HomeMy WebLinkAboutCity Council Committees - Public Works/Planning - 10/19/2015 (3) I
Public Works Committee Agenda
i
-'^ Councilmembers: Brenda Fincher - Dana Ralph - Dennis Higgins, Chair
a.a„ .ani , .KeAt
October 19, 2015
4 p.m.
Item Description Action Speaker Time Pace
1. Call to order Chair Higgins 1
2. Roll Call Chair Higgins 1
3. Changes to the Agenda Chair Higgins 1
4. Approval of Minutes, dated October 5, 2015 YES Chair Higgins 3 3
5. Department of Ecology Coordinated YES Gina Hungerford 05 7
Prevention Grant
6. Local Hazardous Waste Management YES Gina Hungerford 05 25
Program
7. Information Only/Snow and Ice Preparation NO Bill Thomas 10 33
8. Information Only/Stormwater Rates Analysis NO Mike Mactutis 10 35
Unless otherwise noted, the Public Works Committee meets at 4 p.m. on the first and third
Monday of each month at Kent City Hall, Council Chambers East, 220 41h Ave S, Kent, WA
98032. For additional information please contact Cheryl Viseth at 253-856-5500.
Any person requiring a disability accommodation should contact the City Clerk's
Office at 253-856-5725 in advance. For TDD relay service call Washington
Telecommunications Relay Service at 1-800-833-6388.
z
This page intentionally left blank
Public Works Committee Minutes 3
October 5, 2015
Item 1 — Call to Order: The meeting was called to order at 4:02 p.m. by Committee Chair,
Dennis Higgins.
Item 2 — Roll Call: Committee members present: Dennis Higgins and Brenda Fincher were
present. Committee member Dana Ralph had an excused absence.
Item 3 — Chances to the Agenda: There were no changes to the agenda.
Item 4 — Approval of Meeting Minutes Dated September 21, 2015:
Committee member Fincher MOVED to approve the minutes of September 21, 2015. The
motion was SECONDED by Committee member Ralph and PASSED 2-0.
Item 5 —2016 Business & Occupation and Residential Street Repair Project Lists:
Pavement Engineer, Joe Araucto went over the list of projects that, if approved, will be worked on
in 2015 through 2016.
The Department recommends pavement replacement on the James Street hill climb between
Central Avenue and 94th Avenue, as well as landscape work between the sidewalk and the curb.
A second major endeavor would be to begin the pavement replacement on 80th Avenue between
194th and 192nd streets. Staff recommends that this be repaved with concrete due to the very
high truck count and it being in a high water table area. The concrete surfacing will perform much
better over time and would be more economical over a life cycle.
Araucto stated that staff also expects to be able to do some work on missing portions of sidewalk
on Reith road.
It was recommended that funds be set aside to potentially complete the landscape island
renovation on Pacific Highway South; $150,000 for continuing the flashing left turn arrow program.
The exact amount cannot be determined until the existing wiring and controller configuration is
analyzed for the selected signal systems.
Araucto went over the Residential street maps that listed streets that are planned for pavement
overlay work.
Kelly Peterson, Transportation/Special Projects Manager quickly went over the Traffic Loops project
and what it entails. He stated we have 9 flashing arrows and 24 new signals and are looking to get
3 additional flashing yellow lights.
Committee Member Fincher MOVED to Approve the 2016 street improvement project
lists, pay for these additional project costs, except as may be supplemented by grant
funds or additional Council authorization, from available Business and Occupation Tax
receipts, or from solid waste utility tax receipts for the residential street repair, subject
to final terms and conditions acceptable to the City Attorney and Public Works Director.
The motion was SECONDED by Committee member Higgins and PASSED 2-0.
1
Public Works Committee Minutes 4
October 5, 2015
Item 6 — Proiect Funding Agreement for Mill Creek Side Channel — Leber Restoration
Proiect:
Matt Knox, Environmental Biologist noted that he will present the two grants (items 6 and 7)
together with two separate motions to be approved.
Knox stated that the City of Kent proposes to construct a floodplain wetland off of Mill Creek
providing a large salmon habitat. The Leber property is located adjacent to Highway 167 and the
Green River and Downey Farmstead adjacent to Highway 516. The design was funded by Salmon
Recover Funding Board grants.
This last increment of funding will be used to complete the remaining phase of construction and will
include: 1000 LF of new off-channel habitat; 43 log structures designed to maximize salmon
habitat; removal of invasive vegetation; improvement of more than five acres of riparian and two
acres of upland plantings to increase diversity, density and shading with a focus on increasing
conifer density.
Committee Member Fincher MOVED to recommend Council authorize the Mayor to sign
the Washington State Recreation and Conservation Office Salmon Recovery Funding
Board (SRFB) agreement for Mill Creek Side Channel — Leber project, and direct staff to
accept the grant and establish a budget for the project, subject to final terms and
conditions acceptable to the City Attorney and Public Works Director. The motion was
SECONDED by Committee member Higgins and PASSED 2-0.
Item 7 — King County Flood Control District Cooperative Watershed Management Grant,
Proiect Funding Agreement for Mill Creek Side Channel — Leber and Downey Farmstead
Restoration Proiects:
Item was discussed with Item 6.
Committee Member Fincher MOVED to recommend Council authorize the Mayor to sign
the King County Cooperative Watershed Management Grant (CWM) in the amount of
$664,227.00 and direct staff to accept the grant and establish budgets for the projects
subject to final terms and conditions acceptable to the City Attorney and Public Works
Director. The motion was SECONDED by Committee member Higgins and PASSED 2-0.
Item 8 — Information Only/Russell Road Upper Levee — North Reach River Protection
Easement — Marina Pointe HOA:
Alex Murillo, P.E., Environmental Engineering Supervisor gave a brief background and quick update
of this project which is located along the Green River on the west side of the Lakes Community. It
is currently under construction and will meet FEMA accreditation standards. Murillo provided an
update on the construction progress.
A condemnation ordinance hearing was held on August 18, 2015 City Council Meeting. At that
meeting, a request was made by City Council to update the Public Works Committee on the status
of the River Protection Easement that is needed by the King County Flood Control District for
inspection and maintenance of the levee along a privately owned area of the Marina Pointe
Homeowners' Association. Murillo provided a brief summary on the progress to date regarding the
River Protection Easement.
INFORMATION ONLY/NO MOTION REQUIRED
2
Public Works Committee Minutes 5
October 5, 2015
Item 9 — Information Only/Public Works Operations (Russell Road) Bulk Fueling Facility:
Ron Green, Fleet Superintendent noted that the Kent East Hill Operations Center (KEHOC) master
plan included construction of a new fueling facility with above ground tanks. The plan was to
decommission the underground tanks and upgrade the Russell Road Operations facility with above
ground tanks, overhead canopy, dispensers, and automated fuel management system once the
KEHOC was up and running.
With the decision to discontinue construction of the KEHOC there is concern about imminent
deficiencies in the existing underground fuel tanks, and the fuel dispensing equipment at the Public
Works Maintenance and Operations facility on Russell Road.
Green noted that the underground tanks are 26 years old, are not leaking and are compliant with
the Department of Ecology (DOE), for now. Concerns include the liability that may be incurred due
to the proximity of the pumps to the Green River; the potential cost to mitigate in the future should
they begin leaking and that the existing dispensing equipment is obsolete and well past its life
cycle. Maintenance on these dispensers has become an issue due to their age and availability of
serviceable parts. Additionally, the chip key fuel management software system is no longer
sustainable. Green went on to state that the fuel facility does not meet current requirements of an
overhead canopy covering the fuel islands to reduce and contain contaminants from storm-water
runoff.
INFORMATION ONLY/ NO MOTION REQUIRED
Item 10 — Information Only/James Street Hill Climb Planters:
Mark Howlett, P.E., Design Engineering Manager noted that the condition of James street sidewalk
sections that have been repaired due to buckles made by street trees. Howlett showed an artist
rendition of what the area may look like with alternative plants.
An open house was held on April 9, 2015 to solicit input from the public about what they would like
to see planted in the strips.
Staff has reviewed all the information and will provide an update on the progress at a later
meeting.
INFORMATION ONLY/NO MOTION REQUIRED
The meeting was adjourned at 5:05 p.m.
ChexyLVOetiV
Council Committee Recorder
3
6
This page intentionally left blank
7
PUBLIC WORKS DEPARTMENT
� Timothy J. LaPorte, P.E. Public Works Director
Phone: 253-856-5500
rEwta Fax: 253-856-6500
Address: 400 West Gowe Street
Kent, WA 98032-5895
Date: October 15, 2015
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: October 19, 2015
From: Gina Hungerford. Conservation Coordinator
Through: Kelly Peterson, AICP, Transportation/Special Projects Manager
Chad Bieren, P.E., City Engineer
Subject: Washington State Department of Ecology Coordinated
Prevention Grant (CPG)
Motion: Move to recommend Council authorize the Mayor to accept the
Coordinated Prevention Grant in the amount of $123,522.67 and
authorize expenditure of the grant funds, subject to final terms and
conditions acceptable to the City Attorney and Public Works Director.
Summary: The Coordinated Prevention Grant is a two year grant funded by the
Washington State Department of Ecology. It pays 75% of the "maximum eligible
program cost" which for Kent is $123,522.67. A 25% match will be provided by the
King County Waste Reduction and Recycling Grant.
This Grant funds Residential and Commercial Waste Reduction and Recycling
Programs including events for collection of materials hard-to-recycle at the curb:
appliances, electronic equipment, mattresses, Styrofoam, bulky yard debris,
concrete and tires.
Exhibit: Coordinated Prevention Grant
Budget Impact: The City will receive from the Washington State Department of
Ecology $92,642.00, distributed on a cost basis as tasks are completed. The
required 25% match of $30,880.67 will come from the King County Waste Reduction
and Recycling Grant.
8
This page intentionally left blank
Agreement No: W2RCPG-1517-KentPW-00075 Ppge 1 of 16
Project Title: 2015-17 CPG Kent IMP 7
Recipient Name: City ofKent
DEPARTMENT OF
%%%%///
,i,I ECOLOGY
State of Washington
Agreement W2RCPG-1517-KentPW-00075
WASTE 2 RESOURCES COORDINATED PREVENTION GRANT PROGRAM AGREEMENT
BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY
AND
City of Kent
This is a binding Agreement entered into by and between the State of Washington, Department of Ecology,
hereinafter referred to as "ECOLOGY' and City of Kent, hereinafter referred to as the 'RECIPIENT"to carry out
with the provided funds activities described herein.
GENERAL INFORMATION
Project Title: 2015-17 CPG Kent IMP
Total Cost: $123,522.67
Total Eligible Cost: $123,522.67
Ecology Share: $92,642.00
Recipient Share: $30,880.67
The Effective Date of this Agreement is: 07/10/2015
The Expiration Date of this Agreement is no later than 06/30/2017
Project Type: Implementation
Project Short Description:
The RECIPIENT(City of Kent)will host up to six (6)Residential Recycling Collection Events for City residents
with its $123,522.67 CPG monies. The RECIPIENT expects to divert 300 tons of recycled material, which includes
an estimated 25 tons of organics and 60 tons of moderate risk waste,from 4000 residential participants as a result of
making over 188,000 resident contacts during the 2015-17 grant cycle.
Project Long Description:
N/A
Overall Goal:
Provide regional solutions and intergovernmental cooperation; prevent or minimize environmental contamination
through planning and project implementation; and comply with state and local solid and hazardous waste
management plans and laws.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 1Ppge2of16
Project Title: 2015-17 CPG Kent IMP ��JJ
Recipient Name: City ofKent
RECIPIENT INFORMATION
Organization Name: City of Kent
Federal Tax ID: 91-6001254
DUNS Number: 000000000
Mailing Address: 220 Fourth Ave S
Kent, WA, 98032
Physical Address: 220 Fourth Ave S
Kent, Washington, 98032
Organization Email: ghungerford#kentwa.gov
Contacts
Project Manager Regina Hungerford
Conservation Coordinator
PW Works Engineering
220 Fourth Ave. S.
Kent, Washington, 98032
Email: ghungerford#kentwa.gov
Phone: (253) 856-5549
Billing Contact Paul Devine
General Manager
4715 SW WALKER ST
Seattle, Washington, 98116
Email: pauldevine#msn.com
Phone: (206)938-8262
Authorized Regina Hungerford
Signatory Conservation Coordinator
PW Works Engineering
220 Fourth Ave. S.
Kent, Washington, 98032
Email: ghungerford#kentwa.gov
Phone: (253) 856-5549
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 fige3of16
Project Title: 2015-17 CPG Kent IMP
Recipient Name: City ofKent
ECOLOGY INFORMATION
Mailing Address: Department of Ecology
Waste 2 Resources
PO BOX 47600
Olympia, WA 98504-7600
Physical Address: Waste 2 Resources
300 Desmond Drive
Lacey, WA 98503
Contacts
Project Vicki Colgan
Manager
3190 160th Ave SE
Bellevue, Washington, 98008-5452
Email: vcol461#ecy.wa.gov
Phone: (425)649-7224
Financial Vicki Colgan
Manager
3190 160th Ave SE
Bellevue, Washington, 98008-5452
Email: vcol461#ecy.wa.gov
Phone: (425)649-7224
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 iPege 4 of 16
Project Title: 2015-17 CPG Kent IMP 12
Recipient Name: City ofKent
SCOPE OF WORK
Task Number: 1 Task Cost: $123,522.67
Task Title: WR&R: Residential Collection Events
Task Description:
The RECIPIENT will host up to six(6)Residential Recycling Collection Events for City residents during this grant
cycle. The events will provide residents with the opportunity to divert hard-to-recycle items from the waste stream by
recycling them in a convenient City location, as well as serve as an opportunity to distribute educational materials on
how to reduce waste and recycle using City-sponsored or private sector WR&R programs.
The RECIPIENT may charge user fees for some items or may drop user fees to increase the volume of materials
collected. The RECIPIENT will credit this grant for any revenue received from the collection of fees or commodity
sales on items the grant is directly supporting. In addition, the Coordinated Prevention Grant Program does not pay for
costs covered by an existing product stewardship program(such as E-cycle Washington, LightRecycle Washington, or
Call2Recycle). Contact your Ecology grant project manager or consult the following website if you are unsure about a
cost's grant-eligibility:http://www.ecy.wa.gov/programs/swfa/ProductStewardsMpFAQ.html.
The costs of membership in civic, business, and technical/professional organizations are allowed to the extent they are
covered in the overhead rate. If the RECIPIENT does not charge overhead to this task,it may directly bill for
membership(s)pre-approved by ECOLOGY.
