Loading...
HomeMy WebLinkAboutCity Council Meeting - Council Workshop - Minutes - 09/17/2013 FAIT Kent City Council Workshop September 17, 2013 The meeting was called to order at 5:31 p.m. by Council President Dennis Higgins. Councilmembers present: Higgins, Thomas, Boyce, and Ralph. Councilmember Albertson and Perry were absent. Councilmember Ranniger arrived at 5:57 p.m. Senate Transportation Flearinas. Michelle Wilmot discussed the Senate Transportation Hearings and a letter she prepared for mailing to the legislature which highlighted the concerns of the City of Kent. She noted that the letter strongly recommends the legislature pass a transportation package that includes funding to complete the SR 509/SR 167 "Gateways Project" and to assist with the completion of the 228th Street/Union Pacific Railroad Grade Separation. Council President Higgins added that he would also like to see a section in the letter that addresses the funding of King County Metro Transit services. Councilmember Boyce inquired about the gas tax and Wilmot replied that the prime concern is that there are no strings attached to the distribution of the funds. The funds, she said, must directly fund the needs of the city of Kent and other municipalities. Council President Higgins noted that a sunset clause may or may have been identified and the Council should pay attention to specifics. Councilmember Ralph stated that she didn't think the gas tax funds would come back to the cities. Councilmember Thomas said he was ok if the letter is coming from the Council President, but he didn't want it coming from the Council as a whole. Council President Higgins said he could submit it as the Council President only. Brubaker communicated that the Council can vote on the letter and either have it come from the majority through a vote or determine how the rest of the Council feels about it and add the appropriate names. Council President Higgins, Councilmember Ralph, and Councilmember Boyce communicated that they were ok with having their names on the letter and Brubaker stated that Wilmot can communicate with the other Councilmembers to see if they want their names included in the letter. Downtown Subarea Action Plan. Planning Director Fred Satterstrom discussed the item. He noted that there are some actions that the Council will have to take in the next month and some to execute after the plan is adopted. Downtown has been a Council target issue for years, he said, and displayed a copy of the Kent Downtown Plan from 1966. He pointed out that many of the items in the 2005 Downtown Plan have been executed. Satterstom communicated that the downtown area has expanded since the 2005 Downtown Study Area. He discussed the downtown Kent City Council Workshop Meeting September 17, 2013 stakeholder interviews and the vision that came about those studies. The planning principals, he pointed out, are Economic Vitality, Enjoyable Outdoor Space, Urban Livability, Neighborhood Capability, Memorable Downtown Experience, Pedestrian Priority, and Environmental Sustainability. He communicated that Urban Livability was the most important and had the highest interest in the study. He displayed a video of some people that were surveyed about their vision for downtown Kent. City Planner Gloria Gould-Wessen stated that this is a two-phase approach with the first phase being an update of the Comprehensive Plan, map amendments, and a Code amendment. She stated that this Downtown Subarea Action Plan (DSAP) completely replaces the 2005 Downtown Strategic Action Plan. She stated the plan provides three alternatives for growth and staff prefers alternative two which balances the jobs and growth efforts. It also provides adequate housing and jobs which adequately provide for the growth management act levels assigned. She discussed the themes of the DSAP (livability, economic vitality, safety, outdoor gathering space, compatibility, and sustainability) and several enhancements such as improved street and area