HomeMy WebLinkAbout1317RESOLUTION NO. /317
A RESOLUTION of the City of
Kent, Washington, adopting the Six
Year Transportation Improvement
Program 1993-1998.
THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES
HEREBY RESOLVE AS FOLLOWS:
Section 1. The Six Year Transportation Improvement
Program 1993 to 1998, as set forth in the attachments hereto and
herewith filed with the City Clerk, is hereby adopted.
Passed at a regular meeting of the City Council of the
City of Kent, Washington this 0 I day of ~ kd~ , 1992.
Concurred in by the Mayo~ of the City of Kent, this OJ. ,;t. Qq.Jhr , 1992. .
(/ ' "'
day of
'., -~~ \\'--~ ~\_____,--
DAN\KELLEHER, MAYOR
ATTEST:
~~--&-)
BRENDA JACOBER,( CI
APPROVED AS TO FORM:
I hereby certify that this is a true and correct copy of
Resolution No. !3 I 1 , passed by the City Council of the City of
Kent, Washington, the 02..( day of ~ , 1992.
trans imp. res
2
CLCt~ (SEAL)
CITY CLERK
CITY OF J<ENT
SIX YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
1993 -1998
Don E. Wickstrom, P.E.
Uirector of Public Works
CI1Y OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
1993 THROUGH 1998 PROJECT USTING
FIRST YEAR
ANNUAL ELEMENT 1993
1 272nd/277th Street-Auburn Way to Kent-Kangley Road
2 196th/200th Street Corridor Project (West Leg)
3 192nd/196th Street Corridor Project (Middle leg)
4 Metro Park and Ride Lot
5 Canyon Drive Median Barrier
6 S.E. 260th Street at 104th Avenue S.E. Intersection
Improvements
7 76th Ave S. at S. 212th Street Intersection Improvements
8 Reith Road/Meeker Street at Kent-Des Moines Road
Intersection Improvements
9 ?2nd Ave S. at S. 212th Street Intersection Improvements
10 Central Avenue at S. 259th Street Intersection Improvements
11 Central Avenue at SR 167 Signal Improvements
12 Central Avenue -Willis Street to Smith Street
13 ?2nd Ave S. -S. 194th Street to S. 196th Street
14 S. 212th Street-West Valley Hwy. to SR 167
15 Commute Trip Reduction
16 S.E. 256th Street-Kent-Kangley Road to 116th Ave. S.E.
17 Crow Road By-Pass (SR 516)
18 Valley Signal Coordination
19 64th Ave. S.-S. 216th Street to S. 226th Street
20 James Street Safety Improvements (incl. 100th Ave. S.E. at
S. 240th Street Signal Improvements)
21 VMS Upgrade
22 Neighborhood Traffic Control Program
23 West Valley Hwy. -S. 180th Street to S. 189th Street
23a West Meeker Street-SR 516 to West Valley Highway
SECOND/THIRD YEAR 1994 -1995
24 Lincoln Avenue at James Street Traffic Signal
25 James Street at Central Avenue Intersection Improvements
26 Kent-Kangley Road at lllth Avenue S.E. Intersection
Improvements
27 Smith Street at 4th Avenue Intersection Improvements
28 Willis Street at 4th Avenue Signal Modifications (1995)
29 James Street -Jason Avenue to 94th Avenue S.
30 Lind Avenue-S. 180th Street to East Valley Hwy.
FOURTH/FIFTH/SIXTH YEAR 1996, 1997, 1998
31 S. 224th Street/S. 228th Street Corridor Project (West Leg)
32 S. 192nd Street/S. 196th Street Corridor Project (East Leg)
33 N. Central Avenue at Smith Street Intersection
Improvements
34 94th Avenue South-Canyon Drive to James Street
35 248th Street -94th Ave S.E. to 116th Ave. S.E.
36 84th Avenue South-S. 212th St. to SR 167
37 James Street at 104th Ave S.E. Acceleration Lanes
38 72nd Avenue S. -S. 196th Street to S. 200th Street
1993-1998 6 YEAR TRANSPORTATIO~ IMPROVEMENT PROGRA~
)~:>::;· ':v'••i -:•
City/County Kent. Washingtor
City No 0615
Countv Nc. 17
Hearing Date ______________ _
Adoption Date _____________ _
============================================================================================================================~
D
0
t
y
Nc
PROJECT IDENTIFICATION
DESCRIPTION OF WORK
(Street name or number.
Co. road name or numoer.
term~ni beginning & end.
Describe work to be done.)
PROJECT COSTS IN THOUSANDS OF DOLLARS
FUNDING SOURC~ !TOTA~ OBLIGATION
SC14EDULE ~------------------------------1 . .
Y E A R ! FEDERA~ ! FUNDS
1993 1994 1995 '96-'98!
1 st 2 nc 3 rd 4th,5th! Pro-!AMT
!Annual Year vear and 6th!AMT gram!
Yea~ !
============================================================================================================================!
1 !S. 272nd Street/ S. 277th Street Corrido~
!Auburn Way to Kent-Kangley Road
!Construct a new four/five 1ane roadway from Auburn!
!Way to the Kent-Kangley Road. including a
!bridge across the Green River, and a traffic
!signal system at the intersection of the
J Kent-Kang ·ley Roac.
2 !S.196th/S.200th Street Co"rido~ Project
!Orillia Road to West Valley Highway
!Widen S.200th Street from Orillia Road tc
!Russell Road. ana rechannelize Russell Roaa/
!S. 196th Street from tne Green River to West
! Va 11 ey Highway.
!S.192nd/S.196th Street Corridor Project
!West Valley Hignway to East Va1.iey Highway
!Construct a new four/five lane roadway, incl.
!pavement widening on S.196th Street from West
!Valley Highway to E Valley Hwy, incluaing a new
!bridge over the Union Pacific and Burlingto~
!Northern Railroad tracks, and a traffic signal-
!ization system at tne East Valley Hwy and S.196t~
4 !Metro Park and Ride lo:
!Expansion of the present Metro facility
!located at SR516 and Military Road tc accomodate
!an additional 200 to 300 vehicles.
5 !Canyon Drive Median Barrier
!Extend the existing concrete median barrier or
!Canyon Drive from its current terminus near
!Weiland Street to 101st Ave SE: and widen Canyor
!Drive. including: pavement. curbs and gutters, and!
!siaewc:'k.
4200 5800 !10000 10000
2575 ! [8425]!
!1\.inq C!
! p'lus
!City
5000 2000 5000
1116 1284
.300 1200
9000
!Doimary!
!Alternat 1200 JSTA!
8140 TIA! 21860 30000
3205 TIA![7795J ! 11000
!King Co!
!plus
~City
10500 TIA! 1 1500
1920 TIA! 480 !
METRO!
1200 UAT! 300
300
22000
240C
1500
or
'500
1993-1998 6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARv
City/County Kent. Washingtor
City No 0615
County No. 17
Hearing Date ______________ _
Adoption Date _____________ _
Resolution Nc.
