Kent City Council Workshop
July 2, 2013
The meeting was called to order at 5:31 p.m. by Council President Higgins.
Councilmembers present: Higgins, Albertson, Thomas, Boyce, Ralph.
Sound Transit on the Federal Way Transit Extension. Cathal Ridge, Sound Transit
(ST), discussed the Federal Way Transit Extension. She discussed the Alternatives
Analysis Process. Additionally, she communicated that the Environmental Impact
Statement (EIS) Scoping stage is about to begin and it includes a public comment
period. There was discussion about Sound Transit 2 (ST2) and that it is fully funded to
the Kent/Des Moines area. She presented the Level 1 evaluation results of the
alternatives analysis and highlighted the options which were screened out. She
continued and reviewed the Level 2 alternatives and gave the specifics of the SR99
hybrid alternative. Additionally, the results from the Level 2 evaluation results and the
positive and negative aspects for each alternative were presented. She reviewed the
transit-oriented potential (TOD) of the project, how it aligns itself with SR99 and I5
corridors, and stated that the station potential is also considered when it comes to
TOD potential. She noted that there was also an analysis done on the 22 potential
station locations and that there are seven still on the table. She communicated that
the factors that were considered are access and TOD potential. She discussed the
station location evaluation results and said the 216th and 260th stations performed
well when this analysis was applied. She also noted that since these two locations
weren't included in the ST2 funding, they won't get funded.
Councilmember Albertson inquired if intermediate stops could be added in twenty or
thirty years in the future and Ms. Ridge replied that they could.
Ms. Ridge continued her report with the timeline. She noted that the scoping period is
going on now and ends July 17. The Sound Transit Board will distribute the draft EIS
and conduct another public comment period in late 2014. Following these steps, she
stated that ST anticipates that a final EIS will be completed in 2016 and the Board will
identify a preferred alternative shortly after that. She communicated that the best way
the public can comment concerning the project is through the ST website.
Councilmember Ralph inquired if there are enough funds under ST2 for 216th and
260th and Ms. Ridge replied that there were.
Councilmember Albertson inquired how the hybrid alternative came to be and
Ms. Ridge communicated that it emerged from the scoping period and ST will continue
to learn more as the EIS process continues.
Councilmember Albertson inquired about Highline Community College and Ms. Ridge
replied that they are briefing the college nett week. However, she said there needs to
be a full planning exercise.
Council President Higgins stated that the City should communicate that if the decision
is made for the station to be located on the west side of Highway 99 the City should
work on providing easy access to those on the east side of Highway 99.
1
Kent City Council Workshop Minutes July 2, 2013
Councilmember Boyce inquired if there has been any opposition and Ms. Ridge stated
that there hasn't been any to this point.
King County Flood Control District 2014 Budget Process. Mike Mactutis,
Environmental Engineer, discussed the structure of the King County Flood Control
District (KCFCD) and that the City participates through the Joint Basin Technical
Committee and the City's Advisory Committee. He reviewed the $40 million budget
and highlighted that $10 million goes to the operating fund for maintenance and $30
million is for countywide capital projects. $7 to $8 million also goes to Green River
projects, he stated. Mike reviewed the budget schedule and highlighted the specific
dates. He stated that the next meeting is July 18 to consider the budget. However, it
won't get voted on until November or December. He stated the city of Kent has four
major items to complete to move closer to accreditation. Those items are to repair; 1)
Upper and Lower Russell Road Levee 2) the SR516 Levee 3) the Signature Point
connection, and the 4) Milwaukee #2 Levee. He stated that the city of Kent made a
request to the King County Flood Control District Joint Basin Technical Committee to
reduce the budget to the Briscoe/Desimone levee to $18 million and Horseshoe Bend
to zero. The proposal also increases the SR 516/S 231st levee to $8.9 million, the
Lower/Lowest Russell Road to $9.3 million, and the Milwaukee #2 levee to $6 million.
He explained to Councilmember Boyce that the amount was supposed to be used to
purchase property and buildings which wasn't what the city wanted. He discussed the
levees, reviewing the budget and status of each of them from downstream to
upstream. He reviewed the Flood Control District budget request to King County and
said that the System-wide.Improvement Framework (SWIF) study is $12 million, with
most of the funds going to implementation. He also noted for Council President Higgins
that the budget for SWIF is split into two pieces, one for the study and the other for
implementation.
