Loading...
HomeMy WebLinkAbout1107FOLLOWS: RESOLUTION NO. //{)7 A RESOLUTION of the City Council of the City of Kent, washington adopting the SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1987 TO 1992. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KENT AS Section 1. The SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1987 TO 1992, as set forth in the attachments hereto and herewith filed with the City Clerk, is hereby adopted. Passed at a regular meeting of the City Council of the City of Kent Washington this ~ day of ~ 1986. Concurred in by the Mayor of the ytt:Y of Kent, this 1 7 day of ~·2 -vt--, 1986. \_ f. -- 2•-.< ~1(___ l(__ L. _ ~KELLEHER, MAYOR ATTEST: APPROVED AS TO FORM: I hereby certify that this is a true and correct copy of Resolution No. ~aJ? , passed by the City Council of the City of ' Kent, Washington, the /6 day of ~86. 4--~ -~ ~~ ·• -(SEAL) MARIE J~Y CLERK 2740-110 SA SIX YEAR TRANSPORTATION I"PRDVE"ENT PROGRAK 1987 TO 1992 City/Co.unty Kent, Washington City .No-0615 County No. 17 Hearing Date ________ June 16 1 1986 Adoption Date _______ June 16, 1986 Resolution No. __ f/_~~------ 4 B ===============================================================================================================================1 p PROJECT IDENTIFICATION • T F c: PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 u A: i DESCRIPTION OF WORK jo work T L N R: OBLIGATION FUNDING SOURCE :TOTAL : 0 f code A E c R: SCHEDULE :------------------------: r !Street naae or nuaber, c lsl L N TC v: y E A R :FEDERAL I RAP : IFUNDS l i Co. road naae or nuaber, lw G NL 01 87 88 89 90-921 or I Local I t teraini beginning ~ end. ao T LA VI 1st 2nd 3rd 4,5 Pro-lA"T UAB I y Describe work to be done.} sr H s ElAnnl 6th lAIH graal No sk s RIEl at ======================================================================================================================:::::::a:f 2 1 S 212th St at 42nd Ave S Add left turn lane, grading, drainage, channelization, curb & gutter. 2 S 212th St and 84th Ave S Add right turn lanes, grading, channelization, paving, curb & gutter, sidewalk, signing. 3 S 240th St. !106th Ave SE-116th Ave SEl Widen roadway froa two lanes to five lane section with curb & gutter, sidewalks, drainage, paving, channelization, signing, and landscaping. 4 Reith Rd. lS.253th-38th Ave S.l Reconstruct curve, add left turn lane, bike path, pedestrian shoulder, grading, drainage, paving, channelization, lighting, and signing. 5 S 252nd St. and SR-99 !Pacific Highway Sl Hew Signal project. 6 West Valley Highway !SR-181) and S. 212th St. Add turn lanes, channelization, signing, signal iaproveaents, grading, widening. 7 Saith St. !SR-516} !1st Ave-Jason Ave} Widen Saith St. for additional turn lanes, signal, drainage, lighting, curb & gutter, sidewalks, and landscaping. 8 West Valley Highway !SR-181} and S. 190th St. Installation of a full eight phase signal systea with channelization and lighting. 9 West Valley Highway !SR-181) and Jaaes St. Add a double left turn lane, channelization, lighting, signal upgrade, and signing. 10 West Valley Highway !SR-181} and S 180th St. Add turn lanes, channelization, aajor widening, signal revision, grading, drainage, and lighting Joint project with Tukwila, Renton, and WSDOT. 3 : 4 s 6 :71 8 9 10 11 : 12 13 : 14 15 : 16 l 17 l 02 ABDF 0.20 16 X 525 HJK 02 ABDF 0. 15 16 X 304 GHK 02 ABDF 0.56 16 1320 GHIJ K" 01 ABDH 0.40 17 625 JKO 06 K 0.10 14 x BO 02 ABDH 0.10 14 x 250 K 02 ABDF 0.40 14 x 720 6HIJ K" 06 HIJK 0.10 14 02 ABDH 0.13 14 IJK 02 ABDH 0.15 14 IJK 130 300 bOO 89 UAB 236 325 200 KING co. 143 FAUS 132 UAB 29 304 250 FAUS 800 UAB 270 1320 150 UAB 475 625 67 FAP 13 so 208 FAUS 42 250 150 FAUS 150 UAB 420 720 108 FAUS 22 130 250 FAUS 50 300 500 FAUS 100 600 3A SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1987 TO 1992 City/Coanty Kent, Washington Hearing Date ________ June lb, 1986 rity No 0615 Adoption Date _______ June lb, 1986 County No. 17 Resolution No. __ {)_~~------ ===============================================================================================================================~ p PROJECT IDENTIFICATION I T F c: PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 u AI i DESCRIPTION OF WORK jo work T L N Rl OBLIGATION FUNDING SOURCE ITOTAL I 0 f code A E c Rl SCHEDULE t------------------------1 r !Street na1e or nu1ber 1 c lsi L N TC v: y E A R !FEDERAL I RAP I !FUNDS i Co. road na1e or nu1ber 1 111 6 NL o: 87 88 89 90-921 or !Local! t teraini beginning ~ end. ao T LA VI 1st 2nd 3rd 4,5 ' Pro-IAIH UAB I ' y Describe work to be done.! sr H s ElAnnl 6th IAMT gra1l No sk ·s RlEllt =============================================================================================================================== 2 3 : 4 5 b 17: 8 9 10 11 : 12 13 : 14 15 : 16 : 17 : -------------------------------------------------------------------------------------------------------------------------------- 11 East Valley Highway lS !80th St.