HomeMy WebLinkAboutCity Council Committees - Public Works/Planning - 03/17/2014 (3) 1
Public Works Committee Agenda
�� Councilmembers: Brenda Fincher • Dana Ralph • Dennis Higgins, Chair
`� KENT
WASHINGTON
March 17, 2014
4:00 P.m.
Item Description Action Speaker Time Page
1. Approval of Meeting Minutes March 3, 2014 YES None 03 03
2. TV Inspection Truck Procurement & Interlocal YES Ron Green 10 05
Agreement
3. Upper Russell Road Interlocal Agreement with YES Toby Hallock 05 21
King County Flood Control Zone District
4. Consultant Services Agreement with GEI YES Ken Langholz 05 37
Consultants, Inc. - Briscoe-Desimone Levee
Reaches 2 &3
5. Consultant Services Agreement with Jason YES Paul Kuehne 05 57
Engineering for Construction Services -
Briscoe-Desimone Levee Reaches 2 &3
6. Boeing Levee Environmental Restoration YES Mike Mactutis 05 73
Project
7. Information Only/Citywide Spring Litter NO Gina Hungerford 05 97
Cleanup Event
8. Information Only/Update on Pavement NO Bill Thomas 10 99
Conditions
9. Information Only/Update on Bridge Inventory NO Bill Thomas 10 101
& Inspection
10. Information Only/Coal & Crude Oil Train - NO Chad Bieren 10 103
Update
Unless otherwise noted, the Public Works Committee meets at 4:00 p.m. on the 1"& 3rd Mondays of each
month. Council Chambers East, Kent City Hall, 220 4th Avenue South, Kent, 98032-5895. For information
please contact Public Works Administration (253) 856-5500.
Any person requiring a disability accommodation should contact the City Clerk's Office at
(253) 856-5725 in advance.
For TDD relay service call the Washington Telecommunications Relay Service at 1-800-833-6388.
z
This page intentionally left blank.
3
Public Works Committee Minutes
March 3,.. 2014
COMMITTEE MEMBERS PRESENT:
Committee Chair, Dennis Higgins and Committee members Dana Ralph and Brenda Fincher were
present. The meeting was called to order at 4:03 p.m.
Item 1 — Approval of Meeting Minutes Dated February 24, 2014:
Committee member Ralph MOVED to approve the minutes of February 24, 2014. The
motion was SECONDED by Committee member Fincher and PASSED 3-0.
Item 2 —Goods &Services Agreement with TMG Services for Chlorination Equipment for
Kent Springs:
Sean Bauer, Interim Water Superintendent noted that chlorine is used to kill bacteria and other
microbes in the drinking water supply. The chlorination equipment at Kent Springs has reached
the end of its useful life and needs to be replaced. Bauer said the purchase from TMG Services is
for parts only; Water Department staff will complete the installation of equipment.
Committee member Fincher MOVED to recommend Council authorize the Mayor to sign
a Goods and Services Agreement with TMG Services, Inc. for purchase of chlorination
equipment in an amount not to exceed $22,499.00 subject to final terms and conditions
acceptable to the City Attorney and Public Works Director. The motion was SECONDED
by Committee member Ralph and PASSED 3-0.
Item 3 — Grant Acceptance/Kent Regional Trails Connector:
Mark Madfai P.E., Design Engineering Supervisor stated that the Public Works Department
competed for and was successful in obtaining a $1,125,368 federal grant for the Kent Regional
Trails Connector project. This project will construct a new, east-west, multi-use trail connecting
the existing Green River Trail to the Interurban Trail. The trail location will be adjacent to the
Green River Natural Resources Area and will include the installation of rectangular rapid flashing
beacons at 641h Avenue and 72"' Avenue and a new "HAWK" signal at the crossing of West Valley
Highway. A new, non-motorized bridge will be constructed across Mill Creek on the east end,
connecting to the Interurban Trail.
Committee member Ralph MOVED to recommend Council accept the federal grant in the
amount of $1,125,368 for the Kent Regional Trails Connector Project and direct staff to
establish a budget for the funds to be spent within the Kent Regional Trails Connector
Project subject to final terms and conditions acceptable to the City Attorney and Public
Works Director. The motion was SECONDED by Committee member Fincher and
PASSED 3-0.
Item 4 — Consultant Services Agreement with Tetra Tech, Inc. for 2014 Lakes Water
Ouality Monitoring:
Matt Knox, Environmental Ecologist stated that Lake Fenwick and Lake Meridian are listed on the
303d list (the nation's list of"impaired waters"compiled by the State Department of Ecology and
the Environmental Protection Agency) for a number of water quality parameters.
4
Public Works Committee Minutes
March 3,.. 2014
The City has enacted a number of measures to improve water quality at both lakes, including:
Constructing stormwater treatment measures and requiring them on private systems; educating
residents about ways to reduce polluted runoff (e.g. natural yard care and car washing); and in
the case of Lake Fenwick, installing an in-lake aeration system and introducing weed-eating fish
(Grass Carp) to reduce non-native aquatic plants.
This contract will assist staff by providing the expert help and specialized equipment necessary to
accurately assess lake conditions.
Committee member Fincher MOVED to recommend Council authorize the Mayor to sign
a consultant services agreement with Tetra Tech, Inc. in an amount not to exceed
$24,432.97 to monitor and analyze surface water quality conditions and aquatic weeds
in Lake Fenwick and Lake Meridian during 2014, subject to final terms and conditions
acceptable to the City Attorney and the Public Works Director. The motion was
SECONDED by Committee member Ralph and PASSED 3-0.
Item 5- Information Only/ Recycling Event, Rain Barrell, Composter & Work
Bin Sale, Curbside Cleanup, & City-Wide Spring Clean Event:
Gina Hungerford, Conservation Coordinator noted the following events:
Spring Recycling Event
March 15, 2014 from 9:00 am - 3:00 pm, at Russell Road Park. Residents are invited to bring
items that are not easily recycled at the curb including appliances, tires, bulky yard debris
and Styrofoam at no charge. For a list of what to bring, visit www.KentRecyclies.com.
Composter, Work Bin & Rain Barrel Sale
Russell Road Park on March 22. Composters &Worm Bins will be available for $25 and Rain
barrels for $35, while supplies last.
Spring Curbside Cleanup Week
March 31-April 4 residents can place additional garbage and yard waste at the curb. A flyer
with details will be sent in mid-March for more information visit www.KentRecycles.com.
2nd Annual City-Wide Litter Cleanup
Will take place Saturday, April 5 residents may sign up online at
www.KentWA.gov/LitterFreeEventRegistration.
Information Only/No Motion Required
The meeting was adjourned at 4:41 p.m.
Cheryl Viseth
Council Committee Recorder
5
PUBLIC WORKS DEPARTMENT
Tim LaPorte, Public Works Director
Phone: 253-856-5515
• Address: 220 Fourth Avenue S.
N'147KENT Kent, WA. 98032-5895
WASHING-ON
Date: February 14, 2014
To: Chair Dennis Higgins and Public Works Committee Members
Special PW Committee Meeting Date: March 17, 2014
From: Ron Green, Fleet Superintendent
Greg Reed, Utility Superintendent
Through: Dave Brock, P.E., Interim Operations Manager
Subject: Interlocal Agreement with HGAC for Utility TV Inspection Truck
Procurement
Item - 2
MOTION: Move to recommend Council authorize the Mayor to sign an interlocal
agreement with HGAC to facilitate the purchase of a TV Inspection Truck and
associated software, hardware, cameras and training, subject to final terms and
conditions acceptable to the City Attorney and Public Works Director.
SUMMARY:
Public Works Operations needs to replace its sewer and storm line TV inspection truck,
along with associated software, hardware and cameras in 2014. Over the past 17 years, the
inspection truck has served its useful life and the equipment inside the truck has become
obsolete.
Nationwide, a number of local and state agencies utilize group contracting to receive the
best prices on equipment. The Houston Galveston Area Council (HGAC) has developed a
reliable list of vendors for TV inspection trucks and equipment that is widely used. HGAC is
similar to the Washington State Interlocal Agreement which we use to purchase more
typical vehicles and equipment. HGAC vendors have the equipment specifications we need
to update our TV inspection equipment.
The vendor selected from the HGAC list is CUES, which is a national company widely used
throughout Puget Sound. CUES supplies and supports complete packages; inspection trucks,
cameras, inspection equipment/training and equally as important, the functional hardware
and software platforms we require.
We have selected the HGAC inter-local contract as the basis of our purchasing agreement
because of its flexibility to integrate components, and because. We deal directly with the
vendor to achieve the best prices for the products and services rendered. This method has
been reviewed and approved by our legal department, as it meets all state and local
procurement requirements.
BUDGET IMPACT:
Approved - 2014 Budget Adjustment (Utility Funded)
1
6
This page intentionally left blank.