Mr. LaPorte communicated that whoever does SWIF will already have information from
the city of Kent's $3 million dollars worth of studies for its 12 miles incorporated which
has been estimated by King County to be $1 million for 60 miles.
Mr. Mactutis noted that Auburn is looking for accreditation on the Reddington Levee
and other cities are generally supporting the city of Kent's view to stop studying and
move to repair the levees in Kent.
Councilmember Albertson stated that it is her understanding that the SWIF study was
to ensure the work of all the cities is applicable to the system and necessary in getting
the entire system repaired, not just levees in one particular city.
Councilmember Ralph communicated that the City can't get to the accreditation if the
funds are used for the SWIF process and the things the City has already done with the
$3 million are abandoned. She added that there will still be deficiencies in Kent if the
SWIF process is done.
Tim LaPorte, Public Works Director communicated that you can get a lot of protection
in the entire system if you invest in the dam.
Chad Bieren, City Engineer noted that the issue for Kent is that the County wants to do
2
Kent City Council Workshop Minutes July 2, 2013
the study and to work on projects that aren't defined. He stated that the projects in
Kent are defined and are in need of funds now.
Mr. Mactutis reviewed the additional Joint BTC questions and the upcoming meeting
schedule. He communicated that the SWIF process will take two years and noted the
key issues and cost estimates.
Council President Higgins suggested Mr. Mactutis bring forth a recommendation for the
full Council to take action at the July 16 meeting.
Public Facilities Board Vacancy.
Ronald F. Moore, City Clerk presented the Council a packet containing the 13 ShoWare
Center Public Facilities District candidate applications.
Council President Higgins noted that he, Councilmember Ralph, and Councilmember
Albertson will have a recommendation ready by the July 16 Council meeting.
The meeting adjourned at 6:20 p.m.
�115f
onald F. 00re, p�MC
City Clerk
3
1
a
5 � y�w
*i Lam,a'4-4
a
y aF •; ;gym' 4 Qy4,.
ing County flood Control District
udget Process;'
�- Council Workshop
Flood Control District King County
Board of Supervisors
KCFCD Advisory
Committee
KCFCD Executive
Committee
King County
KCFCD Administratio DNRP
King CoQniy WLRD
Bolin Technical
7/2/2013
CD Budget
T
Approximately $40 million total
$10 million Operating Fund .
$30 million Capital Projects
Average $7 - $8 million to Green River CIP
FCID Schedule
April: Basin-level review of project status and key changes
May 1: Advisory Committee Budget Preview
May 14: Joint BTC meeting to review operating proposal and
combined CIP proposal
May 23: Green River BTC meeting to review proposal
May 30: Advisory Committee
June 26: Advisory Committee (cancelled)
July 18: Advisory Committee (Temperature Read)
Late July: Draft Advisory Committee Report
August 31: Transmit Report to Exec Comm., Board of Supervisors
7/2/2013
ty of Kent Needs
Complete Accreditation
Repairs and Improvements to:
Lower/Lowest Russell Road
Levee
SR 516 to S 231 It Way Levee
• Signature Pointe Connection
• Milwaukee No. 2 Levee
FCD City of Kent L)dge'l.
Request
Decrease Budget to:
Briscoe/Desimone ($18 M)
Horseshoe Bend ($0)
Increase Budget to:
SR 516 to S 231 It Way (Upper Russell Road,
Pipeline, Okimoto, Narita) ($8.9 M)
Lower/Lowest Russell Road ($9.3 M)
Milwaukee No. 2 ($6 M) '
� x
3
7/2/2013
- . - -
x
Green River Protects
{ suasr`
k Design and Permitting Continuing in 2013
y,.,A 9i ST
C9 tt red— ,
f/�
(f
r
,i
4
7/2/2013
Milwaukee 11 Levee
Proposed Flood Wall
a
HoYsashtie Bend Lowe t� }�,
s•t.{�' {�.'.fie,�^.iJ'� I d • •
HBB landscape ArchitecPure Photo Renderings-June 21,2013
• ! � Yssell Rood Levee
C
•.J
yam} t 4
'12 STi C
1
� 1
jy t
a � r
i Green River High Water Event-February 23,2012
1
g� ,REN TON
TUKWIl•A
'S ¢1R
I.