Task Goal Statement:
Decreasing the amount of organics, moderate risk waste (MRW), and other hard-to-recycle items from being landfilled
by holding collection events in a convenient location for City residents, is the goal of the program, thereby also
keeping environmentally damaging materials from finding their way to stonndrains, streams, and other isolated sites in
our City. Human health risks from these materials will be lowered as well.
Task Expected Outcome:
The RECIPIENT expects to divert 300 tons of recycled material, which includes an estimated 25 tons of organics and
60 tons of moderate risk waste, from 4000 residential participants as a result of making 188,000 resident contacts. The
RECIPIENT will provide the following information to the Department of Ecology for project evaluation:
1)The number of events held.
2)The number of event participants attending-the site greeter will count cars as they arrive.
3)The volume of each material collected in pounds/tons as reported from event vendors and from material delivered
to recycling centers.
4)The numbers of promotional/educational contacts made.
Recipient Task Coordinator: Paul Devine
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 iPeS{e 5 of 16
Project Title: 2015-17 CPG Kent IMP 13
Recipient Name: City ofKent
WR&R: Residential Collection Events
Deliverables
Number Description Due Date
1.1 Ql: No work this quarter.
1.2 Q2: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.3 Q3: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.4 Q4: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.5 Q5: No work this quarter.
1.6 Q6: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.7 Q7: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.8 Q8: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement and
closeout.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 P�e 6of 16
1
Project Title: 2015-17 CPG Kent IMP 1
Recipient Name: City ofKent
BUDGET
Funding Distribution EG160221
Funding Title: State Building Construction Account
Funding Type: Grant Funding Expiration Date: 06/30/2017
Funding Effective Date: 07/10/2015
Funding Source:
Title: State Building Construction Account(SBCA)
Type: State
CFDA:
Assistance Agreement:
Description:
Recipient Match%: 25
InKind Interlocal Allowed: Yes
InKind Other Allowed: No
Is this Funding Distribution used to match a federal grant? No
State Building Construction Account Task Total
WR&R: Residential Collection Events $ 123,522.67
Total: $ 123,522.67
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 P�ge7of16
1
Project Title: 2015-17 CPG Kent IMP s
Recipient Name: City ofKent
Funding Distribution Summary
Recipient/Ecology Share
Funding Distribution Name Recipient Match % Recipient Share Ecology Share Total
State Building Construction 25.00 % $ 30,880.67 $ 92,642.00 $ 123,522.67
Account
Total S 30,880.67 S 92,642.00 S 123.522.67
AGREEMENT SPECIFIC TERMS AND CONDITIONS
N/A
SPECIAL TERMS AND CONDITIONS
Indirect costs can be charged at a rate of up to 25%of salaries and benefits.
GENERAL FEDERAL CONDITIONS
If a portion or all of the funds for this agreement are provided through federal funding sources or this
agreement is used to match a federal grant award,the following terms and conditions apply to you.
CERTIFICATION REGARDING SUSPENSION, DEBARMENT,INELIGIBILITY OR VOLUNTARY EXCLUSION:
1. The RECIPIENT/CONTRACTOR, by signing this agreement, certifies that it is not suspended, debarred,
proposed for debarment, declared ineligible or otherwise excluded from contracting with the federal
government, or from receiving contracts paid for with federal funds.If the RECIPIENT/CONTRACTOR is
unable to certify to the statements contained in the certification, they must provide an explanation as to why they
cannot.
2. The RECIPIENT/CONTRACTOR shall provide immediate written notice to ECOLOGY if at any time the
RECIPIENT/CONTRACTOR learns that its certification was erroneous when submitted or had become
erroneous by reason of changed circumstances.
3. The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, participant,
person, primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have
the meaning set out in the Definitions and Coverage sections of rules implementing Executive Order 12549.
You may contact the department for assistance in obtaining a copy of those regulations..
4. The RECIPIENT/CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction
with a person who is proposed for debarment under the applicable Code of Federal Regulations, debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction.
5. The RECIPIENT/CONTRACTOR further agrees by signing this agreement, that it will include this clause titled
"CERTIFICATION REGARDING SUSPENSION, DEBARMENT,INELIGIBILITY OR VOLUNTARY
EXCLUSION" without modification in all lower tier covered transactions and in all solicitations for lower tier
covered transactions.
6. Pursuant to 2CFR180.330,the RECIPIENT/CONTRACTOR is responsible for ensuring that any lower tier
covered transaction complies with certification of suspension and debarment requirements.
7. RECIPIENT/CONTRACTOR acknowledges that failing to disclose the information required in the Code of
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 iPgge 8of 16
Project Title: 2015-17 CPG Kent IMP 16
Recipient Name: City ofKent
Federal Regulations may result in the delay or negation of this funding agreement, or pursuance of legal
remedies,including suspension and debarment.
8. RECIPIENT/CONTRACTOR agrees to keep proof in its agreement file, that it, and all lower tier recipients or
contractors, are not suspended or debarred, and will make this proof available to ECOLOGY before requests for
reimbursements will be approved for payment. RECIPIENT/CONTRACTOR must run a search in
<http://www.sam.gov>and print a copy of completed searches to document proof of compliance.
Federal Funding Accountability And Transparency Act (FFATA)Reporting Requirements:
RECIPIENT must complete the FFATA Data Collection Form(ECY 070-395)and return it with the signed
agreement to ECOLOGY.
Any RECIPIENT that meets each of the criteria below must also report compensation for its five top executives,
using FFATA Data Collection Form.
Receives more than$25,000 in federal funds under this award; and
Receives more than 80 percent of its annual gross revenues from federal funds; and
Receives more than$25,000,000 in annual federal funds
ECOLOGY will not pay any invoice until it has received a completed and signed FFATA Data Collection Form.
ECOLOGY is required to report the FFATA information for federally funded agreements, including the required
DUNS number, at www.fsrs.gov<http://www.fsrs.gov>within 30 days of agreement signature. The FFATA
information will be available to the public at www.usaspending.gov<http://www.usaspending.gov>.
For more details on FFATA requirements, see www.fsrs.gov<http://www.fsrs.gov>.
GENERAL TERMS AND CONDITIONS
1. ADMINISTRATIVE REQUIREMENTS
a) RECIPIENT shall follow the "Administrative Requirements for Recipients of Ecology Grants and Loans—EAGL
Edition". https://fortress.wa.gov/ecy/publications/SummaryPages/1401002.htm1
b) RECIPIENT shall complete all activities funded by this Agreement and be fully responsible for the proper
management of all funds and resources made available under this Agreement.
c) RECIPIENT agrees to take complete responsibility for all actions taken under this Agreement,including ensuring
all subgrantees and contractors comply with the terms and conditions of this Agreement. ECOLOGY reserves the right
to request proof of compliance by subgrantees and contractors.
d) RECIPIENT's activities under this Agreement shall be subject to the review and approval by ECOLOGY for the
extent and character of all work and services.
2. AMENDMENTS AND MODIFICATIONS
This Agreement may be altered, amended, or waived only by a written amendment executed by both parties. No
subsequent modification(s)or amendment(s) of this Agreement will be of any force or effect unless in writing and
signed by authorized representatives of both parties. ECOLOGY and the RECIPIENT may change their respective staff
contacts and administrative information without the concurrence of either party.
3. ARCHAEOLOGICAL AND CULTURAL RESOURCES
RECIPIENT shall take reasonable action to avoid, minimize, or mitigate adverse effects to archeological or cultural
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 e 9of 16
1P�
Project Title: 2015-17 CPG Kent IMP 1
Recipient Name: City ofKent
resources. Activities associated with archaeological and cultural resources are an eligible reimbursable cost subject to
approval by ECOLOGY.
RECIPIENT shall:
a) Immediately cease work and notify ECOLOGY if any archeological or cultural resources are found while
conducting work under this Agreement.
b) Immediately notify the Department of Archaeology and Historic Preservation at(360) 586-3064, in the event
historical or cultural artifacts are discovered at a work site.
c) Comply with Governor Executive Order 05-05, Archaeology and Cultural Resources, for any capital construction
projects prior to the start of any work.
d) Comply with RCW 27.53, Archaeological Sites and Resources, for any work performed under this Agreement, as
applicable. National Historic Preservation Act(NHPA)may require the RECIPIENT to obtain a permit pursuant to
Chapter 27.53 RCW prior to conducting on-site activity with the potential to impact cultural or historic properties.
4. ASSIGNMENT
No right or claim of the RECIPIENT arising under this Agreement shall be transferred or assigned by the RECIPIENT.
5. COMMUNICATION
RECIPIENT shall make every effort to maintain effective communications with the RECIPIENT's designees,
ECOLOGY, all affected local, state, or federal jurisdictions, and any interested individuals or groups.
6. COMPENSATION
a) Any work performed prior to effective date of this Agreement will beat the sole expense and risk of the
RECIPIENT. ECOLOGY must sign the Agreement before any payment requests can be submitted.
b) Payments will be made on a reimbursable basis for approved and completed work as specified in this Agreement.
c) RECIPIENT is responsible to determine if costs are eligible. Any questions regarding eligibility should be clarified
with ECOLOGY prior to incurring costs. Costs that are conditionally eligible may require approval by ECOLOGY
prior to purchase.
d) RECIPIENT shall not invoice more than once per month unless agreed on by ECOLOGY.
e) ECOLOGY will not process payment requests without the proper reimbursement forms, Progress Report and
supporting documentation. ECOLOGY will provide instructions for submitting payment requests.
f) ECOLOGY will pay the RECIPIENT thirty(30)days after receipt of a properly completed request for payment.
g) RECIPIENT will receive payment through Washington State Department of Enterprise Services' Statewide Payee
Desk. RECIPIENT must register as a payee by submitting a Statewide Payee Registration form and an IRS W-9 form at
the website, http://www.des.wa.gov/services/ContractingPurchasingBusiness/VendorPay/Pages/default.aspx. For any
questions about the vendor registration process contact the Statewide Payee Help Desk at(360) 407-8180 or email
payeehelpdesk#des.wa.gov.
h) ECOLOGY may, at its sole discretion, withhold payments claimed by the RECIPIENT if the RECIPIENT fails to
satisfactorily comply with any term or condition of this Agreement.
i) Monies withheld by ECOLOGY maybe paid to the RECIPIENT when the work described herein, or a portion
thereof,has been completed if, at ECOLOGY's sole discretion, such payment is reasonable and approved according to
this Agreement, as appropriate, or upon completion of an audit as specified herein.
j) RECIPIENT should submit final requests for compensation within thirty (30)days after the expiration date of this
Agreement. Failure to comply may result in delayed reimbursement.
7. COMPLIANCE WITH ALL LAWS
RECIPIENT agrees to comply fully with all applicable Federal, State and local laws, orders, regulations, and permits
related to this Agreement,including but not limited to:
a) RECIPIENT agrees to comply with all applicable laws, regulations, and policies of the United States and the State
of Washington which affect wages and job safety.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 P�ye 10 of 16
i
Project Title: 2015-17 CPG Kent IMP O
Recipient Name: City ofKent
b) RECIPIENT agrees to be bound by all federal and state laws, regulations, and policies against discrimination.
c) RECIPIENT certifies full compliance with all applicable state industrial insurance requirements.
d) RECIPIENT agrees to secure and provide assurance to ECOLOGY that all the necessary approvals and permits
required by authorities having jurisdiction over the project are obtained. RECIPIENT must include time in their project
timeline for the permit and approval processes.
ECOLOGY shall have the right to immediately terminate for cause this Agreement as provided herein if the
RECIPIENT fails to comply with above requirements.
If any provision of this Agreement violates any statute or rule of law of the state of Washington, it is considered
modified to conform to that statute or rule of law.
8. CONFLICT OF INTEREST
RECIPIENT and ECOLOGY agree that any officer,member, agent, or employee, who exercises any function or
responsibility in the review, approval, or carrying out of this Agreement, shall not have any personal or financial
interest, direct or indirect, nor affect the interest of any corporation, partnership, or association in which he/she is a part,
in this Agreement or the proceeds thereof.
9. CONTRACTING FOR GOODS AND SERVICES
RECIPIENT may contract to buy goods or services related to its performance under this Agreement. RECIPIENT shall
award all contracts for construction,purchase of goods, equipment, services, and professional architectural and
engineering services through a competitive process, if required by State law. RECIPIENT is required to follow
procurement procedures that ensure legal,fair, and open competition.
RECIPIENT must have a standard procurement process or follow current state procurement procedures. RECIPIENT
may be required to provide written certification that they have followed their standard procurement procedures and
applicable state law in awarding contracts under this Agreement.
ECOLOGY reserves the right to inspect and request copies of all procurement documentation, and review procurement
practices related to this Agreement. Any costs incurred as a result of procurement practices not in compliance with
state procurement law or the RECIPIENT's normal procedures may be disallowed at ECOLOGY's sole discretion.
10. DISPUfES
When there is a dispute with regard to the extent and character of the work, or any other matter related to this
Agreement the determination of ECOLOGY will govern, although the RECIPIENT shall have the right to appeal
decisions as provided for below:
a) RECIPIENT notifies the funding program of an appeal request.
b) Appeal request must be in writing and state the disputed issue(s).
c) RECIPIENT has the opportunity to be heard and offer evidence in support of its appeal.
d) ECOLOGY reviews the RECIPIENT's appeal.
e) ECOLOGY sends a written answer within ten(10)business days, unless more time is needed, after concluding the
review.
The decision of ECOLOGY from an appeal will be final and conclusive,unless within thirty(30)days from the date of
such decision, the RECIPIENT furnishes to the Director of ECOLOGY a written appeal. The decision of the Director or
duly authorized representative will be final and conclusive.
The parties agree that this dispute process will precede any action in a judicial or quasi-judicial tribunal.
Appeals of the Director's decision will be brought in the Superior Court of Thurston County. Review of the Director's
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 iP�pe 11 of 16
Project Title: 2015-17 CPG Kent IMP 17
Recipient Name: City ofKent
decision will not be taken to Environmental and Land Use Hearings Office.
Pending final decision of a dispute, the RECIPIENT agrees to proceed diligently with the performance of this
Agreement and in accordance with the decision rendered.
Nothing in this contract will be construed to limit the parties'choice of another mutually acceptable method,in addition
to the dispute resolution procedure outlined above.
