HomeMy WebLinkAbout1211RESOLUTION NO. 1211
A RESOLUTION of the City Council of the
City of Kent, Washington, adopting the SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM 1990 to 1995.
THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES
HEREBY RESOLVE AS FOLLOWS:
Section 1. THE SIX-YEAR TRANSPORTATION IMPROVEMENT
PROGRAM 1990 to 1995, as set forth in the attachments hereto and
herewith filed with the City Clerk, is hereby adopted.
Passed at a regular meeting of the City Council of the
City of Kent, Washington this 18th day of July, 1989.
Concurred in by the Mayor of the City of Kent this 19th
day of July, 1989.
DAN KELLEHER, MAYOR
ATTEST:
APPROVED AS TO FORM:
I hereby certify that this is a true and correct copy of
Resolution No. 1211, passed by the City Council of the City of
Kent, Washington, the 18th day of July, 1989.
MARIE JENSEN, CITY CLERK
(SEAL)
'·---------
CITY OF KENT
SIX YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
1990-1995
Don E. Wickstrom, P.E.
Director of Public Works
SIX YEAR TRANSPORTATION IMRPOVEMENT PROGRAM
1990 TO 1995 PROJECT LISTING
ANNUAL ELEMENT 1990
(First Year)
Priority
1989 1990
13
X
X
22
X
X
X
19
6
14
6
X
9
2
3
5
5
10
8
11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
ANNUAL ELEMENT 1989
Military Road -Bolger Road to SR 516
Central Avenue Traffic Signal Interconnect
72nd Avenue South -s. 194th street to s. 196th street
s. 228th street and Military Rd Improvements
city-wide Traffic Signal Installation & Improvements
Railroad Grade crossing Replacement (City-wide)
canyon Drive Guardrail Replacement
S. 196th St./200th St. Corridor Improvements (West Leg)
West Valley Highway (SR-181)-S. 189th st. to s. 212th st.
crow Road Bypass (SR-516 Bypass)
west Valley Highway (SR-181)-s. 180th st. to s. 192nd st.
64th Ave. South -s. 212th st. to Meeker street
canyon Dr. (SR-516) Left Turn Lanes -Hazel Ave. to Weiland
west Valley Highway (SR-181) and s. 212th Street
West Valley Highway (SR-181) and s. 190th street
S.E. 277th St. -SR-167 to Auburn Way North
s. 272nd st;s. 277th st -Auburn Way North to K-K Rd.
S.E. 256th street and 104th Avenue s.E.
S.E. 260th street and 104th Avenue S.E.
central Ave. (SR-516) -Willis street to smith street
SECOND YEAR 1991
X
12
X
THIRD
20
15
18
17
21
22
23
YEAR 1992
24
25
26
27
James street and 104th Avenue S.E.
East Valley Highway -S. 180th St. to S. 189th St.
S. 196th St./200th St. Corridor Improvements (Middle Leg)
Central Avenue and s. 259th street
East Valley Highway and s. 196th street
North Central Avenue and Smith street
James street and central Avenue
4TH, 5TH, 6TH YEARS 1993, 1994, 1995
21
16
X
28
29
30
94th Ave. S./SE 248th St -Canyon Dr. SE to 116th Ave. SE
Kent-Kangley Rd (SR-516) & 111th Avenue S.E.
S.E. 256th St -Kent-Kangley Rd. (SR-516) to 116th Ave. SE
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
1990 TO 1995
Hearing Date _____ -.:_f :_-_' d-'7 1 r·c:;
Adoption Date 7 -/. -f 1
Resolution No~f=~J=f------
============================================================================================================================!
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
r
DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTAL
0 SCHEDULE 1------------------------------1 . .
r (Street name or number, y E A R !FEDERAL !FUNDS
i Co. road name or number, 89 90 91 92-94
t termini beginning & end. ! 1st 2nd 3rd 4' 5 Pro-!AMT TlB!Local
y Describe work to be done.) !Annl 6th !AMT gram!
No !Elmt
============================================================================================================================!
----------------------------------------------------------------------------------------------------------------------------!
!Military Rd. -Bolger Rd. to SR-516
!Widen roadway to 5 lanes with curb, gutter &
!sidewalk. Provide drainage, paving,
!channelization, street lighting & landscaping
60
2 !Central Avenue Traffic Signal Interconnect 75
!Traffic signal modifications @ S. 244th St. & 84th!
!Ave. S., replacement of existing WSDOT traffic
!signal controllers with City equipment & install
!traffic signal interconnect to the City's Master.
3 !?2nd Ave. S. -S. 194th St. to S.196th St. 540
!Construction of a new two lane roadway with
!curb & gutter, sidewalk, grading, paving,
!channelization and landscaping.
4 !S. 228th St. and Military Rd. Improvements 100
!Construct new roadway for S. 228th St., from
!54th Ave. S. to Military Rd. & improve Military Rd!
!from S. 228th St. to SR-516.
5 !City-Wide Traffic Signal Installation & Imp.
!Add new traffic signals & improve existing
!signalized interxection locations throughout
!the city.
6 !Railroad Grade Crossing Replacement (City-Wide)
!City wide railroad crossing replacement
!program.
!Canyon Drive Guardrail Replacement
!Replace existing cable wire guardrail system
!on the southwesterly side of Canyon Drive S.E.
150
40
150
622
100 60
40 40
150
8 !S 196/200th Corridor Improvement (West Leg)
!Major widening of S. 200th St. from Orillia Rd.
