Loading...
HomeMy WebLinkAbout4135AN ORDYNANCE of the City Council of the City of Kent, Washington, amending the Kent Comprehensive Plan and its Capital Facilities Element to reflect a six-year plan for capital improvement projects (2015-2020) (CPA -2014-3). A. The State of Washington Growth Management Act (GMA) requires internal consistency among comprehensive plan elements and the plans from other jurisdictions. B. To assure that comprehensive plans remain relevant and up to date, the GMA allows amendments to the capital facilities element of comprehensive plans concurrently with the adoption or amendment of a city budget. C. The City of Kent has established procedures for amending the Comprehensive Plan in Chapter 12.02 of the Kent City Code (KCC), allowing amendment of the Capital Facilities Element of the Comprehensive Plan concurrently with the adoption or amendment of the City's budget. As part of these procedures the City Council may hold the 1 Comprehensive Plan �4mendment to the Capita/ Faci/hies E/ement for 2015-2020 Capital Improvements public hearing instead of the Land use and Planning Board. KCC 12.02.010. D. The City of Kent Finance Department has submitted proposed amendments to the Capital Facilities Element of the Comprehensive Plan to identify a six-year plan for capital improvement projects, including costs and revenue sources. E. On October 6, 2014, the City provided the State of Washington the required sixty (60) day notification under RCW 36.70A.106 of the City's proposed amendment to the Capital Facilities Element of the Comprehensive Plan. The sixty (60) day notice period has passed. F. On October 6, 2014, the City's SEPA responsible official issued a SEPA Addendum to existing environmental documents consisting of the City of Kent Comprehensive Plan Review and Midway Subarea Planned Action Environmental Impact Statement (EIS) Draft and Final (ENV -2010-3) and the Downtown Subarea Action Plan Supplemental EIS Draft and Final (ENV -2012-30). The SEPA Addendum explained that the proposed amendment would not create unavoidable impacts beyond those previously identified in the EIS. G. After providing appropriate public notice, the City Council of the City of Kent conducted a public hearing on October 21, 2014, to consider the six-year plan for capital improvements and the requested amendment to the Comprehensive Plan and its Capital Facilities Element. H. On December 16, 2014, the City Council for the City of Kent approved the Capital Facilities Element amendment to the Kent 2 Comprehensive Plan A mendment to the Capita/ Faci/ities E/ement for 2015-2020 Capita/ improvements Comprehensive Plan (CPA -2014-3) to reflect a six-year plan for capital improvement projects (2015-2020). NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS. SECT,IOnI Z. -Amendment. The City of Kent Comprehensive Plan and its Capital Facilities Element are hereby amended to reflect a six-year pIan for capital improvement projects (2015-2020), as set forth in Exhibit "A" attached and incorporated by this reference (CPA -2014-3). SECTI®P� 2. - Corrections � City Clerk or Code Reviser. Upon approval of the City Attorney, the City Clerk and the code reviser are authorized to make necessary corrections to this ordinance, including the correction of clerical errors; ordinance, section, or subsection numbering; or references to other local, state or federal laws, codes, rules, or regulations. SECT.ZOI� 3. -Severability. If any one or more section, subsection, or sentence of this ordinance is held to be unconstitutional or invalid, that decision shall not affect the validity of the remaining portion of this ordinance and that remaining portion shall maintain its full force and effect. SECT2'O/V 4. -Effective Date. This ordinance shall take effect and be in force thirty (30) days from and after its passage and publication, as provided by law. 3 Comprehensive Plan A mendment to the Capita/ Faci/ities E/ement for 2025-2020 Capita/ Improvements ATTEST: ONALD F. FORE,,C�TTY CLE APPROVED AS TO FORM: TOWI BRUBAKER, CITY ATTORNEY PASSED: qday of December, 2014. APPROVED: day of