HomeMy WebLinkAbout1211RESOLUTION NO. 1211 A RESOLUTION of the City Council of the City of Kent, Washington, adopting the SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1990 to 1995. THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES HEREBY RESOLVE AS FOLLOWS: Section 1. THE SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1990 to 1995, as set forth in the attachments hereto and herewith filed with the City Clerk, is hereby adopted. Passed at a regular meeting of the City Council of the City of Kent, Washington this 18th day of July, 1989. Concurred in by the Mayor of the City of Kent this 19th day of July, 1989. DAN KELLEHER, MAYOR ATTEST: APPROVED AS TO FORM: I hereby certify that this is a true and correct copy of Resolution No. 1211, passed by the City Council of the City of Kent, Washington, the 18th day of July, 1989. MARIE JENSEN, CITY CLERK (SEAL) '·--------- CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1990-1995 Don E. Wickstrom, P.E. Director of Public Works SIX YEAR TRANSPORTATION IMRPOVEMENT PROGRAM 1990 TO 1995 PROJECT LISTING ANNUAL ELEMENT 1990 (First Year) Priority 1989 1990 13 X X 22 X X X 19 6 14 6 X 9 2 3 5 5 10 8 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ANNUAL ELEMENT 1989 Military Road -Bolger Road to SR 516 Central Avenue Traffic Signal Interconnect 72nd Avenue South -s. 194th street to s. 196th street s. 228th street and Military Rd Improvements city-wide Traffic Signal Installation & Improvements Railroad Grade crossing Replacement (City-wide) canyon Drive Guardrail Replacement S. 196th St./200th St. Corridor Improvements (West Leg) West Valley Highway (SR-181)-S. 189th st. to s. 212th st. crow Road Bypass (SR-516 Bypass) west Valley Highway (SR-181)-s. 180th st. to s. 192nd st. 64th Ave. South -s. 212th st. to Meeker street canyon Dr. (SR-516) Left Turn Lanes -Hazel Ave. to Weiland west Valley Highway (SR-181) and s. 212th Street West Valley Highway (SR-181) and s. 190th street S.E. 277th St. -SR-167 to Auburn Way North s. 272nd st;s. 277th st -Auburn Way North to K-K Rd. S.E. 256th street and 104th Avenue s.E. S.E. 260th street and 104th Avenue S.E. central Ave. (SR-516) -Willis street to smith street SECOND YEAR 1991 X 12 X THIRD 20 15 18 17 21 22 23 YEAR 1992 24 25 26 27 James street and 104th Avenue S.E. East Valley Highway -S. 180th St. to S. 189th St. S. 196th St./200th St. Corridor Improvements (Middle Leg) Central Avenue and s. 259th street East Valley Highway and s. 196th street North Central Avenue and Smith street James street and central Avenue 4TH, 5TH, 6TH YEARS 1993, 1994, 1995 21 16 X 28 29 30 94th Ave. S./SE 248th St -Canyon Dr. SE to 116th Ave. SE Kent-Kangley Rd (SR-516) & 111th Avenue S.E. S.E. 256th St -Kent-Kangley Rd. (SR-516) to 116th Ave. SE SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY City/County Kent, Washington City No 0615 County No. 17 1990 TO 1995 Hearing Date _____ -.:_f :_-_' d-'7 1 r·c:; Adoption Date 7 -/. -f 1 Resolution No~f=~J=f------ ============================================================================================================================! p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS r DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTAL 0 SCHEDULE 1------------------------------1 . . r (Street name or number, y E A R !FEDERAL !FUNDS i Co. road name or number, 89 90 91 92-94 t termini beginning & end. ! 1st 2nd 3rd 4' 5 Pro-!AMT TlB!Local y Describe work to be done.) !Annl 6th !AMT gram! No !Elmt ============================================================================================================================! ----------------------------------------------------------------------------------------------------------------------------! !Military Rd. -Bolger Rd. to SR-516 !Widen roadway to 5 lanes with curb, gutter & !sidewalk. Provide drainage, paving, !channelization, street lighting & landscaping 60 2 !Central Avenue Traffic Signal Interconnect 75 !Traffic signal modifications @ S. 244th St. & 84th! !Ave. S., replacement of existing WSDOT traffic !signal controllers with City equipment & install !traffic signal interconnect to the City's Master. 3 !?2nd Ave. S. -S. 194th St. to S.196th St. 540 !Construction of a new two lane roadway with !curb & gutter, sidewalk, grading, paving, !channelization and landscaping. 4 !S. 228th St. and Military Rd. Improvements 100 !Construct new roadway for S. 228th St., from !54th Ave. S. to Military Rd. & improve Military Rd! !from S. 228th St. to SR-516. 5 !City-Wide Traffic Signal Installation & Imp. !Add new traffic signals & improve existing !signalized interxection locations throughout !the city. 6 !Railroad Grade Crossing Replacement (City-Wide) !City wide railroad crossing replacement !program. !Canyon Drive Guardrail Replacement !Replace existing cable wire guardrail system !on the southwesterly side of Canyon Drive S.E. 150 40 150 622 100 60 40 40 150 8 !S 196/200th Corridor Improvement (West Leg) !Major widening of S. 200th St. from Orillia Rd. !to the Green River. The project shall include !curb & gutter, sidewalks, lighting, grading, !paving, bridge over Green River, a new signal at !Oril1ia Rd., signing, and landscaping. This is 1000 2040 1000 568 FAUS! 114 682 62 FAUS! 13 75 432 TIB! 108 540 7934 6347 TIB! 1587 7934 260 570 570 160 280 280 270 SFTY! 30 300 3232 TIB! BOB 4040 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SU~1MARY City/County Kent, Washington City No 0615 County No. 17 1990 TO 1995 Hearing Date ______________ _ Adoption Date _____________ _ Resolution No. ============================================================================================================================! P PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS ! r DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTAL 0 SCHEDULE !------------------------------! r (Street name or number, y E A R !FEDERAL ! FUNDS Co. road name or number, 89 90 91 92-94 t termini beginning & end. ! 