lighting, business development and redevelopment, mixed uses, and repositioning parks to better serve the community. She communicated that compatibility deals with having appropriate ways to move the residents into downtown and improving pedestrian and bicycling routes. She presented the land use plan maps and the zoning district maps and discussed the staff proposal to grow the urban center (UC) and changing the Comprehensive Plan land use of another area to industrial (I). She noted that doing this will satisfy the King County requirement for urban centers. She explained the aggregated staff proposed rezones and noted that there are residents residing near the ShoWare that are in favor with the rezone. Councilmember Ralph and Councilmember Ranniger inquired about zoning in the North Park area. Gould-Wessen replied that the staff came to the realization that to encourage the size of development to make it worthwhile the area has to be rezoned and have the potential for redevelopment. Councilmember Thomas also inquired about another area next to the one Councilmember Ranniger pointed out and Gould-Wessen replied that the intention is to maintain the buffer to the residential neighborhood. Councilmember Thomas discussed having all of the areas in the CP land use plan map is zoned the same and Council President Higgins pointed out that there is a difference between land use and zoning. Council President Higgins communicated that the rezone would only affect ten properties and Gould-Wessen stated that the Land Use and Planning Committee has looked at them. Councilmember Ralph encouraged the Council to listen to the LUPC meeting. Gould-Wessen stated that there are abandoned buildings on Meeker and the need for investment in that area. She noted that based on the survey and questions to the community the City wants something done. She communicated that rezoning the area to DCE allows the heights to be higher and they anticipate a 65 foot building in the zone. 2 Kent City Council Workshop Meeting September 17, 2013 Gould-Wessen communicated the mixed use overlay amendments and noted that the mixed use definition would be revised, there would be an increase in the GC-MU building height, a design review would be added, and the mixed use standards for GC-MU would need to be amended. She communicated that in October this item goes to the Economic and Community Development Committee and, in November, the Council will review it. She continued and stated that in Phase II there will be planned action and infill exemption, an update of the downtown design guidelines, and amendments to development regulations. Economic and Community Development Director Ben Wolters communicated that the economic development initiatives will be a planned action ordinance, the Meeker Revitalization Initiative, work done on outdoor gathering spaces/parks, and a citywide economic development strategy to include more upgraded housing choices. He noted that revitalization initiatives have done well across the nation and the Meeker Revitalization Initiative will take place between 2nd and 4th on Meeker. Satterstrom thanked Councilmember Perry for her service on the downtown steering group and Randal Smith for his work on the committee. The meeting adjourned at 6:29 p.m. I Ronald F M re, MKC City Clerk 3 9/17/2013 VENTUREDowNTov investing in the future City of Kent Council Workshop venture September 17, 2013 CPZ/CPA-2012-1and ZCA-2013-2 "WHAT'S So DARNED IMPORTANT ABOUT DOWNTOWNT' Population Growth • Downtown's role in providing capacity for residential growth Economic Change • Downtown's role is changing 1 9/17/2013 S P / S fit'£ \ 6 G+A3 4.