HomeMy WebLinkAboutPW18-469 - Original - Puget Sound Energy - Upper Mill Creek Lift Station Electrical Service - 12/18/2018 ls� KENT Records Management Document
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to the City Clerk's Office. All portions are to be completed.
If you have questions, please contact the City Clerk's Office at 253-856-5725.
Vendor Name: Puget Sound Energy
37086
Vendor Number (]DE):
Contract Number (City Clerk):
Category: _Contract Agreement
Sub-Category (if applicable): None
Project Name: Upper Mill Creek Lift Station Electrical Service
Date Mayor sign. 12/31/19
Contract Execution Date: Termination Date:
Contract Manager:
Stephen Lincoln Department: PW: Engineering
Contract Amount: 20,964.64
Budgeted: ❑✓ Grant?
Part of NEW Budget: Local: ❑ State: ❑ Federal: ❑
Related to a New Position:
Basis for Selection of Contractor? Other
Approval Authority: ❑ Director ❑✓ Mayor ❑ City Council
Other Details: This is a Commercial Electric Facilities Contract to revise the location
of the electrical service for the Upper Mill Creek Sewer Lift Station to accomodate
construction of the Upper Mill Creek Dam Improvements.
PUGET Date
' SOUND COMMERCIAL ELECTRIC FACILITIES CONTRACT 12/12/2018
Contract is subject to
ENERGY revision after 90 days
CUSTOMER(OWNER)NAME CO-OWNER NAME(IF APPLICABLE)
City of Kent
SERVICEADDRESS CITY STATE ZIP
26835 104th Ave SE Kent WA 98030
BILLINGADDRESS CITY STATE ZIP
220 4th Ave S Kent WA 98032
PHONE EMAIL PSE WORKORDER NO.
253-856-5552 Mayor@KentWA.gov 101115456
Summary of Charges: Brief Description of Work:
-Install new conduit and underground wire from a
different pole to feed existing transformer. Remove
existing underground that is currently feeding
Construction Costs: $ transformer.
Transformation Charges: $
Less Applicable Margin Allowance: $
Sub-Total(Potential Refundable Costs) $.
Permitting Fees*: $$ 1,297.89
Relocation/Removal of Existing Facilities: $$ 19,666.75 Brief Description of Other Costs:
Other Non-Refundable Construction Charges: $ Non-refundable charges due to reroute underground
Sub-Total (Non-Refundable Costs): $$ 20,964.64 primary/service prior to construction.
$1,297.89-Permitting
Total Amount to be Billed Under This Contract: $$20,964.64 $1,251.50-Removal
$18,415.25-Relocation/Installation
Customer Initials $20,964.64-TOTAL NON-REFUNDABLE COST
*If the above Permitting Fees are associated with service work only,those costs will be billed with the applicable service
charges below after the service is energized.
SECONDARY SERVICE CHARGES(PERMANENT AND TEMPORARY)ARE NOT INCLUDED IN THE SUMMARY OF CHARGES ABOVE
Any applicable Secondary Service Type charges listed below will be billed after your service line installation,based on the actual work
performed.Base Costs,in the table below, include Schedule 87 tax and are current costs effective 11/l/2018. These charges also do not
include permitting fees,trenching and other excavation related work that is your responsibility.The Secondary Service Type charges from the
list below that apply to your project will be invoiced on a second bill.
Secondary Service Type 480 Voltacie or Below Base Cost
Single wire run to handhole or transformer $552.00
Each additional run of wire(per circuits $127.00 Customer Initials:
Each additional trip beyond 15 trip due to customer requirements $378.00 per trip
Hourly rate for additional engineering $165.00
Underground Temporary Service Charge
Overhead Temporary Service Charge 260.00
Overhead Permanent Service Charge $1,03957
By signing this contract you are authorizing PSE to continue with all the needed elements to complete your project. Upon
receipt of a signed contract, PSE will bill you for the amount indicated on the"Total Amount to Be Billed Under This
Contract'line.The bill will sent to the billing address listed on this contract. PSE requires payment of these line extension
charges prior to scheduling construction. Payments can be made via pse.com (fees may apply), by mail, or at a PSE Pay
Station. Delaying payment may result in a construction delay for your project. Customer requested changes in the scope
of the project may result in additional charges, and/or delays to your project.
