Loading...
HomeMy WebLinkAbout3331ORDINANCE NO. 333 I AN ORDINANCE of the City Council of the City of Kent, Washington, amending the City of Kent Comprehensive Plan to change the plan's land use map designations of three (3) parcels of property: (1) from Residential (SF -6) to Industrial for property located at 22320 - 88th Avenue South (CPA -96-3(A)); (2) from Residential (SF -1) to Residential (SF -6) for property located at the southwest corner of 104th Avenue Southeast and Southeast 272nd Street, CPA -96-3(B); and (3) from Low Density Multi -Family Residential to Commercial for property located at the southeast corner of 132nd Avenue Southeast and Southeast 270th Street (CPA -96-3(E)); amending the Capital Facilities Element of the Comprehensive Plan (CPA -96-3(F)); and amending the Transportation Element of the Comprehensive Plan (CPA -96-3(G)). WHEREAS, the Washington State Growth Management Act ("GMA") requires internal consistency among comprehensive plan elements and the plans from other jurisdictions; and WHEREAS, to assure that comprehensive plans remain relevant and up to date, the GMA requires each jurisdiction to establish procedures whereby amendments to the plan are considered by the City Council (RCW 36.70A.130(2)), and limits amendments to once each year unless an emergency exists; and WHEREAS, the City of Kent has established a procedure for amending the Comprehensive Plan set forth in Chapter 12.02 of the Kent City Code which sets a deadline of September 1 st of each year for acceptance of comprehensive plan amendments; and WHEREAS, by September 1, 1996, the City received applications to amend the comprehensive plan's land use plan map designation. Three of those applications involve parcels located at: (1) 22320 - 88th Avenue South; (2) the southwest corner of 104th Avenue Southeast and Southeast 272nd Street; and (3) the southeast corner of 132nd Avenue Southeast and Southeast 270th Street; and WHEREAS, the parcel at 22320 - 88th Avenue South is currently designated Residential (SF -6) and the applicants are requesting a plan designation of Commercial; and WHEREAS, the parcel at the southwest corner of 104th Avenue Southeast and Southeast 272nd Street is currently designated Residential (SF -1) and the applicants are requesting a plan designation of Residential (SF -6); and WHEREAS, the parcel at the southeast corner of 132nd and 270th is currently designated Low Density Multi -Family Residential and the applicants ar requesting a plan designation of Commercial; and WHEREAS, the City of Kent Finance Department has submitted proposed amendments to the Capital Facilities Element of the comprehensive plan to update capital facilities inventories, financial information, and project summaries; and WHEREAS, the City of Kent Public Works Department has submitted proposed amendments to the Transportation Element of the comprehensive plan to update financial information and project summaries; and WHEREAS, the staff presented the requested comprehensive plan amendments for consideration by the City of Kent's Land Use and Planning Board on November 25, 1996; and 2 WHEREAS, the City of Kent Land Use and Planning Board held a public hearing on the proposed comprehensive plan amendment on November 25, 1996; and WHEREAS, the proposed amendments are consistent with the standards of review for comprehensive plan amendments outlined in Section 12.02.050 of the Kent City Code; and WHEREAS, the City of Kent Land Use and Planning Board took public testimony, reviewed the proposed comprehensive plan amendments, and moved to recommend the approval of the amendments of the comprehensive plan designations and Capital Facilities and Transportation Element Amendments to the full City Council; and WHEREAS, the City Council for the City of Kent approved the recommendation of the comprehensive plan amendment CPA -96-3(A) to amend the comprehensive plan designation of a parcel of property at 22320 - 88th Avenue South from a plan designation of Residential (SF -6) to a plan designation of Commercial; and WHEREAS, the City Council for the City of Kent approved the recommendation of the comprehensive plan amendment CPA -96-3(B) to amend the comprehensive plan designation of a parcel of property at the southwest corner of 104th Avenue Southeast and Southeast 272nd Street from a plan designation of Residential (SF -1) to a plan designation of Residential (SF -6); and WHEREAS, the City Council for the City of Kent approved the recommendation of the comprehensive plan amendment CPA -96-3(E) to amend the comprehensive plan designation of a parcel of property at the southeast corner of 132nd Avenue Southeast and Southeast 270th Street from a plan designation of Low Density Multi -Family Residential to a plan designation of Commercial; and WHEREAS, the City Council for the City of Kent approved the recommendation of the Capital Facilities Element Amendment CPA -96-3(F); and WHEREAS, the City Council for the City of Kent approved the recommendation of the Transportation Element Amendment CPA -96-3(G); NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION]. The City of Kent Comprehensive Plan adopted by Ordinance No. 3222, as subsequently amended, is hereby amended to establish new plan designations for the following parcels: A. For the property located at 22320 - 88th Avenue South, Kent, Washington from a plan designation of Residential (SF -6) Single Family Residential with six units per acre to Industrial as depicted in the map attached as Exhibit A and incorporated herein by this reference (CPA -96-3(A)). B. For the property of approximately 6.74 acres located at the southwest corner of 104th Avenue Southeast and Southeast 272nd Street, Kent, Washington, from a plan designation of Residential (SF -1) Single Family Residential with one unit per acre to Residential (SF -6) Single Family Residential with six units per acre as depicted in the map attached hereto as Exhibit B and incorporated herein by this reference (CPA -96-3(B)). C. For the property of approximately 0.89 acres located at the southeast corner of 132nd Avenue Southeast and Southeast 270th Street, Kent, Washington from a plan designation of Low Density Multi -Family Residential to Commercial as depicted in the map attached as Exhibit C and incorporated herein by this reference (CPA -96-3(E)). SECTION 2. The Capital Facilities Element of the City of Kent Comprehensive Plan is hereby amended as set forth in Exhibit D, attached hereto and incorporated herein by this reference(CPA-96-3(F)). SECTION3. The Transportation Element of the City of Kent Comprehensive Plan is hereby amended as set forth in Exhibit E attached hereto and incorporated herein by this reference (CPA -96-3(G)). SECTION 4. - Severability Clause. If any one or more sections, sub -sections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION 5. - Effective Date. This Ordinance shall take effect and be in force thirty (30) days from and after its passage, approval and publication as provided by law. ATTEST: BRENDA JACOBER, CITY CLERK APPROVED AS TO FORM: ROGER A. LUBOVICH. CITY ATTO 5 PASSED / day of , 1997. APPROVED day of , 1997. PUBLISHED day o 41 1997. I hereby certify that this is a true copy of Ordinance No. 33 f , passed by the City Council of the City of Kent, Washington, and approved by the Mayor of the City of Kent as hereon indicated. (SEAL) BRENDA JAC E CITY CLERK P ALAWVORDINANCICPA952B ORD UJ EXHIBIT A City of Kent - Planning Department APPLICATION NAME: Coblentz #CPA -96-3(A) REQUEST: Comprehensive Plan Amendment LEGEND Application site DATE: January 21, 1997 city limits Comprehensive Plan: Single Family (SF -6) to Industrial Qaa �lOQU000 Do �� � Q D p�oap oao°� o0p0o pa �" t J J Q L - J o e 22N Il 4 D ❑ o ❑ a a a LL I a a P O Q� Q C7 tJ�.. APPLICATION NAME: Coblentz #CPA -96-3(A) REQUEST: Comprehensive Plan Amendment LEGEND Application site DATE: January 21, 1997 city limits Comprehensive Plan: Single Family (SF -6) to Industrial EXHIBIT B City of Kent - Planning Department APPLICATION NAME: Prouty #CPA -96-3(B) EI REQUEST: Comprehensive Plan Amendment LEND application site 21, 1997 �-,-�.- city limits DATE: January � N Comprehensive Plan: Single Family (SF -1) to Single Family (SF -6) EXHIBIT C City of Kent - Planning Department APPLICATION NAME: Kent Planning Department #CPA -96-3(E) REQUEST: Comprehensive Plan Amendment LEGEND Application site DATE: January 21, 1997 city limits Rk Comprehensive Plan: Low Density Multifamily Residential (LDMF) to Commercial PR o a � � 4 Q 1 O SE ST' (F RIV. =FuE, I Iv, I I J I I O ❑ O CD � J � I II let IF ❑ ❑ _- 4 a d APPLICATION NAME: Kent Planning Department #CPA -96-3(E) REQUEST: Comprehensive Plan Amendment LEGEND Application site DATE: January 21, 1997 city limits Rk Comprehensive Plan: Low Density Multifamily Residential (LDMF) to Commercial Date: November 12, 1996 To: Land Use & Planning Board Members From: Mayene Miller, Finance Director Subject: Proposed Changes to Capital Facilities Element of Kent Comprehensive PIan The following is a summary of the proposed changes to the Capital Facilities Element of the City of Kent Comprehensive Plan. Introduction / Background and Analysis The only change proposed on pages 8-1 thru 8-5 is to update the six year plan period from 1994- 1999 to 1997-2002. The proposed changes on page 8-6 show the actual process used to select a specific level of service to be the adopted standard. Current Facilities Inventory Several changes are necessary to update the Current Facilities Inventories on pages 8-7 thru 8-12. The increases in inventory are primarily due to property acquired as a result of the Meridian annexation and additional purchases since the Comprehensive Plan was developed and adopted. Corrections Facility_ No Changes Fire and Emergency Services The City has acquired two fire stations from King County Fire District #37, increasing the total number of stations owned by the City to six. Station 72 has two fire/aid units in service and a capacity for three and Station 75 has one fire/aid unit in service and capacity for three. King County Fire District #37 now owns only one fire station, Station 77, within the unincorporated Urban Growth Area of Kent.. Police / Fire Training Center No Changes City Administrative Office - General Government The Centennial Building and Municipal Court facility are no longer leased. The City purchased the Centennial Building (71,949 square feet) and the Municipal Court facility (4,251 square feet) in June 1996. City Administrative Offices - Police Headquarters No Changes City Maintenance Facilities No Changes Parks and Recreation Facilities The City of Kent now owns and manages 147.2 acres of neighborhood park land and 972.0 acres of community park land within the current City limits, which is an overall increase of 210.7 acres. The number of acres within the current City limits owned by King County decreased from 6.1 acres to 0.5 acres. Within the unincorporated Urban Growth Area (UGA) of Kent, King County owns 720.3 acres of park land, which is a reduction of 87.5 acres. These acres are now included in the City of Kent inventory as a result of the Meridian annexation. Golf Courses No Changes Sanitary Sewer Facilities No Changes Stormwater Management Facilities The total drainage area of the City has increased from 19 square miles to 25.42 square miles. Water Supply, Distribution, and Storage Facilities No change to the water service area of 27 square miles. The last paragraph on page 8-11 has been changed to mention the update of the Water System Comprehensive Plan that is scheduled in 1997. Transportation Facilities The City's current road system inventory has increased from 164 total land miles to 254.9 total land miles and is divided into four major categories of roads; 40.5 miles of principal arterials; 91.0 miles of minor arterials; 94.4 miles of collector arterials, and 29.0 miles of local roads. The pedestrian transportation inventory will be updated after a physical inventory of the Meridian annexation area is completed. The following maps are currently being revised to show the above inventory changes: Figure 8.1 Public Services and Facilities Figure 8.2 Sewer System Figure 8.3 Storm Drainage Service Area Figure 8.4 Water System Figure 10.1 Parks and Recreation Facilities (Parks Element of Comprehensive Plan) Figure 10.2 Existing Trails (Parks Element of Comprehensive Plan) Analysis of Impacts Tables 8.1 and 8.2 in the Analysis of Impacts section (pages 8-13 and 8-14) are updated to reflect the 1997-2002 Capital Facilities Plan. Total project costs have increased from $129,319,000 for 1994-1999 to $181,516,000 for 1997-2002. Revenue sources have increased from $131,292,000 for 1994-1999 to $181,516,000 for 1997-2002. Level of Service Consequences of the CFP on page 8-15 are currently being evaluated. CHAPTER EIGHT CAPFFAL FACILITIES ELEMENT CHAPTER EIGHT �c�(�r0? CAPITAL FACILITIES ELEMENT INTRODUCTION The capital facilities element contains a summary of the Capital Facilities Plan (CFP) for the City of Kent. The element consists of the following information: (1) statements of requirements, level -of -service (LOS) standards, guidelines, and criteria that are used to develop and implement the CFP; (2) inventories of existing facilities; (3) maps showing the locations of existing facilities; and (4) a list of proposed capital projects, including a financing plan, future operating costs, and reconciliation of project capacity and LOS standards. The complete CFP and supporting- documents are available for review at the City of Kent Planning Department. The CFP is a