!to the Green River. The project shall include
!curb & gutter, sidewalks, lighting, grading,
!paving, bridge over Green River, a new signal at
!Oril1ia Rd., signing, and landscaping. This is
1000 2040 1000
568 FAUS! 114 682
62 FAUS! 13 75
432 TIB! 108 540
7934 6347 TIB! 1587 7934
260 570 570
160 280 280
270 SFTY! 30 300
3232 TIB! BOB 4040
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SU~1MARY
City/County Kent, Washington
City No 0615
County No. 17
1990 TO 1995
Hearing Date ______________ _
Adoption Date _____________ _
Resolution No.
============================================================================================================================!
P PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS !
r
DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTAL
0 SCHEDULE !------------------------------!
r (Street name or number, y E A R !FEDERAL ! FUNDS
Co. road name or number, 89 90 91 92-94
t termini beginning & end. ! 1st 2nd 3rd 4 '5 Pro-!AMT TIS! Local
y Describe work to be done.) !Annl 5th !AMT gram!
No !Elmt
============================================================================================================================!
!
----------------------------------------------------------------------------------------------------------------------------!
!(Pending annexation).
9 !West Valley Highway (S 189th-S 212th)
!Major widening of West Valley Highway to
!include curb & gutter, sidewalks, lighting
!grading, paving, channelization, signalization,
!signing, and landscaping.
10 !Crow Road By-Pass (SR-516 By-Pass)
!Minor widening to improve turning radius at
!SE 260th St. and 108th Ave SE with signalization
!at Kent-Kangley Road (SR-516) & 108th Ave SE
!to include curb & gutter, sidewalks, lighting
!grading, paving, channelization and signing.
6121
700
11 !East Valley Highway (S 180th St.-S 192nd St.) 2900
!Complete five lane section with drainage, paving,
!sidewalks, curb & gutter, lighting, landscaping,
!underground utilities, bridge, and signing.
12 !64th Ave. S. -S. 212th St. to Meeker St.
!Construction of new roadway on 64th Ave. S. from
!S. 212th St. to James St., roadway widening from
!James St. to Smith St. and signals~ S.212th St.,
!S. 228th St., James St. & Meeker St.
13 !Canyon Drive (SR-516) Hazel Ave -Weiland St
!Addition of left turn lanes at Hazel, Smith,
!and Weiland Streets to include curb & gutter,
!sidewalks, channelization and drainage.
I
14 !West Valley Highway (SR-181) and S. 212th St.
!Add turn lanes, channelization, signing, signal
!improvements, grading, widening.
15 !West Valley Highway (SR-181) and S. 190th St.
!Installation of a full eight phase signal system
!with channelization and lighting.
16 !S.E. 277th St. -SR-167 to Auburn Way
!Roadway improvements to include: Major widening of!
4200
350
130
1200
370 FAUS!
SFTY!
292 FAUS!
108 FAUS!
'!
1000 900
900 TIB! 5221
700
900 TIS! 2000
. !
I
I
1000 TIB!
4200
58
22
2100
6121
700
2900
4200
370
350
130
3100
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
1990 TO 1995
Hearing Date ______________ _
Adoption Date _____________ _
Resolution No.
~===========================================================================================================================!
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
0
r
;
t
y
No
DESCRIPTION OF WORK
(Street name or number,
Co. road name or number,
termini beginning & end.
Describe work to be done.)
89
! 1st
!Annl
!Elmt
OBLIGATION
SCHEDULE
Y E A R
90 91
2nd 3rd
92-94
4. 5
5th
FUNDING SOURCE !TOTAL
!------------------------------!
!FEDERAL ! FUNDS
Pro-!AMT TIB! Loca 1
!AMT gram!
============================================================================================================================!
----------------------------------------------------------------------------------------------------------------------------1
!roadway to tour/five lanes with curb& gutter,
!sidewalk, lighting, grading, paving, signing,
!channelization & railroad crossing safety devices.!
17 !S. 272nd/S. 277th St. -Aubrun Way to Kent-Kangley! 2400 2400 3600
!Construct new four/five lane roadway including
!channelization, new bridge construction & signal &!
!Kent-Kangley Rd.
18 !SE 256th St. and 104th Ave SE
!Addition of a double southbound lett turn lane
!and traffic signal revisions.
19 ~sE 260th St. and 104th Ave SE
!New traffic signal
20 !Central Ave. (SR-516) Willis St. -Smith St.
!Minor widening to include northbound left turn
!lane, storm drainage & channelization.
21 !James St. and 104th Ave. S.E.
!Construct additional eastbound acceleration
!lane on James St. approximately 600 feet east
!the intersection.
22 !West Valley Highway (S 180th-S 212th)
!Major widening of West Valley Highway to
!include curb & gutter, sidewalks, lighting
of
!grading, paving, channelization, signalization,
!signing, and landscaping.
23 !S. 196th/200th St. Corridor Imp. (Middle Leg)
!construct new four/five lane roadway from the
!Green River to 80th Ave. S., & widening from 80th
!Ave. to East Valley Highway.
24 !Central Ave. and S. 259th St.
!Install two phase traffic signal, street lighting
!& channelization.
25 !East Valley and S. 196th St.
!Install two phase traffic signa 1. street lighting
!& channelization.
450
135
465 1051
150
2609
350
130
130
1000 TIB! '1400 8400
200 TlB! 250 450
135 135
1000 TIB! 516 1516
125 FAUS! 25 150
I
2609 2609
' 280 TIB! 70 350
108 FAUS! 22 130
'!
108 FAUS! 22 130
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
1990 TO 1995
Hearing Date ______________ _
Adoption Date _____________ _
Resolution No.
============================================================================================================================!
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
r
DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTAL
0 SCHEDULE !------------------------------!
r (Street name or number, y E A R !FEDERAL ! FUNDS
i Co. road name or number, 89 90 91 92-94
t termini beginning & end. ! 1st 2nd 3rd 4 '5 Pro-!AMT TIB!Local
y Describe work to be done.) !Annl 6th !AMT gram!