Signature, NameDanQTitle: Date:
TERMS AND CONDITIONS
PROJECT INFORMATION
1. The PSE drawing shows the proposed scope of your project including the location of permanent, above ground
electrical facilities required to provide electrical service to your project. Fault current information for transformers
associated with your project is noted on the work sketch drawing. Please review this drawing as soon as possible
to ensure there are no unforeseen conflicts between PSE's design and your project. If you determine there are
conflicts or if you identify a discrepancy while reviewing the drawing for your project, please contact me at the
number below. This is attached as Exhibit A.
2. Additional construction-related information and information on metering and service entrance requirements
areprovided in PSE's Electric Service handbook for commercial projects. If you would like a copy of the
handbook please contact me at the number below. It is your responsibility to provide your project manager, site
superintendent, and/or subcontractors with any relevant information from this correspondence that apply to their
work in support of your project.
3. The Excavation Requirements&Final Grade Certification must be signed by the project owner or designee and
returned to me along with a signed copy of this contract.This is attached as Exhibit B.
4.Transformers have been sized for diversified commercial loads only, and shall not be used for high load factor
(continuous)temporary power uses, such as electric heaters for dry-out. Fault currents for non-residential
transformers in your project are noted on the attached PSE design drawing. Please notify the PSE representative
listed on this contract immediately if you believe there are conflicts between this design and your project. It is
your responsibility to provide your project manager, site superintendent, and subcontractors with any information
from this correspondence and it's attachments that apply to their work.
5.The requirements for trenching by customers on public right-of-ways and/or on Puget Sound Energy easements
must be signed by the project owner or designee and returned along with a signed copy of this contract. This is
attached as Exhibit C.
POTENTIAL REFUNDS
Margin Allowance:
If PSE has not provided a Margin Allowance or if your Margin Allowance exceeds$75,000, PSE agrees to calculate
and refund the Margin Allowance, subject to Schedule 85, up to two(2)years after the line extension is energized.
Customers are responsible for making the refund request.
DIM Refund:
Other refunds associated with the line extension charge may be available if additional permanent service hook-ups
are made to your line extension.These service hook-ups must be made within five(5)years of the date on which
your project is initially energized Customers are responsible for making all refund requests.A refund may be
requested one(1)time within six(6)years of the date on which your line extension is initially energized. It is the
customer's responsibility to make the refund request.Your refund request should be directed to PSE's Customer
Accounting Coordinators at Schedule85refundrequests@pse.com.
RATE SCHEDULE 85
All terms and conditions, costs, and refunds are in accordance with PSE's Rate Schedule 85, and any
discrepancies between this contract and the Rate Schedule will be resolved in favor of the Rate Schedule. Rate
Schedule 85 contains more detailed information covering costs, refunds, rights, and obligations than is reflected in
this contract.The entirety of Rate Schedule 85 can be viewed at PSE's website www.pse.com.
This cost information is valid for 90 days from the date of this contract. Should we receive your contract after this
period, the costs will be subject to changes.
The amount noted on this contract is an estimated cost; however PSE's Schedule 85 line extension tariff requires
customers to pay the actual cost of construction. PSE will determine the actual cost of the job once construction is
complete. If the actual cost of the job is more than 10% above or below the estimated cost, an additional billing or
refund will result to account for the difference.
GENERAL SPECIFICATIONS
Scope of Work —————— NEW CONDUCTOR AND OR TRENCH LINE
REROUTE UG PRIMARY TO TRANSFORMER EXISTING CONDUCTOR TO BE REMOVED
OR ABANDONED
General • NEW POLE
All work is to be completed per PSE Standards&Practices.Copies of all PSE O EXISTING POLE
Standards are available upon request. OR DISCONNECT-FUSED
Work sites shall be kept clear of debris and all construction materials;equipment OR DISCONNECT-UNFUSED
and packing shall be removed daily. /\ OVERHEAD JUMPER CONNECTION
Return all unused and removed poles,transformers and hardware to PSE, ♦ OVERHEAD TRANSFORMER
storeroom. All copper shall be coiled and returned the day it is removed from the D OR D CONDUIT RISER
poles.Remove all unused pins and insulators. 7*-- STREET LIGHT
a - Return all streetlights,area lights and floodlights to Sumner yard. F DOWN Guy
0 8 ENERGY CUSTOMER DEMAND POINT
U
I Preconstruction ❑ PULL VAULT OR SPLICE VAULT
oNotify appropriate city,County or DOT authorities 48 to 72 hours,or as required by ❑J JUNCTION VAULT/JUNCTION BOX
permitting agency,in advance of starting work in Right-of-way involving a Permit. W PADMOUNT TRANSFORMER
v All system switching shall be approved by System Operations(425-882-852)a TOTAL UNDERGROUND TRANSFORMER
minimum of 48 hours in advance. p SECONDARY HANDHOLE
Notify customers of all outages 48 hours in advance.