required element of the City's comprehensive plan, mandated by the Washington State Growth Management Act (GMA). The GMA requires cities and counties to approve and maintain a CFP which includes requirements for specific types of capital facilities, LOS standards, financial feasibility, and assurance that adequate facilities will be provided as development occurs. As required by the GMA, the CFP is a 6 -year plan for capital improvements that support the City's current and future population and employment growth. It contains LOS standards for each public facility, and requires that new development is served by adequate facilities. The CFP also contains broad goals and specific policies that guide and implement the provision of adequate public facilities. The capital facilities element is the element that makes real the rest of the comprehensive plan. By establishing LOS as the basis for providing capital facilities and for achieving concurrency, the CFP determines the quality of life in the community. The requirement to fully finance the CFP provides a reality check on the vision set forth in the comprehensive plan. The capacity of capital facilities that are provided in the CFP affects the size and configuration of the urban growth area. The purpose of the CFP is to use sound fiscal policies to provide adequate public facilities in a manner consistent with the land use element and at a time concurrent with KENT COMPREHENSIVE PLAN 8-1 CAPITAL FACLII7ES ELEMENT CHAPTER EIGHT (or prior to) the impacts of development. These capital facilities propose to achieve and maintain adopted standards for LOS in order to maintain the quality of life for existing and future development. The plan fulfills the GMA requirement for facilities planning; but, in addition, the plan serves' as a base for good city management and establishes eligibility for grants and loans. It provides coordination among the City's many plans for capital improvements, including other elements of the comprehensive plan, master plans of departmental service providers, and facilities plans of the state, the region, and adjacent local jurisdictions. Requirements of the Growth Management Act The GMA requires the CFP to identify public facilitii .s that will be required during the six years following adoption of the new plan through �- The CFP must include the location and cost of the facilities, and the sources of revenue that will be used to fund the facilities. The CFP must be financially feasible; in other words, dependable revenue sources must equal or exceed anticipated costs. If the costs exceed the revenue, the City must reduce its level of service, reduce costs, or modify the Iand use element to bring development into balance with available or affordable facilities. Other requirements of the GMA mandate forecasts of future needs for capital facilities and the use of standards for levels of service of facility capacity as the basis for public facilities contained in the CFP (see RCW 36.70A.020 (12)J. As a result, public facilities in the CFP must be based on quantifiable, objective measures of capacity, such as traffic - volume capacity per mile of road and acres of park per capita. One of the goals of the GMA is to have capital facilities in place concurrent with development. This concept is known as concurrency (also called "adequate public facilities"). In the City of Kent, concurrency requires 1) facilities which serve the development to be in place at the time of development (or for some types of facilities, a financial commitment to be made to provide the facilities within a specified period of time) and 2) facilities which serve the development to have sufficient capacity to serve the development without decreasing LOS below minimum standards adopted in the CFP. The GMA requires concurrency for transportation facilities. The GMA also requires all other public facilities to be "adequate" (see RCW 19.27.097, 36.70A.020, 36.70A.030, and 58.17.110). Concurrency management procedures will be developed to ensure that sufficient public facility capacity is available for each proposed development. 8-2 KENT COMPREHENSIVE PLAN CHAPTER EIGHT CAPITAL FACILITIES ELEMENT After the CFP is completed and adopted as part of the comprehensive plan, the City must adopt development regulations to implement the plan. The development regulations will provide detailed regulations and procedures for implementing the requirements of the plan. Each year, the City must update the CFP. The anal update will be completed before the City's budget is adopted in order to incorporate into the budget the capital improvements from the updated CFP. BACKGROUND AND ANALYSIS LOS (SCENARIO-DRIVEM METHOD OF ANALYSIS .Explanation of Levels of Service Levels of service usually are quantifiable measures of the amount of public facilities that are provided to the community. Levels of service also may measure the quality of some public facilities. Typically, measures of LOS are expressed as ratios of facility capacity to demand (i.e., actual or potential users). The following chart lists examples of LOS measures for some capital facilities. Type of Capital Facility Corrections Fire and Rescue Hospitals Law Enforcement Library Parks Roads and Streets Schools Sewer Sample LOS Measures Beds per 1,000 population Average response time Beds per 1,000 population Officers per 1,000 population Collection size per capita Building square feet per capita Acres per 1,000 population Ratio of actual volume to design capacity Square feet per student Gallons per customer per day KENT COMPREHENSIVE PLAN 8-3 CAPKFAL FACILITIES ELEMENT CHAPTER FIGHT Solid Waste Surface Water & River Levees Transit Water Effluent quality Tons (or cubic yards) per capita or per customer Design storm (i.e., 100 -year storm) Runoff water quality Ridership Gallons per customer per day Water quality Each of these LOS measures needs one additional piece of information: the specific quantity that measures the current or proposed LOS. For example, the standard for parks might be 5 acres per 1,000 population; but the current LOS may be 2.68 acres per 1,000, which is less than the standard. In order to make use of the LOS method, the City selects the way in which it will measure each facility (i.e., acres, gallons, etc.). It also identifies the amount of the current and proposed LOS standard for each measurement. There are other ways to measure the LOS of many of these capital facilities. The examples in the previous chart are provided to give greater depth to the following discussion of the use of LOS as a method for determining the City's need for capital facilities. Method for Using Levels of Service The LOS method answers two questions in order to develop a fmancially-feasible CFP. The GMA requires the CFP to be based on standards