7
INTERLOCAL CONTRACT ILC
V94Pff FOR COOPERATIVE PURCHASING No.:
Pc,m =t Mmbcr assigned by H-GAC
THIS INTERLOCAL CONTRACT("Contract'),made and entered into pursuant to the Texas lnterlocal Cooperation Act,Chapter
791,Texas Government Code(the"Act'),by and between the Houston-Galveston Area Council,hereinafter referred to as"H-GAC,"
having its principal place of business at 3555 Timmons Lane, Suite 120,Houston,Texas 77027,and *City of Kent
, a local government, a state agency, or a non-profit corporation
created and operated to provide one or more governmental functions and set-vices,hereinafter referred to as"End User,"having its
principal place of business at* 220 4th Avenue South, Kent Washington 98032-5895
WITNESSETH
WHEREAS,H-GAC is a regional planting commission and political subdivision of the State of Texas operating under Chapter 391,
Texas Local Government Code;and
WHEREAS, pursuant to the Act, H-GAC is authorized to contract with eligible entities to perform governmental functions and
services,including the purchase of goods and services;and
WHEREAS, in reliance on such authority,H-GAC has instituted a cooperative purchasing program under which it contracts with
eligible entities under the Act; and
WHEREAS,End User has represented that it is an eligible entityunder the Act,that its governing bodyhas authorized this Contract on
*01/06/2014 (Date),and that it desires to contract with II-GAC on the terms set forth below;
NOW,THEREFORE,H-GAC and the End User do hereby agree as follows:
ARTICLE 1: LEGAL AUTHORITY
The End User represents and warrants to H-GAC that(1)it is eligible to contract with H-GAC under the Act because it is one of the
following: a local government,as defined in the Act(a county,a municipality,a special district,or other political subdivision of the
State of Texas or any other state),or a combination of two or more of those entities,a state agency(an agency of the State of Texas as
defined in Section 771.002 of the Texas Government Code,or a similar agency of another state),or a non-profit corporation created
and operated to provide one ormore governmental functions and services,and(2)it possesses adequate legal authotityto enterinto this
Contract.
ARTICLE 2: APPLICABLE LAWS
H-GAC and the End User agree to conduct all activities under this Contract in accordance with all applicable rules,regulations,and
ordinances and laws in effect oT promulgated during the term of this Contract.
ARTICLE 3: WHOLE AGREEDIENT
This Contract and any attachments,as provided herein,constitute the complete contract between the parties hereto,and supersede any
and all oral and written agreements between the parties relating to matters herein.
ARTICLE 4: PERFORMANCE PERIOD 01/06/2014
The period of this Contract shall be for the balance of the fiscal year of the End User,which began • and
ends* 12/31/2014 , This Contract shall thereafter automatically be renewed annually for each succeeding fiscal year,
provided that such renewal shall not have the effect of extending the period in which the End User may make any payment due an H-
GAC contractor beyond the fiscal year in which such obligation was incurred under this Contract.
ARTICLE 5: SCOPE OF SERVICES
The End User appoints H-GAC its true and lawful purchasing agent for the purchase of certain products and services through the H-
GAC Cooperative Purchasing Program.End User will access the Program through IIGACBtm.eum and by submission of any duly
executed purchase order, in the form prescribed by H-GAC to a contractor having a valid contract with H-GAC. All purchases
hereunder shall be in accordance with specifications and contract terms and pricing established by H-GAC. Ownership (title) to
products purchased through H-GAC shall transfer directly from the contractor to the End User.
(over)
8
ARTICLE 6: PAYMENTS
H-GAC will confirm each order and issue notice to contractor to proceed. Upon delivery of goods or services purchased, and
presentation of a properly documented invoice,the End User shall promptly,and in any case within thirty(30)days,pay H-GAC's
contractor the full amount oftbe invoice.All payments for goods or services will be made from currentrevenues available to thepaying
party. In no event shall H-GAC have any financial liability to the End User for any goods or services End User procures from an H-
GAC conti actor.
ARTICLE 7: CHANGES AND AMENDMENTS
This Contract may be amended only by a written amendment executed by both parties, except that any alterations, additions, or
deletions to the terms of this Contract which arc required by changes in Federal and State law or regulations are automatically
incorporated into this Contract without written amendment hereto and shall become effective on the date designated by such law or
regulation.
H-GAC reserves the right to make changes in the scope of products and services offered through the H-GAC Cooperative Purchasing
Program to be performed hereunder.
ARTICLE 8: TERMINATION PROCEDURES
H-GAC or the EndUscr may cancel this Contract at any time upon thirty(30)days written notice by certified mail to the other party to
this Contract. The obligations of the End User,including its obligation to pay H-GAC's contractor for all costs incurred under this
Contract prior to such notice shall survive such cancellation, as well as any other obligation incurred under this Contract,until
performed or discharged by the End User.
ARTICLE 9: SEVERABILITY
Allparties agree that should any provision of this Contract be determined to be invalid orunenforceable,such determination shall not
affect any other term of this Contract,which shall continue in frill force and effect.
ARTICLE 10: FORCE MAJEURE
To the extent that either party to this Contract shall be wholly or partiallyprevented from the performance within the term specified of
any obligation or duty placed on such party by reason of or through strikes,stoppage of labor,riot,fire,flood,acts of war,insurrection,
accident,order of any court,act of God,or specific cause reasonably beyond the party's control and not attributable to its neglect or
nonfeasance,in such event,the time for the performance of such obligation or duty shall be suspended until such disability to perform is
removed;provided,however,force majeure shall not excuse an obligation solely to pay funds. Determination of force majeure shall
rest solely with H-GAC,
ARTICLE 11: VENUE
Disputes between procuring party and Vendor are to be resolved in accord with the law and venue rules of the State of purchase.
THIS INSTRUMENT HAS BEEN EXECUTED IN TWO ORIGINALS BY THE PARTIES HERETO AS FOLLOWS:
-City of Kent Houston-Galveston Area Council
Name of End User(local government,agency,a-non profit eotporatlon) 3555 Timmons lane,Suite 120,Houston,TX 77027
*220 4th Avenue, South By:
Mailing Address Executive➢imctor
*Kent WA 98032-5895
City State ZIP Code Arrest;
Manager
*By:
Date:
Signature of chief elected or appointed official
*Suzette Cooke, Mayor 01/06/2014
Typed Name&Title of Signatory Date
*Denotes required fields
rm 03.111
*Request for Information 9
To expedite service,please complete the following blanks relevant to your agency's administrative/elective
personnel and reharn the completed for to FT-CAC, Coot3erative Purchasin Pro rran
P.O. Box 22777,Houston,TX 77227-2777.
Name of End User Agency: City of Kent County Name: King
(Municipality/Coiuity/DisU-ict/etc.)
Mailing Address: 220 4th Ave., South Kent WA 98032-5895
(Street AddreSS/P.0. Box) (City) (State) (ZIP Code)
Main Telephone Number: (253)856-5700 FAX Number: (253)856-6712
Physical Address: 220 4th Ave., South Kent WA 98032-5895
(Street Address, if different frown mailing address) (Ciii) (State) (ZIP Code)
Web Site Address: www.kentwa.gov
Official Contact: Ron Green Title: Fleet Superintendent
(Point of Contact far HGACBuy Ltterlocal Contract) Ph No.: (253)856-5680 _
Mailing Address: 5821 South 240th Street Fx No. :(253)856-6600 _
(Street Address/P.O.Box) E-Mail Address: Rgreen@kentwa.gov
Kent WA 98032
(City) (State) (ZIP Code)
Authorized Official: Suzette Cooke Title: Mayor
(Mayor/City Manager/Executive Director etc) Ph No.: (253)856-6700 _
Mailing Address: 220 4th Ave.South Fx No. :(253)856-6712 _
(SpvetAddresr/O.a Box) E-Mail Address: Scooke@kentwa.gov
Kent WA 998032-5895
(City) (State) (ZIP Code)
Official Contact: Title:
(PurchasingAgent/Auditoretc) Ph No.: -
Mailing Address: Fx No. : -
(Sti'eetAddreSS/O.O.Box) E-Mail Address:
(City) (State) (ZIP Code)
Official Contact: Tim LaPorte Title: Public WorkS Director
(Public Works Director/Police Chief etc) Ph No.: (253)856-5500 _
Mailing Address: 220 4th Ave.South Fx No. :(253)856-6500 _
(Street Address/O.O.Box) E-Mail Address: Tlaporte@kentwa.gov
Kent WA 98032-5895
(City) (State) (ZIP Code)
Official Contact: Title:
(F.MS Director/Fire Chief etc) Ph No.: -
Mailing Address: Fx No.
(Street Addrers/O.0.Box) E-Mail Address:
(City) (State) (ZIP Code)
* denotes required fields
10
This page intentionally left blank.
