HomeMy WebLinkAbout1480RESOLUTION NO. /lfgQ
A RESOLUTION of the City Council of the
City of Kent, Washington, adopting the 1997-
2002 Six Year Transportation Improvement
Plan.
WHEREAS, after proper notice, the City Council of the
City of Kent held a public hearing at the regular meeting of the
City Council held at 7:00 p.m. on September 3, 1996, to consider
public testimony on the proposed Transportation Improvement Plan
for the City and having considered public testimony to the Plan;
NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES
HEREBY RESOLVE AS FOLLOWS:
Section 1. The 1997 through 2002 Six Year
Transportation Improvement Plan, set forth in the Exhibit A
attached hereto and herewith filed with the city Clerk, is hereby
adopted.
Passed at a regular meeting of the City Council of the
3 tt-J-/1. /\ -r;;--~ ; • A A City of Kent, Washington this day of ~, 1996.
Concurred in by the Mayor of the City of Kent, this
311-J-day of ~-, 1996.
ATTEST~
BRENDA JACOBER,
APPROVED AS TO FORM:
I hereby certify that this is a true and correct copy
of Resolution No. /~ft) , passed by the City Council of the City
of Kent, Washington, the 3d day of ~~~, 1996. ,
sixyear.res
2
CITY OF KENT, WASHINGTON
SIX-YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
1997-2002
Don E. Wickstrom, P.E.
Director of Public Works
Prepared By:
Transportation Engineering Section
Public Works Department
Edward White, City Transportation Engineer
Kristen Langley, Assistant Transportation Engineer
Assisted By:
Kurt Palowez, Mapping/ GIS Coordinator
Project
Number
CITY OF KENT, WASHINGTON
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
Project Name Page
9701 South 272nd/277th Street Corridor Project ....................... 8
Auburn Way North to Kent-Kangley Road (State Route 516)
9702 South 196th/200th Street Corridor Project ....................... 9
Orillia Road to West Valley Highway (State Route 181)
9703 South 196th/200th Street Corridor Project ...................... 10
West Valley Highway (State Route 181) to East Valley Highway
9704 Reith Road/ West Meeker at Kent-Des Moines Road
( State Route 516 ) Intersection Improvement Project ............ 11
Reith Road/ Meeker Street at Kent-Des Moines Road (State Route 516)
9705 Russell Road at West Meeker Street Traffic Signal System ....... 12
Russell Road at West Meeker Street
9706 Interurban Trail Signal Improvements ........................ 13
Interurban Trail Crossings at South 2281h St., Smith Street, and Meeker
Street
9707 Washington Avenue (State Route 181) High Occupancy Vehicle
Lanes Project ............................................. 14
Harrison Street to Green River Bridge
9708 Pacific Highway South ( State Route 99 ) High Occupancy
Vehicle Lanes Project ...................................... 15
Kent-Des Moines Road (State Route 516) to South 252nd Street
9709 64th Avenue South Extension Project .......................... 16
South 2 I 61h Street to South 2261h Street
9710 Green River Valley Traffic Signal Coordination Project .......... 17
West Valley Highway--Kent-Des Moines Road to South 18(Jh Street
South J8(Jh Street--West Valley Highway to Benson Highway
9711 METRO Americans' with Disabilities Act [ADA]
Improvements Project ...................................... 18
Washington Avenue (State Route 181 ), Harrison Street, Smith
Street, Lincoln Avenue
Project
Number
CITYOFKENT, WASHINGTON
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
Project Name Page
9712 Southeast 240th Street Widening Project ....................... 19
I 16th Avenue Southeast to I 36th Avenue Southeast
9713 Railroad Grade Separation Project ........................... 20
South 212th Street, South 228th Street, James Street, Smith Street and
State Route 516
9714 Americans' with Disabilities Act Compliance Sidewalk Repair
and Rehabilitation Program Project .......................... 21
Citywide
9715 Canyon Drive Bicycle and Pedestrian Facilities Project .......... 22
Alvord Avenue to 94th Avenue South
9801 South 212th Street Pavement Rehabilitation Project ............. 23
Green River Bridge to East Valley Road
9802 Reith Road at 42nd A venue South Traffic Signal System ......... 24
Reith Road at 42nd Avenue South
9803 James Street at Central Avenue Intersection Improvement Project 25
James Street at Central Avenue
9804 132nd A venue Southeast Street Widening Project ................ 26
Southeast 266th Street to Kent-Kangley Road ( SR 516)
9805 Flexible/ Intelligent Shuttle Bus Demonstration Project .......... 27
Downtown
9806 Neighborhood Traffic Control Program ....................... 28
Citywide
9807 Southeast 256th Street Widening Project ....................... 29
I 16th Avenue Southeast to I 36th Avenue Southeast
9901 Citywide Bicycle Improvements .............................. 30
Citywide
9902 94th Avenue South at Canyon Drive ( SR 516) Signal System ...... 31
94th Avenue South at Canyon Drive ( SR 516)
Project
Number
9903
200001
200101
200102
200201
CITYOFKENT, WASHINGTON
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
Project Name Page
72nd Avenue South Extension Project ........................... 32
South I 94th Street to South I 96th Street
Military Road Widening Project .............................. 33
Reith Road to Kent-Des Moines Road (State Route 516)
West Meeker Street Widening Project--Phase I ................. 34
Kent-Des Moines Road (State Route 516) to Green River Bridge
Central Avenue Pavement Rehabilitation Project ................ 35
Willis Street to (State Route 516) to Green River Bridge
South 228th Street Corridor Project ............................ 36
Military Road to 54th Avenue South
1997 to 2002
(Project Costs in Thousands of Dollars)
MPO : PSRC Puget Sound Reg. Council
Agency : Kent
County : King County
Phase Data
Func Project Imp Total Util Start __ Federal --RAP,etc. Local/
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State
City Kent 01 0.000 ~ C P S T W :~ Funding Secured Revision:
16 1 9701 South 272nd/277t~t Corndor Projec
So 272nd, So 277th, 116th Ave SE Auburn Way to Kent-Kangley Rd. ( SR 516)
Construct new 5-lane arterial to full urban improvements Construct new 5
PE 8/1996 0 TIA 584 1,316
RW 8/1996 0 TIA 983 2,217
CN 10/1998 0 TIA 6,574 14,826
PROJECT TOTAL 0 8,141 18,359
City Kent 04 0.000 .f. c p s T w _I Funding Secured Revision:
16 2 9702 So. 196th/ 200th St. l;ornaor -vvest
So 200th St/ Russell Rd/ So 196th St Orillia Road to West Valley Highway
Widen existing roads, Construct new bridge over Green River
PE 8/1996 0 TIA 200 581
RW 10/1996 0 TIA 595 1,724
CN 10/1998 0 TIA 2,410 6,990
PROJECT TOTAL 0 3,205 9,295
City Kent 01 0.000 E c p s T w J Funding Secured Revision:
16 3 9703 So. 196th/ 20oth St Corndor-~-:-Mid leg-
So 196th St. West Valley Hwy. to East Valley Road
Construct new bridge over RR tracks, widen existing section of streets
PE 8/1996 0 TIA 716 784
RW 10/1996 0 TIA 2,243 2,457
CN 5/1998 0 TIA 7,540 8,260
PROJECT TOTAL 0 10,499 11,501
City Kent 12 0.000 I c OJ Funding Secured Revision:
00 4 9704 Reith/ Meeker at Kent-Des Memes Road
Reith Road/ Meeker St./ Kent-Des Moines N/A
Widen Reith Road and Meeker St and construct walkways.