============================================================================================================================'
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE ! TOTA!_
0 SCHEDULE '------------------------------'
n
' (Street name or number.
Co. road name or number.
termini beginning & end.
Y E A R ! FEDERAL ! FUNDS
1993 1994 1995 '96-'98!
1 st 2 nd 3 rd 4th.5th 1 Pro-!AMT TIA!Loca 1
y Describe work to be done.) 1 Annual Year Year and 6th!AMT gram!
No ! E'lement Yea~ ! .
============================================================================================================================'
!SE 260th Street at 104th Ave SE lntersectior
! Improvements
!Construct minor widening on 104th Ave SE to provid 1
~a separate left turn lane on 104th Ave SE. and
!install a new traffic signalization svstem.
!76th AvenueS at S 212th Street Intersection
! Improvements
!Reconstruct the channelization en the southeast
!and southwest corners of the intersection to
!construct of an additional left tur~ lane.
8 !Reith Road/ Meeker Street at Kent-Des Moines
!Read Intersection Improvements
!Widen Reith Road/ Meeker Street: reconstruct the
!channelizing islands on the northwest. nortneast.
!and southeast corners of the intersection: and
!modify the traffic signalization system.
!72nd AveS. at S 212th Street intersection
! I mpr ovemen t s
!Widen oavement to permit construction of a right
!tur~ lane on the northeast corner of the inte~
!section.
1 0 !Central. Ayenue at S. 259th Street Intersection
!Improvements
!Installation or a traffic signalization system.
350
50
45
100
180
'1 !Central Avenue at SR 167 Traff~c Signal Improvemen! 40
!Construct improvements to the traffic siaanlizatio!
'system(s) at the SR 167 ramos to Centra~ Avenue.
!PrQiect inc~udes revisions to provide protective/ 1
1 oermissive ]eft turn pnasing, replacement of the
!WSDOT t~affic signal controllers with Citv of Kent!
!standard equipment. and interconnection.
10 ~~mary!
!Alternate
140 ISTA! 210 UAT! 350
HES
35 ISTAI 50
12 ISTA! 45
83 JSTA! 11 . ' 1QQ
33 UAT! 17 '00
150 ISTA! 30 180
33 ISTA! 40
1993-1998 6 YEAR TRANSPORTATION IMPROVEMENT PROGRA~
DROJECT SUMMARY
City/County Kent, Washinato~
City No 0615
CountY No. 1"
Hearing DatE ______________ _
Adoption Date _____________ _
Resolution lie.
============================================================================================================================I
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTAL
SCHEDULE !------------------------------!
(Street name or numbe~.
Co. road name or number.
termini beginning & end.
Y E A R ! FEDERAL ! FUNDS
t
y
No
Describe work to be done. l
1993 1994 1995 '96-'98!
1 st 2 nd 3 rd 4th.5th 1 Pro-!AMT TIA!Loca1
!Annual Year Year and 6th!AMT gram!
!Element Yea~ !
============================================================================================================================!
12 !Central Avenue -Willis Street to Smith Street
!Widen Central Avenue to provide left turn lanes
!from Gowe Street to Titus Street. and right turr
!lanes at Smith Street and E. Gowe, and reconstruct!
!the traffic signalization svstem at the Central
'Avenue intersection with E. Gcwe.
854
'3 !?2nd Ave South-S. 194th Street to S. 196th Stree! 390
!Construct new two iane roadway fro~ S. 194th St.
!to S. 196th Street.
150
:4 !S. 212th Street -West Valley Highway to SR 161
!Widen existing roadway to add HOV lanes fro~
!West Valley Hwy to SR 167. Includes $200,000 for
!HOY studv in 1993 Annual Element
200*! 1000 ! 3000 !Project!
1* (HOV Study)
15 !Commute Trio Reduction
!Prepare parking policy review oer the Nashington
!State Commute Trip Reduction ·iaw. incl. review
!~f supply, cost, and design guidelines; and
!administrative processes.
25
16 !SE 256th Street-Kent-Kangley Road to 116th Ave SE! 2900
!Widen existing roadway from Kent-Kangley Road to !
! 116th Ave SE.
17 !Crow Road By-pass -97th P.l S, SE 260th Street.
1and 108th Ave SE
!Widen existing roadways, from Canyon Drive throuar!
!to the Kent-Kangley Road, including traffic signal!
!-ization svstem at the 108th Ave SE intersectior
!with the Kent-Kangiey Road.
1 8 !Valley Signal Coordination
!Design report for interagency signal coordinatior 1
!on West Valley Hwy. and S 180th Street. Coordinate!
!with Tukwila. Renton. WSDOT. and King Cc.
1000
628 UAT! 226
540
2200 ISTA! 1800
160 ISTA! TIA/UATA! 40
20 ISTA! 5
1450 UAT! 1450
600 UAT 1 400
854
540
1000
200 !
25
2900
1000
5
1993-1998 6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
Sity No 0615
County No. 17
Hearing Date ______________ _
Adoption Date _____________ _
Resolution No.
============================================================================================================================!
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
0
t
y
DESCRIPTION OF WORK
(Street name or numoe~.
Co. road name or number.
termini beginning & end.
Describe work to be dane. l
1993
1 st
:Annual
OBLIGATION
SCHEDULE
y E A R
1994 1995
2 nd 3 rd
Year Year
FUNDING SOURCE !TOTA~
1------------------------------1 . .
!FEDERAL
'96-'98!
4th. 5th!
and 6th!AMT
Pra-!AMT
gram!
!FUNDS
TIA! Lac a 1
No ! E·iement Yea~ '
============================================================================================================================!
19 !64th AveS. -S 216th S~ree: :8 5 226th Street
!Construct a new four lane rcacway ~-o~ 5 2'5:~
!Street to S 226th Street.
20 !James Street Safety Improvements -Central Avenue
!to 94th Ave S
!Construct pedestrian safety improvements ajon~
!James Street tS 240th Street) from Centra1 Avenue
!to 94th Avenue S. and modify the traffic signa~
!~zation system at the James Street intersection
!with 100th Ave SE.
21 !VMS System Update
!Replace the City's Master Traffic Signal Control
!computer with a new computer system.
22 !Neighborhood Traffic Control Program (City-Wide)
!Modify local residential streets to promote safe !
!and appropriate levels of traffic flows.
23 !West Valley Highway-S 180th Street to S 189th
!Street
!Widen West Valley Highway to seven lanes tram So.
!180th Street to S 189th Street, including moaif-
!ications tc the traffic signalization systems.
2200
300 50
25 140
20 20 20
250 750 1700
60
270 HES I
42 ISTAJ
137 ISTA!
108 HES
2200
30
8
28
12
2160 UAT! 540
2200
300
50
165
120 !
2700 I
----------,------------------------------------------------------------------------------------------------------------------
23a!West Meeker Street-SR 516 (Kent-Des Moines Road)! 4000 2000 1500
!to West Valley Highway
!Widen Meeker Street to five lanes from SR 515
!(Kent-Des Maines Road) to West Valley Hwy. includi!