Y LEGEND
Work Drawings&Documents
Field design changes shall be approved by PSE Project Manager or Engineer.
Mark all field changes,equipment ID numbers and Underground cable information in
o red on Foreman's copy of worksketch.
Return one Foreman's copy of worksketch to Project Manager at completion of job.
When permits are required,a copy shall be available on work site at all times.
0
Safety
E Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
a
Refer to PSE standards 6275.9050 for personal protective grounding requirements. Vicinity Map
Refer to PSE standards 6275,9150 for vehicle grounding and barricading
requirements. FOREMAN(CHECK BOX WHEN COMPLETED) e N
Proper line clearances shall be taken at the beginning,and released at the end,of PSE EWps—LocKEorsEcuREoaw, ArsaaII,n NISAFEcanwo,n
Grk L4da.eM Sr4ldi mmOar51NSTAL ' VERIFIED. �"
each work day,or as otherwise instructed by the System Operator. IHacN.�asSRED-uNEDo,As.eu;a I f
Q i—sa VERIFIED ere CHANCES noNe on Pspawork.
Provide signs,barricades,and traffic control in conformance with permit regulations. -FIRINARY Dada i.Aral W
cmw.ay IpfS RecoRceo�,mrmo Ham,�,As-0uilt. e
o Utilize flagging and other vehicle traffic control as necessary and in conformance with i t USE WE m�&�I^Y F w PHASE I y I JOB SITE O_
r focal traffic regulations. I %
yiNt+M AOrk pdNlmtl e1eaN PSE'S alaMartls and po[eaura5
' Maintain traffic flow as required by permitting agency. Usa 0Vu4Hr r.wre acre mn
.- +wr5341naaAe
II
Y Erosion&Sediment Control Ne,e Data
-Refer to PSE standards 0150.3200 for minimum requirements. Ll I
ECT PHASE MNIA583-
InstalledRM J
Comply with all requirements of permitting agency. s Permr "Installed erosion&sediment devices shall be maintained until vegetation has been UG Espenaa .��re-established or disturbed soil has been otherwise permanently stabilized. OH�^sa ....UG Expanse41Removal4aJoint Facilities Owner/Developer Contact Info
Coordinate with Communication Companies for transfers. CI of KEN
2204TH AVE 8
EKENT.WA 98032
OVERHEAD CONSTRUCTION M.nao.came mreHewem
ATTN STEVE LINCOLN 253-858-5552 d
Zr HONG NGUYEN For conlads below Fill 1b88-CALL PSE(225-5773)
NI m: 4264494W9
o HONG.NGUYEN@PBE.COM CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
Poles&Structures .v Heg— Yes No r„IS SNE111 N-0MW— �oc.noN OF ENIsImc rAci�mEs
Poles are to be installed or relocated as staked. Unless otherwise noted,all pole a R ,Y�m] REAL ESTATE/EASEMENT�N PERMIT
location measurements are from the center of the pole. NIA CITY OF KENT
3 FUNCTION I CONTACT PHONENO DATE
x -All new poles set shall be the class indicated on the sketch,or better. Do not set a 2 PROJECT MGR HONG NGUYEN 425J494609 6/iq/18
lower class pole than specified. I ENCR-POWER ALEX KARPTSOV 21 8 3454,589 611408
a Install ground plate assembly on all new poles. Install Switch Ground Assembly per Va I DATE I By IDIESCRIPMON ENCR.GAS WA ILA wA
TY Emer Bad Gas Wk Clr POWER WK:- DRAWN BY MOLLY SOREM 253-208A843 6r14I18
- standard specification 6014.1000 at new gang operated switch locations. KING WA WA CSPSKEPM CHECKED BY
-Install grid numbers on all new and existing poles as shown on sketch. O oP MAP PLAT MAP APPROVED BY T
j 29 TnN ROSE WA WA FOREMAN et
Straighten existing poles as indicated or as necessary. NO(POWER) OH CKT MAP UG CKT MAP CIRCUIT NO FOREMAN e2
E -Treat all field-drilled poles with copper napthenate wood preservative. 2zos6n5 22o5EIn 2205E115 KNT-31 SEO-13 MAPPING
n -Remove old poles after communication companies have transferred off and return to JOINT FACILITIES ARRANGEMENTS
PSE storeroom. Fill and crown pole holes and restore area similar to adjacent unLmes wA TA NIA NIA
I landscaping. CONTACT WA WA WA WA
p g PHONEP WA N/A WA WA
PUGET KENT 104TH AVE CULVERT ffA112