^yHI.e if .A 'F �FENT s z � > A "Downtown has } � •a I V_ ss Vision for Downtown" Commitment to Implementation Economic Vitality Enjoyable Outdoor Space Urban Livability Neighborhood Compatibility Memorable Downtown Experience Pedestrian Priority Environmental Sustainability 2 9/17/2013 Public Otiteach httos://vimeo.com/74741462 Phase I - Outcomes Update Comprehensive Plan • Downtown Subarea Action Plan (DSAP) Map Amendments • Land Use Plan Map • Zoning Districts Map Kent City Code Amendment • Mixed Use Overlay Downtown Subarcii Action PlaIi Replaced by 3 9/17/2013 Themes of DSAP Actio ._, • Livability • Economic vitality • Safety • Outdoor Gathering Space • Compatibility • Sustainability Nlai) An—jendment-, • Land Use Plan Map • Zoning Districts Map Existing Land Use Plan Dtap L.W.d Lar.: purr_ 14 �.a= M. IL I 3 ` . .tC ROW L(HAi i 4 9/17/2013 Aggregated Proposed Land 1--se Plan Amendments • 'c, nor aE, �' , sic � trYti stria) n�r�T •k jT: t Urban Centel (UC) s t Proposed Comprehensive Plan Land Use Plan\lap L-9-4 r I Downtown Existing Zoning Districts flap x> a t> T-- ' 5 9/17/2013 Aggregated Staff Proposed Rezones Pcmc-sEc aEzalE �vnxwn sru�rnrsEa - GC-MU &J :., Downtown �... C Commercial y Enterprise LAE (DCE) 3 C. �...,.. GC- •General 1 ±"`L"'ommercia� r Mixed Use Ga-MU) Aggregated Land t"se&Planning Board Proposed Rezones uyena _Pi£E�liFZOtlE l /� !.' fiTV'DYME4 r.. GC-MU yF Downtown..... Commercial Enterprise " (DCE1.�,•••..� .- � � GC eneral omrnercia Mixed Use s 4� '.RE T1 Proposed Zoning Districts Map L.g" :e ip1YH 6TLOY I.iEA �n R� I - a 6 9/17/2013 Mixed Use Overlay Am- • Amend mixed use definition • Increase GC-MU building height • Add design review • Amend mixed use standards for GC-MU Zoning DLs kl,YI+p.D-11 of G(i GC-MI, 5-0 Phase I • October - Economic &Community Development Committee • November - City Council Phase II • Planned Action & Infill Exemption • Update Downtown Design Guidelines • Development Regulation Amendments 7 9/17/2013 Economic Development,-Initidtivc • Planned Action Ordinance • Meeker Revitalization Initiative • Outdoor Gathering Spaces/Parks • Citywide Economic Development Strategy N .....---.--•-- -- lMM N DRAFT-Meeker Street Revitalization Initiative i + a � eEt�rr 8 9/17/2013 Outdoor Gathering,SpacesTarks k Economic Development Stratep Build.on What,Works , j 9 9/17/2013 VENTURE Do"TO investing in the future P' 'k VENTURE DOWNTOWN investing in the future httl2s://vimeo.com/7474i464 10 The Full DSAP Document may be accessed at: Venturedowntownkent.com DRAFT r KENT DOWNTOWN SUBAREA ACTION PLAN CITY OF KENT — JUNE 2013 to It OIAL�...� Sri -_• if x s, < r _ =q x gg�4x n e w u 3 r CITY OF KENT Downtown Subarea Action Plan TABLE OF CONTENTS CHAPTER ONE—INTRODUCTION PURPOSE 1-1 BACKGROUND 1-2 Planned Actions 1-3 Infill Exemption 1-4 ORGANIZATION OF REPORT 1-4 CHAPTER TWO—EXISTING CONDITIONS ENVIRONMENTAL 2-1 DEMOGRAPHICS AND ECONOMICS 2-2 Population Trends 2-3 Employment Trends 2-3 Economic Trends 2-4 GROWTH ESTIMATES AND EXPECTATIONS 2-5 Planning Horizon&Assumptions 2-5 Methodology&Outcomes 2-6 Downtown Growth Alternatives 2-7 COMMUNITY SERVICES 2-9 Transportation 2-9 Police&Fire 2-10 Water&Sewer 2-11 Education 2-12 Parks &Open Space 2-13 King County Regional Justice Center 2-15 Social Services 2-15 CHAPTER THREE—THE VISION VENTURE DOWNTOWN IN 2030 3-1 PUBLIC OUTREACH 3-3 Table of Contents v CITY OF KENT Downtown Subarea Action Plan CHAPTER FOUR-FRAMEWORK FOR DOWNTOWN KENT DOWNTOWN DISTRICTS 4-1 West District 4-2 North District 4-3 Central Avenue District 4-5 East District 4-5 South District 4-6 Historic District 4-7 DOWNTOWN GOALS—POLICIES—ACTIONS 4-8 Land Use Element 4-8 Urban Design Element 4-10 Housing Element 4-13 Transportation Element 4-13 Parks Element 4-16 Environmental Sustainability Element 4-18 Public Safety Element 4-19 Utilities Element 4-20 Economic Development Element 4-22 LAND USE PLAN MAP APPENDICES A. EMPLOYMENT&HOUSING GROWTH RESOURCES AND METHODOLOGY Data Resources A-1 Methodology A-2 B.VENTURE DOWNTOWN KENT COMMUNITY ENGAGEMENT C. DOWNTOWN SUBAREAACTION PLAN DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT Table of Contents v 2013 DOWNTOWN SUBAREA ACTION PLAN 4.1 Phasing of Kent Downtown Subarea Action Plan Recommendations. Strategic Time RECOMMENDATION Frame 0-2 2-5 5-10 110-20 Funding yr yr yr yr Implications considerations LAND USE