1
Agreement Number:
DES Use Only
MASTER CONTRACT USAGE AGREEMENT
This Master Contract Usage Agreement (the "Agreement") is made pursuant to Chapter 39.34 of
the Revised Code of Washington, and other applicable laws, by and between the state of
Washington(the "State"), acting by and through the Department of Enterprise Services ("DES"),
an agency of the State, and
Entity Nanie
a state agency, or local or federal agency or entity, or public benefit nonprofit corporation, or any
tribe located in the State (`Buyer").
1. Propose: The purpose of the Agreement is to establish the terms and conditions for when
Buyer purchases or acquires goods and services for its direct use under contracts entered into
by DES that permit such use ("Master Contracts").
2, Duration: This Agreement will become effective on date of execution, and will continue in
full force and effect until thirty(30) days following receipt of written notice from either party
cancelling this Agreement.
3. Agreement Contact Information: Contact person to whom contract documents and related
communications are to be mailed or faxed.
Organization Name:
Tax Identification Number:
Unified Business Identifier Required for Non-Profil:
Contact Name:
Title:
Address:
City: State: Zip:
Phone Number:
Email Address:
4. Cancellation of Afreement: This agreement can be terminated by either party upon 30 days
written notice provided to DES at:
Email to: mcua@des.wa.gov OR Mail to: WA Dept. of Enterprise Services
Attn: ACCO
P.O.Box 41409
Olympia, WA 98504-1409
5. Financial Responsibility: Buyer will deal directly with the Master Contract contractor,
supplier, or service supplier("Contractor") for any purchases Buyer makes pursuant to this
Agreement and under a Master Contract. DES does not accept any responsibility, financial
or otherwise, for any purchase Buyer makes under a Master Contract.
1
z
Agreement Number:
DES Use Only
6. Compliance with Other Laws: Each of the parties will comply with all applicable federal,
state, and local laws and regulations governing its own purchases.
7. Master Contract Audits: Buyer agrees to cooperate with DES, the Office of the State
Auditor, federal officials, or any third party authorized by law,rule, regulation or contract,in
any audit conducted by such party related to any Master Contract(s)that Buyer has made
purchases from pursuant to this Agreement, including providing records related to any
purchase from a Master Contract. In addition; Buyer agrees to provide,upon request from
DES, documentation to confirm its eligibility to use Master Contracts.
8. Dispute Resolution: if there are any disputes between Buyer and a Contractor, Buyer agrees
to (a)provide DES written notice of the nature of the dispute; and(b)unless otherwise
provided in the Master Contract or as set forth below,work in good faith with the Contractor
to resolve the dispute without the involvement of DES. DES may, upon request,review and
assist in the resolution of a dispute, and if DES chooses to do so, the Buyer will cooperate
with DES in that resolution process.
In its sole discretion,DES may,but is not obligated to,upon written notice to Buyer, resolve
disputes with a Contractor on behalf of Buyer and all other state, local, and federal agencies,
local governments, and public benefit nonprofit corporations with similar or related disputes
with such Contractor.
9. No Separate Entity: No separate legal or administrative entity is intended to be created by, or
for the administration of, this Agreement.
10. Hold Harmless: Each party agrees to defend, indemnify, and hold the other party harmless
from any claim arising from such party's sale negligent, reeldess, or willfid misconduct.
11. Entire Agreement: This Agreement sets forth the entire agreement between the parties, and
supersedes any other prior written agreements between the parties, with respect to the subject
matter hereof.
IN WITNESS WHEREOF the parties having read this Agreement, agree to it in each and every
particular, and have executed it below.
APPROVED APPROVED
WASHINGTON STATE
DEPARTMENT OF ENTERPRISE SERVICES
Entity Name Entity Name
Signature Signature
Farrell Presnell, Assistant Director
Name/Title Name/Title
Date Date
2
13
Specifications For: KENT, WA
HI CUBE MOUNTED TV INSPECTION TRUCK
1 CHEVROLET EXPRESS COMMERCIAL CUTAWAY DIESEL CG33903 RWD 4500
1 Duramax 6.6L V8 Turbo Diesel Engine
1 6-Speed Heavy Duty Automatic Transmission, electronic control with overdrive and
tow/haul mode
1 3.73 Axle Ratio
1 13,980 lb GVW R
1 177"Wheel Base
1 Standard Driver/Passenger Seats with Seatbelts and Sun Visors
1 12-Volt Light in Cab Area
1 Cab Air Conditioner
1 AM /FM Radio
1 16' CARGO BOX WITH WALKTHRU
1 AeroCap with Walk Thru
1 2"X 6" Dense Pine Flooring
1 LED Light Package Includes Body Clearance and Stop/Tail/Turn
1 Rear Roll Up Door
2 Laminated Steel Lock
1 Kemlite Covering on Inside Rear Doors
1 Back Up Alarm
1 INSTALL CUSTOMER SUPPLIED ARROW BOARDS
1 ELECTRIC REAR AWNING FOR WEATHER PROTECTION AT REAR OF TRUCK—MODEL DOMETIC 9500 E
1 FLOOR MOUNTED PEDESTAL CRANE
1 BACK-UP CAMERA SYSTEM [CHASSIS]
1 TRUCK LIGHT PACKAGE TO INCLUDE:
2 Whelen M9AC 1 each mounted to upper right and left front corner of Van Body. Furnish and install a switch
mounted in the cab within reach of the driver
2 Whelen WIONA lights mounted in front truck grille mounted as wide as practical. Furnish and install a
switch mounted in the cab within reach of the driver
3 Whelen WIONA lights mounted on right and left bottom rail. 1 at front corner, 1 at rear corner and 1
centered between the two lights. Wired to the front grille lights and switch
1 Whelen M9AC mounted to rear of van body approx. 7 feet up from ground and mounted as wide as
possible. Mounted to the van body front corner lights and switch
1 TA870L 72" wide arrow stick mounted above the rear door and centered on width of the van body.
Controls for the arrow stick will be mounted in the cab within the driver's reach
1 SAFE ENTRY/EXIT BUMPER 14
1 Three (3) Steps Evenly Spaced
1 Bottom Steps Fold Up for Ground Clearance
1 One (1) Fold- Away Safety Grab Handles
1 TRANSPORTERICAMERA LOCKABLE STORAGE COMPARTMENT WITH NOTCH IN REAR
DOOR THRESHOLD OF BODY FOR TV CABLE TO PASS THROUGH TO TRANSPORTER
STORAGE DRAWER
1 Lockable Storage Compartment for Camera and Transporter
1 Sliding Drawer
1 Notch in rear door threshold of body for TV cable to pass through to transporter storage
drawer
1 1 DRAWER ALUMINUM STORAGE
1 LOCKABLE METAL STORAGE CABINET MOUNTED UNDER CHASSIS
1 BULKHEAD WALL BETWEEN CAB AND CONTROL ROOM
1 Door
1 TV HIGH CUBE VAN EXTERIOR LIGHTING &CONTROL ROOM TO INCLUDE:
2 Adjustable LED Floodlights Rear of Vehicle Area Illumination
Control Room Interior—EVO 3.0:
1 Lonseal Lonplate Flooring
1 Kemlite Wall &Ceiling Covering
1 Bulkhead Wall With Passage Door From Control Room to Equipment Room
1 Tinted Viewing Window in Bulkhead Wall
1 Tinted Viewing Window in Bulkhead Door
1 Above Desk Control Console with Rack Mount for Electronic Equipment
1 Desktop/Work Area
1 12 V High Intensity LED Light Fixture
2 Electrical Outlet with Dual Receptacles
1 Fire Extinguisher with Bracket, 10BC Rating