for service levels that are measurable and financially feasible for the six fiscal years following adoption of the plan. The CFP must meet the City's capital needs for the fiscal years f994 through 3999: �2- The two questions that must be answered in order to meet the GMA requirements are: (1) What is the quantity of public facilities that will be required by the end of the 6th year (i.e., 19996)? ;M} (2) Is it financially feasible to provide the quantity of facilities that are required by the end of the 6th year (i.e., }999)? Xba- &4 KEN' COMPREHENSNE PLAN CHAPTER EIGHT CAPITAL FACILITIES ELEMENT The answer to each question can be calculated by using objective data and formulas. Each type of public facility is examined separately (i.e., roads are examined separately C� from parks). The costs of all the types of facilities then are added together in order to determine the overall financial feasibility of the CFP. A detailed explanation of the formulas used is contained in the Capital Facilities Plan. One of the CFP support documents, Capital Facilities Requirements, contains the results of the use of this method. Setting the Standards for Levels of Service Because the need for capital facilities is determined largely by the adopted LOS, the key to influencing the CFP is to influence the selection of.the LOS standards. LOS standards are measures of the quality of life of the community. The standards should be based on the community's vision of its future and its values. Traditional approaches to capital facilities planning rely on technical experts (i.e., staff and consultants) to determine the need for capital improvements. In the scenario -driven approach, these experts play an important advisory role, but they do not control the determination. Their role is to define and implement a process for the review of various scenarios, to analyze data, and to make suggestions based on technical considerations. The final, legal authority to establish the LOS rests with the City Council because the City Council enacts the LOS standards that reflect the community's vision. The City Council's decision should be influenced by recommendations of the 1) PI�nnino Commission; 2) providers of public facilities (i.e., local government departments, special districts, private utilities, the State of Washington, tribal governments, etc.); 3) formal advisory groups that make recommendations to the providers of public facilities (i.e., community planning groups); 4) the general public through individual citizens and community civic, business, and issue -based organizations that make their views known or are sought through sampling techniques. The scenario -driven approach to developing the LOS standards provides decision -makers and anyone else who wishes to participate with a clear statement of the outcomes of various LOS for each type of public facility. This approach reduces the tendency for decisions to be controlled by expert staff or consultants, opens up the decision-making process to the public and advisory groups, and places the decisions before the City Council. KENT COMPREHENSIVE PLAN g -S CAPITAL FACILITIES ELEMENT CHAPTER EIGHT �S Selection of a specific LOS to be the "adopted standard" UILiBumtrvcig-be'accomplished by a 12 -step process: (1) The "current" (1993), actual LOS a e calculated. (2) Departmental service providers�e given national standards or guidelines and examples of LOS from other local governments. Yestaycl�d (3) Departmental service providers =search local standards from City studies, master plans, ordinances, and development regulations. r¢.comrr r dawl (4) Departmental service providers =semm=d a standard for the City of Kent's CFP. (5) The fust draft of Capital Facilities Requirements fareeasts needed capacity and approximate costs of two LOS scenarios (e.g., the 1993 actual LOS and the department's recommended LOS). ►'uti tial c0yVY\JLM- t,.d (6) The City Council reuiewT and comments on the first draft of Capital Facilities Requirements. (7) The Operations department a o � up Capital Facilities Level of Service/Cost Options report which�i gesrive alternative LOS options, or scenarios, to forecast the amount of capital facilities that would he ruost appropriate for the City of Kent during the 6 -year growth period H914- t49 4. Phis report complements Capital Facilities Requirements, which was reviewed with the City Council November 30, 1993, and not only identifies LOS options but also includes specific recommendations from the Operations department. rL\li Lw i C6rrLtr (8) The City Council reaiews 4nd c on Capital Facilities Level of Service/Cost Options and �`+references for LOS and noncapacity capital projects to be included in the first draft of the CFP. �MWLa (9) Departmental service providers pregare-specific capital improvements projects and estimates of related maintenance and operating costs to support the City Council's preferred LOS and noncapacity projects. (10) The first -draft CFP -is -prepared using the City CounciIpreferred LOS and noncapacity projects. The LOS in the fust -draft CFP seFves as the basis for capital projects, their costs, and a financing plan necessary to pay for the costs. W4S (11) The draft CFP -is- reviewed/discussed during City Council and Planning Commission workshop(s) prior to formal reading/hearing of the CFP by the City Council. 8-6 KENT COMPREHENSIVE PLAN CHAPTER EIGHT CAPFFAL FAC=ES ELEMENT aA-oiLa (12) The City Council formally adepts LOS as partof the CFP. Every year, as required by the Growth Management Act, department service providers reassess land use issues, level of service standards, and projected revenues to determine what changes, if any are needed. CURRENT FACTMIMS E VENTORIES CORRECTIONAL FACIIIITY The Kent Correction Center is managed by the Kent Police Department. The current inventory of the Correctional Facility totals 130 beds. The Center is located at 1201 Central in the City. An intergovernmental contract with the Federal Marshall's Office currently allows the City to provide approximately 20 beds for Federal prisoners. The geographic location of the Correctional Facility is found on Figure 8.1. dL The Kent Fire Department is responsible for delivering fire protection and emergency medical services to the City, and to the geographic area w King County fie District #37.The City ow (� 24-f stations: Station 71 (south), Station 3 (west); Station 74 (east);ana "nation 76 (north). Each station is equipped with"one fire/aid unit which consists of a pumper truck with emergency medical service/rescue equipment and manpower, and each station has a future capacity for three units. The table below lists each station, fire/aid units in service, total capacity, and average response time: Name of Fire/Aid Units Total Capacity Location Station in Service (Bays) MLon�� �Sr ' a71 1 3 'E� South 66WQ S�atirogt74 -+5 Station � �1* 33 East 'forth 1 3 *Ladder Truck King County Fire District #37 owns t2fee fine KENT COMPREHENSME PLAN 8-7 CAPITAL FA MMES ELEMENT CHAPTER .EIGHT, , Station 77 (Kentridge), with one fine/aid unit in service and capacity for two. The geographic locations of the Fire and Emergency Services facilities are found on Figure 8.1. cY- ' • 1' 1 1 •1�I�If Y�: The Police/Fire Training Center is located on East Hill at 24611 116th Avenue SE. The Center, housed in an 8,000 square foot buiIdinn, provides audio and visual equipment and other facilities for in-service training for City of Kent police officers and fire fighters. Instruction is conducted by Kent Police and Fire Department personnel, and by nationally known instructors from organizations such as the International Association of Police Chiefs and the State Fire Service. In addition to providing a facility for training city of Kent personnel, the training center also accommodates a satellite training program sponsored by the Washington State Criminal Justice Training commission. The geographic locations of the police/fire training facilities are found on Figure 8.1. CLI CITY ADMINISTRATIVE OFFICES - GENERAL GOVERNMENT The City of Kent Operations Department manages several facilities and buildings necessary to the administrative and maintenance functions of the City. These include City Hall and the City Council Chambers, the Centennial Center, the Municipal Court facility, and City maintenance shops. The table below lists the name, location and capacity of each facility: P`-" City Hall . Centennial Center qzel�) Municipal Court LOCATION 220 4th Avenue South 400 West Gowe 302 West Gowe CAPACITY (Square Feet) 33,100 49 4,251 The geographic locations of the City administrative facilities are found on Figure 8.1. � 8-8 KEN' COMPREHENSIVE PLAN CHAPTER EIGHT CAPITAL FACILITIES ELEMENT CITY ADM gSMATION OFFICES - POLICE HEADQUARTERS The inventory of City administrative offices for the Police Department headquarters totals 18,000 square feet, and is located at 232 4th Avenue South in downtown Kent. The geographic location of the Police Headquarters is found on Figure 8.1. d - CITY mAr4TENANCE FA['nMIES The total area of city government maintenance facilities totals 22,558 square feet, and includes the Public Works maintenance shops (17,173 square• feet) and Park and Recreation Department maintenance shops (5,385 square feet). The Police Vehicle Storage facility (3,600 square feet), which is an open, uncovered yard is not included in this inventory. The geographic location of the City Maintenance facilities is found on Figure 8.1 at - PARKS AND RECREATION FACILITIES I'v:k a- q -+;L0 The City of Kent owns and manages 1254 acres of neighborhood park land and T�. - acres of community park land within the current City limits. King County owns *s:p arr c3 Within the unincorporated Urban Growth Area (UGA) of Kent, King county owns acres of park land, aB the Gii y of Ttor,r e% -� nn�nc park and Recreation �� �„ e Department manages a wide variety of facilities located on park land, including the Senior Center, Kent Commons, Special Populations Resource Center, play fields, and trails. A detailed inventory of current parks and recreation facilities is contained in the Comprehensive Park and Recreation Plan. The geographic locations of the parks and recreational facilities are found on Figures 10.1 and 10.2 of the parks element. GOLF COURSES The inventory of current City golf courses includes the following: NAME Par 3 Golf Course 18 Hole Golf Course LOCATION 2030 West Meeker 2019 West Meeker CAPACITY (HOLES) z 18 KEN' COMPREHFNSIVE PLAN 8-9 CAPITAL FACILIi7ES ELEMENT CHAPTER EIGHT The geographic locations of the golf course facilities are found on Figure 10.1 of the parks element. off' SANITARY SEWER FACILITIES The sewer service area of the City of Kent encompasses 23 square miles, and includes most of the incorporated City, as well as adjacent franchise areas within unincorporated King County. Since the existing collection system already serves most of the City's service area, expansion of this system will occur almost entirely by infill development, which will be accomplished primarily through developer extensions and local improvement districts. In general, the existing sewer system is sized based on existing standards which will carry peak flows which will be generated by the service area for ultimate development. However, the City of Kent Comprehensive Sewerage Plan has identified various undersized lines, as well as others that require rehabilitation. A complete inventory of Sanitary Sewer facilities is found in the City of Kent Comprehensive Sewerage Plan. The Municipality of Metropolitan Seattle (Metro) has assumed the responsibility for interception, treatment, and disposal of wastewater from the City of Kent and its neighboring communities. Therefore, the City does not incur any direct capacity -related capital facilities requirements or costs for sanitary sewer treatment. The voluminous inventory of current Sanitary Sewer facilities is on file with the City's Department of Public Works. j t The geographic locations of the sanitary sewer facilities are found on Figure 8.2. o!% MRMWATER MANAGEV= FACILITIES The City of Kent lies primarily within the Green River Watershed, which encompasses 480 square miles and the total drainage area of the City is 19- �u1es which includes most of the incorporated city, as well as the adjacent franchise areas within unincorporated King County. The eight major watershed areas include (1) Green River; (2) Lake Fenwick; (3) Midway; (4) Mill Creek (Kent); (5) Mill Creek (Auburn); (6) Mullen Slew; (7) Springbrook-Garrison Creek; (8) Star Lake. The City has operated a stormwater utility since 1981 as a means of financing the construction, operation, and maintenance of the surface water management program. Conveyance systems in both the "hillside" and "valley" areas must convey at minimum the 25 year storm event. The 8-10 KENT COMPREHENSIVE PLAN CHAPTER EIGHT CAPITAL FACILITIES ELEMENT standards include requirements to provide water quality control recommended by the "State Department of Ecology Stormwater Management Manual". The voluminous inventory of current stormwater management facilities is on file with the City's Department of Public Works. The geographic locations of the stormwater management facilities are found on Figure 8.3. OV - WATER SUPPLY, DISTRIBUTION, AND STORAGE FACILITIES The water service area of the City encompasses 27 square miles. This area includes most of the incorporated City, as well as adjacent franchise areas within unincorporated King County. To the east, the service area boundary coincides with the boundary of Water District No. 111 and Soos Creek