1st 2nd 3rd 4 '5 Pro-!AMT TIS! Local y Describe work to be done.) !Annl 5th !AMT gram! No !Elmt ============================================================================================================================! ! ----------------------------------------------------------------------------------------------------------------------------! !(Pending annexation). 9 !West Valley Highway (S 189th-S 212th) !Major widening of West Valley Highway to !include curb & gutter, sidewalks, lighting !grading, paving, channelization, signalization, !signing, and landscaping. 10 !Crow Road By-Pass (SR-516 By-Pass) !Minor widening to improve turning radius at !SE 260th St. and 108th Ave SE with signalization !at Kent-Kangley Road (SR-516) & 108th Ave SE !to include curb & gutter, sidewalks, lighting !grading, paving, channelization and signing. 6121 700 11 !East Valley Highway (S 180th St.-S 192nd St.) 2900 !Complete five lane section with drainage, paving, !sidewalks, curb & gutter, lighting, landscaping, !underground utilities, bridge, and signing. 12 !64th Ave. S. -S. 212th St. to Meeker St. !Construction of new roadway on 64th Ave. S. from !S. 212th St. to James St., roadway widening from !James St. to Smith St. and signals~ S.212th St., !S. 228th St., James St. & Meeker St. 13 !Canyon Drive (SR-516) Hazel Ave -Weiland St !Addition of left turn lanes at Hazel, Smith, !and Weiland Streets to include curb & gutter, !sidewalks, channelization and drainage. I 14 !West Valley Highway (SR-181) and S. 212th St. !Add turn lanes, channelization, signing, signal !improvements, grading, widening. 15 !West Valley Highway (SR-181) and S. 190th St. !Installation of a full eight phase signal system !with channelization and lighting. 16 !S.E. 277th St. -SR-167 to Auburn Way !Roadway improvements to include: Major widening of! 4200 350 130 1200 370 FAUS! SFTY! 292 FAUS! 108 FAUS! '! 1000 900 900 TIB! 5221 700 900 TIS! 2000 . ! I I 1000 TIB! 4200 58 22 2100 6121 700 2900 4200 370 350 130 3100 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY City/County Kent, Washington City No 0615 County No. 17 1990 TO 1995 Hearing Date ______________ _ Adoption Date _____________ _ Resolution No. ~===========================================================================================================================! p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS 0 r ; t y No DESCRIPTION OF WORK (Street name or number, Co. road name or number, termini beginning & end. Describe work to be done.) 89 ! 1st !Annl !Elmt OBLIGATION SCHEDULE Y E A R 90 91 2nd 3rd 92-94 4. 5 5th FUNDING SOURCE !TOTAL !------------------------------! !FEDERAL ! FUNDS Pro-!AMT TIB! Loca 1 !AMT gram! ============================================================================================================================! ----------------------------------------------------------------------------------------------------------------------------1 !roadway to tour/five lanes with curb& gutter, !sidewalk, lighting, grading, paving, signing, !channelization & railroad crossing safety devices.! 17 !S. 272nd/S. 277th St. -Aubrun Way to Kent-Kangley! 2400 2400 3600 !Construct new four/five lane roadway including !channelization, new bridge construction & signal &! !Kent-Kangley Rd. 18 !SE 256th St. and 104th Ave SE !Addition of a double southbound lett turn lane !and traffic signal revisions. 19 ~sE 260th St. and 104th Ave SE !New traffic signal 20 !Central Ave. (SR-516) Willis St. -Smith St. !Minor widening to include northbound left turn !lane, storm drainage & channelization. 21 !James St. and 104th Ave. S.E. !Construct additional eastbound acceleration !lane on James St. approximately 600 feet east !the intersection. 22 !West Valley Highway (S 180th-S 212th) !Major widening of West Valley Highway to !include curb & gutter, sidewalks, lighting of !grading, paving, channelization, signalization, !signing, and landscaping. 23 !S. 196th/200th St. Corridor Imp. (Middle Leg) !construct new four/five lane roadway from the !Green River to 80th Ave. S., & widening from 80th !Ave. to East Valley Highway. 24 !Central Ave. and S. 259th St. !Install two phase traffic signal, street lighting !& channelization. 25 !East Valley and S. 196th St. !Install two phase traffic signa 1. street lighting !& channelization. 450 135 465 1051 150 2609 350 130 130 1000 TIB! '1400 8400 200 TlB! 250 450 135 135 1000 TIB! 516 1516 125 FAUS! 25 150 I 2609 2609 ' 280 TIB! 70 350 108 FAUS! 22 130 '! 108 FAUS! 22 130 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT SUMMARY City/County Kent, Washington City No 0615 County No. 17 1990 TO 1995 Hearing Date ______________ _ Adoption Date _____________ _ Resolution No. ============================================================================================================================! p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS r DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTAL 0 SCHEDULE !------------------------------! r (Street name or number, y E A R !FEDERAL ! FUNDS i Co. road name or number, 89 90 91 92-94 t termini beginning & end. ! 1st 2nd 3rd 4 '5 Pro-!AMT TIB!Local y Describe work to be done.) !Annl 6th !AMT gram! No !Elmt ============================================================================================================================! ----------------------------------------------------------------------------------------------------------------------------' 26 !N. Central Ave. and Smith St .. !Add a new double left turn lane, channelization, !street lighting, signal upgrade & signing. 27 !James St. and Central Ave. !Minor widening of intersection to accomodate !a westbound right turn lane. 28 !94th Ave S.E./S.E. 24Bth St. -Canyon Dr. to 116th! !Widen to 3 lanes with curb, gutter & sidewalk. !Provide drainage, paving, channelization, !signing, street lighting & landscaping. 