PE 111995 STP(U) 3 0 1
CN 5/1997 STP(U) 10 0 43
PROJECT TOTAL 13 0 44
City Kent 12 o.ooo 1 1 Funding Secured Revision:
17 ':: 1705 Russell Rd at Meeker St Traffic Signal
Russell Road, Meeker Street
Install multi-phase traffic signalization system
PE 2/1996 0 0 10
G Gas 0 Other
C Cable TV
6YRTIP.FRX SNV Rev: 2.00 05/08/95 Form Rev Date: 04/26/95
Total
1 PE
RW
CN
Total
1,900
3,200
21,400
26,500
1 PE
RW
CN
Total
781
2,319
9,400
12,500
1 PE
RW
CN
Total
1,500
4,700
15,800
22,000
1 PE
RW
CN
Total
4
53
57
1 PE
RW
CN
Total
10
Hearing Date
Adoption Date
Resolution Number
Page
Expenditure Schedule
(Local Agency Use)
1st 2nd 3rd 4th-6th
1,900 0 0
300 2,900 0
0 4,900 10,000
2,200 7,800 10,000
781 0 0
2,319 0 0
2,900 6,500 0
6,000 6,500 0
1,500 0 0
3,500 1,200 0
0 6,800 9,000
5,000 8,000 9,000
4 0 0
0 0 0
53 0 0
57 0 0
10 0 0
10 0 0
180 0 0
200 0 0
0
0
6,500
6,500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1997 to 2002
(Project Costs in Thousands of Dollars)
MPO : PSRC Puget Sound Reg. Council
Agency : Kent
County : King County
Phase Data
Func Project Imp Total Util Start __ federal --RAP,etc. Local/
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State
City Kent 12 o.ooo 1 1 Funding Secured Revision:
17 5 9705 Russell Rd at Mee er StTrafficSfgnal
RW 5/1996 0 0 10
CN 1011996 0 0 180
PROJECT TOTAL 0 0 200
City Kent 12b o.ooolm s·~--__ _I Funding Secured Revision:
16 6 9706 lnterur an Trail Tra 1c 1gnals
South 228th, Smith Street, Meeker Street
Install traffic signals for pedestrian and bicycle traffic
PE 8/1996 STP(E) 26 0 4
CN 3/1996 STP(E) 61 0 95
PROJECT TOTAL 87 0 99
City Kent 04 0.290 ~F C P S T W J Funding Secured Revision:
14 7 9707 Washington Ave ( RlSTTRDV lanes
Washington Avenue ( SR 181 ) Harrison Street to Green River Bridge
Widen Washington Avenue to provide HOV lanes north of SR 516, general purpose lanes south of SR 516, and
concrete sidewalks where missing.
PE 8/1996 0 UATA 96 64
RW 1/1997 0 UATA 180 120
CN 4/1997 0 UATA 324 216
PROJECT TOTAL 0 600 400
City Kent 04 0.450 ~~ P S T -""'--J Funding Secured Revision:
14 8 9708 Pacific Highway So. OVLanes
Pacific Highway So. ( SR 99 ) Kent-Des Moines Road to So 252nd Street
Widen Pacific Highway South ( SR 99 ) to provide HOV lanes, curbs, gutters, sidewalks, and Class II bicycle
facilities
PE 4/1997 STP 187 UATA 191 88
RW 4/1998 STP 26 UATA 322 152
CN 4/1999 STP 1,037 UATA 1,831 854
PROJECT TOTAL 1,250 2,344 1,094
City Kent 01 o.63o h~>c T 1 Funding Secured Revision:
16 9 9709 64th Avenue Soutti xtensron
64th Avenue South So. 216th Street to So. 226th Street
Construct new 5-lane arterial with full urban improvements incl. landscaped median
GGas 0 Other
C Cable TV
6YRTIP.FRX SIW Rev: 2.00 05/0B/95 Form Rev Date: 04/26/95
Total
1 PE
RW
CN
Total
10
180
200
1 PE
RW
CN
Total
30
156
186
1 PE
RW
CN
Total
160
300
540
1,000
1 PE
RW
CN
Total
466
500
3,722
4,688
1 PE
RW
CN
Total
Page
Hearing Date
Adoption Date
Resolution Number
Expenditure Schedule
(Local Agency Use)
1st 2nd 3rd
10 0
10 0
180 0
200 0
30 0
0 0
156 0
186 0
160 0
300 0
540 0
1,000 0
466 0
0 500
0 0
466 500
104 0
148 0
0 1,948
252 1,948
2
4th-6th
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
'
0 01
0 0 '
0 o I
0 0
I
I
I
0 0
0 0 I
3,722 0
3,722 0
0 0
0 0
0 0
0 0
1997 to 2002
(Project Costs in Thousands of Dollars)
MPO : PSRC Puget Sound Reg. Council
Agency : Kent
County : King County
Phase Data
Func Project Imp Total Util Start __ Federal --RAP,etc. Local/
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State
City Kent 01 0.630 e c _ _ r J Funding Secured Revision:
16 9 9709 64th Avenue Soutli EXtension ---
PE 2/1997 0 0 104
RW 8/1997 0 0 148
CN 5/1998 0 0 1,948
PROJECT TOTAL 0 0 2,200
City Kent 12 0.000 l~l ,J Funding Secured Revision:
16 10 9710 Valley Traffic Signa cooraination-Proj
West Valley Highway, So. 180th Street SR 516 to So. 180th, SR 181 to SR 515
Optimize signal timing and coordination among Green River Valley jurisdictions
PE 8/1996 0 0 5
PROJECT TOTAL 0 0 5
City Kent 01 0.000 .L _j Funding Secured Revision:
00 11 9711 METRO ADA Wall<way Progfa~-
Washington Avenue, Smith Street N/A
Construct walkway improvements to support regional transit stops
PE 6/1996 0 10 2
CN 10/1996 0 86 22
PROJECT TOTAL 0 96 24
City Kent 04 1.250 ;~ c p s T w 0 I Funding Secured Revision:
16 12 9712 Southeast 240th S reef ProJea
Southeast 240th Street 116th Avenue SE to 136th Avenue SE
Widen SE 240th Street to 5-lane configuration, add bicycle lanes and signals
CN 2/1997 0 0 8,162
PROJECT TOTAL 0 0 8,162
City Kent 01 0.000 _e~ c p s T w
1
Planning Purposes Revision:
00 13 9713 Railroad Grade Separabon 1-'roject 1-'n 1
South 212th,South 228th, James, Smith St South 196th St. to South 259th Street
Evaluate future grade separations and construct
PE 111997 0 0 100
CN 112001 STP(U) 68,000 0 0
RW 111999 STP(U) 20,000 TIA 5,000 0
PE 12/1998 STP(U) 5,000 TIA 4,000 1,000
PROJECT TOTAL 93,000 9,000 1,100
Ut111t1es Legena
GGas P Power TTelephone 0 Other
C Cable TV S Sewer WWater
6YRTIP.FRX Stw Rev: 2.00 05/08/95 Form Rev Date: 04/26/95
Total
1 PE
RW
CN
Total
104
148
1,948
2,200
1 PE
RW
CN
Total
5
5
1 PE
RW
CN
Total
12
108
120
1 PE
RW
CN
Total
8,162
8,162
1 PE
RW
CN
Total
100
68,000
25,000
10,000
103,100
Hearing Date
Adoption Date
Resolution Number
Page 3
Expenditure Schedule
(local Agency Use)
1st 2nd Jrd 4th-6th
104 0 0
148 0 0
0 1,948 0
252 1,948 0
5 0 0
0 0 0
0 0 0
5 0 0
12 0 0
0 0 0
108 0 0
120 0 0
0 0 0
0 0 0
8,162 0 0
8,162 0 0
100 0 10,000
0 0 25,000
0 0 0
100 0 35,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
68,000
68,000
1997 to 2002
(Project Costs in Thousands of Dollars)
MPO : PSRC Puget Sound Reg. Council
Agency : Kent
County : King County
Phase Data
Func Project Imp Total Util Start __ Federal --RAP,etc. Local/
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State
City Kent 32 0.000 p C P T ~~' Funding Secured Revision:
00 14 9714 ADA Complience Program -Repaii'/Re ab
Citywide Citywide
Rehabiltate/ repair pedestrian facilities to comply with ADA requirements
PE 8/1996 0 0 180
RW 8/1996 0 0 100
CN 111997 0 0 1,520
PROJECT TOTAL 0 0 1,800
City Kent 32 0.2201 ;~ Planning Purposes Revision:
14 15 9715 Canyon Dr. Bike and-Pea Facilities
Canyon Drive ( SR 516) Alvord Avenue to 94th Avenue South
Construct concrete sidewalk, widen for bike lane, along southerly side of roadway
PE 111997 0 0 50
CN 6/1997 0 0 626
PROJECT TOTAL 0 0 676
City Kent 06 0.000 J . J Funding Secured Revision:
16 16 9801 South 212th Street Pavement~efiao
South 212th Street Green River Bridge to West Valley Hwy
Reconstruct paving
PE 8/1998 STP(U) 40 0 10
CN 5/1999 STP(U) 440 0 110
PROJECT TOTAL 480 0 120
City Kent 12 0.000 [ _ _ J Funding Secured Revision:
16 17 9802 Reith Road at 42nd Avenue Soutn Signal
Reith Road, 42nd Avenue South N/A
Revise existing pedestrian signal to comply with MUTCD
PE 111998 0 0 5
CN 4/1998 0 0 70
PROJECT TOTAL 0 0 75
City Kent 04 0.0001 C P T j Planning Purposes Revision:
00 18 9803 James St at Central Ave Intersection Imp
James St., Central Avenue
Widen James Street at Central Avenue to provide an exclusive right turn lane for westbound traffic
PE 111998 0 UATA 20 5
RW 4/1998 0 UATA 80 20
CN 6/1999 0 UATA 180 45
GGas 0 Other
C Cable TV
6YRTIP.FRX SIW Rev: 2.00 05/08/95 Form Rev Date: 04/26/95
Total
1 PE
RW
CN
Total
180
100
1,520
1,800
1 PE
RW
CN
Total
50
626
676
1 PE
RW
CN
Total
50
550
600
1 PE
RW
CN
Total
5
70
75
1 PE
RW
CN
Total
25
100
225
Hearing Date
Adoption Date
Resolution Number
Page
Expenditure Schedule
(Local Agency Use)
1st 2nd 3rd
30 30
17 17
253 253
300 300
50 0
0 0
626 0
676 0
0 50
0 0
0 0
0 50
0 5
0 0
0 70
0 75
0 25
0 100
0 0
0 125
4
4th-6th
30 90
17 49
253 761
300 900
0 0
0 0
0 0
0 0
0 0
0 0
550 0
550 0
0 0
0 0
0 0
0 0
0 0
0 0
225 0
225 0
1997 to 2002
(Project Costs in Thousands of Dollars)
MPO : PSRC Puget Sound Reg. Council
Agency : Kent
County : King County
Phase Data
Func Project Imp Total Util Start __ Federal --RAP,etc. Local/
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total
·~v-..;t TOTAL 0 280 70 350
City Kent 04 0.438 .F.L c p s T w 0 J Planning Purposes Revision: 1
16 19 9804 132nd Avenue Southeast Project -·
132nd Avenue Southeast SE 266th Street to SE 272nd Street
Widen 132nd Avenue SE to provide 5-lanes, with bicycle lanes and sidewalks
PE 111998 0 0 150 150
RW 111999 0 0 200 200
CN 6/1999 0 0 650 650
PROJECT TOTAL 0 0 1,000 1,000
City Kent 22 0.000 l J Funding Secured Revision: 1
00 20 9805 Flex./ Intelligent Shuttle Bus·oemo ProJ
N/A N/A
Provide shuttle bus running on a combination of fixed-routing with route deviation capability in the Downtown Kent
area.
