HomeMy WebLinkAbout1288-... . -~ ~ f RESOLUTION NO. I~ ! 0 A RESOLUTION of the City of Kent, Washington, adopting the 1992 through 1997 Six Year Transportation Improvement Plan. WHEREAS, pursuant to RCW 35.77.010, the legislative body of a city shall prepare and adopt a comprehensive street program for the ensuing six calendar years after public hearing; and WHEREAS, after proper notice, the City council of the city of Kent held a public hearing at the regular meeting of the city Council to consider public testimony on the proposed Transportation Improvement Plan for the City and having considered public testimony to the Plan; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES HEREBY RESOLVE AS FOLLOWS: Section 1. The 1992 through 1997 Six Year Transportation Improvement Plan, as set forth in the attachments hereto and herewith filed with the City Clerk, is hereby adopted. Passed at a regular meeting of the Citp;ouncil of the City of Kent, Washington this /h day of _ ___,,.._,......,"""'!i'!.___, 1991. 0 . ,. 17 Concurred in of <J.u ~ u day ATTEST: APPROVED AS TO FORM: by the Mayo ' 1991. City of Kent, Washington, the lb --_.._ -~ 2 of the City of Kent, this KELLEHER, MAYOR ..,., ....... -.... - ' - ~ --..: . ---.. ·:--.. -_ _ ... -. ..-: ............ -.. .. . -~ -..... _------// ~-___ ........... /' ... __ ..... ~ "'-."' ~/ ---------~-~./ day of copy the 1991. CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 -1997 I . I · Don E. Wickstrom, PoE. Director of Public Works I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 TO 1997 PROJECT LISTING ANNUAL ELEMENT 1992 (First Year) ANNUAL ELEMENT 1991 1. 272nd/277th St. -Auburn Way to Kent-Kangley 2. 196th/200th St. Corr. Project (West Leg) 3. 192nd/196th St. Corr. Project (Middle Leg) 4. Metro Park & Ride Lot 5. S.E. 260th St. & 104th Ave. S.E. 6. 76th Ave. s. & s. 212th st. 7. Reith Road & Kent-Des Moines Road {SR 516) 8. 72nd Ave. S. & S. 212th St. 9. Central Ave. & S. 259th St. 10. 101st Ave. S.E. & S.E. 256th St. 11. Central Ave. & SR 167 Traffic Signal Impvmt. 12. Central Ave. (SR 516) -Willis St. to Smith St. 13. 72nd Ave. S. -S. 194th St. to S. 196th St. 14. Crow Road By-Pass (SR 516) 15. East Valley Hwy.-S. 180th St. to S. 192nd St. 16. 64th Ave. S. -S. 216th St. to S. 226th St. 17. James Street Safety Improvements 18. Railroad Grade Crossing Replacement (City-Wide) 19. VMS Upgrade 20. Neighborhood Traffic Control Program 21. Comprehensive Transportation Plan Update 22. Green River Valley Trans. Benefit District SECOND/THIRD YEAR 1993-1994 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. west Valley Hwy. -s. 180th st. to s. 189th st. James St. & Central Ave. Kent-Kangley (SR 516) & 111th Ave. S.E. 100th Ave. S.E. & S.E. 240th St. Lincoln Ave. & James St. Smith St. & 4th Ave. Intersection Improvement 4th Ave. S. & Willis St. James St. -94th Ave. s. to 100th Ave. s. James St. -Jason Ave. to 94th Ave. s. SE 256th St -Kent-Kangley Rd. to 116th Ave SE Lind Ave. -s. 180th St. to East Valley Hwy. 4th, 5th & 6th YEARS 1995-1997 34. S. 224th/S. 228th St. Corr. Project (West Leg) 35. s. 192ndfS. 196th St. Corr. Project (East Leg) 36. N. Central Ave. & Smith St. 37. Kent-Des Moines Rd. & Meeker St. Signal Improvement 38. 94th Ave. S. -Canyon Dr. to James St. 39. 248th St. -94th Ave. S.E. to 116th Ave. S.E. 40. s. 212th St. -West Valley Hwy. to 84th Ave. s. 41. S. 212th St. -East Valley Hwy. to SR 167 42. 84th Ave. -S. 212th St. to SR 167 43. James St. & 104th Acceleration Lane 44. W. Meeker St. -64th Ave. S. to West Valley Highway I I I I I I I I I I I I I I I I I I City/County Kent, Washington City No. 615 County No. 17 1992-1997 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY Hearing Date. _____ _ Adoption Date. _____ _ Resolution No. ____ _ 7·16-91 7·16-91 1288 ============================================================================================================================= p r I 0 ! r I i t y No.! PROJECT IDENTIFICATION DESCRIPTION OF WORK (Street name or number, Co. road name or number, termini beginning & end. Describe work to be done.) PROJECT COSTS IN THOUSANDS OF DOLLARS I OBLIGATION SCHEDULE FUNDING SOURCE 1----------------------------!------------------------------! I Y E A R FEDERAL I STATE LOCAL I ! 92 93 94 95·97 I ! 1st 2nd !Annual !Element 3rd 4th !Amt. 5th ! 6th I Pro-IAmt. gram! ! TIB! Amt. I TOTAL FUNDS ============================================================================================================================= CITY COUNCIL TARGET ISSUES • 1ST YEAR !--------------------------------------------------!---------------------------------------------------------------------! I l l l !S. 272nd/S. 277th St. -Auburn Way to Kent·Kangleyl 4161 !Construct new four/five lane roadway including 4288 5526 2305 l 8140 TIB! 8140 16280 !curb & gutter, sidewalk, street lighting, land· lscaping, channelization, new bridge construction !and signalization at Kent·Kangley Road CSR 516). 2 !S. 196th/S. 200th St. Corridor Project (West Leg) !Orillia Rd. to West Valley Highway (SR 181) !Major widening of s. 200th St. from Orillia Rd. !to Russell Rd., curb & gutter, sidewalk, lighting, !landscaping, grading, paving, bridge construction lover Green River, signalization at Orillia Rd., !minor realignment of Russell Rd. at Green River, lrechannelization of Russell Rd./S. 196th St. !from Green River to West Valley Highway. This is !a joint project with King County and Tukwila. 3 !S. 192nd/S. 196th St. Corridor Proj. (Middle Leg) !West Valley Hwy CSR 181) to East Valley Hwy !Construct new four/five lane roadway including !widening improvements to S. 196th St. from West !Valley Hwy to 72nd Ave. S., bridge construction !over UP & BN railroad tracks, major widening of IS. 196th St. from 78th Ave. s. to East Valley !Highway, traffic signalization at East Valley !Highway & S. 196th St., curb and gutter, !sidewalk, landscaping, street lighting and !channelization. I 4 !Metro Park & Ride Lot !Expansion of present Metro facility located at !SR 516 & Military Rd. to accommodate parking from !200 to 300 vehicles. I ---------------------------- ----------------------------------------! 468 2233 2904 942 1706 6032 8820 3205 TIBI 2400 10500 TIB! 7000 ! 5605 17500 !--------------------------------------------------------------------- ! 1116 l 1284 1920 TIB! 480 METRO 2400 !--------------------------------------------------!