-S 192nd St.J Co1plete five lane section with drainage, paving, sidewalks, curb ~ gutter, lighting, landscaping, underground utilities, bridge, and signing. 12 N. Central Ave lJa1es St.-Siith St.) Major widening of roadway to include curb & gutter, sidewalks, lighting, grading, paving, channelization, signalization, signing, and landscaping. 02 ABDF 0.85 16 GHJK LM 02 ABDF 0.23 16 6HIJ KM 240 2400 200 FAUS 1920 UAB 520 2640 780 624 UAB 156 780 13 76th AveS lS 2t2th St.-S 222nd St.l 02 ABDF 0.65 16 1912 288 FAUS 500 UAB 1124 1912 New construction of roadway to include grading, 6HIJ paving, curb~ gutter, sidewalk, lighting, signing, KH landscaping, and signalization. 14 SR-515 1104th Ave SE and SE 248th St.l Install full eight phase signal syste1 at the intersection. Due to growth in traffic, this intersection aeets several signal warrants. The work will be done in conjuction with the WSDOT widening and i1prove1ent of 104th Ave SE. 15 SR-515 widening lSE 242nd St.-SE 252nd St.l This roadway will be widened fro• two lanes to five lanes with curb~ gutter, sidewalks, paving, lighting, and landscaping. 16 SE 272/277th Corridor Pre. Engineering & Design Preli1inary engineering and design of roadway sections fro• the Green River to SR-516. Design shall include curb ~ gutter, sidewalks, lighting, grading, paving, channelization, signalization, signing, and landscaping. This is a joint project with Auburn and King County. 06 K 0.10 16 02 ABDF 0.70 16 6HJK " 01 ABDF 3.60 14 SHIJ KH 13() 108 FAUS 22 130 3000 2500 WSDOT 500 3000 1008 500 3000 4750 208 FAUS BOO 10()8 SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1987 TO 1992 City/Ccunty Kent, Washington City ilo 0615 County No. 17 Hearing Date ________ June 16 1 1986 Adoption Date____ June 16 1 1986 Resolution No. ___ {./_~:l ____ _ =================================================================================a=============================================: p PROJECT IDENTIFICATION I T F c: PROJECT COSTS IN THOUSANDS OF DOLLARS r a D u AI i DESCRIPTION OF WORK jo IIDrk T L N Rl OBLIGATION FUNDING SOURCE ITO TAL 0 f code A E c Rl SCHEDULE t------------------------1 r (Street nate or nuaber, c lsl L N TC VI V E A R !FEDERAL : RAP I I FUNDS i Co. road nate or nuaber, 11'1 G NL o: 87 88 89 9~921 or llocall t teraini beginning & end. ao T LA VI 1st 2nd 3rd 4,5 Pro-IA"T UAB I y Describe 11ork to be done.l sr H s EIAnnl 6th IA"T gratl No sk s RIEl at =============z====================================================================================2=========================z::1 2 3 I 4 5 6 I 71 8 9 10 11 I 12 13 : 14 15 I 16 I 17 I 17 SE 192/196th Corridor Pre. Engineering & Design 01 ABDF 4.00 14 250 500 4000 5250 208 FAUS 42 250 Preliainary engineering and design of road11ay GHIJ sections fro• the Orillia Road to lOSth Ave SE. KH Design shall include curb & gutter, side11alks 1 lighting, grading, paving, channelization, signalization, signing, and landscaping. This is a joint project 11ith Tukwila, Renton, and King County. 18 West Valley High11ay (S lSOth-S 228thl 02 ABDF 2.95 16 7100 500 UAB 6600 7100 "ajar widening of West Valley Highway to GHIJ include curb & gutter, sidewalks, lighting K" grading, paving, channelization, signalization, signing, and landscaping. 19 Nest Valley Highway IS 228th-"eeker St.l 02 ABDF 1.20 16 2900 900 UAB 2000 2900 "ajar 11idening of Nest Valley Highway to GHIJ include curb ~gutter, sidewalks, lighting K" grading, paving, channelization, signalization, signing, and landscaping. 20 SR-516 14th Ave S-Central Ave) 01 ADFG 0.32 16 30 300 25 FAUS 240 UAB 65 330 "inor widening of road11ay to include HK curb & gutter, sidewalks, grading, paving, channelization, and signing. 21 SE 256th St. 1Kent-Kangley-116th Ave SEl 02 ABDF 0.69 17 900 720 UAB 180 900 "ajar widening of road11ay to include drainage, GHIJ curb~ gutter, sidewalks, lighting, grading, KM paving, channelization, signalization, signing, and landscaping. 22 East Valley Highway and S 180th St. 02 ABDH 0.10 16 230 192 FAUS 38 230 Add turn lanes and channelization.