No !Elmt
============================================================================================================================!
----------------------------------------------------------------------------------------------------------------------------'
26 !N. Central Ave. and Smith St ..
!Add a new double left turn lane, channelization,
!street lighting, signal upgrade & signing.
27 !James St. and Central Ave.
!Minor widening of intersection to accomodate
!a westbound right turn lane.
28 !94th Ave S.E./S.E. 24Bth St. -Canyon Dr. to 116th!
!Widen to 3 lanes with curb, gutter & sidewalk.
!Provide drainage, paving, channelization,
!signing, street lighting & landscaping.
29 !Kent-Kangley (SR-516) and 111th Ave SE
!Traffic signal revisions and traffic signal
! interconnect.
30 !S.E. 256th St. -Kent-Kangley Rd. to 116th Ave SE
!Improvements to include roadway widening, drainage!
!curb, gutter & sidewalk, lighting, paving,
!channelization, signing & landscaping
590
150
1450
25
900
492 FAUS! 98 590
125 FAUS! 25 150
1160 TIB! 290 1450
21 FAUS! 25
720 TIB! 180 900
============================================================================================================================!
GRAND TOTALS 21166 10512 6600 10729 2649 FAUS 17171 TIB 29457 49277
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
'·
180th
N
116th
256th
FIRST YEAR 1990
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Military Rd. -Bolger Rd. to SR-516
DESCRIPTION: {Proj. Length .28 1'11.) Roadway improven-ents to include:
Widen roadway to five lanes with curb & gutter, sidewalk.
Provide drainage, paving, channelization, street lighting,
channelization & landscaping improvements. This project will
provide a future connection for the S. 228th St. corridor
project.
SUMMARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $ 60,000
Right Of Way ................. $
Construction ................. $ 622,000
Total .................... $ 682,000
FUNDING SOURCE: LID,FAUS, Prop. 1991
PROJECT COST:
1
1st Yr
Annual Elenent
60,000
ST
2nd Yr
622,000
3rd Yr
6"--<r-ov
r:
I
4, 5,
& 6th Yr
~0;
p 7 II•, loiJ~tiS l n"<iltll
p. ~ MIDWAY ---------
P INTEHCHAHGE
Total
682,000
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROA.IHlAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
Major Roadway Widening ................... $ 507,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk: ............................ · · · · · $
Paths/Trails/Bikeways .................... $
SUB TarAL $ 507,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $ 30,000
Channelization/Signing ................... $ 15,000
SUB TOTAL $ 45,000
IJI'ILITY IMPROVEMENTS
Storm Drainage System .................... $ 70,000
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 70,000
ESTIMATED TOTAL CONSTRUCTION COST $ 622,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Central Avenue Traffic Signal Interconnect
DESCRIPTION: (Proj. Length .11 Mi.) Traffic signal modifications at S.
224th St. and 84th Avenue S. 1 replacement of existing WSOOT
traffic signal controllers with City of Kent standard
equipnent 1 and install traffic signal interconnect to the
City of Kent Master Signal Computer.
SUM1ARY: {Project Costs in 'TI1ousands of Dollars)
Preliminary Engineering ...... $ 5,000
Right Of Way ................. $
Construction ................. $ 70,000
Total .................... $ 151000
FUNDING SOURCE: CIP 1 DEV, FAUS 1990
PROJECT COS'l':
4, 5, 1st Yr
Annual Element 2nd Yr 3rd Yr & 6th Yr
751000
s 222NIJ
PROJECT 12 7
.,
J: J: ... ~ ~ :5 !IT "' ~ ~2BT i OQ 5T 4
J: "' ~
a ID w z w "' >
N ~ -<
:z:
2
Total
751000
a
~
1'1
"'
Ill
w > -<
J:
~
I ..,
"' L_
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAIWAY IMPROVEMENTS
STREET IMPROVEMENTS: .
New Roadway Construction ................. $
Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways ........... · ......... $
SUB TOTAL $ 0
TRAFFIC IMPROVEMENTS:
Signal System ............................ $ 70,000
Street Light System ...................... $
Channelization/Signing ................... $
SUB TOTAL $ 70,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUBTOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 70,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROORAM
PROJECT: 72nd Avenue S. -S. 194th Street to S. 196th Street
DESCRIPTION: (Proj. Length .11 Mi.) Construction of new two lane roadway
with curb & gutter, sidewalk, grading, paving,
channelization, landscaping.
SUMv!ARY: (Project Costs in Thousands of Dollars)
Preliminai(Y Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: CIP, TIB 1990
PROJECT COST:
1st Yr
Arumal Element
540,000
2nd Yr 3rd Yr
81,000
459,000
540,000
4, 5,
& 6th Yr
S !90TH ST
S. !90th. ST.
fri . 23 N
> 22 N ~
' ·-N ~
ctl ..,
S. !94th. ST.
s !96TH ST
3
-Ct.l
~ <
35
2
36
0 z
N ,...
/
/
/
(
a
~I
==I q
0::1
ul
Total
540,000
N
SIX YEl\R TRANSPORTATION IMPROVEMENT PROGRAM
(CONI'.)
ROAI:WAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $ 444,000
,Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 444,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $ 15,000
SUB TOTAL $ 15,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 459,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROORAM
PROJECT: S . 2 28th St. and Military Rd. Improvements
DESCRIPTION: (Proj. Length 1.15 Mi.} Construct new roadway for S. 22Bth
St., from 54th AvenueS. to Military and improve Military
Rd. from S. 228th St. to SR-516. The project shall include a
bridge crossing over the Green River and constructing a 4 to
5 lane roadway, curb & gutter, sidewalk, street lighting,
signalization at Military Rd., channelization & strom
drainage.