!replacing the existing bridge across the Green Riv 1
24 !Lincoln Avenue at James Street Traffic Signa~
:Install traffic signalization system at the
!Lincoln Avenue at James Street intersection. incl.!
!vehicle detection. and interconnection to the
!existing pedestriar and railroad crossing systems. 1
130
4000 ISTA! 2000 TIA! 1500
130 !
!(METRO)!
7500
1 993-1998 6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARv
City/County Kent. Washington
City No 0615
Hearing Date ______________ _
Adoption Date _____________ _
County No. 17 Resolution No.
============================================================================================================================!
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
~
DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTAL
0 SCHEDULE 1------------------------------1 . .
r (Street name or number. y E A R !FEDERAL ! FUNDS
Co. road name or number. 1993 1994 1995 '96-'98!
t termini beginning & end. 1 st 2 nd 3 rd 4th.5th! Pro-!AMT TIA! Local
y Describe work to be done.) !Annual Year Year and 6th!AMT gram!
No ! E-lement Yea~ !
============================================================================================================================!
25 !James Street IS 240th Street) at Central Avenue
!Intersection Improvements
!Widen intersection to construct a right turn lane
!for westbound traffic.
26 !Kent-Kangley Road at 111th Avenue SE Intersection !
!Improvements
!Install traffic signalization interconnection cabl!
!between the 104th Ave SEat SE 256th Street
!and the Kent-Kangley Road at 111th Ave SE
! intersections.
27 !Smith Street at S 4th Avenue lntersectior
! Improvements
!Widen Smith Street and S 4th Avenue to provide
!exclusive left turn 1ane channelization. modify th!
!existing traffic signalization system to provide
!protected left turn phasing, and improve the curb !
!return radii for right turning vehicles.
28 !Willis Street at S 4th Avenue Signal Modifications!
!Modify the existing traffic signalization system
!at the Willis Street (SR 5161 at S 4th Avenue
!intersection.
29 !James Street -Jason Avenue to 94th Ave S
!Widen pavement to provide exclusive le't turn lane!
!along James Street from Jason Street to 94th AveS!
30 !Lind Avenue-S 180th Street to East Valley Hwy
!Construct new fi\'e ·lane roadway from S 180th St
:to East Valley Hwy.
350 !Primary!
!Alternate
15
500
25
:ooo
:soo
280 ISTA! 70 350
250 UAT! 100 350
12 ISTA! 3 15
416 ISTA! 84 500
21 ISTA! 4 25
900 UAT 100 1000
750 TIA! 750 1500
1993-1998 6 YEAR TRANSPORTATION IMPROVEMENT PROGRA~
PROJECT SUMMARY
City/County Kent. Washington
City No 0615
County No. 17
Hearing Date ______________ _
Adoption Date _____________ _
Resolution No.
============================================================================================================================!
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
0
r
t
y
No
DESCRIPTION OF WORK
(Street name or number.
Co. road name or number,
termini beginning & end.
Describe work to be done.)
1993
1 st
!Annual
!Element
OBLIGATION
SCHEDULE
y E A R
1994 1995
2 nd 3 rc
Year Year
FUNDING SOURCE !TOTAL
1------------------------------1 . .
!FEDERA~
'96-'98!
4th, 5th!
and 6th!AMT
Year !
!FUNDS
Pro-!AMT TIA!Local
gram!
============================================================================================================================!
31 !S 224th/ S 228th Street Corridor Project
! S 228th Street -Military Road to 54th AveS
! Military Road -S 228th St to Kent-Des Moines
!Construct a new four/five lane roadway from
!Military Road to 54th AveS, including a new bridg!
!across the Green River, and widen Military Read
!from S 228th Street to Kent-Des Moines Road.
32 !S 192nd/S 196th Street Corridor Project -
!East Valley Highway (SR 181) to 92nd Ave S
!Construct new four/five lane roadway, including
!pavement widening to S 196th Street from East Vall!
!Hwy to 92nd Ave S. including a new bridge over the!
!Valley Freeway (SR 167).
33 !N Central Avenue at Smith Street Intersection
!Improvements
!Widen pavement to construct an additional left tur!
!lane. and modify the existing traffic signalizatio!
!system.
34 !94th Ave S -Canyon Drive to James Street
!Widen 94th Ave S to a three lane roadway from Jame!
:Street to Canyon Drive.
35 !SE 248th Street -94th Ave SE to 116th Ave SE
!Widen SE 248th Street to three lanes from 94th Ave!
!SE to 116th Ave SE.
36 !84th AveS -S 212th Street to SR 167
!Widen 84th Ave S to seven lanes from S 212th Stree!
!to SR 167.
37 !James Street at 104th Ave SE Acceleration Lanes
!Construct an acceleration lane for eastbound traft! 1along James Street (S 240th Street) from 104th Ave!
!SE. easteriy a distance of 600 feet.
9558
8749
500
300
2000
2950
7646 TIA! 1912 9558
6999 TIA! 1750 8749
499 ISTA! 101 600
640 UAT! 160 800
1600 UAT! 400 2000
2360 UAT! 590 2950
125 25 150
1993-1998 6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
Hearing Date ______________ _
Adoption Date _____________ _
Resolution No.
============================================================================================================================!
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTA~
0
r
SCHEDULE 1------------------------------1 . .
t
y
No
(Street npme or number.
Co. road name or number,
termini beginning & end.
Describe work to be done.)
!993
1 st
!Annual
!Element
y E
1994
2 nd
Year
A R
1995
3 rd
Year
!FEDERAL
'96-'98!
4th, 5th!
and 6th!AMT
Yea~ !
Pro-!AMT
gram!
! FUNDS
TIA! Local
============================================================================================================================!
38 !72nd AvenueS-S 196th Street to S 200th Street
!Construct a new two lane roadway from S 196th
!Street to S 200th Street.
!TOTAL PROJECT COSTS (Primary Funding on
Project Numbers 5, 9, and 25:
U:t::I:**OR******
!TOTAL PROJECT COSTS (Alternate Funding on
Project Numbers • 9. and 25) "•
!26125
! or
!26125
540 540 540
!25154 !23395 44407 9643 53808 55640 119091
! or ! or or or or or or
!25164 !23395 44407 10480 52941 55670 !19091
-----------------------------------------------------------------------------------------------------------------------------
·gg3 199.1
1 st 2 nc
.~nnua 1 Year
Element
l0_1 0oOE10h12vsb3Tl3aOE11oOE10h12vsb3T 1 1X2064D46W@$&-fPc
1995 '96-'98
3 rd 4th.5th
Year and 6th
Year
CIIT OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: S.272nd /S.277th Street Corridor Project-Auburn Way to Kent-Kangley Road
DESCRIPTION: Construct a new four/five lane roadway from Auburn Way to the Kent-Kangley Road,
including a new bridge across the Green River, and a traffic signal system at the intersection with
the Kent-Kangley Road. Project will include construction of full width paving, curbs and gutters,
sidewalk, street lighting, and street channelization.