CN 7/1997 CMAQ 419 0 84 503
PROJECT TOTAL 419 0 84 503
City Kent 12 o.ooo
1
k< 1 Funding Secured Revision: 1
00 21 9806 Neighborhood Tra 1CComrol-program J
Citywide Citywide
Construct minor improvements to local streets to enhance traffic safety
PE 8/1998 0 0 4 4
CN 8/1998 0 0 36 36
PROJECT TOTAL 0 0 40 40
City Kent 04 0.690 ;~ C P S T W j Funding Secured Revision: 1
16 22 9807 Southeast 256th s reeiWidening--·
SE 256th Street 116th Avenue SE to 132nd Avenue SE
Widen SE 256th Street to 3-lane configuration with full urban improvements and Class II bicycle facility
PE 2/1998 0 UATA 217 217 434
RW 4/1999 0 UATA 464 464 928
CN 3/1999 0 UATA 769 769 1,538
PROJECT TOTAL 0 1,450 1,450 2,900
City Kent 32 0.000 .b~ _ _j Funding Secured Revision: 1
00 23 9901 City-wide Bicycle Improvements -
Citywide Citywide
Improve Bicycle and Pedestrian facilties in various locations around the City of Kent
PE 111999 STP(U) 32 0 8 40
GGas 0 Other
C Cable TV
6YRTIP.FRX srw Rev: 2.00 05/08/95 Form Rev Date: 04/26/95
PE
RW
CN
Total
PE
RW
CN
Total
PE
RW
CN
Total
PE
RW
CN
Total
PE
RW
CN
Total
Hearing Date
Adoption Date
Resolution Number
Page
Expenditure Schedule
(Local Agency Use)
1st 2nd 3rd
0 150
0 0
0 0
0 150
0 0
0 0
0 503
0 503
0 2
0 0
0 18
0 20
0 434
0 928
0 0
0 1,362
0 0
0 0
0 0
0 0
5
4th-6th
0 0
0 0
650 0
650 0
0 0
0 0
0 0
0 0,
I
0 2
0 0
0 18
0 20
0 0
0 0
1,538 0
1,538 0
10 30
0 0
90 270
100 300
1997 to 2002
(Project Costs in Thousands of Dollars)
MPO : PSRC Puget Sound Reg. Council
Agency : Kent
County : King County
Phase Data
Func Project Imp Total Util Start __ Federal --RAP,etc. Local/
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State
City Kent 32 0.000 .L I Funding Secured Revision:
00 23 9901 City-wide Bicycle Improvements
R 111997 0 0 0
CN 6/1999 STP(U) 312 0 48
PROJECT TOTAL 344 0 56
City Kent 12 0.250 t~j P S T W 01. Planning Purposes Revision:
14 24 9902 94th Avenue So at anyon Drive Signal
Canyon Drive, 94th Avenue South N/A
Install multi-phase signal and widen 94th Avenue South between Canyon Dr and So 248th Street
PE 111999 STP(U) 30 UATA 15 5
RW 8/1999 STP(U) 6 UATA 2 2
CN 2/2000 STP(U) 324 UATA 162 54
PROJECT TOTAL 360 179 61
City Kent 01 0.130th\CPSTW I Funding Secured Revision:
17 25 9903 72nd Avenue Soul Exfension ____ ___j
72nd Avenue South South 194th St to South 196th Sr
Construct new roadway with full urban improvements
PE 2/1999 0 0 80
RW 4/2000 0 0 0
CN 10/2000 0 0 460
PROJECT TOTAL 0 0 540
City Kent 05 1.400 r c p s T w I Planning Purposes Revision:
16 26 200001 Military Road Widenmg
Military Road Reith Road to Kent-Des Moines Road
Widen Military Road to provide left turn lanes and paved shoulders at selected intersections
PE 2/2000 0 UATA 20 20
CN 8/2000 0 UATA 55 55
PROJECT TOTAL 0 75 75
City Kent 04 0.170 1e~ c P T J Planning Purposes Revision:
16 27 200101 West Meeker Stree Widening -~ Phase I
West Meeker Street SR 516 to East side Green River Bridge
Widen West Meeker Street to 5 lane configuration with full urban improvements
PE 8/2001 BR 150 UATA 150 76
RW 112001 BR 30 UATA 30 0
GGas 0 Other
C Cable TV
GYRTIP.FRX SIW Rev: 2.00 05/08/95 Form Rev Date: 04/26/95
Total
1 PE
RW
CN
Total
0
360
400
1 PE
RW
CN
Total
50
10
540
600
1 PE
RW
CN
Total
80
0
460
540
1 PE
RW
CN
Total
40
110
150
1 PE
RW
CN
Total
376
60
Hearing Date
Adoption Date
Resolution Number
Page
Expenditure Schedule
(local Agency Use)
1st 2nd 3rd
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
6
4th-6th
10 30
0 0
90 270
100 300
50 0
0 10
0 540
50 550
80 0
0 216
0 244
80 460
0 40
0 0
0 110
0 150
0 376
0 60
0 2.130
0 2,566
1997 to 2002
(Project Costs in Thousands of Dollars)
MPO : PSRC Puget Sound Reg. Council
Agency : Kent
County : King County
Phase Data
Func Project Imp Total Uti I Start __ Federal --RAP,etc. Local/
Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State
City Kent 04 0.170 I c p T J Planning Purposes Revision:
16 27 200101 West Meeker Street Wlclening-= Pnase I
CN 612002 BR 1,000 UATA 716 414
PROJECT TOTAL 1,180 896 490
City Kent 03 1.250 p c p s ~ Funding Secured Revision:
16 28 200102 Central Avenue PavemeilfRe a .
