High
❑ El ❑ ❑
HUMIDITY Dry Low Med High
❑ 0 ❑ ❑ o t2 >
0 '0 w
a+ Y O
J O- 2 q
N O H J
Larry Peters 9.75 X
Erik Johnson 9.75 X
Eddy Partida 9.75 X
Dan Tuff 9.75 X
Andy Baias 19.75 X
Location and/or Description of Work - e` Mari it�es
Bid Item No. Total
Cleanout K37(S.251st St.) Asphalt Cut,Placed Rock and Asphalt
Cleanout K49(S.248th PI.) Asphalt Cut,Placed Rock and Asphalt
Cleanout at the End of 249th PI.S. Asphalt Cut,Placed Rock and Asphalt
Temporary Traffic Control Photo(s) ■ Yes No
All traffic control items have been inspected and found to be satisfactory ❑ Yes No(if no,explain below)
No traffic control plans for clean out excavation and removal was submitted. Implemented traffic control
included Road Work Ahead and Steel Plate On Roadway signs as well as traffic cones around equipment.
Equipment Photo(s) ❑Yes ❑ No
(1) 14cy Mach Dump Truck, (1) 85G Excavator, (1) 35ft equipment trailer, (1) F450 Truck (1) F350 Truck. (1)
310SK Deere front end loader with attached hoe pack compactor, (1) tow behind water trailer. (1) Bomag BW
900-50 Roller
■ No
None installed
Nathan Bemis
Prepared by Project Inspector Project Inspector Signature
Prepared by Project Manager Project Manager Signature
DaV O Sunday Q Monday Q Tuesday O Wednesday Q Thursday O Friday O Saturday 08/15/2019
Shift
Work Date
1
murraysmil~h
■
30.04 tons (15.27+14.77) of 3/4th backfill [Renton Concrete Recyclers - Load Ticket: 22098]
8.61 tons of 1/2" PH 58H-22 HMA [Icon Materials - Load Ticket 45409583]
■
None
■
Include condition of roadway;important discussions with contractors regarding rejected work or materials and reasons;delays,difficulties,accidents,utility damage
and other unusual conditions and events;arrivals and departures of major equipment,visitors.
LASER General Notes:
- Work started at 7.00am and completed at 4:45pm.
- Work involved cutting existing asphalt around the repair, placing and compacting backfill, and placing
asphalt.
- Backfill was placed in 1-2 ft lifts and compacted with the hoe-pack. Where the hoe-pack was unable to be
used, a jumping jack and 6-12 inch lifts were used.
- Asphalt was compacted and leveled using a combination of a walk behind whacker and driven roller.
- Measurement and temp. of 6inch asphalt patches:
• Cleanout K49: 6'-4" x 11'-5". Temp: 1st lift (273 & 274) 2nd lift (286)
• Cleanout K37: 6'-6" x 7'-10". Temp: 1 st lift (247 & 286) 2nd lift (255 & 261)
• Cleanout at the end of 249th PI. S.: 6'-6" x 10'-4". Temp: unable to record temperature due to other site
observations. This asphalt was placed after K49 and before K37.
Nathan Bemis
Prepared by Project Inspector Project Inspector Signature
Prepared by Project Manager Project Manager Signature
Day 0 Sunday 0 Monday 0 Tuesday 0 Wednesday Q Thursday 0 Friday 0 Saturday 08/15/2019
Shift
Work Date
2
Kuehne, Paul
From: Jeff Moss <Jeff.Moss@murraysmith.us>
Sent: Tuesday, August 20, 2019 2:33 PM
To: Kuehne, Paul
Cc: Nathan Bemis; Jeff Kreshel
Subject: RE: Change Order Worksheet
Attachments: Change Order 1 Package - 2019 Sanitary Sewer CIPP Lining.pdf
Paul, the Change Order 1 package is attached. The following components are included per our conversation:
• Change Order Worksheet
• Summary
• Independent Estimate
• Signed Change Proposal Form
• Change proposal cost spreadsheet
• Change proposal figures and referenced Standard Plans
• RFI #1
• Email correspondence with direction to proceed with change proposal
• Dailylogs related to cleanout excavation and replacement
Please let me know if you have any questions,
-Jeff
Jeff Moss
Engineering Designe
520 Pike Street, Suite 1350, Seattle, WA 98101
P 206.462.7030
Murraysmith I www.murraysmith.us
From: Kuehne, Paul <PKuehne@kentwa.gov>
Sent: Monday,August 12, 2019 2:22 PM
To:Jeff Moss<Jeff.Moss@murraysmith.us>
Subject: Change Order Worksheet
Change Order Worksheet
Paul Kuehne, Construction Engineering Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 1 Cell 253-740-5015