'1 J• —. s
KENT- .
r
s
_ l
Upper Russell Road Levee
Potential Flood Inundation Area
Upper Russell Road Levee
Lakes Levee Communities
.� Ittttt
a.
r
7/2/2013
ReachUpper Russell Road Levee
North
6ESYR FLOW A01ERiYLINE
(ELEVATIONQ 13')
IEEYR ELEVAiiON OH.353ol POTENTU:
ARCN1fECTWULOA
VEGcTATYE SOREEN..
-----------
ORDINARY HIGH 9WTER 9NRK
(AP-ROY IM4,E',EVU"2E')
CRYOFE
EASEMEHI
—'cXiS'tI5'FIFE
th'TFI TR>. IIT,r;G GRACE
X%VCE PAO ,DC,T'
OFICNTUE ECR_S'
1ELEVAT'.ON+s+11
y
NORTH REACH•SECTION
Upper Road
South
I
SEO YR GLODO ^ y.
(ELEVATrg1�1.9Y)
—'—PROPFATY I4VF
' fE1.EVATlON 1926)
PCT9NTwL
W-ETA NE SCFdEN
{APpip9gµTE
-Ezsnnc ttvEE � -9v Y'ncE PROPosEo
4NMTPA0. piY OF KFNiLEVEE Ir HI4
�IELEVAAUN 159i1 1 CIFY OF RFNT
�� E}J6TING GPACf EASt].ENT
iSOUTH REACH-SECTION
Russell Road Lower/Lowest Levee y
Holiday Kent-tel Levee -
m
r
t
x
33t^
At
d
Russell Road Lower/Lowest Levee
Potential Flood Inundation Area
7/2/2013
FCD King County Budget
Request
Decrease budget to: � :p
Briscoe/Desimone ($13 M)
Horseshoe Bend ($2.5 M)
Increase budget to: I >
SWIF Study and Implementation ($12.7 M)
Lower Russell Road ($1 .0 M) r
Reddington Levee ($13.5 M)
Other City B-i"11--l' Questions
Q 1�
l. If we are doing a corridor planning effort should we commit
funding to specific capital projects in advance of completing the
planning effort? Under what circumstances can actions move
forward in advance of the larger planning effort?
2. Should new projects be considered for the CIP at this time, and if
so how do other jurisdictions submit new project ideas for
consideration? If yes,are coastal projects eligible for funding?What
about urban streams and stormwater?
3. Should FEMA accreditation be a policy priority for District funding?
4. Should we have predetermined allocations for each basin from
year to year, or adjust the CIP across the entire county?
5. Should the 2012 resolution approving the sandbag removal
expenditures on the Green be amended?
6. How do we make sure that the CIP reflects the highest priority
needs across the county?
S
7/2/2013
FCD Budget Next Step
Technical Committee Meeting-July 11
Advisory Committee Meeting-July 18
Provide report-August 31
Executive Committee-
September 16 a y
F
Board of Supervisors
FLMA Flood Hazard Mop
Schedule Driver
• FEMA to issue Levee Analysis
and Mapping Procedures
* 4 ..,
Conduct new flood studies
with new policies (1 yr.)
Public Review of Preliminary
Maps and Appeals (1 yr.)
• Finalize Flood Hazard Maps
(1 yr.)
�_r
7/2/2013
Green River S st rn Wide
Improvement Framework IFI
2-year planning process until February 2015
Key issues: Levels of protection
Risk-based levee improvements
Public outreach
Vegetation management
Long-term maintenance costs
Habitat/water quality
Identify problems, recommend improvements, and prioritize
solutions based on flood risks
Consultant Costs: $865,000
County Staff: 10,290 hours
King County Flood Hazard
Managei-nenf Plan Update
Draft Released for Public Review
Comments due July 12
Public Meeting on July 9
Issues: Accreditation, Coastal Flooding, Project Criteria and List
7/2/2013
„ Budget
Council ..