1 Operators Chair, Swivel With Casters
1 Breaker Box Storage Area with Locking Positive Latch
1 CARBON MONOXIDE DETECTOR MOUNTED IN INTERIOR OF UNIT
1 ROOF TOP AIR CONDITIONER, 13,500 BTU WITH HEAT STRIP
1 WALL MOUNTED ELECTRIC HEATER
1 BENCH SEAT IN CONTROL ROOM
1 TV HI-CUBE VAN EQUIPMENT ROOM INTERIOR TO INCLUDE:
1 Kemlite Wall &Ceiling Covering
1 Electrical Outlet with Dual Receptacles
1 12 V High Intensity LED Light Fixture
1 15 Minute Courtesy Timer Located at Rear Door Area for 12V Led Interior Lights
1 LED AMBIENT LIGHTING PACKAGE
1 LONSEAL LONPLATE FLOORING IN EQUIPMENT ROOM
1 20-GALLON WASHDOWN SYSTEM TO INCLUDE:
1 20-Gallon Fresh Water Tank
1 Electric Water Pump
1 Retractable Hose Reel with 25'Water Hose and Nozzle
1 UPPER AND LOWER STORAGE CABINET IN EQUIPMENT ROOM
1 Lower Storage Cabinet/Work Top with Sink and Faucet
1 Upper Wall Mounted Storage Cabinet
1 OUTLET OVER WORKTOP 15
1 PORTABLE AIR COMPRESSOR
1 Electric Air Compressor
1 Air Tank
1 RETRACTABLE AIR HOSE REEL WITH 25' AIR HOSE,AND CHUCK
1 32" REAR FLAT SCREEN MONITOR MOUNTED IN BULKHEAD WALL
1 Flat Screen Monitor
1 Cable Assembly- Video Monitor to Monitor in Control Room
1 Electrical Outlet
1 7500 WATT QUIET DIESEL ONAN GENERATOR
1 120 Volt 60 HZ 7500 Watt (Minimum) Commercial Grade"Quiet"Generator
1 Diesel Powered
1 Electric Start
1 GENERATOR COMPARTMENT[UNDER CHASSIS MOUNT]
1 Generator Remote Start/Stop Cable Assemble
1 Generator Storage Compartment with Lockable External Access Door with slide out rails
1 Commercial Power Supply Receptacle, 25' Cord, and Plug
1 Electrical Supply Center with Circuit Breaker Box
1 Commercial power and Generator Power Connectors
1 Automatic Power Transfer Switch
1 DIGITAL ENGINEERING PANEL
1 Voltage Readout, Power Supply
1 Hertz Readout, Power Supply
1 Generator Hour Readout
1 Remote Generator Start/Stop Control Switch
2 P&T ZOOM III M/C SONDE INCLINOMETER CAMERA
1 Solid State Color Sewer TV Camera
1 Pan &Rotate Camera Head, 40:1 Zoom Ratio, 1 Ox Optical Zoom, 4x Digital Zoom
1 NTSC Color Standard with 4x Light Integration
1 Camera Lighting System for 6"through 72" lines
1 Built In Pipe Grade Verification System [Inclinometer]to Read and Transmit Pipe Grade
Data
1 [+/-5 Degrees [+/-8.7% Grade]with Maximum Error of+/-0.1 Degrees]
1 Built In Transmitter, 512 Hz
1 Camera Transportation and Storage Case
1 BRASS COMP STEERABLE CAM TRANS,WHEELED
1 Steerable Unit Designed to Turn 360 Degrees Within Its Own Radius
1 Two (2) Speed Transmission to Maximize Torque in Large Diameter Pipe with:
1 Manual Shifter on Camera Carrier
1 Unit Shall Have Forward, Free Wheel, and Power Reverse
1 Set of Driven Rubber Wheels to Inspect 6" Pipe
1 All Six (6)Wheel Drive Transporter Assembly to Include:
1 Motor&Enclosed Drive Train
1 Tip Up Rear 12-Pin Connector
1 8" RUBBER WHEEL KIT FOR COMPACT TRANSPORTER
1 10-15" RUBBER WHEEL KIT FOR COMPACT TRANSPORTER
1 ELECTRIC CAMERA LIFT FOR COMPACT TRANSPORTER
16
1 KIT,TIRE,PNEUMATIC,12" -15" PIPE, COMPACT TRANSPORTER
1 REAR-VIEW CAMERA FOR STEERABLE TRANSPORTER
1 Color NTSC Camera
1 Lightring with (12) Solid State White LEDs
1 SELF-PROPELLED CAMERA TRANSPORTER, TRAC DRIVEN,WITH ABILITY TO ADD
WHEELS TO INCLUDE:
1 For 6" Pipe Sizes with Free Wheel and Powered Reverse
1 Built In 6-Pin Receptacle for Direct Insertion of the Camera
1 Protective Housing for Optical Zoom Camera Pan&Tilt with Locking Feature
1 7 Handle for Quick Removal/ Insertion of Optical Zoom Pan &Tilt Camera
1 SPARE PARTS KIT FOR TRAC TRANSPORTER TO INCLUDE:
1 Additional Chain Links And Rubber Cleats
1 7"-15" EXTENDERS FOR COMPACT TRAC TRANSPORTER
1 STEERABLE CAMERA TRANSPORTER,WHEELED
1 Steerable Unit Designed to Turn 360 Degrees Within Its Own Radius
1 Two (2) Speed Transmission to Maximize Torque in Large Diameter Pipe
1 Unit Shall Have Forward, Free Wheel, and Power Reverse
1 Set of Six (6) Driven Rubber Wheels to Inspect 8" Pipe
1 All Six (6)Wheel Drive Transporter Assembly to Include:
1 Motor&Enclosed Drive Train
1 Tip Up Rear 12-Pin Connector
1 Transporter Control Unit
1 10" - 15" TIRE KIT TO INCLUDE:
6 10"- 15"Tire
6 Outer Hub
4 KNOBBY TIRE 18" -60"
1 ELECTRIC CAMERA LIFT FOR STEERABLE PIPE RANGER
1 PAN &TILT III W/SONDE AND LIFT ADAPTER TUBE KIT FOR WHEELED TRANSPORTER
1 1800' CABLE ASSEMBLY, M/C 12PIN METAL
1 1800' Gold Multi Conductor Kevlar Fiber Armored Combination TV Transmission/Tow
Cable
1 .450 Diameter
1 Metal Splice Chamber with Pigtail
1 Cable Strain Relief
1 TV REEL ASSEMBLY, MECHANICAL FOOTAGE FOR SUMMIT.450 CABLE W/AUTO PAYOUT
1 Black Thermoplastic Powder Coated Frame
1 Power Levelwind & Multi Ratio Manual Transmission
1 Automatic Cable Payout System
1 Footage Meter with Local Counter and Remote Electronic Counter
1 Transmission Control at Viewing Station
1 Local Reel Mount Electrical and Mechanical Control
1 Sealed Continuous Contact Collector Assembly
1 Removable Drip Pan for Cleaning
17
2 22" FLATSCREEN COLOR INDUSTRIAL TV MONITOR
1 PCU ASSEMBLY [RACK MOUNT]
1 CCU ASSEMBLY[RACK MOUNT]
1 Alpha Numeric Information Display, with Multi Paging and Defect Coding
1 Remote"QWERTY" Keyboard for Data Entry
1 On Screen Footage Display
1 WRC and PACP Codes
1 WIRED USB CONTROLLER
1 Joystick Control for Pan and Tilt Zoom Camera to Include:
1 360 Degree Rotate
1 330 Degree Optical Pan
1 Joystick Control for All Steering Functions&Forward/Reverse Directions for Transporter
1 Camera Lift Control for Optional Electronic Camera Lift
1 All Other Controls for Camera to Include:
1 Camera Iris and Focus Override&Zoom
1 Camera Lights &Shutter Control for Light Enhancement
1 Camera Diagnostics&Auto Home
1 Cruise Control to Set Speed of the Transporter for Hands Off Operation
1 All Reel Controls to Include: Retrieve, Release, and Variable Speed [Excluding Dolly
Systems]
1 WIRELESS CONTROLLER
1 Joystick Control for Pan and Tilt Zoom Camera to Include:
1 360 Degree Rotate
1 330 Degree Optical Pan
1 Joystick Control for All Steering Functions &Forward/Reverse Directions for Transporter
1 Camera Lift Control for Optional Electronic Camera Lift
1 All Other Controls for Camera to Include:
1 Camera Iris and Focus Override&Zoom
1 Camera Lights &Shutter Control for Light Enhancement
1 Camera Diagnostics&Auto Home
1 Cruise Control to Set Speed of the Transporter for Hands Off Operation
1 All Reel Controls to Include: Retrieve, Release, and Variable Speed [Excluding Dolly
Systems]
1 8.7" MINI KEYBOARD
1 CUSTOMER SUPPLIED GXP COMPUTER WITH KEYBOARD AND MOUSE WITH GRANITE XP SOFTWARE
1 HP OFFICEJET COLOR PRINTER
1 INCLINOMETER MODULE SOFTWARE
1 ESRI GIS MODULE SOFTWARE
*Subject to prior confirmation between Customer IT Resource and Cues Software Development
Division.
1 ARCGIS RUNTIME ENGINE SOFTWARE
1 UNIVERSAL SCORING MODULE SOFTWARE
2 DATA COLLECTION SYSTEMS IMPLEMENTATION ASSISTANCE WITH SOFTWARE is
PROFESSIONAL VIA WEBEX PER DAY
1 RACK MOUNTED UPS
1 PATENTED**MAPPING STICK,WIRELESS GPS WITHOUT SOFTWARE
1 Modem, RF Package
1 Wireless GPS Receiver
1 Pole, 85, with Quick Release
1 Case, Watertight, Yellow
1 Mounting Bracket, Modem Enclosure
2 Rechargeable Battery
*Subject to prior confirmation between Customer IT Resource and Cues Software Development
Division.
