HomeMy WebLinkAbout1251RESOLUTION NO. /,;;2.._~ I
"
A RESOLUTION of the City Council of the
City of Kent, Washington, adopting the Six-Year
Transportation Improvement Program 1991 to 1996.
THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES
HEREBY RESOLVE AS FOLLOWS:
Section 1. The Six-Year Transportation Improvement
Program 1991 to 1996, as set forth in the attachments hereto and
herewith filed with the City Clerk, is hereby adopted.
Passed at a regular
City of Kent, Washington this
~dinbythe
day of~ , 1990.
ATTEST:
APPROVED AS TO FORM:
------·-
meeting of t~/council of the
~ day of ~ 1990.
Mayo \of the City of Kent, this~
, ,~JILL~.~-~
D KELLEHER, MAYOR
--~-
! ~:fc L/' 1--/( l---' {_ l.J/c-J j_j-{ ..; "----
I CITY ATTORNEY
I hereby certify that this is a true and correct copy of
Resolution No. ~/ , passed by the City Council of the City of
Kent, Washington, the 1'1 day of ~« , 1990.
• •
I
/'
" I
I
I
\,
c
I
ll
lj
,,
! ~
'•
CITY OF KENT
SIX YEAR
'
TRANSPORTATION IMPROVEMENT PROGRAM
........ \ .................... , ... ·~·.--. ·--·-· .4 .... ·---. -. .
1991 -1996
Don E. Wickstrom, P.E.
Director of Public Works
. .
WV.H.
.... ....
~~~ .. ~: ..... i .... . :
~... . .. : . . . . . . . . ---· . . . . --- --.
sn
1\)
U1
en
-t
:J:
UJ
:-t
UJ
1\)
~
0
-t
:J:
UJ
:-t
,_ 5
. •
: lllllr----.1 . .............. :
E.V.H.
. .
• .
104TH AVE. S.E •
sn .... co
0
-t :J:
UJ
:-f
Cl -~
-<
"' :1>.
::0
-f
:tl ,
z
CJl
"'0
0
:JJ
E -0
2 -3:
"t'
:lJ c <
IT' s rr. z . -
"t..
:JJ
0
~
:X.
)>
S'
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
ANNUAL ELEMENT 1991
(First Year)
Priority
1990
17
8
23
X
18
19
X
X
X
20
30
3
10
6
13
7
22
12
X
X
1991
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1991 TO 1996 PROJECT LISTING
ANNUAL ELEMENT 1991
272nd/277th St Cor. Project -Auburn Wy to Kent-Kangley
196th/200th St Cor. Project -Orillia Rd to WVH (West)
196thj200th St Cor. Project -WVH to EVH.
Metro Park & Ride Lot -Interchange with I-5 & SR 516
SE 256th St. and 104th Ave. SE.
SE 260th St. and 104th Ave. SE.
76th Ave. s. and s. 212th St.
Military Road & Reith Road.
Reith Rd. and Kent-Des Moines Rd. (SR 516).
Central Ave. (SR 516) -Willis St. to Smith St.
SE 256th St. -Kent-Kangley Rd. to 116th Ave. SE.
72nd Ave. s. -s. 194th St. to s. 196th St.
Crow Road By-Pass (SR 516).
Railroad Grade Crossing Replacement (City-Wide).
Canyon Drive -Hazel Ave. to Weiland St.
canyon Drive Guardrail Replacement.
East Valley Highway -S. 180th St. to S. 192nd St.
64th Ave. S. -S. 212th St. to Meeker St.
77th Ave. s. -S. 202nd St. to s. 212th St.
VMS Upgrade
SECOND/THIRD YEAR 1992-1993
27 21
29 22
X 23
X 24
X 25
X 26
1 27
X 28
X 29
X 30
X 31
X 32
11 33
5 34
4thl 5th ' 6th YEARS
24 35
26 36
X 37
21 38
X 39
X 40
28 41
James st. and Central Ave.
Kent-Kangley Rd. and 111th Ave SE.
72nd Ave s. and s. 212th st.
100th Ave SE and SE 240th St.
Lincoln Avenue and James Street
WVH to 1st AvejMeeker StjLincoln Ave/Smith St.
Military Rd. -s. 228th st. to SR 516.
4th Ave -Willis St. to_James St.
James St. -94th Ave S. to 100th Ave. S.
James St. -Alvord Ave. to Hazel Ave.
S. 212th St. -WVH to 84th Ave. S.
S. 228th St. -Military Rd. to 68th Ave S. (SR 181}.
WVH -S. 180th St. to S. 189th St.
city-Wide Traffic Signal Installation and Impvt.
1994
Central Ave. and S 259th st.
N. Central Ave. and Smith St.
4th Ave. s. and Willis St.
SE 240th St. and 104th Ave. SE.
101st Ave. SE and SE 256th St.
94th Ave S -Canyon Dr. to James st.
SE 248th St. -94th st. to 116th Ave SE.
RESOLUTION NO. ,Z;2._.c;-I
A RESOLUTION of the City Council of the
city of Kent, Washington, adopting the six-Year
Transportation Improvement Program 1991 to 1996.
THE CITY COUNCIL OF THE CITY OF KENT, WASHINGTON DOES
HEREBY RESOLVE AS FOLLOWS:
Section 1. The Six-Year Transportation Improvement
Program 1991 to 1996, as set forth in the attachments hereto and
herewith filed with the City Clerk, is hereby adopted.
Passed at~a regular
City of Kent, Washington this
~din by the
day of~ , 1990.
ATTEST:
APPROVED AS TO FORM:
-
meeting of t~/Council of the
~ day of ~ 1990.
Mayo of the City of Kent, this ~
, ~~IL'-'-·L ~
D KELLEHER, MAYOR
i/CtTU:~/;c:J-J-:__.,;_/--_
, CITY ATTORNEY
I hereby certify that this is a true and correct copy of
Resolution No. ~/ , passed by the City Council of the City of
Kent, Washington, the ~day of ~----, 1990.
