HomeMy WebLinkAbout1135RESOLUTION NO. //,'$~
I
A RESOLUTION of the City Council of the
City of Kent, Washington, adopting the SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAH 1988 to 1993.
THE CITY COUNCIL OF 'l'HE CITY OF KENT, WASHINGTON DOES
HEREBY RESOLVE AS FOLLOWS:
Section 1. THE SIX-YEAR TRANSPORTATION IMPROVEMENT
PROGRAM 1988 to 1993, as set forth in the attachments hereto and
herewith filed with the City Clerk, is hereby adopted.
Passed at a regular meeting of e City Council of the
City of Kent, washington this~ day of ~~---1987.
day of
~oncurred in by the
-<.,_.-1 1987.
:'>
i ty of Kent, this ~
ELLEHER, MAYOR
ATTEST:
I hereby certify that this is a true and correct copy of
Resolution No./ ( ...._~ -:::-, passed by the City Council of the City of
Kent, Washingt;)fl, the ~ day of o-7~ , 1987.
4830-160
SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1988 TO 1993
Cf~y/County Kent, washington
City No 0615
Hearing Date. ___ _
Adoption Date. ___ _
Cout.ty No. 17 Resolution No. __
=================================================================================================================================!
p PROJECT IDENTIFICATION m T F Cl PROJECT COSTS IN THOUSANDS OF DOLLARS
r a 0 u AI
DESCRIPTION OF WORK jo work T L N Rl OBLIGATION FUNDING SOURCE !TOTAL!
0 f code A E c Rl SCHEDULE I· .. ·••• .. ··•·•·••·•·•· ·I I
r (Street name or number, c (S) L N TC Yl y E A R !FEDERAL I RAP I I FUNDS!
Co. road name or number, lw G NL 01 88 89 90 91·931 or I Local!
t termini beginning & end. ao T LA VI 1st 2nd 3rd 4,5 Pro·IAMT UABI
y Describe work to be done.) sr H s E!Annl 6th IAMT gram! I
No sk s R IE lmt I I
=================================================================================================================================!
1 I 2 I 3 I 4 I 5 I 6 171 8 I 9 I 10 I' 11 I 12 13 I 14 15 I 16 I 17 I
...••...•.•.•..•••.•••••..•••.••••••.•••••.•..•.••••..•••.••••.••...••.•.•..••..••..•••..•..••..•....•..•......••..•...•......... I
1 ISE 240th St. (106th Ave SE·116th Ave SE) 102 IABDFI0.56 116 !1320 I 250 FAUSI 800 UABI 270 11320 I
!Widen roadway from two lanes to five lane section I
!with curb & gutter, sidewalks, drainage, paving,
!channelization, signing, and landscaping.
I
2 ISE 240th St. & 104th Ave SE
!Addition of a eastbound right turn lane at
!the intersection.
3 IS 252nd St. and SR·99 (Pacific Highway S)
INew Signal project.
I
4 !West Valley Highway (SR·181) and S. 212th St.
!Add turn lanes, channelization, signing, signal
!improvements, grading, widening. 1 1
I I I I
5 !Smith St. (SR·516) (1st Ave·Jason Ave) 102 IABDFI0.40 114 lxl 720
!Widen Smith St. for additional turn lanes, signal,! IGHIJI I 1
!drainage, lighting, curb & gutter, sidewalks, I IKM I
land landscaping. I
I I I I I
6 !West Valley Highway CSR·181) and S. 190th St. 106 IHIJKI0.10 114 lxl 130
!Installation of a full eight phase signal system I 1
!with channelization and lighting.
I
7 !West Valley Highway (SR·181) and James St.
!Add a double left turn lane, channelization,
!lighting, signal upgrade, and signing.
I
102 IABDHI0.13 114
IIJK I
I I
I I
106 IABDHI0.15 8 !West Valley Highway and S 180th St. • Phase
!Upgrade traffic signal controller and add traffic
!signal interconnect for signal to communicate withl
!the City of Kent Master Traffic Signal Computer. 1
!Joint project with Kent and WSDOT.
114 I
I
9 lEast Valley Highway (S 180th St.·S 192nd St.)
!Complete five lane section with drainage, paving,
!sidewalks, curb & gutter, lighting, landscaping,
!underground utilities, bridge, and signing.
