Loading...
HomeMy WebLinkAbout972RESOLUTION NO. A RESOLUTION of the City Council of the City of Kent, Washington, amending a plan commonly called the "East Hill Plan" which is an element of the City's Comprehensive Plan. WHEREAS, an amendment to the City of Kent's East Hill Plan, an element of the City's Comprehensive Plan, has been pro- posed, and WHEREAS, in accordance with the provisions of Chapter 35A.63.073 of the Revised Code of Washington, hearings were held before the Planning Commission of the City of Kent, and WHEREAS, mission on May 11, to the City Council be adopted, and after 1982, with the the the final hearing of the Planning Com- proposed amended plan was forwarded recommendation that the amendment WHEREAS, the City Council held public hearings on the proposed amendment on June~21, July 6, July 19, and August 2, -1982, and following those hearings modified the recommendations of the Planning Commission. vlliEREAS, Resolution No. 969 was inadvertently adopted on August 16, 1982, without the attachment referenced therein and such attachment having now been prepared; NOW, THEREFORE THE CITY COUNCIL OF THE CITY OF KENT, vlASHINGTON, DO HEREBY RESOLVE: Section 1: That the amendment of the East Hill Plan attached hereto as Exhibit A, which plan is an element of the City's Comprehensive Plan, be and hereby is incorporated herein by reference as if fully set forth herein, and the same hereby is adopted. Section 2. That the East Hill Plan amendment be filed with the City Clerk and in the office of the Planning Department and be made available for public inspection upon request. PASSED at a regular 7.J._ day of -¥-"-Ar-=----- ATTEST: ~'~ MARIE~~ CLERK I hereby certify that this is.a true copy of Resolution No. p~~d by the City Council of the City of Kent, Washington, ~ dayof -¥ , 1982-~~ MARIE JENS~ CLERK this /7~ the (SEAL) !' ----- ' . L\ /'{'I I\' , "-""' ) ' . _,,, --\ ~ )\ ~ r YL),_H •. , " ~ ~''/\ :t -\ ~ -I ) ~---=·--}\__\ ~ --J r· --,J r-·---------- I '<J\ ~. ~.} -+~:--._ ~-- \ ~--_J ___ .L - 'SEP 1 1982 • I t I I I I I I l I I r ! I CITY OF KENT, WASHINGTON Current Members Donald Baer, Chairman MAYOR ISABEL HOGAN CITY ADMINISTRATOR RICHARD CUSHING CITY COUNCIL Billie Johnson Thomas S. Bailey Bernie Biteman Jon J.ohnson Dan Kelleher Tim Leahy Dave ~~ooney PLANNING COMMISSION Helen Brooks, Vice-Chairman John Astle Barbara Bell Bill Carey Doug Cullen Mary Louise Kilbourn Michael Powers Carol Stoner Former Members Tim Leahy Dan Ke 11 eher Tom Sharp Harry Wi 11 i ams Byron Baker Planning Commission 1 s East Hill Plan Committee Barbara Bell, Chairperson l~ichael Powers Harry Williams, Former Member Byron Baker, Former Member Tim Leahy, Former Member I b TABLE OF CONTENTS I. INTRODUCTION Approach . . . . . . . . . Planning Process ..... Study Area Characteristics Kent Sphere of Interest. Document Organization. II. COMMUNITY ISSUES Summary of Community Workshops Summary of Telephone Survey. III. GROWTH TRENDS ANALYSIS Recent Growth Trends . . . . . . Deve 1 opment Activity . . . . . . Growth Trends Since World War II East Hill Annexations .. . Sanitary Sewers ....... . Growth Management Efforts .. . IV. PLAN ELEI,1ENTS/RECOM~·1ENDATIONS Introduction ....... . Natural Environment Element. Housing Element ...... . Transportation Element .. . Public Facilities and Services Element Human Environment Element. Human Resources Element. . . . Land Use Element ...... . Land Use Policies ... . Land Use Classifications. Adopted Land Use Map ... V. IMPLEMENTATION VI. Recommended Ordinance Changes. Coordination with King County. APPENDIX .. -i- PAGE 2 2 2 4 4 8 9 11 11 15 15 15 16 18 18 24 27 34 43 47 51 52 55 58 f ~ l ' I j ! I j i i f f I LIST OF FIGURES 1. Vicinity Map ..... 2. East Hi 11 Study Area . 3. Existing Land Use Map. 4 . Ex i s t i n g Z on i n g Map . . 5. Sphere of Interest Boundaries. 6. Lots Platted 1978-1981 ..... . 7. Building Permits Issued 1978-1981. 8. Number of Housing Units Per Square Mile. 9. Proposed Park Sites Map. . . 10. Adopted Land Use Plan Map ..... -ii- PAGE 1 3 5 6 7 12 13 14 ~ PJV~Cf ... ~- ·--· '· ' ·' ~-. .· -•. 1. . .,., · .. .:.,. . ~: ....... ~-~-. ~· .... j'-~ ·:~~ .. ~.>ll~ · .. ,--~--~: -j~';'.:--:-.~ ·:-: ... '· ·::,·~ ~ I. INTRODUCTION .. · <t:·""JJ~:~:~-- .... -~ .. Y:.j: .. ~- -- D <f' 0 • DES ~10INES 0 I <f' " ;;, • " I - AUBLTRN VICINITY l I I I 1 I. INTRODUCTION APPROACH The preparation of area plans has been undertaken by the City of Kent to supple- ment the City's Comprehensive Plan. The goals, objectives, and policies of the Comprehensive Plan represent an expression of community intentions and aspira- tions concerning the future of Kent and the areas within Kent•s Sphere of Inter- est. The Comprehensive Plan is used by the Mayor, City Council, City Administra- tor, Planning Commission, Hearing Examiner and city departments to guide growth, development, and spending detisionsd Residents, land developers, business representatives and others may refer t6 the plan as a statement of the City's intentions concerning future development. The East Hill Plan provides a more definite and specific interpretation of Comprehensive Plan goals, objectives, and policies as these relate to the East Hill area. The City's former East Hill Plan was adopted by the Kent City Council in 1971. In 1981, City Council directed the Planning Department to prepare a new East Hill Plan. PLANNING PROCESS Preliminary information concerning land use, population characteristics, housing, public facilities and services, natural features, and transportation were collected during the spring of 1981. Two public workshops held in ~1ay helped to identify community issues and concerns. A telephone survey conducted during ~lay also provided information regarding East Hill residents' attitudes and opinions about public facilities and services, natural features, transportation, and community development. Following the public workshops and completion of the telephone survey, six citizen advisory committees representing East Hill area residents, property owners, and businesses were appointed. Committee members assisted in the development of goals, objectives, policies, and recommended implementation measures for each element addressed in the plan. Each committee was chaired by a member of the Planning Commission and met regularly during the months of July through December. During January and February of 1982, preliminary land use concepts were developed and presented for comment and review to citizen advisory committee members and others at a public meeting held in March. Proposed land use alternatives were developed following the review of preliminary land use concepts. The Planning Commission held public hearings during April and May to receive public comment regarding the proposed plan and the draft environmental impact statement. Following review by the Planning Commission, the draft plan and environmental impact statement was submitted to City Council and reviewed at Council workshops and public hearings. The plan was adopted by City Council in Septembe~ 1982. STUDY AREA CHARACTERISTICS The East Hill planning area is bounded to the north by S.E. 208th Street, to the east by 148th Avenue S.E. and Big Soos Creek, to the south by S.E. 280th -2,..- ,-,po 1 OH!I :.::not I , ;n •. ip -- ,, j J l ! .. . . I Street, and to the west by the Green River, the base of Scenic Hill, and the city limits. This area includes approximately sixteen square miles. Of this total, slightly more than two square miles are incorporated as part of the City of Kent. Existing land use in the East Hill area is dominated by a mix of low to moderate density resiJential development and undeveloped land includ- ing pastures, woodland, and wetlands. Commercial land ·use is concentrated at two major centers located on 104th Avenue S.E. at S.E. 240th Street and S.E. 256th Street. Smaller commercial areas are located at the following intersections in the county: on Kent-Kangley Road at l32nd Avenue S.E. and l52nd Avenue S.E.; at S.E. 240th Street and l32nd Avenue S.E.; and at S.E. 208th Street and l08th Avenue S.E. Multi-family dwellings of low to moderate density are located near the commercial centers along l04th Avenue S.E. and Kent-Kangley Road. Major north-south roads serving the East Hill area are l04th Avenue S.E., l08th Avenue S.E., and l32nd Avenue S.E, Major east-west roads are Kent-Kangley Road, S.E. 240th Street, S.E. 256th Street and S.E. 208th Street. Population in the East Hill area has grown rapidly during the last decade. The area's esti- mated 1981 population of 33,085 is nearly double the 1970 estimated population of 18,000. KENT SPHERE OF INTEREST The East Hill planning area includes the eastern portion of the City of Kent and unincorporated areas within Kent's Sphere of Interest boundaries. "Sphere of Interest" refers to a geographical area considered by the City during review of annexation requests, land use policies, and proposals for the expansion of municipal services. The Sphere of Interest was adopted by Kent City Council in 1972 and amended in 1978. Cities are concerned about unincorporated areas near their boundaries because decisions regarding land use policies, significant development proposals, and the provision or expansion of municipal services have potential impacts that may extend beyond the boundaries of the jurisdiction responsible for the decision. Traffic impacts are an example. The rapid increase in the number of county resiJents living in the East Hill area has contributed-to congestion and other traffic-related problems on Kent roadways. County residents may also directly benefit from municipal services provided by the City of Kent. The City provides many county residents in the East Hill area with water and sewer service. County residents use city parks and recreation facilities and may participate in programs sponsored by the Kent Parks and Recreation Department. Cities, counties, and special purpose districts (school, utility) are increasingly recognizing the need for coordination. The East Hill Plan provides a basis for greater communication and coordination between the City and King County regarding an area of mutual concern. DOCUMENT ORGANIZATION To better integrate environmental review procedures with the planning process and to avoid duplication, the draft environmental impact statement was combined with the draft plan document. This document is available for public review at the Kent Planning Department. -4- I f ... , ....• ::.:·: .. · .... EXISTING LAND USE ~ 8 Pre-Development Rural Residential Single Family Res ~Multi-Family Res. L..:illJ Community Facility ~-.. ··: .. · Office Commercial Pasture Wooded Park ····:.j SR 7200 ' ' ······-···+··· .. :.:.; .. :.: SR 9600 EXISTING OF ••••••Annexation Area ••••Primary Sphere 111111111 Secondary Sphere i ' \ i ' !8. BOUNDARIES Boundary \ i ~ . '· i I I •'.T. t I t 1 I f t i t i l '•t" ·,, --·- ... ":' -··· .-.. . -'~~-~"'--. . :::~~::~:£:'•.' .· . ,.f:"'i' __ .. ;,... -_-;:·--::~- .., ....... ·;·' ... ·,·"~ '_.:-- ' ~ ;I ":.~ ;: .-· ·-:.~ · .. ·,- ·-· ..... II. COMMUNITY ISSUES ,,. ~-'"" ·' .. ·. '~ .. -- , . .,• ' ,,,. II. COMMUNITY ISSUES SUMMARY OF COMMUNITY WORKSHOPS Two community workshops held in May 1981, initiated the East Hill Study and provided residents and others with an opportunity to express their views and concerns about issues important to the East Hill community. About 230 resi- dents, property owners, and representatives of local businesses attended the workshops. An attempt was made to inform as many East Hill residents of the workshops as possible. Notice of the meetings appeared in several articles published by the Kent Daily News Journal, and over 7,000 meeting announcements were mailed to city and county residents within the East Hill area. Meeting notices were posted at City Hall, the library and the downtown and East Hill post offices, Announcements also appeared in the newsletters of Kent School District employees, the Parent-Teacher-Student Association, and several East Hill churches. WORKSHOP FORMAT After a brief presentatioQ, workshop participants were asked to form small groups to identify and discuss issues and concerns to be addressed by the East Hill Plan. A questionnaire consisting of a series of open-ended questions organized under six comprehensive plan elements provided a focus for the discussion. Members of the Planning Commission's East Hill Committee and Planning Department staff recorded comments made by participants. Participants were also invited to take the group discussion questionnaire home to record individual answers. At the end of the meeting, participants were asked to complete a short, individual questionnaire. This questionnaire provided additional information for those interested in participating as a member of a citizen's advisory committee. It also requested information concerning how participants found out about the work- shop, their opinions concerning the workshop, and suggestions for improving it. Major issues and concerns identified at the workshop are discussed in the fol- lowing paragraphs. SUMMARY OF ISSUES The effects of a rapid rate of development, characterized by many workshop partic- ipants as being haphazard and uncontrolled, emerged as a central issue, Many participants expressed concern about the amount of new development, particularly housing, that has occurred in the East Hill area, Loss of the area's natural amenities, the impacts of continued residential growth upon East Hill roads, schools and other public facilities and services, and the poor design or poor quality of some new development were reasons given for the concern. Some particip~nts felt that large, higher density apartment and condominium developments present special problems. Varied opinions were expressed, but many agreed that this type of residential development should be limited and -8- :permitted only in areas where existing services and facilities are adequate :and can accommodate the increased demand. Desi.gn issues were also considered important. The need for more effective buffering between areas of different or conflicting land use (single-family residences adjacent to commercial development or high density multi-family development) was emphasized. Greater attention to site layout, preservation of open space or existing site vegetation and setbacks were mentioned as ways of improving the appearance of new development and achieving separation between uses. :Traffic-related problems were a