~~ -MAR--I-E_J_E_N--,.£--,+-C-I_T_Y---=-C-+E-R_K_ (SEAL)
·-··
8660-300
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
1991 TO 1996
City/County Kent, Washington
City No 0615
Hearing Date ______________ 7·17·90
Adoption Date 7·17·90
County No. 17 Resolution No. 1251
============================================================================================================================
p PROJECT IDENTIFICATION PROJECT COSTS IN THOUSANDS OF DOLLARS
r
DESCRIPTION OF WORK OBLIGATION FUNDING SOURCE !TOTAL
0 SCHEDULE !······························!
r (Street name or number, y E A R !FEDERAL !FUNDS
Co. road name or number, 89 90 91 92·94
termini beginning & end. !1st 2nd 3rd 4,5 Pro·! AMT TIB!Local
y Describe work to be done.) !Annl 6th !AMT gram!
No ! Elmt
============================================================================================================================
CITY COUNCIL TARGET ISSUES · 1ST YEAR
!····--------·-------------------------------------!---------------------------------------------------------------------
IS. 272nd/S. 277th St. -Aubrun Way to Kent-Kangley! 4161
!Construct new four/five lane roadway including
!curb & gutter, sidewalk, street lighting,
!channelization, new bridge construction & signal@!
!Kent-Kangley Rd.
4288 5526 2305 14652 TIB! 1628 16280
! --------------------------------------------------------------------·
2 IS 196/ZOOth Corridor Improvement (West Leg)
IOrillia Rd. to West Valley Highway
!Major widening of S. 200th St. from Orillia Rd.
!to the Russell Rd., curb & gutter, sidewalk,
! lighting, grading, paving, construct bridge over
!Green River, install a new signal at Orillia Rd.,
!minor realignment of Russell Rd. at Green River,
!rechannelization of Russell Rd./S. 196th St.
!from Green River to West Valley Highway. This is
!a joint project with King County and Tukwila.
468 2233 2904 5044 TIBI 561 5605
!--------------------------------------------·------------------------
3 !S. 196th/200th St. Corridor Imp. (Middle Leg)
!West Valley Highway to East Valley Highway
!Construct new four/five lane roadway provide major!
!widening improvements to S. 196th St. from West
!Valley Highway to 72nd Ave.s., construct a bridge
!structure over UP & BN railroad tracks, major
!widening of S. 196th St. from 78th Ave. s. to
!East Valley Highway, install traffic signal @
lEast Valley Highway & S. 196th St. with street
! lighting, sidewalk & channelization.
941 1706 ! 6032 8820 15750 TIB! 1750 17500
! ---------------------------------------------------------------------
4 !Metro Park & Ride Lot
!Expansion of present Metro facility located at
!SR-516 & Military Rd. to accommodate between
!200-300 vehicles.
1440 960 2160 TIB! 240 2400
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
1991 TO 1996
Hearing Date ______________ 7·17·90
Adoption Date 7·17·90
Resolution No. 1251
============================================================================================================================
p
r
0
r
PROJECT IDENTIFICATION
DESCRIPTION OF WORK
PROJECT COSTS IN THOUSANDS OF DOLLARS
FUNDING SOURCE !TOTAL OBLIGATION
SCHEDULE
Y E A R
!······························!
!FEDERAL !FUNDS
90 91
t
y
No
(Street name or number,
Co. road name or number,
termini beginning & end.
Describe work to be done.)
89
!1st
!Annl
!Elmt
2nd 3rd
92·94
4,5
6th
Pro·!AMT
!AMT gram!
TIB!Local
============================================================================================================================
INTERSECTIONS · 1ST YEAR
I · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · ·······I · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · ·
5 !SE 256th St. and 104th Ave SE 700 630 TIB! 70 700
I Intersection improvements to include: Widening of!
!104th Ave. to provide a double exclusive
!southbound left·turn lane, install a right turn
!only lane on the northeast corner of SE 256th St
!& 104th Ave., rechannelize SE 256th St. between
!104th Ave & Kent·Kangley Rd/SE 256th St., &
!provide siginalization & channelization
limprovemnets at SE 256th St & Kent·kangley Rd .•
! .................................................................... .
6 ISE 260th St. and 104th Ave SE
!Intersection improvements to include minor
!widening of 104th Ave. S.E. for northbound left
!turn lane. New signal & interconnect, curb,
!gutter, and sidewalk.
350 175 TIB! 175 350
! ......................................................•..•...........
7 !76th Ave s. & s. 212th St.
!Rebuild the traffic island in theSE and SW
!corners of 76th Avenues. at 212 St for an
!additional NB left lane.
50 42 FAUS! 8 50
!·····································································
8 !Military Road & Reith Road
!Remodel existing intersection and provide new
!detection and controller.
50 42 FAUS! 8 50
I
!·····································································
9 !Reith Road and Kent-Des Moines Road (SR-516)
!Rechannelize Reith Road west of Kent·Des Moines Rd!
!to add an eastbound right turn lane. Provide left!
!turn protected phasing & channelization for west
!leg of intersection.
15 12 FAP 3 15
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
1991 TO 1996
Hearing Date. _______ 7-17-90
Adoption Date 7-17-90
Resolution No. 1251
============================================================================================================================
p
r
0
r
t
y
No
PROJECT IDENTIFICATION
DESCRIPTION OF WORK
(Street name or number,
Co. road name or number,
termini beginning & end.
Describe work to be done.)
89
!1st
!Annl
!Elmt
PROJECT COSTS IN THOUSANDS OF DOLLARS
OBLIGATION
SCHEDULE
Y E A R
90 91
2nd 3rd
92-94
4,5
6th
FUNDING SOURCE !TOTAL
!·--·--·---·--·-------·---·--··!
!FEDERAL !FUNDS
Pro-! AMT TIB!Local
!AMT gram!
============================================================================================================================
STREET SEGMENTS -1ST YEAR
! -------------.. ---... --.--------------------------! ---------------------------------------------------------------------
10 !Central Ave. (SR-516) Willis St. -Smith St.
!Minor widening to include northbound right turn
! lane At Titus St., two way left turn lane, storm
!drainage & channelization.
! [* Central Ave. & Gowe St. ]
370 723 984 TIB! 109 1093
! ---------------------------·-------------------·------···-··---·--·--
11 IS.E. 256th St. -Kent-Kangley Rd. to 116th Ave SE
!Improvements to include roadway widening, drainage!
!curb, gutter & sidewalk, lighting, paving,
!channelization, signing & landscaping
493 557 945 TIB! 105 1050
! --.----------------------------.----------------------.-----.. --.. ---
12 !72nd Ave. S. · S. 194th St. to S.196th St.
!Construction of a new two lane roadway with
!curb & gutter, sidewalk, grading, paving, street
! lighting, channelization and landscaping.