Sewer and Water District. To the north, the service area boundary coincides with the mutual Kent/Renton and Kent/Tukwila city limits. ts'the west, it coincides with Highline Water District's boundary, and to the south, the City's service area boundary coincides with the City of Auburn, and Federal Way Sewer and Water. District. The principal sources of water supply for the City's C water system are Kent Springs and Clark Springs. During. high demand periods, the capacity of these two sources is exceeded, and supplemental well facilities are activated. These sources are adequate to meet peak day demands; however, during an extreme dry/hot spell, the City purchases water from adjacent purveyors. Water system interties are presently available with Highline Water District, Tukwila, and Renton during such emergency situations; however, these sources are not considered to be dependable for meeting long-term demand requirements. A new open storage reservoir is proposed to be located on a site near 124th Avenue SE and SE 304th Street. The City also plans a future intertie with Tacoma's pipeline 5 project. The water distribution system exists throughout most of the City's service area. Expansion will take place almost entirely through infill development, which will be accomplished primarily through developer extensions. Most of the remaining projects in the City's most recent water system Plan consist primarily of water main replacements and upsizing in older portions of the A Comprehensive Water System Plan update is required by the Washington State Department of Social and Health Services (DSHS) every five years. The City's most recent Water System Plan (completed in 1988 and amended in 1990) has been approved La;}t_. by DSHS. This plan was completed in conjunction ski the Critical Water Supply Plan for the South King County area.,,A detailed inventory of current water system facilities, 1 ,,, 1 �- � 5 +�Q rl 1119 4 . KENT COMPREHENSIVE PLAN 8-11 CAPITAL FACLUTIES•ELEMENT CHAPTER EIGHT - and City water rights records are on file with the City's Department of Public Works. The voluminous inventory of current stormwater management facilities is on file with the City's Department of Public Works. The geographic locations of water distribution facilities are found on Figure 8.4. zV- TRANSPORTATION FACILMES The City's road system current imrepn�ry consists of approximately 1J.6# total land miles for 4 major categories of roads; 49� miles of principal arterials; :L miles of minor 9a.q �q arterials; 1378 miles of collector arterials, and X13' miles of local roads. There are 9 bridges in Kent. T..19g3,'hansportation networks for pedestrians' include: Widened shoulder 19.35 miles Gravel Paths 28.31 miles Asphalt sidewalks 4.69 miles Concrete sidewalks 108.56 miles Pathways 21 01 miles nro.rob ko .ti lhuP.r%iov-4 %Z111 %U-Pdb+LcJ- c� a jhy5iCa,.Q thV�►'�z=Y� 4s The geographic locations of mayor transportation facilities are found on Figure 9.1 of the LS transportation element. CL- PUBLIC L PUBLIC EDUCATION FACILITIES Most of Kent's residential areas are served by the Kent School District. "The Renton School District serves students from an area of Kent near the north City limits, and Kent students from a section of the West Hill of Kent attend Federal Way Schools. Detailed inventories of school district capital facilities are contained in the capital facilities plan of each school district The geographic locations of schools in Kent are found on Figure 8.1. g- 92 PUBLIC LIBRARY FAC XI'IFS The City of Kent is served by the King County Library system in the Kent Library building at 212 2nd Avenue West, which was built in 1992. Detailed information ` regarding the King County Library System is contained in the King County Library System, The Year 2000 Plan, September 1992. t The geographic location of the Kent Library building is found on Figure 8.1. OL - 8 -12 1CMT COMPREHENSIVE PLAN CHAPTER EIGHT CAPITAL FAC=ES ELEMENT ANALYSIS OF ITAPACTS CAPITAL COSTS Table 8.1 .(Q. 1994 - 1999 Capital Facilities Plan Project Cost Statistics (In 000's) 1994 1995 1996 1997 1998 1999 TOTAL NON UTILITY PROJECTS TRANSPORTATION Corridors 1,982 7.511 8.877 3,734 13,529 , 13.163 48,796 Arterials 115 6,550 2.189 11 3,040 2.200 14,105 Intersection Improvements 265 350 150 765 Other Improvements 584 100 510 792 425 2.411 Subtotal Transoortation 2.681 14,426 11,576 4,887 17,144 15.:63 66.077 PUBLIC SAF -=7Y Correctional Facility 35 105 90 230 Fire & Emergency Services 63 185 231 479 Police! Fre Training Facility 60 577 637 Police Administrative Offices 274 55 145 474 Subtotal Public Safety 95 1,019 330 145 231 1,820 Parks 8 Recreation Neighbrhd Park/Rec Land 100 100 200 200 600 Community Park/Rec Land 814 5,086 1,836 86 86 886 8.794 Neighborhood Rec Facilities 80 101 207 432 410 503 1,793 Community Rec Faa'Uities 745 866 320. 3.267 254 107 5,559 Golf Courses 1,000 300 200 1.500 Subtctal'Parks & Recreation 1,639 7,153 2.763 4,185 750 1,756 18.246 General Government Facilities City Administrative Offices 400 675 200 200 200 200 1,875 City Maintenance Facilities 60 55 60 1,765 125 2.065 Subtotal General Govemment 400 735 255 260 1,965 325 3.940 Total Non Utility 4,815 23,333 14,924 9.332 20.003 17,675 90,082 UTILITY PROJECTS ISanitary Sewer 200 769 175 250 260 270 1,924 Stormwater Management 2.662 11,265 4,363 3.013 2.793 3.072 27,168 Water Supply & Distribution 2.344 2,264 244 1.754 1,764 1,775 10,145 Total Utility Projects 5.206 14,298 4,782 5.017 4,817 5.117 39.237 Total CIP 10.021 37.631 19.706 14.349 24.820 22.792 129.319 KENT COMPREHENSIVE PLAN 8-13 ANALYSIS OF IMPACTS CAPITAL COSTS Table 8.1 DRAFT 1997 - 2002 Capital Facilities Plan Project Cost Statistics (In 000's) SUMMARY 1997 1998 1999 2000 2001 2002 TOTAL NON UTILITY PROJECTS TRANSPORTATION Corridors 13,393 13,529 I3,163 3,085 5,479 1,180 49,828 Arterials 3,188 2,863 5,962 108 109 2,457 14,687 Intersection Improvements 55 350 149 554 Other Improvements 1.294 1,030 757 848 879 1.530 6.338 SUBTOTAL TRANSPORTATION 17,930 17,771 19,883 4,189 6,467 5,167 71.408 PUBLIC SAFETY Correctional Facility 118 25 143 Fire and Emergency Services 2,985 601 721 521 496 496 5,820 Police / Fire Training Center Police Administrative Offices SUBTOTAL PUBLIC SAFETY 3,103 626 721 521 496 496 5,963 PARKS AND. RECREATION Neighborhood Park Recreational Land Community Park Recreational Land 1,200 1,200 Neighborhood Recreational Facilities 1,185 495 735 910 210 210 3,745 Community Recreational Facilities 1,069 4,857 30,220 295 479 295 37,215 Golf Complex 100 350 350 800 SUBTOTAL PARKS AND RECREATION 2,354 5,702 32,505 1,205 689 505 42,960 GENERAL GOVERNMENT Information Services / Automation 6,072 6,072 Government Facilities - Buildings / Mtc 2,310 150 8,290 150 1,650 250 12,800 Other 127 55 59 62 66 70 439 SUBTOTAL GENERAL