P
SOUND REROUTE UG PRIMARY der
ENERGY 56
.. 26835104TH AVE SE,KENT,WA 98030 E
O
/2
I I
I
N XM21615T } _ 3
313538
25kVA 166085 P01 -!-'-unary Bushings
120/240v _j Trawl
( ID No
ASBUILT INFORMATION
MID (�wmmWR ro) Foreman-Complete
J
7830600
Is
I I IIj ! e
POt
li
-37 I�n I ':. I 14" 1 NEW
SE 267TH ST l m I I 1 8 Ir✓/ 80EI8035
I I I I I I C0EI8036
II I
o � TRANSMISSI 527 I 13 - 90°
a \ 1$6Q84 ` - CABLEICONDUIT DIAGRAM
\_-�`___ \. NOT TO SCALE
'
Y I ABANDON
10305 \
—
� � iI
c
o
tt j
N
a - I
o I I j
i
Record ASBUT INFORMATION
.Ctu
Foreman-CompleteMnu p
Actual Amount Installed(Conduit&Cable)
MY13' I I -
1
�rOTAL UNITS:
a
_ 3
a 415'SEAST 313510 P03 I ''-24%1
--- X10068 166084 O I I I�,.I A5 X 1
X1
-5757X6
-55 X 490
Y I 3 -36 X 270
- REAL ESTATE/EASEMENT PERMIT
0
WA CITY OF KENT
FUNCTION CONTACT PHONE NO DATE
x SITE PLAN PROJECT MGR HONG NGUYEN 425�9.6309 6/14/18
ENGR-POWER ALEX KARPTSOV 206.3466585 W14/18
SCALE'1"=20' DATE BY IDESCRIPTION ENGR-GAS WA WA WA
a
E—Seq Gn Vrk Ctr POWER WK CT R DRAWN BY HOLLY SOREM 253-208-OM 6/1-8
UNG WA WA CSPSKEPM CHECKED BY
OP MAP PLAT MAP APPROVED BY
% T22N ROSE WA WA FOREMAN t1
7(POWER) ON
CKT MAP 11G CXTMAP CIRCUITNO ORFJ.NN e2
a SE115 220SE132 22DSE115 KNT-32.SE0.13 APPING
rMj JOM FACILRIE3 ARRANGIAIENTa
UTILRIES ��A WA WA WA
CONTAC WAPHONE. WA WA WA
N PUGET KENT 104TH AVE CULVERT Nc"ANT NAP
o ENERGY SOUND REROUTE UG PRIMARY WA r 1E01115456
-, 26835104TH AVE SE.KENT.WA 98090
SCALE PAGE
0 AS NOTED 2/2
PUGET
10 SOUND
ENERGY
PSE ELECTRICAL FACILITIES
EXCAVATION REQUIREMENTS AND FINAL GRADE CERTIFICATION
PURPOSE
This document is an agreement between Puget Sound Energy (PSE) and the Owner/Developer (Developer) who is
providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating
rights. If PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be
the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction.
EXCAVATION REQUIREMENTS
The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a
condition of receiving electrical service for your project. If you need additional information, please call the PSE contact
person listed below.
1. Developer is responsible for acquiring utility locates by calling One-Call, 1-800-424-5555 at least 48 hours (two full
working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative
Code and Safety Standards.
2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation.
3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum
trench depth of 48 inches. The electric service trench shall be excavated to provide a minimum of 24 inches of facility
coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical
facilities and other utilities within a joint trench.
4. All back fill must be free of sharp objects and construction debris. Developer shall provide and install sand bedding and
shading for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages
caused by improper backfill or compaction.
5. Developer agrees to maintain a minimum of 2 feet of horizontal clearance between PSE conduit, pipe or conductors and
any foundation on Developer's property.
6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid
level bottom with a 6 inch deep layer of crushed rock bedding.
7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall identify
and provide final grade, property lines, and utility easements prior to installation of PSE's electrical facilities.
8. Developer will be financially liable for the relocation of PSE's facilities which are inadequately covered, located outside
the area where PSE has adequate operating rights, improperly graded inhibiting standard access and/or any damages
resulting from dig-ins due to changes or variations in grade that are made after the installation of PSE's facilities.