I
13 !Crow Road By-Pass (SR-516 By-Pass)
!Minor widening to improve turning radius at
!97th Pl. S. & Canyon Dr. and SE 260th St & 108th
lAve SE, with signalization at Kent-Kangley Rd.
!(SR-516) & 108th Ave SE also include curb &
!gutter, sidewalks, lighting, grading, paving,
!channelization and signing.
I
250 250 250
I -------------- - - - -----------.---------------.------.----.--.---------
900 900 900
!···--------·-------··---------------------------·-! -------------------------------------------------------·----·--------
MISC. IMPROVEMENT PROJECTS -1ST YEAR
!-----------------·--------------------------------! ---------------------------------------------------------------------
14 !Railroad Grade Crossing Replacement (City-Wide)
!City wide railroad crossing replacement
!program.
120 108 RRP 12 120
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
1991 TO 1996
Hearing Date ______________ 7·17-90
Adoption Date 7-17-90
Resolution No. 1251
============================================================================================================================
p
r
0
r
t
y
No
PROJECT IDENTIFICATION
DESCRIPTION OF WORK
(Street name or number,
Co. road name or number,
termini beginning & end.
Describe work to be done.)
89
! 1st
!Annl
!Elmt
PROJECT COSTS IN THOUSANDS OF DOLLARS
OBLIGATION
SCHEDULE
Y E A R
90 91
2nd 3rd
FUNDING SOURCE !TOTAL
! ----------···········-··-··-··!
!FEDERAL ! FUNDS
92·94
4,5 Pro·!AMT TIB!Local
6th !AMT gram!
============================================================================================================================
PROJECTS ALREADY FUNDED
!-··----··--···--·---------··--··--·-·-············!·-··--·-·-··-····--·--····-·-··-·····-·-··-···-········-··--··-··-···
15 !Canyon Dr. (SR-516) Hazel Ave. · Weiland St.
!Addition of left turn lanes@ Hazel, Smith,
!& Weiland St. to include curb, gutter & sidewalk,
!channelization & drainage, remodel existing
!traffic signal@ Smith St., & Jason Ave. & add
!advance warning flasher
I
16 !Canyon Drive Guardrail Replacement
!Replace existing cable wire guardrail system
!on the southwesterly side of Canyon Drive S.E.
17 !East Valley Highway (S 180th St.-S 192nd St.)
!Major widening to five lanes, provide drainage,
!sidewalks, curb & gutter, lighting, landscaping,
740 62 FAUS! 666 TIB! 12 740
HES
! .. -.--... ----.... -.. -.. -... -........ -•. --.• -.. -•.•... -.--.. -•..... -..
20 18 HES 2 20
! --·--···-···-····-··-··--·--·--·--·---·············-·-···-··--···--··
1083 2917 3600 TIB! 400 4000
I
!paving, underground utilities, bridge, and signing!
18 !64th Ave. S. · S. 212th St. to Meeker St.
!Construction of new roadway on 64th Ave. S. from
!S. 212th St. to James St., roadway widening from
!James St. to Smith St. and signals @ S.212th St.,
!S. 228th St., James St. & Meeker St.
19 !77th Ave. · S. 202nd St. to s. 212th St.
!Widen roadway to 3 lanes with curb, gutter &
!sidewalk, drainage, paving, channelization,
! ·-----··-··----··-·--·-········-··-··--·····--·--··--·-········-··--·
688 3187 2125 6000 6000
! --······--··-·······-··-···-···-········-·-·-···-·---····--···-······
1300 1300 1300
!street lighting & landscaping. Install new traffic!
!signal @77th Ave. S. & s. 212th St .•
20 !VMS Upgrade
!Replace existing Traffic Signal Computer with new
!upgraded computer system.
!··--·--················-··-····-··-·-·-·····--··-·---······--·---··-·
150 125 FAUS! 25 150
I
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
1991 TO 1996
Hearing Date ______ 7·17-90
Adoption Date 7-17·90
Resolution No. 1251
============================================================================================================================
p
r
0
r
t
y
No
PROJECT IDENTIFICATION
DESCRIPTION OF WORK
(Street name or number,
Co. road name or number,
termini beginning & end.
Describe work to be done.)
89
! 1st
!Annl
!Elmt
PROJECT COSTS IN THOUSANDS OF DOLLARS
OBLIGATION
SCHEDULE
Y E A R
90 91
2nd 3rd
92-94
4,5
6th
FUNDING SOURCE !TOTAL
I ................. -............ !
!FEDERAL !FUNDS
I
Pro-! AMT TIBI Local
!AMT gram!
============================================================================================================================
INTERSECTIONS -2ND & 3RD YEAR
!····························-··-···········--·····!·-··············-·--···········-·····································
21 !James St. and Central Ave.
!Minor widening of intersection to accomodate
Ia westbound right turn lane at northwest corner.
22 !Kent·Kangley (SR-516) and 111th Ave SE
!Traffic signal interconnect.
I
23 172nd Ave S. & S. 212th street.
!Install a westbound right turn lane at northeast
!corner of intersection.
24 !100th Ave S.E. & S.E. 240th St.
!Install pedestrian protection for eastbound &
!westbound travel, and provide loop detection.
I
25 !Lincoln Ave. & James St.
!Install a traffic signal at the intersection of
!lincoln Ave. & James St. with vehicle detection
100 8 FAUS! 90 TIB! 2 100
! ........... -................................................. -.-.... .
10 ! 8 FAUS! 2 ! 10
!····················-······---------·--------·--·····················
50 42 FAUS! 8 50
! ·••·····························································••···
30 25 FAUS! 5 30
! ..................................... -...............•..•••....•.•...
130 130 130
1& opticom. Provide interconnect to existing
!pedestrian signal and railroad signal approximate(!
1100 feet to the east. Installation requested
!by Metro to accommodate transit vehicles.
! ·····························--···················! ·············································-·······················
STREET SEGMENTS · 2ND & 3RD YEAR
1····-·····-·················--····················! ·····································································
26 !Smith St. · West Valley Hwy. to 1st Ave.
!Install a two·way left turn lane.
! [* 4th Ave. & Smith St.
27 !Military Rd. · S. 228th St. to SR-516
!Widen roadway to 5 lanes with curb, gutter &
!sidewalk. Provide drainage, paving,
!channelization, street lighting & landscaping.
15 15 15
! ············-························································
202 1148 1215 TIB! 135 1350
! ............................. -... -.. -............... -............... .