29 !Kent-Kangley (SR-516) and 111th Ave SE !Traffic signal revisions and traffic signal ! interconnect. 30 !S.E. 256th St. -Kent-Kangley Rd. to 116th Ave SE !Improvements to include roadway widening, drainage! !curb, gutter & sidewalk, lighting, paving, !channelization, signing & landscaping 590 150 1450 25 900 492 FAUS! 98 590 125 FAUS! 25 150 1160 TIB! 290 1450 21 FAUS! 25 720 TIB! 180 900 ============================================================================================================================! GRAND TOTALS 21166 10512 6600 10729 2649 FAUS 17171 TIB 29457 49277 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM '· 180th N 116th 256th FIRST YEAR 1990 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Military Rd. -Bolger Rd. to SR-516 DESCRIPTION: {Proj. Length .28 1'11.) Roadway improven-ents to include: Widen roadway to five lanes with curb & gutter, sidewalk. Provide drainage, paving, channelization, street lighting, channelization & landscaping improvements. This project will provide a future connection for the S. 228th St. corridor project. SUMMARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ 60,000 Right Of Way ................. $ Construction ................. $ 622,000 Total .................... $ 682,000 FUNDING SOURCE: LID,FAUS, Prop. 1991 PROJECT COST: 1 1st Yr Annual Elenent 60,000 ST 2nd Yr 622,000 3rd Yr 6"--<r-ov r: I 4, 5, & 6th Yr ~0; p 7 II•, loiJ~tiS l n"<iltll p. ~ MIDWAY --------- P INTEHCHAHGE Total 682,000 N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROA.IHlAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ Major Roadway Widening ................... $ 507,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk: ............................ · · · · · $ Paths/Trails/Bikeways .................... $ SUB TarAL $ 507,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ 30,000 Channelization/Signing ................... $ 15,000 SUB TOTAL $ 45,000 IJI'ILITY IMPROVEMENTS Storm Drainage System .................... $ 70,000 Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 70,000 ESTIMATED TOTAL CONSTRUCTION COST $ 622,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Central Avenue Traffic Signal Interconnect DESCRIPTION: (Proj. Length .11 Mi.) Traffic signal modifications at S. 224th St. and 84th Avenue S. 1 replacement of existing WSOOT traffic signal controllers with City of Kent standard equipnent 1 and install traffic signal interconnect to the City of Kent Master Signal Computer. SUM1ARY: {Project Costs in 'TI1ousands of Dollars) Preliminary Engineering ...... $ 5,000 Right Of Way ................. $ Construction ................. $ 70,000 Total .................... $ 151000 FUNDING SOURCE: CIP 1 DEV, FAUS 1990 PROJECT COS'l': 4, 5, 1st Yr Annual Element 2nd Yr 3rd Yr & 6th Yr 751000 s 222NIJ PROJECT 12 7 ., J: J: ... ~ ~ :5 !IT "' ~ ~2BT i OQ 5T 4 J: "' ~ a ID w z w "' > N ~ -< :z: 2 Total 751000 a ~ 1'1 "' Ill w > -< J: ~ I .., "' L_ N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAIWAY IMPROVEMENTS STREET IMPROVEMENTS: . New Roadway Construction ................. $ Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways ........... · ......... $ SUB TOTAL $ 0 TRAFFIC IMPROVEMENTS: Signal System ............................ $ 70,000 Street Light System ...................... $ Channelization/Signing ................... $ SUB TOTAL $ 70,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUBTOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 70,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROORAM PROJECT: 72nd Avenue S. -S. 194th Street to S. 196th Street DESCRIPTION: (Proj. Length .11 Mi.) Construction of new two lane roadway with curb & gutter, sidewalk, grading, paving, channelization, landscaping. SUMv!ARY: (Project Costs in Thousands of Dollars) Preliminai(Y Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: CIP, TIB 1990 PROJECT COST: 1st Yr Arumal Element 540,000 2nd Yr 3rd Yr 81,000 459,000 540,000 4, 5, & 6th Yr S !90TH ST S. !90th. ST. fri . 23 N > 22 N ~ ' ·-N ~ ctl .., S. !94th. ST. s !96TH ST 3 -Ct.l ~ < 35 2 36 0 z N ,... / / / ( a ~I ==I q 0::1 ul Total 540,000 N SIX YEl\R TRANSPORTATION IMPROVEMENT PROGRAM (CONI'.) ROAI:WAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ 444,000 ,Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 444,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 15,000 SUB TOTAL $ 15,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 459,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROORAM PROJECT: S . 2 28th St. and Military Rd. Improvements DESCRIPTION: (Proj. Length 1.15 Mi.} Construct new roadway for S. 22Bth St., from 54th AvenueS. to Military and improve Military Rd. from S. 228th St. to SR-516. The project shall include a bridge crossing over the Green River and constructing a 4 to 5 lane roadway, curb & gutter, sidewalk, street lighting, signalization at Military Rd., channelization & strom drainage. SUMMARY: (Project Costs in 1~usands of Dollars} Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: CIP,LID,TIB, Prop.90 PROJECT COST: 4 1st Yr Annual Element 100,000 2nd Yr 3rd Yr 847,698 691,692 6,394,610 7,934,000 4, 5, & 6th Yr 7,834,000 Total 7,934,000 N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROA.I:WAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $6,149,610 ,Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $6,149,610 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 80,000 25,000 30,000 SUB TOTAL $ 135,000 UTILITY IMPROVEMENTS Storm Drainage System .................... 