I IJK I
I I
I
102 IABDFI0.85 116
IGHJKI
ILM I
I
460
50
I
12900
42 FAUSI
108 FAP
250 FAUSI
I
150 FAUSI
I
108 FAUSI
1250 FAUSI
I
42 FAUSI
I
I
I I
8 50
22 130
I
100 350
I
150 UABI 420 720
I
22 130 I
210 I 460
8 50
1250 FAUSI1000 UABI1650 12900 I
I
SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1988 TO 1993
Cit~/County Kent, Washington
City No 0615
Hearing Date. ___ _
Adoption Date ___ _
County No. 17 Resolution No. I
=================================================================================================================================!
p PROJECT IDENTIFICATION m T F Cl PROJECT COSTS IN THOUSANDS OF DOLLARS
r a 0 u AI
DESCRIPTION OF WORK jo work T L N Rl OBLIGATION I FUNDING SOURCE !TOTAL!
0 f code A E c Rl SCHEDULE !·······················! I
r (Street name or number, c (S) L N TC Yl Y E A R I FEDERAL I RAP! I FUNDS!
Co. road name or number, lw G NL 01 88 89 90 91·931 or !Local!
t termini beginning & end. ao T LA VI 1st 2nd 3rd 4,5 Pro·IAMT UABI I
y Describe work to be done.) sr H S EIAnnl 6th IAMT gram!
No sk S RIElmt I I I
=================================================================================================================================!
1 I 2 I 3 I 4 I 5 I 6 171 8 I 9 I 10 I ·11 I 12 13 I 14 15 I 16 I 17 I
................................................................................................................................ ·I
10 !North Central Ave and Smith St. 103 IABDHI0.25 116 I I 590 I I I 472 UABI 118 I 590
!Add a double left turn lane, channelization,
!lighting, signal upgrade, and signing.
IIJK I
I I
I
11 ISE 277th Street (SR167 • East Valley Highway)
I I
102 IABDFI0.65 114
!Major widening of roadway to include curb & gutter!
!sidewalks, lighting, grading, pavins, signing, 1
!channelization, signalization, and RR crossing
!upgrade. This is a joint project with Auburn
land King County.
I I
IGHIJI
IKM I
12 IS 196/200th Corridor Improvement (West Leg)
!Major widening of s. 200th St. from Orfllia Rd.
Ito the Green River. The project shall include
!curb & gutter, sidewalks, lighting, grading,
!paving, bridge over Green River, a new signal at
101 IABDFI0.62 114 I
!Orillia Rd., signing, and landscaping. This is
Ia joint project with King County and Tukwila
!(Pending annexation).
' 13 !West Valley Highway (S 189th·S 212th)
!Major widening of West Valley Highway to
!Include curb & gutter, sidewalks, lighting
!grading, paving, channelization, signalization,
!signing, and landscaping.
I
I
!02
IGHIJI
IKLM I
' ' IABDFI1.50 114
IGHIJI
IKM I
I
I I
14 !West Valley Highway (S 212th·S 236th St.)
!Major widening of West Valley Highway to
!include curb & gutter, sidewalks, lighting
!grading, paving, channelization, signalization,
!signing, and landscaping.
102 IABDF11.50 114
IGHIJI
IKM I
I I
15 ISR·516 (Union Pacific RR • Smith St.) 103 IADFGI0.85 114
!Minor widening of roadway to include curb & IHK
!gutter, sidwalks, grading, paving, channelization I
land signing. A double left and exclusive right
!turn lane will be provided at Central & Willis. Ani
!additional through lane will be provided at I
!at 4th Ave & Willis St. for eastbound traffic.
I
395 11865 676 I 1350 FAUS!1500 UABI1086 12936 I
I I I I
14000 1250 FAUS!1000 UABI2750 14000 I
I I
I
' 14610 500 UABI4110 14610 I
I
15840 900 UABI4940 5840
358 40 FAUSI 240 UABI 78 358 I
Sll. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1988 TO 1993
City/County Kent, Washington
City No 0615
County No. 17
Hearing Date ___ _
Adoption Date ___ _
Resolution No. __
=================================================================================================================================I
p PROJECT IDENTIFICATION m T F Cl PROJECT COSTS IN THOUSANDS OF DOLLARS
r a 0 u AI I
DESCRIPTION OF WORK jo work T L N Rl OBLIGATION I FUNDING SOURCE I TOT ALl
0 f code A E c Rl SCHEDULE I······················ ·I I
r (Street name or number, c (s) L N TC VI y E A R !FEDERAL I RAP I IFUNDSI
; Co. road name or number, lw G NL 01 88 89 90 91·931 or I Local I
t termini beginning & end. ao T LA VI 1st 2nd 3rd 4,5 Pro·l AMT UABI I
y Describe work to be done.) sr H s EIAnnl 6th IAMT graml I I
No sk s RIElmt I I
=================================================================================================================================I
1 I 2 1314 I 5161718 I 9110 1'11 1121311415116117 I
......................•.•..... • ...••...•..........•.........•...•...•....•...•..........•....................................... ·I
16 ISE 256th St. (Kent·Kangley·116th Ave SE) 102 IABDFI0.69 117 I I 900 I I 720 UABI 180 900 I
!Major widening of roadway to include drainage, IGHIJI I
!curb & gutter, sidewalks, lighting, grading, IKM 1
!paving, channelization, signalization,
!signing, and landscaping.