COST SUMMARY:
Preliminary and Design Engineering ..... $ 1, 900,000
Right of Way Acquisition ......................... $ 4,600,000
Construction ........................................... $ 23,500,000
TOTAL ...................................................... $30,000,000
FUNDING SOURCE(S)
TIA, LID, CIIT
PROJECT COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year
4,200,000 5,800,000 10,000,000
Jr~:,_,.,.lf:~~·s,f.J
10,000,000 "'ot~,.J?n
TOTAL
---;rr~-~---n-\-B~g~n-AI-Ign-me~i~ ----.---=---~-=--c----~---LL,_--'--!~~~~d--,---.----.---.+---"-!1-...,~-rl
-~~~ STA. 10.00
~~~~~~~~~~ c;\;,
\) c
)\ II nilC,1 ~~~,~·,_•,_~-~ -~
~,,\•,or-
~.
""'· ~
PROJECT 1
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: S.196th/S.200th Street Corridor Project-Orillia Road to West Valley Highway
(WEST LEG -192nd/196th/200th Street Corridor Project)
DESCRIPTION: Widen S. 200th Street from Orillia Road to Russell Road, and construct a new bridge
over the Green River, and widen/rechannelize Russell Road/S. 196th Street from the Green River
to West Valley Hwy. Project will include the constmction of full width paving, curbs and gutters,
sidewalk, street lighting, landscaping, grading, and channelization .
NOTE: This is a joint project with King County
SUM:MARY:
CITY KING COUNTY
Preliminary and Design Engineering ..... $ 390,000
Right of Way Acquisition ........................ $1,185,000
Constmction .............................................. $4,000,000
TOTAL ...................................................... $5,575,000 $5,425,000
TOTAL PROJECf COST ····························-············· $11,000,000
FUNDING SOURCE(S)
TIA, LID, CITY, COUNTY
PROJECf COST:
First Year
ANNUAL ELEMENT
2,575,000
2nd Year 3rd Year
4th/ 5th
& 6th Year TOTAL
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: S.192nd/S.196th Street Corridor Project-West Valley Highway (SR181) to East Valley
Highway
(MIDDLE LEG-S.l92nd/S.l96th/S.200th Street Corridor Project)
DESCRIPTION: Construct new four/five lane roadway, including pavement widening to S. 196th
Street from West Valley Highway to 72nd Ave. South, including a new bridge over the Union Pacific
and Burlington Northern Railroad tracks, and a traffic signalization system for the intersection of
East Valley Highway at S. 196th Street. Project will include the construction of full-width pavement,
curbs and gutters, sidewalks, street lighting, landscaping, and channelization.
SUMMARY:
Preliminary and Design Engineering ...... $ 1,500,000
Right of Way Acquisition .......................... $ 4,700,000
Construction $15,800,000
TOTAL ...................................................... $22,000,000
FUNDING SOURCE(S)
TIA, LID, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT
5,000,000
2nd Year
2,000,000
3rd Year
6,000,000
PROJECT 3
4th/5th
& 6th Year
9,000,000
TOTAL
22,000,000
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: Metro Park and Ride Lot
DESCRIPTION: Expansion of the present Metro facility located at SRS16 and Military Road to
accommodate an additional 200 to 300 vehicles
SUMMARY:
Preliminary and Design Engineering ..... $ 400,000
Right of Way Acquisition ......................... $
Construction $2,000,000
TOTAL ..................................................... $2,400,000
FUNDING SOURCE(S)
TIA, METRO
PROJECT COST:
First Year
ANNUAL ELEMENT 2nd Year
1,116,000
H/CHL/NE
C 0/"1/"IUN IT r
rrfl 1 .e-re-
1,284;000
3rd Year
-----------..,;r
PROJECT 4
4th/5th
& 6th Year
LflNOF ILL
TOTAL
2,400,000
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: Canyon Drive Median Barrier
DESCRIPTION: Extend the existing concrete median barrier on Canyon Drive, from near Weiland
Street to 101st Ave SE. Project will include the construction of a concrete median barrier; pavement
widening to accomodate the barrier; and curbs, gutters, and sidewalks.
SUMMARY:
Preliminary and Design Engineering ..... $ 200,000
Right of Way Acquisition .......................... $ 100,000
Construction ........................................... $ 1,200,000
TOTAL ....................................................... $ 1,500,000
FUNDING SOURCE(S)
ISTEA, HES, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT
300,000
2nd Year
1,200,000
3rd Year
PROJECT 5
4th/ 5th
& 6th Year TOTAL
-_.
·-2.-"
"' >
<(
1,500,000
-0-.
a:.: ..,
0
SE 252NC
ST
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: SE 260th Street at 104th Avenue SE Intersection Improvements
DESCRIPTION: Construct minor widening on 104th Ave SE to provide a separate left tum lane on
northboun_<il04th Avenue SE, and install a new traffic signalization system. Project will include the
construction of pavement, curbs and gutters, and sidewalks.
SUMMARY:
Preliminary and Design Engineering ..... $ 52,000
Right of Way Acquisition ......................... $
Construction $ 298,000
TOTAL ...................................................... $ 350,000
FUNDING SOURCE(S)
TIA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year
350,000
:111 ~ MAPLE ST
KENT
1ETE!Ir
1111111111111~
illlllllllllllllllll~
iu111n11m.lie.fN I C II ILL
~ ELE] SCHaff£
PROJECT 6
SEOU/JI/1 §JR.
11/CII SCII~L
TOTAL
350,000
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: 76th Avenue S. at S. 212th Street Intersection Improvements
DESCRIPTION: Reconstruct the channelization on the southeast and southwest comers of the
intersection to permit the construction of an additional northbound left tum lane.
SUMMARY:
Preliminary and Design Engineering ..... $ 8,000
Right of Way Acquisition ................ $
Construction $ 42,000
TOTAL ..................................................... $ 50,000
FUNDING SOURCE(S)
ISTEA, CITY
P~OJEq COST:
First Year
ANNUAL ELEMENT
50,000
tJ'BRIEN
ELEff.
2nd Year 3rd Year
4th/5th
& 6th Year TOTAL
50,000
!TH ST SCHtJ(JL
212TH ST
UJ
> a:
:r .....
"' "' 216TH ST
w
> a:
0 z
"' ,..
UJ
> a:
:r ...
PROJECT 7
S 216TH ST
\ 2!8TH ST
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Reith Road/ Meeker Street at Kent-Des Moines Road Intersection Improvements
DESCRIPTION: Widen Reith Road/ Meeker Street; reconstruct the channelizing islands on the
northwest, northeast, and southeast comers of the intersection; and modify the traffic signalization
system. Project will include pavement widening, and channelization modifications.
SUMMARY:
Preliminary and Design Engineering ..... $ 5,000
Right of Way Acquisition ......................... $
Construction $ 40,000
TOTAL ..................................................... $ 45,000
FUNDING SOURCE(S)
ISTEA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT
45,000
2nd Year 3rd Year
PROJECT 8
4th/ 5th
& 6th Year
11/VEIIBENO
CrJLF CrJUf/5E
TOTAL
45,000
I
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: 72nd Ave. S at S 212th Street Intersection Improvements
DESCRIPTION: Widen pavement to permit construction of a right tum lane on the northeast comer
of the intersection.