major issue. Traffic congestion on East Hill ! area roadways has increased rapidly and is continuing to increase. New develop- \ ment along narrow roads, unpaved shoulders, and lack of sidewalks have intensi- ; fjed traffic conflicts and created hazardous conditions for pedestrians and bicyclists using these roads. The safety of children walking to and from school is a s~ecial concern. SUMMAR~ OF TELEPHONE SURVEY A telephone survey of 621 households within the East Hill area was conducted during May 1981. The purpose of the survey was to obtain information concern- ing residents• attitudes and opinions about community facilities and services, natural resources, community development, and transportation. Some of the survey•s findings are described below. Of the 621 people surveyed, 300 were residents of the City of Kent and 321 were county residents. The findings of the survey are representative of both city and county residents residing in single-family households, Because of a small sample size (184 households or 14 percent of the total sample), the survey•s findings are not necessarily representative of East Hill residents who live in apartments, condominiums, or mobile homes. The responses of both city and county residents were remarkably similar for the survey questions discussed in this summary. Unless otherwise noted, the totals referred to represent the combined responses of city and county residents. A total of 536 respondents own their homes. A majority of those surveyed (39 percent) have lived in the Kent area for five years or less, although nearly a third (29 percent) have lived in the Kent area for ten to nineteen years and 18 percent have 1 ived in the area for tv;enty years or more. Years of residence at the same address follows a similar pattern. A majority (35 percent) have lived at the same address for five years or less. ~early a quarter have lived at the same address for ten to nineteen years and nine percent for twenty years or more. When asked why they had moved to their present location, the largest percentage of respondents (36 percent) cited proximity to their place of employ~ent, En- vironmental characteristics (attractive area, open space, quiet) were mentioned by 31 percent. Other reasons included affordable housing and schools (nine percent respectively). -9- ' I /Respondents were asked to describe what they liked most about living in the East Hill area. Access to shopping was mentioned by 37 percent. Other responses most frequently-given were similar to reasons for having moved to the East Hill area and included open space, quiet, and good schools. t-Jhen asked what they liked least about living in the East Hill area, 55 percent listed traffic or traffic-related problems. Rapid growth and development was the next most fre- lquently cited response and the only one for which the percentages of responses ' differed signficantly depending upon the respondent's place of residence: forty percent of county residents as compared to only 23 percent of those living 1within city limits. I Respondents were also asked a series of questions about the natural features and resources of the East Hill area and how important respondents considered 1 these to be in maintaining their quality of life. Respondents were asked to ! rate seven types of natural features as being "very important," "somewhat import- lant," "somewhat unimportant,11 or "not at all important.11 The types of natural l features rated included wetlands (ponds and marshes), lakes, creeks and streams, ! steep hillsides, vistas and natural views, open pastures, and woodlands, The l responses received indicate that natural features are highly valued by many i East Hi·ll residents. Creeks and streams, lakes, vistas and natural views, 1 open pastures, and woodlands were described as being "very important" by 60 per- ; cent or more. Woodlands received the highest rating (79 percent} followed by lakes (75 percent} and vistas and natural views (71 percent). If the ~very important" and "somewhat important" ratings are combined for these features, the resulting percentages are as high as 95 percent for woodlands and greater than 90 percent for lakes, vistas, and natural views. When asked whether public 1 funds should be spent to preserve or protect the natural resources of the East Hill area, 73 percent replied "yes'1 and 84 percent supported the adoption of , local laws or regulations to preserve natural resources. Respondents were asked whether they thought that protection of the East Hill's natural resources and open space would improve, worsen, or remain about the same if additional land in the East Hill area were annexed to the city. Forty- five percent of those living both within and outside city limits felt that protection would worsen. Only ten percent felt that protection would improve and 29 percent felt that the level of protection would remain about the same. Several questions were asked about public facilities and services. These included emergency services, streets, traffic control devices (signals, signs), schools, and parks and recreation facilities. Public facilities and services were rated as "somewhat adequate" by 50 percent of respondents and "somewhat i na9equate" by 17 percent. Particular services considered to be inadequate included streets and roads (49 percent}, traffic safety (25 percent) and emer- gency services (12 percent}. Assuming that development will continue on East Hill, respondents were asked to consider what would be needed to maintain or improve their quality of life, Road improvements and/or improvements to traffic flow patterns were most fre- quently mentioned. The need for more strict controls on growth were mentioned by 22 percent. Less multi-family and commercial development were suggested by 19 percent and 11 percent respectively. -1_0- '. ·~ · ..•. . . ~~ : .• ·, . ~· ~·; --.i · .. · ~: -~'' . ( ''. '\. ·; .. ~~ ... • .. -~ •. ··:···· . ' .;..: r\ .. ,_ ,... ·~ . ' --~ ·.·. ~ : . ;.,... ,, ·'-'•, '.1' ,: ... _ .. ·,i•. · ... '~-. .. ,·. _:_•, ~· .. III. GROWTH TREND ANALYSIS -· ...... III. GROWTH TRENDS ANALYSIS RECENT GROWTH TRENDS Population in the East Hill area has grown rapidly during the last decade, in- creasing from an estimated 18,000 persons in 1970 to about 33,085 in 1981. Future growth in the East Hill area is expected to exceed the rate of growth for King County as a whole, as a substantial share of future growth is projected to occur in unincorporated areas. Growth in the number of households in King County, due to a decline in house- hold size, has increased at an even faster rate than population. This trend has a major impact upon housing construction. In 1960, the average household in King County contained three persons. In 1981, the average household size in the East Hill area was estimated at 2.54 persons per single family dwelling and l .8 per multiple dwelling, reflecting an increase in the number of house- holds headed by a single parent, of households containing fewer or no children, and in households consisting of individuals living alone, Growth in the number of households is projected to continue at a higher rate than the rate of popula- tion g~owth. Although recessionary economic conditions have considerably slowed both popula- tion growth and new home construction in the East Hill area during the past sixteen months, the number of vacant, subdivided lots awaiting construction totaled 2,633 at the end of 1981. These lots, when developed, could add an additional 6,690 residents. DEVELOPMENT ACTIVITY Development activity is reflected in the number of subdivided (or platted) lots recorded and approved and the number of building permits issued. An analysis of the location and number of platted lots helps to determine areas that may be expected to experience development in the near future and to what degree, while building permits help to determine past and future growth trends. Figure 4 shows the location and number of platted lots recorded or approved for the years 1978 to 1981. Figure 5 shows the location and number of building permits approved for the construction of single-family houses in unincorporated portions of the study area for the same period. The figures illustrate that most recent develop- ment activity has occurred in areas about a half mile to two miles east of Kent'~ city limits. Activity has concentrated south of Kentridge High School LGlen Car1n), south of Lake Meridian near Kent-Kangley Road, and north of Cla~k Lake between S.E. 240th Street and S.E. 224th Street. Building permits generally correspond to those areas where recent subdivision activity has occurred. Figure 6 illustrates housing unit density by square mile (640 acres) as of April 1981, The highest . number of housing units is found in the mostly unincorporated Park Orchard-Kentr1dge area. -11- : j 216 .. 1 • . ., j •. ! ~ -·-~-. -.--. . +.-_... ..... ---.. ~ ...... _ ... 801 -·. ' 276 87 195 240 -326 72 ···-+------+-----..... -----+---- ··-·~·-· ·-··296~·---~·367·· . '188 . ~.,.,,,.••.ot~~ *IIPJ lP fttr.-• ---~· , LOTS PLATTED 1978-1981 -$.-,, ......... .. ..... ____________________________________ _ _......., ~---~~-. .. -----.... . ....... ~-.. I ... 49 ... ' . ~-....... ~ 278 .. \ .. 195 · .. 122 84 19 44 172 43 BUILDING PERMITS ISSUED 1978-1981 (COUNTY} ~·· . -........ _.,..., .. _..,..""""" ... _ ... ' .... ~~-.......... ---~---- L \ ./ ~-\ ' ~· .J..T _....,.......... . .-............. '*'·~-· .. ---------(,. •· ·-• --• ..-\ ... ...-..~ .. -k ..... __ ... • '. ~ .. 892 865 148 -- 572 240 474 517 '· .. 368 588 ··-+-----~------+-----~---- '~ . . 161 ·~-... ,._ -812 " --.... _., 3 3 8 .. 'II ... _._.J ···•,'1;.--"lt>~.'!~...,-,a:UQWIIC b$ !I <#•* -~· ,,,._ •.~·'-c.,._.aff.;·•-··. ~ ~···<.-··· ·~ ... -•,.. • , NUMBER OF HOUSING UNITS (APRIL 1981} , L_ r---··· j -·-....-.--- GROWTH TRENDS SINCE WORLD WAR II An analysis of past growth trends is useful in providing a better understanding of present development patterns and current problems. The growth and activity of the Boeing Company ~ouple~ ~ith the ind~strial development of Green ~iver valley and the general econom1c act1v1ty and hous1ng development that accompan1ed it have acted as major determinants influencing the development of the East Hill area. During the decade following World War II, planning for a future flood control project and improvements to the regional transportation system would ultimately result in major land use changes in the City of Kent and in areas surrouding the city. The authorization by Congress in 1955 of the HovJard Hanson Dam and its completion in 1961 eliminated concerns about the annual flooding of the Green River. Planning for the .construction of Interstates 5 and 405 as well as State Road 167 (the Valley Freeway) _was also underway. These projects were completed between 1966 and 1969. During the late fifties, speculative purchases of large tracts of Green River valley farmland began in anticipation of future industrial and urban development. These purchases caused inflated land values and costs. City bpundaries in the Green River valley expanded rapidly during this period as land owners sought municipal services and zoning for more intense land uses through annexation. Residential development increasingly shifted to the east and west hills surrounding the city. EAST HILL ANNEXATIONS The annexation in 1953 of a ten-acre parcel located south of S.E. 240th Street, directly east of Summit Avenue, was the first of a series of annexations in the East Hill area that would eventually encompass 1,485 acres and extend the city•s eastern boundary to ll6th Avenue S.E. More than half of the city~s East Hill acreage was annexed between 1960 and 1969. Most of the annexations during this period occurred in the vicinity of Canyon Drive and Kent-Kangley Road. Annexations also occurred during this period in the vicinity of James .Street (S.E. 240th Street). SANITARY SEWERS The provisions of sewers is a major factor influencing the timing and location of new development. The presence of sewers in or near rural areas often results in continued pressures for conversion to suburban development. When utilities are available, outlying areas become attractive as locations for new development because of lower initial land acquisition costs and the ease of assembling tracts of adequate size for development. The earliest subdivisions and other residential development at suburban densities in the East Hill area were built upon septic tank systems or constructed adjacent to or near existing development served by sewers. The first major sewer line extensions in the East Hill area occurred during the early to mid-fifties and were provided to serve Kent-Meridian High -15- School and East Hill Elementary School. Other major extensions occurred during the 1960's and made possible the scattered, widely spaced subdivisions separated by dispersed rural residential development that characterize development within the unincorporated portions of the study area. GROWTH MANAGEMENT EFFORTS A discussion of the city's and county's land use planning and regulatory systems and the implications for growth management could extend to many pages. The fol- lowing discussion provides a brief overview of the relationships among planning, land use regulations, and various public facility and service programs. i The county's Comprehensive Plan establishes a direction for land use planning If and development decisions within the county. The comprehensive plan designates the general location of urban, suburban and rural land uses within the county 1 but does not indicate specific land use or zoning designations. These are 1 established by community plans and zoning maps. A new comprehensive plan, the I King County Development Guide, was completed in 1981 and is intended to replace I the 1964 plan. The recent change in county administration, however, has resulted i in postponement of the guide's adoption. f Community Plans are part of the county's comprehensive plan and guide land use i and capital improvement within specific portions of the county, ~ * Functional Plans are detailed technical plans prepared by the City of Kent, King County, other public agencies and special districts(utility, school). Some functional plans guide daily management decisions; others provide detailed criteria for the acquisition, development, and operation of public facilities and services. Sewer and water district plans are examples of functional plans. Capital Improvement Plans