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
1991 TO 1996
Hearing Date ______________ 7-17-90
Adoption Date 7-17-90
Resolution No. 1251
============================================================================================================================
p
r
0
r
t
y
No
PROJECT IDENTIFICATION
DESCRIPTION OF WORK
(Street name or number,
Co. road name or number,
termini beginning & end.
Describe work to be done.)
89
! 1st
!Annl
!Elmt
PROJECT COSTS IN THOUSANDS OF DOLLARS
OBLIGATION
SCHEDULE
Y E A R
90 91
2nd 3rd
92-94
4,5
6th
FUNDING SOURCE !TOTAL
! ------------------------------!
!FEDERAL
Pro·!AMT
!AMT gram!
TIB! Local
!FUNDS
I
============================================================================================================================
28 14th Ave. -Willis St. to James St. 10 ! 10 ! 10
! Install 2 way left turn lane. [* 4th & Gowe St.]
I !---------------------------------------------------------------------
29 !James St. -94th Ave. S. to 100th Ave. S.
!Install traffic signal interconnect between 100th
!Ave. S. & 94th Ave. S., new controller and loop
!detection at the at the intersection of 94th Ave.
! S. & James St.
30 !James St. -Alvord Ave. to Hazel Ave.
!Provide widening for left turn movements into
!Church of the Nazarene.
31 !S. 212th ST. · West Valley Hwy. to 84th Ave. S.
!Widen to seven lanes with drainage, paving,
!sidewalks, curb & gutter, lighting, landscaping,
!underground utilities, channelization & signing.
! [* ?2nd Ave. & S. 212th St. J
30 25 FAUS! 5 30
! --------------------------------------------------------.---.---.. --.
250 225 HES 25 250
!··----···-·---··············-··················----------·····--···--
600 3400 3600 TIB! 400 4000
1·------------------··-------------------········-·!·······-·-·······-···························-········-----···-·-···-
l CITY COUNCIL TARGET ISSUES · 2ND & 3RD YEAR
! ---..... ----.--..... -... -.............. -..... --.--! ............ ---... -.... -...... ---.-.------------.--..•. --..... -.... -.
32 !S. 228th St. -Military Rd. to SR-181
!Construct new roadway for S. 228th St., from
!54th Ave. S. to Military Rd. & improveS. 228th St!
!from 54th Ave. s. to 64th Ave. S ..
748 610 5642 6300 TI B! 700 7000
! ..... -.-.-.-.. -.--.......... -.... -.... --.. -....... --.-----.... --.... .
33 !West Valley Highway (S 180th-S 189th)
!Major widening of West Valley Highway to
! include curb & gutter, sidewalks, lighting
!grading, paving, channelization, signalization,
!signing, and landscaping.
65 505 2130 2430 TIB! 270 2700
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Yashington
City No 0615
County No. 17
1991 TO 1996
Hearing Date _______ 7·17·90
Adoption Date 7·17·90
Resolution No. 1251
============================================================================================================================
p
r
0
r
t
y
No
PROJECT IDENTIFICATION
DESCRIPTION OF YORK
(Street name or number,
Co. road name or number,
termini beginning & end.
Describe work to be done.)
89
! 1st
!Annl
!Elmt
PROJECT COSTS IN THOUSANDS OF DOLLARS
OBLIGATION
SCHEDULE
Y E A R
90 91
2nd 3rd
FUNDING SOURCE !TOTAL
!······························!
!FEDERAL !FUNDS
92·94
4,5 Pro·IAMT TIB!Local
6th !AMT gram!
============================================================================================================================
MISC. IMPROVEMENT PROJECTS · 2ND & 3RD YEAR
I··················································l·····································································
34 !City·Wide Traffic Signal Installation & Imp.
!Add new traffic signals & provide traffic signal
!modifications adding protected/permissive phasing
!at various intersection locations.
273 227 FAUS! 46 273
! --------.--.-.-... ---.-------.--------------------! ----------------------.. ---------.------------... -.. -.-------... -----
INTERSECTIONS · 4TH, 5TH, & 6TH YEAR
! ......... ---.. ---.-.---.--------------------------! -----------------------------.---.------------.------••. --------.----
35 !Central Ave. and s. 259th St.
!Install two phase traffic signal, street lighting
I& channelization.
36 IN. Central Ave. and Smith St.
!Add a new double left turn lane, channelization,
!street lighting, signal upgrade & signing.
37 !4th Ave. S. & Willis St.
!Improvements to include: modifying westbound mast
!arm, installing Protected/Permissive phasing and
!providing loop detection.
38 !S.E. 240th St. and 104th Ave. S.E.
!Construct additional eastbound acceleration
!lane on James St. approximately 600 feet east of
130 108 FAUS! 22 130
! --------------------------------------------.--.-•• -•• -••• -----------
500 417 FAUS! 83 500
!---------------------------------·---·------------------·------------
25 21 FAUS! 4 25
!----·------------------------------·--·---·---------------·----------
150 125 FAUS! 25 150
!the intersection & add protected/permissive phase.!
39 !101st Ave. S.E. & S.E. 256th St.
!Install pedestrian protection for eastbound &
!westbound travel, and provide loop detection.
! --------------------------------------------------·----·--·!---------
25 FAUS! 5 30
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT SUMMARY
City/County Kent, Washington
City No 0615
County No. 17
1991 TO 1996
Hearing Date. ____________ __
Adoption Date ______ _
Resolution No.
7·17·90
7·17·90
1251
============================================================================================================================
p
r
0
r
t
y
No
PROJECT IDENTIFICATION
DESCRIPTION OF WORK
(Street name or number,
Co. road name or number,
termini beginning & end.
Describe work to be done.)
89
! 1st
!Annl
!Elmt
PROJECT COSTS IN THOUSANDS OF DOLLARS
OBLI GAT! ON
SCHEDULE
Y E A R
90 91
2nd 3rd
92·94
4,5
6th
FUNDING SOURCE !TOTAL
! .........•........•.•••.•.•... !
!FEDERAL ! FUNDS
Pro· !AMT TIB!Local
!AMT gram!
============================================================================================================================
STREET SEGMENTS · 4TH, 5TH, & 6TH YEAR
! •••..•••.•...........................•............ ! .................................................................... .
40 !94th Ave. S. · Canyon Dr. to James St.
!Widen to 3 lanes with curb, gutter & sidewalk.
