Loading...
HomeMy WebLinkAbout1480RESOLUTION NO. /lfgQ A RESOLUTION of the City Council of the City of Kent, Washington, adopting the 1997- 2002 Six Year Transportation Improvement Plan. WHEREAS, after proper notice, the City Council of the City of Kent held a public hearing at the regular meeting of the City Council held at 7:00 p.m. on September 3, 1996, to consider public testimony on the proposed Transportation Improvement Plan for the City and having considered public testimony to the Plan; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES HEREBY RESOLVE AS FOLLOWS: Section 1. The 1997 through 2002 Six Year Transportation Improvement Plan, set forth in the Exhibit A attached hereto and herewith filed with the city Clerk, is hereby adopted. Passed at a regular meeting of the City Council of the 3 tt-J-/1. /\ -r;;--~ ; • A A City of Kent, Washington this day of ~, 1996. Concurred in by the Mayor of the City of Kent, this 311-J-day of ~-, 1996. ATTEST~ BRENDA JACOBER, APPROVED AS TO FORM: I hereby certify that this is a true and correct copy of Resolution No. /~ft) , passed by the City Council of the City of Kent, Washington, the 3d day of ~~~, 1996. , sixyear.res 2 CITY OF KENT, WASHINGTON SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997-2002 Don E. Wickstrom, P.E. Director of Public Works Prepared By: Transportation Engineering Section Public Works Department Edward White, City Transportation Engineer Kristen Langley, Assistant Transportation Engineer Assisted By: Kurt Palowez, Mapping/ GIS Coordinator Project Number CITY OF KENT, WASHINGTON SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM Project Name Page 9701 South 272nd/277th Street Corridor Project ....................... 8 Auburn Way North to Kent-Kangley Road (State Route 516) 9702 South 196th/200th Street Corridor Project ....................... 9 Orillia Road to West Valley Highway (State Route 181) 9703 South 196th/200th Street Corridor Project ...................... 10 West Valley Highway (State Route 181) to East Valley Highway 9704 Reith Road/ West Meeker at Kent-Des Moines Road ( State Route 516 ) Intersection Improvement Project ............ 11 Reith Road/ Meeker Street at Kent-Des Moines Road (State Route 516) 9705 Russell Road at West Meeker Street Traffic Signal System ....... 12 Russell Road at West Meeker Street 9706 Interurban Trail Signal Improvements ........................ 13 Interurban Trail Crossings at South 2281h St., Smith Street, and Meeker Street 9707 Washington Avenue (State Route 181) High Occupancy Vehicle Lanes Project ............................................. 14 Harrison Street to Green River Bridge 9708 Pacific Highway South ( State Route 99 ) High Occupancy Vehicle Lanes Project ...................................... 15 Kent-Des Moines Road (State Route 516) to South 252nd Street 9709 64th Avenue South Extension Project .......................... 16 South 2 I 61h Street to South 2261h Street 9710 Green River Valley Traffic Signal Coordination Project .......... 17 West Valley Highway--Kent-Des Moines Road to South 18(Jh Street South J8(Jh Street--West Valley Highway to Benson Highway 9711 METRO Americans' with Disabilities Act [ADA] Improvements Project ...................................... 18 Washington Avenue (State Route 181 ), Harrison Street, Smith Street, Lincoln Avenue Project Number CITYOFKENT, WASHINGTON SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM Project Name Page 9712 Southeast 240th Street Widening Project ....................... 19 I 16th Avenue Southeast to I 36th Avenue Southeast 9713 Railroad Grade Separation Project ........................... 20 South 212th Street, South 228th Street, James Street, Smith Street and State Route 516 9714 Americans' with Disabilities Act Compliance Sidewalk Repair and Rehabilitation Program Project .......................... 21 Citywide 9715 Canyon Drive Bicycle and Pedestrian Facilities Project .......... 22 Alvord Avenue to 94th Avenue South 9801 South 212th Street Pavement Rehabilitation Project ............. 23 Green River Bridge to East Valley Road 9802 Reith Road at 42nd A venue South Traffic Signal System ......... 24 Reith Road at 42nd Avenue South 9803 James Street at Central Avenue Intersection Improvement Project 25 James Street at Central Avenue 9804 132nd A venue Southeast Street Widening Project ................ 26 Southeast 266th Street to Kent-Kangley Road ( SR 516) 9805 Flexible/ Intelligent Shuttle Bus Demonstration Project .......... 27 Downtown 9806 Neighborhood Traffic Control Program ....................... 28 Citywide 9807 Southeast 256th Street Widening Project ....................... 29 I 16th Avenue Southeast to I 36th Avenue Southeast 9901 Citywide Bicycle Improvements .............................. 30 Citywide 9902 94th Avenue South at Canyon Drive ( SR 516) Signal System ...... 31 94th Avenue South at Canyon Drive ( SR 516) Project Number 9903 200001 200101 200102 200201 CITYOFKENT, WASHINGTON SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM Project Name Page 72nd Avenue South Extension Project ........................... 32 South I 94th Street to South I 96th Street Military Road Widening Project .............................. 33 Reith Road to Kent-Des Moines Road (State Route 516) West Meeker Street Widening Project--Phase I ................. 34 Kent-Des Moines Road (State Route 516) to Green River Bridge Central Avenue Pavement Rehabilitation Project ................ 35 Willis Street to (State Route 516) to Green River Bridge South 228th Street Corridor Project ............................ 