ELEMENT: 1 Action LU-2.1: Expand the diversity and density of uses. Existing Staff a. lAmend the Land Use Plan and Zoning Districts Maps. Existing Staff b. lIncrease height for General Commercial Mixed-Use . Existing Staff 2 Action LU-2.2: Ensure developmnet regulations support a livable, economically vibrant, and well designed Downtown. Existing staff a. IRevise the Mixed-Use Overlay Development Standards. Existing Staff b. Revise the multifamily development regulations. Existing Staff c. Revise Design Guidelines and development regulations. Existing Staff d. Review and revise the sign regulations. Existing Staff URBAN DESIGN ELEMENT: 3 Action UD-1.1: Apply Design Guidelines and development standards to the entire Downtown consistant with the vision. Existing Staff 4 Action UD-1.2: Revise Design Guidelines'Pedestrian Plan Overlay'. Existing Staff 5 Action UD-1.3: Revise programmatic and design manuals to ensure pedestrian and bike accessibility. Existing Staff a. lConsider standards for'street-seats'. Existing Staff 6 Action UD-1.4: Connect Kent Station and Historic Kent. a. lInstall year-round street tree lighting. $50-$150K $5KAnnually b. jAdd seasonal planters and hanging baskets. $1OKAnnually c. Consider a covered pedestrian walkway along 2nd Avenue. Maintenance $1.6 $2.2M Costs d. jPromote pedestrian-oriented activities and visual interest. Existing Staff 7 Action UD-1.5: Establish a streetscape design standard. Existing Staff a. jEstablish a working group to review streetscape standards. Existing Staff b. lIdentify where to apply streetscape standards. Existing Staff 8 Action UD-1.6: Ensure that public streetscapes and private properties in Downtown are well maintained. Existing Staff a. IMaintain public streetscape. New Z FTE b. Encourage the private sector to maintain properties. Existing Staff c. Work with KDP to encourage property owners to renovate and restore their buildings. Existing Staff 9 Action UD-2.1: Revise Design Guidelines and development regulations to promote 1st floor facade treatments and uses. Existing Staff 10 Action UD-2.2: Encourage use of high quality building materials. Existing Staff 11 Action UD-2.3: Revise Design Guidelines and development regulations to identify locations for continuous buildings. Existing Staff a. IMaintain historic architectural character of the urban pedestrian streetscape. Existing Staff b. lConsider design options to mitigate building height and bulk to adjacent residential neighborhoods. Existing staff 12 Action UD-2.4: Establish regulations to prohibit the development of Few drive-through businesses on Class A streets. Existing Staff Strategic Time RECOMMENDATION Frame 0-2 1 2-5 1 5-10 110-20 Funding yr yr yr yr Implications Considerations HOUSING ELEMENT: 13 Action H-2.1: Provide incentives to residential development in mixed-use structures or complexes. Existing Staff TRANSPORTATION ELEMENT: 14 Action T-1.1: Establish LOS for multimodal facilities. Consultant 15 Action T-1.2: Ensure pedestrian and bicycle connectivity. Existing Staff 16 Action T-1.3: Design safe &attractive pedestrian connections to adjacent neighborhoods. a. Repair&beautify Gowe St from Central to Temperance. $7M-$8,11 b. Program existing traffic lights along Central. Existing Staff c. Departments coordination when implementing standards. Existing Staff d. Plant and maintain street trees, ensure lifecycle funds. $100KAnnually e. Beautifying paved medians with road improvements $200K Annually 17 Action T-1.4: Transform Central Ave into a place for pedestrians. Existing Staff a. Examine traffic speeds along Central Ave. Existing Staff b. Consider possible elements for pedestrian safety and comfort. Cost contingent on solutions c. E valuate improvements to sidewalks at street corners. $150K 18 Action T-1.5: Work with WSDOT to improve pedestrian safety and aesthetics of the under-passes of SR-167. a. Clean up and maintain underpasses of SR-167. $SOK Annually New 1 FTE b. Explore pedestrain improvements at Willis/SR-167. Existing