schedule spending for the provision or expansion of facilities needed to maintain or improve the quality of public facilities and services. Various codes and ordinances assist the City of Kent and King County in imple- menting their respective comprehensive plans. Other sections of this document provide information concerning specific city and county codes and ordinances. CURRENT EAST HILL PLANNING EFFORTS City of Kent East Hill Plan The city's East Hill Plan and its relationship to the city's comprehensive plan is discussed in the Introduction section of this document, King County Soos Creek Plateau Communities Plan In 1979, King County Council adopted a community plan fo~ the Soos Creek Plateau, which includes the unincorporated portions of the East H1ll study area, The plan -16- -- l was based upon a managed growth concept which proposed to accommodate suburban development in the more developed portions of the plateau that were already committed to development by the presence of public facilities and services, principally sewers. This included most of the East Hill area excluding the area east of Big Soos Creek. The plan also identified transportation and park proposals and included a list of project priorities and cost estimates, The proposals addressed deficiencies present at the time of the plan~s develop- ment and improvements necessary to support the plan•s land use recommendations, Problems and Conflicts Since adoption of the Soos Creek Plan, major changes have occurred in the avail- ability of funds for transportation improvements. Many projects identified in the Soos Creek Plan have been delayed and costs have increased. Rapid population growth has made additional roadway improvements necessary as well, Population growth exceeded the plan 1 s forecasts for 1980 and is expected to exceed the plan's 1990 forecast. Much of the unincorporated portion of the study area west of 116th Avenue S.E, is cl~ssified by the county as a transitional area. Development patterns in transitional areas are characterized by scattered subdivisions and dispersed residential development. It is in these areas, the fastest growing areas of the county, that future growth and development will have the most significant impacts. The Soos Creek Plan points out that under existing county policies and zoning requirements, development requests in transitional areas are generally approved if sewage disposal and water can be provided. The cummulative impact of individual development approvals upon the ability of public agencies to provide services, however, is often not specifically considered by the county. (This observation can also be applied to development requests within the city as well.) The Soos Creek Plan recommended that the county establish procedures to allow development to be phased so that service can be more effectively coor- dinated with population growth. The services identified by the plan that could be addressed by these procedures include waste disposal (sewers, septic tanks)~ water, schools and school capacity, parks, roads, and fire protection. The county is presently considering an ordinance that would require adequate public facili- ties and services as a condition of development approval. Coordination among the City of Kent, King County and special purpose districts is especially important when considering issues related to growth management efforts. In the past, Kent and King County have not taken active roles in the review of special district plans and proposals, nor have they actively partici- pated-in the development of plans addressing areas of mutual interest. -17- ' •--~ f I I ~ ' r'' IV. PLAN -' '< ~ ..... -' ,_ • ""to"•, -~ ~ : . . ; ... - ~ ·--.-' ·.,., .,, --, ·~. ,_ .. ~-' ... -'. . . ; . ; {to/.<-':;·~~---;/! : . -~-- / '.· ELEMENTS I :a E C 0 MMENDA TIO N S L oOL , ... IV. PLAN ELEMENTS/RECOMMENDATIONS TRODUCTION e Plan Elements and Recommendations that follow are the product of a year ng planning process described in Chapter I. During that period, public sues and concerns were noted and goals, objectives and policies were developed. addition, critical resource base information on the natural and man-made nvironment was gathered and evaluated by staff. The end result of this pro- ess is contained in the seven elements which are essentially the crux of the ast Hill Plan. he Elements and Recommendations in this chapter represent a reVlSlOn of the ast Hill Plan adopted in 1971. Therefore, many of the goals, objectives, and olicies in that document have been carried forward into this plan and indicate n even stronger commitment by the City of Kent to guide future growth according o the Comprehensive Plan. NATURAL ENVIRONMENT ELEMENT he streams, lakes and wetlands, scenic views, woodlands and rolling terrain of the East Hill area are highly valued by East Hill residents. The goals, objectives and policies of the Natural Environment Element are intended to promote development patterns that respond to the natural environment and the functioning of natural systems. Natural Environment policies provide a guide for maintaining the quality of environmentally sensitive areas and preserving the important public benefits which they provide including storm water runoff management, flood control and other drainage functions, preservation of fish and wildlife resources, recreation opportunity and visual amenity. The policies also address development of lands subject to landslide, erosion and seismic hazards. Development that occurs without regard for the special conditions present in these areas can result in public safety problems and excessive public co~ts due to higher costs of providing roads and utilities in these areas, re- placement or repair of facilities damaged as a result of slides or,erosion, and the costs of emergency relief and rescue operations. OVE~LL GOAL: PROMOTE ORDERLY DEVELOPMENT PATTERNS WHICH RECOGNIZE AND RESPOND to THE NATURAL ENVIRONMENT AND THE FUNCTIONING OF NATURAL SYSTEMS. GOAL 1: Preservation and enhancement of the natural qualities that make the East Hill area an attractive place in which to live. Objective 1: Policy 1: Promote development that utilizes significant natural features to enhance development character and preserve natural amenities. Consider natural and physical assets and liabilities including but not limited to topography, natural drainage, vegetation, views, amenities and access when making decisions concerning the type and intensity of land use. -18- i f l j ~ I • I i I I I ! ! I j l I j Policy 2: Policy 3: Base approval of proposed uses adjacent to sensitive natural areas (streams, lakes, wetlands) upon demonstration of com- patibility with and maintenance of the natural functions of these areas. Permit adjustments to development requirements (flexible set- backs and landscaping, lot size averaging and lot clustering) to encourage design solutions which preserve, protect and enhance natural features as part of proposed development. Objective 2: Maintain and restore the natural character of the East Hill community through the retention and introduction of native and ornamental plants in existing and planned development. Policy 1: Encourage the retention and reestablishment of vegetation in the issuance of development permits and in development actions of the City. Policy 2: folicy 3: Objective 3: Policy 1: Policy 2: Permit the preservation of significant existing trees to satisfy a portion of required landscaping. Promote the planting of street trees in areas of established high intensity commercial land use and along major arterials. Acquire, when feasible, sensitive natural features and areas that are valuable as public open space. Sensitive features that are appropriate for public acquisition include sites that require public management for storm water control or wildlife habitat or that support scenic or educational resources where public access is desirable. Seek information from knowledgeable local residents. when compiling information concerning natural resource areas. I GOAL 2: Protection of East Hill residents and property from risks associated with f development in areas subject to landslide, slippage, erosion and seismic hazard. Objective l: Regulate development in areas subject to landslide, slippage, erosion and seismic hazards. Policy 1: Retain in a natural state areas which exceed an average slope of 40 percent or greater. Policy 2: Retain in a natural state areas exceeding an average slope of 25 to 40 percent combined with a severe risk of landslide, slippage, seismic and erosion hazard. Policy 3: Promote special site layout, building design and construction measures to minimize risk in areas subject to moderate or severe landslide, slippage, erosion or sedimentation hazard. -19- Policy 4: Require the retention of natural vegetation in areas subject to moderate or severe landslide, slippage, erosion or seismic hazard to maintain slope stability, control erosion and pre- serve water quality. Policy 5: Require special construction practices in erosion hazard areas to prevent erosion, sedimentation and other drainage problems. A water quality management program that protects the East Hill 1 S water esources and recognizes the varied uses and important benefits these resources rovide. Objective l: Recognize, protect and promote beneficial uses of the East Hill 1 S water resources. Policy 1: Monitor and enforce codes, ordinances, policies and interjuris- dictional agreements addressing stream preservation and water quality issues. P.olicy 2: Require building setbacks, limits on vegetation removal and other appropriate design and construction controls for development adjacent to streams, lakes and wetland areas to protect water quality, minimize erosion and sedimentation, and preserve natural drainage and wildlife habitat. Policy 3: Policy 4: Policy 5: Policy 6: Policy 7: Policy 8: Require additional development restrictions, where necessary, to avoid degradation to any water supporting salmon or trout as identified by the Washington State Departments of Fisheries and Game and/or the City of Kent Planning Department. Establish a salmon enhancement program for Mill Creek to maintain and improve water quality and stream habitat and to increase public awareness concerning water quality issues. Require, where feasible, rehabilitation of degraded stream channels and banks as a condition of development approval. Identify wetlands having value for storm water drainage and flood control, water quality protection and wildlife habitat and develop a strategy for preserving these wetlands. Manage storm water runoff from development on or adjacent to hill- sides and ravines to avoid gully erosion, landslides, and erosion at the base of steep hillsides or ravines. Preserve woodlands located on slopes with a grade of 40 percent or greater to moderate storm runoff flows and minimize erosion and sedimentation. -20- Objective 2: Coordinate with representatives of King County, METRO and neighboring jurisdictions to maintain and enhance the functions of natural drainage systems and to preserve and enhance water quality. Policy 1: Develop interagency agreements with King County and the City of Renton to coordinate runoff control activities among the juris- dictions which share common drainage sub-basins within the East Hill area. ; RECOMI,1ENDATIONS l ~NOTE: A Water Quality Management Study currently nearing completion is expected to assist in the implementation of many policies included in the Natural Environ- ment Element. The purpose of the Water Quality Management Study was to assess water quality in city streams to determine desirable uses for these streams and develop recommendations to maintain or establish these uses, and to identify the best management practices for maintaining or improving water quality and managing the impacts associated with development and increased storm water runoff. The identification of development limitations in areas subject to severe landslide, erosion and seismic hazards and recommended development standards for these areas were also included as part of the study. 1. In accordance with Goal 1, Objective 2, Policies l and 2, and Goal 2, Objective 2, Policy l of the Housing Element, modifications are proposed to the current landscaping requirements of the Kent Zoning Code and to those provisions of the Tree and Stream Ordinance that apply to the retention of trees. The modifications are proposed to achieve the following objectives: A. Incorporate those provisions of Ordinance No. 2245 that concern the retention of significant trees with the landscape regulations of the Zoning Code. B. Place emphasis upon woodlands, stands of trees and trees which form a continuous canopy when applying tree preservation requirements. C. Identify protection measures to insure the continued health of existing trees to be retained following development. D. Provide a better transition between residential and nonresidential land uses and between adjacent residential land uses of different intensities. 1. Landscaping Regulations Recommendation: ~1odify current landscaping regulations to establish landscape requirements that are based on the following variables: type and density of plant material, including existing vegetation to be re- tained following development; use of structures (walls, fences); and land forms (existing topographic characteristics, berms). -21- i I r f t f I ' ' 2 .. Discussion: This modification would permit greater flexibility in ·meeting landscaping requirements while insuring that minimum standards, as established by the Zoning Code, are met. It would also permit the incorporation with landscape regulations of those provisions of the Tree and Stream Ordinance that are applicable to the retention of significant trees. The following section discusses this recommendation in greater detail. Tree and Stream Ordinance Recommendation: Discussion: It is recommended that the requirements of the Tree and Stream Ordinance that concern the retention of trees become part of the landscaping requirements of the Zoning Code, incorporating the modifications discussed in the following sections. Revise the requirements of the Tree and Stream Ordinance to place greater emphasis upon the preservation of stands of trees at and over a designated height which form a continuous or nearly continuous canopy. Trees which pose a safety hazard and areas to be devoted to required roads, sidewalks, utilities, storm drainage improve- ments, etc., would be exempt. The Tree and Stream Ordinance ~efers to Comprehen- sive Plan policies concerning the preservation of forests, woodlands and stands of trees as well as freestanding trees of significant size. Placing greater emphasis upon the retention of stands of trees and trees which form a continuous or nearly continuous canopy, including associated undergrowth, could contribute to the maintenance of some of the important public benefits provided by woodlands.