SUMMARY:
Preliminary and Design Engineering ..... $ 20,000
Right of Way Acquisition ......................... $
Construction ........................................... $ 80,000
TOTAL ...................................................... $ 100,000
FUNDING SOURCE(S)
ISTEA, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/5th
& 6th Year
100,000
lU
> a:
-.... ··--· :c
"' u.J ,.
a:
:t: ....
r
r
PROJECT 9
S 2l6TH ST
TOTAL
100,000
2l2TH ST ~ ~=====~{
2l8TH !
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Central Avenue at S 259th Street Intersection Improvements
DESCRIPTION: Installation of traffic signalization system. Project includes installation of street
lighting, and channelization modification.
SUMMARY:
Preliminary and Design Engineering ..... $ 14,000
Right of Way Acquisition ......................... $
Construction ........................................... $ 166,000
TOTAL ...................................................... $ 180,000
FUNDING SOURCE(S)
ISTEA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year
180,000
(J
"',
w' >
C[
w > cr
....
Ill
3rd Year
PROJECT 10
4th/ 5th
& 6th Year
I(ENT
CE!tETERT
TOTAL
180,000
illlllfllll!llllllll~
""o ~
(-9-1-
5CEN/C IfiLL c
?RRK '
~lllllllllii!.M".fN/C Iff
ELE-~ SCHO
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Central Avenue at SR 167 Traffic Signal Improvements
DESCRIPTION: Construct improvements to the traffic signalization system(s) at the SR 167 ramps
to Central Avenue. Project includes revisions to provide protective/permissive left tum phasing,
replacement of the WSDOT traffic signal controllers with City of Kent standard equipment,
interconnection to the City's Master Traffic Control System, and interconnection to the adjacent
traffic signals at S. 224th Street and S. 228th Street
SUMMARY:
Preliminary and Design Engineering ..... S 12,000
Right of Way Acquisition .......................... $
Construction ........................................... $ 28,000
TOTAL ...................................................... $ 40,000
FUNDING SOURCE(S)
ISTEA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year
40,000
w
S 22BTH Sf ST
~ w
> a:
0 z
N w
> cr
TOTAL
40,000
"' w
> cr -i=l
~I
s 22BTH -1111111111111111111
"' 1\1!111111111\1111~ w
> cr -J:
I ~
--~
t ....
tD -"'
z l
UJ \0 , > :t: cr >-;;/ ro :r: NOVAC LN "'' >-) tD ) z _f S 232NO
PROJECT 11
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Central Avenue -Willis Street to Smith Street
DESCRIPTION: Widen to provide left turn lanes from Gowe Street to Titus Street, and right turn
lanes at Smith Street and East Gowe, and reconstruct traffic signalization system at the Central
Avenue intersection with Gowe Street. Project will include construction/reconstruction of paving,
curbs and gutters, sidewalk, street lighting, storm drainage, street channelization, and landscaping.
NOTE: Project construction in progress -Summer 1992
SUMMARY:
Preliminary and Design Engineering ..... $ 43,000 (Not included in 1993 Annual Element)
Right of Way Acquisition ......................... $210,000 (Not included in 1993 Annual Element)
Construction ........................................... $ 854,000
TOTAL ...................................................... $1,107,000
FUNDING SOURCE(S)
TIA, CITY, STATE
PROJECf COST:
First Year
ANNUAL ELEMENT
854,000
(Construction Cost Only) J I
Jo
2nd Year 3rd Year
PROJECT 12
4th/ 5th
& 6th Year TOTAL
CIIT OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: 72nd Avenue S -S 194th Street to S 196th Street
DESCRIPTION: Construct new two lane roadway from S 194th Street to S 196th Street.
Project will include the construction of full-width paving, curbs and gutters, sidewalks, street
lighting, channelization, grading, and landscaping.
SUMMARY:
Preliminary and Design Engineering ..... $ 80,000
Right of Way Acquisition ......................... $ 216,000
Construction ............................................ $244,000
TOTAL ...................................................... $ 540,000
FUNDING SOURCE(S)
CIIT
PROJECT COST:
First Year
ANNUAL ELEMENT
390,000
2nd Year
4th/5th
3rd Year & 6th Year
150,000
w~
0
If
"' w
;..
0::
"' ,_.I ~
PROJECT 13
TOTAL
540,000
LJ [:J
>-:r
"'
UJ ....
> w
.JI 0: .J .... 0:
"' >
"' w
rl
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: S. 212th Street -West Valley Highway to SR 167
DESCRJPTION: Widen existing roadway to add HOV lanes from West Valley Highway (SR 181) to
SR 167, and modify traffic signalization systems at 84th Avenue S and SR 167. Project will include
the construction of full width paving, curbs and gutters, sidewalks, street lighting, traffic
signalization system modification, underground utilities, street channelization, and landscaping. The
Annual Element reflects a joint HOV Needs/ Feasibilty Study with King County for HOV on this
route; from I-5, past SR's 181 and 167, through to SR 515.
SUMMARY:
Preliminary and Design Engineering ..... $ 600,000
Right of Way Acquisition ......................... $
Construction ............................................ $ 3,600,000
TOTAL ...................................................... $ 4,200,000
FUNDING SOURCE(S)
TIA, LID, CITY, COUNTY
PROJECT COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year TOTAL
200,000 1,000,000 3,000,000 4,200,000 . ·--I J S~ST
5 2t5TH ST
1r
PROJECT 14
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Commute Trip Reduction
DESCRIPTION: Prepare the parking policy review per the Washington State Commute Trip
Reduction law; including a review of the City's parking supply, parking costs, and parking design
guidelines; and implement policies to encourage reductions in commuter trips.
COST SUMMARY:
Administration and Analysis Costs ........... $ 25,000
TOTAL ...................................................... $ 25,000
FUNDING SOURCE(S)
ISTEA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT
25,000
2nd Year 3rd Year
PROJECT 15
4th/ 5th
& 6th Year TOTAL
25,000
=
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: SE 256th Street -Kent-Kangley Road to 116th Ave SE
DESCRIPTION: Widen existing roadway from the Kent-Kangley Road to 116th Avenue SE. Project
will include widening of the existing 2 lane roadway to 5 lanes with pavement, curbs and gutters,
sidewalks, street lighting, street channelization, and landscaping.
SUMMARY:
Preliminary and Design Engineering ..... $ 434,000
Right of Way Acquisition ......................... $ 928,000
Construction ............................................ $ 1,538,000
TOTAL ...................................................... $ 2,900,000
FUNDING SOURCE(S)
TIA, LID, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year TOTAL
2,900,000
UJ
UJ G > a: "' :c UJ
" 5 2S2ND ST .... >
=r a:
-::P :::: "' z
<T\ ....