!Provide drainage, paving, channelization,
!signing, street lighting & landscaping.
41 1248th St. · 94th Ave S.E. to 116th Ave S.E.
!Widen to 3 lanes with curb, gutter & sidewalk.
!Provide drainage, paving, channelization,
!signing, street lighting & landscaping.
I[* 94th Ave. S.E. & 248th St. ]
I
800 720 TIB! 80 800
!·····································································
1775 1597 TIB! 178 1775
!························································································································
TOTAL !14289 !18749 !22585 ! 22277 I 1665 ! 60558 ! 15708! 77931
!========================================================================================================================
SIX YEAR TRANSPORTATION IMPROVE:·MENT PROGRAM
FIRST YEAR
~' en
w >
1-
'¢
0 .,..
S. 240THJST
6TH ST.
g~~y
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: s·. 272nd/S. 277th St. Corridor Project -Auburn Way to
Kent-Kang ley Rd .
DESCRIPTION: (Project length 2. 27 Mi.) Construct a new four/five lane
roadway with curb and gutter, sidewalk, street lighting,
channelization. Provide new bridge across Green River and
install new traffic signal at either S. 116th St. or S.
132nd St. and f\ent-l~ang ley Rd ..
SUIVMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: TIB, LID, CITY
PROJECT COST:
1st Yr
Annual E'lement 2nd Yr 3rd Yr
1,979,000
3,52'1,000
10,780,000
16,280,000
1 4. 5.
I· & 6th Yr
4. 161, 000 4,288,000 5,526,000 2,305,000
lm~lilll~:,-,~1 ~~:;( Hll£ ··-\-/'AIIK
r '!'/(Hill
, SCHtl~ !
't: nur n
Total
16,280,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: S. 196th/S. 200th St. Corridor Project-Orillia Rd. to West
Valley Highway (West Leg)
DESCRIPTION: (Project length ·1.40 IYli.) Major widening of S. 200th St.
from Orillia Rd, to Russell Rd., curb & gutter, sidewalk,
lighting, grading, paving, construct bridge over Green
River, instal"! a signal at Oril"lia Rd., minor realignment of
Russell Rd. at Green River, rechannelization of Russell
Rd./S. 196th St. from Green River to West Valley Highway.
This is a joint project with l<ing County & Tukwila.
SUJYMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Constr·uction ................. $
Tota"l .................... $
FUNDING SOURCE: TIS, LID, CITY
PROJECT COST:
1st Yr
Annua ., E"l ement
468,000
2nd Yr
2,233,000
3rd Yr
2,904,000
837,000
76'7,000
4,001,000
5,605,000
4, 5,
& 6th Yr
8dE/NC ~ERdSrRCE
Total
5,605,000
2
.J
I
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: S. 196th/S. 200th St. Corridor Project -West Valley Highway to
East Valley Highway
DESCRIPTION: (Project length 1.00 Mi.) Construct new four/five lane
roadway, provide major widening improvements to S. 196th St
from West Valley Hwy. to 72nd Ave. S., construct bridge over
UP & BN tracks, major widening of S. 196th St. from 78th
Ave. S. to East Vallley Hwy., install traffic signal at East
Valley Hwy. & S. 196th St. with lighting, sidewalk &
channelization.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: TIB, LID, CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
2,762,000
1,000,000
"13' 738' 000
17,500,000
4' 5,
& 6th Yr
941,500 1,706,500 6,032,000 8,820,000
Tota"l
17' 500' 000
~---~/)---
~
liUH ST
(' '"'""
IZMO '
I, 10:1,..0 II
0 HI H
3
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Metro Park & Ride Lot -Interchange with I-5 & SR-516
DESCRIPTION: Expansion of present Metro facility located at SR-516 and
Military Rd. to accomodate between 200 & 300 vehicles.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE:
PROJECT COST:
1st Yr
Annual Element
1,440,000
TIS, City
2nd Yr 3rd Yr
960,000
400,000
0
2,000,000
2,400,000
4' 5'
& 6th Yr Tota"l
2,400,000
4
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: S.E. 256th St. and 104th Avenue S.E.
DESCRIPTION: (Project length .09 Mi.) Intersection improvements to
include: widening of 104th Ave. to provide a doub"le,
exclusive southbound ·left-turn ·lane, instal"! a right turn
only lane on the northeast corner of S.E. 256th St between
104th Ave. & Kent-Kang"ley Rd/S.E. 256th St., & provide
signalization & channe·l ization improvements at S. E. 256th St
& Kent-Kangley Rd ..
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Tota 1 .................... $
FUNDING SOURCE:
PROJECT COST:
1st Yr
Annual E"lement
700,000
TIB, City
2nd Yr 3rd Yr
105,000
50,000
545,000
700,000
4, 5,
& 6th Yr Total
700,000
5
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: S.E. 260th St and 104th Avenue S.E.
DESCRIPTION: ( lntersection) Intersection improvements to include: minor'
widening of 104th Ave. S.E. for northbound left turn lane.
Install new signal & interconnect, curb & gutter, &
sidewalk.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Tota 1 .................... $
FUNDING SOURCE: TIB, CITY
PROJECT COST:
1st Yr
Annua·l Element
350,000
2nd Yr 3rd Yr
52,000
0
298,000
350,000
4 r 5,
& 6th Yr Total
350,000
6
I
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: 76th Avnue S. and S. 212th St.
DESCRIPTIO\I: (intersection) Rebui'ld existing traffic is"land at the
southeast and southwest corners of 76th Ave. S. at S. 212th
St. for an additional northbound "left turn lane.
SUMMARY:
Preliminary Engineering ...... $
Right Of ~'Jay ................. $
Cons·truction ................. $
Tota·l .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual Element
50,000
8~EIN5 RER~S~RCE
2nd Yr 3rd Yr
8,000
0
42,000
50,000
"
4, 5,
& 6th Yr Tota"l
50,000
7
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Military Road & Reith Road
DESCRIPTION: (lntersection) Remode-l existing intersection and provide new
detection and contro1ler.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... ~
FUNDING SOURCE: FAUS, CITY
PROJECT COST :
1st Yr I
Annua 1 E"l ement I · 2nd Yr 3rd Yr
50,000
10,000
0
40,000
50,000
4' 5,
& 6th Yr Tota"l
50,000
8
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Reith Road and Kent-Des Moines Road (SR-516)
DESCRIPTION: (Project ·length .05 Mi.) Rechanne.lize Reith Rd. west of
Kent-Des Moines Rd. to add an eastbound t•ight turn lane.
