HomeMy WebLinkAboutPW18-335 - Change Order - #2 - Quigg Bros., Inc. - Upper Mill Creek Dam Improvement & Diversion Structure Replacement - 08/29/2019 Records Management KEN0N�'�/ Document A S H I N G T O N CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name : Quigg Bros., Inc. Vendor Number: 2041590 JD Edwards Number Contract Number: PW18-335 Project Name: Upper Mill Creek Dam Improvements & Diversion Structure Replacement Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 8/21/18 Termination Date: 190 Working Days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Steve Lincoln Department: PW Engineering Contract Amount: $5,951,037.95 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order #2 As of: 08/27/14 • KENT WAS H 1 N G T O h CHANGE ORDER NO. #2 NAME OF CONTRACTOR: Quigg Brothers, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Upper Mill Creek Dam & Diversion Structure Replacement ORIGINAL CONTRACT DATE: August 21, 2018 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled 'Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Create a topsoil type A bid item which was omitted from the contract. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $5,951,037.95 (including applicable alternates and WSST) Net Change by Previous Change Orders $33,000.00 (incl. applicable WSST) Current Contract Amount $5,984,037.95 (incl. Previous Change Orders) Current Change Order $20,212.50 Applicable WSST Tax on this Change $2,021.25 Order Revised Contract Sum $6,006,271.70 CHANGE ORDER - 1 OF 3 Original Time for Completion 190 working days (insert date) Revised Time for Completion under 190 working days prior Change Orders (insert date) Days Required (f) for this Change Order 0 calendar days Revised Time for Completion 190 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: �� ��.'.. a� By: M262 Azle, , C4 r arc,26,i (signature) ;rrr (signature) Print Name: '7,=0 F69NC0 Print Name: Timothy J. LaPorte, P.E. Its Ple-0Ii5-C-7''17?4446 .-X- Its Public Works Director (title) (title) DATE: 9 -/ I DATE: CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: (applicable if Mayor's signature required) ,AAA A & - Kent City Clerk Kent Law Department CHANGE ORDER - 3 OF 3 40111110*500 • FILE NO: 200.2 KEN1T W a s N—T— CHANGE ORDER WORKSHEET NO. 2 Construction Engineering Division — Public Works Project: Upper MITI Creek Dam Project No.: 09-3030 Project Engineer: Steve Lincoln Fed-Aid No.: N/A Capital Projects Phil McConnell Contractor: Quigg Brothers Manager: Date: Various I. PROPOSED CHANGE Create a topsoil Type A bid item H. REASON AND BACKGROUND FOR CHANGE Topsoil bid item was omitted from the contract III. METHOD OF PAYMENT NEW PAY ITEM(S) Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. Item Description Total Qty this Unit Unit Price Total Estimated Cost of Est. Qty 1 PE Item _........................................................--.___.--...._....._......._..._...................... ...... .................................._ ............................. ....__.......... ... ........................._........................................................... .......... ._..... ........................ ....... 7 Topsoil T e A --..................._192.5..........._.........................._.....................'............CY........................................................... 00...........__.._..._.._.__._......_......$20,212.50 ................... ..................................................._._.P..........................._Y.P_......_.._.._.._._._.........._........._...................... _ i ...............................}......_................................._................................................................_.........._...............................,......_.......................... ............................. ......_.....................;....... i ❑ Independent Estimate Attached ® CREATE PAY ITEM ONLY— Payment to be made ❑ PAY THIS PAY ESTIMATE -REQUIRED at a later date upon completion of work ........ ....... . ....... .. ..._.......... -.. ❑ Material Submittals Required — CC. Construction Coordinator New Sub Regrd� No DELETE EXISTING PAY ITEM(S) per 1r09.5 M Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch. No. B.I. No. Item Description Qty Unit Unit Price Cost of Item .._._. ......... ......................._._._.__ ........ ............ .._....._............. .. ....q.. ...._. ........_ .. .......... .. .. .. q. .... 1 4 Independent Estimate Attached -REQUIRED ❑ ❑ INCREASE/DECREASE TO EXISTING PAY ITEM(S) Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch No. B.I. No Item Description .............Qty ................._._....._Unit Unit Price Cost of Item .......... :.... ............... ...... .... ........ ....... ......_............q................... ............ ...... ............ ............................. _............._....._......................._...............__......_........._....1---'..................__._........................................................._.._......._....._...................:..............................._........