"' ~=~ ~ w w w "'I "' "' KENT "'' w ~I > f!ER!OIRN a:
H!CH SCHOOL EflST
~
ST
PROJECT 16
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Crowe Road By-Pass -97th Place S, SE 260th Street, and 108th Ave SE
DESCRIPTION: Widen existing roadways, from Canyon Drive through to the Kent-Kangley Road,
including traffic signalization system at the 108th Ave SE intersection with the Kent-Kangley Road.
Project will include the installation of pavement to improve the turning radii at the 97th Place SE
and Canyon Drive, and SE 260th Street and 108th Ave SE intersections; curbs and gutters,
sidewalks, street lighting, street channelization, and grading.
SUMMARY:
Preliminary and Design Engineering ..... $ 150,000
Right of Way Acquisition ......................... $ 167,000
Construction ............................................ $ 683,000
TOTAL ...................................................... $ 1,000,000
FUNDING SOURCE(S)
TIA, DEVELOPER, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year TOTAL
1,000,000
trENT
CEtfETERf
EIJIIJIIIIIIIIIIIIIIIIIIIIIIIII
MAPLE ST
illlllllllli!IIIJIII~
iuuuuJuuh!i'.fNIC HJL L
ELE,SCHOm
KENT
HERJOJRN
HJCH SCHOOL E/?51
1,000,000
5EOU(Jff1 §/R.
H!CH 5CHrL
&u~1 1JUitlnm«.1
1
1111111111111111111111111111111111111i
PROJECT 17
CI1Y OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: Green River Valley Signal Coordination Project
DESCRIPTION: Prepare the design report for an interagency signal coordination project between the
City of Kent with the Cities of Renton and Tukwila; the Washington State Department of
Transportation, and King County. Signal coordination recommendations to be made for the traffic
signalization systems on West Valley Hwy between SR 516 and I-405, and on S 180th Street (SW
43rd) bet<.veen West Valley Hwy and . Report to recommend necessary equipment modifications
to accomodate proposed coordination measures, and potential funding sources for these
modifications.
COST SUMMARY:
Administration and Analysis Costs ........... $ 5,000
TOTAL ...................................................... $ 5,000
FUNDING SOURCE(S)
CI1Y
PROJECT COST:
First Year
ANNUAL ELEMENT
5,000
2nd Year 3rd Year
PROJECT 18
4th/ 5th
& 6th Year TOTAL
5,000
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: 64th Avenue S. -S. 216th Street to S. 226th Street
DESCRIPTION: Construct a new four lane roadway from S. 216th Street to S. 226th Street. Project
will include full-width paving, curbs and gutters, sidewalks, street lighting, street channelization,
and landscaping.
SUMMARY:
Preliminary and Design Engineering ...... $ 104,000
Right of Way Acquisition ......................... $ 148,000
Construction ............................................. $ 1,948,000
TOTAL ...................................................... $ 2,200,000
FUNDING SOURCE($)
LID
PROJECT COST:
First Year
ANNUAL ELEMENT
2,200,000
2nd Year 3rd Year
l
~
4th/ 5th
& 6th Year
S Jl-;~·6TH S T
Lf?COON I ~ ill s
,_I 220TH ST
,--
w
..J
..J cr
>
::<
1
-11 ~ S 226TH ST
lr=4l
PROJECT 19
TOTAL
2,200,000
J
"'
UJ
> a:
:r: ....
1.0 ,...
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: James Street Safety Improvements -Central Avenue to 94th Avenue S.
DESCIUPTION: Construct pedestrian safety improvements along James Street (S. 240th Street) from
Central Avenue to 94th Ave S., and modify the traffic signalization system at the James Street
intersection at lOOth Avenue SE. Project will include the provision of pedestrian protection for the
north and south legs of the James Street at lOOth Avenue SE traffic signalization system,
signalization system interconnection between the traffic signal systems at the James Street at 94th
Avenue S. and James Street at lOOth Avenue SE; and traffic activated detection at those two
intersections.
SUMMARY:
Preliminary and Design Engineering ..... $ 62,000
Right of Way Acquisition ......................... $
Construction ............................................. $ 288,000
TOTAL ...................................................... $ 350,000
FUNDING SOURCE(S)
HES, ISTEA, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year TOTAL
UJ
>
350,000
KENT
a: liEiiu!?JRL
I ')L ~4TH Fl
PROJECT 20
UJ
"'
UJ
> a:
350,000
~t,;===;
"' 0
SE 2'
CIIT OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: VMS System Upgrade
DESCRIPTION: Replace the City's Master Traffic Signal Control computer with a new computer
system.
SUMMARY:
Preliminary Engineering ......................... $
Right of Way Acquisition ......................... $
Construction ............................................. $ 165,000
TOTAL ...................................................... $ 165,000
FUNDING SOURCE(S)
ISTEA, CIIT
PROJECf COST:
First Year
ANNUAL ELEMENT
165,000
2nd Year 3rd Year
PROJECT 21
4th/5th
& 6th Year TOTAL
165,000
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: Neighborhood Traffic Control Program (City-Wide)
DESCRIPTION: Modify local residential streets to promote safe and appropriate levels of traffic flows
SUMMARY:
Preliminary Engineering ......................... $ 18,000
Right of Way Acquisition ......................... $
Construction . . . . . . . . . . . . . . . . . . . . . .. . . . .. . . . . . . . . . . . . . . . . $ 102,000
TOTAL ...................................................... $ 120,000
FUNDING SOURCE(S)
HES, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT
20,000
2nd Year
20,000
3rd Year
20,000
PROJECT 22
4th/ 5th
& 6th Year
60,000
\
TOTAL
120,000
CITY OF KENT, WASHIKGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: West Valley Highway -S. 180th Street to S. 189th Street
DESCRIPTION: Widen West Valley Highway to seven lanes from S. 180th Street to S. 189th Street,
including modifications to the traffic signalization systems. Project will include construction of full-
width pavement, curbs and gutters, sidewalks, street channelization, street lighting, grading, and
landscaping.
SUMMARY:
Preliminary and Design Engineering ..... $ 65,000
Right of Way Acquisition ......................... $ 505,000
Construction ............................................. $ 2,130,000
TOTAL ...................................................... $ 2,700,000
FUNDING SOURCE(S)
TIA, LID, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT
250,000
TUKN/!..!1
'~\\,\\\'IIIIVflltflllt/4:,.-
2nd Year
750,000
;!' ~
$ %/. GLACIER ST ~ 'l.-, 5 llllllllllllllltllllllllflllllllflllllllllllllllllllllllllllllllllllllf
~ -,,,,,
Jri!JftiJIIlffJt/J/1 ,,,,///
~-
S l90TH ST
3rd Year
1,700,000
];
PROJECT 23
4th/5th
& 6th Year
ST
TOTAL
2,700,000
S l88TH ST
S l90TH ST
w
> a:
:I:
~
0
<D
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: West Meeker Street-SR 516 (Kent-Des Moines Road) to West Valley Highway
DESCRIPTION: Widen West Meeker Street to five lanes, from SR 516 (Kent-Des Moines Road) to
West Valley Highway. Phase 1 of the project will include the replacement of the existing bridge over
the Green River and minor widening of Meeker Street on either side of the structure. Phase 2 of the
Project will include construction of full-width paving (to five lanes), curbs and gutters, sidewalks,
street lighting, street channelization, minor modifications to the traffic signalization systems at the
intersections of W. Meeker at SR 516 (Kent -Des Moines Road) and West Valley Hwy., drainage,
and landscaping.