Provide lett turn protected phasing & channelization for
v1est leg of intersect 1 on .
SUMI'v1ARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAP, CITY
PROJECT COST:
1st Yr
Annual E'! ement
15,000
2nd Yr 3rd Yr
5,000
0
10,000
15,000
4. 5'
& 6th Yr Tota·l
15,000
9
I
t.
PROJECT: Central Avenue (SR-516) -Willis St. to Smith St.
DESCRIPTION: (Project length .38 Mi.) Minor widening to include a
northbound right turn lane at Titus St., two-way left turn
lane, storm drainage & channe"Iization.
-.....
SUIVIMARY:
Preliminary Engi0eering ...... $
Right Of Way ................. $
Corist rLict ion ................. $
Total .................... $
FUNDING SOURCE: TIB, CITY, STATE
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
63,000
307,000
723,000
1,093,000
4, 5,
& 6th Yr
·----------------------------------------------------·-------370,000
Total
723,000 1,093,000
_il•'
. ·.
·. ·.:
1 o' .....
i:
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: S.E. 256th St. -Kent-Kangley Road to 116th Avenue S.E.
DESCRIPTION: (Project length .64 Mi.) Improvements to include: roadway
widening, drainage, curb & gutter, sidewalk, street
lighting, paving channelization. signing & landscaping.
SUMMARY:
Preliminary Engineering ...... $
Right Of \'lay ................. $
Construction ................. $
Tota"l .................... $
FUNDING SOURCE: TIB, LID, CITY
PROJECT COST:
·1st Yr
Annual Element
493,000
2nd Yr
557,000
3rd Yr
"157,000
336,000
557,000
1,050,000
4, 5,
& 6th Yr
z ~
Total
1,050,000
i c I[ 11 ~~==~m•"~~~~,_tj'~::~~~~~~·l
11
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: 72nd AvenueS. -S. 194th St. to S. '196th St.
DESCRIPTION: (Project length .13 Mi.) Construction of a new two lane
roadway with curb & gutter, sidewalk, grading, paving,
street lighting, channelization and landscaping.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Cons·t ruction ................. $
Tota"l .................... $
FUNDING SctJRCE: CITY
PROJECT COST:
1st Yr
Annual Element
250,000
2nd Yr 3rd Yr
37,000
100,000
113,000
250,000
4, 5,
& 6th Yr Tota"l
250,000
N
1---'l,...="-=-'----1 ;
-....... -------D :-
-
(!lOTH RV< 0
I;?
12
SIX YEAR TR.A.I'.JSPORTATION IMPROVEMENT PROGRAM
PROJECT: Crow Road By-Pass (SR-516)
DESCRIPTION: (Project length .35 Mi.) Minor widening to improve turning
radius at 97th Pl. S. & Canyon Drive, and S.E. 260th St. &
108th Ave. S.E., with signalization at Kent-Kangley Rd &
108th Ave. S.E. also include curb & gutter, sidewalks,
lighting, grading, paving, channelization and signing.
SUrv\MARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: DEVELOPER
PROJECT COST:
1st Yr
Annual Element
900,000
2nd Yr 3rd Yr
135,000
150,000
615,000
900,000
4, 5.
& 6th Yr Total
900,000
13
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Railroad Grade Crossing Replacement (City-Wide)
DESCRIPTION: City wide railroad crossing rep-lacement program.
SU!Vi>1ARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: RRP, CITY
PROJECT COST:
1st Yr
Annual Element
120,000
2nd Yr 3rd Yr
NO MAP
10,000
0
110,000
120,000
4, 5,
& 6th Yr Total
120,000
14
PROJECT: Canyon Drive-Hazel Avenue to \fJeiland St.
DESCRIPTION: (ProJect length .50 Mi.) Addition of left turn "lanes at
Hazel Ave., Smith St. & Weiland St. to include: curb &
gutter, sidewalk, channe·l ization & drainage, remodel
existing traffic signal at Smith St. & Jason St., and add
advance warning flasher.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: HES, FAUS, TIB, CITY
PROJECT COST:
'1st .Yr
Annua 1 E"J ement
740,000
2nd Yr 3rd Yr
111,000
300,000
329,000
740,000
4, 5,
& 6th Yr Total
740,000
I ·----
~
~
~ " ~
~ ~
s ~
~
~
E!IST HI
ST
'15
SIX YEAR TRANSPORTATI0!\1 IMPROVEMENT PROGRAM
PROJECT: Canyon Drive Guardrail Repalcement
DESCRIPTION: (Project length .50 Mi.) Rep·lace existing cable wire
guardrail system on the southwester 1y side oi: Canyon Drive
S.E ..
SUIVUV\ARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: HES, CITY
PROJECT COST:
1st Yr
Annual E"lement 2nd Yr 3rd Yr
5,000
0
15,000
20,000
4, 5,
& 6th Yr Total
------------------------------------------------------------------------
20,000
I
~~~~~~~~~~~----,
KeNT
C<HlJE/fY
1111111111111!11'1
20,000
16
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: East Valley Highway -S. 180th St. to S. 192nd St.
DESCRIPTION: (Project length .78 Mi.) Major widening to five lanes,
provide drainage, sidewalk, curb and gutter, street
lighting, "landscaping, paving, underground utilities, bridge
improvements and signing.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Canst t'uct ion ................. $
Tota-l .................... $
FUNDING SOURCE: TIB, LID, CITY
PROJECT COST:
1st Yr
Annual Element
1,083,000
2nd Yr
2,917,000
N a a
x llSf AVI!. 5
u
Vf/LL E r f'fl EWfl r
3rd Yr
1:?
600,000
483,000
2, 917,000
4,000,000
4, 5,
& 6th Yr Total
4,000,000
17
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: 64th AvenueS. -S. 212th St. to Meeker St.
DESCRIPTION: (Project length 1.74 Mi.) Construction of new roadway on
64th Ave. S. from S. 212th St. to James St., widen roadway
from James St. to Smith St. & instal·! new traffic signa"ls at
S. 212th St., S. 228th St., James St. & Meeker St.
SUIVIMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Tota"l .................... $
FUNDING SOURCE: LID
PROJECT COST:
1st Yr
Annua 1 E"l ement
688,000
2nd Yr
3,187,000
3rd Yr
2,125,000
283,000
405,000
5,312,000
6,000,000
4, 5,
& 6th Yr Total
6,000,000
18
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: 77th AvenueS. -S. 202nd St. to S. 212th St.