I
17 ISE 260th St. and 104th Ave SE
!New traffic signal
I
18 IJames St. and 4th Aves.
!Traffic signal revisions to convert ·present two
!phase signal to an eight phase signal.
I
19 IS. 228th St. and 4th Ave S,
!Traffic signal revisions and traffic signal
I Interconnect.
I
20 lEast Valley Highway and s. 208th St.
!Traffic signal revisions and traffic signal
I interconnect.
21 IKent·Kangley CSR·516) and 111th Ave SE
!Traffic signal revisions and traffic signal
I interconnect.
22 !Canyon Drive (SR·516)
!Placement of c·curbfng barrior along Canyon Dr.
Ito prevent left turn and rear end accidents.
I
23 !West Valley Highway and s 180th st. • Phase II
!Add double left turns on all four legs of the
!Intersection with addtional through lanes
!for northbound and southbound traffic.
!Joint project with Tukwila and Kent.
I
24 !West Valley Highway CSR·181) and Meeker St.
!Minor widening to improve the right turn
!radius on the southeast corner for northbound
!traffic turning right onto Meeker St.
I
106 I I
106 II
106 I I
106 II
I I
106 II
I
106 IH
I
I I I
10.20 116 I
I
10.20 116 I
I
I I
0.50 117
0.25 116
I I
0.42 114 I
I I
10.50 114 I
I
102 IABDHJ0.25 114
IIJK I
I I
I
102 I ABDFJ 0.10 114
IGHJKI
I
I
130 I
25
50
50
50
I
50 I 50
42 FAUSt 8 50
I
11700 1200 FAUSI 600 UABI 900 1700
I
50 FAUSI
I
I
50 100 I
SP\ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1988 TO 1993
City/County Kent, Yashington
City No ::1615
County No. 17
Hearing Date ____ _
Adoption Date ___ _
Resolution No. __ _
=================================================================================================================================I
p PROJECT IDENTIFICATION m T F Cl PROJECT COSTS IN THOUSANDS OF DOLLARS
r a 0 u AI
DESCRIPTION OF YORK jo work T L N Rl OBLIGATION FUNDING SOURCE I TOTAL I
0 f code A E c Rl SCHEDULE I······················ ·I
r (Street name or number, c (s) L N TC Yl y E A R !FEDERAL I RAP I I FUNDS!
i Co. road name or number, lw G NL 01 88 89 90 91 ·931 I or I Local!
t termini beginning & end. ao T LA VI 1st 2nd 3rd 4,5 Pro·IAMT UABI I
y Describe work to be done.) sr H s EIAnnl 6th IAMT gram! I
No sic s RIElmt I I
=================================================================================================================================I
1 I 2 I 3 I 4 I 5 I 6 171 8 I 9 I 10 I ·11 I 12 13 I 14 15 I 16 I 17 I
·································································································································!
25 !Crow Road By·Pass (SR·516 By·Pass) 103 IABDFI0.35 119 I I I 700 I I I 70 FAUSI 200 UABI 430 I 700 I
!Minor widening to improve turning radius at JGHIJI 1 1 1 I I I I I I
ISE 260th St. and 108th Ave SE with signalization IK
lat Kent·Kangley Road (SR·516) & 108th Ave SE
Ito include curb & gutter, sidewalks, lighting
!grading, paving, channelization and signing.
I
26 ISE 256th St. and 104th Ave SE
!Addition of a double southbound left turn lane
land traffic signal revisions.
103 IABDFI0.15 114
IGHK I
I I
250 I 1200 FAUSI 50 I 250 I
=====================================·============================================================================================