**U.S. Patent No. 7,889,124
1 GPS MODULE SOFTWARE
1 MANHOLE TOPROLLER ASSEMBLY, TV ONLY
1 MANHOLE ADAPTER CLAW HOOK
6 RETRIEVAL/DOWNHOLE POLE ASSEMBLY
1 INVERT ROLLER ASSEMBLY
1 RETRIEVAL HOOK
1 MULTI CONDUCTOR TV ONLY TOOL KIT
1 Milliampmeter Tool
1 Electrical Tape
1 Needle Nose Pliers
1 Six-In-One Screwdriver
1 6"Adjustable Wrench
1 Anti Seize Grease
1 9-Piece Allen Wrench kit
1 Solder Iron Kit
1 Industrial Pliers
1 5/32 T-Handle Hex Wrench
1 Multi Conductor TV Only Operation Manual
1 Parts Catalog
1 Cable Repair Kit DVD
1 TV Only Training DVD
1 TRAINING, ON-SITE(THREE DAYS)
1 TRUCK DELIVERY-WASHINGTON
19
This is a sample of Cues Municipal users in Pacific NW territory:
1. Seattle, WA
2. Vancouver, WA
3. Tacoma, WA
4. Bellevue, WA
5. Olympia, WA
6. Bellingham, WA
7. King County, WA
8. Thurston County, WA
9. Kitsap County, WA
10, Pierce County, WA
11. Clark Regional wastewater, WA
12, Oak Harbor, WA
13. Bremerton, WA
14. Aberdeen, WA
15. Walla Walla, WA
16. Centralia, WA
17. Chehalis, WA
18. Bainbridge Island, WA
19. Beacon Hills sewer,WA
20. Redmond, WA
21. Kent, WA
22. Monroe, WA
23. Alderwood Water district,WA
24. Arlington, WA
25. Bothell, WA
26, North Shore Utility Dist
27. Federal Way,WA
28. Cheney, WA
29. Colville, WA
30. Omak, WA
31. Edmonds, WA
32. Longview,WA
33. Enumclaw, WA
34. Kirkland, WA
35, Ellensburg, WA
36. Everett, WA
37. West Sound Utility District, WA
38, Lacey, WA
39. Shelton, WA
40. Midway Sewer district, WA
41. Mountlake Terrace,WA
42. Marysville, WA
43. Richland, WA
44. Sedro Woolley, WA
45. Snoqualmie Pass, WA
46. Snohomish, WA
20
This page intentionally left blank.
21
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 220 Fourth Avenue S.
Kent, WA 98032-5895
Date: March 7, 2014
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: March 17, 2014
From: Toby Hallock, P.E., Environmental Engineer
Through: Chad Bieren, P.E., City Engineer
Subject: Russell Road Upper Levee - Interlocal Agreement with the
King County Flood Control District
Item - 3
Motion: Move to recommend Council authorize the Mayor to sign an
Interlocal Agreement with the King County Flood Control District to receive
reimbursement for improvements to the Russell Road Upper Levee, subject
to final terms and conditions acceptable to the City Attorney and Public
Works Director.
Summary:
The Interlocal Agreement (ILA) will allow the City to move ahead with construction of the
South Reach Levee segment at the James Street/Russell Road Intersection using
budgeted funds from the King County Flood Control District (District). Additional funds
from the District will be necessary to construct the remaining Levee segment near the
Lakes Community.
Background:
In July 2013, an ILA was executed with the District to construct the North Reach segment
of the Russell Road Upper Levee, located near the Marina Pointe Home Owners Association
(HOA) in the Lakes Community.
The proposed ILA will supersede the previous agreement and will pay for construction of
the James Street/Russell Road Intersection setback levee, and acquisition of property
along the South Reach near the southwest portion of the Lakes Community. The District's
budget for 2013 and 2014 is about $3.8 million for the project. Per the ILA, project costs
in excess of this amount will require separate approval from the District.
While the project will complete another portion of the Levee, construction of the remaining
segments needed to meet federal levee safety standards can only be achieved through
additional funding from the District. The ILA is written to allow construction of the
remaining segments of the Levee once Districts funds are available.
Page 1 of 2
zz
Budget Impact:
Under this agreement the City would be reimbursed up to $2,787,228 additional
dollars, or a total of $3,787,228. The Flood Control District has funding set aside in its
budget for the Russell Road Upper levee within the District's 6-year Capital
Improvement Program.
Page 2 of 2
23
AGREEMENT FOR LEVEE CONSTRUCTION, OPERATION AND MAINTENANCE
Russell Road Upper Levee—North Reach and South Reach
River Mile 19.25 to 20.4, Right Bank
THIS AGREEMENT FOR LEVEE CONSTRUCTION, OPERATION AND
MAINTENANCE ("Agreement") of the Russell Road Upper Levee — North Reach and South
Reach, River Mile 19.25 to 20.4, Right Bank ("Levee") is entered into on the last date signed
below by and between the Parties, the CITY OF KENT, a Washington municipal corporation
("City"), and KING COUNTY FLOOD CONTROL ZONE DISTRICT, a quasi-municipal
corporation of the State of Washington ("District") (collectively, the 'Parties").
RECITALS
A. King County, Washington, through the Water and Land Resources Division of the
King County Department of Natural Resources and Parks ("WLRD"), as service provider to the
District pursuant to an interlocal agreement with the District, operates and maintains a major
portion of the Green River Levee System.
B. The Russell Road Upper Levee — North Reach and South Reach ("Levee") is a
key part of the Green River levee system. The District Board of Supervisors desires to improve
the Levee by constructing a new secondary earthen levee described and shown in Exhibit A as
part of a longer term plan for a setback levee in this area. The secondary levee project will
hereafter be referred to as "Project" or "Levee Project". The Levee Project is planned for
construction from 2013 through 2014.
C. The District desires to authorize and the City desires to construct the Project as
soon as possible, in order to provide for the safety of the residents and businesses that are
protected by this levee.
D. By Resolution FCD 2012-09.3, adopted on November 5, 2012 and FCD 2013-
14.3, adopted on November 12, 2013, the District Board of Supervisors determined that the flood
control improvements included in that resolution generally contribute to the objectives of the
District's comprehensive plan of development. hi those Resolutions, the District Board of
Supervisors also approved funding for the North Reach Levee part of the Project and a portion of
the South Reach Levee part of the Project.
E. Consistent with Resolution FCD 2012-09.3, the Parties in July of 2013 entered
into the "Agreement for Levee Construction, Operation and Maintenance, Russell Road Upper
Levee-North Reach, River Mile 19.5 to 19.8, Right Bank" relating to the North Reach portion of
1
Russell Road Upper— North Reach and South Reach (Kent)
24
the Project ("North Reach Agreement"). The Parties have implemented in part the North Reach
Agreement.
F. The Parties desire to enter into this Agreement to establish the terms and
conditions for the entire Levee Project, both North Reach and South Reach, and to amend and re-
state the terms and conditions of the North Reach Agreement in this Agreement.
G. The Parties desire to complete future additional improvements of the overall
Russell Road Upper Levee in a setback alignment and the City agrees to work with the District
and/or King County to convey any necessary easements for design or construction of or access to
the Levee in the form of the standard River Protection Easement in Reference 8-P to the King
County Surface Water Design Manual . These improvements shall include the upstream and
downstream ends of this Project, where the District's eventual setback alignment is landward of
the transition sections.
AGREEMENT
Based upon the foregoing,the Parties agree as follows:
1. Incorporation of Recitals Scope of Agreement.
a. All recitals above are hereby incorporated and ratified as part of this Agreement.
b. This Agreement establishes the terms and conditions for design, construction,
installation, operation, maintenance and repair of improvements to the Levee, as that term is
defined in the recitals above. This Agreement amends and replaces the "Agreement for Levee
Construction, Operation and Maintenance, Russell Road Upper Levee-North Reach, River Mile
19.5 to 19.8, Right Bank" relating to the North Reach portion of the Project ("North Reach
Agreement") executed by the Parties in July 2013, on the effective date of this Agreement.
2. Definition of District. Unless provided otherwise in this Agreement, the term
"District"hereinafter also shall include WLRD in its capacity as service provider to the District.
3. Levee Design, Construction and Reimbursement.
a. The City shall design, construct and install the improvements to the Levee Project
described and depicted on Exhibit A, attached hereto and incorporated herein by reference in
accordance with this Agreement, subject to the authorizations and restrictions in Exhibit A. In
this Agreement, the term "Levee Project" or "Project" shall apply to both the North Reach and
the South Reach, unless the term can and should apply only to a part of the Project or Levee
Project, such as where only the South Reach is being designed.
2
Russell Road Upper— North Reach and South Reach (Kent)
25
b. The City shall obtain and be responsible for all necessary local, state, and federal
permits and approvals for the Levee Project, and shall fully comply with all applicable
requirements and conditions thereof.