DESCRIPTION: (Project length .64 Mi.) Widen roadway to three lanes with
curb & gutter, sidewalk, drainage, paving, channelization,
street lighting & landscaping. Install new traffic signal at
77th Ave. S. & S. 212th St ..
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: LID
PROJECT COST:
1st Yr
Annual Element
1,300,000
2nd Yr 3rd Yr
200,000
200,000
900,000
1 , 300, 000
4. 5,
& 6th Yr Total
1,300,000
19
SIX YEAR TRANSPORTATIOI\1 IMPROVEMEI\lT PROGRAM
PROJECT: VMS Upgrade
DESCRIPTION: Replace existing Master Traffic Signal Computer with new
upgraded system.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual Element
150,000
2nd Yr 3rd Yr
NO MAP
0
0
150,000
150,000
4, 5,
& 6th Yr Total
150,000
20
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
UJ
ui
w >
I <
X:
1-
'lit
0 ....
S. 24011iiST.
S. 256THIST.
X:
~ ;:,
SECOND & THIRD YEARS .
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: James St. and Central Avenue
DESCRIPTION: (Intersection) Minor widening of intersection to accomodate
a westbound right turn lane at northwest corner .
SUMMARY:
. "I •
·'
.Preliminary EAgineering ...... $
Right Of Way ................. $
Construct; on ................. $
Total .................... $
FUNDING·SOURCE: FAUS, TIS, CITY
PROJECT COST:
1st Yr
Annual E"Jement 2nd Yr 3rd Yr
10,000
0
90,000
100,000
4, 5,
& 6th Yr Total ----------------------------------
100,000
100,000
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Kent-Kang 1 ey Rd. and 111 t h Avenue S. E.
DESCRIPTION: (Project length .49 Mi.) Install traffic signal interconnect
cable for 104th Avenue S.E. and S.E. 256th St. to
Kent-Kang "J ey Rd. and 111 th Avenue S. E ..
SUJVIMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
10,000
0
0
10,000
10,000
4' 5,
& 6th Yr Total
10,000
22
SIX YEAR TRANSPORTATIOI\1 IMPROVEMENT PROGRAM
PROJECT: 72nd AvenueS. and S.212th St.
DESCRIPTION: (Intersection) Instal"! a westbound right turn "lane at the
northeast corner of intersection.
SUMMARY:
Pre'l iminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual Element
! I
l*l
2nd Yr 3rd Yr
50,000
10,000
0
40,000
50,000
4, 5,
& 6th Yr
"
Total
50,000
23
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: 100th Avenue S.E. and S.E. 240th St.
DESCRIPTION: (Intersection) Insta·1·1 pedestrian protection for eastbound
and westbound travel, and provide loop detection.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Tota'l .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual E'lement 2nd Yr
30,000
3rd Yr
0
0
30,000
30,000
4, 5,
& 6th Yr Total
30,000
24
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Lincoln Avenue and James St.
DESCRIPTION: (Intersection) Install a traffic signal at the intersection
of Lincoln Avenue and James St. with vehicle detection and
opticom. Provide interconnect to existing pedestrian signal
and railroad signal approximately 100 feet to the east.
lnstal"lation requested by Metro to accomodate transit
vehicles.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: METRO
PROJECT COST:
1st Yr
Annual Element 2nd Yr
130,000
3rd Yr
19,000
0
111 '000
130,000
4' 5,
& 6th Yr Total
130,000
25
SIX YEAR TRANSPORTATIOhl IMPROVEMENT PROGRAM
PROJECT:· Smith St./Lincoln Avenue/Meeker St. -West Valley Highway to 1st
Avenue
DESCRIPTION: (Project Length . 76 Mi.) Install a two-way left turn lane.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: CITY
PROJECT COST:
1st Yr
Annua ·1 Element 2nd Yr 3rd Yr
15,000
5,000
0
10,000
15,000
4. 5.
& 6th Yr Total
15,000
26
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: Military Rd. -S.228th St. to SR-516
DESCRIPTION: (Project Length . 57 ~1i.) Widen existing roadway to five
lanes with curb and gutter, and sidevJalk. Provide drainage,
paving, channe-lization, street lighting and landscaping.
SUMIVIARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Tota·l .................... $
FUNDING SOURCE: TIB, LID, CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr
202,000
3rd Yr
1,148,000
202,000
0
1' 148,000
1,350,000
4, 5,
& 6th Yr Tota ·1
1,350,000
27
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: 4th Avenue -\',Ji"Jl"is St. to James St.
DESCRIPTION: (Project Length .62 Mi.) lnstal·\ a two-way left turn "lane.
SUMM.A.RY:
Pre'l im"inary Eng-ineering ...... $
Right Of Way ................. $
Canst ruction ................. $
Total .................... $
FUNDING SOURCE: CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
10,000
2,000
0
8,000
10,000
4. 5.
& 6th Yr Tota·\
10,000
;). --·-·-·
\
K K
0 <
28
SIX YEAR TRANSPORTATION IIVIPROVEMENT PROGRAM
PROJECT: James St.-94th AvenueS. to "lOOth AvenueS.
DESCRIPTION: (Project Length .38 Mi.) Install traffic signal interconnect
between "lOOth AvenueS. and 94th AvenueS., provide new
control"ler and "loop detection at the intersection of 94th
Avenue S. and James St ..
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual E"lement 2nd Yr
30,000
r··· ---·---~ --,-
3rd Yr
10,000
0
20,000
30,00()
4, 5,
& 6th Yr Tota·l
30,000
29
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: James St. -A 1 vord Avenue to Haze·1 Avenue
DESCRIPTIOI\l: (Project Length . 14 Mi.) Provide widening and channelization
improvements for left turning movements into the Church of
the Nazarene.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Tota ·1 •••••••••••••••••••• $
FUNDING SOURCE: HES, CITY
PROJECT COST:
·1st Yr
Annual E"lement 2nd Yr 3rd Yr
250,000
10,000
50,000
190,000
250,000
4, 5,
& 6th Yr Tota"l
250,000
.._,
fRJf i
Hill
rMI(
30
I
SIX YEAR TRANSPORTATIOI\1 IMPROVEMENT PROGRAM
PROJECT: S. 212th St. -West Valley Highway to 84th Avenue S.