-------------------------------------------------------------------- I I I I I I I I I I I I I I I I I I I 1992-1997 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY City/County Kent, Yashington City No. 615 County No. 17 Hearing Date _____ _ Adoption Date, _____ _ Resolution No. ____ _ 7-16-91 7-16-91 1288 ===-========================================================================================================================= p r 0 r t y No.I PROJECT IDENTIFICATION DESCRIPTION OF YORK (Street name or number, Co. road name or number, termini beginning & end. Describe work to be done.) PROJECT COSTS IN THOUSANDS OF DOLLARS OBLIGATION SCHEDULE FUNDING SOURCE I TOTAL ----------------------------l------------------------------1 y E A R I FEDERAL STATE LOCAL FUNDS 92 93 94 95-97 I I 1st 2nd 3rd 4th !Amt. Pro-!Amt. TIBI Amt. Annual 5th ! gram! !Element 6th I I ==============================================================================================================:============== INTERSECTIONS -1ST YEAR !-----------------------------------------------------------------------------------------------------------------------1 5 !S.E. 260th St. & 104th Ave. S.E. !Intersection improvements to include minor !widening of 104th Ave. S.E. for northbound left !turn lane. New signal and interconnect, curb, !gutter, and sidewalk. 6 !76th Ave. s. & s. 212th St. !Rebuild the traffic islands in the S.E. and S.Y. !corners of 76th Avenue S. at 212th St. for an !additional northbound left turn lane. 350 I I I I I 175 TIB! 175 I 350 ---------------------------------------------------------------------1 I 50 35 FAUS! 15 so 7 !Reith Road & Kent-Des Moines Road CSR 516) !Rechannelize Reith Road west of Kent-Des Moines !Road to add an eastbound right turn lane. Provide. !left turn protected phasing & channelization for 15 12 FAUSI 3 15 west leg of intersection. 8 72nd Avenue s. & S. 212th Street. Install a westbound right turn Lane at northeast corner of intersection. 9 Central Ave. and s. 259th St. Install two-phase traffic signal, street Lighting & channelization. 10 101st Ave. S.E. & S.E. 256th St. Install pedestrian protection for eastbound and westbound travel, and provide Loop detection. l---------------------------------------------------------------------1 I I I I I 100 83 FAUSI 17 100 1---------------------------------------------------------------------! l l I I I 180 150 FAUS! 30 180 I I 1----------------~---------------------------------------------------- 25 21 FAUSI I 4 25 1--------------------------------------------------------------------- 11 Central Avenue & SR 167 Traffic Signal Improvement! 40 Traffic signal modifications at s. 224th St. & 33 FAUSI I 7 40 !84th Ave. including replacement of YSDOT traffic I I I I I I I I I I I I I I I I I I I City/County Kent, Washington City No. 615 County No. 17 1992-1997 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY Hearing Date. _____ _ Adoption Date. _____ _ Resolution No •. _____ _ 7-16-91 7-16-91 1288 ============================================================================================================================= p r • o I r I t y No.! PROJECT IDENTIFICATION DESCRIPTION OF WORK (Street name or number, Co. road name or number, termini beginning & end. Describe work to be done.) PROJECT COSTS IN THOUSANDS OF DOLLARS I OBLIGATION SCHEDULE FUNDING SOURCE l----------------------------!------------------------------1 Y E A R I FEDERAL I STATE I LOCAL I 92 93 94 95-97 1st 2nd !Annual !Element 3rd 4th !Amt. 5th I 6th I Pro-!Amt. gram! I TIB! Amt. I TOTAL FUNDS ============================================================================================================================= !signals with City of Kent standard equipment and !interconnection to the City of Kent master signal !computer system. I ! ! !--------------------------------------------------!---------------------------------------------------------------------1 STREET SEGMENTS -1ST YEAR . I I I I I 1----------------------------------------------------------·-----------------------------------------------------------1 I I I I 12 !Central Ave. (SR 516)-Willis St. to Smith St. 749 628 TIB! 121 749 I Minor widening to include northbound right turn Lane at Titus St., two-way Left turn Lane from Titus St. to Gowe St., overlay from Willis St. to Smith st., storm drainage and channelization. 13 72nd Ave. s. -S. 194th St. to S.196th St. Construction of a new two Lane roadway with curb & gutter, sidewalk, grading, paving, street lighting, channelization and Landscaping. 14 !Crow Road By-Pass CSR-516 By-Pass) !Minor widening to improve turning radius at !97th Pl. S. & Canyon Dr. and S.E. 260th St & 108th !Ave. S.E., with signalization at Kent-Kangley Rd. I(SR-516) & 108th Ave. S.E. including curb and !gutter, sidewalks, Lighting, grading, paving, !channelization and signing. ---------------------------------------------------------------------1 I I 390 150 540 540 --------------------------------------------------------------1 I 1000 1000 1000 -------------------------------------------------------------------·-! I 15 !East Valley Highway (S. 180th St. to s. 192nd St.) 972 I 2617 !Major widening to five Lanes including drainage, 900 TIBI I 2689 3589 !sidewalks, curb and gutter, Lighting, Landscaping,! !paving, underground utilities, bridge, and signing! I I 1-----------------··------------··········-----------------------··---! 16 !64th Ave. s. -S. 216th St. to S. 226th St. !Construct new four lane roadway including curb and! !gutter, sidewalk, street Lighting, Landscaping, !channelization. I 2200 I I I 2200 2200 I I I I I I I I I I I I I I I I I I I 1992-1997 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY City/County Kent, Washington City No. 615 County No. 17 Hearing Date. _____ _ Adoption Date. _____ _ Resolution No. ____ _ 7-16-91 7-16-91 1288 ===-========================================================================================================================- p r 0 r t y No.I PROJECT IDENTIFICATION DESCRIPTION OF WORK (Street name or number, Co. road name or number, termini beginning & end. Describe work to be done.) PROJECT COSTS IN THOUSANDS OF DOLLARS I OBLIGATION SCHEDULE FUNDING SOURCE I TOTAL l----------------------------l------------------------------1 y E A R I FEDERAL STATE LOCAL FUNDS I 92 93 94 95-97 I I 1st 2nd 3rd 4th !Amt. Pro-!Amt. TIBI Amt. !Annual 5th gram! !Element 6th I ============================================================================================================================= l--------------------------------------------------l---------------------------------------------------------------------1 I MISC. IMPROVEMENT PROJECTS -1ST YEAR I I I !-----------------------------------------------------------------------------------------------------------------------! 17 James Street Safety Improvements Construction of pedestrian safety improvements on James Street (South 240th Street). 