GOVERNMENT 8,509 205 8,349 212 1,716 320 19,311 TOTAL NON UTILITY PROJECTS 31,896 24,304 61,458 6,127 9,368 6,488 139,642 UTILITY PROJECTS Sanitary Sewer 2,813 1,259 5,589 281 291 303 10,536 Stormwater Management 5,941 4,669 3,154 949 460 478 15,651 Water Supply & Distribution 1,320 11,625 375 286 897 1,184 15,687 TOTAL UTILITY PROJECTS 10,074 17,553 9,118 1,516 1,648 1,965 41,874 TOTAL CAPITAL PROJECTS 41,970 41,858 70,576 7,643 11,016 8,453 181,516 CAPITAL FACILITIES ELEMENT CHAPTER EIGHT FINANCING The revenue sources that are available to the City of Kent for capital facilities include taxes, fees and charges, and grants. Some sources of revenue for capital facilities can also be used for operating costs. A comprehensive list of revenue sources and a discussion of limitations on the use of each revenue source is contained in the Capital Facilities Plan. Existing City revenues are not forecast, nor are they diverted to capital expenditures from maintenance and operations. The financing plan for these capital improvements includes the revenues listed in the pie chart below. The chart lists the major categories of Capital Improvement Projects (CIP) revenue sources and the amount contributed by each source. Table 8.2 Gott $ Utility Fees 31,7: Sale of Property 4,763 3.64: Bonds 8- Grants _ ...._ CITY OF KENT, WASHINGTON CAPITAL FACILITIES PLAN (In 000'a) Total $131,292 REVENUES BY SOURCE 1994-1999 TOTAL REVENUES (in UUU's) m 20.975 16.0% Genera! CIP Revenue 9.959 7.64' s 22.058 16.84° Detailed project lists and financing plans are contained in the Capital Facilities Plan. 8-14 KEN' COMPREHENSIVE PIAN Table 8.2 9§H2FF City of Kent, Washington Capital Facilities Plan (In 000's) REVENUES BY SOURCE 1997-2002 G01fR Utility Fees 26,514 'd A0� Lips 15,693 8.6% CIP Revenues 10,457 5.8% Sal& n£Prnp-rry / Misc 2,721 msportation 23,528 Bonds 8: Grants 102.603 56.5% 1.5% 13.0% TOTAL REVENUE: S181,516 CHAFFER EIGHT CAPITAL FACIL177ES ELEMENT LEVEL OF SERVICE CONSEQUENCES OF THE CFP The CFP will enable the City of Kent to accommodate 15.1 % growth during the next 6 years (48,144 people in 1999) while maintaining the 1993 LOS for the following public facilities: k\ Facility LOS Units 1993 LOS CFP LOS (�( PROPOSED Fire/Emergency Services Units/1,000 pop. 0.096 0.096 Neighborhood Rec. Facilities Community Rec. Facilities Investment/Capita Investment/Capita $151.52 $496.26 $151.52 $496.26 Sanitary Sewer Per DOE and METRO Regulations Stormwater Management Per State Regulations/KinQ County Stds. Transportation NIA Water System Per DSHS Regulations/King County Stds The level of service for the following facilities will be increased as a result of the CFP: Facility V LOS Units 1993 LOS CFP LOS PROPOSED City Maintenance Facilities Sq. Fc./1,000 pop. 539.0 625.0 The level of service for the following facilities will be reduced as a result of the CFP: Facility LOS Units 1993 LOS CFP LOS PROPOSED Correctional Facility Beds/ 1,000 pop. 3.11 2.70 Police/Fire Training Center City Sq. Ft./Employee 32.5 28.3 Admin. Offices Sq. Ft./1,000 pop. 1,525.0 1,325.0 - General Government City Admin. Offices Sq. Ft./1,000 pop. 430.0 396.0 - Police Headquarters Neighborhood Park/ Acres/ 1,000 pop. 2.59 2.53 Recreational Land Community Park/ Acres/1,000 pop. 18.80 18.19 Recreational Land Golf Courses Holes/1,000 pop. 0.65 0.56 8-15 KENT .COMPREHENSIVE PLAN EXHIBIT E TRANSPORTATION ELEMENT ATTACHMENT D CHAPTER NINE Regional Action 2 - Improve * connections with Pierce Transit, especially if commuter rail is not implemented, to provide a regional bus line from Pierce County to Kent, via Auburn. The recent Downtown Parking Study suggested that there is an imbalance in long- and short-term parking in the downtown area. It is also agreed that the existing downtown park-and-ride is too far from downtown for employees to use, and that existing transit service from that Iot to downtown is inconvenient. Conversion of the area near the BN tracks to long-term am3sit/commuter parking would require relocation of some existing long-term, general -use parking. If the area is not appropriately sized, on -street parking in downtown could be affected by spillover as a result of increased use of transit. System Management Alternatives - The City currently is involved in two projects to improve system operation in the valley. One is a muldiurisdictional examination and review of signal timina and coordination for valley arterials that cross jurisdictional bounds. The outcome of this project should be improved flow on major roads and the ability, via computer technology, to adjust signal cycles as demand warrants. The second project is within the City and includes installing a new master computer for the City's signal system. This will allow the City to adjust signal cycles as demand varies. As technology improves over the next 10 to 20 years, a system of surveillance, control, and driver information (SC&DI), similar to that operated by WSDOT on I-5, I-90, and SR 520, would be appropriate for the principal arterials in south King County. This would allow drivers to be notified where back-ups are occurring and what alternate - routes may be available. It also would provide a way to meter traffic entering congested facilities. EMPROVEMENT PROGRAMS Six -Year Program Every year, the City adopts a transportation improvement program aimed at showing impiovements and expenditures over the next six years. The program adopted for 199)(- 2000 generally provides adequate levels of service and corrects existing deficiencies, as defined by the City's service standard. Elements of this action plan Linclude road J L rOwd a..d +.ti.�FIC Si n11 -.o�;.�"`'cr�o..tic'` widening and development oew corridors, o,.. 4 6;cKe(c � de otet- , and support for neighborhood traffic control. 9-22 KENT COMPREHENSIVE PLAN CHAPTER NINE TR4NSPORT.47I0N ELEMENT 2010 Improvements As new development occurs, additional improvements will be needed to maintain the proposed LOS standards. A number of projects have been identified, including road widening for general purpose traffic and for HOV lanes, completion of the regional network, and conversion of lanes for peak -period HOV use. 2020 Improvements A similar project list has been identified for implementation between 2010 and 2020, assuming growth occurs at the rate identified in the land usealfec These projects include more widening, primarily to serve HOV users. TRANSPORTATION FINANCING & BIPLEMENTATION PLAN The creation of a financing and implementation plan is critical to the overall development of the transportation element. In turn the transportation element is a critical element of the comprehensive plan. Development of a financing and implementation plan involves the examination of a number of issues including, improvements to the street system, transit, parking, pedestrian