36 Military Road to 54th Avenue South 1997 to 2002 (Project Costs in Thousands of Dollars) MPO : PSRC Puget Sound Reg. Council Agency : Kent County : King County Phase Data Func Project Imp Total Util Start __ Federal --RAP,etc. Local/ Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State City Kent 01 0.000 ~ C P S T W :~ Funding Secured Revision: 16 1 9701 South 272nd/277t~t Corndor Projec So 272nd, So 277th, 116th Ave SE Auburn Way to Kent-Kangley Rd. ( SR 516) Construct new 5-lane arterial to full urban improvements Construct new 5 PE 8/1996 0 TIA 584 1,316 RW 8/1996 0 TIA 983 2,217 CN 10/1998 0 TIA 6,574 14,826 PROJECT TOTAL 0 8,141 18,359 City Kent 04 0.000 .f. c p s T w _I Funding Secured Revision: 16 2 9702 So. 196th/ 200th St. l;ornaor -vvest So 200th St/ Russell Rd/ So 196th St Orillia Road to West Valley Highway Widen existing roads, Construct new bridge over Green River PE 8/1996 0 TIA 200 581 RW 10/1996 0 TIA 595 1,724 CN 10/1998 0 TIA 2,410 6,990 PROJECT TOTAL 0 3,205 9,295 City Kent 01 0.000 E c p s T w J Funding Secured Revision: 16 3 9703 So. 196th/ 20oth St Corndor-~-:-Mid leg- So 196th St. West Valley Hwy. to East Valley Road Construct new bridge over RR tracks, widen existing section of streets PE 8/1996 0 TIA 716 784 RW 10/1996 0 TIA 2,243 2,457 CN 5/1998 0 TIA 7,540 8,260 PROJECT TOTAL 0 10,499 11,501 City Kent 12 0.000 I c OJ Funding Secured Revision: 00 4 9704 Reith/ Meeker at Kent-Des Memes Road Reith Road/ Meeker St./ Kent-Des Moines N/A Widen Reith Road and Meeker St and construct walkways. PE 111995 STP(U) 3 0 1 CN 5/1997 STP(U) 10 0 43 PROJECT TOTAL 13 0 44 City Kent 12 o.ooo 1 1 Funding Secured Revision: 17 ':: 1705 Russell Rd at Meeker St Traffic Signal Russell Road, Meeker Street Install multi-phase traffic signalization system PE 2/1996 0 0 10 G Gas 0 Other C Cable TV 6YRTIP.FRX SNV Rev: 2.00 05/08/95 Form Rev Date: 04/26/95 Total 1 PE RW CN Total 1,900 3,200 21,400 26,500 1 PE RW CN Total 781 2,319 9,400 12,500 1 PE RW CN Total 1,500 4,700 15,800 22,000 1 PE RW CN Total 4 53 57 1 PE RW CN Total 10 Hearing Date Adoption Date Resolution Number Page Expenditure Schedule (Local Agency Use) 1st 2nd 3rd 4th-6th 1,900 0 0 300 2,900 0 0 4,900 10,000 2,200 7,800 10,000 781 0 0 2,319 0 0 2,900 6,500 0 6,000 6,500 0 1,500 0 0 3,500 1,200 0 0 6,800 9,000 5,000 8,000 9,000 4 0 0 0 0 0 53 0 0 57 0 0 10 0 0 10 0 0 180 0 0 200 0 0 0 0 6,500 6,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1997 to 2002 (Project Costs in Thousands of Dollars) MPO : PSRC Puget Sound Reg. Council Agency : Kent County : King County Phase Data Func Project Imp Total Util Start __ federal --RAP,etc. Local/ Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State City Kent 12 o.ooo 1 1 Funding Secured Revision: 17 5 9705 Russell Rd at Mee er StTrafficSfgnal RW 5/1996 0 0 10 CN 1011996 0 0 180 PROJECT TOTAL 0 0 200 City Kent 12b o.ooolm s·~--__ _I Funding Secured Revision: 16 6 9706 lnterur an Trail Tra 1c 1gnals South 228th, Smith Street, Meeker Street Install traffic signals for pedestrian and bicycle traffic PE 8/1996 STP(E) 26 0 4 CN 3/1996 STP(E) 61 0 95 PROJECT TOTAL 87 0 99 City Kent 04 0.290 ~F C P S T W J Funding Secured Revision: 14 7 9707 Washington Ave ( RlSTTRDV lanes Washington Avenue ( SR 181 ) Harrison Street to Green River Bridge Widen Washington Avenue to provide HOV lanes north of SR 516, general purpose lanes south of SR 516, and concrete sidewalks where missing. PE 8/1996 0 UATA 96 64 RW 1/1997 0 UATA 180 120 CN 4/1997 0 UATA 324 216 PROJECT TOTAL 0 600 400 City Kent 04 0.450 ~~ P S T -""'--J Funding Secured Revision: 14 8 9708 Pacific Highway So. OVLanes Pacific Highway So. ( SR 99 ) Kent-Des Moines Road to So 252nd Street Widen Pacific Highway South ( SR 99 ) to provide HOV lanes, curbs, gutters, sidewalks, and Class II bicycle facilities PE 4/1997 STP 187 UATA 191 88 RW 4/1998 STP 26 UATA 322 152 CN 4/1999 STP 1,037 UATA 1,831 854 PROJECT TOTAL 1,250 2,344 1,094 City Kent 01 o.63o h~>c T 1 Funding Secured Revision: 16 9 9709 64th Avenue Soutti xtensron 64th Avenue South So. 216th Street to So. 226th Street Construct new 5-lane arterial with full urban improvements incl. landscaped median GGas 0 Other C Cable TV 6YRTIP.FRX SIW Rev: 2.00 05/0B/95 Form Rev Date: 04/26/95 Total 1 PE RW CN Total 10 180 200 1 PE RW CN Total 30 156 186 1 PE RW CN Total 160 300 540 1,000 1 PE RW CN Total 466 500 3,722 4,688 1 PE RW CN Total Page Hearing Date Adoption Date Resolution Number Expenditure Schedule (Local Agency Use) 1st 2nd 3rd 10 0 10 0 180 0 200 0 30 0 0 0 156 0 186 0 160 0 300 0 540 0 1,000 0 466 0 0 500 0 0 466 500 104 0 148 0 0 1,948 252 1,948 2 4th-6th 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' 0 01 0 0 ' 0 o I 0 0 I I I 0 0 0 0 I 3,722 0 3,722 0 0 0 0 0 0 0 0 0 1997 to 2002 (Project Costs in Thousands of Dollars) MPO : PSRC Puget Sound Reg. Council Agency : Kent County : King County Phase Data Func Project Imp Total Util Start __ Federal --RAP,etc. Local/ Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State City Kent 01 0.630 e c _ _ r J Funding Secured Revision: 16 9 9709 64th Avenue Soutli EXtension --- PE 2/1997 0 0 104 RW 8/1997 0 0 148 CN 5/1998 0 0 1,948 PROJECT TOTAL 0 0 2,200 City Kent 12 0.000 l~l ,J Funding Secured Revision: 16 10 9710 Valley Traffic Signa cooraination-Proj West Valley Highway, So. 180th Street SR 516 to So. 180th, SR 181 to SR 515 Optimize signal timing and coordination among Green River Valley jurisdictions PE 8/1996 0 0 5 PROJECT TOTAL 0 0 5 City Kent 01 0.000 .L _j Funding Secured Revision: 00 11 9711 METRO ADA Wall<way Progfa~- Washington Avenue, Smith Street N/A Construct walkway improvements to support regional transit stops PE 6/1996 0 10 2 CN 10/1996 0 86 22 PROJECT TOTAL 0 96 24 City Kent 04 1.250 ;~ c p s T w 0 I Funding Secured Revision: 16 12 9712 Southeast 240th S reef ProJea Southeast 240th Street 116th Avenue SE to 136th Avenue SE Widen SE 240th Street to 5-lane configuration, add bicycle lanes and signals CN 2/1997 0 0 8,162 PROJECT TOTAL 0 0 8,162 City Kent 01 0.000 _e~ c p s T w 1 Planning Purposes Revision: 00 13 9713 Railroad Grade Separabon 1-'roject 1-'n 1 South 212th,South 228th, James, Smith St South 196th St. to South 259th Street Evaluate future grade