300 270 HES 30 300 ---------------------------------------------------------------------! 120 120 120 18 Railroad Grade Crossing Replacement (City-Wide) City wide railroad crossing replacement program. I I I I I 1---------------------------------------------------------------------l 19 !VMS Upgrade !Replace existing Traffic Signal Computer with new !upgraded computer system. 25 140 I 137 FAUS! 28 165 I I I I I ---------------------------------------------------------------------1 20 !Neighborhood Traffic Control Program !Modification of local residential streets to !promote safe and appropriate levels of traffic !flow. 20 21 !Comprehensive Transportation Plan Update 120 !Thorough analysis of the existing transportation !system and development of the City of Kent !Comprehensive Transportation Plan. 20 I ------------- 22 !Green River Valley Transportation Benefit District 225 !Participation in cooperative effort to establish Ia Green River Valley Transportation Benefit !District in conjunction with the cities of Renton, !Tukwila, and Auburn as well as King County, WSDOT, !Metro, VATA and PSCOG. I I 20 60 108 HES I 12 120 100 FAUS! 20 120 --------------------·······---------------------------·1 I I I I I 113 T I B! 112 225 1·--·-··----------------------------------------------------------------------------------------------------------------1 CITY COUNCIL TARGET ISSUES -2ND & 3RD YEARS I I !-----------------------------------------------------------------------------------------------------------------------1 I I I I I I I I I I I I I I I I I I I 1992-1997 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY· City/County Kent, Yashington City No. 615 County No. 17 Hearing Date. _____ _ Adoption Date. _____ _ Resolution No., _____ _ 7-16-91 7-16-91 1288 ============================================================================================================================= p r I o I r I t y No.I PROJECT IDENTIFICATION DESCRIPTION OF YORK (Street name or number, Co. road name or number, termini beginning & end. Describe work to be done.) PROJECT COSTS IN THOUSANDS OF DOLLARS OBLIGATION SCHEDULE FUNDING SOURCE l----------------------------!------------------------------1 Y E A R FEDERAL STATE LOCAL 92 93 94 95-97 I 1st 2nd !Annual !Element 3rd 4th IAmt. Pro-!Amt. TIB! Amt. 5th I gram! 6th TOTAL FUNDS =============================================================-=============================================================== 23 !Yest Valley Highway (S. 180th St. to S. 189th St.)! !Major widening of Yest Valley Highway to I !include curb and gutter, sidewalks, lighting, !grading, paving, channelization, signalization, !signing, and landscaping. I 2700 2160 TIB! 540 I 2700 J--------------------------------------------------!---------------------------------------------------------------------1 I INTERSECTIONS · 2ND & 3RD YEARS I ! I I I I !--------------------------------------------------!---------------------------------------------------------------------1 24 IJames St. & Central Ave. !Minor widening of intersection to accomodate Ia westbound right turn lane at northwest corner. I 25 !Kent-Kangley CSR 516) & 111th Ave. S.E. !Traffic signal interconnect. I ! 250 208 FAUS! I 200 TIB! 42 so 250 I ---------------------------------------------------------------------! 15 I 12 FAUS! 3 ! 15 ! I 1---------------------------------------------------------------------! 26 !100th Ave S.E. & S.E. 240th St. !Install pedestrian protection for eastbound and !westbound travel, and provide loop detection. 27 !Lincoln Ave. & James St. !Install a traffic signal at the intersection of !Lincoln Ave. & James St. with vehicle detection !& opticom. Provide interconnect to existing !pedestrian and railroad signals approximately 1100 feet to the east. Installation requested !by Metro to accommodate transit vehicles. I 28 !Smith Street & 4th Avenue Intersection Improvement !Left turn capacity improvements including street I !widening, channelization for left turn lanes, !radius improvements and signal modifications. I I 30 I 25 FAUS! 5 30 ---------------------------------------------------------------------! 130 130 130 ---------------------------------------------------------------------! 500 416 FAUS! 84 500 I !---------------------------------------------------------------------1 ! I I I I 29 14th Ave. s. & Yillis St. 25 ! 21 FAUS! 4 I 25 I I I I I I I I I I I I I I I I I I I I City/County Kent, Washington City No. 615 County No. 17 1992-1997 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY Hearing Date _____ _ Adoption Date. _____ _ Resolution No. ____ _ 7-16-91 7-16-91 1288 ============================================================================================================================= p r 0 r t y No. PROJECT IDENTIFICATION DESCRIPTION OF WORK (Street name or number, Co. road name or number, termini beginning & end. Describe work to be done.) PROJECT COSTS IN THOUSANDS OF DOLLARS ! OBLIGATION SCHEDULE FUNDING SOURCE !----------------------------!------------------------------1 ! Y E A R ! FEDERAL I STATE LOCAL ! I 92 93 94 95-97 ! I 1st 2nd !Annual !Element 3rd 4th !Amt. 5th I 6th Pro-!Amt. gram! I TIBI Amt. I TOTAL FUNDS ============================================================================================================================= !Improvements include modifying westbound mast !arm, installing protected/permissive phasing and !Loop detection. I !--------------------------------------------------l--------------------------------------------------------------------·1 I STREET SEGMENTS -2ND & 3RO YEARS I I I I I I I 1-----------------------------------------------------------------------------------------------------------------------! 30 IJames St. -94th Ave. s. to 100th Ave. S. !Install traffic signal interconnect between 100th !Ave. s. and 94th Ave. s., new controller and loop !detection at the intersection of 94th Ave. S. & IJames St. I 31 !James Street -Jason Avenue to 94th Avenue South !Provide widening and channelization for Left turn !movements along James Street. 32 !SE 256th St. -Kent-Kangley Rd. to 116th Ave. SE !Improvements include roadway widening, drainage, !curb and gutter, sidewalk, lighting, paving, !channelization, signing & landscaping. 50 42 FAUS! 8 so ---~---------------------------------------------------·----~--------! 1000 900 HES 100 1000 -------------------------------------------------------------------·-! 2900 1450 TIB! 1450 I 2900 1---------------------------------------------------------------------! 33 !Lind Avenue -S. 180th St. to East Valley Highway Construct new five Lane roadway including curb and gutter, sidewalk, street Lighting, Landscaping! and channelization. ! 