* Many of these benefits are lost if only isolated, individual trees are retained. The basic intent of the present ordinance would be further strengthened by relating its provisions to the landscaping requirements of the Zoning Code. The retention of significant trees and naturally occurring undergrowth could be required in the perimeter landscaping area designated by landscaping *Woodlands maintain soil stability and protect water quality in streams and lakes by reducing erosion and sedimentation. Woodlands help to moderate flooding by reducing the rate and volume of storm water runoff. Woodlands also help to increase human comfort by moderating temperatures, acting as windbreaks and reducing noise levels, glare and reflection. -22- _L I • r • i I I Recommendation: Discussion: regulations. A small percentage of significant trees located outside the required perimeter landscaped area could also be designated for preservation. Retention of significant natural vegetation could be permitted to meet all or part of required landscapin< The retention of existing vegetation, supplemented if necessary, to provide a result at least as effective as could be obtained by introduced landscaping, could provide a superior separation between adjacent land uses of different intensiti~s. Require applicants to identify and implement measures and techniques to ensure the continued health of retained trees and associated under- growth (if applicable) following-land alteration and development. Trees which have attained the caliper size desig- nated in the Tree and Stream Ordinance maintain a relatively stable equilibrium with the surrounding environment. Disruptions and other modifications can inflict significant stress upon trees. Greater susceptibility to disease, pests, and other potentially life-threatening conditions may occur as a result. Trees are particularly sensitive to changes in soil depth and other alterations occurring within the drip line (the soil area beneath the tree's canopy) . -23- -- HOUSING ELEMENT using is a significant consideration for local government. Providing services for using and its inhabitants involve water and waste collection, police and fire tection, schools, roads, parks and social services which represent a major portion local government expenditures. sing represents the predominant use of land within the East Hill area. The goals, bjectives and policies of the Housing Element respond to the major concerns of East ill residents regarding housing. Housing policies address the need to coordinate he provision of public facilities and services with residential development and to chieve a more effective transition or separation between areas of intensive land use nd adjacent residential development. Other policies encourage a wide range of types to provide varied housing choices. VERALL GOAL: ASSURE PRESENT AND FUTURE EAST HILL RESIDENTS HOUSING THAT IS SAFE, RS ESIRABLE LIVING ENVIRONMENT, AND IS SUPPORTED BY ADEQUATE COMMUNITY FACILITIES AND SERVICES. Residential development that is related to the availability of community ties and services. Objective l: When making decisions concerning land use, consider the adequacy of and impact upon roads and other public facilities and services including utilities, police and fire protection, public transpor- tation, schools and parks. Policy 1: Ensure that public facilities and services are available or will be available to support development at proposed densities. folicy 2: Locate new single-family detached residential development in areas and at densities which permit roads, utilities, public transit, schools and other public facilities and services to be provided in an efficient and cost-effective manner. Policy 3: To reduce congestion in residential areas, limit the number of driveways for new development located on arterial streets and provide mutual access (e.g. shared driveways, e~sements) where- ever possible. GOAL 2: Development patterns that promote residential quality and provide diverse housing opportunity. Objective 1: Promote flexible residential development approaches to: a) Provide a variety of housing types, densities and prices. b) Enhance residential development character through retention of open space and sensitive natural features (streams, lakes, wetlands, steep slopes). -24- Policy 1: c) Encourage energy conservation opportunities. d) Permit maximum efficiency in the layout of streets and other public improvements. Permit adjustments to residential development requirements including, bul not limited to, flexible setbacks, lot size averaging and lot clustering. Policy 2: The East Hill Plan Land Use Map will serve as a general guide for future development of the East Hill. Flexible residential development means that specific development proposals at densities somewhat higher than shown on the Land Use Map may be appropriate on certain sites where natural features are preserved and adequate buffering of lower density development is provided. Objective 2: Decisions concerning land use designations and development proposals shall consider surrounding residential land uses and mitigating measures necessary to minimize potential conflicts. Policy 1: Require separation between residential and rionresidential areas and between adjacent lower and higher density residential areas through landscaping, building placement, location of off-street parking, traffic control and other measures. RECOM~1ENDATIONS 1. In accordance with Goal l, Objective 1, Policies 1 and 2, the following recommendations are made: Recommendation: The City should assume an active role in reviewing King County land use plans and functional plans as well as the plans of other public agencies or special purpose districts which directly or indirectly affect the growth and development of the East Hill area and other areas within the City's sphere of interest. The City should initiate discussions with King County directed towards the establishment of a joint sphere of influence agreement concerning the East Hill area. The intent of such an agreement·would be to encourage consideration of specific issues related to growth management, to provide for an exchange of information regarding land use actions and provisions of services, and to resolve conflicts among plans, policies and development standards. -25- -- I ' ' The City should strongly support and encourage County efforts to phase development in transitional areas of the East Hill to allow the provisions of public facilities and services to keep pace with growth as proposed in the King County Soos Creek Plateau Communities Plan: "It is recommended that King County develop a tool that will allow develop- ment to be phased so that services can keep pace and be more effectively coordinated with population growth." 2. In accordance with Goal 2, Objective 1, Policy 1, the following recommendations are made: 3. Recommendation: The Kent Zoning Code should be amended to permit cluster site de~ign in subdivisions and short sub- divisions. Cluster provisions permit the develop- ment of lots that are smaller than those specified for conventional development provided that the land not developed is reserved for permanent common use, usually as open space. (The cluster subdivision con- cept should not be confused with planned unit develop- ment. Cluster subdivisions do not increase the maximum overall density permitted within a residential district. Zoning and subdivision regulations should permit review of proposals for cluster subdivisions and short subdivisions under conventional subdivision procedures). The Kent Zoning Code should be amended to provide a residential district permitting a range of town- house densities. The minimum lot size requirements of such a district could be reduced provided that the average lot area of the development is not less than the minimum required lot size established for the district. King County's Residential Townhouse classification provides an example. This district would permit a more flexible approach to attached single-family development than is currently possible under existing zoning district classifications. In accordance with Goal 2, Objective 2, under Policy 1 modifications are pro- posed to the current landscaping requirements of the Kent Zoning Code. These modifications are discussed under the recommendations for the Natural Environ- ment Element, Goal 1, Objective 2, Policies l and 2. -26- TRANSPORTATION ELEMENT transportation is one of the most critical activities that is evaluated and f lanned in the comprehensive planning process. Virtually every aspect of the lan affects the movement and destination of vehicles and pedestrians in one ay or another. In addition, it has perhaps the most visible impact as an area rows. Everyone is aware of the traffic congestion and in the East Hill Study ~rea it is usually the first item that people mention in any discussion of urban ~rowth impacts. ' i 'The rapid growth of the East Hill has essentially been caused indirectly by ]transportation (the automobile). Because people can go to and from work easily ibY car, the East Hill has become a popular area for residential growth even for iworkers who must travel to Tacoma and Seattle. And despite the increase in itraffic congestion, the East Hill continues to grow rapidly as more people choose ithe suburban/rural lifestyle over the urban environment. Because of this, a "transportation plan is imperative in the revision of a comprehensive plan. 'The goals, objectives, policies and recommendations that follow are the product , of the ~ransportation Committee that was comprised of several citizens that met "during 1981 to discuss a number of common concerns. In addition to this effort, ; a transportation plan for the entire city is being developed by a transportation ~consultant for the Department of Public Works. This plan element represents available portions of that study and the policies complement several facets of the plan that were known at the time of publication. OVERALL GOAL: ESTABLISH A BALANCED, SAFE AND EFFICIENT TRANSPORTATION SYSTEM LINKING THE EAST HILL WITH INTERNAL AND EXTERNAL HOUSING, EMPLOYMENT, SERVICE AND RECREATIONAL OPPORTUNITIES. THE TRANSPORTATION SYSTEM SHOULD BE DESIGNED AS BOTH A MULTI-MODAL AND A MULTI-PURPOSE SYSTEM THAT CAN BE ECONOMICALLY IMPLE- MENTED THROUGH THE JOINT EFFORTS OF LOCAL JURISDICTIONS, THE STATE AND TRANSPORTATION PROVIDERS. GOAL 1: A transportation system that is designed to protect the safety of its users. Objective 1: folicy 1: Objective 2: Provide a system of walkways, bikeways and roads that are designed to ensure the safety of pedestrians. Different modes of transportation should be separated to the greatest extent possible. Require that safety be considered as a top priority in the design, construction and maintenance of existing and planned transportation facilities including but not limited to road- way surfaces, signage, sight clearance, lighting and landscaping. -27- I i I r Policy 1: Provide unobstructed visibility for transportation users. Qbjective 1-: Policy l: Policy 2: Objective 4: Po 1 icy 1 : Coordinate with King County, the Kent School District and the State to develop and implement a community program to ensure the safety of students traveling between home and schooi. Ensure safe pedestrian access for students by providing side- walks near schools and walkways separated from vehicular traffic in areas served by school buses. Appropriate traffic control devices shall be provided by developers of projects that create potential safety problems near schools. Provide a transportation network that ensures adequate emergency services to all development on East Hill. Ensure that all transportation designs associated with new development or rehabilitation programs allow adequate clearance for emergency vehicle passage. GOAL 2: There should be a planned network of vehicular, pedestrian, bicycle and recreational routes based on a priority of travel. (Specific travel needs include emergency service, commuter routes, local routes, recreational routes, and special population groups such as school children, elderly and handicapped.) Objective 1: Designate and map classifications for existing and planned streets based upon the function of each street within the transportation system. Policy 1: Provide a citizens' committee to work with staff to review the results of the transportat1on plan and coordinate development of the transportation network. Objective 2: Coordinate with King County and the State to design and maintain arterials and intersections to ensure access and travel for emergency vehicles. Objective 3: Establish a network of bicycle routes which link East Hill residential neighborhoods with employment centers and com- mercial centers. Provide a network of sidewalks and trails for pedestrians and nonmotorized vehicles linking residential areas to recreational, commercial and educational transportation opportunities. Policy 1: Sidewalks and bike routes should be included in all highway development and improvement plans and linked to similar planned or existing routes. -28- -- Policy 2: Trail plans shall be included in all park developments and improvements. policy 3: Trails shall be incorporated in all residential and commercial open space where practical. Objective 4: Ensure that accessibility and mobility needs of the elderly and handicapped are considered in the design and construction of the East Hill transportation network. Policy 1: Ramped sidewalks access shall be provided at all intersections within commercial and residential developments. Policy 2: Developers of housing for seniors shall provide appropriate traffic control devices for crosswalks adjacent to their development. GOAL 3: Establish and maintain the highest feasible level of service for East Hill. Objective 1: Policy 1: policy 2: Policy 3: Policy 4: Policy 5: Determine the minimum level of service. Develop a plan to obtain minimum level of service. Work with developers to minimize their development's impact on traffic. Coordinate with the cities, county and state to maintain the planned level of service for the East Hill area. Coordinate the transportation plan with land use patterns and plans. Regularly monitor and evaluate the level of service of existing streets and intersections to identify those transportation im- provements that will most effectively obtain/maintain the planned level of service for East Hill. GOAL 4: Develop a transportation management program that incorporates all modes of transportation. Objective 1: Provide a transportation system management program to monitor and maintain vehicular, pedestrian and other nonmotorized move- ment of traffic in a cost effective and energy efficient manner. Policy 1: Conduct periodic level of service measurements. Policy 2: Adjust traffic controls to maintain or improve desired levels of service. -29- gpjective 2: Policy 1: Policy 2: Objective 3: Policy 1: Policy 2: Objective 4: Policy 1: Policy 2: RECOMMENDATIONS Promote interjurisdictional management coordination among cities, county and other governmental agencies. Ensure that the City of Kent is represented at interjuris- dictional meetings. Rather than reacting or responding after the fact, the City of Kent shall take the initiative in the formation of an interjurisdictional transportation management oody. Promote the use of economical and energy efficient transpor- tation alternatives. Encourage van pooling and car pooling. Increase safe access for cyclists and pedestrians by providing sidewalks or paved shoulders in developed areas and requiring that sidewalks or paved shoulders be provided as part of new development. Promote the use and expansion of public transit. Encourage expansion of the METRO system. Encourage intracity public transit system. 