8 110,000 Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 110,000 ESTIMATED TOTAL CONSTRUCTION COST $6,394,610 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: City~ide Traffic Signal Installatiion & Improvements DESCRIPTION: Add new traffic signals and improve existing signalized intersection locations throughout the city in order to accomodate increased traffic volumes due to growth. Sill-'MARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: CIP PROJECT COST: 1st Yr Annual Element 150,000 2nd Yr 100,000 3rd Yr 60,000 57,000 513,000 570,000 4, 5, & 6th Yr 260,000 NO MAP 5 Total 570,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAI!r'ID. Y IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL . $ 0 TRAFFIC IMPROVEMENTS : Signal System ............................ $ 513 1 000 Street Light System ...................... $ Channelization/Signing ................... $ SUB TOTAL $ 513 I 000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 513 1 000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Railroad Grade Crossing Replacement (City-wide) DESCRIPTION: City wide railroad crossing replacement program. SUMMARY: {Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ..•.....•........ $ Construction ................. $ Total .................... $ FUNDING SOURCE: CIP PROJECT COST: 1st Yr Annual Element 40,000 2nd Yr 40,000 3rd Yr 40,000 280,000 280,000 4, 5, & 6th Yr 160,000 NO MAP 6 Total 280,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAimAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ ,Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ 280,000 Resurfacing .............................. $ Curb & Gutter ............................ $ Sidevlalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 280,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light system ...................... $ Channelization/Signing ................... $ SUB TOTAL $ 0 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TarAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 280,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Canyon Drive Guardrail Replacement DESCRJPTION: (Proj. Length .50 Mi.) Replace existing cable wire guardrail system on the southwesterly side of Canyon Drive S.E. SUMMARY: (Project Costs in 'fhousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: SAFETY, Prop. 1990 PROJECT COST: 7 1st Yr Annual Element 150,000 2nd Yr 3rd Yr 150,000 300,000 300,000 4, 5, & 6th Yr Total 300,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGR/\M (CONT.) ROALWAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ 300,000 Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 300 I 000 'ITIAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ SUB TOTAL $ 0 lil'ILITY IMPROVE11ENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUBTOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 300,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S. 196th St./200th St. Corridor Improvements (West Leg} DESCRIPTION: (Proj. Length .62 Mi.) Roadway improvements to include: Major widening of S. 200th St., from Orillia Rd. to the Green River. Included also are curb & gutter, sidewalk, street lighting, grading, paving, construction of a bridge over the Green River, a new traffic signal at Orillia Rd., signing & landscaping. 1his is a joint project with the City of Tukwila (Pending Annexation) & King County. SUM-1ARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: LID,TIB,Prop. 1991 PROJECT COST: 1st Yr Annual Element 1,000,000 2nd Yr 3rd Yr 2,040,000 1,000,000 448,000 267,000 3,325,000 4,040,000 4, 5, & 6th Yr PROJECT 8 AKE NGE I I f ·• s. • . ' 204 TH ST Total 4,040,000 N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAI:WAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ Major Roadway Widening ................... $3,075,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb &. Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $3,075,000 'IRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light Syst6n ...................... $ Channelization/Signing ................... $ 200,000 40,000 10,000 SUB TOTAL $ ~50,000 liTILITY IMPROVEMENI'S Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $3,325,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT:. West Vall~y Highway {SR-181) -S. 189th St. to S. 212th St. DESCRIPTION: {Proj. Length 1.45 Mi.) Roadway improvements to include: Major widening of West Valley Highway. Also included are curb & gutter, sidewalk, street lighting, grading, paving, channelization, signalization, signing & landscaping. SUMMARY: {Project Costs in Thousands of Dollars} Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: LID,TIB,Funded 1989 PROJECT COST: 9 1st Yr Annual Element 6,121,000 2nd Yr 3rd Yr PROJECT J 620,000 1,200,000 4,301,000 6,121,000 4, 5, & 6th Yr Total 6,121,000 > z SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAINJAY IMPROVEMENTS STREET IMPROVEJ.1ENTS: New Roadway Construction ................. $ ·Major Roadway Widening ................... $3,929,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $3,929,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light system ...................... $ Channelization/Signing ................... $ 300,000 60,000 12,000 SUB TOTAL $ 372, 000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $4,301,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Crow Rd. By-Pass (SR-516 By-Pass) DESCRIPTION: (Proj. Length .35 Mi.) Minor widening to improve turning radius at S.E. 260th St. & 108th Ave. S.E., also at Canyon Dr. S.E. and Craw Rd., signalization at Kent-Kangley Rd. (SR-516) & 108th Ave. S.E. curb & gutter, sidewalk, street lighting, grading, paving, channelization & signing. SUM11\RY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ :ruNDING SOURCE: Dev. PROJECT COST: 1st Yr Annual Element 700,000 SCENIC HILL • ELEMENTARY' SCHOOL -1 10 2nd Yr Of···"ch ftt'ld \ 3rd Yr Sf 252ND ST 70,000 100,000 530,000 700,000 4, 5, & 6th Yr EAST ll!LL CENTER X .... ~ Total 700,000 '"' (I) w > o( N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAr1iiAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ ,Major Roadway Widening ................... $ 297,150 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 297,150 TRAFFIC IMPROVEMENTS : Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 120,000 40,000 12,000 SUB TOTAL $ 172 I 000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ 60,850 Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 60,850 ESTIMATED TOTAL CONSTRUCTION COST $ 530,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: East Valley Highway (SR-181) -S. 180th St. to S. 192nd St. DESCRIPTION: (Pro j . Length . 