SUMMARY: (Project Costs in 1~usands of Dollars}
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: CIP,LID,TIB, Prop.90
PROJECT COST:
4
1st Yr
Annual Element
100,000
2nd Yr 3rd Yr
847,698
691,692
6,394,610
7,934,000
4, 5,
& 6th Yr
7,834,000
Total
7,934,000
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROA.I:WAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $6,149,610
,Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $6,149,610
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
80,000
25,000
30,000
SUB TOTAL $ 135,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... 8 110,000
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 110,000
ESTIMATED TOTAL CONSTRUCTION COST $6,394,610
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: City~ide Traffic Signal Installatiion & Improvements
DESCRIPTION: Add new traffic signals and improve existing signalized
intersection locations throughout the city in order to
accomodate increased traffic volumes due to growth.
Sill-'MARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: CIP
PROJECT COST:
1st Yr
Annual Element
150,000
2nd Yr
100,000
3rd Yr
60,000
57,000
513,000
570,000
4, 5,
& 6th Yr
260,000
NO MAP
5
Total
570,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAI!r'ID. Y IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL . $ 0
TRAFFIC IMPROVEMENTS :
Signal System ............................ $ 513 1 000
Street Light System ...................... $
Channelization/Signing ................... $
SUB TOTAL $ 513 I 000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 513 1 000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Railroad Grade Crossing Replacement (City-wide)
DESCRIPTION: City wide railroad crossing replacement program.
SUMMARY: {Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ..•.....•........ $
Construction ................. $
Total .................... $
FUNDING SOURCE: CIP
PROJECT COST:
1st Yr
Annual Element
40,000
2nd Yr
40,000
3rd Yr
40,000
280,000
280,000
4, 5,
& 6th Yr
160,000
NO MAP
6
Total
280,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAimAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
,Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $ 280,000
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidevlalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 280,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light system ...................... $
Channelization/Signing ................... $
SUB TOTAL $ 0
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TarAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 280,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Canyon Drive Guardrail Replacement
DESCRJPTION: (Proj. Length .50 Mi.) Replace existing cable wire guardrail
system on the southwesterly side of Canyon Drive S.E.
SUMMARY: (Project Costs in 'fhousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: SAFETY, Prop. 1990
PROJECT COST:
7
1st Yr
Annual Element
150,000
2nd Yr 3rd Yr
150,000
300,000
300,000
4, 5,
& 6th Yr Total
300,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGR/\M
(CONT.)
ROALWAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $ 300,000
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 300 I 000
'ITIAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
SUB TOTAL $ 0
lil'ILITY IMPROVE11ENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUBTOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 300,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: S. 196th St./200th St. Corridor Improvements (West Leg}
DESCRIPTION: (Proj. Length .62 Mi.) Roadway improvements to include:
Major widening of S. 200th St., from Orillia Rd. to the
Green River. Included also are curb & gutter, sidewalk,
street lighting, grading, paving, construction of a bridge
over the Green River, a new traffic signal at Orillia Rd.,
signing & landscaping. 1his is a joint project with the City
of Tukwila (Pending Annexation) & King County.
SUM-1ARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: LID,TIB,Prop. 1991
PROJECT COST:
1st Yr
Annual Element
1,000,000
2nd Yr 3rd Yr
2,040,000 1,000,000
448,000
267,000
3,325,000
4,040,000
4, 5,
& 6th Yr
PROJECT
8
AKE
NGE
I
I
f ·• s. • . ' 204 TH ST
Total
4,040,000
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAI:WAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
Major Roadway Widening ................... $3,075,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb &. Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $3,075,000
'IRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light Syst6n ...................... $
Channelization/Signing ................... $
200,000
40,000
10,000
SUB TOTAL $ ~50,000
liTILITY IMPROVEMENI'S
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $3,325,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:. West Vall~y Highway {SR-181) -S. 189th St. to S. 212th St.
DESCRIPTION: {Proj. Length 1.45 Mi.) Roadway improvements to include:
Major widening of West Valley Highway. Also included are
curb & gutter, sidewalk, street lighting, grading, paving,
channelization, signalization, signing & landscaping.
SUMMARY: {Project Costs in Thousands of Dollars}
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: LID,TIB,Funded 1989
PROJECT COST:
9
1st Yr
Annual Element
6,121,000
2nd Yr 3rd Yr
PROJECT
J
620,000
1,200,000
4,301,000
6,121,000
4, 5,
& 6th Yr Total
6,121,000
>
z
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAINJAY IMPROVEMENTS
STREET IMPROVEJ.1ENTS:
New Roadway Construction ................. $
·Major Roadway Widening ................... $3,929,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $3,929,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light system ...................... $
Channelization/Signing ................... $
300,000
60,000
12,000
SUB TOTAL $ 372, 000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $4,301,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Crow Rd. By-Pass (SR-516 By-Pass)
DESCRIPTION: (Proj. Length .35 Mi.) Minor widening to improve turning
radius at S.E. 260th St. & 108th Ave. S.E., also at Canyon
Dr. S.E. and Craw Rd., signalization at Kent-Kangley Rd.
(SR-516) & 108th Ave. S.E. curb & gutter, sidewalk, street
lighting, grading, paving, channelization & signing.
SUM11\RY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
:ruNDING SOURCE: Dev.
PROJECT COST:
1st Yr
Annual Element
700,000
SCENIC HILL •
ELEMENTARY'
SCHOOL
-1
10
2nd Yr
Of···"ch
ftt'ld
\
3rd Yr
Sf 252ND
ST
70,000
100,000
530,000
700,000
4, 5,
& 6th Yr
EAST ll!LL
CENTER X ....