December, 2014. PUBLISHED: day of December, 2014. I hereby certify that this is a true copy of Ordinance No. passed by the City Council of the City of Kent, Washington, and approved by the Mayor of the City of Kent as hereon indicated. P:\Civil\Ordinance\Compplanamend-Capitalimproveplan 2015.Docx 4 Comprehensive P/an �4mendment to the Capital Facilities E'/ement for 20.25-2020 Lap/a, Improvements 1 1 1 P • - r Requested Amounts in Th• r Sources of Funds CIP REET 2 Revenues Donations / Contributions Drainage Revenues Facilities Revenues Grants IT Revenues Sewer Revenues Sources To Be Determined Street Revenues B & O Tax Voted Bonds Water Revenues 7ota1 Sources of Funds Project Requests General Government Public Safety Transportation Parks, Rec, and Comm Svcs Utilities Total Project Requests Sources of Funds 7% 2015 2016 2017 2018 2019 2020 Yotal 800 800-: 800 800 800 800 4,800 5 5 5 5 5 5 30 81000 81000 81000 81000 81000 81000 48,000 11135 541 500 500 500 500 , 31676 21227 2,316 1,114 11046 749 308 71760 11250 11250 1,250 11047 11250 11250 7,297 11075 11000 11000 11000 11000 11000 61075 22,235 46,731 39,147 40,885 38,254 26,796 214,047 41700 41700 4,747 41794 41842 4,891 28,675 34,000 0 0 0 0 0 34,000 2,800 21800 21800 2,800 21800 2,800 16,800 78,227 68,143 59,363 60,877 58,200 46,350 371,159 31742 31400 41734 11597 51012 31606 22,090 34,000 0 0 0 0 0 34,000 12,000 12,000 12,000 12,000 12,000 12,000 72,000 51572 5,388 6,831 41427 51116 41117 31,451 22,913 47,355 35,798 42,853 36,072 26,627 211,618 78,227 68,143 59,363 60,877 58,200 46,350 371,159 i ;CIP REET 2 Revenues Donations /Contributions Drainage Revenues Facilities Revenues Grants IT Revenues Sewer Revenues Sources To Be Determined Street Revenues - B & 0 Tax Voted Bonds Water Revenues 58 1 Project Requests 57 19% General Government ®Public Safety Transportation Parks, Rec, and Comm Svcs Utilities 6% Sources of Funds CIP REET 2 Revenues Donations / Contributions Facilities Fund Grants IT Revenues Sources To Be Determined Street Revenues - B & O Tax Utility Funds Voted Bonds Total Sources of Funds Project Requests General Government Facilities Fleet Technology Total General Government Public Safety Police Department Total Public Safety Transportation Other Projects Street Overlays Total Transportation Parks, Rec, and Comm Svcs Programs Planning & Design Redevelopment & Renovations Development Total Parks, Rec, and Comm Svcs Utilities Water Sewer Stromwater Total Utilities Total Project Requests Requested Amountsr • 2015 2016 2017 2018 2019 2020 Total 800 800 800 800 800 800 4,800 5 5 5 5 5 5 30 11135 541 500 500 500 500 31676 21227 21316 1,114 11046 749 308 71760 11250 1,250 11250 1,047 11250 1,250 71297 22,235 46,731 39,147 40,885 38,254 26,796 214,047 4,700 41700 41747 41794 41842 41891 28,675 111875 111800 11,800 111800 111800 111800 70,875 34,000 0 0 0 0 0 34,000 78,227 68,143 59,363 60,877 58,200 46,350 371,159 11532 880 1,290 550 755 650 5,657 0 1,100 0 0 0 0 11100 21210 1,420 31444 11047 41257 2,956 15,334 31742 31400 41734 11597 51012 31606 22,090 ,000 0 0 0 0 0 34,000 000 0 0 0 0 0 34,000 960 960 960 960 960 960 5,760 11,040 11,040 11,040 11,040 11,040 11,040 66,240 362 363 364 366 366 367 2,188 120 0 0 0 0 0 120 1,290 31725 61167 21311 3,400 500 17,393 3,800 11300 300 11750 11350 31250 11,750 5,572 51388 61831 41427 51116 41117 31,451 12,238 20,460 10,958 7,528 7,982 6,927 66,093 1,075 3,990 10,830 10,410 5,370 6,125 37,800 91600 22,905 14,010 24,915 22,720 13,575 107,725 22,913 47,355 35,798 42,853 36,072 26,627 211,618 781227 681143 59,363 60,877 58,200 46,350 371,159 2 General Government 2015 - 2020 Capital Improvement Program Requested Amounts in Thousands Total Projects Requested 3,742 3,400 41734 1,597 51 2015 2016 2017 2018 2019 2020 Total Priority Sources of Funds Facilities Revenues 11135 541 500 500 500 500 31676 IT Revenues 1,250 11250 11250 11047 11250 11250 71297 Source To Be Determined 11357 11609 21984 50 3,262 11856 11,117 Total Sources of Funds 31742 3,400 4,734 1,597 5,012 31606 22,090 Projects Requested Facilities 1 HVAC Lifecycle Replacements (Lifecycle) 200 100 100 100 100 100 700 