85 Mi. ) Roadway improvements to include: TI1e completion of five lane section with drainage, paving, curb & gutter, sidewalk, street lighting, landscaping, underground utilities, construct/reconstruct box culvert, traffic & railroad signing. SUMvfARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: LID,TIB,Funded 1989 PROJECT COST: 11 1st Yr Annual Element 2,900,000 I U)IV) 1-1- ~ ~ :=itJ z ~I~ 0 Gsu f- z w 2nd Yr 3rd Yr PROJECT 290,000 350,000 2,260,000 2,900,000 4, 5, & 6th Yr Total 2,900,000 I- V) z SIX YEAR TRANSPORTATION IMPROVEMF ... NT PROGRAM (CONT.) RO.AI:::WAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ .Major Roadway Widening ................... $2,160,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $2,160,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 80,000 20,000 SUB TOTAL $ 100,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $2,260,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: 64th Avenue S. -S. 212th Street to Meeker Street DESCRIPTION: (Proj. Length 1.74 Mi.) Const1~1ction of new roadway on 64th Ave. S. from James St. to S. 22Bth St. & from S. 226th St. to S. 212th St., widening of 64th Ave. S. from James St. to Smith St .. New traffic signals at S. 212th St., S. 228th St., W. James St. , W. Meeker St. , Improvements to include: new roadway, curb & gutter, sidewalk, storm drainage, lighting, sanitary sewer, watermain & landscapin SUM'1ARY: (Project Costs in 'I11ousands of Dollars) Preliminary Engineering ...... $ Right Of Way ............. ~ ... $ Construction ................. $ Total .................... $ FUNDING SOURCE: LID PROJECT COST: 1st Yr Annual Element 4,200,000 12 2nd Yr 2,703,000 3rd Yr 690,000 1,863,900 4,349,100 6,903,000 4, 5, & 6th Yr PROJECT .... ~;- !. r,, . . ; ~ i ; Total 6,903,000 ' .. I .. ,., or ! 8! '! '------J.:-:-,--=-... -~-l-5- z SIX YEAR TRANSPORTATION IMPROVEMF..NT PROGRAM (CONT.) ROA.tWAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $3,569,100 ,Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $3,569,100 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 650,000 100,000 30,000 SUB TOTAL $ 780,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $4,349,100 SIX YEAR TRANSPORTATION IMPROVE1'1ENT PROGRAM PROJECT: Canyon Dr. (SR-516} Left Turn Lanes -Hazel Avenue to Weiland st. DESCRIPTION: (Proj. Length .50 Mi.) Roa&~y improvenents to include: TI1e addition of left turn lanes at Hazel St. 1 Smith St. & Weiland St., installing curb & gutter, sidewalk, channelization & drainage. SUfvMARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: FAUS, SFI'Y I Funded 89 PROJECT COST: 1st Yr Annual Element 370,000 13 2nd Yr 3rd Yr "' z ~ ~ z U E ., TEM 28,000 74,000 268,000 370,000 4, 5, & 6th Yr PROJECT Ill w ST. JAMES > SCHOOL <( ril s J: .... 247TH ... -(PI ST Total 370,000 .... "' Ill ..., > <( J: .... .., (PI Ill w s 246TH > PL <( J: J: Ill 1-1-w 10 ..... > . 248 (PI <( s ~1= "' > <( N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROA.I:WAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ .Major Roadway Widening ................... $ 230,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 230,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 38,000 SUB TOTAL $ 38,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 268,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: West Valley Highway (SR-181) and S. 212th St. DESCRIPTION: (Intersection) Intersection improvements to include: The addition of turn lanes, channelization, signing, signal improvements, grading & roadway widening. StJMI1ARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ 45,000 Right Of Way ................. $ Construction ................. $ 305,000 Total .................... $ FUNDING SOURCE: FAUS,Funded, 1989 PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 4, 5, & 6th Yr 350,000 / · o.\.,.:.l" 14 / ' / I I • --2121 ~ ( / / \ \ PROJECT fire Station EE J 2 I ~- OBRIEN :l. ELEM ENTA • SCHOOL ·-.....__ --· -o 0 N 218th.ST-r-&.....:.:.....::.~..:;.;_~--~ Total 350,000 \ ) w > o( N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAIW'AY IMPROVEMENTS STREET IMPROVEMENTS : New Roadway Construction ................. $ ,Major Roadway Widening ................... $ tL11or Roadway Widening ................... $ 220,000 Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidev-ralk ................................. $ Paths/Trails/Bikeways .................... $ SUB.TOTAL $ 220,000 TRAFFIC IMPROVEMENTS : Signal System ............................ $ 75,000 Street Light System ...................... $ Channelization/Signing ................... $ 10,000 SUB TOTAL $ 85,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 305,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: West Valley Highway (SR-181) and S. 190th St. DESCRIPTION: (Intersection) Intersection improvements to include: The installation of a five phase signal system with channelization and street lighting. SUM1ARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ 12,000 Right Of Way ................. $ Construction ................. $ 118,000 Total .................... $ 130,000 FUNDING SOURCE: FAUS, Funded, 1989 PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 4, 5, & 6th Yr 130,000 . ·.····.-CJir _u_M!li- S. l901h. ST. 15 ·r _J ?. :X: S !66TH ST ~ ~- !90TI-I ST Pl<OJECT (/) w > < Q z N " / \ a '1: 0 0: _, •.