~
Total
700,000
'"' (I)
w >
o(
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAr1iiAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
,Major Roadway Widening ................... $ 297,150
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 297,150
TRAFFIC IMPROVEMENTS :
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
120,000
40,000
12,000
SUB TOTAL $ 172 I 000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $ 60,850
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 60,850
ESTIMATED TOTAL CONSTRUCTION COST $ 530,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: East Valley Highway (SR-181) -S. 180th St. to S. 192nd St.
DESCRIPTION: (Pro j . Length . 85 Mi. ) Roadway improvements to include: TI1e
completion of five lane section with drainage, paving, curb
& gutter, sidewalk, street lighting, landscaping,
underground utilities, construct/reconstruct box culvert,
traffic & railroad signing.
SUMvfARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: LID,TIB,Funded 1989
PROJECT COST:
11
1st Yr
Annual Element
2,900,000
I
U)IV) 1-1-
~ ~
:=itJ
z ~I~
0
Gsu
f-
z
w
2nd Yr 3rd Yr
PROJECT
290,000
350,000
2,260,000
2,900,000
4, 5,
& 6th Yr Total
2,900,000
I-
V)
z
SIX YEAR TRANSPORTATION IMPROVEMF ... NT PROGRAM
(CONT.)
RO.AI:::WAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
.Major Roadway Widening ................... $2,160,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $2,160,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
80,000
20,000
SUB TOTAL $ 100,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $2,260,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: 64th Avenue S. -S. 212th Street to Meeker Street
DESCRIPTION: (Proj. Length 1.74 Mi.) Const1~1ction of new roadway on 64th
Ave. S. from James St. to S. 22Bth St. & from S. 226th St.
to S. 212th St., widening of 64th Ave. S. from James St. to
Smith St .. New traffic signals at S. 212th St., S. 228th St.,
W. James St. , W. Meeker St. , Improvements to include: new
roadway, curb & gutter, sidewalk, storm drainage, lighting,
sanitary sewer, watermain & landscapin
SUM'1ARY: (Project Costs in 'I11ousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ............. ~ ... $
Construction ................. $
Total .................... $
FUNDING SOURCE: LID
PROJECT COST:
1st Yr
Annual Element
4,200,000
12
2nd Yr
2,703,000
3rd Yr
690,000
1,863,900
4,349,100
6,903,000
4, 5,
& 6th Yr
PROJECT
.... ~;-
!. r,, . .
; ~
i ;
Total
6,903,000
' ..
I .. ,., or
! 8!
'!
'------J.:-:-,--=-... -~-l-5-
z
SIX YEAR TRANSPORTATION IMPROVEMF..NT PROGRAM
(CONT.)
ROA.tWAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $3,569,100
,Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $3,569,100
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
650,000
100,000
30,000
SUB TOTAL $ 780,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $4,349,100
SIX YEAR TRANSPORTATION IMPROVE1'1ENT PROGRAM
PROJECT: Canyon Dr. (SR-516} Left Turn Lanes -Hazel Avenue to Weiland
st.
DESCRIPTION: (Proj. Length .50 Mi.) Roa&~y improvenents to include: TI1e
addition of left turn lanes at Hazel St. 1 Smith St. &
Weiland St., installing curb & gutter, sidewalk,
channelization & drainage.
SUfvMARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, SFI'Y I Funded 89
PROJECT COST:
1st Yr
Annual Element
370,000
13
2nd Yr 3rd Yr
"' z ~ ~ z
U E ., TEM
28,000
74,000
268,000
370,000
4, 5,
& 6th Yr
PROJECT
Ill
w
ST. JAMES >
SCHOOL <(
ril
s J: ....
247TH ... -(PI
ST
Total
370,000
....
"'
Ill
...,
> <(
J: .... ..,
(PI
Ill
w s 246TH
> PL <(
J: J: Ill
1-1-w
10 ..... > . 248 (PI <( s
~1= "' > <(
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROA.I:WAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
.Major Roadway Widening ................... $ 230,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 230,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $ 38,000
SUB TOTAL $ 38,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 268,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: West Valley Highway (SR-181) and S. 212th St.
DESCRIPTION: (Intersection) Intersection improvements to include: The
addition of turn lanes, channelization, signing, signal
improvements, grading & roadway widening.
StJMI1ARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $ 45,000
Right Of Way ................. $
Construction ................. $ 305,000
Total .................... $
FUNDING SOURCE: FAUS,Funded, 1989
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
4, 5,
& 6th Yr
350,000
/
· o.\.,.:.l"
14
/
'
/
I
I
• --2121
~ (
/
/
\
\
PROJECT
fire Station
EE
J 2 I ~-
OBRIEN
:l. ELEM ENTA
• SCHOOL
·-.....__ --·
-o
0
N
218th.ST-r-&.....:.:.....::.~..:;.;_~--~
Total
350,000
\
)
w >
o(
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAIW'AY IMPROVEMENTS
STREET IMPROVEMENTS :
New Roadway Construction ................. $
,Major Roadway Widening ................... $
tL11or Roadway Widening ................... $ 220,000
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidev-ralk ................................. $
Paths/Trails/Bikeways .................... $
SUB.TOTAL $ 220,000
TRAFFIC IMPROVEMENTS :
Signal System ............................ $ 75,000
Street Light System ...................... $
Channelization/Signing ................... $ 10,000
SUB TOTAL $ 85,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 305,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: West Valley Highway (SR-181) and S. 190th St.
DESCRIPTION: (Intersection) Intersection improvements to include: The
installation of a five phase signal system with
channelization and street lighting.
SUM1ARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $ 12,000
Right Of Way ................. $
Construction ................. $ 118,000
Total .................... $ 130,000
FUNDING SOURCE: FAUS, Funded, 1989
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
4, 5,
& 6th Yr
130,000
. ·.····.-CJir _u_M!li-
S. l901h. ST.
15
·r
_J
?.