11. ENVIRONMENTAL STANDARDS
a) RECIPIENTS who collect environrental-monitoring data must provide these data to ECOLOGY using the
Environmental Information Management System(EIM). To satisfy this requirement these data must be successfully
loaded into EIM, see instructions on the EIM website at: http://www.ecy.wa.gov/eim.
b) RECIPIENTS are required to follow ECOLOGY's data standards when Geographic Information System (GIS)data
are collected and processed. More information and requirements are available at:
http://www.ecy.wa.gov/services/gis/data/standards/standards.htm. RECIPIENTS shall provide copies to ECOLOGY of
all final GIS data layers, imagery, related tables, raw data collection files, map products, and all metadata and project
documentation.
c) RECIPIENTS must prepare a Quality Assurance Project Plan(QAPP)when a project involves the collection of
environmental measurement data. QAPP is to ensure the consistent application of quality assurance principles to the
planning and execution of all activities involved in generating data. RECIPIENTS must follow ECOLOGY's
Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies, July 2004(Ecology Publication
No. 04-03-030). ECOLOGY shall review and approve the QAPP prior to start of work. The size, cost, and complexity
of the QAPP should be in proportion to the magnitude of the sampling effort.
12. GOVERNING LAW
This Agreement will be governed by the laws of the State of Washington, and the venue of any action brought
hereunder will be in the Superior Court of Thurston County.
13. INDEMNIFICATION
ECOLOGY will in no way be held responsible for payment of salaries, consultant's fees, and other costs related to the
project described herein, except as provided in the Scope of Work.
To the extent that the Constitution and laws of the State of Washington permit, each party will indemnify and hold the
other harmless from and against any liability for any or all injuries to persons or property arising from the negligent act
or omission of that party or that party's agents or employees arising out of this Agreement.
14. INDEPENDENT STATUS
The employees,volunteers, or agents of each party who are engaged in the performance of this Agreement will continue
to be employees,volunteers, or agents of that party and will not for any purpose be employees,volunteers, or agents of
the other party.
15. KICKBACKS
RECIPIENT is prohibited from inducing by any means any person employed or otherwise involved in this Agreement to
give up any part of the compensation to which he/she is otherwise entitled to or receive any fee, commission, or gift in
return for award of a subcontract hereunder.
16. MINORITY AND WOMEN'S BUSINESS ENTERPRISES(MWBE)
RECIPIENT is encouraged to solicit and recruit,to the extent possible, certified minority-owned(MBE)and
women-owned(WBE)businesses in purchases and contracts initiated under this Agreement.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 .�PpXe 12 of 16
Project Title: 2015-17 CPG Kent IMP L 0
Recipient Name: City ofKent
Contract awards or rejections cannot be made based on MWBE participation; however, the RECIPIENT is encouraged
to take the following actions,when possible, in any procurement under this Agreement:
a) Include qualified minority and women's businesses on solicitation lists whenever they are potential sources of goods
or services.
b) Divide the total requirements,when economically feasible, into smaller tasks or quantities, to permit maximum
participation by qualified minority and women's businesses.
c) Establish delivery schedules, where work requirements permit, which will encourage participation of qualified
minority and women's businesses.
d) Use the services and assistance of the Washington State Office of Nfinority and Women's Business Enterprises
(OMWBE)(866-208-1064) and the Office of Minority Business Enterprises of the U.S.Department of Commerce, as
appropriate.
17. ORDER OF PRECEDENCE
In the event of inconsistency in this Agreement,unless otherwise provided herein, the inconsistency shall be resolved by
giving precedence in the following order: (a)applicable Federal and State statutes and regulations; (b) Scope of Work;
(c) Special Terms and Conditions; (d)Any provisions or terms incorporated herein by reference including the
"Administrative Requirements for Recipients of Ecology Grants and Loans"; and(e) the General Terns and Conditions.
18. PRESENTATION AND PROMOTIONAL MATERIALS
RECIPIENT shall obtain ECOLOGY's approval for all communication materials or documents related to the
fulfillment of this Agreement. Steps for approval:
a) Provide a draft copy to ECOLOGY for review and approval ten(10)business days prior to production and
distribution of any documents or materials compiled or produced.
b) ECOLOGY reviews draft copy and reserves the right to require changes until satisfied.
c) Provide ECOLOGY two (2)final copies and an electronic copy of any tangible products developed.
Copies include any printed materials, and all tangible products developed such as brochures, manuals, pamphlets,
videos, audio tapes, CDs, curriculum,posters, media announcements, or gadgets, such as a refrigerator magnet with a
message as well as media announcements, and any other online communication products such as Web pages,blogs, and
Twitter campaigns. If it is not practical to provide a copy, then the RECIPIENT must provide a complete description
including photographs, drawings, or printouts of the product that best represents the item.
RECIPIENT shall include time in their project timeline for ECOLOGY's review and approval process.
RECIPIENT shall acknowledge in the materials or documents that funding was provided by ECOLOGY.
19. PROGRESS REPORTING
a) RECIPIENT must satisfactorily demonstrate the timely use of funds by submitting payment requests and progress
reports to ECOLOGY. ECOLOGY reserves the right to amend or terminate this Agreement if the RECIPIENT does not
document timely use of funds.
b) RECIPIENT must submit a progress report with each payment request. Payment requests will not be processed
without a progress report. ECOLOGY will define the elements and frequency of progress reports.
c) RECIPIENT shall use ECOLOGY's provided progress reportfornat.
d) Quarterly progress reports will cover the periods from January 1 through March 31, April 1 through June 30, July 1
through September 30, and October 1 through December 31. Reports shall be submitted within thirty (30)days after
the end of the quarter being reported.
e) RECIPIENT shall submit the Closeout Report within thirty (30) days of the expiration date of the project, unless an
extension has been approved by ECOLOGY. RECIPIENT shall use the ECOLOGY provided closeout report format.
20. PROPERTY RIGHTS
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 e 13 of 16
Project Title: 2015-17 CPG Kent IMP L 1
Recipient Name: City ofKent
a) Copyrights and Patents. When the RECIPIENT creates any copyrightable materials or invents any patentable
property, the RECIPIENT may copyright or patent the same but ECOLOGY retains a royalty free,nonexclusive, and
irrevocable license to reproduce, publish, recover, or otherwise use the material(s)or property, and to authorize others
to use the same for federal, state, or local government purposes.
b) Publications. When the RECIPIENT or persons employed by the RECIPIENT use or publish ECOLOGY
information;present papers, lectures, or seminars involving information supplied by ECOLOGY; or use logos, reports,
maps, or other data in printed reports, signs, brochures, pamphlets, etc., appropriate credit shall be given to ECOLOGY.
c) Presentation and Promotional Materials. ECOLOGY shall have the right to use or reproduce any printed or graphic
materials produced in fulfillment of this Agreement, in any manner ECOLOGY deems appropriate.ECOLOGY shall
acknowledge the RECIPIENT as the sole copyright owner in every use or reproduction of the materials.
d) Tangible Property Rights. ECOLOGY's current edition of"Administrative Requirements for Recipients of Ecology
Grants and Loans," shall control the use and disposition of all real and personal property purchased wholly or in part
with funds famished by ECOLOGY in the absence of state and federal statutes, regulations, or policies to the contrary,
or upon specific instructions with respect thereto in this Agreement.
e) Personal Property Furnished by ECOLOGY. When ECOLOGY provides personal property directly to the
RECIPIENT for use in performance of the project, it shall be returned to ECOLOGY prior to final payment by
ECOLOGY. If said property is lost, stolen, or damaged while in the RECIPIENT's possession, then ECOLOGY shall
be reimbursed in cash or by setoff by the RECIPIENT for the fair market value of such property.
f) Acquisition Projects. The following provisions shall apply if the project covered by this Agreement includes funds
for the acquisition of land or facilities:
a. RECIPIENT shall establish that the cost is fair value and reasonable prior to disbursement of funds provided for in
this Agreement.
b. RECIPIENT shall provide satisfactory evidence of title or ability to acquire title for each parcel prior to
disbursement of funds provided by this Agreement. Such evidence may include title insurance policies, Torrens
certificates, or abstracts, and attorney's opinions establishing that the land is free from any impediment, lien, or claim
which would impair the uses intended by this Agreement.
g) Conversions. Regardless of the agreement expiration date, the RECIPIENT shall not at any time convert any
equipment, property, or facility acquired or developed under this Agreement to uses other than those for which
assistance was originally approved without prior written approval of ECOLOGY. Such approval maybe conditioned
upon payment to ECOLOGY of that portion of the proceeds of the sale, lease, or other conversion or encumbrance
which monies granted pursuant to this Agreement bear to the total acquisition, purchase, or construction costs of such
property.
21. RECORDS, AUDITS, AND INSPECTIONS
RECIPIENT shall maintain complete program and financial records relating to this Agreement, including any
engineering documentation and field inspection reports of all construction work accomplished.
All records shall:
a) Be kept in a manner which provides an audit trail for all expenditures.
b) Be kept in a common file to facilitate audits and inspections.
c) Clearly indicate total receipts and expenditures related to this Agreement.
d) Be open for auditor inspection by ECOLOGY, or by any duly authorized audit representative of the State of
Washington,for a period of at least three (3)years after the final grant payment or loan repayment, or any dispute
resolution hereunder.
RECIPIENT shall provide clarification and make necessary adjustments if any audits or inspections identify
discrepancies in the records.
ECOLOGY reserves the right to audit, or have a designated third party audit, applicable records to ensure that the state
has been properly invoiced. Any remedies and penalties allowed by law to recover monies determined owed will be
enforced. Repetitive instances of incorrect invoicing or inadequate records may be considered cause for termination.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 .�Pege 14 of 16
Project Title: 2015-17 CPG Kent IMP L G
Recipient Name: City ofKent
All work performed under this Agreement and any property and equipment purchased shall be made available to
ECOLOGY and to any authorized state,federal or local representative for inspection at any time during the course of
this Agreement and for at least three (3)years following grant or loan termination or dispute resolution hereunder.
RECIPIENT shall provide right of access to ECOLOGY, or any other authorized representative, at all reasonable times,
in order to monitor and evaluate performance, compliance, and any other conditions under this Agreement.
22. RECOVERY OF FUNDS
The right of the RECIPIENT to retain monies received as reimbursement payments is contingent upon satisfactory
performance of this Agreement and completion of the work described in the Scope of Work.
All payments to the RECIPIENT are subject to approval and audit by ECOLOGY, and any unauthorized expenditure(s)
or unallowable cost charged to this agreement shall be refunded to ECOLOGY by the RECIPIENT.
RECIPIENT shall refund to ECOLOGY the full amount of any erroneous payment or overpayment under this
Agreement.
RECIPIENT shall refund by check payable to ECOLOGY the amount of any such reduction of payments or repayments
within thirty(30)days of a written notice. Interest will accrue at the rate of twelve percent(12%)per year from the
time ECOLOGY demands repayment of funds.
Any property acquired under this Agreement, at the option of ECOLOGY, may become ECOLOGY's property and the
RECIPIENT's liability to repay monies will be reduced by an amount reflecting the fair value of such property.
23. SEVERABILITY
If any provision of this Agreement or any provision of any document incorporated by reference shall be held invalid,
such invalidity shall not affect the other provisions of this Agreement which can be given effect without the invalid
provision, and to this end the provisions of this Agreement are declared to be severable.
24. STATE ENVIRONMENTAL POLICY ACT(SEPA)
RECIPIENT must demonstrate to ECOLOGY's satisfaction that compliance with the requirements of the State
Environmental Policy Act(Chapter 43.21C RCW and Chapter 197-11 WAC)have been or will be met. Any
reimbursements are subject to this provision.
25. SUSPENSION
When in the best interest of ECOLOGY, ECOLOGY may at any time, and without cause, suspend this Agreement or
any portion thereof for a temporary period by written notice from ECOLOGY to the RECIPIENT.RECIPIENT shall
resume performance on the next business day following the suspension period unless another day is specified by
ECOLOGY.
26. SUSTAINABLE PRACTICES
In order to sustain Washington's natural resources and ecosystems,the RECIPIENT is fully encouraged to implement
sustainable practices and to purchase environmentally preferable products under this Agreement.
a) Sustainable practices may include such activities as: use of clean energy, use of double-sided printing, hosting low
impact meetings, and setting up recycling and composting programs.
b) Purchasing may include such items as: sustainably produced products and services, EPEAT registered computers
and imaging equipment, independently certified green cleaning products, remanufactured toner cartridges, products
with reduced packaging, office products that are refillable,rechargeable, and recyclable, and 100%post consumer
recycled paper.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 .�Pege 15 of 16
Project Title: 2015-17 CPG Kent IMP L J
Recipient Name: City ofKent
For more suggestions visit ECOLOGY's web pages: Green Purchasing, http://www.ecy.wa.gov/programs/swfa/epp
and Sustainability,www.ecy.wa.gov/sustainability.
27. TERMINATION
a) For Cause
ECOLOGY may terminate for cause this Agreement with a seven(7)calendar days prior written notification to the
RECIPIENT, at the sole discretion of ECOLOGY, for failing to perform an Agreement requirement or for a material
breach of any tern or condition. If this Agreement is so terminated,the parties shall be liable only for performance
rendered or costs incurred in accordance with the terns of this Agreement prior to the effective date of termination.
Failure to Commence Work. ECOLOGY reserves the right to terminate this Agreement if RECIPIENT fails to
commence work on the project funded within four(4) months after the effective date of this Agreement, or by any date
mutually agreed upon in writing for commencement of work, or the time period defined within the Scope of Work.
Non-Performance. The obligation of ECOLOGY to the RECIPIENT is contingent upon satisfactory performance by the
RECIPIENT of all of its obligations under this Agreement. In the event the RECIPIENT unjustifiably fails, in the
opinion of ECOLOGY, to perform any obligation required of it by this Agreement, ECOLOGY may refuse to pay any
further funds, terminate in whole or in part this Agreement, and exercise any other rights under this Agreement.
Despite the above, the RECIPIENT shall not be relieved of any liability to ECOLOGY for damages sustained by
ECOLOGY and the State of Washington because of any breach of this Agreement by the RECIPIENT. ECOLOGY
may withhold payments for the purpose of setoff until such time as the exact amount of damages due ECOLOGY from
the RECIPIENT is determined.
b) For Convenience
ECOLOGY may terminate for convenience this Agreement, in whole or in part, for any reason when it is the best
interest of ECOLOGY,with a thirty(30)calendar days prior written notification to the RECIPIENT. If this Agreement
is so terminated, the parties shall be liable only for performance rendered or costs incurred in accordance with the terns
of this Agreement prior to the effective date of termination.