{ Q u ;:;: u •T Q_ <::. Qi -I 2:j :J. 1 Total 130,000 s IN!liJ A ---~-+--N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAIWAY IMPROVEMENTS STREET IMPROVEMENTS : New Roadway Construction ................. $ , Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ........ , ... $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOT.l\L $ 0 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 108,000 8,000 2,000 SUB TOTAL $ ·118,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 118,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROORAM PROJECT: S.E. 277th St. -SR-167 to Auburn Way N. DESCRIPTION: (Proj. Length .72 Mi.) Roadway improvements to include: Major widening of roadway to four and five lanes with curb & gutter, sidewalk, street lighting, grading, paving, signing channelization, signalization & railroad crossing safety devices. This is a joint project with the City of Auburn. SUMvU\RY: (Project Costs in 1110usands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construct ion ................. $ Total .................... $ FUNDING SOURCE: LID,CIP,TIB,Prop. 90 PROJECT COST: 1st Yr Annual Element 1,200,000 0:: lL >-UJ .J .J <( > 2nd Yr 3rd Yr 1,000,000 900,000 It -t'-:l 186,000 1,085,000 1,829,000 3,100,000 4, 5, & 6th Yr ---- Total 3,100,000 25 . 30 l I @.?) 36 31 l I THOMAS STREET l. INTERCHANGE PROJECT 1 TUOMAS n•P. -1 0 LL 3;3; ww oql{) 0::0:: I;; ( 0 N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROALWAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ 'Major Roadway Widening ................... $1,769,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $1,769,000 TRAFFIC IMPROVEMENTS : Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 30,000 20,000 10,000 SUB TOTAL $ 60,000 UTILITI IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $1,829,000 SIX YEAR TRANSPORTATION IMPROVE1'1ENT PROGRAM PROJECT: S. 272nd St./S. 277th St. -AubuiTn Way N to Kent-Kangley Rd. DESCRIPTION: (Proj. Length 2.27 Mi.} Constuct new four to five lane roadway section including street lighting, grading, paving, signing, channelization, new bridg~ construction & a new traffic signal at Kent-Kangley Rd .. TI1is is a joint project with King County. SUMMARY: (Project Costs in Thousands of Dollars} Preliminary Engineerinu ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: CIP,LID,TIB,Prop. 90 PROJECT COST: 1st Yr Annual Element 2,400,000 2nd Yr 3rd Yr 2,400,000 3,600,000 --, I ~ 495,600 2,939,999 4,964,401 8,400,000 4, 5, & 6th Yr . 9_ ---~-+:.:.___:-=n.-3'-r' PfWJECT . ! A U B U R N 17 Total 8,400,000 11'11( , .... ( K!.. ""ll:t-H"'"" t.CitOOl •• N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROA.IMAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $4,799,401 .Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing ............................... $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ . SUB TOTAL $4, 799, 401 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 100,000 50,000 15,000 SUB TOTAL $ 165,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $4,964,401 SIX YEAR 'IRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S.E. 256th St. and 104th Avenue S.E. DESCRIPTION: (Intersection) Intersection improvements to include: Addition of a double southbound left turn lane, westbound right turn lane & traffic signal revisions. SUMMARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: Dev.,TIB,Funded 1989 PROJECT COST: 1st Yr Annual Element 450,000 2nd Yr 3rd Yr 45,000 20,000 385,000 450,000 4, 5, & 6th Yr EAST H!LL CENTER 18 SE 252ND ST PROJECT Total 450,000 ... Ill S.E. N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAI:WAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ 1 Major Roadway Widening ................... $ 347,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 347,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ 30, 000 Street Light System ...................... $ Channelization/Signing ................... $ 8,000 SUB TOTAL $ 38,000 UTILI1Y IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 385,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: S.E. 260th St. and 104th Avenue S.E. DESCRIPTION: (Intersection) Roadway improvements to include: Minor widening of 104th Ave. S.E. including curb & gutter, sidewalk. Install double left turn lane and northbound right turn lane, new signal & signal interconnect. Sut41ARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: CIP, Dev. , PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 135,000 SE 19 13,500 121,500 135,000 4, 5, & 6th Yr Total 135,000 uJ SE (I) 260TH ST (Pvt) SEQUOIA' JR. HI. SCHOOL :X: 1- ~ -2641 ST ' N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAIJflA.Y IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ , Major Roadway Widening ................... $ Minor Roadway Widening ................... $ · 36,500 Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 36,500 TRAFFIC IMPROVEMENTS: Signal System ............................ $ 80,000 Street Light System ...................... $ Channelization/Signing ................... $ 5,000 SUB TOTAL $ 85,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 121,500 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Central Avenue (SR-516) -Willis St. to Smith St. DESCRIPTION: (Proj. Length .38 Mi.) Minor widening of roadway to include curb & gutter, sidewalk, grading, paving, channelization & signing. Also included is a northbound right turn lane at Central Ave. & Gowe St. SUMMARY: (Project Costs in 1housands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: LID,TIB,Prop, 1990 PROJECT COST: 1st Yr Annual Element 465,000 20 2nd Yr 3rd Yr 1,051,000 90,000 375,000 1,051,000 1,516,000 4, 5, & 6th Yr Total 1,516,000 N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRJ\M (CONT.) ROA.I:MAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ ,Major Roadway Widening ................... $ 630,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ 171,000 CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 