2 Emergency Repairs 100 100 100 70 100 100 570 3 Kitchen Equipment (Lifecycle) 46 40 25 20 20 30 181 4 Roof Repairs (Lifecycle) 500 150 450 35 400 145 11680 5 Kent Pool (Lifecycle) 25 25 25 25 25 25 150 6 Centennial Center Reseal 45 45 45 50 185 7 Fire Alarm Upgrades 20 20 8 Parking Lots (Lifecycle) 165 195 130 100 590 9 Floor Covering Replacements (Lifecycle) 150 290 200 60 100 800 10 Commons Racquet Ball Wall Repairs 40 40 it City Hall Elevator Doors 60 60 12 City Hall/Council Chambers Renovation 100 100 13 Facilities Card Access 75 75 75 225 14 Corrections Portable Back-up Power Conn. 50 50 15 Tenants Requested Renovations 56 50 50 50 50 50 306 Total Facilities Projects 11532 880 11290 550 755 650 51657 Fleet 4 Fuel Island Replacement 1 100 1,100 Total Fleet Projects 0 1,100 0 0 0 0 11100 Technology 2 Hardware Lifecycle Replacements 11236 509 622 622 622 622 41232 3 Emerging Projects 242 193 200 200 200 200 11235 3 Software Lifecycle 733 718 2 622 225 3r435 21134 9,867 Total Technology Projects 21210 11420 31444 11047 41257 21956 15,334 012 3,606 22,090 3 Priority Sources of Funds Voted Bonds Total Sources of Funds Projects Requested 1 New Kent Police Station Total Projects Requested .. , Requested Amounts in Thousands 2015 2016 2011 2018 2019 2020 Total 34,000 34,000 34,000 0 0 0 0 0 34,000 34,000 34,000 34,000 0 0 0 0 0 34,000 C'. Priority Transportation 2015 ® 2020 Capital Improvement Program Requested Amounts in Thousands Sources of Funds Street Revenues - B & O Tax Sources To Be Determined Total Sources of Funds Projects Requested 1 Citywide Gaurdrail & Safety Imp 1 Kent Shuttle Service 1 Neighborhood Traffic Control 1 Sidewalk Repair 1 Signals/Contollers 1 St Light Replacement 1 St Striping/Thermoplastic Program 1 Street Overlays Total Projects Requested 2015 2016 2017 2018 2019 2020 Total 155 155 155 155 155 30 30 41700 41700 41747 41794 41842 41891 28,675 7,300 71300 71253 71206 71158 71109 431325 12,000 12,000 121000 12,000 121000 121000 72,000 20 20 20 20 20 20 155 155 155 155 155 155 30 30 30 30 30 30 500 500 500 500 500 500 75 75 75 75 75 75 50 50 50 50 50 50 130 130 130 130 130 130 11, 040 111040 11,040 11,040 111040 11,040 12,000 12,000 12,000 12,000 12,000 12,000 5 72,000 Parks, Recreation at Community Services 2015 - 2020 Capital Improvement Program Requested Amounts in Thousands Priority Sources of Funds CIP REET2 Revenues Donations / Contributions Grant - King County Grant- Other Grant - Washington State Source To Be Determined Total Sources of Funds 2015 2016 2017 2018 2019 2020 Total 800 Projects Requested 800 Programs 3 ShoWare Lifecycle 4 Green Kent Program 5 Adopt -A -Park Volunteer Program 237 Planning & Design 7 Park and Open Space Plan 6 Redevelopment & Renovations 1 Community Parks Reinvestment Program 2 Neighborhood Park Reinvestment Program 11 Lake Meridian Park Phase I 13 Van Dorens Park Renovation 14 Russell Road Field Conversion 15 Kent Memorial Park Renovation 16 Lake Fenwick Park Phase I 17 Springwood Park Improvements Development 12 Kent Valley Loop Trail Implementation 18 Strategic Development 19 Strategic Assemblages Total Projects Requested 2015 2016 2017 2018 2019 2020 Total 800 800 800 800 5 5 5 5 232 235 237 239 5 6 6 7 1,990 21075 872 800 2,540 2,267 4,912 2,576 800 5 242 7 500 3,562 5,116 8 300 3,004 4,117 300 300 300 300 300 300 20 21 21 22 22 23 42 42 43 44 44 44 120 525 700 700 600 500 300 475 11100 400 700 300 200 290 11450 1 125 21018 2 250 11743 1 121 811 100 11185 1 200 21600 2 250 150 150 150 150 150 150 350 2,650 3 400 1,000 1,600 1,000 600 0 4, 800 30 1,184 39 6,537 18,862 451 31, 3,325 3,175 , 740 ,143 ,993 932 , 285 , 800 550 ,600 7,600 0 4, 800 30 1,184 39 6,537 18,862 451 31, 3,325 3,175 , 740 ,143 ,993 932 , 285 , 800 550 ,600 7,600 Utilities Water Supply & Distribution 2015 - 2020 Capital Improvement Program Requested Amounts in Thousands Priority 2015 2016 2017 2018 2019 2020 Total Sources of Funds Water Revenues 21800 21800 21800 21800 21800 21800 16,800 Sources To Be Determined 9f438 17r660 8,158 4f728 5 182 41127 49,293 Total Sources of Funds 12,238 20,460 10,958 7,528 71982 61927 66,093 Projects