HomeMy WebLinkAbout1345RESOLUTION NO.
A RESOLUTION of the City Council of the
City of Kent, Washington, amending Resolution
1317, adopting the Six Year Transportation
Improvement Program 1993-1998, by adding
roadway construction on 76th Avenue.
WHEREAS, the City Council, following a hearing on
July 21, 1992, passed Resolution 1317 adopting the Six Year
Transportation Improvement Program for the years 1993 through 1998;
and
WHEREAS, the City desires to include in the Six Year
Transportation Improvement Program reconstruction on 76th Avenue;
NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES
HEREBY RESOLVE AS FOLLOWS:
Section 1. Resolution No. 1317, adopting the Six Year
Transportation Improvement Program 1993-1998, is hereby amended to
include roadway construction on 76th Avenue between South 222nd
Street and South 228th street, as set forth in the attachments
hereto and herewith filed with the City Clerk.
Passed at a regular meeting of the City Council of the
City of Kent, Washington this c7-. day of n/\ CU\cA , 1993.
Concurred in by the Mayor
day of ~cJv , 1993.
ATTEST:
ITY CLERK
APPROVED AS TO FORM:
f the City of Kent, this
~ ~ '\___.~~ ----
I hereby certify that this is a true and correct copy of
Resolution No. /3'15 , passed by the City Council of the City of
Kent, Washington, the d-.... day of /J1...aA-c-t..J , 1993.
sixyear.res
2
~(SEAL)
CITY CLERK
1993-~998 6 YEAR TRANSPORTATION IMPROVEMENT PROGRA~
PROJECT SU~1MARY
City/County Kent, Washington
City No 0615
County No. 17
Hearing Date_ July 21, 1992
Adoption Date_July 21, 1992
Resolution No. 1317
============================================================================================================================!
p
r
0
r
t
y
No
PROJECT IDENTIFICATION
DESCRIPTION OF WORK
(Street name or number,
Co. road name or number,
termini beginning & end.
Describe work to be done.)
PROJECT COSTS IN THOUSANDS OF DOLLARS
1993
1 st
!Annual
!Element
FUNDING SOURCE !TOTAL OBLIGATION
SCHEDULE
Y E A R
1------------------------------!
1994 1995
!FEDERAL
'96-'98!
2 nd 3 rd 4th,5th!
Year Year and 6th!AMT
Year !
Pro-!AMi
gram!
TIA!Loca1
!FUNDS
=======================================================================================================~====================i
!S. 272nd Street/ S. 277th Street Corridor
!Auburn Way to Kent-Kangley Road
4200 5800 !10000 10000
!Construct a new four/five lane roadway from Auburn!
!Way to the Kent-Kangley Road, including a
!bridge across the Green River, and a traffic
!signal system at the intersection of the
!Kent-Kangley Roac.
2 !S. i96th/S.200th Street Corridor Project
!Orillia Road to West Valley Highway
!Widen S.200th Street from Orillia Road to
!Russell Road, ana rechannelize Russell Road/
!S. 196th Street fro~ the Green River to West
!Valley Highway.
2575 ! [8425]!
!King C!
! P ·Ius
!C~ty
3 !S. 192nd/S. 196th Street Corriaor Project 5000 2000 6000
!West Val'iey Highway to East Valiey Highway
!Construct a new four/f~ve lane roadway, incl.
!pavement widening on S. 196th Street from West
!Valley Highway to E Valley Hwy, including a new
!bridge over the Union Pa:ific and Burlington
!Northern Railroad tracks, and a traffic signal-
!ization system at the East Valley Hwy and S. 196tr.
4 !Metro Park and R~ae lc:
!Expansion of the presen: Met~c facil~ty
!locatec at SR515 and ~ilita"y Road to acccmodate
!an additional 200 to 300 vehicles.
1116 1284
4a! 76th Avenue South Asonalt Overlay/Resurfacing !336.5
!Resurface existing roadway paving on 76th Avenue
!South; includes reo1acement of failed pavement,
!reconstruction of catch basin aprons, reolacement
!of cracked curbs, ana reconstruction of cracked
!driveways.
9000
72.85 ISTA!
8140 TIA! 21860 30000
3205 TIA! [7795] ! 11000
!\ing Co!
!p1us
!C~ty
10500 TIA! 11500 22000
1920 TIA! 480 ! 2400
METRO!
!263.65 336.5
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: 76th Avenue South Asphalt Overlay/ Resurfacing
DESCRIPTION: Resurface existing roadway pavement on 76th Avenue South with asphalt overlay,
from South 228th Street to a point 0.5 miles northerly. Project includes the replacement of failed
paving, reconstruction of existing catch basin aprons, and reconstruction of existing cracked curbs
and driveways. Project also includes the replacement of the existing traffic signalization system loops
at the 76th Avenue South/ South 228th Street intersection.
SUMMARY:
Preliminary Engineering ............................. $25,500
Right of Way Acquisition ............................. $
Construction ............................................... $311,000
TOTAL .......................................................... $336,500
FUNDING SOURCE(S)
ISTEA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year
336,500
0 ~-c _....-"' ...
"' ;;: ,... ,.
:0
"' ,. . r
""' AVE
4th/5th
3rd Year & 6th Year
. .. ..
~ ,.,
72 od.
76TH AYE
TOTAL