:X: S !66TH ST
~
~-
!90TI-I ST
Pl<OJECT
(/)
w > <
Q
z
N
"
/
\
a
'1:
0
0: _,
•.{
Q
u ;:;:
u
•T
Q_
<::.
Qi
-I 2:j
:J.
1
Total
130,000
s
IN!liJ
A
---~-+--N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAIWAY IMPROVEMENTS
STREET IMPROVEMENTS :
New Roadway Construction ................. $
, Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ........ , ... $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOT.l\L $ 0
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
108,000
8,000
2,000
SUB TOTAL $ ·118,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 118,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROORAM
PROJECT: S.E. 277th St. -SR-167 to Auburn Way N.
DESCRIPTION: (Proj. Length .72 Mi.) Roadway improvements to include:
Major widening of roadway to four and five lanes with curb &
gutter, sidewalk, street lighting, grading, paving, signing
channelization, signalization & railroad crossing safety
devices. This is a joint project with the City of Auburn.
SUMvU\RY: (Project Costs in 1110usands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construct ion ................. $
Total .................... $
FUNDING SOURCE: LID,CIP,TIB,Prop. 90
PROJECT COST:
1st Yr
Annual Element
1,200,000
0::
lL
>-UJ
.J
.J
<(
>
2nd Yr 3rd Yr
1,000,000 900,000
It -t'-:l
186,000
1,085,000
1,829,000
3,100,000
4, 5,
& 6th Yr
----
Total
3,100,000
25 . 30 l
I @.?) 36 31
l
I
THOMAS STREET l.
INTERCHANGE
PROJECT
1
TUOMAS
n•P.
-1
0
LL
3;3;
ww
oql{)
0::0::
I;; (
0
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROALWAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
'Major Roadway Widening ................... $1,769,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $1,769,000
TRAFFIC IMPROVEMENTS :
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
30,000
20,000
10,000
SUB TOTAL $ 60,000
UTILITI IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $1,829,000
SIX YEAR TRANSPORTATION IMPROVE1'1ENT PROGRAM
PROJECT: S. 272nd St./S. 277th St. -AubuiTn Way N to Kent-Kangley Rd.
DESCRIPTION: (Proj. Length 2.27 Mi.} Constuct new four to five lane
roadway section including street lighting, grading, paving,
signing, channelization, new bridg~ construction & a new
traffic signal at Kent-Kangley Rd .. TI1is is a joint project
with King County.
SUMMARY: (Project Costs in Thousands of Dollars}
Preliminary Engineerinu ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: CIP,LID,TIB,Prop. 90
PROJECT COST:
1st Yr
Annual Element
2,400,000
2nd Yr 3rd Yr
2,400,000 3,600,000
--,
I
~
495,600
2,939,999
4,964,401
8,400,000
4, 5,
& 6th Yr
. 9_ ---~-+:.:.___:-=n.-3'-r'
PfWJECT .
! A U B U R N
17
Total
8,400,000
11'11( , .... (
K!.. ""ll:t-H"'""
t.CitOOl ••
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROA.IMAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $4,799,401
.Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing ............................... $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
. SUB TOTAL $4, 799, 401
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
100,000
50,000
15,000
SUB TOTAL $ 165,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $4,964,401
SIX YEAR 'IRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: S.E. 256th St. and 104th Avenue S.E.
DESCRIPTION: (Intersection) Intersection improvements to include:
Addition of a double southbound left turn lane, westbound
right turn lane & traffic signal revisions.
SUMMARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: Dev.,TIB,Funded 1989
PROJECT COST:
1st Yr
Annual Element
450,000
2nd Yr 3rd Yr
45,000
20,000
385,000
450,000
4, 5,
& 6th Yr
EAST H!LL
CENTER
18
SE 252ND
ST
PROJECT
Total
450,000
...
Ill
S.E.
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAI:WAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
1 Major Roadway Widening ................... $ 347,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 347,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $ 30, 000
Street Light System ...................... $
Channelization/Signing ................... $ 8,000
SUB TOTAL $ 38,000
UTILI1Y IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 385,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: S.E. 260th St. and 104th Avenue S.E.
DESCRIPTION: (Intersection) Roadway improvements to include: Minor
widening of 104th Ave. S.E. including curb & gutter,
sidewalk. Install double left turn lane and northbound right
turn lane, new signal & signal interconnect.
Sut41ARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: CIP, Dev. ,
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
135,000
SE
19
13,500
121,500
135,000
4, 5,
& 6th Yr Total
135,000
uJ SE (I) 260TH
ST
(Pvt) SEQUOIA' JR. HI.
SCHOOL
:X:
1-
~ -2641 ST
'
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAIJflA.Y IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
, Major Roadway Widening ................... $
Minor Roadway Widening ................... $ · 36,500
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 36,500
TRAFFIC IMPROVEMENTS:
Signal System ............................ $ 80,000
Street Light System ...................... $
Channelization/Signing ................... $ 5,000
SUB TOTAL $ 85,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 121,500
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Central Avenue (SR-516) -Willis St. to Smith St.
DESCRIPTION: (Proj. Length .38 Mi.) Minor widening of roadway to include
curb & gutter, sidewalk, grading, paving, channelization &
signing. Also included is a northbound right turn lane at
Central Ave. & Gowe St.
SUMMARY: (Project Costs in 1housands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: LID,TIB,Prop, 1990
PROJECT COST:
1st Yr
Annual Element
465,000
20
2nd Yr 3rd Yr
1,051,000
90,000
375,000
1,051,000
1,516,000
4, 5,
& 6th Yr Total
1,516,000
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRJ\M
(CONT.)