DESCRIPTION: (Project Length 1. 00 Mi.) \'>Iiden existing roadway to seven
lanes with drainage, paving, sidewalk, curb and gutter,
street lighting, landscaping, underground utilities,
channelization and signing.
SUf\o1MARY:
Preliminary Engineering ...... $
Right Of Way ............. -~··$
Construction ................. $
Total .................... $
FUNDING SOURCE: TIB, LID, CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr
600,000
8/J,U NG f/ER/JSI'IIC£
w . .
g
3rd Yr
3,400,000
600,000
0
3,400,000
4,000,000
4, 5,
& 6th Yr
! l:IITK Sf
Total
4,000,000
lU1H U
·······-~
CIIR/1/St!/
CRUK
~
31
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: S. 228th St. -Military Rd. to 68th AvenueS. (SR-181)
DESCRIPTION: (Project Length 2.08 Mi.) Construct new roadway for S. 228th
St. from 54th AvenueS. to l'l!ilitary Road and improveS.
228th St. from 54th AvenueS. to 68th AvenueS ..
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: TIB, LID, CITY
PROJECT COST:
·1st Yr
Annual Element 2nd Yr
748,000
3rd Yr
610,000
748,000
610,000
5,642,000
7,000,000
4, 5,
& 6th Yr Tota·l
5,642,000 7,000,000
32
-
' ,,
' ~o-;.:.
~ -:·:-•
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: West Valley Highway -S. 180th St. to S. 189th st.
DESCRIPTION : (Project Length .66 Mi.) Major widening of West Valley
Highway to include curb ~nd gutter, sidewalk, street .
1 ighting' grading paving r channe"lization r signalization r
signing and landscaping. ~ ........ __. ......................... i
·'
'SUMMARY:
Preliminary,Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: TIS, LID, CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr ---------------
65,000
3rd Yr
505,000
65,000
505,000
2,130,000
2,700,000
4, 5,
& 6th Yr
2,130,000
Total
2,700,000
33
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: City-Wide Traffic Signal Installation and Improvement
DESCRIPTION: Add new traffic signa-ls and provide traffic signal
modifications adding protected/permissive phasing at various
intersection locations.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr
273,000
3rd Yr
0
0
273,000
273,000
4, 5,
& 6th Yr
NO MAP
Total
273,000
34
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
gj
ui -,-I I I I II I gj
>
~~I I <
X
~~
1-
o:t
0 ,....
>
u.i
S.I240TH ST.
S. 256THIST.
FOURTH, FIFTH. & SIXTH YEARS
SIX YEAR TRANSPORTATIOI\1 IMPROVEMENT PROGRAM
PROJECT: Central Avenue and S. 259th St.
DESCRIPTION: (Intersection) Install two phase traffic signa·\, street
lighting and channelization.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
10,000
0
120,000
130,000
4, 5,
& 6th Yr Tota·l
130,000 130,000
35
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: N. Central Avenue and Smith St.
DESCRIPTION: (Intersection) Add a new doub-le left turn "lane,
channelization, street lighting, signal upgr•ade and signing.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
75,000
100,000
325,000
500,000
4' 5,
& 6th Yr
500,000
Total
500,000
36
SIX YE.A.R TRANSPORTATIOI'~ IMPROVEMENT PROGRAM
PROJECT: 4th AvenueS. and 1-'Jillis St.
DESCRIPTION: (Intersection) Intersection improvements to include:
modifying westbound mast arm, installing
protected/permissive phasing and providing 'loop detection.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual E'lement 2nd Yr 3rd Yr
0
0
25,000
25,000
4, 5,
& 6th Yr
25,000
Total
25,000
37
SIX YEAR TRANSPORTATIOI\1 IMPROVEMENT PROGRAM
PROJECT: S. E. 240th St. and '104th Avenue
DESCRIPTION: (Project Length .11 Mi.) Construct additional eastbound
acceleration lane on James St. approximately 600 feet east
of the intersection and add protected/permissive phase.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Tota'l .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual Element 2nd Yr 3rd Yr
15,000
0
135,000
150,000
4, 5,
& 6th Yr
150,000
Tota'l
150,000
38
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: 101st Avenue S.E. and S.E. 256th St.
DESCRIPTION: (Intersection) Instal"l pedestrian protection for eastbound
and westbound travel, provide loop detection for eastbound
left turn and into Kent Meridian High Schoo·l.
SUMIV1ARY:
Preliminary Engineering ...... $
Right Of ~'lay ................. $
Construction ................. $
Tota·l .................... $
FUNDING SOURCE: FAUS, CITY
PROJECT COST:
1st Yr
Annual E"lement 2nd Yr 3rd Yr
0
0
30,000
30,000
4, 5,
& 6th Yr Total
30,000 30,000
39
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PROJECT: 94th Avnue S. -Canyon Dr. to James St.
DESCRIPTION: (Project Length . 06 /VIi.) Widen to three lanes with curb and
gutter, and sidewalk. Provide drainage, paving,
channelization, signing, street lighting and "landscaping.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Total .................... $
FUNDING SOURCE: TIB, LID, CITY
PROJECT COST:
1st Yr
Annual E"lement 2nd Yr 3rd Yr
120,000
0
680,000
800,000
4, 5,
& 6th Yr
800,000
TH :H
I KENT ~ER/0/f/N'
HJCH SCHtJtJl ERST HI
Total
800,000
·---------
X
0
N
40
SIX YEAR TRANSPORTATION Ii'1PROVEMENT PROGRAM
PROJECT: S. E. 248th St. -94th St. to ·1 '16th Avenue S. E.
DESCRIPTION: (Project Length ·1 .40 Mi.) Widen to three lanes with curb and
gutter, and sidewalk. Provide drainage, paving,
channelization, signing, street lighting and landscaping.
SUMMARY:
Preliminary Engineering ...... $
Right Of Way ................. $
Construction ................. $
Tota·/ .................... $
FUNDING SOURCE: TIB, LID, CITY
PROJECT COST:
·1st Yr
Annual E'l ernent 2nd Yr 3rd Yr
I K{'JIT ~{'11/0/IIN
. NJ.CH SCHOO£
266,000
0
I' 509 I 000
11775,000
4' 5,
& 6th Yr
1,775,000
.
~
0
ERST HI
HI H
Total
1,775,000
41