separations and construct PE 111997 0 0 100 CN 112001 STP(U) 68,000 0 0 RW 111999 STP(U) 20,000 TIA 5,000 0 PE 12/1998 STP(U) 5,000 TIA 4,000 1,000 PROJECT TOTAL 93,000 9,000 1,100 Ut111t1es Legena GGas P Power TTelephone 0 Other C Cable TV S Sewer WWater 6YRTIP.FRX Stw Rev: 2.00 05/08/95 Form Rev Date: 04/26/95 Total 1 PE RW CN Total 104 148 1,948 2,200 1 PE RW CN Total 5 5 1 PE RW CN Total 12 108 120 1 PE RW CN Total 8,162 8,162 1 PE RW CN Total 100 68,000 25,000 10,000 103,100 Hearing Date Adoption Date Resolution Number Page 3 Expenditure Schedule (local Agency Use) 1st 2nd Jrd 4th-6th 104 0 0 148 0 0 0 1,948 0 252 1,948 0 5 0 0 0 0 0 0 0 0 5 0 0 12 0 0 0 0 0 108 0 0 120 0 0 0 0 0 0 0 0 8,162 0 0 8,162 0 0 100 0 10,000 0 0 25,000 0 0 0 100 0 35,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68,000 68,000 1997 to 2002 (Project Costs in Thousands of Dollars) MPO : PSRC Puget Sound Reg. Council Agency : Kent County : King County Phase Data Func Project Imp Total Util Start __ Federal --RAP,etc. Local/ Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State City Kent 32 0.000 p C P T ~~' Funding Secured Revision: 00 14 9714 ADA Complience Program -Repaii'/Re ab Citywide Citywide Rehabiltate/ repair pedestrian facilities to comply with ADA requirements PE 8/1996 0 0 180 RW 8/1996 0 0 100 CN 111997 0 0 1,520 PROJECT TOTAL 0 0 1,800 City Kent 32 0.2201 ;~ Planning Purposes Revision: 14 15 9715 Canyon Dr. Bike and-Pea Facilities Canyon Drive ( SR 516) Alvord Avenue to 94th Avenue South Construct concrete sidewalk, widen for bike lane, along southerly side of roadway PE 111997 0 0 50 CN 6/1997 0 0 626 PROJECT TOTAL 0 0 676 City Kent 06 0.000 J . J Funding Secured Revision: 16 16 9801 South 212th Street Pavement~efiao South 212th Street Green River Bridge to West Valley Hwy Reconstruct paving PE 8/1998 STP(U) 40 0 10 CN 5/1999 STP(U) 440 0 110 PROJECT TOTAL 480 0 120 City Kent 12 0.000 [ _ _ J Funding Secured Revision: 16 17 9802 Reith Road at 42nd Avenue Soutn Signal Reith Road, 42nd Avenue South N/A Revise existing pedestrian signal to comply with MUTCD PE 111998 0 0 5 CN 4/1998 0 0 70 PROJECT TOTAL 0 0 75 City Kent 04 0.0001 C P T j Planning Purposes Revision: 00 18 9803 James St at Central Ave Intersection Imp James St., Central Avenue Widen James Street at Central Avenue to provide an exclusive right turn lane for westbound traffic PE 111998 0 UATA 20 5 RW 4/1998 0 UATA 80 20 CN 6/1999 0 UATA 180 45 GGas 0 Other C Cable TV 6YRTIP.FRX SIW Rev: 2.00 05/08/95 Form Rev Date: 04/26/95 Total 1 PE RW CN Total 180 100 1,520 1,800 1 PE RW CN Total 50 626 676 1 PE RW CN Total 50 550 600 1 PE RW CN Total 5 70 75 1 PE RW CN Total 25 100 225 Hearing Date Adoption Date Resolution Number Page Expenditure Schedule (Local Agency Use) 1st 2nd 3rd 30 30 17 17 253 253 300 300 50 0 0 0 626 0 676 0 0 50 0 0 0 0 0 50 0 5 0 0 0 70 0 75 0 25 0 100 0 0 0 125 4 4th-6th 30 90 17 49 253 761 300 900 0 0 0 0 0 0 0 0 0 0 0 0 550 0 550 0 0 0 0 0 0 0 0 0 0 0 0 0 225 0 225 0 1997 to 2002 (Project Costs in Thousands of Dollars) MPO : PSRC Puget Sound Reg. Council Agency : Kent County : King County Phase Data Func Project Imp Total Util Start __ Federal --RAP,etc. Local/ Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State Total ·~v-..;t TOTAL 0 280 70 350 City Kent 04 0.438 .F.L c p s T w 0 J Planning Purposes Revision: 1 16 19 9804 132nd Avenue Southeast Project -· 132nd Avenue Southeast SE 266th Street to SE 272nd Street Widen 132nd Avenue SE to provide 5-lanes, with bicycle lanes and sidewalks PE 111998 0 0 150 150 RW 111999 0 0 200 200 CN 6/1999 0 0 650 650 PROJECT TOTAL 0 0 1,000 1,000 City Kent 22 0.000 l J Funding Secured Revision: 1 00 20 9805 Flex./ Intelligent Shuttle Bus·oemo ProJ N/A N/A Provide shuttle bus running on a combination of fixed-routing with route deviation capability in the Downtown Kent area. CN 7/1997 CMAQ 419 0 84 503 PROJECT TOTAL 419 0 84 503 City Kent 12 o.ooo 1 k< 1 Funding Secured Revision: 1 00 21 9806 Neighborhood Tra 1CComrol-program J Citywide Citywide Construct minor improvements to local streets to enhance traffic safety PE 8/1998 0 0 4 4 CN 8/1998 0 0 36 36 PROJECT TOTAL 0 0 40 40 City Kent 04 0.690 ;~ C P S T W j Funding Secured Revision: 1 16 22 9807 Southeast 256th s reeiWidening--· SE 256th Street 116th Avenue SE to 132nd Avenue SE Widen SE 256th Street to 3-lane configuration with full urban improvements and Class II bicycle facility PE 2/1998 0 UATA 217 217 434 RW 4/1999 0 UATA 464 464 928 CN 3/1999 0 UATA 769 769 1,538 PROJECT TOTAL 0 1,450 1,450 2,900 City Kent 32 0.000 .b~ _ _j Funding Secured Revision: 1 00 23 9901 City-wide Bicycle Improvements - Citywide Citywide Improve Bicycle and Pedestrian facilties in various locations around the City of Kent PE 111999 STP(U) 32 0 8 40 GGas 0 Other C Cable TV 6YRTIP.FRX srw Rev: 2.00 05/08/95 Form Rev Date: 04/26/95 PE RW CN Total PE RW CN Total PE RW CN Total PE RW CN Total PE RW CN Total Hearing Date Adoption Date Resolution Number Page Expenditure Schedule (Local Agency Use) 1st 2nd 3rd 0 150 0 0 0 0 0 150 0 0 0 0 0 503 0 503 0 2 0 0 0 18 0 20 0 434 0 928 0 0 0 1,362 0 0 0 0 0 0 0 0 5 4th-6th 0 0 0 0 650 0 650 0 0 0 0 0 0 0 0 0, I 0 2 0 0 0 18 0 20 0 0 0 0 1,538 0 1,538 0 10 30 0 0 90 270 100 300 1997 to 2002 (Project Costs in Thousands of Dollars) MPO : PSRC Puget Sound Reg. Council Agency : Kent County : King County Phase Data Func Project Imp Total Util Start __ Federal --RAP,etc. Local/ Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State City Kent 32 0.000 .L I Funding Secured Revision: 00 23 9901 City-wide Bicycle Improvements R 111997 0 0 0 CN 6/1999 STP(U) 312 0 48 PROJECT TOTAL 344 0 56 City Kent 12 0.250 t~j P S T W 01. Planning Purposes Revision: 14 24 9902 94th Avenue So at anyon Drive Signal Canyon Drive, 94th Avenue South N/A Install multi-phase signal and widen 94th Avenue South between Canyon Dr and So 248th Street PE 111999 STP(U) 30 UATA 