Non-Allocation of Funds. ECOLOGY's ability to make payments is contingent on availability of funding. In the event
funding from state, federal or other sources is withdrawn, reduced, or limited in any way after the effective date and
prior to the completion or expiration date of this agreement, ECOLOGY, at its sole discretion,may elect to terminate
the agreement,in whole or part, or renegotiate the agreement, subject to new funding limitations or conditions.
ECOLOGY may also elect to suspend performance of the agreement until ECOLOGY determines the funding
insufficiency is resolved. ECOLOGY may exercise any of these options with no notification or restrictions.
If payments have been discontinued by ECOLOGY due to unavailable funds, the RECIPIENT shall not be obligated to
repay monies which had been paid to the RECIPIENT prior to such termination.
RECIPIENT's obligation to continue or complete the work described in this Agreement shall be contingent upon
availability of funds by the RECIPIENT's governing body.
c) By Mutual Agreement
ECOLOGY and the RECIPIENT may terminate this Agreement, in whole or in part, at any time, by mutual written
agreement.
d) In Event of Termination
All finished or unfinished documents, data studies, surveys, drawings, maps, models, photographs, reports or other
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 ripe 16 of 16
Project Title: 2015-17 CPG Kent IMP LL
Recipient Name: City ofKent
materials prepared by the RECIPIENT under this Agreement, at the option of ECOLOGY, will become property of
ECOLOGY and the RECIPIENT shall be entitled to receive just and equitable compensation for any satisfactory work
completed on such documents and other materials.
Nothing contained herein shall preclude ECOLOGY from demanding repayment of all funds paid to the RECIPIENT in
accordance with Recovery of Funds, identified herein.
28. THIRD PARTY BENEFICIARY
RECIPIENT shall ensure that in all subcontracts entered into by the RECIPIENT pursuant to this Agreement, the state
of Washington is named as an express third party beneficiary of such subcontracts with full rights as such.
29. WAIVER
Waiver of a default or breach of any provision of this Agreement is not a waiver of any subsequent default or breach,
and will not be construed as a modification of the terms of this Agreement unless stated as such in writing by the
authorized representative of ECOLOGY.
W2RCPG-1517-KentPW-00075
25
PUBLIC WORKS DEPARTMENT
� Timothy J. LaPorte, P.E. Public Works Director
Phone: 253-856-5500
rEwta Fax: 253-856-6500
Address: 400 West Gowe Street
Kent, WA 98032-5895
Date: October 15, 2015
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: October 19, 2015
From: Gina Hungerford, Conservation Coordinator
Through: Kelly Peterson. AICP, Transportation/Special Projects Manager
Chad Bieren, P.E., City Engineer
Subject: Seattle-King County Health Department Local Hazardous
Waste Management Program (LHWMP) Grant Amendment 1
Motion: Move to recommend Council authorize the Mayor to accept
Amendment 1 to the Local Hazardous Waste Management Program Grant
providing $35,082.26 for 2016 and authorize expenditure of grant funds,
subject to final terms and conditions acceptable to the City Attorney and
Public Works Director.
Summary: The Seattle/King County Health Department's Local Hazardous Waste
Management Program Grant, previously an annual grant, is moving to a biennial
budget cycle with this Amendment. Funding is intended to help cities protect public
health and the environment from toxins and hazardous products and wastes. The
grant covers collection of hazardous waste at three special recycling collection
events for residents, as described in the attached Grant Agreement's Scope of Work.
Exhibit: Local Hazardous Waste Management Program Grant Amendment 1
Budget Impact: The City will receive $35,082.26. No match is required. The Local
Hazardous Waste Management Program grant fully funds the collection of hazardous
waste collected at the three events the City hosts each year.
26
This page intentionally left blank
Public Health, 27
Seattle F&King County��11
AMENDMENT PHSKC Agreement #EHS3678
Amendment #1
This Amendment between PHSKC and the Recipient changes the referenced Agreement for the following
purpose(s): Extends end date of agreement to 12/31/2016 and adds year two funding of$35,082.26 to continue
hazardous waste education activities to protect residents' health and the environment.
Recipient Name &Address: City of Kent
220 41" Avenue S
Kent, WA 98032-5895
Project Title: Local Hazardous Waste Management Program
Effective Date of Amendment: June 1, 2015
Agreement End Date: ❑ No Change X Change to: December 31, 2016
Agreement Amount: ❑ No Change X Change to: $68,862.07
Funding Details: ❑ No Change X Revise the following funding details:
Funding Source PHSKC Contract# Amount Effective Dates New or Revised
County- LHWMP $35,082.26 61112015—1213112016 NEW
Funding Summary: ❑ No Change X Revise to read:
FEDERAL: $0 COUNTY: $35,082.26 STATE: $0 OTHER: $0
Exhibits: ❑ No Change X Revise as follows: REPLACE following exhibits as attached hereto:
• EXHIBIT A—Scope of Work
• EXHIBIT B— Budget
• EXHIBIT C— Invoice
King County Terms&Conditions: X No Change ❑ Revise as follows:
All other terms and conditions of the referenced Agreement and any previous Agreement amendment not
revised herein shall remain unchanged and in full force and effect.
RECIPIENT SIGNATURE PRINTED NAME AND TITLE DATE SIGNED
PHSKC SIGNATURE PRINTED NAME AND TITLE DATE SIGNED
Ngozi Clew,
Environmental Health Division Director
2s
EXHIBIT A
SCOPE OF WORK
AMENDMENT #1
CITY OF KENT
1/1/2015-12/31/2016
Background
The Local Hazardous Waste Management Plan (hereafter referred to as the "Plan") as updated in
1997 and 2010, was adopted by the partner agencies (King County Solid Waste Division, Seattle
Public Utilities, King County Water and Land Resources Division and the Seattle-King County
Department of Public Health) and cities located in King County. The Washington State
Department of Ecology in accordance with RCW 70.105.220 subsequently approved the Plan.
The City is an active and valued partner in the regional Local Hazardous Waste Management
Program (hereafter referred to as the "Program").
The purpose of this Exhibit is to define the relationship associated with the Program's funding of
City activities performed under the auspices of the Plan and as approved by the Program's
Management Coordination Committee (hereinafter referred to as the "MCC"). This Agreement
further defines the responsibilities of the City and Seattle-King County Department of Public
Health with respect to the transfer of Program monies.
Scope of Work
The City of Kent will organize six citywide household hazardous waste collection and recycling
events. At these events the following materials will be collected and recycled: motor oil, motor
oil filters, petroleum based products, antifreeze, batteries, CFCs and other materials if determined
to be cost effective.
Responsibilities of the Parties
The Citv
1. The City shall develop and submit project proposals and budget requests to the Program's
Contract Administrator. Funds provided to the City by the Local Hazardous Waste
Management Program pursuant to this Contract shall be used to implement hazardous
waste programs and/or services as approved by the MCC.
2. For reimbursement the City shall submit the following to the Contract Administrator:
a) An invoice (see Exhibit C). Invoices should be sent to the Contract
Administrator for approval and payment.
b) A brief description of activity accomplished and funds expended in
accordance with the scope of work.
c) Copies of invoices for expenditures or afinancial statement prepared by the
City's finance department. The financial statements should include vendor
EHS3678—Amendment#1 - City of Kent 1
29
names, a description of services provided, date paid and a check or warrant
number.
3. The City shall notify the Contract Administrator no later than December 15a' regarding the
amount of outstanding expenditures for which the City has not yet submitted a
reimbursement request.
4. It is the responsibility of the City to comply with all applicable county, state and/or federal
reporting requirements with respect to the collection and transfer of moderate risk wastes.
The City shall report to the Contract Administrator the quantity, by type, of moderate risk
waste collected using Program funds. The City shall also provide the Contract Administrator
with copies of EPA's Non-Hazardous Waste Manifest or similar form, associated with the
transport of moderate risk waste collected through Program-funded events.
5. The City is solely responsible for any and all spills, leaks or other emergencies arising at the
facilities associated with the City's events or in any other way associated with activities
conducted within the scope of this Contract. In the event of a spill or other emergency, the
City is responsible for complying with all applicable laws and regulations.
6. The City agrees to appropriately acknowledge the Program in all media produced—in part or
in whole—with Program funds. The intent of this provision is to further strengthen this
regional partnership in the public's mind.
7. The City agrees to provide the Program with copies of all media material produced for local
hazardous waste management events or activities that have been funded by the Program. The
City also agrees to allow the Program to reproduce media materials created with Program
money provided that the Program credits the City as the originator of that material.
8. This project shall be administered by Gina Hungerford at the City of Kent, 220 Fourth Ave.
S, Kent at(253) 856-5549, (ghungerford(okentwa.gov) or her designee.
9. Questions or concerns regarding any issue associated with this Exhibit that cannot be handled
by the Contract Administrator should be referred to the LHWMP Program Director for
resolution.
Seattle-King County Department of Public Health
1. Seattle-King County Department of Public Health shall administer, via the attached
Contract, the transfer of Program funds to the City for hazardous waste management
events and activities.
2. Within ten (10)working days of receiving a request for reimbursement from the City, the
Contract Administrator shall either notify the City of any exceptions to the request which
have been identified or shall process the request for payment. If any exceptions to the
request are made,this shall be done by written notification to the City providing the
reason for such exception. The Contract Administrator will not authorize payment for
activities and/or expenditures that are not included in the scope of work, unless the scope
has been amended. The Contract Administrator retains the right to withhold all or
partial payment if the City's invoices are incomplete (e.g. they do not include proper
documentation of expenditures for which reimbursement is being requested) or are not
consistent with the submitted scope of work.
EHS3678—Amendment#1 - City of Kent 2
30
Program Contacts
Lynda Ransley Paul Shallow
LHWMP Program Director LHWMP Contract Administrator
150 Nickerson Street, Suite 204 401 Fifth Ave., Suite 1100
Seattle WA 98109 Seattle WA 98104
206-352-8163 206-263-8487
lynda.ransleyAkingcounty.go v Paul.shallowAkingcounty.Rov
EHS3678—Amendment#1 - City of Kent 3
31
EXHIBIT B
2015-2016 BUDGET
LOCAL HAZARDOUS WASTE MANAGEMENT PROGRAM
City of Kent
220 Fourth Ave. S
Kent, WA 98032
Component Description 2015 Budget 2016 Budget Total
Household Hazardous
Waste Education
Household Hazardous $33,779.81 $35,082.26 $68,862.07
Waste Collection
TOTAL $33,779.81 $35,082.26 $68,862.07
Footnote: The 2015 and 2016 budgets can be partly or totally spend in either 2015 and/or 2016
but cannot exceed the budget total in these two years.
EHS3678—Amendment#1 -City of Kent
32
INVOICE
Contract Number: EHS3678 King County Accounts Payable Information
Exhibit: C Purchase Order#
Amendment#1 Supplier Name City of Kent
Remit to:City of Kent Supplier# 1585
220 Fourth Avenue South Supplier Pay Site City of Kent
Kent WA 98032 Invoice Date
Gina Hungerford Invoice#
253-856-5549 Amount to be Paid
ghungerford@kentwa.gov Note to AP
Print on Remittance
Paul Shallow 206-263-
Submit signed invoice to: LHW Program name&phone 8487
Paul Shallow
Public Health -Seattle & King County
Local Hazardous Waste Management Program
401 Fifth Ave., Suite 1100
Seattle, WA 98104
206-263-8487
paul.shallow@kingcounty.gov
Invoice for services rendered under this contract for the period of:
Total Current Previous
Expenditure Item 2016 Budget Expenditure Expenditure Balance
HHW Education
HHW Collection 68,862.07 22,519.87 $46,342.20
TOTAL 68,862.07 $22,519.87 $46,342.20
I,the undersigned,do hereby certify under penalty of perjury,that this is a true and correct claim
for reimbursement services rendered. I understand that any false claims, statements, documents,
or concealment of material fact may be prosecuted under applicable Federal and State laws.This
certification includes any attachments which serve as supporting documentation to this
reimbursement request.
Signed Date Contract Administrator Approval Date
Print Name
33
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 400 W Gowe St.
Kent, WA 98032-5895
Date: October 16, 2015
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: October 19, 2015
From: Bill Thomas, Street Superintendent
Through: Dave Brock, P.E., Operations Manager
Subject: Information Only/Snow and Ice Preparation
INFORMATION ONLY/NO MOTION REQUIRED
Summary: The Public Works Operations Division is responsible for responding to snow
and ice conditions throughout the winter season. In a typical year, Kent experiences 2-3
significant events that require a prolonged response from staff. Staff is prepared to work
around-the-clock to address conditions.
Crews are currently prepping for the 2015-16 winter season. We have enough materials
stock piled to sustain us for a five day event. Snow and ice response equipment consisting
of eight trucks with plows seven with sanders, one truck with liquid anti-icing application
equipment and a plow, and a motor grader are also being prepped for the season.
Annual coordination meetings are held with the Police Department in advance of the
winter snow and ice season. Operations staff and the Police department work hand-in-
hand during response events. The Police Department takes a lead role in facilitating the
removal of vehicles abandoned in the roadway they also temporarily close priority routes
during heavy snow events to facilitate access by snow and ice removal equipment.
During a snow and ice event, Operations response staff address prioritized arterial routes
first. These routes are identified in the Snow and Ice Response Plan, which is available on
the City's website. As roadways are closed or opened during a response event, updates
are posted on the City's www.drivekent.com website. Other public communication
methods utilized include Kent radio, the Traffic Alert system (e-mail), and variable
message boards.
Staff also works closely with the Department of Transportation and King County Metro.
Budget Impact: Snow and ice response is an unbudgeted general fund expense. The
duration of a significant event is challenging to predict. Historically, response events have
lasted from two to fourteen days. Operations Division costs associated with responding to
an event with this variability have ranged between $10,000 and $150,000, not including
clean-up costs.
34
This page intentionally left blank
35
PUBLIC WORKS DEPARTMENT
� Timothy J. LaPorte, P.E. Public Works Director
Phone: 253-856-5500
rEwta Fax: 253-856-6500
Address: 400 West Gowe Street
Kent, WA 98032-5895
Date: October 16, 2015
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: October 19, 2015
From: Alex Murillo, P.E., Environmental Engineering Supervisor
Through: Chad Bieren, P.E., City Engineer
Subject: Information Only/Stormwater Utility Rate Update
INFORMATION ONLY/NO MOTION REQUIRED
Summary: In August information was presented to the Committee regarding
research on our stormwater rate structure. Further analysis has been completed
which will be reviewed with the Committee.