Requested Water Supply & Distribution 1 HCP Implementation (Clark Springs) 164 95 238 893 212 242 11844 2 Tacoma Pipeline 11889 30 30 30 30 30 21039 3 Water Conservation 50 50 50 50 50 50 300 4 Landsburg Mine 100 100 100 100 100 100 600 5 Gulberson Reservoir Replacement 31000 61000 31000 12,000 6 Misc Water Improvements 21035 21000 21035 2,000 2,035 21000 12,105 7 East Hill Pressure Zone (640) 21095 41030 21650 11750 2,500 21150 15,175 8 Large Meter & Vault Replacements 75 75 75 75 75 75 450 9 Hydrant Replacement 30 30 30 30 30 30 180 10 Source Generators 200 250 450 900 11 Wellhead Projection 800 800 800 800 800 800 41800 12 Reservoir Painting 250 250 500 13 Security Improvements 50 50 50 50 50 50 300 14 Transmission Mains 750 750 750 750 750 750 41500 15 Jenkins Creek Bridge Replacement 21000 21000 16 SCADA System Upgrades 150 150 150 150 150 750 17 Automated Meter Reading 500 500 500 500 500 500 31000 18 Water System Plan 300 300 19 Seismic Joints on Bridges 250 250 250 750 20 Road Projects 31500 31500 21 212 Plant Valve Replacement 100 100 Total Projects Requested 12,238 201460 10,958 71528 71982 61927 66,093 Priority Utilities Sewer 2015 - 2020 Capital Improvement Program Requested Amounts in Thousands Sources of Funds Sewer Revenues Sources to be Determined Total Sources of Funds Projects Requested Sewer 1 Miscellaneous Sewer Replacements 2 Linda Heights Replacement 3 Skyline Sewer Interceptor 4 Miscellaneous Pump Station Improvements 5 Horsehoe Sanitary Replacement 6 Derbyshire Sewer Improvements 7 SCADA System Upgrade 8 Frager Rd Secondary Wetwell & Grinder Total Projects Requested 2015 2016 2017 2018. 2019 2020 Total 1,075 1,000 1,000 1,000 1,000 1,000 6,075 0 2,990 91830 91410 41370 5,125 31,725 11075 31990 10,830 10,410 51370 61125 37,800 675 300 100 0 1,790 5,080 5,310 5,120 5,250 23,225 1,600 11900 100 21100 21200 100 100 100 100 100 600 300 11750 2,050 400 31100 31100 61600 150 150 150 150 600 Utilities Stormwater Management 2015 - 2020 Capital Improvement Program Requested Amounts in Thousands Priority 2015 2016 2016 2018 2019 2020 Total Sources of Funds Stormwater Management Drainage Revenues 81000 81000 81000 81000 81000 8,000 48,000 Sources to be Determined 11600 14 905 6 010 16f915 14 720 51575 59,725 Total Sources of Funds 9,600 22,905 14,010 24,915 221720 131575 107,725 Projects Requested Stormwater Management 1 Green River Levee Repairs 31200 91000 11100 15,300 10,000 381600 2 Creek & River Tributaries * 3,200 81900 81500 31700 71200 91500 41,000 3 NPDES 200 205 210 215 220 225 11275 4 Green River Habitat 700 300 300 11300 5 Soos Creek & Tributaries 400 800 21600 21100 5,900 6 Storm Maintenance & Replacement 21100 21100 21100 21100 21100 21100 12,600 7 West Hill Drainage 100 750 850 Drainage 8 Drainage Portion of Street Improvements 200 2 000 1 000 1 000 1 000 1 000 6F200 Total Projects Requested 91600 22,905 14,010 24,915 22,720 13,575 107,725 WASHINGTON ,• - - . •WI r I•, t Ben Wolters, Director ���r��a�vG seRvac�s Fred N. Satterstrom, AICP, Planning Director Charlene Anderson, AICP, Manager Phone:253-856-5454 Fax: 253-856-6454 Address: 220 Fourth Avenue S Kent, WA 98032-5895 Responsible Official: Charlene Anderson SCOPE ., The City of Kent has completed environmental analysis, pursuant to the State Environmental Policy Act (SEPA), 'for an amendment of the Capital Facilities Element of the Comprehensive Plan to iriciude the City's 2015-2020 Capital Improvement Plan (CIP). This amendment to the Capital Facilities Element is occurring concurrently with the adoption of the City's 2015-16 operating budget as provided by RCW 36.70A.130. The GMA requires cities and counties to approve and maintain a six (6) year capital facilities plan which Includes requirements for specific types of capital facilities, measurable levels -of -service (LOS) standards, financial feasibility, and assurance that adequate facilities are provided as population and employment growth occurs. Kent's biennial budget document and six-year CIP fulfill the GMA requirement for facilities planning. In addition, these documents serve as a foundation for the city's fiscal