ROA.I:MAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
,Major Roadway Widening ................... $ 630,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $ 171,000
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 801,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
50,000
20,000
20,000
SUB TOTAL $ 90,000
tiTILITY IMPROVEMENTS
Storm Drainage System .................... $ 160,000
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 160, 000
ESTIMATED TOTAL CONSTRUCTION COST $1,051,000
L!l
I
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
180th
116th
256th
SECOND YEAR 1991
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: James Street and 104th Avenue S.E.
DESCRIPTION: (Proj. Length .11 Mi.) Construct additional eastbound
acceleration lane on James Street (S.E. 240th St.)
appro}timately 600 feet east of intersection. Relocate
existing curb & gutter, sidewalk and street lighting.
SUMMARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $ 15,000
Right Of Way ................. $
Construction ................. $ 135,000
Total .................... $ 150,000
FUNDING SOURCE: CIP,FAUS,Prop. 1991
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
4, 5,
& 6th Yr
21
Ill
...,
> -<
150,000
-~-~
"-' w 0
> 0
-< ,.
'"' cr:
:r (Pv1) SE 23~TH
1-..., ST 8 0 Ill
z
18 l 7 N
~
EAST HILL ,... ELEMENTARY
SCHOOL
0 w
0:: Ill
~ w -
SE
PROJECT
SE
E 236TH
ST
OTH
244TH
Total
150,000
ST
I
f--
"' N
ST
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROADWAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
·Major Roadway Widening ................... $
Minor Roadway Widening ................... $ 135,000
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 135,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
SUB TOT 1\L $ 0
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 135,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRN~
PROJECT: West Vall~y Highway (SR-181)-S. 180th St. to S.189th St .
.
DESCRIPTION: (Proj. ··Length . 66 Mi.) Ro.:~dway improvements to include:
Major widening of V,lest Valley Highway. Also included are
curb & gutter, sidewalk, street lighting, grading, paving,
channelization, signalization, signing & landscaping.
SUtv'MARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOJRCE: LID
PROJECT COST :
1st Yr
Annual Element 2nd Yr 3rd Yr
·2 ,609,000
N N lc: N w
2 2 I~ AVE, s, ~ w
N Ul
"'
...
ID ~ 0
-i :r -i :r
(I) (I) -i -i
72HO AVf.. s
--........
60,000
505,000
2,044,000
2,609,000
4, 5'
& 6th Yr
A f) \ UNION PACifiC RAJLnOAD -·
22
Total
2,609,000
-·
z
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
I ,.
\ ....
(CONT.)
ROADWAY IMPROVEMENTS ·· . . · ..
STREET IMPROVEMENTS:
New Roadway Construction ................. $
I' Major Roadway Widening ................... $1,974,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $1,974,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ........... : .......... $ , 60,000
Channelization/Signing ................... $ 10,000
SUB TOTAL $ 70,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $2,044,000
,,
SIX YEAR TRANSPORTATION IMPROVEMENT PRCGRAM
PROJECT: S. 196th/200th St. Cor'ridor Improvements (Midd'le Leg)
DESCRIPTictJ: (Proj. Length 1.46 lVli.) Construction of ne•.-<1 four to five
lane roadway from the Green River to 80th Avenue S. & major
widening from 80th Avenue S. to East Valley Highway. Roadway
improvements to include: curb & gutter, sidewalk street
lighting, grading, paving, channelization & landscaping.
SUIVMARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Tota·l .................... $
FUNDING SOURCE: CIP, TIB, Prop. 1991
PROJECT COST:
1st Yr
Annual Element
?3
2nd Yr 3rd Yr
350,000
350,000
350,000
' (
)
4' 5,
& 6th Yr
350,000
I
l
·= I~
is
I~U
I '" -
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROADV'JAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
, Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Cur·b & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 0
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
SUB TOTAL $ 0
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary SeNer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
N
116th
256th
THIRD YEAR 1992
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Central Avenue and S. 259th St.
DESCRIPTION: (Intersection} Intersection improvements to include: The
installation of a full ei~1t phase signal system with
channelization and street lighting.
SUrvMARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: CIP,FAUS, Prop. 1992
PROJECT COST:
24
1st Yr
Annual Element 2nd Yr 3rd Yr
130,000
..J 2,1 < a: ...
z: 25 uJ u
Ill
19
30
Ill
w >
13,000
1171000
130,000
4, 5,
& 6th Yr
ST
Total
130,000
Ill
K
ClM r-Q;--1
<"1--
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAfJilAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
,Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 0
TRAFFIC IMPROVEMENTS:
Signal System ............................ $ 117,000
Street Light System ...................... $
Channelization/Signing ................... $
SUB TOTAL $ 117,000
{JI'ILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 117,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: East Valley Highway and S. 196th St.
DESCRIPTION: (Intersection) Intersection improvements to include: The
installation of a full eight phase signal system with
channelization ru1d street lighting.
SrnvMARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: LID,CIP,FAUS,Prop.92
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
130,000
4TH ST
ST
Ill
Ill
I I i'J I H J S 1 I~ I A l
I X ~
I l "' V)
\ ) ~ Aid!\ :
\ \ ______ ....------· "t --------r--;;;
\V ~-s _ __.__2 o_o_T_H __ s_T-1 ..
Ill
202NO Sl
2::)
13,000
117,000
130,000
4, 5,
& 6th Yr
\
J
l l
\
Total
130,000
<
}>
r r rn -<
N
s
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAIWAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
'Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 0
TRAFFIC IMPROVEMENTS:
Signal System ............................ $ 117,000
Street Light System ...................... $
Channelization/Signing ................... $
SUB TOTAL $ 117,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 117,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: North Central Avenue and Smith St.