C. The Parties acknowledge and understand that at the effective date of this
Agreement, all of the estimated cost of the North Reach portion of the Levee Project is included
in the District's 2014-2019 Six-Year CIP, but that only a part of the estimated cost of the South
Reach portion of the Levee Project is included in the District's 2014-2019 Six-Year CIP. The
District reserves the right to terminate this Agreement, and the City shall immediately terminate
work; provided, that until substantial completion of the Project, the District shall continue to
accept and review City requests for reimbursement up to the amount of funds appropriated in an
approved District budget or this Agreement.
d. The City's cost and expense for the Levee Project improvements shall be
reimbursed pursuant to the procedures, requirements and restrictions of paragraph 12 below.
e. The City shall obtain and convey to the District or King County, as determined by
the District, all necessary easements or property for design, construction of or access to the
Levee Project, using the form of the standard River Protection Easement in Reference 8P to the
King County Surface Water Design Manual, which includes an amendment that allowsthe City
to proceed with any vegetation management work necessary for public safety without prior
approval by the District or King County, or a River Protection Easement of an alternative form
approved by the District. The necessary easements shall include a 15-foot
maintenance/inspection easement along the landward side of the Levee Project. This
maintenance/inspection easement is not required for construction and may be conveyed
following completion of construction of the Levee Project.
4. Levee Inspection, Maintenance, Operation and Repair Standards. The District
shall inspect, operate, maintain and repair the Levee in accordance with this Agreement, which
includes Exhibit B, attached hereto and incorporated herein by reference, and with District
general standards, requirements and policies for operation, maintenance and repair of Green
River levees, as these are determined and applied by the District, provided that the District shall
not be obligated to operate, maintain and repair the Levee if FEMA does not approve a risk-
based approach to operation, maintenance and repair of the Levee.
5. District Review of Levee Plans and CLOMR Applications. The City shall
provide to the District a schedule of the material and significant events and actions for design
and bidding of the Project, which events and actions shall include, but not be limited to, three
design stages and the invitation to bid. The City shall submit plans and specifications for each of
these three design stages to the District for review and comment. At least thirty(30) days before
advertising an invitation to bid, the City shall submit to the District for review and comment the
plans, specifications and requirements of the invitation to bid and the application (with
3
Russell Road Upper— North Reach and South Reach (Kent)
26
attachments and exhibits) for a FEMA Conditional Letter of Map Revision ("CLOMR"). The
District shall submit any comments within thirty (30) days of receipt of the documents.
6. Additional Activities. The District will provide enhanced monitoring of the
Levee through slope stability instrumentation.
7. District Inspections. The District shall have the right to inspect the City's
construction of the Levee Project.
8. Contracts for Levee Work. Upon execution of a contract for construction of the
Levee Project,the City shall send a copy of the contract to the District.
9. Record Drawings: Retention and Review of Documents. The City shall submit to
the District record drawings for the Project, in a form and with detail required by the District.
The City agrees to maintain documentation of all planning, design, construction and inspection
of the Project sufficient to meet state audit standards for a capital project, recognizing that the
costs of the Project are paid for in whole or in part by the City and the District. The City agrees
to maintain any additional documentation that is requested by the District. City contracts and
internal documents shall be made available to the District for review and/or independent audit
upon request.
10. Access; Special Use Permit. To the extent that the District's or King County's
property interests require and allow, the City shall follow the District and/or King County
processes for obtaining, as applicable, special use permits, consistent with King County special
use permit procedures and standards, and shall obtain such permits for any City access to and
construction and inspection work on the Levee. The District shall waive any applicable bond
requirements. If Levee Project work involves access to and use of real property for which
neither the District nor King County has real property interests or rights, the City shall be
responsible for obtaining real property rights sufficient for City access to and construction and
inspection of such Levee Project work, and District and WLRD access to and maintenance,
operation and repair of the Levee.
11. District Costs and Expenses. The District's budgets for 2013 and 2014 include
$3,787,228 for the Levee Project as described and depicted in Exhibit A. The Project costs shall
not exceed this amount without amendment of the District's 2014 budget or approval of such
amount in a future annual District budget.. The total cost to the District of the Project is
estimated by the City to be $6,000,000. The City acknowledges and understands that only a part
of the South Reach portion of the Levee Project is included in Exhibit A, and that the District has
not appropriated funds to complete the South Reach portion of the Levee Project. The City
agrees to accept the consequences and risks of moving forward with a part of the South Reach
portion of the Levee Project without full funding from the District of the South Reach
12. Reimbursement of City Expenditures.
4
Russell Road Upper— North Reach and South Reach (Kent)
27
a. No more than once a month, the City shall submit requests for reimbursement of
City costs and expenses incurred on or after July 8, 2013 for right-of-way acquisition,
construction and inspection of the Project. The requests shall be in a form and shall contain
information and data as is required by the District.
b. The District shall review the requests to confirm that they are reimbursable and
payable under this Agreement. The District shall endeavor to complete such review within thirty
(30) days of receipt of a request in order to determine whether they are reimbursable and payable
under this Agreement. The District shall forward the approved reimbursement to the City within
forty-five (45) days of the City request.
C. The District may postpone review of a City request for reimbursement where all
or any part of the request is inaccurate or incomplete. The District shall notify the City of any
inaccuracies or incompleteness within thirty (30) days of receipt of the request. The City shall
provide the requested information or data within thirty (30) days of the request for such
information or data. If the request is still inaccurate or incomplete in the opinion of the District,
the dispute shall be resolved in accordance with paragraph 21 below. After resolution of the
dispute, the District shall provide reimbursement as provided in this paragraph 12.
13. Levee Warranty. The City shall warrant the materials, work and function of the
Project for five (5) years after the City's acceptance of construction of the Project, or any
discrete and separate portion thereof.
14. Compliance with Laws and Regulations. The City shall be responsible for
compliance with all applicable laws and regulations, and obtaining all required permits,
approvals and licenses in connection with the Project.
15. Impact on Other Reaches or Segments. The District and the City agree that the
improvements to the Levee under this Agreement shall not have a detrimental effect on other
segments or reaches of the Green River levee system. The improvements to the Levee shall be
deemed not to have such a detrimental effect where the improvements fully protect the
conveyance capacity and storage volume of the floodplain during base flood (100-year flood)
conditions, as demonstrated by compliance with King County flood hazard regulations, which
are Sections 21A.24.230 through 21A.24.260 of the King County Code.
16. Duration Effective Date. This Agreement shall take effect on the date on which
the second party signs this Agreement, and shall remain in effect until the Levee Warranty
expires.
17 Third Parties. This Agreement and any activities authorized hereunder shall not
be construed as granting any rights or privileges to any third person or entity, or as a guarantee or
warranty of protection from flooding or flood damage to any person, entity or property, and
nothing contained herein shall be construed as waiving any immunity to liability to the City, the
5
Russell Road Upper— North Reach and South Reach (Kent)
2s
District and/or King County, granted under state statute, including Chapters 86.12 and 86.15
RCW, or as otherwise granted or provided for by law.
18. Liens and Encumbrances. The City acknowledges and agrees that it will not
cause or allow any lien or encumbrance arising from or related to the Levee work authorized by
this Agreement to be placed upon the real property interests of King County and the District. If
such lien or encumbrance is so placed, King County and the District shall have the right to
remove such lien and charge back the costs of such removal to the City.
19. Indemnification. To the maximum extent permitted by law, the City shall defend,
indemnify and hold harmless the District and King County, and all of their officials, employees,
principals and agents, from any and all claims, demands, suits, actions, losses, costs, reasonable
attorney fees and expenses, fines, penalties and liability of any kind, including injuries to persons
or damages to property, arising out of, or as a consequence of, the design and construction of the
improvements to the Levee under this Agreement. As to all other obligations under this
Agreement, to the maximum extent permitted by law, each Party shall defend, indemnify and
hold harmless the other Party, and all of its officials, employees, principals and agents, from any
and all claims, demands, suits, actions, fines, penalties and liability of any kind, including
injuries to persons or damages to property, arising out of or relating to any negligent acts, errors
or omissions of the indemnifying Party and its contractors, agents, employees and representatives
in performing these obligations under this Agreement. However, if any such damages and
injuries to persons or property are caused by or result from the concurrent negligence of the
District or its contractors, employees, agents, or representatives, and the City or its contractor or
employees, agents, or representatives, each Party's obligation hereunder applies only to the
extent of the negligence of such Party or its contractor or employees, agents, or representatives.
This indemnification provision shall not be construed as waiving any immunity granted to the
City, the District, or King County, under state statute, including chapters 86.12 and 86.15 RCW,
as to any other entity.
The foregoing indemnity is specifically and expressly intended to constitute a waiver of
each Party's immunity under industrial insurance, Title 51 RCW, as respects the other Party
only, and only to the extent necessary to provide the indemnified Party with a full and complete
indemnity of claims made by the indemnitor's employees. This waiver has been mutually
negotiated.