801,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 50,000 20,000 20,000 SUB TOTAL $ 90,000 tiTILITY IMPROVEMENTS Storm Drainage System .................... $ 160,000 Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 160, 000 ESTIMATED TOTAL CONSTRUCTION COST $1,051,000 L!l I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 180th 116th 256th SECOND YEAR 1991 N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: James Street and 104th Avenue S.E. DESCRIPTION: (Proj. Length .11 Mi.) Construct additional eastbound acceleration lane on James Street (S.E. 240th St.) appro}timately 600 feet east of intersection. Relocate existing curb & gutter, sidewalk and street lighting. SUMMARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ 15,000 Right Of Way ................. $ Construction ................. $ 135,000 Total .................... $ 150,000 FUNDING SOURCE: CIP,FAUS,Prop. 1991 PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 4, 5, & 6th Yr 21 Ill ..., > -< 150,000 -~-~ "-' w 0 > 0 -< ,. '"' cr: :r (Pv1) SE 23~TH 1-..., ST 8 0 Ill z 18 l 7 N ~ EAST HILL ,... ELEMENTARY SCHOOL 0 w 0:: Ill ~ w - SE PROJECT SE E 236TH ST OTH 244TH Total 150,000 ST I f-- "' N ST SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROADWAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ ·Major Roadway Widening ................... $ Minor Roadway Widening ................... $ 135,000 Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 135,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ SUB TOT 1\L $ 0 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 135,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRN~ PROJECT: West Vall~y Highway (SR-181)-S. 180th St. to S.189th St . . DESCRIPTION: (Proj. ··Length . 66 Mi.) Ro.:~dway improvements to include: Major widening of V,lest Valley Highway. Also included are curb & gutter, sidewalk, street lighting, grading, paving, channelization, signalization, signing & landscaping. SUtv'MARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOJRCE: LID PROJECT COST : 1st Yr Annual Element 2nd Yr 3rd Yr ·2 ,609,000 N N lc: N w 2 2 I~ AVE, s, ~ w N Ul "' ... ID ~ 0 -i :r -i :r (I) (I) -i -i 72HO AVf.. s --........ 60,000 505,000 2,044,000 2,609,000 4, 5' & 6th Yr A f) \ UNION PACifiC RAJLnOAD -· 22 Total 2,609,000 -· z SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I ,. \ .... (CONT.) ROADWAY IMPROVEMENTS ·· . . · .. STREET IMPROVEMENTS: New Roadway Construction ................. $ I' Major Roadway Widening ................... $1,974,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $1,974,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ........... : .......... $ , 60,000 Channelization/Signing ................... $ 10,000 SUB TOTAL $ 70,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $2,044,000 ,, SIX YEAR TRANSPORTATION IMPROVEMENT PRCGRAM PROJECT: S. 196th/200th St. Cor'ridor Improvements (Midd'le Leg) DESCRIPTictJ: (Proj. Length 1.46 lVli.) Construction of ne•.-<1 four to five lane roadway from the Green River to 80th Avenue S. & major widening from 80th Avenue S. to East Valley Highway. Roadway improvements to include: curb & gutter, sidewalk street lighting, grading, paving, channelization & landscaping. SUIVMARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Tota·l .................... $ FUNDING SOURCE: CIP, TIB, Prop. 1991 PROJECT COST: 1st Yr Annual Element ?3 2nd Yr 3rd Yr 350,000 350,000 350,000 ' ( ) 4' 5, & 6th Yr 350,000 I l ·= I~ is I~U I '" - N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROADV'JAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ , Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Cur·b & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 0 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ SUB TOTAL $ 0 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary SeNer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM N 116th 256th THIRD YEAR 1992 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Central Avenue and S. 259th St. DESCRIPTION: (Intersection} Intersection improvements to include: The installation of a full ei~1t phase signal system with channelization and street lighting. SUrvMARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: CIP,FAUS, Prop. 1992 PROJECT COST: 24 1st Yr Annual Element 2nd Yr 3rd Yr 130,000 ..J 2,1 < a: ... z: 25 uJ u Ill 19 30 Ill w > 13,000 1171000 130,000 4, 5, & 6th Yr ST Total 130,000 Ill K ClM r-Q;--1 <"1-- N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAfJilAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ ,Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 0 TRAFFIC IMPROVEMENTS: Signal System ............................ $ 117,000 Street Light System ...................... $ Channelization/Signing ................... $ SUB TOTAL $ 117,000 {JI'ILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 117,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: East Valley Highway and S. 196th St. DESCRIPTION: (Intersection) Intersection improvements to include: The installation of a full eight phase signal system with channelization ru1d street lighting. SrnvMARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: LID,CIP,FAUS,Prop.92 PROJECT COST: 1st Yr Annual Element 2nd Yr 3rd Yr 130,000 4TH ST ST Ill Ill I I i'J I H J S 1 I~ I A l I X ~ I l "' V) \ ) ~ Aid!\ : \ \ ______ ....------· "t --------r--;;; \V ~-s _ __.__2 o_o_T_H __ s_T-1 .. Ill 202NO Sl 2::) 13,000 117,000 130,000 4, 5, & 6th Yr \ J l l \ Total 130,000 < }> r r rn -< N s SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAIWAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ 'Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 0 TRAFFIC IMPROVEMENTS: Signal System ............................ $ 117,000 Street Light System ...................... $ Channelization/Signing ................... $ SUB TOTAL $ 117,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 117,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: North Central Avenue and Smith St. DESCRIPTION: (Proj. Length .25 Mi.) Intersaction improvements to include: Adding a new double left turn lane, channelization, street lighting, signal upgrade, and signing. SIJM.1ARY: (Project Costs in TI1ousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: FAUS, Prop. 1992 PROJECT COST: 1st Yr AmlUal Element 'JC 2nd Yr 3rd Yr 590,000 10,000 413,000 167,000 590,000 4, 5, & 6th Yr Total 590,000 N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROADWAY IMPROVEMENTS STREET IMPROVEMENTS : New Roadway Construction ................. $ , Major Roadway Widening ................... $ Minor Roadway Widening ................... $ 140,000 Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 140,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ SUB TOTAL $ UTILITI IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ 20,000 5,000 2,000 27,000 SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 167,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: James Street and Central Avenue DESCRIPTION: (Proj. Length .10 Mi.) Roadway improvements to include: Minor widening of of intersection to accomidate a westbound right turn lane. Provide curb & gutter, sidewalk. SlJM'.1ARY: {Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: FADS, PROP. 1992 PROJECT COST: 1st Yr Annual Element 27 .... > < 2nd Yr 3rd Yr 150,000 ... ... ... > > > < w < < COLE ST 10,000 140,000 150,000 4, 5, & 6th Yr Total 150,000 0 Q! 0 '> ..J <( N SIX YEAR TRANSPORTATION IMPROVE!'vlENI' PROGRAM (CONT.) ROA.I:WAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ , Major Roadway Widening ................... $ 135,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 135,000 TRAFFIC IMPROVEMENTS : Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 5,000 SUB TOTAL $ 5,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 140,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM lSOth N !16th 256th 4TH, 5TH, 6TH YEARS 1993, 1994, 1995 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJEC'r: 94th Ave. S. -Canyon Dr. S.E. to S.E. 248th St./S.E. 248th St. -94th Ave. S.E. to ll6th Ave. S.E. DESCRIPTION: (Pro j . Length 1. 4 6 Mi. } Roa.dw-ay improvements to include: Major widening to three lanes with curb & gutter, sidewalk. Provide drainage, paving, channelization, signing, street lighting & landscaping. SUMMARY: (Project Costs in Thousands of Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: TIB, Prop. 1993-1996 PROJECT COST: 1st Yr Armual Element 2nd Yr 3rd Yr 145,000 0 1,305,000 1,450,000 4, 5, & 6th Yr 1,450,000 Total 1,450,000 0 ... ; '! 16 . .. 20 2l N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRJ\M (CONT.) ROAI.Hm.Y IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ , Major Roadway Widening ................... $1,195,000 Minor Roadway Widening ................ _ ... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $1,195,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ 100,000 Channelization/Signing ................... $ 10,000 SUB TOTAL $ 110,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $1,305,000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: Kent-Kangley Rd. (SR-516} & 111th Avenue S.E. DESCRIPTION: (Proj. Length . 42 Mi.) Intersection improvements to include traffic signal revisior~ and traffic signal interconnect. SlJM.1ARY: (Project Costs in Thousands of fullars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: CIP,FAUS, Prop. 1991 PROJECT COST: 1st Yr Annual Element NT-MERIDIAN . HI. SCHOOL 00 SE 2nd Yr 3rd Yr ST 5,000 20,000 25,000 4, 5, & 6th Yr 25,000 PROJECT Total 25,000 N SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (CONT.) ROAIWAY IMPROVEMENTS S'IREET IMPROVEMENTS : New Roadway Construction ................. $ , Major Roadway Widening ................... $ Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ Curb & Gutter ............................ $ Sidewalk ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ . 0 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ 20,000 Channelization/Signing ................... $ SUB TOTAL $ 20,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUB TOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 20,000 SIX YEAR TRANSPORTATION IMPROVEMENI' PROGRAM PROJECT: S.E. 256th Street -Kent-Kangley Rd. (SR-516) to 116th Avenue S.E. DESCRIPTION: (Proj. Length . 64 Mi.) Project consists of major widening of roadway to include drainage curb & gutter, sidewalk, street lighting, paving channelization, signalization, signing and landscaping. SlJMviARY: (Project Costs in Thousands of. Dollars) Preliminary Engineering ...... $ Right Of Way ................. $ Construction ................. $ Total .................... $ FUNDING SOURCE: LID,TIB,Prop. 1990 PROJECT COST: 1st Yr Armual Element 2nd Yr 3rd Yr ch SE 252NO d ST 30 ~KENT-MERIDIAN • SR. HI. SCHOOL :c 1- 8 £ 2WT'I ~ T EAST H!LL CENTER "' S£ <11 260TH ST --"' > 90,000 288,000 522,000 900,000 4, 5, & 6th Yr 900,000 Total 900,000 N SIX YEAR TRANSPORTATION IMPROVEMENI' PROGRAM (CONT.) ROACWAY IMPROVEMENTS STREET IMPROVEMENTS: New Roadway Construction ................. $ , Major Roadway Widening ................... $ 332,000 Minor Roadway Widening ................... $ Rehabilitation/Reconstruction ............ $ Resurfacing .............................. $ CUrb & Gutter ............................ $ SidewaJ.k ................................. $ Paths/Trails/Bikeways .................... $ SUB TOTAL $ 332,000 TRAFFIC IMPROVEMENTS: Signal System ............................ $ Street Light System ...................... $ Channelization/Signing ................... $ 100,000 80,000 10,000 SUB TOTAL $ 190,000 UTILITY IMPROVEMENTS Storm Drainage System .................... $ Water System ............................. $ Sanitary Sewer System .................... $ SUBTOTAL $ 0 ESTIMATED TOTAL CONSTRUCTION COST $ 522,000