Exhibit: None
Budget Impact: None
I
Public Works Committee Agenda
i
-'^ Councilmembers: Brenda Fincher - Dana Ralph - Dennis Higgins, Chair
a.a„ .ani , .KeAt
October 19, 2015
4 p.m.
Item Description Action Speaker Time Pace
1. Call to order Chair Higgins 1
2. Roll Call Chair Higgins 1
3. Changes to the Agenda Chair Higgins 1
4. Approval of Minutes, dated October 5, 2015 YES Chair Higgins 3 3
5. Department of Ecology Coordinated YES Gina Hungerford 05 7
Prevention Grant
6. Local Hazardous Waste Management YES Gina Hungerford 05 25
Program
7. Information Only/Snow and Ice Preparation NO Bill Thomas 10 33
8. Information Only/Stormwater Rates Analysis NO Mike Mactutis 10 35
Unless otherwise noted, the Public Works Committee meets at 4 p.m. on the first and third
Monday of each month at Kent City Hall, Council Chambers East, 220 41h Ave S, Kent, WA
98032. For additional information please contact Cheryl Viseth at 253-856-5500.
Any person requiring a disability accommodation should contact the City Clerk's
Office at 253-856-5725 in advance. For TDD relay service call Washington
Telecommunications Relay Service at 1-800-833-6388.
z
This page intentionally left blank
Public Works Committee Minutes 3
October 5, 2015
Item 1 — Call to Order: The meeting was called to order at 4:02 p.m. by Committee Chair,
Dennis Higgins.
Item 2 — Roll Call: Committee members present: Dennis Higgins and Brenda Fincher were
present. Committee member Dana Ralph had an excused absence.
Item 3 — Chances to the Agenda: There were no changes to the agenda.
Item 4 — Approval of Meeting Minutes Dated September 21, 2015:
Committee member Fincher MOVED to approve the minutes of September 21, 2015. The
motion was SECONDED by Committee member Higgins and PASSED 2-0.
Item 5 —2016 Business & Occupation and Residential Street Repair Project Lists:
Pavement Engineer, Joe Araucto went over the list of projects that, if approved, will be worked on
in 2015 through 2016.
The Department recommends pavement replacement on the James Street hill climb between
Central Avenue and 94th Avenue, as well as landscape work between the sidewalk and the curb.
A second major endeavor would be to begin the pavement replacement on 80th Avenue between
194th and 192nd streets. Staff recommends that this be repaved with concrete due to the very
high truck count and it being in a high water table area. The concrete surfacing will perform much
better over time and would be more economical over a life cycle.
Araucto stated that staff also expects to be able to do some work on missing portions of sidewalk
on Reith road.
It was recommended that funds be set aside to potentially complete the landscape island
renovation on Pacific Highway South; $150,000 for continuing the flashing left turn arrow program.
The exact amount cannot be determined until the existing wiring and controller configuration is
analyzed for the selected signal systems.
Araucto went over the Residential street maps that listed streets that are planned for pavement
overlay work.
Kelly Peterson, Transportation/Special Projects Manager quickly went over the Traffic Loops project
and what it entails. He stated we have 9 flashing arrows and 24 new signals and are looking to get
3 additional flashing yellow lights.
Committee Member Fincher MOVED to Approve the 2016 street improvement project
lists, pay for these additional project costs, except as may be supplemented by grant
funds or additional Council authorization, from available Business and Occupation Tax
receipts, or from solid waste utility tax receipts for the residential street repair, subject
to final terms and conditions acceptable to the City Attorney and Public Works Director.
The motion was SECONDED by Committee member Higgins and PASSED 2-0.
1
Public Works Committee Minutes 4
October 5, 2015
Item 6 — Proiect Funding Agreement for Mill Creek Side Channel — Leber Restoration
Proiect:
Matt Knox, Environmental Biologist noted that he will present the two grants (items 6 and 7)
together with two separate motions to be approved.
Knox stated that the City of Kent proposes to construct a floodplain wetland off of Mill Creek
providing a large salmon habitat. The Leber property is located adjacent to Highway 167 and the
Green River and Downey Farmstead adjacent to Highway 516. The design was funded by Salmon
Recover Funding Board grants.
This last increment of funding will be used to complete the remaining phase of construction and will
include: 1000 LF of new off-channel habitat; 43 log structures designed to maximize salmon
habitat; removal of invasive vegetation; improvement of more than five acres of riparian and two
acres of upland plantings to increase diversity, density and shading with a focus on increasing
conifer density.
Committee Member Fincher MOVED to recommend Council authorize the Mayor to sign
the Washington State Recreation and Conservation Office Salmon Recovery Funding
Board (SRFB) agreement for Mill Creek Side Channel — Leber project, and direct staff to
accept the grant and establish a budget for the project, subject to final terms and
conditions acceptable to the City Attorney and Public Works Director. The motion was
SECONDED by Committee member Higgins and PASSED 2-0.
Item 7 — King County Flood Control District Cooperative Watershed Management Grant,
Proiect Funding Agreement for Mill Creek Side Channel — Leber and Downey Farmstead
Restoration Proiects:
Item was discussed with Item 6.
Committee Member Fincher MOVED to recommend Council authorize the Mayor to sign
the King County Cooperative Watershed Management Grant (CWM) in the amount of
$664,227.00 and direct staff to accept the grant and establish budgets for the projects
subject to final terms and conditions acceptable to the City Attorney and Public Works
Director. The motion was SECONDED by Committee member Higgins and PASSED 2-0.
Item 8 — Information Only/Russell Road Upper Levee — North Reach River Protection
Easement — Marina Pointe HOA:
Alex Murillo, P.E., Environmental Engineering Supervisor gave a brief background and quick update
of this project which is located along the Green River on the west side of the Lakes Community. It
is currently under construction and will meet FEMA accreditation standards. Murillo provided an
update on the construction progress.
A condemnation ordinance hearing was held on August 18, 2015 City Council Meeting. At that
meeting, a request was made by City Council to update the Public Works Committee on the status
of the River Protection Easement that is needed by the King County Flood Control District for
inspection and maintenance of the levee along a privately owned area of the Marina Pointe
Homeowners' Association. Murillo provided a brief summary on the progress to date regarding the
River Protection Easement.
INFORMATION ONLY/NO MOTION REQUIRED
2
Public Works Committee Minutes 5
October 5, 2015
Item 9 — Information Only/Public Works Operations (Russell Road) Bulk Fueling Facility:
Ron Green, Fleet Superintendent noted that the Kent East Hill Operations Center (KEHOC) master
plan included construction of a new fueling facility with above ground tanks. The plan was to
decommission the underground tanks and upgrade the Russell Road Operations facility with above
ground tanks, overhead canopy, dispensers, and automated fuel management system once the
KEHOC was up and running.
With the decision to discontinue construction of the KEHOC there is concern about imminent
deficiencies in the existing underground fuel tanks, and the fuel dispensing equipment at the Public
Works Maintenance and Operations facility on Russell Road.
Green noted that the underground tanks are 26 years old, are not leaking and are compliant with
the Department of Ecology (DOE), for now. Concerns include the liability that may be incurred due
to the proximity of the pumps to the Green River; the potential cost to mitigate in the future should
they begin leaking and that the existing dispensing equipment is obsolete and well past its life
cycle. Maintenance on these dispensers has become an issue due to their age and availability of
serviceable parts. Additionally, the chip key fuel management software system is no longer
sustainable. Green went on to state that the fuel facility does not meet current requirements of an
overhead canopy covering the fuel islands to reduce and contain contaminants from storm-water
runoff.
INFORMATION ONLY/ NO MOTION REQUIRED
Item 10 — Information Only/James Street Hill Climb Planters:
Mark Howlett, P.E., Design Engineering Manager noted that the condition of James street sidewalk
sections that have been repaired due to buckles made by street trees. Howlett showed an artist
rendition of what the area may look like with alternative plants.
An open house was held on April 9, 2015 to solicit input from the public about what they would like
to see planted in the strips.
Staff has reviewed all the information and will provide an update on the progress at a later
meeting.
INFORMATION ONLY/NO MOTION REQUIRED
The meeting was adjourned at 5:05 p.m.
ChexyLVOetiV
Council Committee Recorder
3
6
This page intentionally left blank
7
PUBLIC WORKS DEPARTMENT
� Timothy J. LaPorte, P.E. Public Works Director
Phone: 253-856-5500
rEwta Fax: 253-856-6500
Address: 400 West Gowe Street
Kent, WA 98032-5895
Date: October 15, 2015
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: October 19, 2015
From: Gina Hungerford. Conservation Coordinator
Through: Kelly Peterson, AICP, Transportation/Special Projects Manager
Chad Bieren, P.E., City Engineer
Subject: Washington State Department of Ecology Coordinated
Prevention Grant (CPG)
Motion: Move to recommend Council authorize the Mayor to accept the
Coordinated Prevention Grant in the amount of $123,522.67 and
authorize expenditure of the grant funds, subject to final terms and
conditions acceptable to the City Attorney and Public Works Director.
Summary: The Coordinated Prevention Grant is a two year grant funded by the
Washington State Department of Ecology. It pays 75% of the "maximum eligible
program cost" which for Kent is $123,522.67. A 25% match will be provided by the
King County Waste Reduction and Recycling Grant.
This Grant funds Residential and Commercial Waste Reduction and Recycling
Programs including events for collection of materials hard-to-recycle at the curb:
appliances, electronic equipment, mattresses, Styrofoam, bulky yard debris,
concrete and tires.
Exhibit: Coordinated Prevention Grant
Budget Impact: The City will receive from the Washington State Department of
Ecology $92,642.00, distributed on a cost basis as tasks are completed. The
required 25% match of $30,880.67 will come from the King County Waste Reduction
and Recycling Grant.
8
This page intentionally left blank
Agreement No: W2RCPG-1517-KentPW-00075 Ppge 1 of 16
Project Title: 2015-17 CPG Kent IMP 7
Recipient Name: City ofKent
DEPARTMENT OF
%%%%///
,i,I ECOLOGY
State of Washington
Agreement W2RCPG-1517-KentPW-00075
WASTE 2 RESOURCES COORDINATED PREVENTION GRANT PROGRAM AGREEMENT
BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY
AND
City of Kent
This is a binding Agreement entered into by and between the State of Washington, Department of Ecology,
hereinafter referred to as "ECOLOGY' and City of Kent, hereinafter referred to as the 'RECIPIENT"to carry out
with the provided funds activities described herein.
GENERAL INFORMATION
Project Title: 2015-17 CPG Kent IMP
Total Cost: $123,522.67
Total Eligible Cost: $123,522.67
Ecology Share: $92,642.00
Recipient Share: $30,880.67
The Effective Date of this Agreement is: 07/10/2015
The Expiration Date of this Agreement is no later than 06/30/2017
Project Type: Implementation
Project Short Description:
The RECIPIENT(City of Kent)will host up to six (6)Residential Recycling Collection Events for City residents
with its $123,522.67 CPG monies. The RECIPIENT expects to divert 300 tons of recycled material, which includes
an estimated 25 tons of organics and 60 tons of moderate risk waste,from 4000 residential participants as a result of
making over 188,000 resident contacts during the 2015-17 grant cycle.
Project Long Description:
N/A
Overall Goal:
Provide regional solutions and intergovernmental cooperation; prevent or minimize environmental contamination
through planning and project implementation; and comply with state and local solid and hazardous waste
management plans and laws.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 1Ppge2of16
Project Title: 2015-17 CPG Kent IMP ��JJ
Recipient Name: City ofKent
RECIPIENT INFORMATION
Organization Name: City of Kent
Federal Tax ID: 91-6001254
DUNS Number: 000000000
Mailing Address: 220 Fourth Ave S
Kent, WA, 98032
Physical Address: 220 Fourth Ave S
Kent, Washington, 98032
Organization Email: ghungerford#kentwa.gov
Contacts
Project Manager Regina Hungerford
Conservation Coordinator
PW Works Engineering
220 Fourth Ave. S.
Kent, Washington, 98032
Email: ghungerford#kentwa.gov
Phone: (253) 856-5549
Billing Contact Paul Devine
General Manager
4715 SW WALKER ST
Seattle, Washington, 98116
Email: pauldevine#msn.com
Phone: (206)938-8262
Authorized Regina Hungerford
Signatory Conservation Coordinator
PW Works Engineering
220 Fourth Ave. S.
Kent, Washington, 98032
Email: ghungerford#kentwa.gov
Phone: (253) 856-5549
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 fige3of16
Project Title: 2015-17 CPG Kent IMP
Recipient Name: City ofKent
ECOLOGY INFORMATION
Mailing Address: Department of Ecology
Waste 2 Resources
PO BOX 47600
Olympia, WA 98504-7600
Physical Address: Waste 2 Resources
300 Desmond Drive
Lacey, WA 98503
Contacts
Project Vicki Colgan
Manager
3190 160th Ave SE
Bellevue, Washington, 98008-5452
Email: vcol461#ecy.wa.gov
Phone: (425)649-7224
Financial Vicki Colgan
Manager
3190 160th Ave SE
Bellevue, Washington, 98008-5452
Email: vcol461#ecy.wa.gov
Phone: (425)649-7224
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 iPege 4 of 16
Project Title: 2015-17 CPG Kent IMP 12
Recipient Name: City ofKent
SCOPE OF WORK
Task Number: 1 Task Cost: $123,522.67
Task Title: WR&R: Residential Collection Events
Task Description:
The RECIPIENT will host up to six(6)Residential Recycling Collection Events for City residents during this grant
cycle. The events will provide residents with the opportunity to divert hard-to-recycle items from the waste stream by
recycling them in a convenient City location, as well as serve as an opportunity to distribute educational materials on
how to reduce waste and recycle using City-sponsored or private sector WR&R programs.
The RECIPIENT may charge user fees for some items or may drop user fees to increase the volume of materials
collected. The RECIPIENT will credit this grant for any revenue received from the collection of fees or commodity
sales on items the grant is directly supporting. In addition, the Coordinated Prevention Grant Program does not pay for
costs covered by an existing product stewardship program(such as E-cycle Washington, LightRecycle Washington, or
Call2Recycle). Contact your Ecology grant project manager or consult the following website if you are unsure about a
cost's grant-eligibility:http://www.ecy.wa.gov/programs/swfa/ProductStewardsMpFAQ.html.
The costs of membership in civic, business, and technical/professional organizations are allowed to the extent they are
covered in the overhead rate. If the RECIPIENT does not charge overhead to this task,it may directly bill for
membership(s)pre-approved by ECOLOGY.