Central Avenue Willis Street to Green River Bridge
Remove and replace deteriorated pavement and base material, rehabilitate drainage systems
PE 8/2001 STP(U) 40 0 10
CN 3/2002 STP(U) 440 0 110
PROJECT TOTAL 480 0 120
City Kent 01 0.000 f: C P S T W C>_j Planning Purposes Revision:
16 29 200201 South 228th Street Cofria~---
South 228th Street, Military Road 54th Ave to Military Rd, Military to 516
Construct new 5-lane roadway incl bridge over the Green River
PE 1/2002 0 0 440
RW 1/2003 0 0 0
CN 1/2005 0 0 0
PROJECT TOTAL 0 0 440
TOTAL for the Agency of Kent 97,613 36,765 59,580
TOTAL for the County of King County 97,613 36,765 59,580
GRAND TOTAL 97,613 36,765 59,580
GGas 0 Other
C Cable TV
6YRTIP.FRX srw Rev: 2.00 05/08/95 Form Rev Date: 04/26/95
Total
1 PE
RW
CN
Total
2,130
2,566
1 PE
RW
CN
Total
50
550
600
1 PE
RW
CN
Total
440
0
0
440
193,958
193,958
193,958
Hearing Date
Adoption Date
Resolution Number
Page
Expenditure Schedule
(Local Agency Use)
1st 2nd 3rd
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
7
4th-6th
0 376
0 60
0 2,130
0 2,566
0 50
0 0
0 550
0 600
:
0 440 I
0 0
0 0
0 440
I
I
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATIONJMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded, LID Pending,
TIA, City ofKent, LID
South 272"11 / 277 1h Street Corridor Project
Auburn Way North to Kent-Kangley Road (State Route 516)
Construct a new five-lane roadway from Auburn Way to the Kent-Kangley
Road (State Route 516 ), via South 277th Street, Southeast 274th Street, and
116th Avenue Southeast, including a new bridge over the Green River, and a
modification to the traffic signals at the intersections of South 277th Street and
Auburn Way North and at 116th Avenue Southeast and the Kent-Kangley
Road ( State Route 516 ). Project will include the construction of full-width
paving, concrete curbs, gutters and sidewalks, street lighting, storm drainage,
bike paths, landscaping, utilities and appurtenances.
Preliminary Engineering ............ $1,900,000
Right of Way Acquisition ........... $3,200,000
Construction ................... $21,400,000
TOTAL ................... $26,500,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.1 Pa e-8-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded, LID Pending
South 196 1h/ 200 1h Street Corridor Project
Orillia Road to West Valley Highway (State Route 181 )
Construct a new five-lane roadway from Orillia Road to Russell Road, and
widen Russell Road/ South I 96th Street to West Valley Highway ( State
Route 181 ), including a new bridge over the Green River, signalization of the
intersection of South 200th Street at Orillia Road, and a modification to the
traffic signal at the intersection of South I 96th Street at West Valley Highway.
Project will include the construction of full-width paving, concrete curbs,
gutters and sidewalks, street lighting, storm drainage, bike paths, landscaping,
utilities and appurtenances.
Preliminary Engineering . . . . . . . . . . . . . $781 ,000
Right ofWay Acquisition ........... $2,319,000
Construction ................... $ 9,400,000
TOTAL ................... $12,500,000
TIA, King County, City ofKent, LID
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.2 Pa e-9-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded, LID Pending
TIA, City of Kent, LID
South 196 1h/ 2001h Street Corridor Project
West Valley Highway (State Route 181 ) to East Valley Highway
Construct a new five-lane roadway from West Valley Highway to East Valley
Road, including a new bridge over the Union Pacific and the Burlington
Northern Railroads' mainlines; widen South 196th Street between West Valley
Highway and 72nd A venue South, signalization of the intersection of South
196th Street at East Valley Road. Project will include the construction of full-
width paving, bridges, concrete curbs, gutters and sidewalks, street lighting,
storm drainage, bike paths [ from West Valley Highway to the Interurban
Trail ], landscaping, utilities and appurtenances.
Preliminary Engineering ............ $1,500,000
Right of Way Acquisition ........... $4,700,000
Construction ................... $15,800,000
TOTAL ................... $22,000,000
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [ State of Washington]; LID--Local Improvement District
Priorit No.3 Pa e-10-
CITY OF KENT, WASli/NGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
STP (U), City ofKent
Reith Road/ W. Meeker Street at Kent-Des Moines Road Intersection
Improvement Project
Widen Reith Road and West Meeker Street from a point 500 feet west of the
Kent-Des Moines Road to the Frager Road. Construct paving, concrete curbs,
gutters and sidewalks, street lighting, storm drainage, bike paths, landscaping,
utilities and appurtenances.
Preliminary Engineering ............... $4,000
Right of Way Acquisition ................ $ -0-
Construction ...................... $53,000
TOTAL ...................... $57,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements,(CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Locallmprovement District
Prioritv No.4 Pa e-11 -
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
City of Kent, LID
Russell Road at West Meeker Street Traffic Signal System
Install a multi-phase traffic signalization system at the intersection of Russell
Road at West Meeker Street. Project will include the minor widening on West
Meeker Street and reconstruction of the curb returns on the northerly side of
Meeker Street.