management and eligibility for grants and loans: The CIP and biennial budget, along with the Capital Facilities Element of the Comprehensive Plan provide coordination among the city's many plans for capital improvements. The biennial budget and six-year CIP contain broad goals and specific financial policies that guide and implement the provisions for adequate public services and facilities. The six-year CIP Is a funding mechanism to, implement projects and programs identified in the City's Comprehensive . Plan. Specifically, the Capital Facilities Element of the Comprehensive Plan contains goals and policies related to the provision and maintenance . of public services and capital facilities which are necessary;to support the projected growth over the next twenty, (20) years. The goals and policies of the Capital Facilities Element are consistent with the Land Use, Transportation and Parks and Open Space Elements. 1 , The City of Kent Comprehensive Plan Review and Midway Subarea Planned Action Environmental Impact Statement EIS, draft and final, as well as the Downtown Subarea Action Plan Planned Action Supplemental EIS, draft and Comprehensive Pian EIS - Addendum Capital Improvement Program 201511112020 final, evaluated the growth potential, Identified in the City's Comprehensive Plan. The adoption of the six-year. GIP concurrently with the city's biennial budget is consistent with the Comprehensive Plan EIS and Downtown Subarea Action Plan Supplemental EIS analyses as the types of projects and programs identified in the CIP are specifically related to the growth projections in the Comprehensive Plan., EIS and SEIS. SEPA COMPLIANCE On February 13, 2010, the City, of Kent issued a Determination of Significance (DS) and Notice of Scoping for the Midway Subarea Plan and Planned Action Ordinance as well-,,%ps different concepts for growth elsewhere in the Kent Planning Area (ENV -2010-3). The City solicited public comment on the scope of the DEIS during the comment period as well as through a February 22, 2010 open house meeting. A Draft Environmental Impact Statement (DEIS) was issued on October 22, 2010 for the Draft Midway Subarea Plan and Draft Planned Action Ordinance, as well as a Proposal for alternative growth strategies at a programmatic level for the Kent Planning Area, The DEIS was distributed to City Council and Land Use & Planning Board members, adjacent jurisdictions, affected agencies and other parties of Interest, After comments.61n the DEIS were solicited and reviewed, a Final Environmental Impact Statement ' (FEIS) was issued and distributed on September 1, 2011. .i, On October 9, 2012, the 4. City. of Kent issued a Determination of Significance (DS) and Notice of Scoping for.the. Downtown Subarea Action Plan Update (ENV -2012-30). The- City solicited public comment on the scope of the DEIS during the comment period, as well as through an open house meeting. A Draft Supplemental Environmental Impact Statement (DSEIS) was issued on June 21, 2013 for the Draft. Downtown Subarea Action Plan, amendments of Comprehensive Plan Land Use and.. Zoning Districts maps, development regulations, Planned Action and;. nfill Exemption Ordinances, as well as alternative growth strategies at a .:programmatic level for the Kent Planning Area and Midway Subarea, The DSEIS was distributed to City Council and Land Use & Planning Board members, adjacent jurisdictions, affected agencies and other parties of .interest. After comments on the DSEIS were solicited and reviewed, a Final Supplemental Environmental Impact Statement (FSEIS) was issued and distributed on October 4, 2013. This Addendum to the City• of Kent Comprehensive Plan Review and Midway Subarea Planned Action EIS and Downtown Subarea Action Plan Planned Action Supplemental EIS evaluates the<'adoption of the six-year CIP. No additional impacts are identified since the CIP implements projects and programs identified and evaluated in the EIS and SEIS. STATEMENT OF CONSISTENCY Future projects associated with. they CIP will be subject to and shall. be consistent with the following: City of Kent Comprehensive Plan, the