Staff c. Install drought-resistant ornamental landscapes. $200K $75KAnnually d. Establish an'Ado pt-a-Street'program for the maintenance. Existing Staff 19 Action T-1.6: Create gateways into Downtown. Existing Staff a. Design and prioritize potential gateway locations. $30K b. Develop engineering design options and cost estimates. $50KAnnua/ly c. Appropriate funds for implementation. $200K-$500K 20 Action T-2.1: Work towards train grade separation of vehicles. $25M 21 Action T-2.2: Work to establish a'Quiet Zone'. $2M 22 Action T-2.3: Determine the value and feasibility of new construction soundproofing along the rail tracks. $25K-$40K PARKS ELEMENT: 23 Action P-1.1: Improve parks and recreation facilities to achieve a safe, livable, and economically successful Downtown. Existing Staff a. Evaluate park assets to create attractive gathering places. Existing Sufi b. Include public safety considerations in landscape design. Existing Staff c. Strengthen connections to surrounding recreational facilities. To beoetermned d. Enhance recreational value of Town Square Plaza. To be oetermi,,ed 24 Action P-2.1: Study repositioning existing park assets to increase recreational opportunities. To be Determioed 25 Action P-3.1: Pursue public art to enhance the Urban Center. Existing Staff 26 lAction P-3.2: Promote and support community events. Existing Stuff ENVIRONMENTAL SUSTAINABILITY ELEMENT: 27 Action ES-1.1: Investigate car- and bike-share opportunities. Existing Staff 28 Action ES-3.1: Standards for residential electric vehicle chargers. Existing Staff 29 Action ES-4.1: Establish low impact development standar-,; I I Existing Staff Strategic Time RECOMMENDATION Frame 0-2 2-5 5-10 110-20 Funding yr yr yr yr Implications Considerations PUBLIC SAFETY ELEMENT: 30 Action PS-2.1: Ensure key pedestrian routes are well-lighted. $200K 31 Action PS-2.2: Add lighting to the 1st Ave mid-block passageway. $75K 32 Action PS-2.3: Amend public civility laws and enforce. Existing Staff 33 Action PS-2.4: Security at Sounder Rail Station and Garage. Existing Staff 34 Action PS-2.5: Appropriate lighting in Downtown parks. $100K UTILITIES ELEMENT: 35 Action U-2.1: Underground utilities in Downtown. $20M 36 Action U-2.2: Develop a high speed fiber-optic internet system. Existing Staff 37 Action U-3.1: Conduct&implement a parking study. $20K 38 Action U-3.2: Consider the locations for parking structures. Existing Staff ECONOMIC ELEMENT: 39 Action E-2.1: Work with the KDP to revitalize Downtown. Existing Staff a. lRecruit additional anchor stores and key retailers. Existing Staff b. Recruit a diversity of businesses. Existing Staff c. Encourage an increase of store hours into the evening. Existing Staff d. Identify and promote an entertainment district. Existing Staff 40 Action E-2.2: Adopt and implement a Planned Action Ordinance and Funded 2013- Infill Development Ordinance. 14 Budget 41 Action E-2.3: Propose development incentives for economic revitalization within an identified portion of Downtown. Existing Staff 42 Action E-2.4: Encourage Sound Transit to develop retail space along Existing Staff 2nd Ave in front of Transit Garage. 43 Action E-4.1: Expand existing residential development incentives. Existing Staff 44 Action E-4.2: Promote and encourage retail uses. Existing Staff 45 Action E-4.3: Create site specific incentive packages for targeted commercial, residential and mixed-use development. Existing Staff 46 Action E-5.1: Create interim strategies for vacant lots. Existing Staff 47 Action E-5.2: Encourage businesses and landowners to improve the maintenance and aesthetics of historic properties. Existing Staff Figure 4.1 Phasing of Kent Downtown Subarea Action Plan Recommendations. 