SUMMARY:
Preliminary Design and Engineering ...... $ 950,000
Right of Way Acquisition ......................... $ 1,500,000
Construction ............................................ $ 5,050,000
TOTAL ...................................................... $ 7,500,000
FUNDING SOURCE(S)
TIA, ISTEA, STATE, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT
4,000,000
2nd Year
2,000,000
3rd Year
1,500,000
!1USSELL
11fJRO
f'/1/1/(
4th/5th
& 6th Year
w
> a:
TOTAL
7,500,000
SHITH ST ;:: ~~'::!::!:!:~====:::
111 YEI18ENO
PROJECT 21a
"'" <D
z f'/111/(
~ RNO u .= !110E
..J
CI1Y OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Lincoln Avenue at James Street Traffic Signal
DESCRIPTION: Install traffic signalization system at the Lincoln Avenue at James Street intersection.
Project will include vehicle actuation system, emergency vehicle pre-emption capability; and will
include interconnection to the existing pedestrian signalization system and the Union pacific
Railroad at-grade crossing approximately 100 feet easterly.
NOTE: Requested by Metro to accommodate transit vehicles
SUMMARY:
Preliminary and Design Engineering ..... $ 19,000
Right of Way Acquisition ......................... $
Construction ............................................ $ 111,000
TOTAL ...................................................... $ 130,000
FUNDING SOURCE(S)
METRO
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year TOTAL
155ELL
17110
'fi/(
HEEKEA ST
130,000
JAMES ST
130,000
KENT w (
ffEffuf11RL
PROJECT 24
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: James Street (S.240th Street) at Central Avenue Intersection Improvements
DESCRIPTION: Widen intersection to construct a right tum lane for westbound traffic.
SUMMARY:
Preliminary and Design Engineering ..... $ 25,000
Right of Way Acquisition ......................... $ 100,000
Construction .............................................. $ 225,000
TOTAL ....................................................... $ 350,000
FUNDING SOURCE(S)
ISTEA, TIA, CITY
PROJECT COST:
'
First Year
ANNUAL ELEMENT 2nd Year
350,000
3rd Year
PROJECT 25
4th/5th
& 6th Year TOTAL
350,000
CI1Y OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Kent-Kangley Road at lllth Avenue SE Intersection Improvements
DESCRIPTION: Install traffic signalization interconnection cable between the 104th Ave SE at SE
256th Street and the Kent-Kangley Road at 111 th Ave SE intersections.
SUMMARY:
Preliminary and Design Engineering ...... $
Right of Way Acquisition ......................... $
Construction ............................................. $ 15,000
TOTAL ....................................................... $ 15,000
FUNDING SOURCE(S)
ISTEA, CI1Y
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year
15,000
3rd Year
4th/ 5th
& 6th Year TOTAL
15,000
SE 256TH ST
SE
SE 260TH ST
11111n~J,fN/C HILL
SEOMIR §JR.
H!CH 5CHfL
SE 265TH ST
PROJECT 26
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECT: Smith Street at 4th Avenue Intersection Improvements
DESCRIPTION: Widen Smith Street and 4th Avenue to provide exclusive left tum lane
channelization, modify the existing traffic signalization system to provide protected left tum phasing,
and improve the radii for right turning vehicles. Project will include construction of paving,
reconstruction of curbs and gutters, sidewalks, modification of street channelization, and traffic
signalization system modifications.
SUMMARY:
Preliminary and Design Engineering ..... $ 167,000
Right of Way Acquisition ......................... $
Construction .............................................. $ 333,000
TOTAL ...................................................... $ 500,000
FUNDING SOURCE(S)
CITY
PROJECT COST:
First Year
ANNUAL ELEMENT 2nd Year
500,000
3rd Year
PROJECT 27
4th/ 5th
& 6th Year TOTAL
500,000
MACLIN
GU!BERSON ST
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Willis Street at S. 4th Avenue Signal Modifications
DESCRIPTION: Modify existing traffic signalization system at the Willis Street (SR 516)
at S. 4th Ave intersection. Project will include modifying the signal mast arm for westbound traffic,
installing protected/permitted phasing, and installing actuated vehicle detection equipment.
SUMMARY:
Preliminary and Design Engineering ..... $
Right of Way Acquisition ......................... $
Construction ............................................ $ 25,000
TOTAL ...................................................... $ 25,000
FUNDING SOURCE(S)
ISTEA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/5th
& 6th Year TOTAL
H !TH ST
25,000
"' > cr
0 a::
"'
ST
cu
> cr
PROJECT 28
25,000
GUfBEASutl ST
S E R TTL ;-;-;;nr
E CH!CRGO ST
...,[ LRUREL ST
~~~ HE,~LOCK ST
~II FILBERT ST II
I
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: James Street -Jason Avenue to 94th Avenue South
DESCRIPTION: Widen pavement to provide exclusive left tum lanes along James Street-from Jason
Avenue to 94th Ave S. Project will include the construction of pavement, curbs and gutters,
sidewalks, and street channelization.
SUMMARY:
Preliminary and Design Engineering ...... $ 40,000
Right of Way Acquisition ......................... $ 200,000
Construction ............................................ $ 760,000
TOTAL ...................................................... $ 1,000,000
FUNDING SOURCE(S)
HES, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year TOTAL
ttET/117
z f'Rif!(
rS RNO u
~ !flOE
"' > cr
0 a: ,..,
W COLE
w ST > a:
0
Z!
N
z If=-=<?==( I
w
>
1,000,000
a: HEHfJfllflL
-' a: a:
>-z
w
u
?fill!(
PROJECT 29
1,000,000
~4TH PL
S 243RO ST
w
> a:
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: Lind Avenue -S. 180th Street to East Valley Highway
DESCRIPTION: Construct new five lane roadway from S. 180th Street to East Valley Highway.
Project will include construction of full-width paving, curbs and gutters, sidewalks, street lighting,
street channelization, and landscaping.
SUMMARY:
Preliminary and Design Engineering ..... $ 150,000
Right of Way Acquisition ......................... $ 550,000
Construction .............................................. $ 800,000
TOTAL ...................................................... $ 1,500,000
FUNDING SOURCE(S)
TIA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year TOTAL
82NO 51
=
1,500,000 1,500,000
PROJECT 30
CilY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: S 224th/ S 228th Street Corridor Project
• S. 228th Street -Military Road to 54th Ave S
• Military Road -S. 228th Street to Kent-Des Moines Road
( WEST LEG -224th/ 228th Street Corridor Project )
DESCRIPTION: Construct a new four/five lane roadway from Military Road to 54th Avenue S,
including a new bridge across the Green River, and widen Military Road from S 228th Street to
Kent-Des Moines Road. Project will include construction of full width paving, curbs and gutters,
sidewalks, street lighting, street channelization, grading, drainage, and landscaping.