1500 ! 750 TIB! 750 1500 I I --------------------------------------------------l---------------------------------------------------------------------1 CITY COUNCIL TARGET ISSUES -4TH TO 6TH YEARS I I --------------------------------------------------!------------------------------------------------------------------·- 34 .s. 224th/S. 228th St. Corridor Project (West Leg) !Improvements to Military Road from SR 516 to IS. 228th St. and construction of S. 228th St. to !54th Ave. S. including four/five Lane roadway, !curb and gutter, sidewalk, street Lighting, Land- !scaping and channelization. 9558 7646 TIBI 1912 I 9558 I I I I I I I I I I I I I I I I I I I City/County Kent, Yashington City No. 615 County No. 17 1992-1997 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY Hearing Date _____ _ Adoption Date. _____ _ Resolution No. ____ _ 7-16-91 7-16-91 1288 ============================================================================================================================= p r 0 r i t y PROJECT IDENTIFICATION DESCRIPTION OF YORK (Street name or number, Co. road name or number, termini beginning & end. Describe work to be done.) PROJECT COSTS IN THOUSANDS OF DOllARS I OBLIGATION SCHEDULE FUNDING SOURCE !----------------------------1------------------------------! I Y E A R I FEDERAL STATE I lOCAl I 92 93 94 95-97 I I 1st 2nd 3rd 4th !Amt. Pro-IAmt. JIB! Amt. 5th I gram! TOTAL FUNDS No .. !Annual !Element 6th ===============================================================================================================~============= 1---------------------------------------·-----------------------------! I I I I I 35 !S. 192nd/S. 196th St. Corridor Project (East Leg) I 8749 6999 JIB! 1750 8749 lEast Valley Highway to 92nd Avenue South l !Construct new four/five lane roadway including !curb & gutter, sidewalk, street lighting, land- lscaping and channelization. l !--------------------------------------------------!---------------------------------------------------------------------1 INTERSECTIONS -4TH, 5TH, & 6TH YEARS I I I l I !--------------------------------------------------!---------------------------------------------------------------------! 36 IN. Central Ave. and Smith St. Add a new double left turn lane, channelization, street lighting, signal upgrade & signing. 600 499 FAUSI 101 600 !--------------------------------------------------------------------1 37 Kent DesMoines Road & Meeker Street Traffic Signal! Improvement I Traffic signal modifications at SR 516 and Meeker Street including installation of controller and .detection loops, and interconnection to the City !of Kent master signal computer system. 30 25 FAUS! • 5 30 !--------------------------------------,-----------!---------------------------------------------------------------------! STREET SEGMENTS • 4TH, 5TH, & 6TH YEARS !-----------------------------------------------------------------------------------------------------------------------! 38 !94th Ave. S. -Canyon Dr. to James St. !Yiden to 3 lanes with curb and gutter, sidewalk, !drainage, paving, channelization, signing, street !lighting and landscaping. 39 !S.E. 248th St. -94th Ave. S.E. to 116th Ave. S.E. !Yiden to 3 lanes with curb and gutter, sidewalk, I !drainage, paving, channelization, signing, street !lighting & landscaping. ! [* 94th Ave. S.E. & 248th St. l 800 640 JIB! 160 800 ---------------------------------------------------------------------1 2000 l 1600 JIB! I 400 I 2000 I !--------------------------------------------------------------------1 I I I I I I I I I I I I I I I I I I I City/County Kent, Washington City No. 615 County No. 17 1992-1997 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY Hearing Date _____ _ Adoption Date. _____ _ Resolution No. ____ _ 7-16-91 7-16-91 1288 ============================================================================================================================= p r PROJECT IDENTIFICATION DESCRIPTION OF WORK (Street name or number, Co. road name or number, termini beginning & end. PROJECT COSTS IN THOUSANDS OF DOLLARS OBLIGATION SCHEDULE FUNDING SOURCE TOTAL ----------------------------1------------------------------! Y E A R FEDERAL STATE I LOCAL FUNDS 92 93 94 95-97 I 1st 2nd 3rd Pro-IAmt. TIB! Amt. 0 r i t y No. Describe work to be done.) Amual !Element 4th !Amt. 5th ! 6th ! gram! I ============================================================================================================================= 40 !S. 212th St. -West Valley Hwy. to 84th Ave. s. !Widen to seven lanes with drainage, paving, !sidewalks, curb & gutter, lighting, landscaping, !underground utilities, channelization & signing. I[* 72nd Ave. & S. 212th St. l I 41 !South 212th Street -East Valley Hwy to SR 167 !Widening of existing roadway to seven lanes to !include curb and gutter, sidewalk, street lighting !drainage, landscaping, channelization and signing.! 4000 3200 Tl B! 800 4000 ! ! I I I I I I ----------------------------~----------------------------------------1 I 4000 3325 FAUS! 675 4000 I 3200 TIB! 800 I !---------------------------------------------------------------------! 42 !84th Avenue -S. 212th St. to SR 167 !Widening of existing roadway to seven lanes to !include curb and gutter, sidewalk, street lighting! !drainage, landscaping, chamelization and signal 43 !James Street & 104th Acceleration Lane !Construction of eastbound acceleration lane along !South 240th Street from 104th Avenue South for a !distance of 600 feet easterly. 44 IW. Meeker Street -64th Ave. S. to West Valley Hwy !Widening of existing roadway to five lanes !including curb and gutter, sidewalk, lighting, lchamelization, signing, drainage, paving and llands'caping. I 2150 150 1500 1720 TIB! 430 2150 125 FAUS! 25 150 1200 TIB! 300 1500 l------------------------------------------------------------------------------------------------------------------------1 TOTAL 113568 !14763 !21257 ! 44722 I 6547 I 52946 ! 34817 ! 94310 I !========================================================================================================================! I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S. 272nd/S. 277th St. Corridor Project -Auburn Way to Kent-Kangley Rd. DESCRIPTION: (Project length 2.27 Mi.) Construct a new four/five lane roadway with curb and gutter, sidewalk, street lighting, landscaping and channelization. Construct a new bridge across Green River and install traffic signalization at Kent-Kangley Rd. (SR 516). SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIS, LID, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 1,979,000 3,521,000 10,780,000 16,280,000 4, 5, & 6th Yr 4, 161 '000 4,288,000 5,526,000 2,305,000 Total 16,280,000 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S. 196th/S. 200th St. Corridor Project -Orillia Rd. to West Valley Highway (West Leg) DESCRIPTION: (Project length 1.40 Mi.) Widening of S. 200th St. from Orillia Rd. to Russell Rd. including curb, gutter, sidewalk, lighting, landscaping, grading, paving, bridge construction over Green River, signalization at Orillia Rd., realignment of Russell Rd. at Green River, rechannelization of Russell Rd./S. 196th St. from Green River to West Valley Hwy. This is a joint project with King Co. and Tukwila. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIS, LID, CITY PROJECT COST: 1st Yr Annual Element 468,000 2nd Yr 2,233,000 3rd Yr 2,904,000 837,000 767,000 4,001,000 5,605,000 I 4, 5, & 6th Yr Total 5,605,000 2 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S. 192nd/S. 196th St. Corridor Project -West Valley Hwy (SR 181) to East Valley Hwy (Middle Leg) DESCRIPTION: (Project length 1.00 Mi.) Construct new four/five lane roadway including widening improvements to S. 196th St. from West Valley Hwy to 72nd Ave. S., bridge construction over UP & BN railroad tracks, major widening of S. 196th St. from 78th Ave. S. to East Valley Hwy, traffic signalization at East Valley Hwy & S. 196th St. with curb and gutter, sidewalk, landscaping, lighting and channelization. SUMMARY: Preliminary Engineering ...... $ 2,762,000 Right Of Way ................. $ 1,000,000 Construction ................. $ 13,738,000 Total .................... $ 17,500,000 FUNDING SOURCE: TIS, LID, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 4, 5 t & 6th Yr 941 t 500 -~, 706' 500 6,032,000 8,820.000 li!!!l·=" I fill Q.ACI(II Sf .IIi c '"""" i ! tencsr ' .. rH n 81JC/NC 11E!It'Sf'11U _ I _____ l . ; Tota·l 17,500,000 3200Tit! 3 L I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Metro Park & Ride Lot DESCRIPTION: Expansion of present Metro facility located at SR 516 and Military Rd. to accomodate between 200 and 300 vehicles. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIB, METRO PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr -------------------------------·--- 1,116,000 1,284,000 400,000 2,000,000 2,400,000 4' 5' & 6th Yr Total 2,400,000 4 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S.E. 260th Street & 104th Avenue S.E. DESCRIPTION: (Intersection) Improvements to include minor widening of 104th Ave. S.E. for northbound left turn lane. Install new signal and interconnect, curb, gutter, and sidewalk. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIS, CITY PROJECT COST: 1st Yr Annual Element 350,000 KENT CEHETERr UIIIIIIHIIUIIIIIIIII= 5 MAPLE ST = illlllllllllllllllll~ 2nd Yr j 11111111111HiljlfNIC HILL Et.Eif,. SCHtJtJL = 5 ! ~ 5 i i ------ 3rd Yr 52,000 298,000 350,000 4. 5, & 6th Yr Total 350,000 5 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: 76th Avenue S. and S. 212th Street DESCRIPTION: (Intersection) Rebuild existing traffic islands in the southeast and southwest corners of 76th Ave. S. at S. 212th St. for an additional northbound left turn lane. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Canst ruction ................. $ Tota-l .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element 50,000 :-INC f?EfltlS?f?CE S 212TH ST en "" > a: :1: ... CD CD 5 2nd Yr tJ'BIIIEN ELE/1. SCHtJtJL TH ST 3rd Yr en ... > a: 0 z N r- "" > a: :1: ... 8,000 42,000 50,000 4, 5, & 6th Yr Total 50,000 5~ST en ... ,. a: "' ... r-r- 5 216TH ST 212TH 5T 5 6 21BTH 5T I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I PROJECT: Reith Road & Kent-Des Moines Road (SR 516) I I I I I I DESCRIPTION: (Project length 0.05 Mi.) Rechannelize Reith Rd. west of Kent-Des Moines Rd. to add an eastbound right turn lane. Provide left turn protected phasing & channelization for west leg of intersection. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ T ota ·l •..•..•••...••••••.• $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element 15,000 2nd Yr 3rd Yr 5,000 10,000 15,000 4, 5, & 6th Yr Total 15,000 I I I I I I --·-------· -· -·-·---·--·-------,--•. --·----. ---·---. I I I I I -Q R/VERBEIIO Ct7LF Ct7URSE 7 I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I PROJECT: 72nd Avenue S. & S. 212t h Street I I I I I I I I I I I I I I I I I DESCRIPTION: (Intersection) Install a westbound right turn lane at the northeast corner of intersection. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Canst ruction ................. $ Total .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annua ·1 Element 100,000 B~E/NC RER~SPRCE S 212TH ST "' ... > a: % ... "' CD 2nd Yr s tJ'BfiiEN ELE/1. SCHtJtJL 6TH ST 3rd Yr 20,000 80,000 100,000 4, 5, & 6th Yr Total 100,000 S 216TH I :::::1 212TH ST s 218TH ! 8 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Central Avenue & S. 259th Street DESCRIPTION: (Intersection) Install two phase traffic signal, street lighting and channelization. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element 180,000 r 2nd Yr ·a: 0 a: .... (/') "' > a: :z: ,_ 3rd Yr 14,000 166,000 180,000 4, 5. & 6th Yr Total 180,000 MAPLE ST KENT KENT ~ . CEHCTEIIY SJ.IIH CU/8 ~ i ~~ SCENIC HILL <:>, f'RIIK . inunm•~tl!ill_it_II'IC Hlj SCHI!1 9 I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: 101st Avenue S.E. & S.E. 256th Street DESCRIPTION: (Intersection) Install pedestrian protection for eastbound and westbound travel, provide loop detection for eastbound left turns and movements into Kent Meridian High School. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Canst ruction ................. $ 25,000 Total .................... $ 25,000 FUNDING SOURCE: FAUS, CITY I PROJECT COST: 1st Yr 4' 5, & 6th Yr I I I I I I I I Annual Element 2nd Yr 25,000 GUIBERSCIN ST SEATTLE ST E CHICRGCI ST KENT C£#£T£Rr _111111111111111111111111111111_ = i HRPLE ST ''''''" Ellllllllllllllllll= ~'.tA-5 3rd Yr Total 25,000 .... U') .... > a: 10 I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Centra 1 Avenue & SR ·1 6 7 Traffic Signa 1 Improvements DESCRIPTION: (Intersection) Traffic signal modifications at S. 224th St. & 84th Ave. including replacement of WSDOT traffic signals with City of Kent standard equipment and interconnection to the City of Kent master signal computer system. SUMMARY: Preliminary Engineering ...... $ 12,000 Right Of Way ................. $ Construction ................. $ 28,000 Total .................... $ 40,000 II FUNDING SOURCE: FAUS, City II II I I I II I I I PROJECT COST: ST 1st Yr Annua 1 E-1 ement 40,000 fi 4, 5, 2nd Yr 3rd Yr & 6th Yr Total 40,000 $ =· ~ i ~ ! I V> "' > a: I :r: .... :::1' m IIUIHIIRIIIUI:I8 5 228TH i "' _llllllllllllllllllill "' > i a: I "' .... i "' 232NO en = s 5 I = = i! 11 I I I !Pill § = ~ -= i I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I PROJECT: Central Avenue (SR 516) -Willis St. to Smith St. I I I I I I I I I I I I I I I I I DESCRIPTION: (Project length 0.38 Mi.) Minor widening to include a northbound right turn lane at Titus St., two-way left turn lane from Titus St. to Gowe St., overlay from Willis St. to Smith St., storm drainage & channelization. SUI\IIIVIARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIB, CITY, STATE PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 749,000 lfET/1/J .... > .... a: > z PRilK a: f5 RNO ... :z: u ~ ..... ~ 11/0E "' ID ...J .... ST KI#RNIS~ .... > PRilK :z: STR. .... a: ..... > "' a: :z: U1 c ..... 