Task Goal Statement:
Decreasing the amount of organics, moderate risk waste (MRW), and other hard-to-recycle items from being landfilled
by holding collection events in a convenient location for City residents, is the goal of the program, thereby also
keeping environmentally damaging materials from finding their way to stonndrains, streams, and other isolated sites in
our City. Human health risks from these materials will be lowered as well.
Task Expected Outcome:
The RECIPIENT expects to divert 300 tons of recycled material, which includes an estimated 25 tons of organics and
60 tons of moderate risk waste, from 4000 residential participants as a result of making 188,000 resident contacts. The
RECIPIENT will provide the following information to the Department of Ecology for project evaluation:
1)The number of events held.
2)The number of event participants attending-the site greeter will count cars as they arrive.
3)The volume of each material collected in pounds/tons as reported from event vendors and from material delivered
to recycling centers.
4)The numbers of promotional/educational contacts made.
Recipient Task Coordinator: Paul Devine
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 iPeS{e 5 of 16
Project Title: 2015-17 CPG Kent IMP 13
Recipient Name: City ofKent
WR&R: Residential Collection Events
Deliverables
Number Description Due Date
1.1 Ql: No work this quarter.
1.2 Q2: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.3 Q3: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.4 Q4: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.5 Q5: No work this quarter.
1.6 Q6: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.7 Q7: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement.
1.8 Q8: Arrange date and site for event. Arrange event vendors. Hold
Recycling Collection Event. Recycle materials collected at event. Prepare
project progress report and payment request for grant reimbursement and
closeout.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 P�e 6of 16
1
Project Title: 2015-17 CPG Kent IMP 1
Recipient Name: City ofKent
BUDGET
Funding Distribution EG160221
Funding Title: State Building Construction Account
Funding Type: Grant Funding Expiration Date: 06/30/2017
Funding Effective Date: 07/10/2015
Funding Source:
Title: State Building Construction Account(SBCA)
Type: State
CFDA:
Assistance Agreement:
Description:
Recipient Match%: 25
InKind Interlocal Allowed: Yes
InKind Other Allowed: No
Is this Funding Distribution used to match a federal grant? No
State Building Construction Account Task Total
WR&R: Residential Collection Events $ 123,522.67
Total: $ 123,522.67
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 P�ge7of16
1
Project Title: 2015-17 CPG Kent IMP s
Recipient Name: City ofKent
Funding Distribution Summary
Recipient/Ecology Share
Funding Distribution Name Recipient Match % Recipient Share Ecology Share Total
State Building Construction 25.00 % $ 30,880.67 $ 92,642.00 $ 123,522.67
Account
Total S 30,880.67 S 92,642.00 S 123.522.67
AGREEMENT SPECIFIC TERMS AND CONDITIONS
N/A
SPECIAL TERMS AND CONDITIONS
Indirect costs can be charged at a rate of up to 25%of salaries and benefits.
GENERAL FEDERAL CONDITIONS
If a portion or all of the funds for this agreement are provided through federal funding sources or this
agreement is used to match a federal grant award,the following terms and conditions apply to you.
CERTIFICATION REGARDING SUSPENSION, DEBARMENT,INELIGIBILITY OR VOLUNTARY EXCLUSION:
1. The RECIPIENT/CONTRACTOR, by signing this agreement, certifies that it is not suspended, debarred,
proposed for debarment, declared ineligible or otherwise excluded from contracting with the federal
government, or from receiving contracts paid for with federal funds.If the RECIPIENT/CONTRACTOR is
unable to certify to the statements contained in the certification, they must provide an explanation as to why they
cannot.
2. The RECIPIENT/CONTRACTOR shall provide immediate written notice to ECOLOGY if at any time the
RECIPIENT/CONTRACTOR learns that its certification was erroneous when submitted or had become
erroneous by reason of changed circumstances.
3. The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, participant,
person, primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have
the meaning set out in the Definitions and Coverage sections of rules implementing Executive Order 12549.
You may contact the department for assistance in obtaining a copy of those regulations..
4. The RECIPIENT/CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction
with a person who is proposed for debarment under the applicable Code of Federal Regulations, debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction.
5. The RECIPIENT/CONTRACTOR further agrees by signing this agreement, that it will include this clause titled
"CERTIFICATION REGARDING SUSPENSION, DEBARMENT,INELIGIBILITY OR VOLUNTARY
EXCLUSION" without modification in all lower tier covered transactions and in all solicitations for lower tier
covered transactions.
6. Pursuant to 2CFR180.330,the RECIPIENT/CONTRACTOR is responsible for ensuring that any lower tier
covered transaction complies with certification of suspension and debarment requirements.
7. RECIPIENT/CONTRACTOR acknowledges that failing to disclose the information required in the Code of
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 iPgge 8of 16
Project Title: 2015-17 CPG Kent IMP 16
Recipient Name: City ofKent
Federal Regulations may result in the delay or negation of this funding agreement, or pursuance of legal
remedies,including suspension and debarment.
8. RECIPIENT/CONTRACTOR agrees to keep proof in its agreement file, that it, and all lower tier recipients or
contractors, are not suspended or debarred, and will make this proof available to ECOLOGY before requests for
reimbursements will be approved for payment. RECIPIENT/CONTRACTOR must run a search in
<http://www.sam.gov>and print a copy of completed searches to document proof of compliance.
Federal Funding Accountability And Transparency Act (FFATA)Reporting Requirements:
RECIPIENT must complete the FFATA Data Collection Form(ECY 070-395)and return it with the signed
agreement to ECOLOGY.
Any RECIPIENT that meets each of the criteria below must also report compensation for its five top executives,
using FFATA Data Collection Form.
Receives more than$25,000 in federal funds under this award; and
Receives more than 80 percent of its annual gross revenues from federal funds; and
Receives more than$25,000,000 in annual federal funds
ECOLOGY will not pay any invoice until it has received a completed and signed FFATA Data Collection Form.
ECOLOGY is required to report the FFATA information for federally funded agreements, including the required
DUNS number, at www.fsrs.gov<http://www.fsrs.gov>within 30 days of agreement signature. The FFATA
information will be available to the public at www.usaspending.gov<http://www.usaspending.gov>.
For more details on FFATA requirements, see www.fsrs.gov<http://www.fsrs.gov>.
GENERAL TERMS AND CONDITIONS
1. ADMINISTRATIVE REQUIREMENTS
a) RECIPIENT shall follow the "Administrative Requirements for Recipients of Ecology Grants and Loans—EAGL
Edition". https://fortress.wa.gov/ecy/publications/SummaryPages/1401002.htm1
b) RECIPIENT shall complete all activities funded by this Agreement and be fully responsible for the proper
management of all funds and resources made available under this Agreement.
c) RECIPIENT agrees to take complete responsibility for all actions taken under this Agreement,including ensuring
all subgrantees and contractors comply with the terms and conditions of this Agreement. ECOLOGY reserves the right
to request proof of compliance by subgrantees and contractors.
d) RECIPIENT's activities under this Agreement shall be subject to the review and approval by ECOLOGY for the
extent and character of all work and services.
2. AMENDMENTS AND MODIFICATIONS
This Agreement may be altered, amended, or waived only by a written amendment executed by both parties. No
subsequent modification(s)or amendment(s) of this Agreement will be of any force or effect unless in writing and
signed by authorized representatives of both parties. ECOLOGY and the RECIPIENT may change their respective staff
contacts and administrative information without the concurrence of either party.
3. ARCHAEOLOGICAL AND CULTURAL RESOURCES
RECIPIENT shall take reasonable action to avoid, minimize, or mitigate adverse effects to archeological or cultural
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 e 9of 16
1P�
Project Title: 2015-17 CPG Kent IMP 1
Recipient Name: City ofKent
resources. Activities associated with archaeological and cultural resources are an eligible reimbursable cost subject to
approval by ECOLOGY.
RECIPIENT shall:
a) Immediately cease work and notify ECOLOGY if any archeological or cultural resources are found while
conducting work under this Agreement.
b) Immediately notify the Department of Archaeology and Historic Preservation at(360) 586-3064, in the event
historical or cultural artifacts are discovered at a work site.
c) Comply with Governor Executive Order 05-05, Archaeology and Cultural Resources, for any capital construction
projects prior to the start of any work.
d) Comply with RCW 27.53, Archaeological Sites and Resources, for any work performed under this Agreement, as
applicable. National Historic Preservation Act(NHPA)may require the RECIPIENT to obtain a permit pursuant to
Chapter 27.53 RCW prior to conducting on-site activity with the potential to impact cultural or historic properties.
4. ASSIGNMENT
No right or claim of the RECIPIENT arising under this Agreement shall be transferred or assigned by the RECIPIENT.
5. COMMUNICATION
RECIPIENT shall make every effort to maintain effective communications with the RECIPIENT's designees,
ECOLOGY, all affected local, state, or federal jurisdictions, and any interested individuals or groups.
6. COMPENSATION
a) Any work performed prior to effective date of this Agreement will beat the sole expense and risk of the
RECIPIENT. ECOLOGY must sign the Agreement before any payment requests can be submitted.
b) Payments will be made on a reimbursable basis for approved and completed work as specified in this Agreement.
c) RECIPIENT is responsible to determine if costs are eligible. Any questions regarding eligibility should be clarified
with ECOLOGY prior to incurring costs. Costs that are conditionally eligible may require approval by ECOLOGY
prior to purchase.
d) RECIPIENT shall not invoice more than once per month unless agreed on by ECOLOGY.
e) ECOLOGY will not process payment requests without the proper reimbursement forms, Progress Report and
supporting documentation. ECOLOGY will provide instructions for submitting payment requests.
f) ECOLOGY will pay the RECIPIENT thirty(30)days after receipt of a properly completed request for payment.
g) RECIPIENT will receive payment through Washington State Department of Enterprise Services' Statewide Payee
Desk. RECIPIENT must register as a payee by submitting a Statewide Payee Registration form and an IRS W-9 form at
the website, http://www.des.wa.gov/services/ContractingPurchasingBusiness/VendorPay/Pages/default.aspx. For any
questions about the vendor registration process contact the Statewide Payee Help Desk at(360) 407-8180 or email
payeehelpdesk#des.wa.gov.
h) ECOLOGY may, at its sole discretion, withhold payments claimed by the RECIPIENT if the RECIPIENT fails to
satisfactorily comply with any term or condition of this Agreement.
i) Monies withheld by ECOLOGY maybe paid to the RECIPIENT when the work described herein, or a portion
thereof,has been completed if, at ECOLOGY's sole discretion, such payment is reasonable and approved according to
this Agreement, as appropriate, or upon completion of an audit as specified herein.
j) RECIPIENT should submit final requests for compensation within thirty (30)days after the expiration date of this
Agreement. Failure to comply may result in delayed reimbursement.
7. COMPLIANCE WITH ALL LAWS
RECIPIENT agrees to comply fully with all applicable Federal, State and local laws, orders, regulations, and permits
related to this Agreement,including but not limited to:
a) RECIPIENT agrees to comply with all applicable laws, regulations, and policies of the United States and the State
of Washington which affect wages and job safety.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 P�ye 10 of 16
i
Project Title: 2015-17 CPG Kent IMP O
Recipient Name: City ofKent
b) RECIPIENT agrees to be bound by all federal and state laws, regulations, and policies against discrimination.
c) RECIPIENT certifies full compliance with all applicable state industrial insurance requirements.
d) RECIPIENT agrees to secure and provide assurance to ECOLOGY that all the necessary approvals and permits
required by authorities having jurisdiction over the project are obtained. RECIPIENT must include time in their project
timeline for the permit and approval processes.
ECOLOGY shall have the right to immediately terminate for cause this Agreement as provided herein if the
RECIPIENT fails to comply with above requirements.
If any provision of this Agreement violates any statute or rule of law of the state of Washington, it is considered
modified to conform to that statute or rule of law.
8. CONFLICT OF INTEREST
RECIPIENT and ECOLOGY agree that any officer,member, agent, or employee, who exercises any function or
responsibility in the review, approval, or carrying out of this Agreement, shall not have any personal or financial
interest, direct or indirect, nor affect the interest of any corporation, partnership, or association in which he/she is a part,
in this Agreement or the proceeds thereof.
9. CONTRACTING FOR GOODS AND SERVICES
RECIPIENT may contract to buy goods or services related to its performance under this Agreement. RECIPIENT shall
award all contracts for construction,purchase of goods, equipment, services, and professional architectural and
engineering services through a competitive process, if required by State law. RECIPIENT is required to follow
procurement procedures that ensure legal,fair, and open competition.
RECIPIENT must have a standard procurement process or follow current state procurement procedures. RECIPIENT
may be required to provide written certification that they have followed their standard procurement procedures and
applicable state law in awarding contracts under this Agreement.
ECOLOGY reserves the right to inspect and request copies of all procurement documentation, and review procurement
practices related to this Agreement. Any costs incurred as a result of procurement practices not in compliance with
state procurement law or the RECIPIENT's normal procedures may be disallowed at ECOLOGY's sole discretion.
10. DISPUfES
When there is a dispute with regard to the extent and character of the work, or any other matter related to this
Agreement the determination of ECOLOGY will govern, although the RECIPIENT shall have the right to appeal
decisions as provided for below:
a) RECIPIENT notifies the funding program of an appeal request.
b) Appeal request must be in writing and state the disputed issue(s).
c) RECIPIENT has the opportunity to be heard and offer evidence in support of its appeal.
d) ECOLOGY reviews the RECIPIENT's appeal.
e) ECOLOGY sends a written answer within ten(10)business days, unless more time is needed, after concluding the
review.
The decision of ECOLOGY from an appeal will be final and conclusive,unless within thirty(30)days from the date of
such decision, the RECIPIENT furnishes to the Director of ECOLOGY a written appeal. The decision of the Director or
duly authorized representative will be final and conclusive.
The parties agree that this dispute process will precede any action in a judicial or quasi-judicial tribunal.
Appeals of the Director's decision will be brought in the Superior Court of Thurston County. Review of the Director's
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 iP�pe 11 of 16
Project Title: 2015-17 CPG Kent IMP 17
Recipient Name: City ofKent
decision will not be taken to Environmental and Land Use Hearings Office.
Pending final decision of a dispute, the RECIPIENT agrees to proceed diligently with the performance of this
Agreement and in accordance with the decision rendered.
Nothing in this contract will be construed to limit the parties'choice of another mutually acceptable method,in addition
to the dispute resolution procedure outlined above.