Preliminary Engineering .............. $10,000
Right of Way Acquisition ............. $10,000
Construction . . . . . . . . . . . . . . . . . . . . . $180,000
TOTAL . . . . . . . . . . . . . . . . . . . . . $200,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Prioritv No.5 Pa e-12-
CITYOFKENT, WASHINGTON
SIX YEAR TRANSPORT AVON IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
STP (E), City ofKent
Interurban Trail Signal Improvements
Interurban Trail Crossings at South 228th Street, Smith Street, and
Meeker Signal Systems
Install multi-phase traffic signals at the Interurban Trail crossings at South
228th Street, Smith Street, and Meeker Street similar to that system
constructed at the Interurban Trail crossing at South 212th Street. Project will
include the reconstruction, as required, of the concrete ramps within the
sidewalk area.
Preliminary Engineering .............. $30,000
Right of Way Acquisition ................ $ -0-
Construction . . . . . . . . . . . . . . . . . . . . . $156,000
TOTAL ..................... $186,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.6 Pa e-13-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
U AT A, City of Kent, LID
Washington Avenue (State Route 181) High Occupancy Vehicle Lanes
Project
Harrison Street to Green River Bridge
Widen Washington A venue ( State Route 181 ) to seven lanes [ two general
purpose lanes each direction, one H.O.V. lane in each direction, plus turn
lanes ] from Harrison Street to State Route 516 ( Kent -Des Moines Road ),
and four lanes south to the Green River Bridge, and modify the existing traffic
signal systems at the intersections of Washington Avenue at West Meeker
Street and Kent-Des Moines Road (State Route 516 ). Project will include the
construction of full-width paving, concrete curbs, gutters and sidewalks, street
lighting, storm drainage, bike paths, landscaping, utilities and appurtenances.
Preliminary Engineering . . . . . . . . . . . . . $160,000
Right of Way Acquisition ............ $300,000
Construction $540,000
TOTAL .................... $1,000,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Prioritv No.7 Pa e-14-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
Pacific Highway South (State Route 99) H.O.V. Lanes
Kent-Des Moines Road (State Route 516) to South 252nd Street
( Southerly City Limits )
Widen Pacific Highway South to provide a pair of High Occupancy Vehicle
lanes from the Kent -Des Moines Road ( State Route 516 ) to South 252nd
Street, reconstruct existing sidewalks, provide a ten-foot wide concrete
sidewalk I bicycle path, and modify the existing traffic signal systems at the
Kent-Des Moines Road, South 240th Street, and at South 252nd Street.
Project will include paving, concrete curbs, gutters, and sidewalks, storm
drainage systems, utilities, landscaping, and appurtenances.
Preliminary Engineering ............. $466,000
Right of Way Acquisition ............ $500,000
Construction .................... $3,772,000
TOTAL .................... $4,688,000
STP (U), TIA, UATA, City ofKent, LID
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [ State of Washington ]; LID--Local Improvement District
Priorit No.8 Page-15-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded, LID Pending
City of Kent, LID
64 1h Avenue South Extension Project
South 2161h Street to South 226 1h Street
Construct new five-Jane roadway from South 216th Street to South 226th
Street. Project will include the construction of full-width paving, concrete
curbs, gutters, and sidewalks; street lighting, storm drainage, median
improvements, utilities and appurtenances.
Preliminary Engineering . . . . . . . . . . . . . $104,000
Right of Way Acquisition ............ $148,000
Construction .................... $1,948,000
TOTAL .................... $2,200,000
STP --Surface Transportation Program [Federal], (U} Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account. UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.9 Pa e-16-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded, Project Ongoing
City ofKent
Green River Valley Traffic Signal Coordination Project
West Valley Highway--Kent-Des Moines Road to South 180'h Street
South 180'h Street--West Valley Highway to Benson Highway
Complete the design report for the Inter-agency traffic signal coordination
project involving the Cities of Kent, Tukwila, and Renton, King County, and
the Washington State Department of Transportation. Signal coordination
recommendations to be made for West Valley Highway, from Kent-Des
Moines Road to Interstate 405, and on South !80th Street from West Valley
Highway to Benson Highway ( State Route 515 ), implement the
recommendations, therein, and monitor the net level-of-service improvements.
Administration and Analysis . . . . . . . . . . . . $5,000
Right of Way Acquisition ................ $ -0-
Construction ......................... $ -0-
TOTAL ....................... $5,000
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priori tv No.1 0 Pa e-17-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
METRO, City ofKent
METRO Americans With Disabilities Act Improvements Project
Washington Avenue, Harrison Street, Smith Street, Lincoln Avenue
Construct walkway improvements at various locations to improve disabled-
person access to regional transit facilities. Project will include the construction
of concrete sidewalks, and pedestrian ramps at intersections.
Preliminary Engineering . . . . . . . . . . . . . . $12,000
Right of Way Acquisition ................ $ -0-
Construction . . . . . . . . . . . . . . . . . . . . . $108,000
TOTAL ..................... $120,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.ll Pa e-18-
CITYOFKENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PRO.JECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Southeast 240'h Street Widening Project
116th Avenue Southeast to 136'h Avenue Southeast
Widen Southeast 240th Street to provide a five-lane roadway, including four
general-purpose travel lanes, a center left-tum lane, and a Class II bicycle
facility. Modify the existing traffic signal systems at the intersections of 132nd
A venue SE, 116th A venue Southeast, and construct a new signal at the
intersection of 120th A venue SE. Project will include the construction of full-
width paving, concrete curbs, gutters, and sidewalks; street lighting, storm
drainage, median improvements, utilities and appurtenances.
Preliminary Engineering . . . . . . . . . . . . . . [ done ]
Right of Way Acquisition ............. [done]
Construction .................... $8,161,930
TOTAL .................... $8,161,930
Funded, Design Complete [by King County --Lead Agency}
TIA, King County, City ofKent, LID
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [ State of Washington ]; LID--Local Improvement District
Priorit No.12 Pa e-19-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Railroad Crossing Grade Separation Project
South 212 1h Street, South 228 1h Street, .James Street, Smith Street, State
Route 516
Stage 1: Conduct engineering and feasibility studies for the possible grade
separations of the Burlington Northern Santa Fe and Union Pacific Railroad's
main line tracks at the South 212th Street, South 228th Street, James Street,
Smith Street, and Willis Street/ State Route 516.