0: 43,000 210,000 496,000 749,000 4, 5, & 6th Yr Total 749,000 E CHICFIGO ST LFIUREL ST 12 su s 2'1; , VI .... > a: :z: ..... =>' Ol U1 :z: ... ID Ol I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: 72nd Avenue S. -S. 194th St. to S. 196th St. DESCRIPTION: (Project length 0.13 Mi.) Construction of a new two ·lane roadway with curband gutter, sidewalk, grading, paving, street lighting, channelization and landscaping. SUMI'Y1ARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: CITY PROJECT COST: 1st Yr Annual Element 390,000 2nd Yr 3rd Yr 150,000 80,000 216,000 244,000 540,000 4, 5, & 6th Yr Total 540,000 (I') .... > a: --------~-------~ s 192ND II ST I I L :r ... fD fD ("\ II CJ D ,.: "' en X UJ ,.... UJ > ..1 cr ..1 ... cr en > -CD .,j S 20DTH ST 13 I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I PROJECT: Crow Road By-Pass ( SR 516) I I I I I I I I I I I I I I I I I ) DESCRIPTION: (Project length 0.35 Mi.) Minor widening to improve turning radii at 97th Pl. S. & Canyon Drive, and S.E. 260th St. & 108th Ave. S.E., with signalization at Kent-Kangley Rd & 108th Ave. S.E. including curb and gutter, sidewalks, lighting, grading, paving, channelization and signing. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: DEVELOPER PROJECT COST: 1st Yr Annual Element 1,000,000 KENT CEHETERr MAPLE ST 2nd Yr 3rd Yr 150,000 167,000 683,000 1,000,000 4' 5' & 6th Yr -------~---a; 0 - Total .! '000' ooc w w w en "' If) w > cr :c ... -ST - l.JJIIIIIIIIIIIIIIIIIIIIIIIIIIII_ i i iuuUIIIIIIIUUJ~ j 11111111111Hii(j.fN/C HILL ELE~ SCHt!t!L = 5 s ~ = 5 § § 5 § SEOl/t!lfllR. HICH SCHf"L 5 lllfltlliiliii~I-BIIIM~~~~~~~tlllllliitittfuummmnu•m•m•••mmm~ w "' I :c ... CD -.., I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM II PROJECT: East Valley Highway-S. 180th St. to S. 192nd St. I I I I I I I I I I I I I I I I I DESCRIPTION: (Pro~ct length 0.78 Mi.) Major widening to five lanes including drainage, sidewalks, curb and gutter, street lighting, landscaping, paving, underground utilities, bridge improvements and signing. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIB, LID, CITY PROJECT COST: 1st Yr Annual Fi ement 972,000 2nd Yr 2,617,000 "' .... > a: "" ,_ 0 CD S IBBTH ST S !90TH ST 3rd Yr 538,000 434,000 2, 617,000 3,589,000 4, 5, & 6th Yr Total 3,589,000 15 I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM II PROJECT: 64th Avenue S. -S. 216th St. to S. 226th St. I I I I I I I I I I I I I I I I I DESCRIPTION: (Project length 0.57 Mi.) Construction of new four lane roadway from S. 216th St. to S. 226th St.including curb and gutter, sidewalks, street lighting, landscaping and channelization. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Tota·l .................... $ FUNDING SOURCE: LID PROJECT COST: 1st Yr Annual E"lement 2,200,000 "' 2nd Yr "'"' .... .,_, lnO.. 3rd Yr LflCfJfJN S 226TH ST !04,000 148,000 1,948,000 2,200,000 4' 5, & 6th Yr Total 2,200,000 ID S J[~sTH ST J "' "' > a: ' ! I ~ ~ ,_ "' :1:: ,_ UJ -' -' a: > "' -· s 220TH ST r--- "' UJ > a: c . ~~~ ------ 16 "' UJ > a: :1:: ,_ "' r- I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: James Street Safety Improvements DESCRIPTION: (Project length 0.75) Construction of pedestrian safety improvements along James Street (S. 240th Street) from Central Avenue to 94th Avenue South. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: HES, City PROJECT COST: 1st Yr Annual Element 300,000 IU > KENT "' HEHfJ/11/lL f'fl/1/( 2nd Yr IIJ > a: 3rd Yr I IIJ > a: 45,000 255,000 300,000 4, 5, & 6th Yr S 2ll1ST ST S 2 N S 2ll3RO ST ... IIJ ... IU > a: :X: ,_ "' "' Total 300,000 :1: ,_ Q Q Uj ... IIJ > '<!: ~F=~ N Q - ... -------~~-;::.JL-__ IU .., :1: ,_ ., 0 SE 2\ I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Railroad Grade Crossing Replacement (City-Wide) DESCRIPTION: City-wide railroad crossing rep-lacement program. SUMMARY: Preliminary Engineering ...... $ 10,000 Right Of Way ................. $ Construction ................. $ 110,000 Total .................... $ 120,000 FUNDING SOURCE: RRP, CITY PROJ~CT COST: 1st Yr 4, 5, Annual Element 2nd Yr 3rd Yr & 6th Yr Total ---------------------------------------------------------- 120,000 120,000 18 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: VMS Upgrade DESCRIPTION: Replace existing Master Traffic Signal Computer with new upgraded system. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Tota ·1 •••••••••••••••••••• $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element 25,000 2nd Yr 140,000 3rd Yr 165,000 165,000 4, 5, & 6th Yr Total 165,000 19 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Neighborhood Traffic Control Program DESCRIPTION: Modification of local residential streets to promote safe and appropriate levels of traffic flow. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: HES, CITY PROJECT COST: 1st Yr Annual Element 20,000 2nd Yr 20,000 3rd Yr 20,000 18,000 102,000 120,000 4, 5, & 6th Yr 60,000 Total 120,000 20 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Comprehensive Transportation Plan Update DESCRIPTION: Thorough analysis of the existing transportation system and development of the City of Kent Comprehensive Transportation Plan. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element 120,000 2nd Yr 3rd Yr 120,000 120,000 4, 5, & 6th Yr Total 120,000 21 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Green River Valley Transportation Benefit District DESCRIPTION: Participation in cooperative effort to establish a Green River Valley Transportation Benefit District in conjunction with the cities of Renton, Tukwila, and Auburn as well as King County, WSOOT, Metro, VATA and PSCOG. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIS, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 225,000 225,000 4, 5, & 6th Yr Total -------------------------------------------------- 225,000 225,000 22 I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: West Valley Highway -S. 180th St. to S. 189th St. DESCRIPTION: (Project length 0.66 Mi.) Major widening of West Valley Highway to include curb and gutter, sidewalk, street lighting, grading, paving, channelization, signalization, signing and landscaping. SUMMARY: Pre 1 iminary Engineering ...... $ 65,000 Right Of Way ................. $ 505,000 Construction ................. $ 2,130,000 Tota 1 .................... $ 2,700,000 II FUNDING SOURCE: TIS, LID, CITY II I II II II II I II I PROJECT COST: 1st Yr Annual Element 4, 5, 2nd Yr 3rd Yr & 6th Yr Total 2,700,000 2,700,000 1B2NO ST 5 188TH ST S !90TH ST "' LLI > a: "' .... 0 "' 23 I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: James Street & Central Avenue DESCRIPTION: (Intersection) Minor widening of intersection to accomodate a westbound right turn lane at northwest corner. SUMMARY: Preliminary Engineering ...... $ 25,000 Right Of Way ................. $ Canst ruction ................. $ 225,000 Total .................... $ 250.000 I FUNDING SOURCE: FAUS, TIS, CITY I I I I I I I I I PROJECT COST: 1st Yr Annual Element 2nd Yr 250,000 3rd Yr 4, 5, & 6th Yr Total 250,000 24 I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Kent-Kangley Road & 111th Avenue S.E. DESCRIPTION: (Project length 0.49 11~:-.) Install traffic signal interconnect cable for 104th Avenue S.E. and S.E. 256th St. to Kent-Kangley Rd. and 111 th Avenue S.E. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ 15,000 Total .................... $ 15,000 I FUNDING SOURCE: FAUS, CITY II PROJECT COST: I I I I I I I I 1st Yr Annual Element 4. 5, 2nd Yr 3rd Yr & 6th Yr Total 15,000 15,000 25 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: 100th Avenue S.E. & S.E. 240th Street DESCRIPTION: (Intersection) Install pedestrian protection for eastbound and westbound travel, and provide loop detection. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 30,000 "' "' 3rd Yr ~- 2311TH PL 30,000 30,000 4, 5, & 6th Yr Tota·l 30,000 26 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Lincoln Avenue & James Street DESCRIPTION: (Intersection) Install a traffic signal at the intersection of Lincoln Avenue and James Street with vehicle detection and opticom. Provide interconnect to existing pedestrian signal and railroad signal approximately 100 feet to the east. Installation requested by Metro to accomodate transit vehicles. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: METRO PROJECT COST: 1st Yr Annual Element RUSSELL Rt!RO /'RRH 2nd Yr 130,000 3rd Yr 19,000 111 , 000 130.000 4, 5, & 6th Yr Total 130,000 KENT-Q lfE!ft7fllflL 27 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Smith Street & 4th Avenue Intersection Improvements DESCRIPTION: (Intersection) Left turn capacity improvements including street widening, channelization for left turn lanes, radius improvements and signal modifications. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 167,000 333,000 500,000 4, 5, & 6th Yr Total ----------~-------------------------------------------- 500,000 500,000 .. , ~. ~ SHITH ST 28 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: 4th Avenue S. & Willis Street DESCRIPTION: (Intersection) Intersection improvements including modifying westbound mast arm, installing protected/permissive phasing and providing loop detection. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element ] SMITH ST 2nd Yr 3rd Yr 25,000 25,000 25,000 4, 5, & 6th Yr Total 25,000 29 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: James Street -94th Avenue S. to 100th Avenue S. DESCRIPTION: (Project length 0.38 Mi.) Install traffic signal interconnect between 100th Avenue S. and 94th Avenue S., new controller and loop detection at the intersection of 94th Avenue S. and James St. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ . Construction ................. $ Total .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr UJ > cr 50,000 W CIILE UJ ST > cr KENT ( IIEIItJ/1/flL f'fl/1/( "' > cr 17.000 33,000 50,000 4, 5, & 6th Yr 0 0:: c > -' cr Total 50,000 "' S 2ij3RO ST "' UJ en Er 0 0 - --~~-----------~.L---------- 30 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT-PROGRAM PROJECT: James Street -Jason Avenue to 94th Avenue South DESCRIPTION: (Project length 0.52 Mi.) Provide widening and channelization improvements for left turn movements along James Street. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: HES, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 1,000,000 40,000 200,000 760,000 1,000,000 4, 5, & 6th Yr Total 1,000,000 KENT~( ~---·-·· 2311TH PL = W COLE ILl ... ST > > a: a: c :() c z a: N .., ~I z z z a: IU > a: HEHtJRIRL ...J a: a: .... z IU ... P/1111( "' ILl II) S 2 2ND S 2113RO ST "' IU > a: l: .... "' ILl > a: l: ,_ "' "' > a: ------------- 31 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S.E. 256th Street-Kent-Kangley Road to 116th Avenue S.E. DESCRIPTION: (Project length 0.64 Mi.) Improvements include roadway widening, drainage, curb and gutter, sidewalk, street lighting, paving, channelization, signing & landscaping. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIS, LID, CITY PROJECT COST: 1st Yr Annual Element PLE ST ! 2nd Yr 3rd Yr 2,900,000 .., en .., > a: :r ... =I' 0 434,000 928,000 1,538,000 2,900,000 4, 5, & 6th Yr "' en "' > a: :r ... "' 0 .., en "' > a: :r ... I 1111111111111~ SE 260TH ST j 111111111111tftjlsfN/C HILL ELE/4 SCHtJtJL ~ 11 Total 2,900,000 ~ .., .., en en .., > a: 32 I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Lind Avenue -S. 180th St. to East Valley Highway DESCRIPTION: (Project length 0.28) Construct new five lane roadway including curb and gutter, sidewalk, street lighting, landscaping and channelization. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIB, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 150,000 550,000 800,000 1,500,000 4, 5, & 6th Yr Total ·---------- 1,500,000 1,500,000 RENTON 511 113RD ST ' ~182110 ST r= i ·-------------0 - 33 I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S. 224th/S. 228th St. Corridor Project (West Leg) DESCRIPTION: (Project length 1.60 Mi.) Improvements to Military Road from SR 516 to S. 228th St., and construction of S. 228th St. to 54th Ave. S. including four/five lane roadway, curb and gutter, sidewalk, street lighting, landscaping and channelization. SUMMARY: Preliminary Engineering ...... $ 1,021,000 Right Of Way ................. $ 833,000 Construction ................. $ 7,704,000 Total .................... $ 9,558,000 II FUNDING SOURCE: TIS, LID, CITY I I I I I I I I I PROJECT COST: 1st Yr Annua 1 Element 2nd Yr 4, 5, 3rd Yr & 6th Yr Total 9,558,000 9,558,000 cr. 34 CD...J ., ... i=~"' -- I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S. 192nd/S. 196th St. Corridor Project (East Leg) -East Valley Highway to 92nd Avenue South DESCRIPTION: (Project length 0.70) Construct four/five lane roadway including cu~b and gutter, sidewalk, street lighting, landscaping and channelization. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIB, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 817c/NC RcRI7SI"IICc 3rd Yr I 1,300,000 1,000,000 6,449,000 8,749,000 4' 5, & 6th Yr 8,749,000 . • Total 8,749,000 35 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: N. Central Avenue & Smith Street DESCRIPTION: (Intersection) Add a double left turn lane, channelization, street lighting, signal upgrade and signing. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Tota 1 .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 90,000 120,000 390,000 600,000 4, 5, & 6th Yr 600,000 Total 600,000 36 I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM II PROJECT: Kent-DesMoines Road & Meeker Street Traffic Signal Improvements I I I I I I I I I I I I I I II I I DESCRIPTION: (Intersection) Traffic signal modifications at SR 516 & Meeker Street including installation of controller and detection loops, and interconnection to the City of Kent master signa 1 computer system. SUMI\IIARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Tota 1 .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element HRSHIII&Ttfll 2nd Yr 3rd Yr 9,000 21,000 30,000 4, 5, & 6th Yr 30,000 REV£R8£NO Total 30,000 Ct71.F Ct7URS£ 37 I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I PROJECT: 94th Avenue S. -Canyon Dr. to James St. I I I I I I I I I I DESCRIPTION: (Project length 0.06 Mi.) Widen to three lanes with curb, gutter, and sidewalk. Provide drainage, paving, channelization, signing, street lighting and landscaping. SUMM.A.Rv: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIB, LID, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr - 3rd Yr 120,000 680,000 800,000 4' 5' & 6th Yr 800,000 Total 800,000 I I Jtld u. u ~ a: ... ... ST u D ILl ... ... ..J "' ..J D -a: 5 2tj,OTH ST :r:: ... ;u il ILJL I I I I I D z D "' a: ., .., > .... a: > ..J a: .... ... a: X GUIBEFISON ST S 21j,lST ST S 2 N 5 2'13RD ST "' .., > a: :r:: ,_ "" "' en SE 2'1BTH ST X ... CD "' 38 l I I s lj,lj,\ z I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S.E. 248th Street-94th Avenue S.E. to 116th Avenue S.E. DESCRIPTION: (Project length 1.40 Mi.) Widen to three lanes with curb, gutter and sidewalk. Provide drainage, paving, channelization, signing, street lighting and landscaping. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Tota I .................... $ FUNDING SOURCE: TIB, LID, CITY PROJECT COST: lst Yr Annual Element 2nd Yr 3rd Yr S 21l3RO ST en .... > cn cr .... > cr :1: ... CD en SE 2118TH ST ST KFNT_ - .... en .... > cr :1: ... :1' 0 300,000 1,700,000 2,000,000 4, 5, & 6th Yr 2,000,000 LLI en .... > cr :1: ... "' 0 - Total 2,000,000 LL1 LLI cn en LLI 39 I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM II PROJECT: S. 212th Street -West Valley Highway to 84th Avenue South II I I I I I I I II I I I I I I I I DESCRIPTION: (Project length 1.00 Mi.) Widen existing roadway to seven lanes with drainage, paving, sidewalk, curb and gutter, street lighting, landscaping, underground utilities, channelization and signing. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIB, LID, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 600,000 3,400,000 4,000,000 CD 4. 5, & 6th Yr 4,000,000 S 206TH ST 'lfCE S 2 BTH ST 0 z N ,.... "' .... "' ... ,. ex: ~ .... .... .... S 216TH ST Total 4,000,000 --------~ 212TH ST = S/1/IR tl1NEER CEHt'fERr = = 40 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: South 212th Street -East Valley Highway to SR 167 DESCRIPTION: (Project length 0.35) Widening of existing roadway to seven lanes including curb and gutter, sidewalk, street lighting, drainage, landscaping, channelization and signalization. SUMMARY: Preliminary Engineering ...... $ 600,000 Right Of Way ................. $ Construction ................. $ 3,400,000 Total .................... $ 4,000,000 FUNDING SOURCE: FAUS, TIS, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 4, 5, & 6th Yr -====:/1 . 5 206TH 5T L ________ ~ "' "' ,. a: :s: ... ... ,.. 5 208TH ST 5 216TH 5T 4,000,000 s -5--------- Tot~l 4,000,000 41 I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I PROJECT: 84th Avenue -S. 212th St. to SR 167 I I I I I I I I I I I I I I I I I DESCRIPTION: (Project length 0.87) Widening of existing roadway to seven lanes including curb and gutter, sidewalk, street lighting, drainage, landscaping, channelization and signalization. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIS, CITY PROJECT COST: 1st Yr Annual Element E z 2nd Yr ~) ~ ~~====== "' N N CD .... 88TH AVE s ::z: "' .... ----------- 3rd Yr 320,000 1,830,000 2,150,000 N N N z CJ 4, 5, & 6th Yr 2, 150,.000 ~ CD .... :I: "' .... Ul Total 2,150,000 Ul N -"' .... ::z: "' .... 1\) -N .... :I: "' .... 42 I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM II PROJECT: James Street & 104th Avenue S. Acceleration Lane II I I I II II I I I I I I I I I I I DESCRIPTION: (Project length 0.11 Mi.) Construction of eastbound acceleration lane along S. 240th St. from 104th Ave. S. easterly for a distance of 600 feet. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Tota-l .................... $ FUNDING SOURCE: FAUS, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr ,---~ 0 a: D > ILl -' > a: a: .... -s: s: ::> Cl'l = I "' > a: .. -- s 21l1ST ST s S 21l3RD ST Cl'l > a: :>: .... 0 ~ w Cl'l Cl'l ... "' > > a: a: 0 :>: :z "' .... 0 m ~ m 15,000 135,000 150,000 4, 5, & 6th Yr 150,000 Total 150,000 ILl en SE 21lllTH ST e=!.l~ ~-SE 231lTH 51 ' ----- 43 I I I I I I I I I I I I I I I I I I I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Meeker Street -64th Avenue S. to West Valley Highway DESCRIPTION: (Project length 0.30) Widening of Meeker Street to five lanes including curb and gutter, sidewalk, lighting, channelization, signing, drainage, paving and landscaping. SUMMARY: Preliminary Engineering ...... $ Right Of Way ................. $ Canst ruction ................. $ Total .................... $ FUNDING SOURCE: TIS, CITY PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 225,000 500,000 775,000 1,500,000 4, 5, & 6th Yr ----------------------------------------·------- Rf/SSE'L.L. RfJRD Ul I'RRK I&J > a: :z:: ... ,.. U) 7 W MEEKER ST fE' ~ SHITH ST 1,500,000 z I'RRK S RNO u ~ RIDE' ..J Total 1,500,000 ..,..,.,, ::t: CfJHHfJNS!;; I'L.RYr.IE'/.0 z ST r.IRE ........... !:!:! .• -- w > a: ... Ul -z 44 r