11. ENVIRONMENTAL STANDARDS
a) RECIPIENTS who collect environrental-monitoring data must provide these data to ECOLOGY using the
Environmental Information Management System(EIM). To satisfy this requirement these data must be successfully
loaded into EIM, see instructions on the EIM website at: http://www.ecy.wa.gov/eim.
b) RECIPIENTS are required to follow ECOLOGY's data standards when Geographic Information System (GIS)data
are collected and processed. More information and requirements are available at:
http://www.ecy.wa.gov/services/gis/data/standards/standards.htm. RECIPIENTS shall provide copies to ECOLOGY of
all final GIS data layers, imagery, related tables, raw data collection files, map products, and all metadata and project
documentation.
c) RECIPIENTS must prepare a Quality Assurance Project Plan(QAPP)when a project involves the collection of
environmental measurement data. QAPP is to ensure the consistent application of quality assurance principles to the
planning and execution of all activities involved in generating data. RECIPIENTS must follow ECOLOGY's
Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies, July 2004(Ecology Publication
No. 04-03-030). ECOLOGY shall review and approve the QAPP prior to start of work. The size, cost, and complexity
of the QAPP should be in proportion to the magnitude of the sampling effort.
12. GOVERNING LAW
This Agreement will be governed by the laws of the State of Washington, and the venue of any action brought
hereunder will be in the Superior Court of Thurston County.
13. INDEMNIFICATION
ECOLOGY will in no way be held responsible for payment of salaries, consultant's fees, and other costs related to the
project described herein, except as provided in the Scope of Work.
To the extent that the Constitution and laws of the State of Washington permit, each party will indemnify and hold the
other harmless from and against any liability for any or all injuries to persons or property arising from the negligent act
or omission of that party or that party's agents or employees arising out of this Agreement.
14. INDEPENDENT STATUS
The employees,volunteers, or agents of each party who are engaged in the performance of this Agreement will continue
to be employees,volunteers, or agents of that party and will not for any purpose be employees,volunteers, or agents of
the other party.
15. KICKBACKS
RECIPIENT is prohibited from inducing by any means any person employed or otherwise involved in this Agreement to
give up any part of the compensation to which he/she is otherwise entitled to or receive any fee, commission, or gift in
return for award of a subcontract hereunder.
16. MINORITY AND WOMEN'S BUSINESS ENTERPRISES(MWBE)
RECIPIENT is encouraged to solicit and recruit,to the extent possible, certified minority-owned(MBE)and
women-owned(WBE)businesses in purchases and contracts initiated under this Agreement.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 .�PpXe 12 of 16
Project Title: 2015-17 CPG Kent IMP L 0
Recipient Name: City ofKent
Contract awards or rejections cannot be made based on MWBE participation; however, the RECIPIENT is encouraged
to take the following actions,when possible, in any procurement under this Agreement:
a) Include qualified minority and women's businesses on solicitation lists whenever they are potential sources of goods
or services.
b) Divide the total requirements,when economically feasible, into smaller tasks or quantities, to permit maximum
participation by qualified minority and women's businesses.
c) Establish delivery schedules, where work requirements permit, which will encourage participation of qualified
minority and women's businesses.
d) Use the services and assistance of the Washington State Office of Nfinority and Women's Business Enterprises
(OMWBE)(866-208-1064) and the Office of Minority Business Enterprises of the U.S.Department of Commerce, as
appropriate.
17. ORDER OF PRECEDENCE
In the event of inconsistency in this Agreement,unless otherwise provided herein, the inconsistency shall be resolved by
giving precedence in the following order: (a)applicable Federal and State statutes and regulations; (b) Scope of Work;
(c) Special Terms and Conditions; (d)Any provisions or terms incorporated herein by reference including the
"Administrative Requirements for Recipients of Ecology Grants and Loans"; and(e) the General Terns and Conditions.
18. PRESENTATION AND PROMOTIONAL MATERIALS
RECIPIENT shall obtain ECOLOGY's approval for all communication materials or documents related to the
fulfillment of this Agreement. Steps for approval:
a) Provide a draft copy to ECOLOGY for review and approval ten(10)business days prior to production and
distribution of any documents or materials compiled or produced.
b) ECOLOGY reviews draft copy and reserves the right to require changes until satisfied.
c) Provide ECOLOGY two (2)final copies and an electronic copy of any tangible products developed.
Copies include any printed materials, and all tangible products developed such as brochures, manuals, pamphlets,
videos, audio tapes, CDs, curriculum,posters, media announcements, or gadgets, such as a refrigerator magnet with a
message as well as media announcements, and any other online communication products such as Web pages,blogs, and
Twitter campaigns. If it is not practical to provide a copy, then the RECIPIENT must provide a complete description
including photographs, drawings, or printouts of the product that best represents the item.
RECIPIENT shall include time in their project timeline for ECOLOGY's review and approval process.
RECIPIENT shall acknowledge in the materials or documents that funding was provided by ECOLOGY.
19. PROGRESS REPORTING
a) RECIPIENT must satisfactorily demonstrate the timely use of funds by submitting payment requests and progress
reports to ECOLOGY. ECOLOGY reserves the right to amend or terminate this Agreement if the RECIPIENT does not
document timely use of funds.
b) RECIPIENT must submit a progress report with each payment request. Payment requests will not be processed
without a progress report. ECOLOGY will define the elements and frequency of progress reports.
c) RECIPIENT shall use ECOLOGY's provided progress reportfornat.
d) Quarterly progress reports will cover the periods from January 1 through March 31, April 1 through June 30, July 1
through September 30, and October 1 through December 31. Reports shall be submitted within thirty (30)days after
the end of the quarter being reported.
e) RECIPIENT shall submit the Closeout Report within thirty (30) days of the expiration date of the project, unless an
extension has been approved by ECOLOGY. RECIPIENT shall use the ECOLOGY provided closeout report format.
20. PROPERTY RIGHTS
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 e 13 of 16
Project Title: 2015-17 CPG Kent IMP L 1
Recipient Name: City ofKent
a) Copyrights and Patents. When the RECIPIENT creates any copyrightable materials or invents any patentable
property, the RECIPIENT may copyright or patent the same but ECOLOGY retains a royalty free,nonexclusive, and
irrevocable license to reproduce, publish, recover, or otherwise use the material(s)or property, and to authorize others
to use the same for federal, state, or local government purposes.
b) Publications. When the RECIPIENT or persons employed by the RECIPIENT use or publish ECOLOGY
information;present papers, lectures, or seminars involving information supplied by ECOLOGY; or use logos, reports,
maps, or other data in printed reports, signs, brochures, pamphlets, etc., appropriate credit shall be given to ECOLOGY.
c) Presentation and Promotional Materials. ECOLOGY shall have the right to use or reproduce any printed or graphic
materials produced in fulfillment of this Agreement, in any manner ECOLOGY deems appropriate.ECOLOGY shall
acknowledge the RECIPIENT as the sole copyright owner in every use or reproduction of the materials.
d) Tangible Property Rights. ECOLOGY's current edition of"Administrative Requirements for Recipients of Ecology
Grants and Loans," shall control the use and disposition of all real and personal property purchased wholly or in part
with funds famished by ECOLOGY in the absence of state and federal statutes, regulations, or policies to the contrary,
or upon specific instructions with respect thereto in this Agreement.
e) Personal Property Furnished by ECOLOGY. When ECOLOGY provides personal property directly to the
RECIPIENT for use in performance of the project, it shall be returned to ECOLOGY prior to final payment by
ECOLOGY. If said property is lost, stolen, or damaged while in the RECIPIENT's possession, then ECOLOGY shall
be reimbursed in cash or by setoff by the RECIPIENT for the fair market value of such property.
f) Acquisition Projects. The following provisions shall apply if the project covered by this Agreement includes funds
for the acquisition of land or facilities:
a. RECIPIENT shall establish that the cost is fair value and reasonable prior to disbursement of funds provided for in
this Agreement.
b. RECIPIENT shall provide satisfactory evidence of title or ability to acquire title for each parcel prior to
disbursement of funds provided by this Agreement. Such evidence may include title insurance policies, Torrens
certificates, or abstracts, and attorney's opinions establishing that the land is free from any impediment, lien, or claim
which would impair the uses intended by this Agreement.
g) Conversions. Regardless of the agreement expiration date, the RECIPIENT shall not at any time convert any
equipment, property, or facility acquired or developed under this Agreement to uses other than those for which
assistance was originally approved without prior written approval of ECOLOGY. Such approval maybe conditioned
upon payment to ECOLOGY of that portion of the proceeds of the sale, lease, or other conversion or encumbrance
which monies granted pursuant to this Agreement bear to the total acquisition, purchase, or construction costs of such
property.
21. RECORDS, AUDITS, AND INSPECTIONS
RECIPIENT shall maintain complete program and financial records relating to this Agreement, including any
engineering documentation and field inspection reports of all construction work accomplished.
All records shall:
a) Be kept in a manner which provides an audit trail for all expenditures.
b) Be kept in a common file to facilitate audits and inspections.
c) Clearly indicate total receipts and expenditures related to this Agreement.
d) Be open for auditor inspection by ECOLOGY, or by any duly authorized audit representative of the State of
Washington,for a period of at least three (3)years after the final grant payment or loan repayment, or any dispute
resolution hereunder.
RECIPIENT shall provide clarification and make necessary adjustments if any audits or inspections identify
discrepancies in the records.
ECOLOGY reserves the right to audit, or have a designated third party audit, applicable records to ensure that the state
has been properly invoiced. Any remedies and penalties allowed by law to recover monies determined owed will be
enforced. Repetitive instances of incorrect invoicing or inadequate records may be considered cause for termination.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 .�Pege 14 of 16
Project Title: 2015-17 CPG Kent IMP L G
Recipient Name: City ofKent
All work performed under this Agreement and any property and equipment purchased shall be made available to
ECOLOGY and to any authorized state,federal or local representative for inspection at any time during the course of
this Agreement and for at least three (3)years following grant or loan termination or dispute resolution hereunder.
RECIPIENT shall provide right of access to ECOLOGY, or any other authorized representative, at all reasonable times,
in order to monitor and evaluate performance, compliance, and any other conditions under this Agreement.
22. RECOVERY OF FUNDS
The right of the RECIPIENT to retain monies received as reimbursement payments is contingent upon satisfactory
performance of this Agreement and completion of the work described in the Scope of Work.
All payments to the RECIPIENT are subject to approval and audit by ECOLOGY, and any unauthorized expenditure(s)
or unallowable cost charged to this agreement shall be refunded to ECOLOGY by the RECIPIENT.
RECIPIENT shall refund to ECOLOGY the full amount of any erroneous payment or overpayment under this
Agreement.
RECIPIENT shall refund by check payable to ECOLOGY the amount of any such reduction of payments or repayments
within thirty(30)days of a written notice. Interest will accrue at the rate of twelve percent(12%)per year from the
time ECOLOGY demands repayment of funds.
Any property acquired under this Agreement, at the option of ECOLOGY, may become ECOLOGY's property and the
RECIPIENT's liability to repay monies will be reduced by an amount reflecting the fair value of such property.
23. SEVERABILITY
If any provision of this Agreement or any provision of any document incorporated by reference shall be held invalid,
such invalidity shall not affect the other provisions of this Agreement which can be given effect without the invalid
provision, and to this end the provisions of this Agreement are declared to be severable.
24. STATE ENVIRONMENTAL POLICY ACT(SEPA)
RECIPIENT must demonstrate to ECOLOGY's satisfaction that compliance with the requirements of the State
Environmental Policy Act(Chapter 43.21C RCW and Chapter 197-11 WAC)have been or will be met. Any
reimbursements are subject to this provision.
25. SUSPENSION
When in the best interest of ECOLOGY, ECOLOGY may at any time, and without cause, suspend this Agreement or
any portion thereof for a temporary period by written notice from ECOLOGY to the RECIPIENT.RECIPIENT shall
resume performance on the next business day following the suspension period unless another day is specified by
ECOLOGY.
26. SUSTAINABLE PRACTICES
In order to sustain Washington's natural resources and ecosystems,the RECIPIENT is fully encouraged to implement
sustainable practices and to purchase environmentally preferable products under this Agreement.
a) Sustainable practices may include such activities as: use of clean energy, use of double-sided printing, hosting low
impact meetings, and setting up recycling and composting programs.
b) Purchasing may include such items as: sustainably produced products and services, EPEAT registered computers
and imaging equipment, independently certified green cleaning products, remanufactured toner cartridges, products
with reduced packaging, office products that are refillable,rechargeable, and recyclable, and 100%post consumer
recycled paper.
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 .�Pege 15 of 16
Project Title: 2015-17 CPG Kent IMP L J
Recipient Name: City ofKent
For more suggestions visit ECOLOGY's web pages: Green Purchasing, http://www.ecy.wa.gov/programs/swfa/epp
and Sustainability,www.ecy.wa.gov/sustainability.
27. TERMINATION
a) For Cause
ECOLOGY may terminate for cause this Agreement with a seven(7)calendar days prior written notification to the
RECIPIENT, at the sole discretion of ECOLOGY, for failing to perform an Agreement requirement or for a material
breach of any tern or condition. If this Agreement is so terminated,the parties shall be liable only for performance
rendered or costs incurred in accordance with the terns of this Agreement prior to the effective date of termination.
Failure to Commence Work. ECOLOGY reserves the right to terminate this Agreement if RECIPIENT fails to
commence work on the project funded within four(4) months after the effective date of this Agreement, or by any date
mutually agreed upon in writing for commencement of work, or the time period defined within the Scope of Work.
Non-Performance. The obligation of ECOLOGY to the RECIPIENT is contingent upon satisfactory performance by the
RECIPIENT of all of its obligations under this Agreement. In the event the RECIPIENT unjustifiably fails, in the
opinion of ECOLOGY, to perform any obligation required of it by this Agreement, ECOLOGY may refuse to pay any
further funds, terminate in whole or in part this Agreement, and exercise any other rights under this Agreement.
Despite the above, the RECIPIENT shall not be relieved of any liability to ECOLOGY for damages sustained by
ECOLOGY and the State of Washington because of any breach of this Agreement by the RECIPIENT. ECOLOGY
may withhold payments for the purpose of setoff until such time as the exact amount of damages due ECOLOGY from
the RECIPIENT is determined.
b) For Convenience
ECOLOGY may terminate for convenience this Agreement, in whole or in part, for any reason when it is the best
interest of ECOLOGY,with a thirty(30)calendar days prior written notification to the RECIPIENT. If this Agreement
is so terminated, the parties shall be liable only for performance rendered or costs incurred in accordance with the terns
of this Agreement prior to the effective date of termination.