20. Insurance. Each Party recognizes that the other is self-insured and accepts such
coverage for liability arising under this Agreement. Should any Party choose not to self-insure,
that Party shall maintain and keep in full force and effect a policy of general liability insurance in
an amount not less than One Million Dollars ($1,000,000) per occurrence with an additional
excess liability policy of not less than Ten Million Dollars ($10,000,000) and will provide the
other Party with a certificate of insurance and additional insured endorsement that will name the
other Party as an additional insured.
6
Russell Road Upper— North Reach and South Reach (Kent)
29
21. Dispute Resolution. The Parties will seek to resolve any disputes under this
Agreement as follows:
a. For disputes involving cost reimbursements or payments, as provided for in
paragraph 12 above, submittal of all relevant information and data to an independent Certified
Public Accountant and/or a Construction Claims Consultant, if agreed upon by the Parties, for a
non-binding opinion as to the responsibility.
b. If the foregoing does not result in resolution and for all other disputes, the Parties
may mutually select any informal means of resolution and resort will otherwise be had to the
Superior Court for King County, Washington.
C. Each Party will be responsible for its own costs and attorney's fees in connection
with the dispute resolution provisions of this paragraph 21.
22. Trail Design. The City shall permit, design, and construct replacement of the trail
to meet King County Parks regional trail standards. The City shall submit plans to King County
Parks for review coincident with District plan review at each design phase.
23. Entire Agreement Amendment. This Agreement, together with its Exhibits A
and B, represents a full recitation of the rights and responsibilities of the Parties and may be
modified only in writing and upon the consent of both Parties. Should any conflict exist between
the terms of this Agreement and the terms of the Exhibits, this Agreement shall control.
24. Binding Nature. The rights and duties contained in this Agreement shall inure to the
benefit of and are binding upon the Parties and their respective successors in interest and
assigns.25. Notices, Communications and Documents. Unless applicable law requires a
different method of giving notice, any and all notices, demands or other communications
required or desired to be given hereunder by either Party (collectively, "notices") shall be in
writing and shall be validly given or made to the other Party if delivered either personally or by
Federal Express or other overnight delivery service of recognized standing, or if deposited in the
United States Mail, certified, registered, or express mail with postage prepaid, or if sent by
facsimile transmission with electronic confirmation. If such notice is personally delivered, it
shall be conclusively deemed given at the time of such delivery. If such notice is delivered by
Federal Express or other overnight delivery service of recognized standing, it shall be deemed
given one (1) business day after the deposit thereof with such delivery service. If such notice is
mailed as provided herein, such shall be deemed given three (3) business days after the deposit
thereof in the United States Mail. If such notice is sent by facsimile transmission, it shall be
deemed given at the time of the sender's receipt of electronic confirmation. Each such notice
shall be deemed given only if properly addressed to the Party to whom such notice is to be given
as follows:
7
Russell Road Upper— North Reach and South Reach (Kent)
30
To City:
Phone: ( )
Email:
Fax: ( )
To District
Phone: ( )
Email:
Fax: ( )
Any Party may change its address for the purpose of receiving notices as herein provided by a
written notice given in the manner aforesaid to the other Party.
26. Authority. The undersigned warrant that they have the authority duly granted by
their respective legislative bodies to make and execute this Agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement, which shall
become effective on the last date signed below.
CITY OF KENT KING COUNTY FLOOD CONTROL
ZONE DISTRICT
By: By:
Suzette Cooke
Its: Mayor Its: Board Chair
DATE: DATE:
APPROVED AS TO FORM: APPROVED AS TO FORM:
8
Russell Road Upper— North Reach and South Reach (Kent)
31
By: By:
City Attorney Legal Counsel
9
Russell Road Upper— North Reach and South Reach (Kent)
32
EXHIBIT A
Description of the Russell Road Upper Levee- North Reach and South Reach Project
The Russell Road Upper Levee is located along the right bank(easterly side) of the Green River
between River Mile 19.25 and 20.4, which is approximately from S 231st Way to the Riverbend
Golf Complex (see Figure 1). The Russell Road Upper Levee , which includes the North Reach
and South Reach, protects properties within the cities of Kent, Tukwila and Renton. Multi-
family residences and single family residences,the City's Maintenance Operations Facility,
Russell Woods Park, Neely-Soames Historic Homestead and Riverbend Golf Complex are
located adjacent to the Levee.
The North Reach, approximately 1,190 linear feet, does not meet slope and stability requirements
and needs improvement to meet FEMA accreditation standards. This section of Levee is located
between RM 19.5 and 19.8. This section of Levee is on the outside of a sharp bend in the river
and has indications of minor slumping of soils. The North Reach will provide a minimum of 3
feet of freeboard above the predicted 100-year flood event.
The South Reach, approximately 1,800 lineal feet, does not meet slope and stability requirements
and needs improvements to meet FEMA accreditation standards. This section of Levee is
located between RM 20.1 to 20.4, which is located on a sharp outside bend in the river and has
indications of minor slumping in the soils. The South Reach will provide greater than 3-feet of
freeboard above the predicted 100-year flood event.
District funds currently appropriated for the South Reach portion of the Project will allow
acquisition of necessary properties and easements for the full length of the Russell Road Upper
Levee along the Lakes Community,the City's Public Works Maintenance Operations Facility,
Parks Maintenance Facility and Riverbend Golf Complex. District funds currently appropriated
will also allow construction of the setback levee at West James Street and Russell Road.
Additional District funds are required to construct the remaining improvements of the South
Reach (starting north from West James Street and extending about 1,000 lineal feet along the
Lakes Community) and to pave with asphalt the North Reach , which was not paved as part of
the construction improvements of the North Reach in 2013.
For both the North and South Reach, the Project will allow for future re-vegetation and habitat
restoration work along the river between the ordinary high water line and the trail in areas where
the Levee will be constructed. In areas where the Levees are installed, mid-slope terraced areas
or benches may be constructed where feasible and native vegetation will be planted above the
ordinary high water line as part of a future phase.
10
Russell Road Upper— North Reach and South Reach (Kent)
33
EXHIBIT B
Levee Inspection, Maintenance, Operation and Repair
1. The District shall maintain and operate the Levee consistent with the District's Flood
Hazard Management Plan Policy PROJ-6, Flood Protection Facility Design and
Maintenance Objectives (or its successor) which states as follows:
"[The District] should construct new flood protection facilities and maintain,
repair or replace existing flood protection facilities in such a way as to:
• Require minimal maintenance over the long term,
• Ensure that flood or channel migration risks are not transferred to other
sites,
• Protect or enhance aquatic, riparian and other critical habitats, and
• Protect or enhance multiple beneficial uses of flood hazard area."
2. Levee maintenance and operation shall be based on a risk-based analysis approach. If a
risk-based approach is not acceptable to FEMA, and as a result FEMA fails to issue a
CLOMR or LOMR for the Levee, the District shall not be obligated to operate and
maintain the Levee.
3. The upper 1/3 of the riverward slope above the OHWM may be mowed and maintained
in grass cover.
4. The Levee crest shall be maintained to provide for unimpeded vehicular access at all
times, including access by heavy construction equipment and earth-hauling machinery.
5. The landward Levee slope may be mowed and maintained in grass cover.
6. The 15-foot maintenance access and inspection area along the landward Levee toe may
be mowed and maintained in grass cover.
7. Upon acceptance of completed Levee construction by the District, the Levee, as
constructed to these standards, shall be inspected by the District prior to leaf emergence
each spring, at low-flow conditions in the late Summer or early Fall, prior to the onset of
fall rains and seasonal high flows, and during and immediately following flood events at
Phase III(9,000 cfs) or greater.
11
Russell Road Upper— North Reach and South Reach (Kent)
34
8. All structural features of the Levee shall be inspected by the District for deterioration or
damage, including the presence of any slope erosion, washouts, slumping, slides, or
sloughing, and any conditions noted shall be included in prioritization of District and/or
King County maintenance and repair needs, and in performance of maintenance and
repair actions at the earliest appropriate opportunity.
9. All vegetation on the levee slopes, benches, or along the lower embankment shall be
inspected by the District for erosion of the riverward embankment in the root zone, and
appropriate corrective action shall be taken where such conditions may be present.
10. The District and/or King County shall perform continuing levee patrols during all Phase
III or greater flood events.
11. Damaged or impaired Levee conditions observed by the District during flood patrols shall
be evaluated for emergency repair actions.
12. Any emergency repairs performed will be inspected by the District at the neat low-water
period for evaluation of permanent repair needs or additional measures required to restore
the function and integrity of all affected locations.
13. The District and/or King County shall prioritize repairs consistent with the adopted
policies of the District's Flood Hazard Management Plan, or its successor.
14. The City shall be responsible for all local drainage inspections and maintenance. The
District and King County shall not assume any responsibility for stormwater management
activities.