SUMMARY:
Preliminary and Design Enginerring ...... $ 1,021,000
Right of Way Acquisition ......................... $ 833,000
Construction ............................................ $ 7,704,000
TOTAL ...................................................... $ 9,558,000
FUNDING SOURCE(S)
TIA, LID, CilY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
LflNOF.!LL
PROJECT 31
4th/ 5th
& 6th Year
9,558,000
TOTAL
9,558,000
J
wl
~I
:r:
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: S.192nd/S.196th Street Corridor Project -East Valley Highway (SR181) to 92nd
Avenue
(EAST LEG -S.192nd/S.196th/S.200th Street Corridor Project)
DESCRIPTION: Construct new four/five lane roadway, including pavement widening to S. 196th
Street from East Valley Highway to 92nd Ave. South, including a new bridge over the Valley
Freeway (SR 167). Project will include the construction of full-width pavement, curbs and gutters,
sidewalks, street lighting, landscaping, and channelization.
SUMMARY:
Preliminary and Design Engineering ..... $ 1,300,000
Right of Way Acquisition ........................ $ 1,000,000
Construction ............................................ $ 5,449,000
TOTAL ...................................................... $ 8,749,000
FUNDING SOURCE(S)
TIA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year
I ~ aOE/NG REi!05PRC£
3rd Year
~t
J
PROJECT 32
4th/ 5th
& 6th Year
8,749,000
TOTAL
8,749,000
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: N. Central Avenue at Smith Street Intersection Improvements
DESCRIPTION: Widen pavement to construct an additional left tum lane, and modify the existing
traffic signalization system. Project will include construction of additional paving, curbs and gutters,
street lighting, modifying the existing traffic signalization system and street channelization.
SUMMARY:
Preliminary and Design Engineering ..... $ 90,000
Right of Way Acquisition ......................... $ 120,000
Construction .............................................. $ 390,000
TOTAL ...................................................... $ 600,000
FUNDING SOURCE(S)
ISTEA, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
PROJECT 33
4th/ 5th
& 6th Year
600,000
TOTAL
600,000
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: 94th Avenue S. -Canyon Drive to James Street
DESCRIPTION: Widen 94th Avenue S. to a three lane roadway from James Street to Canyon Drive.
Project will include construction of paving, curbs and gutters, sidewalks, street lighting, street
channelization, and landscaping.
SUMMARY:
Preliminary Design and Engineering ..... $ 120,000
Right of Way Acquisition ........................ $
Construction ............................................. $ 680,000
TOTAL ...................................................... $ 800,000
FUNDING SOURCE(S)
TIA, LID, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year
800,000
S 2ti3AD ST
TOTAL
800,000
SE 24
GU!BERSON ST
PROJECT 34
w
> cr
SE 248TH ST
r )
I
. CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: SE 248th Street -94th Ave SE to 116th Ave SE
DESCRIPTION: Widen SE 248th Street to three lanes from 94th Avenue SE to 116th Avenue SE.
Project will include construction of paving, curbs and gutters, sidewalks, street lighting, street
channelization, drainage, and landscaping.
SUMMARY:
Preliminary Design and Engineering ...... $ 300,000
Right of Way Acquisition ......................... $
Construction ............................................. $ 1,700,000
TOTAL ...................................................... $ 2,000,000
FUNDING SOURCE(S)
TIA, LID, CITY
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/ 5th
& 6th Year
2,000,000
TOTAL
2,000,000
3
=--=~r=~~==--=S~E=2~4~4~TH~ST~~~~~==~==~~ ~
ST
w
"'
w
"' w
> a:
>-
"' ~ -
J :r: ~~ w 252NO F
>-;i~ "' 0 w w
"' "'
PROJECT 35
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: 84th Avenue S. -S. 212th Street to SR 167
DESCRIPTION: Widen 84th Avenue S. to seven lanes from S. 212th Street to SR 167. Project will
include construction of full-width paving, curbs and gutters, sidewalks, street lighting, modification
to the existing traffic signalization systems, street channelization, drainage, and landscaping.
SUMMARY:
Preliminary Design and Engineering ...... $ 320,000
Right of Way Acquisition ........................ $ 800,000
Construction ............................................ $ 1,830,000
TOTAL ...................................................... $ 2,950,000
FUNDING SOURCE(S)
TIA, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT
>-
<n
. ·(j ~
I
2nd Year 3rd Year
PROJECT 36
4th/ 5th
& 6th Year
2,950,000
....
<n
:r
>-ro
N
N
TOTAL
2,950,000
S 3A~ H188
w
~I
0..
0 ,_
..J
..J
:J::
J
:X:' :x:l
:::>
"'
CITY OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: James Street at 104th Avenue SE Acceleration Lanes
DESCRJPTION: Construct an acceleration lane for eastbound traffic along James Street ( S. 240th
Street); from 104th Ave S, easterly a distance of 600 feet. Project will include the construction of
additional paving, curbs and gutters, sidewalks, and minor modifications to the existing traffic
signalization system.
SUMMARY:
Preliminary Design and Engineering ...... $ 15,000
Right of Way Acquisition ........................ $
Construction ............................................ $ 135,000
TOTAL ...................................................... $ 150,000
FUNDING SOURCE(S)
ISTEA, CITY
PROJECT COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/5th
& 6th Year TOTAL
~ u> 234TH Pl
V1
5 24 NO
5 2ll3RD ST
uJ
> a:
:J:: .... en en
~I
:'.I
w
V1
UJ
> a:
~!?==:=::<
N,
0
150,000
I
150,000
_l () ~ o~ co~"
= I
E = = 3
§
I
%
I
I
~ SE 244TH ST I e-==::l==~~=~i
PROJECT 37
CIIT OF KENT, WASHINGTON
SIX YEAR TRANSPORTATION IMPROVEMENT BUDGET
PROJECf: 72nd Avenue South -S 196th Street to S 200th Street
DESCRIPTION: Construct a new two lane roadway from S 196th Street to S 200th Street. Project
will include construction of full-width paving, curbs and gutters, sidewalks, street lighting, street
channelization, grading, and landscaping.
SUMMARY:
Preliminary Design and Engineering ...... $ SO,OO.G_
Right of Way Acquisition ......................... $ 216,000
Construction ............................................ $ 244,000
TOTAL ...................................................... $ 540,000
FUNDING SOURCE(S)
CIIT
PROJECf COST:
First Year
ANNUAL ELEMENT 2nd Year 3rd Year
4th/5th
& 6th Year TOTAL
"" "' "' M
...
"'
a z
N
~
H.J.Otl
~
"'
-...
"'
s lAY .l.S t1l
<!
>-w
(/) 0::
:::J <!
0 z
S lAY H.LS£
~
8
"'
"'
540,000
lAY H.l.Otl ..
• NORJH(RN
BURLiNGTON, -_::.-~ .. -----·---
PROJECT Jg
... ..
540,000
S lAY