_..-_s........_._.._................... ......................._..._............._......._........................._. .........._._............._..................._.............._.._._.............--._..- ❑ Independent Estimate Attached - REQUIRED ❑ 1 REV. DATE: 3/27/18 • FILE NO: 200.2 KENT TOTAL ESTIMATED COST OF CHANGE ORDER * $20 212.50 *Total of the Cost of Item Columns THIS PAY ESTIMATE $20 212.50 IV. WORKING DAYS Original Contract 190 Due This Change Order* 0 Previous Total 190 ..... ....................... ......_. .....__... .............................................. ..... . . .................. ._......... ....... ....... .. DATE. DATE: ..... ........ ... .._...... ......... .. * Explanation Justification Re wired. The bodyof workwas shown on the lans no bid item to cover work TOTAL WORKING DAYS* 190 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Capital Projects Manager: Date: hil onnell Construction Engineering Date: _2 C� Supervisor: Paul Kuehne Construction Manager: Date: l Eric Connor 2 REV. DATE: 3/27/18 Quigg Bros., Inc. P.O. BOX 1707- ABERDEEN.WA 98520-0281 PHONE 360-533-1530 FAX 360-532-3449 August 22nd, 2019 Phillip McConnell City Of Kent 220 Fourth Ave South PO Box 1307 Kent, WA 98032 VIA: E-Mail Serial Letter 003 Re: Upper Mill Creek Darn Cost Proposal 3 Furnish & Place Top Soil Mr. McConnell Per your request Quigg Bros., Inc. is submitting our price in the amount of$105.00 per CY. to furnish and place top soil. A cost breakdown is attached for your use. Please contact me if you have any questions or require any further information at(360) 591-5263. Sincerely, QUIGG BROS., INC. ?ed quwo Project Manager tedf@Auiggbros.cont Cell#360-591-5263 0 0 Ul 0 < < 0 cr) a. �2 0 Lli 0 X a. g z cc 04 000000000a0000000000 ��o o(,) (D N < co 0 o o o o ca < z 0 (6 ui a- LU L)i z cl 0 as ge , c) co D c.) Ln D uj m 0 Q- 0 (t)U) o Q 13 Q C, Q Q Q Q Q o(z) o w Lu w > a- 0 ca w D co < (n (1) c� ui (D < cl) 3: w o 0 w ey c; 9 0 z oo co LU cs 0a_ z 0 C) t z (/)Oo 000 000 (n Ox u) >- C) z < o o o o o ZZWWWO 00 ,.z..(7 -z w- opzZo)w5own<..jwl—RZ5�0 5 Z Z 0- w 0 E W, oxo—j2n<l j�Dww 0-0 0 EL oww—j—wwws WW ;� D z z M w-j W 0�. z g E LL Lij V) 0 Q a, co a- C) W LIJ LL;6- LL w z z u- M 0 < 0 LL 0 0< 0 w 0 cL 0 o :E 2 z LU b E so 0 o LL % C) E o u. D 7 L IN I ......................... ITEM# 1 QUANT 36 UNIT CY ITEM DESCRIPTION: Furnish & install top soil ACTIVITY DESCRIPTION: Furnish & install top soil 36 CY EQUIPMENT Comp Outside Outside Perm. # Code Owned Bare Wages STS Operated Material Subs Total 1 1ton $15.00 $0.00 $0.00 $15.00 1 tools $8.00 $0.00 $0.00 $8.00 1 JD75 $25.00 $0.00 $0.00 $25.00 1 Truck $0.00 $0.00 $140.00 $140.00 1 Void $0.00 $0.00 $0.00 $0.00 1 Void $0.00 $0.00 $0.00 $0.00 1 Void $0.00 $0.00 $0.00 $0.00 1 Void $0.00 $0.00 $0.00 $0.00 1 Void $0.00 $0.00 $0.00 $0.00 LABOR Wages 0.15 Fore $9.75 1 Oper $65.00 1 Lab $65.00 1 Void $0.00 1 Void $0.00 1 Void $0.00 1 Void $0.00 1 Void $0.00 ST&S 1 $0 $0 PERMANENT MATERIALS Number 36 Top Soil $504 Unit Cost 14 SUBCONTRACTORS 1 $0 $0 Comp Outside Outside Perm. Owned Bare Wages STS Operated Material Subs Total $48 $0 $140 $0 $140 $504 $0 CRW. HRS. 8 $384 $0 $1,118 $0 $1,120 $504 $0 BID ITEM TOTAL $384 $0 $1,118 $0 $1,120 $504 $0 $3,126 Unit Price $87 464 1442 1254 $610 $3,770 ............ ...................................... ........................ BID DATE: 5/8/2019 Updated:7/15119 GIRARD RESOURCES&RECYCLING, LLC PO BOX 14727 MILL CREEK,WA 98082 OFFICE:425-743-6388 FAX:425-787-1600 PROJECT: TO: Quigg Bros ADDRESS: 104th Ave SE&SE 267th St CITY-STATE-ZIP: Kent ATTN: Hans BID DURATION: 30 Days EMAIL: L a—rLs-t-)(26 SALESMAN: Riley Carr PHONE: PHONE: 425-471-9528 FAX: EMAIL: f%eZkl���dd r'ZS 0 4LC e 5 C 0 We offer to fumish the following from-Sno h om ish/Covi not n/Snoaualmie location 7T-- ITEM DESCRIPTION UNIT PIT 7 Import 1 2"-4"Quarry Spalls Ton $25.00 2 4"-8"Quarry Spalls Ton $23.00 3 1 1/4"Minus Crushed Rock Ton $16.25 4 5/8"Minus Crushed Rock Ton $17.50 5 1 1/2 Drain Rock Ton $25.00 6 Lawn Mix(ADDED:8/15/19) Yard $14.00 Export 1 Sod/Dirt Yard $25.00 2 MudiAPDEC,:7/15/19) Yard $25.00 3 Non Structural Fill Yard $22.00 SOLO T&T Truck Rental Hourly $140.00 $160.00 $100.00 one fte PW admlnWration fee applies This quote Is valid 30 days from the date on the quote.A signed quote and current credit application must be approved and on file prior to delivering or receiving material,A signed waste profile form or clean soil acceptance form must be on file prior to receiving any soils,water or other materials at our yards.All materials received must be clean and free of any hazardous or other contaminated materials.Notification must be received prior to starting any Prevailing Wage jobs.PW administrative fees and PW hourty rates will be Invoiced on all PW jobs,with overtime charged when applicable.Prices quoted are for work to be performed during our normal hours of operations Monday-Friday 7:00 AM to 6:00 PM.Overtime rates will be invoiced If work is requested or required outside our normal hours of operations. Accepted: Girard Resources: By: By; Date: Date: