HomeMy WebLinkAboutCAG2019-017 - Amendment - #1 - MacLeod-Reckord, PLLC - Morrill Meadows-East Hill Park Renovation - 09/20/2019 Agreement Routing Form4�AO
KEN T For Approvals,Signatures and Records Management Director initial
WASHINGTON
This form combines&replaces the Request for Mayor's Signature and Contract Cover Sheet forms.
(Print on pink or cherry colored paper) Manager initials 1 y
Originator. Lynn Osborn for Terry Jungman Department: Parks
Date Sent: 9/11/19 Date Required: Soonest possible please
0 Authorized Director Date of N/A
to Sign: Council
aMayor Approval:
Budget P21019 Grant? Yes No
Account
Number: Type: N/A
Vendor
Name: MacLeod Reckord PLLC Category: Contract
= Vendor gg6584 Sub-Category Amendment j
o Number:
Project
E Name: Morrill Meadows Park Renovation Construction Administration
1.0
c Project Amendment #1 for $20,581.60, adding utility easement documents to scope
Details:
c
0 Agreement Basis for
E g $52710.54 - NEW
0 Amount: Selection of Other
1. Contractor:
a
a Start Date: 1/2/2019 Termination Date: 12/31/2019
Notice required prior to Yes No Contract Number: C (� p/'7`'
disclosure?
Date Received by City Attorney. Comments:
iT
c
3
0
cc
N
41
L
3
i�
f0
Im Date Routed to the Mayor's Office:
in
d Date Routed to the City Clerk's Office:
a�
Date Sent to Originator:
Visit Documents.KentWA.gov to obtain copies of all agreements
adccW22373_6_19
•
KENT
W A 9 H I N G T`^.N
AMENDMENT NO. 1
NAME OF CONSULTANT OR VENDOR: MacLeod Reckord
CONTRACT NAME & PROJECT NUMBER: Morrill Meadows Park Renovation Construction
Administration; #PPD19-02
ORIGINAL AGREEMENT DATE: 1/2/2019
This Amendment is made between the City and the above-referenced Consultant or Vendor
and amends the original Agreement and all prior Amendments. All other provisions of the original
Agreement or prior Amendments not inconsistent with this Amendment shall remain in full force
and effect. For valuable consideration and by mutual consent of the parties, Consultant or
Vendor's work is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, the Consultant or Vendor shall:
As described in attached Exhibit A, incorporated herein, scope is
expanded to include documentation for utility easements.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are modified as follows:
Original Contract Sum, $32,128.94
including applicable WSST
Net Change by Previous Amendments $N/A
including applicable WSST
Current Contract Amount $32,128.94
including all previous amendments
Current Amendment Sum $20,581.60
Applicable WSST Tax on this $0.00
Amendment
Revised Contract Sum $52,710.54
AMENDMENT - 1 OF 2
Original Time for Completion 12/31/2019
(insert date)
Revised Time for Completion under N/A
prior Amendments
(insert date)
Add'I Days Required (f) for this 0 calendar days
Amendment
Revised Time for Completion N/A
(insert date)
The Consultant or Vendor accepts all requirements of this Amendment by signing below, by
its signature waives any protest or claim it may have regarding this Amendment, and
acknowledges and accepts that this Amendment constitutes full payment and final settlement of
all claims of any kind or nature arising from or connected with any work either covered or affected
by this Amendment, including, without limitation, claims related to contract time, contract
acceleration, onsite or home office overhead, or lost profits. This Amendment, unless otherwise
provided, does not relieve the Consultant or Vendor from strict compliance with the guarantee and
warranty provisions of the original Agreement.
All acts consistent with the authority of the Agreement, previous Amendments (if any), and
this Amendment, prior to the effective date of this Amendment, are hereby ratified and affirmed,
and the terms of the Agreement, previous Amendments (if any), and this Amendment shall be
deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this Amendment, which is binding on the parties of this contract.
IN WITNESS, the parties below have executed this Amendment, which will
become effective on the last date written below.
CONSULTANT/VENDOR: CITY OF KENT:
By: C9 By: �--
signature) (signature)
Print Name: Connie Reckord P ' t Name: Julie Para scondola
Its Managing Member Its Parks, Recreation & Community Svcs.