Kent City Code, International Fire Code, International Building Code, Public Works Page 2 of 5 . Comprehensive Plan EIS - Addendum Capltai Improvement Program 2015-2020 Standards and all other applicable .laws and ordinances in effect at the time a complete project permit application is filed. ENVIRONMENTAL REVIEW —BACKGROUND The City of Kent has followed the process of phased environmental review as it undertakes actions to jrnplement the Comprehensive Plan. The State Environmental Policy Act (SEPA) and riles established for the act, WAC 197- 11, outline procedures for the use of existing environmental documents and preparing addenda to environmental decisions. Nonproject Documents - An EIS, prepared for a comprehensive plan, development regulation, or other broad based policy documents are considered "non -project," or programmatic in nature (see WAC 197-11-704). These are distinguished from EISs.or environmental documents prepared for specific project actions, such as a building permit or a road construction project. The purpose of a non -project EIS is to analyze proposed alternatives and to provide environmental consideration and mitigation prior to adoption of an alternative. It is also a document that discloses the process used in evaluating alternatives to decision -makers and citizens. Phased Review -SEPA rules:allow environmental review to be phased so that review coincides with, meaningful, points in the planning and decision making process, (WAC 197-11-060.(5)). Broader environmental documents may be followed by narrower documents that incorporate general discussion by reference and concentrate. ;solely on Issues specific to that proposal. SEPA rules also clearly state that agencies shall use a variety of mechanisms, including addenda, adoption, and incorporation by reference, to avoid duplication and excess paperwork. .Future projects identified and associated with the implementation of the Capital Japmprovement Program may require individual and separate environmental review, pursuant to SEPA. Such review will occur when a specific project is identified. Prior Environmental .Documents The City of Kent issued a Draft Environmental Impact Statement (DEIS) for the City of Kent Comprehensive Plan Review and Midway . Subarea Planned Action on October 22, 2010 (#ENV -2010-3). The DEIS analyzed alternative growth strategies at a programmatic level for the KentqiPlanning Area, as well as adoption of the Midway Subarea Pian and a planned action ordinance to cover a portion of the Midway Subarea, . and recommended mitigation measures, which were used in preparing subarea plan policies. A Final Environmental Impact Statement (FEIS) was issued on September 1, 2011, and the Midway Subarea Plan, Land Use Plan and Zoning Districts Map amendments, and development regulations were adopted by the City Council on December 13, 2011. The City of Kent issued.;. a Draft Supplemental Environmental Impact Statement (DSEIS) for ,tha Gity of :Kent Downtown Subarea Action Plan Planned Action on June :21, 2013 (##ENV -2012-30). • The DSEIS analyzed alternative growth strategies for the. Downtown Subarea, adoption of the Page 3 of 5 Comprehensive Pian EIS - Addendum Capital Improvement Program 2015-2020 Downtown Subarea Action Plan, amendments of Comprehensive Plan Land Use and Zoning Districts maps, development regulations, Planned Action and Infill Exemption Ordinances, as. wle)I as alternative growth strategies at a programmatic level for the Kent41Planning Area and Midway Subarea, The )SEIS also recommended mitigation measures, which were used in preparing subarea plan policies. A Final Supplemental Environmental Impact Statement (FSEIS) was issued on October 4, 2013, and the Downtown Subarea Action Plan, amendments to the Comprehensive Plan Land Use and Zoning Districts maps, and amendments to development regulations within the General Commercial -Mixed Use zoning district were adopted by the City Council on November 19, 2013. The City Council adopted the Downtown Subarea Planned Action and Infill Exemption Ordinances on December 10, 2013. r_ Scope of Addendum - As