1. In accordance wit~ Goal 1, Objective 1, Policy 1, this recommendation was made: Recommendation: Standards and criteria should be established for the construction of bike trails, walkways, and horse trails to insure separation from auto traffic. Separation along arterials or collectors shall be of the highest priority. 2. The following transportation improvements have been derived from the City of Kent and King County Six Year Transportation Plan: Project Year 1981 1982 1982 KENT Location SE 240th at 102nd Avenue SE lOlst Avenue SE from 256th to SE 260th and SE 260th from 101st Avenue SE to 104th Avenue SE (this implements a recommenda- tion from the 1971 East Hill Plan) SE 256th Street at ll6th Avenue SE -30- Project Add left turn pocket Reconstruction (to be done as an LID) Install signal I I I ~ ;3. ' Project Year 1984-86 1984-86 Project Year 1981-82 1981-82 1981-82 1981-82 1983 1986 Location ll2th Ave. SE from SE 232nd to SE 240th Street 104th Ave. SE from 260th Street to SE 264th KING COUNTY Location 124th Avenue SE at SE 208th 132nd Avenue SE at SE 256th 132nd Avenue SE at SE 240th ll6th Avenue SE at SE 208th 116th Avenue SE from SE 208th to SE 240th Street SE 208th from 108th SE to llOth Avenue SE Project Reconstruction Reconstruction Project New signal Left turn lanes east & west Left turn lanes east & west Left turn lane west Paved shoulder Design for four lanes In accordance with Goal 4, Objective 3, the City of Kent should support the following recommendations which are derived from the King County Soos Creek Plateau Community Plan. Consistent with the county-wide policies and public interest, King County, METRO, Renton, Kent, and Auburn should encourage, support, and develop "para-transit" projects and programs in the Soos Creek Plateau including the fo 11 owing:. A. Pooling -support and encourage car pools and other ride-sharing measures by permitting joint use of park and ride lots by poolers as well as transit patrons. B. Mini Park and Ride Lots -the county and cities should require, as a condition of building permits issued for new shopping centers, that ten percent of the total parking spaces be identified and reserved for park and ride and car pool use. Provisions should also be included for routing buses through shopping center's parking lots. These shopping center park and ride lots would be an addition to the park and ride lots developed by METRO as part of other transit projects. C. Off-Peak Flexible Route Services -METRO, the county, and cities should seek to develop increased transit patronage during off-peak periods (midday and evening) by providing services which directly link residences with shopping centers, schools, hospitals, and recreational areas. Routes would not.necessarily be the same all day long, nor of high frequency. Rather, they would serve identifiable travel patterns to the extent of the demand, with scheduling and routing tailored to serve identified users. Such services could include ''dial-a-ride" services and routings which particularly serve the elderly and disabled. -31- D. Para-Transit -due to the rural/suburban characteristics of the Soos Creek area, the standard fixed route type transit service may not be the most cost-productive, effective means of providing service. Rather than standard line haul service, provide local circulation, feeder service to express connections and major trip attractors in Kent and Auburn. In accordance with Goal 4, Objective 4, the City of Kent should support the following recommendations which are derived from the King County Soos Creek plateau Community Plan. A. Transit Shelters -transit shelters are warranted as the area grows and transit service is expanded. Probable sites include community shopping centers and major residential developments. B. Park and Ride Lot: Kent-Kangley/SR-18-a park and ride lot at the interchange of SR-516 and SR-18, as suggested by the PSCOG 1990 Transportation Systems Plan. C. · ~1ini-Park and Ride Lots -to relieve expected congestion in the mid 19ao•s on ·east-west arterials down to the Valley Freeway, a system of small interceptor lots may be workable, coordinated with extensions of express transit routes. These mini-lots should be located so as to intercept automobiles east of Benson Highway (l04th/l08th Avenues), in the vicinity of SE l76th Street, SE 208th Street, SE 240th Street, and SE 256th Street. D. METRO 1990 Plan Scheduled Service -between now and 1990, the service levels (area coverage and frequency of service) contained in METRO•s 1990 Plan should be fulfilled. For more detail see the report 11 A Transit Plan for the ~1etropol i tan Area--1976 Refinement and Update 11 by f11ETRO. E. Service to Green River Community College -the present service on Route 153 links the college to Auburn only. This route should be extended north of 124th Avenue SE to Kent-Kangley Road, and loop through the East Hill shopping area to link with other transit routes in that vicinity. F. New Route to Panther Lake -when the Flyer Stop at SE l80th Street and SR-167 is in operation, extend a new local route via 212th and 208th Streets to residential areas in the vicinity of Panther Lake. This route could also extend across the Green River Valley to I-5 and the Burien/Sea-Tac area. G. Future Service Extensions -Routes -as conditions permit, extend existing routes or develop new routes to improve area coverage in the more urban portions of the Plateau. Primarily this would include the Benson Hill, East Hill, and Lea Hill communities west of l40th Avenue/ l32nd Avenue, but also including the developments occurring in the -32- -- • ( ·~ \ ~ ' ~ f ~ ' ~ • ! t r • I t t t H. Lakes area north of Petrovitsky Road. Objectives are to bring a transit route with a half mile of most residences, and to develop a route pattern permitting transit access to major activity centers within the Plateau as well as access to employment in Seattle, Renton, Kent, Auburn, Bellevue, etc. Conditions affecting the rate of extensions include METRO's financial capabilities as well as public demand for transit, highway congestion, and public interest in energy and fuel conservation. Future Service Extensions -Hours -as conditions oermit, increase the frequency of service on transit routes during peak hours, midday periods, and at night. Objectives of increased service for each of these periods are different, and each route would be dealt with separately. Service adjustments should include a change of focus, from peak to off-peak, to serve the different trip purposes and destinations which occur at different times of the day . -33- PUBLIC FACILITIES AND SERVICES ELEMENT Facilities and Services element includes policies related to utilities, lie safety and parks and recreation. East Hill has experienced considerable rowth during the past ten years which has had an impact on the provision of se services. For example, the extension of water service to areas previously eveloped can adversely affect the level of service to developments already iving water if the system is not adequate to meet the demand of both the new existing customers. The goals, objectives, and policies of the element hasize the provision of adequate public facilities and services at all levels that the needs of existing residents as well as future residents are ERALL GOAL: ESTABLISH A PLANNED AND COORDINATED SYSTEM OF PUBLIC FACILITIES AND S FOR EAST HILL THAT PROTECTS THE HEALTH, SAFETY AND WELFARE OF THE COM- MUNITY. THE PUBLIC FACILITIES AND SERVICES FOR EAST HILL SHOULD BE COST EFFECTIVE TO IMPLEMENT AND MAINTAIN AND SHOULD PROMOTE IN-FILL AND PHASED DEVELOPMENT FROM EXISTING DEVELOPED AREAS. GOAL 1: Adequate sewer service for existing development and those areas adjacent to the collection system prior to expanding the system. Objective 1 : Polic~ 1 : Policy 2: folic_l 3: Assure intensive use of existing sewers prior to developing new trunk lines and interceptors. Promote in-fill development in and around the east side of Kent. Provide incentives for developers to build in areas where they can hook up to existing sewers. The extension of sewer service in the East Hill Study Area shall have priority over projects which extend into previously unde- veloped areas. Objective 2: Coordinate with representatives of METRO and Cascade Sewer District to assure adequate sewer service for East Hill residents. Polic~ 1: Maintain intergovernmental agreements concerning the use and planning of area-wide sewer facilities. Policy 2: Schedule regular meetings with representatives of METRO, City of Kent and Cascade Sewer District to discuss operations and expansion of area-wide sewer service. 9~ective 3: Alleviate public health problems created by the continued failure of septic tank drainfields. -34- Policy 1: policy 2: In cooperation with King County, identify and monitor areas _that have problems with on-site waste water disposal. In cooperation with the King County Health Department and interested citizens, Kent shall pursue the formation of sewer LID•s in areas experiencing continued septic tank failures. ~ OAL 2: A water system that will deliver a cost effective, dependable supply of . igh-quality water to existing development and accommodate the incremental increase , n demand created by new development. ! I I r l Objective 1: Obtain additional long-term, high-quality water supplies that require little treatment to serve present and future needs. I Policy 1: Utilize interjurisdictional water source exploration programs to the fullest extent possible. Policy 2: Develop water supplies that require little or no treatment shall have the highest priority. I i : t Objective 2: Upgrade portions of the water system that are inadequate before expanding or extending to undeveloped areas. folicy 1: The funding of water projects which will enhance the operation of the existing system shall have priority over those projects which expand or enlarge the system. Objective 3: Assure a high level of service to existing customers in areas that continue to develop. Policy 1: Objective 4: Policy 1: When extending the water system to areas of new development, upgrade, where appropriate, the existing distribution network and storage capacity at the time of construction to assure adequate pressure and supply. Reduce water consumption and leakage from transmission mains and service lines. Water conservation programs should be devised in conjunction with plans for water supply development. Policy 2: Residential and commercial development should be designed to include systems and equipment which conserve water. Policy 3: Identify and monitor water lines susceptible to leakage. are discovered, complete repairs as soon as possible. -35- If leaks r f I ! ' ' I ~ ~ ~ ~ ~ ·GOAL 3: A planned and coordinated storm drainage system that utilizes the natural drainage system without adversely affecting water quality in streams or creeks on East Hill. Objective 1: Preserve vegetation and open space where significant natural drainage systems exist. Policy 1: Allow intermittent or permanent wetlands or streams to satisfy a portion of open space requirements. Policy 2: Limits on vegetation removal and site coverage shall be required for any development adjacent to streams, creeks, drainage swales or any other watercourse. Objecti~e 2: Assure that the natural drainage system is protected from degradation caused ·by erosion, siltation, and pollution. Policy 1: New development shall provide appropriate controls to maintain predevelopment peak storm water runoff levels. Policy 2: Runoff shall be controlled from a development site, both during and after construction, to prevent erosion and sedimentation of stream beds. Policy 3: Storm water system outfall pipes shall be designed and located to minimize erosion, especially if the outfall is to a surface flow area with a steep slope or is elevated above the base flow of the receiving stream. Policy 4: Storm water runoff from streets and parking lots shall be routed through oil-water separators prior to leaving the site. Maintenance plans for the oil-water separators shall be established at the time of installation. Public and private systems shall be monitored to assure proper operation. Objective 3: Correct existing East Hill drainage problems such as the excessive runoff from shopping centers and parking lots. Policy 1: Funding for storm water system projects in problem areas shall have high priority. Policy 2: Plans for the expansion of parking lots and shopping centers which currently contribute excessive surface water runoff shall include provisions to reduce runoff to an acceptable level. folicy 3: Require the use of materials and techniques which reduce storm water runoff when repaving parking lots or replacing storm