2005 DOWNTOWN STRATEGIC ACTION PLAN - ACTIONS COMPLETED Figure 4-2: Phasing of Kent Downtown Strategic Action Plan Recommendations RECOMMENDATION Strategic Time Frame c from 2004 a A. LAND USE 0-2 yr 2-5 yr 5-10 yr 10-20 yr U Al. Redesigate SF-8 area between James&Cloudy City to revise zoning. Streets and Fourth&Fifth Avenues N.to DCE 000, and multi-family residential A2. Review master plan development applications for Kent Station(firer.Borden site) A3. Promote infill housing At least 200 market rate dwelling units by 2008. a. Extend multi-family residential tax abatement Revise existing multi family residential to rental units in Downtown development tax abatement program. 00 b. IReduce or waive permit fees for Downtown residential development c. Allow five stories of wood-frame construction Review applicable building and fire _/ above a concrete base codes. d. Remove Zoning Code minimum lot size Include in 2004 CPA/CPZ cycle. 4 requirement in development standards for multi-family residential zones in DSAP districts A4. jEncourage mixed-use development As needed. a. Lincoln Park&Ride lot King County selling 8 acres of DCE- zoned 9.5 acre lot;see Recommendation DI.d. b. Municipal Parking Lot Possible long-term interest in mixed-use redevelopment. c. Ten(10)acres between SR-167,the UP RR, Lot zoned DCE is for sale, see Willis&Meeker Streets Recommendations B5 and DI.d. A5. Study impacts of pawn shops,bail bond offices, day labor agencies,casinos,adult entertainment businesses,gas stations and tattoo parlors A6. Rezone DCE area on Central Ave.between Smith Fold into 2004 CPA/CPZ cycle. and Gowe Streets to GC 001 A7. Allow underground stormwater detention vaults Review applicable development 4 where appropriate for Downtown sites larger than standards of Public Works Department. one acre in size B.TRANSPORTATION B 1. Develop commuter rail station Service components completed in 2001. B2. Construct street improvements a. Fourth Avenue 1 James to north of Smith St. Completed in 2004. Poe- 2 North of Smith St.to Meeker St. Scheduled for completion in 2005. POI b. Second Avenue Triggered by site development. 1 Sidewalk replacement Smith St.to Harrison Scheduled for completion in 2006. St. S:\Permit\Plan\COMP_PLAN_AMENDMENTS\2012\CPA-2012-1 Downtown\Council\09-17-13\2005DSAP_Fig4- 2 ActionPlan B.xls 2005 DOWNTOWN STRATEGIC ACTION PLAN - ACTIONS COMPLETED 0-2 yr 2-5 yr 5-10 yr 10-20 yr c. Smith Street Linked to rail station connections&Kent Station development. 1 Fourth Ave.to Railroad Ave. Scheduled or completion in 2005. d. Central Avenue High priority, 1 James to George St. Completed in 2004. e. Saar Street Triggered by private development. f. Meeker Street High priority. g. Sixth Avenue Property owner initiated. B3. Plan for overpass at Willis Street-at UP and Determined by Regional Fast Corridor BNSF tracks roject. 134. Adopt street tree standards Street tree plan and species selection document is currently applied to development. B5. Consider accessibility options from Willis and Meeker Streets for properties located between SR- 167 and the Union Pacific RR C. PUBLIC FACILITIES Cl. U grade downtown parks a. Locate a Town Square b. Enhance parks along railroad Could be incremental effort. / c. Masterplan Commons Playfield High priority-coordinate parking. d. Develop street tree plan Completed. C2. Enhance Gateways a. Fourth and James b. Fourth and Smith c. Fourth and Meeker Supports rail station d. Fourth and Willis e. Central and Meeker f. Central and Smith g. Second and Smith Connects Kent Station and Historic Core. C3. Add public buildings a. Performing Arts Center b. Public Market This item completed, but Public Market S has returned to Municipal Parking Lot. r c. Rail station structure Service components completed in 2001, l parking garage completed 2002. r C4. Provide trails and Paths a. ILinks from Interurban Trail b. IPath along James Street c. IMill Creek/Kennebeck C5. Incoporate public art Continuous effort C6. Improve pedestrian bridge over Mill Creek at Temperance St. C7. Plan for eventual undergrounding of all utilities in Long-term implementation-coinciding the Historic Core District with private development S:\Permit\Plan\COMP_PLAN_AM END MENTS\2012\CPA-2012-1 Downtown\Council\09-17-13\2005DSAP_Fig4- 2 ActionPlan B.As 2005 DOWNTOWN STRATEGIC ACTION PLAN — ACTIONS COMPLETED D. DESIGN GUIDELINES 0-2 yr 2-5 yr 5-10 yr 10-20 yr D1. Refine design guidelines a. Historic Core District Completed, incorporated into adopted Downtown Design Guidelines. b. Central Avenue Corridor District See above. 