15 5 RW 8/1999 STP(U) 6 UATA 2 2 CN 2/2000 STP(U) 324 UATA 162 54 PROJECT TOTAL 360 179 61 City Kent 01 0.130th\CPSTW I Funding Secured Revision: 17 25 9903 72nd Avenue Soul Exfension ____ ___j 72nd Avenue South South 194th St to South 196th Sr Construct new roadway with full urban improvements PE 2/1999 0 0 80 RW 4/2000 0 0 0 CN 10/2000 0 0 460 PROJECT TOTAL 0 0 540 City Kent 05 1.400 r c p s T w I Planning Purposes Revision: 16 26 200001 Military Road Widenmg Military Road Reith Road to Kent-Des Moines Road Widen Military Road to provide left turn lanes and paved shoulders at selected intersections PE 2/2000 0 UATA 20 20 CN 8/2000 0 UATA 55 55 PROJECT TOTAL 0 75 75 City Kent 04 0.170 1e~ c P T J Planning Purposes Revision: 16 27 200101 West Meeker Stree Widening -~ Phase I West Meeker Street SR 516 to East side Green River Bridge Widen West Meeker Street to 5 lane configuration with full urban improvements PE 8/2001 BR 150 UATA 150 76 RW 112001 BR 30 UATA 30 0 GGas 0 Other C Cable TV GYRTIP.FRX SIW Rev: 2.00 05/08/95 Form Rev Date: 04/26/95 Total 1 PE RW CN Total 0 360 400 1 PE RW CN Total 50 10 540 600 1 PE RW CN Total 80 0 460 540 1 PE RW CN Total 40 110 150 1 PE RW CN Total 376 60 Hearing Date Adoption Date Resolution Number Page Expenditure Schedule (local Agency Use) 1st 2nd 3rd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 4th-6th 10 30 0 0 90 270 100 300 50 0 0 10 0 540 50 550 80 0 0 216 0 244 80 460 0 40 0 0 0 110 0 150 0 376 0 60 0 2.130 0 2,566 1997 to 2002 (Project Costs in Thousands of Dollars) MPO : PSRC Puget Sound Reg. Council Agency : Kent County : King County Phase Data Func Project Imp Total Uti I Start __ Federal --RAP,etc. Local/ Cl Pri Identification Type Length Codes Date Fund Code Cost Code Cost State City Kent 04 0.170 I c p T J Planning Purposes Revision: 16 27 200101 West Meeker Street Wlclening-= Pnase I CN 612002 BR 1,000 UATA 716 414 PROJECT TOTAL 1,180 896 490 City Kent 03 1.250 p c p s ~ Funding Secured Revision: 16 28 200102 Central Avenue PavemeilfRe a . Central Avenue Willis Street to Green River Bridge Remove and replace deteriorated pavement and base material, rehabilitate drainage systems PE 8/2001 STP(U) 40 0 10 CN 3/2002 STP(U) 440 0 110 PROJECT TOTAL 480 0 120 City Kent 01 0.000 f: C P S T W C>_j Planning Purposes Revision: 16 29 200201 South 228th Street Cofria~--- South 228th Street, Military Road 54th Ave to Military Rd, Military to 516 Construct new 5-lane roadway incl bridge over the Green River PE 1/2002 0 0 440 RW 1/2003 0 0 0 CN 1/2005 0 0 0 PROJECT TOTAL 0 0 440 TOTAL for the Agency of Kent 97,613 36,765 59,580 TOTAL for the County of King County 97,613 36,765 59,580 GRAND TOTAL 97,613 36,765 59,580 GGas 0 Other C Cable TV 6YRTIP.FRX srw Rev: 2.00 05/08/95 Form Rev Date: 04/26/95 Total 1 PE RW CN Total 2,130 2,566 1 PE RW CN Total 50 550 600 1 PE RW CN Total 440 0 0 440 193,958 193,958 193,958 Hearing Date Adoption Date Resolution Number Page Expenditure Schedule (Local Agency Use) 1st 2nd 3rd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 4th-6th 0 376 0 60 0 2,130 0 2,566 0 50 0 0 0 550 0 600 : 0 440 I 0 0 0 0 0 440 I I CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATIONJMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded, LID Pending, TIA, City ofKent, LID South 272"11 / 277 1h Street Corridor Project Auburn Way North to Kent-Kangley Road (State Route 516) Construct a new five-lane roadway from Auburn Way to the Kent-Kangley Road (State Route 516 ), via South 277th Street, Southeast 274th Street, and 116th Avenue Southeast, including a new bridge over the Green River, and a modification to the traffic signals at the intersections of South 277th Street and Auburn Way North and at 116th Avenue Southeast and the Kent-Kangley Road ( State Route 516 ). Project will include the construction of full-width paving, concrete curbs, gutters and sidewalks, street lighting, storm drainage, bike paths, landscaping, utilities and appurtenances. Preliminary Engineering ............ $1,900,000 Right of Way Acquisition ........... $3,200,000 Construction ................... $21,400,000 TOTAL ................... $26,500,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.1 Pa e-8- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded, LID Pending South 196 1h/ 200 1h Street Corridor Project Orillia Road to West Valley Highway (State Route 181 ) Construct a new five-lane roadway from Orillia Road to Russell Road, and widen Russell Road/ South I 96th Street to West Valley Highway ( State Route 181 ), including a new bridge over the Green River, signalization of the intersection of South 200th Street at Orillia Road, and a modification to the traffic signal at the intersection of South I 96th Street at West Valley Highway. Project will include the construction of full-width paving, concrete curbs, gutters and sidewalks, street lighting, storm drainage, bike paths, landscaping, utilities and appurtenances. Preliminary Engineering . . . . . . . . . . . . . $781 ,000 Right ofWay Acquisition ........... $2,319,000 Construction ................... $ 9,400,000 TOTAL ................... $12,500,000 TIA, King County, City ofKent, LID STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.2 Pa e-9- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded, LID Pending TIA, City of Kent, LID South 196 1h/ 2001h Street Corridor Project West Valley Highway (State Route 181 ) to East Valley Highway Construct a new five-lane roadway from West Valley Highway to East Valley Road, including a new bridge over the Union Pacific and the Burlington Northern Railroads' mainlines; widen South 196th Street between West Valley Highway and 72nd A venue South, signalization of the intersection of South 196th Street at East Valley Road. Project will include the construction of full- width paving, bridges, concrete curbs, gutters and sidewalks, street lighting, storm drainage, bike paths [ from West Valley Highway to the Interurban Trail ], landscaping, utilities and appurtenances. Preliminary Engineering ............ $1,500,000 Right of Way Acquisition ........... $4,700,000 Construction ................... $15,800,000 TOTAL ................... $22,000,000 STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [ State of Washington]; LID--Local Improvement District Priorit No.3 Pa e-10- CITY OF KENT, WASli/NGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded STP (U), City ofKent Reith Road/ W. Meeker Street at Kent-Des Moines Road Intersection Improvement Project Widen Reith Road and West Meeker Street from a point 500 feet west of the Kent-Des Moines Road to the Frager Road. Construct paving, concrete curbs, gutters and sidewalks, street lighting, storm drainage, bike paths, landscaping, utilities and appurtenances. Preliminary Engineering ............... $4,000 Right of Way Acquisition ................ $ -0- Construction ...................... $53,000 TOTAL ...................... $57,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements,(CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Locallmprovement District Prioritv No.4 Pa e-11 - CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded City of Kent, LID Russell Road at West Meeker Street Traffic Signal System Install a multi-phase traffic signalization system at the intersection of Russell Road at West Meeker Street. Project will include the minor widening on West Meeker Street and reconstruction of the curb returns on the northerly side of Meeker Street. Preliminary Engineering .............. $10,000 Right of Way Acquisition ............. $10,000 Construction . . . . . . . . . . . . . . . . . . . . . $180,000 TOTAL . . . . . . . . . . . . . . . . . . . . . $200,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Prioritv No.5 Pa e-12- CITYOFKENT, WASHINGTON SIX YEAR TRANSPORT AVON IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded STP (E), City ofKent Interurban Trail Signal Improvements Interurban Trail Crossings at South 228th Street, Smith Street, and Meeker Signal Systems Install multi-phase traffic signals at the Interurban Trail crossings at South 228th Street, Smith Street, and Meeker Street similar to that system constructed at the Interurban Trail crossing at South 212th Street. Project will include the reconstruction, as required, of the concrete ramps within the sidewalk area. Preliminary Engineering .............. $30,000 Right of Way Acquisition ................ $ -0- Construction . . . . . . . . . . . . . . . . . . . . . $156,000 TOTAL ..................... $186,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.6 Pa e-13- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded U AT A, City of Kent, LID Washington Avenue (State Route 181) High Occupancy Vehicle Lanes Project Harrison Street to Green River Bridge Widen Washington A venue ( State Route 181 ) to seven lanes [ two general purpose lanes each direction, one H.O.V. lane in each direction, plus turn lanes ] from Harrison Street to State Route 516 ( Kent -Des Moines Road ), and four lanes south to the Green River Bridge, and modify the existing traffic signal systems at the intersections of Washington Avenue at West Meeker Street and Kent-Des Moines Road (State Route 516 ). Project will include the construction of full-width paving, concrete curbs, gutters and sidewalks, street lighting, storm drainage, bike paths, landscaping, utilities and appurtenances. Preliminary Engineering . . . . . . . . . . . . . $160,000 Right of Way Acquisition ............ $300,000 Construction $540,000 TOTAL .................... $1,000,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Prioritv No.7 Pa e-14- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded Pacific Highway South (State Route 99) H.O.V. Lanes Kent-Des Moines Road (State Route 516) to South 252nd Street ( Southerly City Limits ) Widen Pacific Highway South to provide a pair of High Occupancy Vehicle lanes from the Kent -Des Moines Road ( State Route 516 ) to South 252nd Street, reconstruct existing sidewalks, provide a ten-foot wide concrete sidewalk I bicycle path, and modify the existing traffic signal systems at the Kent-Des Moines Road, South 240th Street, and at South 252nd Street. Project will include paving, concrete curbs, gutters, and sidewalks, storm drainage systems, utilities, landscaping, and appurtenances. Preliminary Engineering ............. $466,000 Right of Way Acquisition ............ $500,000 Construction .................... $3,772,000 TOTAL .................... $4,688,000 STP (U), TIA, UATA, City ofKent, LID STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [ State of Washington ]; LID--Local Improvement District Priorit No.8 Page-15- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded, LID Pending City of Kent, LID 64 1h Avenue South Extension Project South 2161h Street to South 226 1h Street Construct new five-Jane roadway from South 216th Street to South 226th Street. Project will include the construction of full-width paving, concrete curbs, gutters, and sidewalks; street lighting, storm drainage, median improvements, utilities and appurtenances. Preliminary Engineering . . . . . . . . . . . . . $104,000 Right of Way Acquisition ............ $148,000 Construction .................... $1,948,000 TOTAL .................... $2,200,000 STP --Surface Transportation Program [Federal], (U} Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account. UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.9 Pa e-16- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded, Project Ongoing City ofKent Green River Valley Traffic Signal Coordination Project West Valley Highway--Kent-Des Moines Road to South 180'h Street South 180'h Street--West Valley Highway to Benson Highway Complete the design report for the Inter-agency traffic signal coordination project involving the Cities of Kent, Tukwila, and Renton, King County, and the Washington State Department of Transportation. Signal coordination recommendations to be made for West Valley Highway, from Kent-Des Moines Road to Interstate 405, and on South !80th Street from West Valley Highway to Benson Highway ( State Route 515 ), implement the recommendations, therein, and monitor the net level-of-service improvements. Administration and Analysis . . . . . . . . . . . . $5,000 Right of Way Acquisition ................ $ -0- Construction ......................... $ -0- TOTAL ....................... $5,000 STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priori tv No.1 0 Pa e-17- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded METRO, City ofKent METRO Americans With Disabilities Act Improvements Project Washington Avenue, Harrison Street, Smith Street, Lincoln Avenue Construct walkway improvements at various locations to improve disabled- person access to regional transit facilities. Project will include the construction of concrete sidewalks, and pedestrian ramps at intersections. Preliminary Engineering . . . . . . . . . . . . . . $12,000 Right of Way Acquisition ................ $ -0- Construction . . . . . . . . . . . . . . . . . . . . . $108,000 TOTAL ..................... $120,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.ll Pa e-18- CITYOFKENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PRO.JECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Southeast 240'h Street Widening Project 116th Avenue Southeast to 136'h Avenue Southeast Widen Southeast 240th Street to provide a five-lane roadway, including four general-purpose travel lanes, a center left-tum lane, and a Class II bicycle facility. Modify the existing traffic signal systems at the intersections of 132nd A venue SE, 116th A venue Southeast, and construct a new signal at the intersection of 120th A venue SE. Project will include the construction of full- width paving, concrete curbs, gutters, and sidewalks; street lighting, storm drainage, median improvements, utilities and appurtenances. Preliminary Engineering . . . . . . . . . . . . . . [ done ] Right of Way Acquisition ............. [done] Construction .................... $8,161,930 TOTAL .................... $8,161,930 Funded, Design Complete [by King County --Lead Agency} TIA, King County, City ofKent, LID STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [ State of Washington ]; LID--Local Improvement District Priorit No.12 Pa e-19- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Railroad Crossing Grade Separation Project South 212 1h Street, South 228 1h Street, .James Street, Smith Street, State Route 516 Stage 1: Conduct engineering and feasibility studies for the possible grade separations of the Burlington Northern Santa Fe and Union Pacific Railroad's main line tracks at the South 212th Street, South 228th Street, James Street, Smith Street, and Willis Street/ State Route 516. Stage II: Construct these grade separations. The project will support the increased number of trains through the City resulting from both the proposed re-opening of the BNSF's Stampede Pass line and Auburn Rail Yard, the commuter rail operations ofthe RTA, UP Railroad projected train traffic, and the planned High-Speed Passenger Rail project. Project will include the construction of bridge structures, ground-water pumping systems, full-width paving, concrete curbs, gutters, and sidewalks; street lighting, utilities and appurtenances. Preliminary Engineering . . . . . . . . . . $100,000 $10,000,000 Right of Way Acquisition ............. $ -0-$25,000,000 Construction . . . . . . . . . . . . . . . . . . . . . . $ -0-$68,000,000 TOTAL .................. $100,000 $103,000,000 STAGE I STAGE II STP ( U ), City of Kent, Regional Transit Agency, State, Burlington Northern/ Santa Fe Railroad, Union Pacific/ Southern Pacific Railroad, Port of Tacoma, Port of Seattle STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements. (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Locallmprovement District Priorit No.13 Pa e-20- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPJl0V£MENTPROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded City of Kent Americans With Disabilities Act Compliance Sidewalk Repair and Rehabilitation Program Project Reconstruct and repair existing sidewalks and pedestrian ramps, and install new hard-surfaced sidewalks to implement the requirements of the Federal Government's Americans With Disabilities Act. Project will include an inventory of the City's sidewalk/ walkway facilities, identification and correction of existing deficiencies. Project will include the construction of concrete curbs, gutters, and sidewalks; minor storm drainage, and appurtenances. Preliminary Engineering $180,000 Right of Way Acquisition $100,000 Construction $1,520,000 TOTAL $1,800,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [ State of Washington ]; LID--Local Improvement District Priorit No.14 Pa e-21- CJTYOFKENT, WASHINGTON SIX YEAR TRANSPORTAVON IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) STP (E), City of Kent Canyon Drive Bicycle and Pedestrian Facilities Project Alvord Avenue to 94th Avenue South Improve Canyon Drive ( State Route 516 ) by constructing new concrete sidewalks along the southerly side of Canyon Drive, between Alvord A venue and 94th A venue South, including widening the pavement along the southerly side ofthe roadway to provide a Class II bicycle facility. Project will include the construction of paving, concrete curbs, gutters, and sidewalks; guardrail, minor storm drainage, and appurtenances. Preliminary Engineering $50,000 Right of Way Acquisition $ -0- Construction $626,000 TOTAL $676,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.l5 Pa e-22- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PRO.JECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) STP (U), City of Kent South 212 1h Street Pavement Rehabilitation Project Green River Bridge to West Valley Highway [ SR 181 ] Remove and rehabilitate the existing roadway pavement to add additional lifespan to the roadway, between the Green River Bridge and West Valley Highway. Project will include the removal and replacement of the existing pavement in the curb travel lanes in both directions, and a full-width asphaltic concrete overlay of the entire roadway. Project will also include the selective replacement of catch basin inlets and aprons, driveways, and curbs and gutters. Preliminary Engineering $50,000 Right of Way Acquisition $-0- Construction $550,000 TOTAL $600,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.l6 Pa e-23- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded City ofKent Reith Road at 42nd Avenue South Traffic Signal System Reconstruct the existing pedestrian crossing signal at the intersection of Reith Road at 42nd A venue South to a fully-actuated traffic signalization system This project is mandated by the Federal Government's [ Federal Highway Administration] changes to the Manual of Uniform Traffic Control Devices that require the elimination of all "pedestrian" signals, or, the conversion thereof to full vehicle-signalization operation, in 1996. Preliminary Engineering $5,000 Right of Way Acquisition $-0- Construction $70,000 TOTAL $75,000 STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.l7 Pa e-24- CJTYOFKENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) UATA, City ofKent .James Street at Central Avenue Intersection Improvement Project Widen the east leg of the James Street at Central Avenue intersection to provide an exclusive right-tum lane for westbound traffic on James Street, and modify the existing traffic signalization system. Project will include the construction of paving, concrete curbs, gutters, and sidewalks; street lighting, storm drainage, utilities and appurtenances. Preliminary Engineering $25,000 Right of Way Acquisition $100,000 Construction $225,000 TOTAL $350,000 STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [ State of Washington ]; LID--Local Improvement District Priorit No.l8 Pa e-25- CITY OF KENT, WASHINGTON SIX YEAR TRANSPQRTA TION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) City of Kent, LID 132"d Avenue Southeast Widening Project Southeast 266 1h Street to Kent-Kangley Road (State Route 516) Widen 132nd Avenue Southeast to provide a five-lane roadway, including four general-purpose travel lanes, a center left-tum lane, and a Class II bicycle facility, modifying the existing traffic signal systems at the intersection of Kent-Kangley Road. Project will include the construction of interim-width paving, concrete curbs, gutters, and sidewalks; street lighting, storm drainage, median improvements, utilities and appurtenances. Preliminary Engineering . . . . . . . . . . . . . $150,000 Right of Way Acquisition ............ $200,000 Construction $650,000 TOTAL .................... $1,000,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.l9 Pa e-26- CITYOFKENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded Flexible/ Intelligent Shuttle Bus Demonstration Project Provide enhanced transit service in the Downtown Kent business area through the use of a fixed route shuttle service, with demand-responsive routing capabilities. Service route points to include Aukeen District Court, South King County Activity Center [ SKCAC ], South King County Regional Justice Center, and DSHS. Preliminary Engineering . . . . . . . . . . . . . . . . . $ -0- Right of Way Acquisition ................ $ -0- Operation and Equipment Purchase ..... $503,000 TOTAL ..................... $503,000 STP ( CMAQ ), Metro, City of Kent STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TJA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.20 Pa e-27- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded City of Kent Neighborhood Traffic Control Program -Citywide- Construct minor improvements: roadway signage and channelization, sight distance improvements, etc., in the City's residential neighborhoods to promote pedestrian and resident safety, divert non-local traffic, and encourage driver compliance with the existing traffic laws. Preliminary Engineering ............... $4,000 Right of Way Acquisition ................ $ -0- Construction . . . . . . . . . . . . . . . . . . . . . . $36,000 TOTAL ...................... $40,000 STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; T!A --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.21 Pa e-28- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded UATA, City ofKent, LID Southeast 256 1h Street Widening Project 1161h Avenue Southeast to 136 1h Avenue Southeast Widen Southeast 256th Street to provide a three-lane roadway, including two general-purpose travel lanes, a center left-tum lane, and a Class II bicycle facility. Widen to five lanes, and modify the existing traffic signal systems, at the intersections of 132nd Avenue Southeast and 124th Avenue Southeast. Project will include the construction of interim-width paving, concrete curbs, gutters, and sidewalks; paved shoulders, street lighting, storm drainage, median improvements, utilities and appurtenances. Preliminary Engineering ............. $434,000 Right of Way Acquisition ............ $928,000 Construction .................... $1,538,000 TOTAL .................... $2,900,000 STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Prioritv No.22 Pa e-29- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded STP (E), City of Kent Citywide Bicycle System Improvements Make miscellaneous improvements to the City's Bicycle Route system. Potential projects include improvements to 1 OOth A venue Southeast north of James Street, Southeast 248th Street east of 94th Avenue South, and 152nd Way Southeast, north of Southeast 272nd Street. Preliminary Engineering .............. $40,000 Right of Way Acquisition ................ $ -0- Construction ..................... $360,000 TOTAL . . . . . . . . . . . . . . . . . . . . . $400,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Prioritv No.23 Pa e-30- CITYOFKENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) 94th Avenue South at Canyon Drive ( SR 516) Traffic Signal System Install a multi-phase traffic signalization system at the intersection of 94th A venue South at Canyon Drive ( SR 516 ). Project will include pavement widening of 94th A venue South from South 248th Street to Canyon Drive ( SR 516 ), construction of sidewalks, and construction of a tum island at the intersection of Canyon Drive. Preliminary Engineering .............. $50,000 Right ofWay Acquisition ............. $10,000 Construction . . . . . . . . . . . . . . . . . . . . . $540,000 TOTAL . . . . . . . . . . . . . . . . . . . . . $600,000 STP ( U ), UATA, City of Kent, LID STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.24 Pa e-31 - CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PRO.JECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) Funded, LID Pending City of Kent, LID 72nd Avenue South Extension Project South 194 1h Street to South 196 1h Street Construct new five-lane roadway from South 194th Street to South I 96th Street. Project will include the construction of full-width paving, concrete curbs, gutters, and sidewalks; street lighting, storm drainage, landscaping, utilities and appurtenances. Preliminary Engineering . . . . . . . . . . . . . . $80,000 Right of Way Acquisition ................ $ -0- Construction ..................... $460,000 TOTAL . . . . . . . . . . . . . . . . . . . . . $540,000 STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.25 Pa e-32- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTA UONIMPROV£MENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) UATA, City ofKent Military Road Widening Project Reith Road to Kent-Des Moines Road (State Route 516) Widen Military Road to provide an interim three-lane roadway, including two general-purpose travel lanes, and a center left-tum lane, and a Class II bicycle facility at selected intersections Project will include the construction of paving, concrete curbs, gutters, and sidewalks; street lighting, utilities and appurtenances. Preliminary Engineering .............. $40,000 Right of Way Acquisition ................ $ -0- Construction . . . . . . . . . . . . . . . . . . . . . $110,000 TOTAL ..................... $150,000 STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [ State of Washington ]; LID --Local Improvement District Prioritv No.26 Pa e-33- CITY OF KENT, WASJIINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) West Meeker Street Widening Project--Phase I Kent-Des Moines Road (State Route 516) to Green River Bridge Widen West Meeker Street to provide a five-lane roadway, including four general-purpose travel lanes, a center left-turn lane, and a Class II bicycle facility, and modify the existing traffic signal system at the intersection of West Meeker Street/ Kent-Des Moines Road, and construct a second, parallel span to the existing bridge over the Green River. Project will include the construction of full-width paving, concrete curbs, gutters, and sidewalks; street lighting, storm drainage, utilities and appurtenances. Preliminary Engineering ............. $376,000 Right of Way Acquisition ............. $60,000 Construction .................... $2,130,000 TOTAL .................... $2,566,000 STP (BR), UATA, City ofKent STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.27 Pa e-34- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTATION/MPROVEMENTPROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: FUNDING SOURCE(S) STP (U), City of Kent Central Avenue Pavement Rehabilitation Project Willis Street (State Route 516) to Green River Bridge Remove and rehabilitate the existing roadway pavement to add additional lifespan to the roadway, between Willis Street ( State Route 516 ) and the Green River Bridge. Project will include the removal and replacement of the upper two inches ( 2") of the existing pavement in the curb ( #2) travel lanes in both directions, and a full-width asphaltic concrete overlay of the entire roadway. Project will also include the selective replacement of catch basin inlets and aprons, driveways, and curbs and gutters. Preliminary Engineering . . . . . . . . . . . . . . $50,000 Right of Way Acquisition ................ $ -0- Construction ..................... $550,000 TOTAL . . . . . . . . . . . . . . . . . . . . . $600,000 STP --Surface Transportation Program [ Federal ], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.28 Pa e-35- CITY OF KENT, WASHINGTON SIX YEAR TRANSPORTAVONIMPROVEMENTPROGRAM PROJECT: DESCRIPTION: PROJECT COST SUMMARY: South 2281h Street Corridor Project South 228 1h Street: Military Road to 54th Avenue South Military Road: South 228 1h Street to Kent-Des Moines Road Construct a new 5-lane roadway from Military Road to 54th Avenue South, including a bridge over the Green River, and widen Military Road from South · 228th Street to Kent-Des Moines Road [ SR 516 ]. Project will include the construction of full-width paving, concrete curbs, gutters and sidewalks, street lighting, storm drainage, bike paths, landscaping, utilities and appurtenances. Preliminary Engineering ............. $440,000 Right of Way Acquisition . . . . . . . . (post 2002) Construction (post 2002) TOTAL ..................... $440,000 FUNDING SOURCE(S) LID Pending City of Kent, LID STP --Surface Transportation Program [Federal], (U) Urban, (C) Statewide Competitive, (BR) Bridge Replacement, (E) Enhancements, (CMAQ) Congestion Mitigation/ Air Quality; TIA --Transportation Improvement Account, UATA -- Urban Arterial Trust Account [State of Washington]; LID--Local Improvement District Priorit No.29 Pa e-36-