drains. -36- Q_bjective 4: Policy 1: Policy 2: Objective 5: Policy 1: Utilize the natural drainage system upstream from Mill Creek and Garrison Creek to store and transport storm water runoff. Natural wetlands, where present, should be incorporated into the design of storm water runoff systems. Enclosed storm water systems should be used only in extreme cases where natural overland flows may threaten safety and cause property damage. Reduce the drainage and erosion problems created by incremental small scale development, e.g. short plats, and single-home construction. Require the use of special paving materials, landscaping techniques and retention of native vegetation to minimize runoff on slopes. GOAL 4: Adequate land and facilities to provide recreational opportunities for those living and working in the East Hill area. Objective 1: Coordinate the planning and development of parks, bikeways and hiking trails with King County. Policy 1 : Policy 2: Objective 2: Polic~ 1 : Initiate and maintain good communication between Kent and the King County Department of Planning and Community Development. The design of residential developments shall incorporate bikeways and trails where linkage can occur with the King County network. Promote citizen participation in developing and maintaining parks. Individual citizens as well as community groups and organizations shall be encouraged to work with the parks department in developing, operating and maintaining parks and recreational facilities. Objective 3: Provide open space or vegetative buffers throughout the community as urban or suburban development occurs. folicy 1: Open space for passive and active recreation shall be acquired by whatever means available. Polic~ 2: New subdivisions should provide for the linkage of planned open space with the open space of existing subdivisions. · Objective 4: Ensure convenient and accessible neighborhood parks for all East Hill residents. Policy 1: Neighborhood parks should be an integral part of residential development. -37- I Polic~ 2: Those areas identified as having inadequate access to park land and recreational facilities shall have priority for funding of projects. ~bjective 5: Provide adequate recreational facilities to meet existing and future needs of the East Hill community. Polic~ l : Recreational facilities shall be planned in conjunction with existing and potential school facilities to complement the function of each. Policy 2: Design recreational facilities to accommodate a variety of need~ including those of handicapped and senior citizens. Policy 3: Encourage the development of park and recreation facilities by private enterprise. GOAL 5: Coordinate fire, emergency medical and police services which will assure the health, safety and protection of East Hill citizens and their property. Objective 1: Assure that response times do not exceed five minutes for fire calls and four minutes for emergency medical call~. Policy 1: Maintain adequate staffing and equipment levels to assure good response to secondary fire and emergency medical calls. Policy 2: Fire stations shall be constructed and equipment acquired to keep up with the demand for fire services created by new development. Policy 3: Support the construction of additional east/west arterials. Objective 2: Promote fire safety, crime prevention and emergency medical training (i.e. C.P.R.) through the use of educational programs. Policy 1: Whenever possible, the police department and the fire department personnel shall work closely in the implementation of their respective programs. Polic~ 2: Educational programs shall be coordinated with the Kent School District, youth organizations, community service clubs and local industrial and commercial establishments. Qbjective 3: Encourage increased participation by auxiliary/volunteer fire- fighting personnel. Policy 1: A program of active recruitment shall be developed and maintained to retain a viable volunteer force. -38- Objective 4: Assure a sufficient water supply distribution network and storage capacity for fire protection. Policy 1: Development approval shall be contingent upon the existence of an adequate water system or an approved, implementable plan to provide such a system. GOAL 6: Adequate facility planning management and coordination to assure educational opportunities for all East Hill residents. Objective l: Promote the use of school facilities for adult education. folicy l: Work closely with the Kent School District in the planning and scheduling of adult education to assure sufficient opportunities for continuing education or the cultivation of special interests. Objective 2: Promote coordination with the Kent School District. Policy 1: City, county and school district officials shall meet on a regular basis to establish a continuing dialogue and to discuss areas of mutual concern. Objective 3: Utilize the full potential of school facilities to meet the changing needs of the community. Policy 1: Assist community organizations and governmental/quasi-governmental agencies in acquiring the use of school facilities for educational purposes. RECOMMENDATIONS l. In accordance with Goal l, Objective 1, Policy l, the following recommendation is made: Recommendation: No Kent sewer extensions should be permitted east of ll6th Avenue SE until such time as a reasonable portion of the property west of ll6th Avenue SE is within the City. 2. In accordance with Goal 1, Objective l, Policy 2, the following recommendation is made: Recommendation: The City of Kent should investigate the use of significantly different development and hook- up fees for sewer service outside the city limits. The intent is to make it economically desirable to connect to the sewer system within the City of Kent. -39- I 3. In accordance with Goal 3, Objective 1, Policy 1, the following recommendation is made: Recommendation: Open space requirements in the Zoning Ordinance and Subdivision Ordinance should allow up to 25 percent of required space to be submerged, i.e. ponds, marshes, intermittent wetlands, etc. 4. In accordance with Goal 3, Objective 3, the following recommendation is made: Recommendation: The City of Kent should pursue the formation of a storm water utility. A tax based on the amount of impervious surface a site contains could generate funds which could be used to mitigate existing problems as well as fund future storm water improve- ments. 5. In accordance with Goal 4, Objective 2, Policy l, the following recommendation is made: Recommendation: The City of Kent should assist citizens in organ1z1ng neighborhood park committees. City staff should assist committee members in clarifying the role and direction of the committee. 6. The following list of parks to be acquired and developed is derived from recommendations contained in the Draft Kent Parks and Recreation Plan (Jones and Jones, 1982). Time Frame -1982-1987 Neighborhood Parks 1. North Scenic Hill 2. South Scenic Hill 3. Sequoia 4. Lower East Hill 5. East Hill Center 6. Panther Lake Community Parks 7. 8. Kent Meridian South ~1eridian -40- Total Total Acquire 5 5 10 10 5 35 9 35 44 Acres Develop 5 5 5 10 10 5 40 15 15 Acquire Develop SQecial Resources & Trails 9. Clark Lake 35 10. Mill Creek Trail 5 Total 35 5 NOTE: See map for locations Time Frame -1987-2000 Neighborhood Parks 11. North ll6th 10 10 12; Glen Carin 5 5 13. Upper Lake Meridian 10 10 14. Kent-Kangley Center 10 10 15. f4i sty Meadows 10 10 16. North Lake Meridian 10 17 .. Meridian Valley 10 Total 65 45 Community Parks 18. Meridian 30 19. South f4eri dian 30 20. East Hill Community Center 10 10 Total TO 70 SQecial Resources & Trails 21. Garrison Creek (North Fork) 50 22. Garrison Creek (South Fork) 30 23. Garrison Creek Trail System 10 24. Clark Lake Meridian Trail System 10 Total 80 20 -41- ~/ figure / \ST I-IILL STLID\T 1:\l~Ef\ PROPOSED PARK SITES .il.L II ".ji'O • f!MIII ,!• .. loll ,:IWioo ..... ____ ......,_ ~~.\I.E l~ FFET HUMAN ENVIRONMENT ELEMENT In the growth and development of a community, changes occur that affect the quality of life and the liveability of an area. On the negative side, traffic congestion, loss of open space, removal of vegetation, and haphazard develop- ment impact the character of an area. While on the positive side a number of needed urban services are added. Some of these include new shopping centers, convenience stores and bus lines which increase the quality of life. The residents of East Hill have expressed their ideas and feelings. on what they value and dislike about their community. The goals, objectives and policies of the Human Environment Element are a representation of what they feel is impor- tant to their quality of life and how best to protect and enhance it. The intent of these policies is to ensure that the quality of life and the desirable characteristics of East Hill are maintained. OVERALL GOAL: ENHANCE, THROUGH GOOD DESIGN, THE AESTHETIC QUALITIES OF THE NATURAL AND MAN-MADE ENVIRONMENT TO PROMOTE THE HEALTH, SAFETY AND WELFARE OF THE COMMUNITY. GOAL 1: Development designed in harmony with the surburban/rural character of East Hill. Objective 1: Ensure that the design and construction of new development is in harmony with the suburban/rural character of East Hill, while maintaining the feeling of openness that exists through- out the area. folicy 1: Open space shall be preserved and located in such a manner as to provide a buffer or separation between a new development and an existir.g development. Policy 2: Every effort shall be made to integrate natural features into the design of residential and commercial development. Qbjective 2: Discourage development that would result in continued sprawl and disjointed growth. Policy 1: Establish zoning and site plan design criteria that will assure a smooth transition between land use of varied intensity and scale. Policy 2: Written notice shall be given to all property owners within 300 feet of the perimeter of property to be subdivided, short platted, or developed into multi-family or commercial develop- ment. Policy 3: The development of areas that require long extensions of public utilities shall be delayed until a time when such utilities are more readily available. -43- Objective 3: Review land use designations periodically to ensure that they continue to reflect the preferences and concerns of Kent area residents. Policy .1: Survey the East Hill community on a routine basis in order to assure that the development of East Hill occurs in a manner which is satisfactory to the residents. Policy 2: Community groups, committees or other formal organizations, wh_ose purpose is to keep abreast of and monitor development on East Hill, shall serve as a liaison between elected officials, county and city staff and the community._ GOAL 2: Development that will preserve, maintain and enhance East Hill's natural arrd man-made environments. Qbjective 1: Preserve those natural features which contribute to the aesthetic quality and rural feeling that exists on East Hill, i.e., streams, lakes, significant views, tall ever- green trees, woodlands and pastures. Policy 1: Consideration shall be given to the integration of natural features such as streams, lakes, views, woodlands, and pastures into the design of residential and commercial develop- ment. Qbjective 2: Promote quality design in structures and landscaping that reflects a strong consideration of the natural as well as the man-made environment. Policy 1: The City of K~nt and King County shall recognize and promote excellent architectural and landscape design through the use of annual awards of merit. Qbjective 3: Provide for the preservation of historical landmarks and sites. Policy 1: Provide the means to identify, acquire or otherwise preserve properties of historical value. GOAL 3: A well-designed community which provides for the health and safety of the citizens of East Hill. Objective 1: Provide safe means of circulation linking residential areas to parks, schools, commercial centers and employment opportunities. Policy 1: Safe, adequate roads and bikeways, trails and equestrian paths should accompany residential growth and development where appropriate. -44- Policy 2: Require the installation of transportation improvements exterior to new development when existing conditions or facilities prove inadequate to handle the pressures created by that new development. Improvements may consist of, but not be limited to, widening streets, installing curbs, side- walks and storm drainage facilities, traffic signals or signs. Objective 2: Promote quality residential and commercial development with a distinctive pattern and character. Policy 1: All utilities shall be placed underground. Policy 2: All residential and commercial development shall be designed to create a consistent and attractive appearance through the adoption of design standards. Objective 3: Prohibit development that would endanger the safety and threate~ the general welfare of East Hill residents. Policy 1: As new subdivisions are developed adjacent to existing sub- divisions, additional ingress and egress roads shall be provided if needed to avoid excessive traffic through the existing sub- divisions. RECOMMENDATIONS l. In accordance with Goal l, Objective 1, Policy l, the following recommendation is made: Recommendation: The Kent Subdivision Ordinance should be amended to include provisions for the preservation of open space. During subdivision review, attention should be paid to connecting open space of existing develop- ments. 2. In accordance with Goal 1, Objective 2, Policy 2, the following recommendation is made: Recommendation: The Zoning Ordinance should be amended to require written notice be given to all property within 300 feet of property to be subdivided, short-platted, or developed into multi-family or commercial develop- ments. Criteria needs to be established for determining the size of developments which require such a notice; i.e., the number of units or the square footage of the building. -45- 3. In accordance with Goal 2, Objective 2, Policy 1, the following recommendation is made: Recommendation: The City of Kent should establish a committee of professionals, lay-persons, and City officials which will recognize quality design through annual awards. 