outlined i,n`'the SEPA rules, the purpose of an addendum is to provide environmental analysis with respect to the described actions. This analysis builds upon the"City of Kent Comprehensive Plan Review and Midway Subarea' Planned Action EIS and the City of Kent Downtown Subarea Action Plan Planned Action SEIS but does not substantially change the identified impacts and analyses, therefore it is prudent to utilize 4 the addendum process as outlined in WAC -197-11- 600(4)(c). ENVIRONMENTAL ELEMENTS ...,,.;. ; All environmental elements were' adequately addressed within the parameters of the City of Kent Comprehensive Plan Review and Midway Subarea Planned Action EIS, draft and final, and the Downtown Subarea Action Pian Planned Action SEIS, draft and final. Further, subsequent "project" actions would . require. the .submittal of separate environmental checklists, pursuant to SEPA, which will be analyzed for consistency with the original mitigating conditions and may require new mitigation based upon site-specific conditions. The adoption of the six -t'e'ar CIP implements goals and policies identified in the City's Capital Facilities. Element of tli�e. Comprehensive Plan. Specifically, the CIP implements the following. Goa/ CF -x - As the City of Kent continues to grow and develop, ensure that an adequate supply and' range of public services and capital facilities are available to provide satisfactory standards of public health, safety, and quality of life. Po/Icy CFZ.Z -Ensure that public services and capital facilities needs are addressed .in updates to the,• Capital Facilities Plans and Capital Improvement Programs, and development regulations as appropriate. Goal CF4 -Ensure that appropriate funding sources are available to acquire or bond for the provision of needed public services and facilities. SUMMARY AND RECOMMENDATION F•: Page 4 of 5 Comprehensive Plan EIS - Addendum Capital Improvement Program 2015-2020.: SUMMARY Kent City Code section 11.03.510 identifies plans and policies from which the City may draw substantive mitigation. under the State Environmental Policy Act. This nonproject action. has been ,evaluated in light of those substantive plans and policies as well as within the overall analysis completed for the City's Comprehensive Plan Review and Midway Subarea Planned Action EIS and Downtown Subarea Action Plan Planned Action SEIS. DECISION The City of Kent Comprehensive Plan Review and Midway Subarea Planned Action EIS, draft and finals and the City of Kent Downtown Subarea Action Plan Planned Action SETS, draft and final, provided analyses with regard to the implementation of the Comprehensive Plan elements, goals and policies. This includes the implementation of the Capital Facilities Element and Capital Improvement Programs, The City has reviewed the 2015-2020 CIP and has found it to be consistent with the range, types and magnitude of impacts and corresponding mitigation putlined. in the City of Kent Comprehensive Plan Review and Midway Subarea Planned Action EIS and the City of Kent Downtown Subarea Action Plan Planned Action SETS. The adoption of the six-year CIP does not substantially change any identified related impacts in the EIS or SEIS. This analysis and subsequent addendum did not identify any new significant impacts associated with the adoption of the 2015-2020 CIP. Therefore, this addendum, combined with the City of Kent Comprehensive Plan Review and Midway Subarea Planned Action EIS sand the City .of Kent Downtown Subarea Action Plan Planned Action SEIS adequately evaluate potential adverse environmental impacts and provide ,ar.ppropriate mitigation for this nonproject action. Based upon this analysis,a separate threshold determination is not required. This document and corresponding environmental record may be utilized in the future in conjunction with environmental review for future projects identified in the CIP in accordance with the guidelines provided by WAC 197-11, Dated: October 6, 2014 Signature; CA/pm: 5: \Permit\Plan\Env\2014\CIPaddendum2015-2020.doc Charlene Anderson, AICP, Responsible Official Page 5 of 5 •toi Page 5 of 5