Non-Allocation of Funds. ECOLOGY's ability to make payments is contingent on availability of funding. In the event
funding from state, federal or other sources is withdrawn, reduced, or limited in any way after the effective date and
prior to the completion or expiration date of this agreement, ECOLOGY, at its sole discretion,may elect to terminate
the agreement,in whole or part, or renegotiate the agreement, subject to new funding limitations or conditions.
ECOLOGY may also elect to suspend performance of the agreement until ECOLOGY determines the funding
insufficiency is resolved. ECOLOGY may exercise any of these options with no notification or restrictions.
If payments have been discontinued by ECOLOGY due to unavailable funds, the RECIPIENT shall not be obligated to
repay monies which had been paid to the RECIPIENT prior to such termination.
RECIPIENT's obligation to continue or complete the work described in this Agreement shall be contingent upon
availability of funds by the RECIPIENT's governing body.
c) By Mutual Agreement
ECOLOGY and the RECIPIENT may terminate this Agreement, in whole or in part, at any time, by mutual written
agreement.
d) In Event of Termination
All finished or unfinished documents, data studies, surveys, drawings, maps, models, photographs, reports or other
W2RCPG-1517-KentPW-00075
Agreement No: W2RCPG-1517-KentPW-00075 ripe 16 of 16
Project Title: 2015-17 CPG Kent IMP LL
Recipient Name: City ofKent
materials prepared by the RECIPIENT under this Agreement, at the option of ECOLOGY, will become property of
ECOLOGY and the RECIPIENT shall be entitled to receive just and equitable compensation for any satisfactory work
completed on such documents and other materials.
Nothing contained herein shall preclude ECOLOGY from demanding repayment of all funds paid to the RECIPIENT in
accordance with Recovery of Funds, identified herein.
28. THIRD PARTY BENEFICIARY
RECIPIENT shall ensure that in all subcontracts entered into by the RECIPIENT pursuant to this Agreement, the state
of Washington is named as an express third party beneficiary of such subcontracts with full rights as such.
29. WAIVER
Waiver of a default or breach of any provision of this Agreement is not a waiver of any subsequent default or breach,
and will not be construed as a modification of the terms of this Agreement unless stated as such in writing by the
authorized representative of ECOLOGY.
W2RCPG-1517-KentPW-00075
25
PUBLIC WORKS DEPARTMENT
� Timothy J. LaPorte, P.E. Public Works Director
Phone: 253-856-5500
rEwta Fax: 253-856-6500
Address: 400 West Gowe Street
Kent, WA 98032-5895
Date: October 15, 2015
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: October 19, 2015
From: Gina Hungerford, Conservation Coordinator
Through: Kelly Peterson. AICP, Transportation/Special Projects Manager
Chad Bieren, P.E., City Engineer
Subject: Seattle-King County Health Department Local Hazardous
Waste Management Program (LHWMP) Grant Amendment 1
Motion: Move to recommend Council authorize the Mayor to accept
Amendment 1 to the Local Hazardous Waste Management Program Grant
providing $35,082.26 for 2016 and authorize expenditure of grant funds,
subject to final terms and conditions acceptable to the City Attorney and
Public Works Director.
Summary: The Seattle/King County Health Department's Local Hazardous Waste
Management Program Grant, previously an annual grant, is moving to a biennial
budget cycle with this Amendment. Funding is intended to help cities protect public
health and the environment from toxins and hazardous products and wastes. The
grant covers collection of hazardous waste at three special recycling collection
events for residents, as described in the attached Grant Agreement's Scope of Work.
Exhibit: Local Hazardous Waste Management Program Grant Amendment 1
Budget Impact: The City will receive $35,082.26. No match is required. The Local
Hazardous Waste Management Program grant fully funds the collection of hazardous
waste collected at the three events the City hosts each year.
26
This page intentionally left blank
Public Health, 27
Seattle F&King County��11
AMENDMENT PHSKC Agreement #EHS3678
Amendment #1
This Amendment between PHSKC and the Recipient changes the referenced Agreement for the following
purpose(s): Extends end date of agreement to 12/31/2016 and adds year two funding of$35,082.26 to continue
hazardous waste education activities to protect residents' health and the environment.
Recipient Name &Address: City of Kent
220 41" Avenue S
Kent, WA 98032-5895
Project Title: Local Hazardous Waste Management Program
Effective Date of Amendment: June 1, 2015
Agreement End Date: ❑ No Change X Change to: December 31, 2016
Agreement Amount: ❑ No Change X Change to: $68,862.07
Funding Details: ❑ No Change X Revise the following funding details:
Funding Source PHSKC Contract# Amount Effective Dates New or Revised
County- LHWMP $35,082.26 61112015—1213112016 NEW
Funding Summary: ❑ No Change X Revise to read:
FEDERAL: $0 COUNTY: $35,082.26 STATE: $0 OTHER: $0
Exhibits: ❑ No Change X Revise as follows: REPLACE following exhibits as attached hereto:
• EXHIBIT A—Scope of Work
• EXHIBIT B— Budget
• EXHIBIT C— Invoice
King County Terms&Conditions: X No Change ❑ Revise as follows:
All other terms and conditions of the referenced Agreement and any previous Agreement amendment not
revised herein shall remain unchanged and in full force and effect.
RECIPIENT SIGNATURE PRINTED NAME AND TITLE DATE SIGNED
PHSKC SIGNATURE PRINTED NAME AND TITLE DATE SIGNED
Ngozi Clew,
Environmental Health Division Director
2s
EXHIBIT A
SCOPE OF WORK
AMENDMENT #1
CITY OF KENT
1/1/2015-12/31/2016
Background
The Local Hazardous Waste Management Plan (hereafter referred to as the "Plan") as updated in
1997 and 2010, was adopted by the partner agencies (King County Solid Waste Division, Seattle
Public Utilities, King County Water and Land Resources Division and the Seattle-King County
Department of Public Health) and cities located in King County. The Washington State
Department of Ecology in accordance with RCW 70.105.220 subsequently approved the Plan.
The City is an active and valued partner in the regional Local Hazardous Waste Management
Program (hereafter referred to as the "Program").
The purpose of this Exhibit is to define the relationship associated with the Program's funding of
City activities performed under the auspices of the Plan and as approved by the Program's
Management Coordination Committee (hereinafter referred to as the "MCC"). This Agreement
further defines the responsibilities of the City and Seattle-King County Department of Public
Health with respect to the transfer of Program monies.
Scope of Work
The City of Kent will organize six citywide household hazardous waste collection and recycling
events. At these events the following materials will be collected and recycled: motor oil, motor
oil filters, petroleum based products, antifreeze, batteries, CFCs and other materials if determined
to be cost effective.
Responsibilities of the Parties
The Citv
1. The City shall develop and submit project proposals and budget requests to the Program's
Contract Administrator. Funds provided to the City by the Local Hazardous Waste
Management Program pursuant to this Contract shall be used to implement hazardous
waste programs and/or services as approved by the MCC.
2. For reimbursement the City shall submit the following to the Contract Administrator:
a) An invoice (see Exhibit C). Invoices should be sent to the Contract
Administrator for approval and payment.
b) A brief description of activity accomplished and funds expended in
accordance with the scope of work.
c) Copies of invoices for expenditures or afinancial statement prepared by the
City's finance department. The financial statements should include vendor
EHS3678—Amendment#1 - City of Kent 1
29
names, a description of services provided, date paid and a check or warrant
number.
3. The City shall notify the Contract Administrator no later than December 15a' regarding the
amount of outstanding expenditures for which the City has not yet submitted a
reimbursement request.
4. It is the responsibility of the City to comply with all applicable county, state and/or federal
reporting requirements with respect to the collection and transfer of moderate risk wastes.
The City shall report to the Contract Administrator the quantity, by type, of moderate risk
waste collected using Program funds. The City shall also provide the Contract Administrator
with copies of EPA's Non-Hazardous Waste Manifest or similar form, associated with the
transport of moderate risk waste collected through Program-funded events.
5. The City is solely responsible for any and all spills, leaks or other emergencies arising at the
facilities associated with the City's events or in any other way associated with activities
conducted within the scope of this Contract. In the event of a spill or other emergency, the
City is responsible for complying with all applicable laws and regulations.
6. The City agrees to appropriately acknowledge the Program in all media produced—in part or
in whole—with Program funds. The intent of this provision is to further strengthen this
regional partnership in the public's mind.
7. The City agrees to provide the Program with copies of all media material produced for local
hazardous waste management events or activities that have been funded by the Program. The
City also agrees to allow the Program to reproduce media materials created with Program
money provided that the Program credits the City as the originator of that material.
8. This project shall be administered by Gina Hungerford at the City of Kent, 220 Fourth Ave.
S, Kent at(253) 856-5549, (ghungerford(okentwa.gov) or her designee.
9. Questions or concerns regarding any issue associated with this Exhibit that cannot be handled
by the Contract Administrator should be referred to the LHWMP Program Director for
resolution.
Seattle-King County Department of Public Health
1. Seattle-King County Department of Public Health shall administer, via the attached
Contract, the transfer of Program funds to the City for hazardous waste management
events and activities.
2. Within ten (10)working days of receiving a request for reimbursement from the City, the
Contract Administrator shall either notify the City of any exceptions to the request which
have been identified or shall process the request for payment. If any exceptions to the
request are made,this shall be done by written notification to the City providing the
reason for such exception. The Contract Administrator will not authorize payment for
activities and/or expenditures that are not included in the scope of work, unless the scope
has been amended. The Contract Administrator retains the right to withhold all or
partial payment if the City's invoices are incomplete (e.g. they do not include proper
documentation of expenditures for which reimbursement is being requested) or are not
consistent with the submitted scope of work.
EHS3678—Amendment#1 - City of Kent 2
30
Program Contacts
Lynda Ransley Paul Shallow
LHWMP Program Director LHWMP Contract Administrator
150 Nickerson Street, Suite 204 401 Fifth Ave., Suite 1100
Seattle WA 98109 Seattle WA 98104
206-352-8163 206-263-8487
lynda.ransleyAkingcounty.go v Paul.shallowAkingcounty.Rov
EHS3678—Amendment#1 - City of Kent 3
31
EXHIBIT B
2015-2016 BUDGET
LOCAL HAZARDOUS WASTE MANAGEMENT PROGRAM
City of Kent
220 Fourth Ave. S
Kent, WA 98032
Component Description 2015 Budget 2016 Budget Total
Household Hazardous
Waste Education
Household Hazardous $33,779.81 $35,082.26 $68,862.07
Waste Collection
TOTAL $33,779.81 $35,082.26 $68,862.07
Footnote: The 2015 and 2016 budgets can be partly or totally spend in either 2015 and/or 2016
but cannot exceed the budget total in these two years.
EHS3678—Amendment#1 -City of Kent
32
INVOICE
Contract Number: EHS3678 King County Accounts Payable Information
Exhibit: C Purchase Order#
Amendment#1 Supplier Name City of Kent
Remit to:City of Kent Supplier# 1585
220 Fourth Avenue South Supplier Pay Site City of Kent
Kent WA 98032 Invoice Date
Gina Hungerford Invoice#
253-856-5549 Amount to be Paid
ghungerford@kentwa.gov Note to AP
Print on Remittance
Paul Shallow 206-263-
Submit signed invoice to: LHW Program name&phone 8487
Paul Shallow
Public Health -Seattle & King County
Local Hazardous Waste Management Program
401 Fifth Ave., Suite 1100
Seattle, WA 98104
206-263-8487
paul.shallow@kingcounty.gov
Invoice for services rendered under this contract for the period of:
Total Current Previous
Expenditure Item 2016 Budget Expenditure Expenditure Balance
HHW Education
HHW Collection 68,862.07 22,519.87 $46,342.20
TOTAL 68,862.07 $22,519.87 $46,342.20
I,the undersigned,do hereby certify under penalty of perjury,that this is a true and correct claim
for reimbursement services rendered. I understand that any false claims, statements, documents,
or concealment of material fact may be prosecuted under applicable Federal and State laws.This
certification includes any attachments which serve as supporting documentation to this
reimbursement request.
Signed Date Contract Administrator Approval Date
Print Name
33
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 400 W Gowe St.
Kent, WA 98032-5895
Date: October 16, 2015
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: October 19, 2015
From: Bill Thomas, Street Superintendent
Through: Dave Brock, P.E., Operations Manager
Subject: Information Only/Snow and Ice Preparation
INFORMATION ONLY/NO MOTION REQUIRED
Summary: The Public Works Operations Division is responsible for responding to snow
and ice conditions throughout the winter season. In a typical year, Kent experiences 2-3
significant events that require a prolonged response from staff. Staff is prepared to work
around-the-clock to address conditions.
Crews are currently prepping for the 2015-16 winter season. We have enough materials
stock piled to sustain us for a five day event. Snow and ice response equipment consisting
of eight trucks with plows seven with sanders, one truck with liquid anti-icing application
equipment and a plow, and a motor grader are also being prepped for the season.
Annual coordination meetings are held with the Police Department in advance of the
winter snow and ice season. Operations staff and the Police department work hand-in-
hand during response events. The Police Department takes a lead role in facilitating the
removal of vehicles abandoned in the roadway they also temporarily close priority routes
during heavy snow events to facilitate access by snow and ice removal equipment.
During a snow and ice event, Operations response staff address prioritized arterial routes
first. These routes are identified in the Snow and Ice Response Plan, which is available on
the City's website. As roadways are closed or opened during a response event, updates
are posted on the City's www.drivekent.com website. Other public communication
methods utilized include Kent radio, the Traffic Alert system (e-mail), and variable
message boards.
Staff also works closely with the Department of Transportation and King County Metro.
Budget Impact: Snow and ice response is an unbudgeted general fund expense. The
duration of a significant event is challenging to predict. Historically, response events have
lasted from two to fourteen days. Operations Division costs associated with responding to
an event with this variability have ranged between $10,000 and $150,000, not including
clean-up costs.
34
This page intentionally left blank
35
PUBLIC WORKS DEPARTMENT
� Timothy J. LaPorte, P.E. Public Works Director
Phone: 253-856-5500
rEwta Fax: 253-856-6500
Address: 400 West Gowe Street
Kent, WA 98032-5895
Date: October 16, 2015
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: October 19, 2015
From: Alex Murillo, P.E., Environmental Engineering Supervisor
Through: Chad Bieren, P.E., City Engineer
Subject: Information Only/Stormwater Utility Rate Update
INFORMATION ONLY/NO MOTION REQUIRED
Summary: In August information was presented to the Committee regarding
research on our stormwater rate structure. Further analysis has been completed
which will be reviewed with the Committee.
Exhibit: None
Budget Impact: None