4. In accordance with Goal 3, Objective 2, Policy 3, the following recommendation is made: Recommendation: A design guideline booklet should be produced to illustrate ideas and techniques aimed at meeting the development requirements of the Zoning Code in an effective and imaginative manner. In addition, ways and means of improving the general appearance and aesthetic character of existing -commercial areas should be included. -46- -- HUt1AN RESOURCES ELn1EtH In an era of g~vernmental budget cutbacks, it is increasingly more difficult to provide the services that our changing society demands. The dramatic rise in single-parent households, high unemployment, sky-rocketing health care costs and a range of other difficulties place a burden on the public and private agencies that deal with these social issues. The goals, objectives and policies of this element are intended to provide a point of focus and direction to assist in pro- moting the health, safety and general welfare of individuals and families in the East Hill area. OVERALL GOAL: COORDINATED AND WELL-PUBLICIZED PUBLIC AND PRIVATE FACILITIES AND SERVICES, EASILY ACCESSIBLE TO EAST HILL RESIDENTS, WHICH MEET PERSONAL NEEDS AND PROMOTE THE HEALTH, SAFETY AND WELFARE OF INDIVIDUALS AND FAMILIES. GOAL 1: A full range of educational opportunities to accommodate the needs and desires of East Hill residents of all ages. Objective 1 : Polict 1 : Polict 2: Objective 2: Pol iQ 1 : Policy 2: Objective 3: Policy 1 : Policy 2: Objective 4: Polic,Y: 1 : Support public and private schools. Facilitate the expansion and development of schools. Become involved in Kent School District affairs. Support preschool and college educational programs. Encourage the location of preschools in ~zoning districts. Make available existing City facilities for college educational programs and encourage other governmental bodies to do likewise. Support vocationa·l training programs. Work with private sector to identify and fulfill vocational skills requirements. Coordinate with adjacent cities and public and private institutions to formulate an interaction plan so as not to duplicate training. Support nontraditional educational programs. Encourage talented persons to engage in private school enterprises. GOAL 2: Health services to enable East Hill residents to enjoy good physical and mental health--physical and mental health services which promote the well-being of East Hill residents. Objective l: Encourage and support high-quality emergency health care services. -47- -- --- I I ! I I Policy 1: Support policies and legislation which provide appropriate standards for emergency health care services. Policy 2: Maintain a strong commitment to emergency medical programs. Policy 3: Support other needed public and private emergency and crises intervention services. Objective 2: Support general community health programs. Policy 1: Provide area residents with a comprehensive information and referral service so that they may be aware of what services are available to them. policy 2: Objective 3: P.olicy 1 : Policy 2: Policy 3: Encourage citizens to participate in planning for health programs. Encourage physical fitness activities. Provide exercise facilities in at least one East Hill location for all age groups. Designate walking, jogging and bike trails. Encourage the private sector to participate in physical fitness activities. GOAL 3: Social services to meet the variety of needs of East Hill residents to assist them in leading safe and productive lives. Objective l : Policy 1 : Policy 2: Objective 2: Policy 1 : Policy 2: Policy 3: Objective 3: Policy 1 : Provide and support an all-purpose facility located in East Hill. Seek sources of funding for an all-purpose facility. Coordinate efforts to support such a facility. Support the availability of day care programs. Encourage industries and business to provide day care opportunities for their employees. Remove barriers that block the implementation of this objective. Encourage and support educational programs to provide staff for day care centers. Support programs designed to make the lives of the aged and handicapped more meaningful. Establish programs for senior citizens in the East Hill area. -48- -- I I I- I Policy 2: Provide transportation for East Hill senior citizens to the existing Senior Center. GOAL 4: Indoor and outdoor leisure activities, including the arts and other cultural ·opportunities, for all age groups. Objective 1: Preserve Kent•s cultural and social heritage. Policy 1: · Support existing historical societies and encourage/promote preservation societies. Policy 2: Polic,Y 3: Objective 2: Polic,Y 1 : Identify and mark historical sites in the East Hill area. Note sites and buildings of cultural and historical significance. Encourage the availability of a broad range and number of artistic and cultural programs, activities and services. Facilitate the development of a facility in the East Hill area that can contain the varied arts and cultural programs. Policy 2: Encourage the Arts Commission sponsorship of artistic activities in the East Hill area. Objective 3: Provide active and passive recreation activities for all East Hill residents including individuals, families, and other mixed-age groups. Polic,Y 1: Work with private and public groups to provide a facility in the East Hill area that will accommodate active and passive recreational activities. RECOMMENDATIONS 1. In accordance with Goal 1, Objective 1, Policy 2, the following recommendation is made: Recommendation: Regularly scheduled meetings should be held between city, county and school district officials to dis- cuss areas of mutual concern and interest. 2. In accordance with Goal 1, Objective 2, Policy 2, the following recommendation is made: Recommendation: A list of city facilities suitable and available for educational purposes should be established and dis- tributed to local educational institutions. -49- 3. In accordance with Goal 3, Objective l, Policy l, the following recommendation is made: Recommendation: If the County Pro Parks bond measure is successful in the fall of 1982, bond money should be used to acquire and develop an all-purpose facility center (similar to Kent Commons} in the East Hill area. This proposal could be a joint city/county project with facility management provided by the city. 4. In accordance with Goal 3, Objective 2, Policy 2, the following recommendation is made: Recommendation: Provision should be made in the Kent zoning ordinance, as it is being revised, to ensure that day care facilities are permitted with only the restrictions necessary to protect the health, safety and general welfare of the community. 5. In accordance with Goal 4, Objective l, Policy 2, the following recommendation is made: Recommendation: A program should be developed which could involve local service clubs, civic organizations, youth groups, and the local historical society in identifying and marking historical sites on East Hill. -50- LAND USE ELEMENT The future us~ of land, described in this element, represents a wide variety of issues and concerns expressed by East Hill citizens. As one might expect, the formulation of land use alternatives is a difficult task, especially after considering the collective input from the following activities between May and December of 1981: two community workshops attended by 230 citizens, a phone survey of 631 persons, and over 40 committee meetings held during the develop- ment of goals, objectives and policies for the plan. Because it is nearly impossible to illustrate on any one map all of the possible land use variations, four alternatives were prepared. These four land use alternatives attempted to reflect the diversity of citizen opinion while at the same time follow sound principles of urban and regional planning. In addition, the alternatives in both map and written form were the product of all known sources of resource information available for the East Hill area. In some cases, key data was available only in limited form which hampered efforts to assess the potential impacts of each alternative. Maps illustrating the alternatives are available for review at the Kent Planning Department. -51- LAND USE POLICIES The following policies concerning the future use of land in the East Hill Study Area were developed from the six previous plan elements and the Land Use Element of the original East Hill Plan. As a result, the policies represent key issues from each individual plan element which are reflected in both the narrative and accompanying land use plan maps. Although the intent of the Land Use Policies has been incorporated into the draft plan alternatives, it is important that the policies stand on their own as they appear below. This arrangement provides for easier reference and interpretation as the policies are implemented through Kent's East Hill Plan (_as an addendum to the Comprehensive-Plan) and zoning ordinance. Natural Environment 1. Consider natural and physical assets and liabilities including but not limited to topography, natural drainage, vegetation, views, amenities, and access when making decisions concerning the type and intensity of land use. 2. Base approval of proposed use adjacent to sensitive natural areas (streams, lakes, wetlands) upon demonstration of compatibility with and maintenance of the natural function of these areas. 3. Sensitive features that are appropriate for public acquisition include sites that require public management for storm water control or wildlife habitat or that support scenic or educational resources where public access is desirable. 4. Retain in a natural state areas exceeding an average slope of 25 percent to 40 percent combined with a severe risk of landslide, slippage, seismic, and erosion hazard. 5. Identify wetlands having value for storm water drainage and flood control, water quality protection and wildlife habitat and develop a strategy for preserving these wetlands. - 6. Preserve woodlands located on slopes with a grade of 40 percent or greater to moderate storm water runoff flows and minimize erosion and sedimentation. Housing 1. Ensure that public facilities and services are available or will be available to support development at proposed densities. 2. Locate new single-family detached residential development in areas and at densities which permit roads, utilities, public transit, schools and other public facilities and services to be provided in an efficient and cost- effective manner. 3. Permit adjustments to residential development requirements including, but not limited to, flexible setbacks, lot size averaging, and lot clustering. -52- -- _...._ ________________________ _ ·-_____________ ......__ 4. Ensure a variety of housing opportunities by providing a mixture of lot sizes, housing types (single family, townhouses, apartments, etc.), designs, and price levels (adapted from 1981 East Hill Plan). Transportation 1. Sidewalks and bike routes should be included in all highway development and improvement plans and linked to similar planned or existing routes. 2. Trails shall be incorporated in all residential and commercial open space where practical. 3. Coordinate the transportation plan with land use patterns and plans. Public Facilities 1. Promote in-fill development in and around the east side of Kent. 2. When extending the water system to areas of new development, upgrade, where appropriate, the existing network and storage capacity at the time of con- struction to assure adequate service. 3. Allow intermittent or permanent wetlands or streams to satisfy a portion of open space requirements. 4. The design of residential developments shall incorporate bikeways and trails where linkage can occur with the King County network. 5. New subdivisions should provide for the linkage of planned open space with the open space of existing subdivisions. 6. Neighborhood parks should be an integral part of residential development. 7. Support the construction of additional east/west arterials. 8. The area commercially zoned should be expanded at such time when at least 75 percent of the existing commercial land is developed (1971 East Hill Plan). Human Environment 1. Open space shall be preserved and located in such a manner as to provide a buffer or separation between a new development and an existing develop- ment. 2. 3. Discourage development that would result in continued sprawl and disjointed growth. The development of areas that require long extensions of public facilities shall be delayed until a time when such utilities are more readily available. -53--- 4. Safe, adequate roads and bikeways, trails and equestrian paths should accompany residential growth and development where appropriate. Human Resources 1. Encourage the location of preschools in all zoning districts. -54- ____ ...,;._ __________ -··-----·--··---· I I l j !- LAND USE CLASSIFICATIONS The land use classifications that were utilizedin the rev 1 s 1 on of the East Hill Plan contain a number of changes that make it possible to determine more specific uses and residential densities. Although the new classifications differ from previous East Hill designations (fts well as other city comprehensive plans), they do not create conflicts or inconsistencies. Instead, they are essentially an expansion of previous designations combined with a few new ones that will afford easier interpretation and implementation of·the revised land use plan. (As other existing area plans are revised in the upcoming years, the new designations will be incorporated.) In addition, another advantage will be increased coordination with King County because the changes will be compatible with the Soos Creek Plan designations. Single-Family Residential The single-family land use category is intended to accommodate single-family homes which range in density from one unit per five acres up to six units per acre. The East Hi]l land use designations include five single-family densities: l. Single Family (one dwelling unit per five acres). This designation is utlized by King County as a means to maintain rural character and to prevent premature urban development in areas without adequate roads, schools, utilities and other public facilities and services. 2. Single Family (one dwelling unit per acre). This designation provides a transition between the urban/suburban and rural areas while still allowing the rural uses and activities that are not practical in concentrated urban areas. 3. Single Family (two to three dwelling units per acre). This designation provides areas that accommodate higher residential densities while still maintaining a high degree of open space and building separation. Lot sizes of 15,000 to 20,000 square feet usually permit the use of septic systems but access to a public water system is usually necessary. 