DESCRIPTION: (Proj. Length .25 Mi.) Intersaction improvements to include:
Adding a new double left turn lane, channelization, street
lighting, signal upgrade, and signing.
SIJM.1ARY: (Project Costs in TI1ousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, Prop. 1992
PROJECT COST:
1st Yr
AmlUal Element
'JC
2nd Yr 3rd Yr
590,000
10,000
413,000
167,000
590,000
4, 5,
& 6th Yr Total
590,000
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROADWAY IMPROVEMENTS
STREET IMPROVEMENTS :
New Roadway Construction ................. $
, Major Roadway Widening ................... $
Minor Roadway Widening ................... $ 140,000
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 140,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
SUB TOTAL $
UTILITI IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
20,000
5,000
2,000
27,000
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 167,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: James Street and Central Avenue
DESCRIPTION: (Proj. Length .10 Mi.) Roadway improvements to include:
Minor widening of of intersection to accomidate a westbound
right turn lane. Provide curb & gutter, sidewalk.
SlJM'.1ARY: {Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FADS, PROP. 1992
PROJECT COST:
1st Yr
Annual Element
27
.... > <
2nd Yr 3rd Yr
150,000
... ... ... > > > < w < <
COLE ST
10,000
140,000
150,000
4, 5,
& 6th Yr Total
150,000
0
Q!
0
'>
..J
<(
N
SIX YEAR TRANSPORTATION IMPROVE!'vlENI' PROGRAM
(CONT.)
ROA.I:WAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
, Major Roadway Widening ................... $ 135,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 135,000
TRAFFIC IMPROVEMENTS :
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $ 5,000
SUB TOTAL $ 5,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 140,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
lSOth
N
!16th
256th
4TH, 5TH, 6TH YEARS 1993, 1994, 1995
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJEC'r: 94th Ave. S. -Canyon Dr. S.E. to S.E. 248th St./S.E. 248th St.
-94th Ave. S.E. to ll6th Ave. S.E.
DESCRIPTION: (Pro j . Length 1. 4 6 Mi. } Roa.dw-ay improvements to include:
Major widening to three lanes with curb & gutter, sidewalk.
Provide drainage, paving, channelization, signing, street
lighting & landscaping.
SUMMARY: (Project Costs in Thousands of Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: TIB, Prop. 1993-1996
PROJECT COST:
1st Yr
Armual Element 2nd Yr 3rd Yr
145,000
0
1,305,000
1,450,000
4, 5,
& 6th Yr
1,450,000
Total
1,450,000
0
... ; '! 16
. .. 20 2l
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRJ\M
(CONT.)
ROAI.Hm.Y IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
, Major Roadway Widening ................... $1,195,000
Minor Roadway Widening ................ _ ... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $1,195,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $ 100,000
Channelization/Signing ................... $ 10,000
SUB TOTAL $ 110,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $1,305,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Kent-Kangley Rd. (SR-516} & 111th Avenue S.E.
DESCRIPTION: (Proj. Length . 42 Mi.) Intersection improvements to include
traffic signal revisior~ and traffic signal interconnect.
SlJM.1ARY: (Project Costs in Thousands of fullars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: CIP,FAUS, Prop. 1991
PROJECT COST:
1st Yr
Annual Element
NT-MERIDIAN
. HI. SCHOOL
00
SE
2nd Yr 3rd Yr
ST
5,000
20,000
25,000
4, 5,
& 6th Yr
25,000
PROJECT
Total
25,000
N
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
(CONT.)
ROAIWAY IMPROVEMENTS
S'IREET IMPROVEMENTS :
New Roadway Construction ................. $
, Major Roadway Widening ................... $
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
Curb & Gutter ............................ $
Sidewalk ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ . 0
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $ 20,000
Channelization/Signing ................... $
SUB TOTAL $ 20,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUB TOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 20,000
SIX YEAR TRANSPORTATION IMPROVEMENI' PROGRAM
PROJECT: S.E. 256th Street -Kent-Kangley Rd. (SR-516) to 116th Avenue
S.E.
DESCRIPTION: (Proj. Length . 64 Mi.) Project consists of major widening of
roadway to include drainage curb & gutter, sidewalk, street
lighting, paving channelization, signalization, signing and
landscaping.
SlJMviARY: (Project Costs in Thousands of. Dollars)
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: LID,TIB,Prop. 1990
PROJECT COST:
1st Yr
Armual Element 2nd Yr 3rd Yr
ch SE 252NO
d ST
30
~KENT-MERIDIAN
• SR. HI. SCHOOL
:c
1-
8
£ 2WT'I ~ T
EAST H!LL
CENTER
"' S£ <11 260TH
ST --"' >
90,000
288,000
522,000
900,000
4, 5,
& 6th Yr
900,000
Total
900,000
N
SIX YEAR TRANSPORTATION IMPROVEMENI' PROGRAM
(CONT.)
ROACWAY IMPROVEMENTS
STREET IMPROVEMENTS:
New Roadway Construction ................. $
, Major Roadway Widening ................... $ 332,000
Minor Roadway Widening ................... $
Rehabilitation/Reconstruction ............ $
Resurfacing .............................. $
CUrb & Gutter ............................ $
SidewaJ.k ................................. $
Paths/Trails/Bikeways .................... $
SUB TOTAL $ 332,000
TRAFFIC IMPROVEMENTS:
Signal System ............................ $
Street Light System ...................... $
Channelization/Signing ................... $
100,000
80,000
10,000
SUB TOTAL $ 190,000
UTILITY IMPROVEMENTS
Storm Drainage System .................... $
Water System ............................. $
Sanitary Sewer System .................... $
SUBTOTAL $ 0
ESTIMATED TOTAL CONSTRUCTION COST $ 522,000