and bicycle facilities. A key tool of the examination was the development of a computer forecast model which simulates the future year travel patterns on the City's transportation system. A key parameter in determining the needs of the system was service levels. Under Growth Management service levels or degree of congestion is a local discretion subject however to consistency, at jurisdictional boundaries. The methodology used to develop the financing plan was consistent with that of the counyywide planning policies. This section is a critical component of the transportation element, and as such plays a important part in enabling growth to occur in concert with the land use projections. —4t— While the KENT COMPREHENSIVE PLAN 9-23 Table 9.4 Six Year Capital Improvement Program (1997 - 2002) (in Thousands) 1997 1998 1999 2000 2001 2002 Revenues Fuel Tax - Unrestricted 928 ' 948 964 980 992 1,005 Fuel Tax - Arterial 434 443 450 458 464 470 Motor Vehicle Registration Fee 449 456 464 471 477 484 Utility Taxes 1,708 1,789 1,879 1,958 2.034 2,112 Intetsst Income 204 166 166 166 166 167 Sale of Land 1.000 Total Revenues 4,723 3.804 3,924 4,034 4,134 4,238 Expenditures Debt Service 464 469 462 383 381 379 Street Utility Operations 341 352 362 373 384 396 Total Expenditures 805 820 824 756 766 774 Net Available for Capital Projects 3,918 2,983 3,100 3,278 3,368 3,463 Sources of Foading Net Available for Capital Projects 2,925 2,983 3,100 3,278 3,368 3,463 Sale ofPropem 1.000 Total Sources of Funding 3,925 2,993 3,100 3,278 3,368 3,463 Capital Project Requests Corridors 196th Street West 47 1,286 196th Street Middle 1,449 1,913 1,771 272nd Corridor - 930 2,42-1 4,414 739 228th Street Corridor 441 Total Corridor 2,426 1.296 4,335 1,771 4,414 1.180 Arterials West Meeker Widening 109 657 72nd Avenue Extension 194 108 SE 256th Improvements (116th - 132nd) 223 262 212th Street Pavement Rehabilitation 300 Total Arterials 223 756 108 109 657 Intersection Improvements Military Road Improvements 149 James & Central Right Turn Lane 70 42nd & Reith Road Pedestrial Signal 55 Total Intersection Improvements 55 70 149 Other Improvements Canyon Drive Sidewalk / Bike Lanes 408 268 South Central Pavement Rehabilitation 350 Sidewalk Rehabilitation 300 300 300 300 300 300 Bike Paths 100 100 100 100 Miscellaneous Asphalt Overlays 337 347 357 368 379 390 Kent Shuttle Service 60 Street Lighting Wiring Upgrades 60 60 Traffic Signal Operational / Safety Improvements 30 42nd Avenue South Reconstruction 75 Road and Railroad Separation Study 100 Traffic Signal Controller Cabinet Replacements 40 40 20 40 40 GIS Software Conversion 19 Total Other Improvements 1,294 1,030 757 848 879 1,180 Total Street Fund Projects 3,775 2,609 5,848 2,876 5,402 3,017 Revenues over (under) Expenditures 143 374 (2,749) 402 (2,034) 446 Beginning Fund Balance Unrestricted 223 736 513 650 582 644 Restricted 79 376 455 10 218 433 Street Utility 226 3.242 3,760 1.320 1,582 (730) Corridor Improvement Balance Available 3,676 Beginning Fund Balance 4,205 4,354 3,728 1,980 2.381 347 Ending Fund Balance Unrestricted 736 513 650 582 644 419 Restricted 376 455 10 218 433 105 Street Utility 3.242 3,760 1.320 1.582 (730) 271 Ending Fund Balance 4,354 4,728 1,980 2,381 347 794 FIGURE 9.3 CITY OF KENT, WASHINGTON 6 YEAR CEP REVENUES LIDS (21.99.14 —Existing Sources (38.33%) Grants (39.70%) Existing sources include cash on hand, MV fuel tax, MV registration fee and west -utility �.� 7TANSPORTAT70N ELEMENT CHA=rrR NINE . transportation element incorporates an improvergent program for 2010 and 2020, the - critical component is he Six Year Improvement Program. The recommended 6 Year X-I.P. is shown on Table 9.3. It is critical because Growth Management mandates that all plans be financially sound and implementable with respect to concurrency. C.L P. '� 'rr, poo, 000 The 6 Year 1-P outlines over- 'i99��66-in impmvement� o1, which a roximately t 000, $50,00 ,000 is to be spent on corridor projeouo more than -7-9A� on arterials, Soo 000 W G almost , n intersections and on non -motorized and maintenance improvements. It should be noted that Zeno revenue sourVs arae cco00, 000 plated. The bulk of the revenue comes from Grants -(63i-,99", j a , LIDs ( , and existing 2-7, 000, 000 sources es (& such as Cash on Hand, MV Fuel Tax, MV Registration Fee and Je ` 7--K - -Seeft- Utility. V- Both pro io osts and anticipated revenues are shown on Figure 91 With reect to Grants, thereof are existing commitments with the SN Bo) Oo O balance related to highly eligible type projects. 90 90 Similarly so with respect to LIDs where ($14,147, OOercains to the corridor coo projects for which adequate covenants exist. The balance involves projects that due to a combination of low assessment level and adjacent high density land use .should be supportable. The implementation schedule which is equally important with respect to Growth Management and the assemblage of funds is reflected in Table 9.4. The crucial projects such as the 196th Street Corridor, Orillia to West Valley Highway, and West Valley Highway to East Valley Highway, and the 272nd Street Corridor are anticipated to be opened in 1998, 2000 and 1999 respectively. 9-14 KENT COMPREHENSIVE PLAN Table 9.3 Six Year Capital Improvement Projects (1997 - 2002) (in Thousands) Corridor Projects 196th Street West (Orillia Road to West Valley Highway) 11,419 272nd Corridor (Auburn Way North to SR516) 20,190 196th Street Middle (West Valley Highway to East Valley Highway) 17,779 228th Street Corridor (54th Avenue to SR516) 441 Total Corridors 49,828 Arterials 212th Street Pavement Rehabilitation (West Valley Highway to Green River Bridge) 600 Washington Ave Widening (SR516 to Smith Street) 1,000 Pacific Highway HOV - Phase I (Kent -Des Moines Road to 240th) 2,188 SE 256th Improvements (116th - 132nd) 2,985 64th Ave Extension (216th to 226th) 2,-)00 Pacific Highway HOV - Phase II (240th to 252nd) 2.500 West Meeker Widening (Kent -Des Moines Road to Green River Bridge) 2,566 72nd Ave Extension (194th to 196th) 648 Total Arterials 14,687 Intersection Improvements James & Central Right Turn Lane 350 Military Road Improvements (Kent -Des Moines Road to Reith Road) 149 42nd Avenue & Reith Road Pedestrian Signal 55 Total Intersection Improvements 554 Other Improvements Miscellaneous Asphalt Overlays 2.178 Traffic Signal Operational / Safety Improvements 30 Sidewalk Rehabilitation 1.800 42nd Avenue South Reconstruction 75 Traffic Signal Controller Cabinet Replacements 180 Street Lighting Wiring Upgrades 120 S Central Pavement Rehabilitation 700 Canyon Drive Sidewalk / Bike Lanes 676 Bike Paths 400 Road and Railroad Separation Study 100 Kent Shuttle Service 60 GIS Software Conversion 19 Total Other Improvements 6,338 Total Capital Improvement Projects 71,408