4. Single Family (_three to four dwelling units per acre). This category pro- vides for lot sizes ranging from 10,000 to 15,000 square feet. Subdivisions and short plats can be designed in areas with this density so that public facilities and services can be provided and maintained in an efficient and economic manner. 5. Single Family (four to six dwelling units per acre). This designation represents the highest single-family residential density. Developments at this density are usually subdivisions with lots ranging from 7,000 to 10,000 square feet. A full range of public services are provided. -55- ~ulti-Family Residential The multi-family land use categories are intended to provide areas for the development of apartments, condominiums, townhouses and row houses at densities ranging from seven to 48 units per acre. Multi-family developments should occur adjacent to commercial centers or near arterials or collector streets that provide direct access to needed urban services. The East Hill land use classifications provide a range of three multi-family land use densities. 1. Multi-Family l7 to 12 dwelling units per acre). This designation is intended to provide areas for low density attached dwelling units such as duplexes, townhouses, low rise apartments and condominiums. Properly designed, low-density multi-family developments can serve as transition areas between commercial areas or high density multi-family developments and single-family neighborhoods. 2. Multi-Family (12 to 24 dwelling units per acre). This is a popular density due to increasing development costs. If designed properly, developments of this density can accommodate more people while still maintaining a quality environment. 3. Multi-Family (24 to 48 dwelling units per acre). As the highest density shown on the land use map alternatives, this designation recognizes existing developments in the study area. Commercial This category includes several commercially related land uses as follows: 1. Community Retail. This use is intended to provide areas for the provision of personal goods and services such as supermarkets, hardware stores, drug- stores, restaurants, etc. These uses generally provide the day-to-day shopping needs of the community. 2. Commercial Manufacturing. The uses along Central Avenue in the study area are represented by this classification which includes some retail establishments, light industrial operations, commercial and wholesale uses. 3. Neighborhood Business. This designation includes limited retail and office development compatible with adjacent residential uses. Neighborhood businesses are intended to serve residents living within a radius of one mile. 4. Office. This designation allows for a number of activities that constitute the general uses found in professional offices, such as medical, legal and counseling services. -56- -- 5. Limited Commercial/Office. This designation applies to the area on either side of 104th Avenue Southeast between the two commercial centers. The Limited Commercial/Office designation is intended to permit a more intense use of this area while providing a transition between community retail uses and residential uses. Office use and smaller commercial businesses having a lower potential for traffic generation are examples of uses with this designation. Community Facility This designation is applied to all public schools, utilities, fire and police stations and public lands (such as county and state land). Open Space These areas are defined by King County in the Soos Creek Plan as public water- sheds and steeply sloped lands that are generally not developable. The slopes are greater than 40 percent. Constrained Areas This description is applied to all "wetland/unique and fragile areas" greater than one acre in size following the general criteria from the Kent Valley Studies program. These areas are illustrated in the Draft Environmental Impact State- ment for the East Hill Plan. Constrained Areas also include Class III Critical Areas as defined by King County. These lands include areas classified as environmentally sensitive due to natural hazards (landslide, seismic, erosion, and flooding potential) and areas which support unique, fragile or valuable resources. Parks This description includes all public parks as well as a few private parks such as the Meridian Valley Country Club and the Lake Meridian resort. -57- ADOPTED LAND USE MAP The land use aiternative adopted by the City Council proposes a modest expansion of the existing commercial centers on 104th Avenue S.E. and of the smaller com- mercial centers located at major intersections in the county. A limited commercial/ office district is proposed along 104th Avenue S.E. This district would link the existing commercial centers and adjacent office land uses. The limited commercial; office district would also provide a transition to existing and proposed multi- family residential areas surrounding 104th Avenue S.E. and East Hill shopping centers·. The table below summarizes the potential growth and impacts associated with the land use shown on the adopted land use map. The table illustrates each land use classification by potential acreage, population, vehicle trips and domestic water demand. (These categories were selected because of available information.) The potential growth and impacts are shown at 100 percent and 75 percent of possible "build-out"; 75 percent provides a more realistic assessment as the ultimate potential of 100 percent rarely occurs. ADOPTED LAND USE 11AP POTENTIAL VEHIC~E POTENTIAL POTENTIAL DEVELOPMENT TRIP ENDS/DA~ WATER ~E~IAND (G, P, D,) DESIGNATION ACRES 75% 100% 75% :: ::~ 75% 100% DEVELOPED DEVELOPED DEVELOPED ~E'IO: :?ED DEVELOPED DEVELOPED SINGLE FAMILY RESID~NTIAL l DU/5 Acres 230 88 117 345 .:5o 11 ,440 15,210 1 DU/A 401 764 1 ,019 3,008 4,~10 99,320 132,470 2-3 DU/A 163 745 994 2,934 3 '= ~ 2 96,850 129,220 3-4 DU/A l ,297 7,907 10,542 31 '128 4: 7: J4 l ,027,910 1,370,460 4-6 OU/A 4 517 41 303 55 071 162,612 216. ~ 16 5,369,390 7,159,230 Single Family Subtotal 6,608 50,807 67 ,743 200,027 266,-22 6,604,910 8,806,590 ~',UL TI -FAMILY RESIDENTIAL 7-12 DU/A 337 4,368 5,823 14 ,801 19,-35 567,840 756,990 12-24 DU/A 544 14,100 18,807 47,785 53,-~3 l ,833 '000 2,444,910 24-48 DU/A 4 207 276 703 ?-37 26,910 35,880 Multi-family Subtotal 885 18,675 24,906 63,289 2~, ~ 35 2,427,750 3,237,780 CONSTRAINED AREAS (Wetlands not included) 1 ,351 l ,824 2,432 10' 133 i 3. ~~ 0 237,120 316 '160 Residential Total 71 ,306 95,081 273.449 36~, ~97 9,269,780 12,360,530 C0~1MERC IAL I Community Ret a i 1 238 133,875 '72,:CJO Cormercia1 11anufacturi ng 12 5,750 ~,: JO ~eighborhood Business 10 5,625 i J: :o Office 48 27,000 3~. :Jo Limited Commercial/Office 36 20,250 27.: )0 Commercial Total 344 193,500 2':2,::JO Trip Ends Total -166,949 :22. =_ 97 NOTE: See Appendix for Definitions and Computations -- -58- /. ~ )"( ,;·· I ' L ,, ...... . ! .".-\:\D L'SE PL.-\~ >;;I:\C~LE FX.\TILY: l L\Tl' .1 .\U\E~ J:-;I:\CLE FA:\IILY: 1 C:\IT .-\\'HE .~1:\CLE F.-\:\IILY: :.!-.; \·:-\Tr:-; .-\l'l\E :-;[:\C~LE FX:VIILY: ;-l \':\IT~ .-\('HE :-;r:\<;LE F.\.\IILY: l-•i \':\IT~ .\l'HE :\Il'LTI-F.-\.\IILY: -;--!:.!\':-\IT~ .\t'HE :Vll'LTI-F.'\..\IILY: !:.!-~I \'\IT~ .-\l'l\E :VIL' L TI-F .'\. .\1 l L Y : :.! 1-! I l l . \ I T :-; . \ c· H E ~ ' ' \ .. _ .. l \ ------·-···---·----• ""'" ""'""'~""'; """"%141111iilllt .!1124!1111. JT!!""k+l"""lll!lw!.l!l'l& .t!IJ!l &!Ill. 41!1'-! tlf!·~~~, .. ,,.~~~-lfftlll!ll, I!!!IIUIII'!'., ""'f·~·f":liil\!!!l,¥!!lll,. -- .-:_1,• --~·s.:_:_ :.·.:-~7~~~:~;~t2',;~~~7-: ~ . -·· ~ ,-~~~:~.}~%~~~~-~ :;;~~~-~ ~-· ·-~- V. IMPLEMENTATION RECOMMENDED ORDINANCE CHANGES Changes to existing city and county codes and ordinances are proposed to imple- ment the recommendations included in Chapter IV. of the plan. These recommenda- tions are detailed according to the seven plan elements but generally affect the following: Kent Zoning Code, Kent Subdivision Code, Kent Tree and Stream ·Ordinance and the King County Zoning Ordinance and General Development Guide. COORDINATION WITH KING COUNTY A frequent question at the many meetings and workshops during the East Hill Plan preparation concerned the City of Kent's ability to influence King County land use decisions. Traditionally, this has always been a problem for the city and this plan proposes three basic approaches to implement the policies and plan recommendations: l. Develop and adopt a common Sphere of Interest agreement with King County. Although an effort by several cities four years ago proved to be unsuccessful in adopting a Sphere of Interest ordinance with the county, the idea is still considered viable by a number of cities at this time. It is the intent of this section to insure that Kent plays a strong role in a collective effort by all cities in King County to adopt a common ordinance and thus implement East Hill Plan as well as past and future land use plans. 2. Evaluate annexation proposals for conflicts with land use policies and for impacts on service delivery costs. This policy, from the King County Development Guide and the 1964 King County Plan, is an additional means of implementing policies of the East Hill Plan. This plan endorses Policy H-17 and H-18 of the 1964 Plan and the more recent Pl-304 (policy) of the General Development Guide that is pending consideration by the new county administration. 3. Increased liaison with King County and adjacent cities. If city staff at the general direction of appointed and elected officials increases ongoing liaison efforts, the chances for implementation of the East Hill Plan will be enhanced. Liaison, in this sense, includes not only attending important meetings but also becoming involved in other jurisdictions' development review processes. This action will produce an exchange of ideas and concerns that will increase the chances for the implementation of plans and policies. Appendix LAND USE MAP POTENTIAL POPULATION Estimates of potential population were obtained by multiplying net buildable acreage by development density (number of dwelling units per acre}. This figure is then multipled by household size. Net Bui 1 dable Acreage Eighty·percent of gross acreage (20 percent is deducted to satisfy circulation and open space requirements). Household Size (by housing type) Single-F.amily: ~1ul ti -Family: Example: 2.54 persons per acre 1.8 persons per acre Potential population = eighty percent of gross acreage x dwelling units per acre (DU/A) x household size. (.80 x 100 acres) x 6 DU/A x 2.54 219 persons Assumptions The population estimates are based on the highest allowable density for each residential designation. Potential population in constrained areas is calculated· at ten percent of the total acreage due to development limitations, circulation requirements, and plan policies. Clustering of development in these areas could occur at densities of up to ten units per acre. POTENTIAL VEHICLE TRIPS The calculation of potential vehicle trip ends per day provides a basic estimate of traffic generation by land use category for East Hill Study Area as a whole. Other factors, important to an analysis of traffic impacts, including traffic distribution, trip assignment, and scheduled transportation improvements, are not considered. A more detailed analysis of transportation impacts.and needs in the East Hill area will be provided by the Kent Area Transportat1on Study. The study will provide a comprehensive view of the transportation needs of Kent and the city's Sphere of Interest. The study's findings are expected to be available in the fall of 1982. -6J- The estimates of potential vehicle trip ends per day shown on the chart on page 58 include both existing development and future development in accordance with the adopted land use plan. Calculating Potential Vehicle Trips A vehicle trip end is a trip which has either a destination or an ending at a particular point. For example, leaving home and traveling to work is one trip end. Returning home from work is a second trip end. Trip Ends BJ" Land Use T.}o'pe Residential: Single family dwellings generate 10 vehicle trip ends per day. Multi-family dwellings generate 6. l vehicle trip ends per day, per unit. Residential trip ends were determined by dividing the number of potential units based on net buildable acreage and then multiplying by the appropriate number of trip ends per unit. Example: Trip ends = Net buildable area x trip ends per unit density 800 acres x 10 trips per unit = l ,333 trip ends 6 DU/A Commercial is estimated at 750 trip ends per gross acre. No differentiation has been made among trips generated by specific commercial uses and impluse :';.;,~~?-~ buying or diversion trips. An "impulse buying" trip is a trip made by drivers.,,;.ii>~'~.:.:,. who usually drive past a commercial establishment for another purpose (travel~~.tf~j to. or from work or school, etc.), but who make an intermediate stop to make a .. ·· purchase. A "diversion" trip is a trip made by a shopper who currently drives past a site on his or her way to another shopping opportunity, but who.would stop at the first site in the future if it offered a comparable select1on of goods and services. Because of the potential for impulse and diversion ~rips. the actual trip generation would probably be less than shown. Actual tr1p · generation for office uses would probably also be lower than indicated. WATER DEnAND Assumptions Water consumption is estimated at 130 gallons per person, per day. There is no water conservation program. Consumption is computed by multiplying the total number of persons by 9-lJ~s used per person each day. -&t- ACK~C~LEDGEMENTS EAST HILL PLAN CITIZ~~s ADVISORY COMMITTEE Bob Anderson Aldo Basile Ann Bound Lloyd Sound Charles Bolz Edward S.lakely Phi 11 i p Camp be 11 Bill CaJ~ey Dan Dansenberg Dean Engel Joann Fairbanks Roger Hanson Katie Hanzeli Lowe 11 Ha 11 Chris Harvey f,1a ry Kilbourn l'Jilliam Laxton Donald fkDaniel Alice r-1atz Tim Miller Charolotte Norder Claudia Otey Patricia Peacore r~a ry Rogers Dan Rowley Bill Ruth Rod Sa a lfe 1 d ~arie West Schrett Karen t-Jebs ter Glenn Votaw Planning Staff James P. Harris, Planning Director James M. Hansen, Associate Planner--Project Manager Richard Lunceford, Assistant Planner Sally Chafe, Assistant Planner Jack Dodge, Assistant Planner P. Andrew Norton, Planning Assistant Former Staff Members Who Worked On The East Hill Plan Dan Leonard Kathy Osen --