00, c. Smith and Fourth corridor See above. Pool d. East Frame and West Frame District parking Include in 2004 CPA/CPZ cycle. standards revision e. North Frame District incorporated into Consistent with DSAP boundaries- Downtown Design Review Area include in 2004 CPA/CPZ cycle. E. TARGET AREAS E1. Explore redevelopment opportunities a. Obtain Smith Street right-of-way b. Work with property owner on Borden site Sale completed. City is master planning site. c. Fourth Avenue d. Central core historic streets Ongoing effort with KDP. e. South Core District Revise residential development incentives, and encourage mixed-use. f. Central Avenue Corridor District F. COMMUNITY BUILDING F1. Continue working with Kent Downtown Ongoing. Partnership in revitalization efforts 00, a. Assist in identifying and promoting issues and Ongoing. opportunities to benefit community interests and economic health b. Actively promote historical preservation Ongoing-education, inventory, archive. C. Support live performance arts in public places, Revise codes as needed and encourage live performance arts in retail 00, and restaurant businesses F2. Encourage adaptive reuse of historic Kent Depot Assist KDP and Greater Kent Historical Society efforts F3. Address causes and consequences of homelessness in Downtown Pole S:\Permit\Plan\COMP_PLAN_AMENDMENTS\2012\CPA-2012-1 Downtown\Council\09-17-13\2005DSAP_Fig4- 2 ActionPlan B.xls Proposed Compreh( ;trial (I) Ico idustrial i I co co office park,and bulk retail Urban Center (UC) * High-density, mixed-use development * Retail,office, multifamily residential * Public facility NF —SF-4:5 - Amend Amen MDMF I to UC to U(' _ 51 j 8 PL (LU-6) (LU-1 I .LDMF T r A I Amend MU Id to UC MDMF� 'OTENTIAL LAND USE PLAN (LU-8) — )OWNTOWN STUDY AREA t_SA ISE DESIGNATIONS Amend i MDMF �=Iarks & Open Space to UC _ ow Density Multifamily (LU-3) tedium Density Multifamily �I =1obile Home Park MHP 8 MU w A Jrban Center S 46 ST �/Iixecl-Use idustrial ?ARCELS N —� zW E No Scale —MDMF— Edownto NT nity Development ------_ \ ' �r 2013 'WAT �',VESThNG IN THE FUTURE ER ��� D_G S_Data/Gloria/Projects/DSAP_E IS/LUPB/LandUseProposed_11 x 17_NE W5.mxd Proposed Rezone of Gener i * All! MR-H Ml * De: * 2s ---7T— * Exi MR-M GC Medium Density Multifamily (MR-M) * Housekeeping MHP * Existing Condominium MR-G Rezone T B LDR%JWy GC T to MR-M (z-8) lAMLE - --- ZR M SR-6 General Commercial Mixed Use (GC-MU) - * Allows Residential above Commercial * Design Guidelines apply * 2 story(35')to 5 story (65') * No change to existing uses Rezone MR Rezone GC -- GC - - to GC-MU = to GC-MU (z-�3> (Z-7) General Commercial Mixed Use(GC-MU) -- *Allows Residential above Commerical --1 * From 2 story(35')to 5 story(65') C/) Sm - - �— * Design Guidelines apply _ -_- * No change to existing uses MHP GC MR-D SR-1 1 GC-MU S L6 ST — SR-8 CC�MU I FTI _ Legend GC-MU L,I POTENTIAL REZONES DOWNTOWN STUDY AREA -- _-_ PARCELS --- MR-M we •• • GIS Data/Glona/Projects/DSAP EIS/LUPB/ZoningPropoSed 11X17 NEW4,mXa 75 E y e E 7N z w ci m T CD 0 c g o) cm a ¢ N E E > aci w < E E E S O U _� m > E m tl m m M m E N ? o oC [C OC oC °o °o Y U E E E E a0�i c c 0 o ail_ U c (n cn ( C 'E c c 2 a E E E m m y U m 0 0 o N o 0 0 0 0 E E ❑ n O Q m ro Q m m m m m w o o O .N o -E c c Y - U U U 5 ro � a a o H -o w LL LL LL LL LL 0 O c E O O 7CON N N N -o as h- a Oz c CD o) o 0 0> Q c c ooL a 0 3 3 E E c E E " W;¢ o 0 o c_ c_ c_ c_ c_ o o m ro m o 0 0 0 0 m m 0 0 0 C ❑ ¢ ¢ ¢ 5 td U U U U ❑ H H C7 _ Z ❑ ❑ U U C7 C7 C7 U U O O 5 E 0 I I. _ r h AV aCQjO L 1 1r a / X Y T i IN T -AV - -- I �f �V...T" i Nnvz,_, �LD , r 1- '`I Snell£jfF rI II ps FT . _ CIV L + 3 h10�N Y S AV ZL I ] �y 3L - U vv No sN N � ,.rSAV99 r LL � _ i •P.4 A -- I _- BAS. �! 1 \ Y 4 I i