9/11/2019tle) Director
DATE: (t e
DATE: ?�
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Lb
Kent City Clerk Kent Law Department
P:\Planning\Morrill Meadows\MM-YMCA Park Renovation 2016-20\MacLeod Reckord Contract Docs\4-Construction Admin\MR Constr Admin-AMENDMENT#1
AMENDMENT - 2 OF 2
EXHIBIT A
MacLeod Reckord PLLC
Landscape Architecture ■ Planning ■ Urban Design
110 Prefontaine Place South, Suite 600
Seattle, Washington 98104
P 206-323-7919
F 206-323-9242
November 14, 2018
January 9, 2019 revised
Brian Levenhagen, CPRP Deputy Director
City of Kent
Parks, Recreation and Community Development
220 Fourth Avenue South
Kent, WA 98032
Brian,
Attached please find our team's proposal for additional services. Services are proposed for
developing easements that will be required to fulfill permit conditions and allow for beneficial
occupancy in the future. Table 1 provide fee breakdown, with attachments from our team
provided. Note the following:
TABLE 1 — EASEMENT DOCUMENTATION - Proposed for Completion of Utility Easements
This represents an estimate of design and engineering services to be provided. Services
proposed from PACE are to provide written legal descriptions and parcel exhibits for
approximately six (6) utility easements (total still to be determined based on additional
information forthcoming from the City) across the site. Proposed services from MR are an
allowance for managing the final resubmittal/assembly of Permit Approved documents and
project management support to complete and submit the easements.
We are requesting $20,581.60 in additional fee for these services.
Let us know if you have questions or need additional information.
Best Regards,
Connie Reckord, PLA, ASLA, LEED AP
Principal
EXHIBIT A(Continued)
Morrill Meadows Development
Fee Summary
November 14,2018, updated January 9,2019
TABLE 1 -EASEMENT DOCUMENTATION -Proposed for Completion of Utility Easements)
Task/Team MacLeod Reckord PACE Subtotal
PM Support, Finalize docs for Permit Set 2,200.00 2,200.00
Survey-Utility Easements 17,020.00 17,020.00
Subtotal 2,200.00 17,020.00 $ 19,220.00
Direct Expenses
Admin.Mark-up(8%) $ 1,361.60
Total Proposed Utility Easement Services 2,200.00 17,020.00 $ 20,581.60
Page 1 of 1
EXHIBIT A(Continued)
Morrill Meadows Development
PACE-2018 Rates
September 15,2018
..................... ...................... ............ PACE
r
Z- . Mp. .;;
................. ...
�G�t...E�.....I.�1'�f�.��. .���f�.45..2��E&.. ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::>:;::
All Additional Tasks Spent to Date $91,833
:'caiss.MI pa CIt�^T�FI I ' :::'::::::::::::::::::::::::::::::::::::::::::::::::::::::: Prin Engr Proj Engr Engr II CAD Survey Admin SUBTOTALS
SCOPE OF WORK $200.00 $160.00 1 $127,00 1 $116.00 1 $185 00 1 $80.00 11
ADD AFTERSEV-10::20-1
SEWER ......... .........
Spent to Date $6,106
Side sewer design changes $0
Subtotal 0 0 0 1 --0 0 0 $6,106
WATER
Spent to Date $16,780
Water main and fire line design changes $0
Subtota. 0 0 0 0 0 $16,780
STORM
Spent to Date $18,380
Drainage,grading,site plan changes and add sheets $0
0 0 0 0 0 0 $18,380
SE 248TH STREET
Spent to Date $3,008
Driveway changes $0
0 1 0 1 0 0 0 0 $3,008
GENERAL WORK OUTSIDE ORIGINAL SCOPE
Spent to Date $23,109
Additional work per narrati $0
Subtotal: 0 0 0 0 0 d 0 $23,109
ADDITIONAL MEETINGS
Spent to D $5,200
MeetiWwith/at City $0
0 0 0 0 0 0 $ 0
(' SURVEY
.'1tP IPlA 7.ri()
Easements and BLA work 92 $17,020
au U U UZ u
Spent to Date numbers for each individual task are approximated. Total Spent to Date of$91,833 is actual. Check —$04,838—