FINAL GRADE CERTIFICATION
By my signing below, 1 certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full
responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold
harmless Puget Sound Energy from all liability arising out of, or in connection with my work, including but not limited to all
claims, losses, damages, and expenses, including reasonable attorney's fees, which result from my failure to excavate
within easement areas or rights-of-way, or from digging without adequate rights on adjoining properties.
Service Address: ;2�j1jj /� ,
�%�-� ��� ��J��—_l f�C�3V Work Order Number:_
Signature: Name: Title: m Dater
2806 08/15
PUGET
' SOUND
ENERGY
REQUIREMENTS FOR TRENCHING BY CUSTOMERS ON PUBLIC RIGHT-OF-WAYS AND/OR ON PUGET
SOUND ENERGY, INC. EASEMENTS
The following outlines most local governmental guidelines and company standards for trenching on a public right-of-way
or Puget Sound Energy, Inc. (PSE)easement.Any trenching performed by the customer, or their contractor, under a PSE
permit or easement must comply with these requirements,
1. All trench construction must be performed by a Washington State licensed and bonded contractor.
2. Trench excavation, backfill, restoration, and facility placement must be coordinated with a PSE designated
representative, and receive on-site approval by that representative, and local jurisdiction.
3. Right-of-way easement trenching and backfill must be performed during normal business hours, Monday through
Friday. Same day excavation and backfill is required for all trenching. Job start notification to the local jurisdiction
is the responsibility of Potelco, Inc. Customer shall notify Potelco Project Manager three working days prior to
trenching. Penalties for failure to comply with this requirement will be borne by the customer.
4. If the job scope requires excavation beyond a single day, fencing and barricading must be installed around utility
facilities exposed above the trench, if allowed, must be in accordance with local regulatory requirements.
5. PSE, all participating utilities, and One-Call Locate, must be notified a minimum of 72 hours in advance of the
date and time for right-of-way trenching and facility placement.The One-Call Locate number is 1-800-424-5555.
State law requires locating service notification.
6. Excavated material must remain clear of the roadway whenever possible. Excavation material, spoils, and debris
shall be removed off-site each day, in accordance with local regulatory requirements.All erosion control
requirements in accordance with local regulatory requirements are the responsibility of the customer.
7. Material excavated from the shoulder of the right-of-way shall be properly disposed, and replaced with select
backfill material in accordance with local regulatory requirements.
8. Proper compaction is required to comply with local regulatory specifications. If the permit requires compaction
testing,the cost of said testing is the responsibility of the customer.
9. All permit requirements, traffic control plans,traffic control and flagging shall meet local regulatory specifications
and satisfaction.
10. In the event of failure to abide by the above requirements, PSE reserves the right, at its sole discretion, to assume
trenching. In the event of delays due to equipment failure, PSE may assume trenching to meet regulatory and
joint construction requirements. The customer is responsible for all trenching costs, and will reimburse the
company for costs should PSE perform the trenching.
Customer Initials:
11. The customer agrees to indemnify, defend and hold harmless PSE from all liability(including reasonable
attorneys' fees) arising out of, or in connection with, the above mentioned trenching activities.
Customer Initials:
1 AGREE TO ADHERE TO THE ABOVE CONDITIONS
Service Address:26835 104th Ave SE Kent 98030 Work Order Number:101115456
Signature: Name:DaO C_ Title: Date: ,�
Is Request for Mayor's Signature
KENT Complete this form and route to the Office of the City Attorney
WASHINGTON
(Print on cherry-colored paper) 17
��-
Approved by Dire r
Originator:Stephen Lincoln Phone (Originator):253-856-5552
Date Sent: 12/12/2018 Date Required: 12/17/18
Returned Signed Document to:Stephen Lincoln M Contract Coversheet Attached
Has this Document been Specifically Authorized
Vendor Name: Puget Sound Energy in the Budget? Yes @No
Date of Council Approval: Account Number:09-3030
Brief Explanation of Document:
This is a commercial Electric Facilities Contract to revise the location of the electrical service for the
Upper Mill Creek Sewer Lift Station to accommodate construction of the Upper Mill Creek Dam
Improvements.
r ho"
%ft*o D E I E`
E
KENT LAW EPT.
Date Received by City Attorney:
Comments:
Date Routed to the Mayor's Office:
Date Routed to the City Clerk: I f
Date Returned to Originator:
adc(W19756_4_18