Stage II: Construct these grade separations. The project will support the
increased number of trains through the City resulting from both the proposed
re-opening of the BNSF's Stampede Pass line and Auburn Rail Yard, the
commuter rail operations ofthe RTA, UP Railroad projected train traffic, and
the planned High-Speed Passenger Rail project. Project will include the
construction of bridge structures, ground-water pumping systems, full-width
paving, concrete curbs, gutters, and sidewalks; street lighting, utilities and
appurtenances.
Preliminary Engineering . . . . . . . . . . $100,000 $10,000,000
Right of Way Acquisition ............. $ -0-$25,000,000
Construction . . . . . . . . . . . . . . . . . . . . . . $ -0-$68,000,000
TOTAL .................. $100,000 $103,000,000
STAGE I STAGE II
STP ( U ), City of Kent, Regional Transit Agency, State, Burlington Northern/ Santa Fe Railroad, Union
Pacific/ Southern Pacific Railroad, Port of Tacoma, Port of Seattle
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements. (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Locallmprovement District
Priorit No.13 Pa e-20-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPJl0V£MENTPROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
City of Kent
Americans With Disabilities Act Compliance Sidewalk Repair
and Rehabilitation Program Project
Reconstruct and repair existing sidewalks and pedestrian ramps, and install
new hard-surfaced sidewalks to implement the requirements of the Federal
Government's Americans With Disabilities Act. Project will include an
inventory of the City's sidewalk/ walkway facilities, identification and
correction of existing deficiencies. Project will include the construction of
concrete curbs, gutters, and sidewalks; minor storm drainage, and
appurtenances.
Preliminary Engineering $180,000
Right of Way Acquisition $100,000
Construction $1,520,000
TOTAL $1,800,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [ State of Washington ]; LID--Local Improvement District
Priorit No.14 Pa e-21-
CJTYOFKENT, WASHINGTON
SIX YEAR TRANSPORTAVON IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
STP (E), City of Kent
Canyon Drive Bicycle and Pedestrian Facilities Project
Alvord Avenue to 94th Avenue South
Improve Canyon Drive ( State Route 516 ) by constructing new concrete
sidewalks along the southerly side of Canyon Drive, between Alvord A venue
and 94th A venue South, including widening the pavement along the southerly
side ofthe roadway to provide a Class II bicycle facility. Project will include
the construction of paving, concrete curbs, gutters, and sidewalks; guardrail,
minor storm drainage, and appurtenances.
Preliminary Engineering $50,000
Right of Way Acquisition $ -0-
Construction $626,000
TOTAL $676,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.l5 Pa e-22-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PRO.JECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
STP (U), City of Kent
South 212 1h Street Pavement Rehabilitation Project
Green River Bridge to West Valley Highway [ SR 181 ]
Remove and rehabilitate the existing roadway pavement to add additional
lifespan to the roadway, between the Green River Bridge and West Valley
Highway. Project will include the removal and replacement of the existing
pavement in the curb travel lanes in both directions, and a full-width asphaltic
concrete overlay of the entire roadway. Project will also include the selective
replacement of catch basin inlets and aprons, driveways, and curbs and gutters.
Preliminary Engineering $50,000
Right of Way Acquisition $-0-
Construction $550,000
TOTAL $600,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.l6 Pa e-23-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
City ofKent
Reith Road at 42nd Avenue South Traffic Signal System
Reconstruct the existing pedestrian crossing signal at the intersection of Reith
Road at 42nd A venue South to a fully-actuated traffic signalization system
This project is mandated by the Federal Government's [ Federal Highway
Administration] changes to the Manual of Uniform Traffic Control Devices
that require the elimination of all "pedestrian" signals, or, the conversion
thereof to full vehicle-signalization operation, in 1996.
Preliminary Engineering $5,000
Right of Way Acquisition $-0-
Construction $70,000
TOTAL $75,000
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.l7 Pa e-24-
CJTYOFKENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
UATA, City ofKent
.James Street at Central Avenue Intersection Improvement Project
Widen the east leg of the James Street at Central Avenue intersection to
provide an exclusive right-tum lane for westbound traffic on James Street, and
modify the existing traffic signalization system. Project will include the
construction of paving, concrete curbs, gutters, and sidewalks; street lighting,
storm drainage, utilities and appurtenances.
Preliminary Engineering $25,000
Right of Way Acquisition $100,000
Construction $225,000
TOTAL $350,000
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [ State of Washington ]; LID--Local Improvement District
Priorit No.l8 Pa e-25-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPQRTA TION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
City of Kent, LID
132"d Avenue Southeast Widening Project
Southeast 266 1h Street to Kent-Kangley Road (State Route 516)
Widen 132nd Avenue Southeast to provide a five-lane roadway, including
four general-purpose travel lanes, a center left-tum lane, and a Class II bicycle
facility, modifying the existing traffic signal systems at the intersection of
Kent-Kangley Road. Project will include the construction of interim-width
paving, concrete curbs, gutters, and sidewalks; street lighting, storm drainage,
median improvements, utilities and appurtenances.
Preliminary Engineering . . . . . . . . . . . . . $150,000
Right of Way Acquisition ............ $200,000
Construction $650,000
TOTAL .................... $1,000,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.l9 Pa e-26-
CITYOFKENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
Flexible/ Intelligent Shuttle Bus Demonstration Project
Provide enhanced transit service in the Downtown Kent business area through
the use of a fixed route shuttle service, with demand-responsive routing
capabilities. Service route points to include Aukeen District Court, South King
County Activity Center [ SKCAC ], South King County Regional Justice
Center, and DSHS.
Preliminary Engineering . . . . . . . . . . . . . . . . . $ -0-
Right of Way Acquisition ................ $ -0-
Operation and Equipment Purchase ..... $503,000
TOTAL ..................... $503,000
STP ( CMAQ ), Metro, City of Kent
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.20 Pa e-27-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
City of Kent
Neighborhood Traffic Control Program
-Citywide-
Construct minor improvements: roadway signage and channelization, sight
distance improvements, etc., in the City's residential neighborhoods to
promote pedestrian and resident safety, divert non-local traffic, and encourage
driver compliance with the existing traffic laws.
Preliminary Engineering ............... $4,000
Right of Way Acquisition ................ $ -0-
Construction . . . . . . . . . . . . . . . . . . . . . . $36,000
TOTAL ...................... $40,000
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; T!A --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.21 Pa e-28-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
UATA, City ofKent, LID
Southeast 256 1h Street Widening Project
1161h Avenue Southeast to 136 1h Avenue Southeast
Widen Southeast 256th Street to provide a three-lane roadway, including two
general-purpose travel lanes, a center left-tum lane, and a Class II bicycle
facility. Widen to five lanes, and modify the existing traffic signal systems, at
the intersections of 132nd Avenue Southeast and 124th Avenue Southeast.
Project will include the construction of interim-width paving, concrete curbs,
gutters, and sidewalks; paved shoulders, street lighting, storm drainage,
median improvements, utilities and appurtenances.
Preliminary Engineering ............. $434,000
Right of Way Acquisition ............ $928,000
Construction .................... $1,538,000
TOTAL .................... $2,900,000
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Prioritv No.22 Pa e-29-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded
STP (E), City of Kent
Citywide Bicycle System Improvements
Make miscellaneous improvements to the City's Bicycle Route system.
Potential projects include improvements to 1 OOth A venue Southeast north of
James Street, Southeast 248th Street east of 94th Avenue South, and 152nd
Way Southeast, north of Southeast 272nd Street.
Preliminary Engineering .............. $40,000
Right of Way Acquisition ................ $ -0-
Construction ..................... $360,000
TOTAL . . . . . . . . . . . . . . . . . . . . . $400,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Prioritv No.23 Pa e-30-
CITYOFKENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
94th Avenue South at Canyon Drive ( SR 516) Traffic Signal System
Install a multi-phase traffic signalization system at the intersection of 94th
A venue South at Canyon Drive ( SR 516 ). Project will include pavement
widening of 94th A venue South from South 248th Street to Canyon Drive
( SR 516 ), construction of sidewalks, and construction of a tum island at the
intersection of Canyon Drive.
Preliminary Engineering .............. $50,000
Right ofWay Acquisition ............. $10,000
Construction . . . . . . . . . . . . . . . . . . . . . $540,000
TOTAL . . . . . . . . . . . . . . . . . . . . . $600,000
STP ( U ), UATA, City of Kent, LID
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.24 Pa e-31 -
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PRO.JECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
Funded, LID Pending
City of Kent, LID
72nd Avenue South Extension Project
South 194 1h Street to South 196 1h Street
Construct new five-lane roadway from South 194th Street to South I 96th
Street. Project will include the construction of full-width paving, concrete
curbs, gutters, and sidewalks; street lighting, storm drainage, landscaping,
utilities and appurtenances.
Preliminary Engineering . . . . . . . . . . . . . . $80,000
Right of Way Acquisition ................ $ -0-
Construction ..................... $460,000
TOTAL . . . . . . . . . . . . . . . . . . . . . $540,000
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.25 Pa e-32-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTA UONIMPROV£MENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
UATA, City ofKent
Military Road Widening Project
Reith Road to Kent-Des Moines Road (State Route 516)
Widen Military Road to provide an interim three-lane roadway, including two
general-purpose travel lanes, and a center left-tum lane, and a Class II bicycle
facility at selected intersections Project will include the construction of
paving, concrete curbs, gutters, and sidewalks; street lighting, utilities and
appurtenances.
Preliminary Engineering .............. $40,000
Right of Way Acquisition ................ $ -0-
Construction . . . . . . . . . . . . . . . . . . . . . $110,000
TOTAL ..................... $150,000
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [ State of Washington ]; LID --Local Improvement District
Prioritv No.26 Pa e-33-
CITY OF KENT, WASJIINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
West Meeker Street Widening Project--Phase I
Kent-Des Moines Road (State Route 516) to Green River Bridge
Widen West Meeker Street to provide a five-lane roadway, including four
general-purpose travel lanes, a center left-turn lane, and a Class II bicycle
facility, and modify the existing traffic signal system at the intersection of
West Meeker Street/ Kent-Des Moines Road, and construct a second, parallel
span to the existing bridge over the Green River. Project will include the
construction of full-width paving, concrete curbs, gutters, and sidewalks; street
lighting, storm drainage, utilities and appurtenances.
Preliminary Engineering ............. $376,000
Right of Way Acquisition ............. $60,000
Construction .................... $2,130,000
TOTAL .................... $2,566,000
STP (BR), UATA, City ofKent
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.27 Pa e-34-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION/MPROVEMENTPROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
FUNDING SOURCE(S)
STP (U), City of Kent
Central Avenue Pavement Rehabilitation Project
Willis Street (State Route 516) to Green River Bridge
Remove and rehabilitate the existing roadway pavement to add additional
lifespan to the roadway, between Willis Street ( State Route 516 ) and the
Green River Bridge. Project will include the removal and replacement of the
upper two inches ( 2") of the existing pavement in the curb ( #2) travel lanes
in both directions, and a full-width asphaltic concrete overlay of the entire
roadway. Project will also include the selective replacement of catch basin
inlets and aprons, driveways, and curbs and gutters.
Preliminary Engineering . . . . . . . . . . . . . . $50,000
Right of Way Acquisition ................ $ -0-
Construction ..................... $550,000
TOTAL . . . . . . . . . . . . . . . . . . . . . $600,000
STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.28 Pa e-35-
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTAVONIMPROVEMENTPROGRAM
PROJECT:
DESCRIPTION:
PROJECT COST
SUMMARY:
South 2281h Street Corridor Project
South 228 1h Street: Military Road to 54th Avenue South
Military Road: South 228 1h Street to Kent-Des Moines Road
Construct a new 5-lane roadway from Military Road to 54th Avenue South,
including a bridge over the Green River, and widen Military Road from South
· 228th Street to Kent-Des Moines Road [ SR 516 ]. Project will include the
construction of full-width paving, concrete curbs, gutters and sidewalks, street
lighting, storm drainage, bike paths, landscaping, utilities and appurtenances.
Preliminary Engineering ............. $440,000
Right of Way Acquisition . . . . . . . . (post 2002)
Construction (post 2002)
TOTAL ..................... $440,000
FUNDING SOURCE(S)
LID Pending
City of Kent, LID
STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement,
(E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA --
Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District
Priorit No.29 Pa e-36-