12
Russell Road Upper— North Reach and South Reach (Kent)
35
FIGURE 1 H
RM 19.0
a
RM 19 25
VETERANS DR
S 228 I H SY
RM 19.5 °
-a.�►
FORTH REACH o
RM THE LA ES o
19.75 ..,� ®C�U�� � o
O
+ ,
®l1TH REACH
RM 20. RMFcJ� _ o
1 —.
zn_25 N o 0
--li �^ JAMES ST
SENT
®PE .TI®NS jl
KENT
va RM 20.5 RUSSELL
ROAD PARK
KENT
R@VERBERD
GOLF COMPLEX
i
- i
RM 21.0 —ME K R ST
LLLLLJ
LlH
® �'U
..� � RM 2x,®
RUSSELL ROAD
� �' UPPER LEVEE
Yfne Ml AT..
CITY OF KENT SCALE NONE FlC�RE
ENGINEERING DEPARYMENY UAiE 6ECEIIBER 107J
G;\D2sign\09-3006 RUSSEL RU LEVEE\dwg\GRMICS\09-3007 HGURE l.tlwg,12/6/2019 1:18:27 PH
36
This page intentionally left blank.
37
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 220 Fourth Avenue S.
Kent, WA 98032-5895
Date: February 13, 2014
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: March 17, 2014
From: Ken Langholz, Design Engineering Supervisor
Through: Chad Bieren, P.E., City Engineer
Subject: Consultant Services Agreement with GEI Consultants, Inc.
for Briscoe-Desimone Levee Reaches 2 & 3
Item — 4
Motion: Move to recommend Council authorize the Mayor to sign a
Consultant Services Contract with GEI Consultants, Inc. in an amount not
to exceed $152,552 to provide engineering services for the Briscoe-
Desimone Levee Reaches 2 & 3 project, subject to final terms and
conditions acceptable to the City Attorney and Public Works Director.
Summary:
The Briscoe-Desimone Levee is located along the Green River between South 180th
Street and South 200th Street. Reaches 2 & 3 of this levee are located within the city
limits of Kent and provide flood protection for the cities of Kent, Tukwila and Renton.
In 2011, the City, in conjunction with the King County Flood Control District
(KCFCD), was successful in obtaining a $7 million grant from the Washington State
Legislature to fund reconstruction of the Briscoe-Desimone Levee. In June 2013 the
City entered into an Interlocal Agreement with the KCFCD which allocated an
additional $11 million of District funds and assigned responsibility for design and
construction of the project to the City of Kent.
The City is continuing to pursue accreditation of the Briscoe-Desimone Levee from
the Federal Emergency Management Agency (FEMA). As part of this accreditation
effort, the City prepared a Conditional Letter of Map Revision (CLOMR) which
identified 4 areas, or reaches, of the levee that do not meet current FEMA standards.
These areas will be repaired utilizing sheet piles to construct a secondary floodwall.
At the January 21, 2014 Council meeting, the construction contract for Reaches 2 &
3 was awarded to Tapani, Inc. Under this consultant services agreement, GEI will
provide construction engineering support for Reaches 2 & 3.
Budget Impact:
This contract will be funded out of the $18 million which was allocated to the
Briscoe-Desimone Levee project through an Interlocal Agreement with the KCFCD.
38
This page intentionally left blank.
39
KENT
CONSULTANT SERVICES AGREEMENT
between the City of Kent and
GEI Consultants, Inc.
THIS AGREEMENT is made between the City of Kent, a Washington municipal corporation
(hereinafter the "City"), and GEI Consultants, Inc. organized under the laws of the State of
California, located and doing business at 180 Grand Avenue, Suite 1410, Oakland, CA 94612,
Phone: (510) 350-2900/Fax: (510) 350-2901, Contact: Alberto Pujol (hereinafter the
"Consultant").
I. DESCRIPTION OF WORK.
Consultant shall perform the following services for the City in accordance with the
following described plans and/or specifications:
The Consultant shall provide engineering construction support for Reach 2 and 3 of
the Briscoe-Desimone Levee Improvements Project. For a description, see the
Consultant's Scope of Work which is attached as Exhibit A and incorporated by this
reference.
Consultant further represents that the services furnished under this Agreement will be
performed in accordance with generally accepted professional practices within the Puget Sound
region in effect at the time those services are performed.
II. TIME OF COMPLETION. The parties agree that work will begin on the tasks
described in Section I above immediately upon the effective date of this Agreement. Consultant
shall complete the work described in Section I by June 1, 2015.
III. COMPENSATION.
A. The City shall pay the Consultant, based on time and materials, an amount not to
exceed One Hundred Fifty Two Thousand, Five Hundred Fifty Two Dollars
($152,552.00), for the services described in this Agreement. This is the maximum
amount to be paid under this Agreement for the work described in Section I above,
and shall not be exceeded without the prior written authorization of the City in the
form of a negotiated and executed amendment to this agreement. The Consultant
agrees that the hourly or flat rate charged by it for its services contracted for herein
shall remain locked at the negotiated rate(s) for a period of one (1) year from the
effective date of this Agreement. The Consultant's billing rates shall be as
delineated in Exhibit B.
CONSULTANT SERVICES AGREEMENT - 1
(Over$10,000)
40
B. The Consultant shall submit monthly payment invoices to the City for work
performed, and a final bill upon completion of all services described in this
Agreement. The City shall provide payment within forty-five (45) days of receipt of
an invoice. If the City objects to all or any portion of an invoice, it shall notify the
Consultant and reserves the option to only pay that portion of the invoice not in
dispute. In that event, the parties will immediately make every effort to settle the
disputed portion.
IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent
Contractor-Employer Relationship will be created by this Agreement. By their execution of this
Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following
representations:
A. The Consultant has the ability to control and direct the performance and
details of its work, the City being interested only in the results obtained
under this Agreement.
B. The Consultant maintains and pays for its own place of business from which
Consultant's services under this Agreement will be performed.
C. The Consultant has an established and independent business that is eligible
for a business deduction for federal income tax purposes that existed before
the City retained Consultant's services, or the Consultant is engaged in an
independently established trade, occupation, profession, or business of the
same nature as that involved under this Agreement.
D. The Consultant is responsible for filing as they become due all necessary tax
documents with appropriate federal and state agencies, including the Internal
Revenue Service and the state Department of Revenue.
E. The Consultant has registered its business and established an account with
the state Department of Revenue and other state agencies as may be
required by Consultant's business, and has obtained a Unified Business
Identifier (UBI) number from the State of Washington.
F. The Consultant maintains a set of books dedicated to the expenses and
earnings of its business.
V. TERMINATION. Either party may terminate this Agreement, with or without
cause, upon providing the other party thirty (30) days written notice at its address set forth on
the signature block of this Agreement. After termination, the City may take possession of all
records and data within the Consultant's possession pertaining to this project, which may be
used by the City without restriction. If the City's use of Consultant's records or data is not
related to this project, it shall be without liability or legal exposure to the Consultant.
VI. DISCRIMINATION. In the hiring of employees for the performance of work under
this Agreement or any subcontract, the Consultant, its subcontractors, or any person acting on
behalf of the Consultant or subcontractor shall not, by reason of race, religion, color, sex, age,
sexual orientation, national origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform the work to which the
employment relates. Consultant shall execute the attached City of Kent Equal Employment
CONSULTANT SERVICES AGREEMENT - 2
(Over$10,000)
41
Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion
of the contract work, file the attached Compliance Statement.
VII. INDEMNIFICATION. Consultant shall defend, indemnify and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits, including all legal costs and attorney fees, arising out of or in
connection with the Consultant's willfully wrongful acts of negligent performance of this
Agreement.
The City's inspection or acceptance of any of Consultant's work when completed shall not
be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Consultant
and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability
hereunder shall be only to the extent of the Consultant's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF
IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF
THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
In the event Consultant refuses tender of defense in any suit or any claim, if that tender
was made pursuant to this indemnification clause, and if that refusal is subsequently determined
by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the
Consultant's part, then Consultant shall pay all the City's costs for defense, including all
reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and
fees incurred because there was a wrongful refusal on the Consultant's part.
The provisions of this section shall survive the expiration or termination of this
Agreement.
VIII. INSURANCE. The Consultant shall procure and maintain for the duration of the
Agreement, insurance of the types and in the amounts described in Exhibit C attached and
incorporated by this reference.
IX. EXCHANGE OF INFORMATION. The City will provide its best efforts to provide
reasonable accuracy of any information supplied by it to Consultant for the purpose of
completion of the work under this Agreement.
X. OWNERSHIP AND USE OF RECORDS AND DOCUMENTS. Original documents,
drawings, designs, reports, or any other records developed or created under this Agreement
shall belong to and become the property of the City. All records submitted by the City to the
Consultant will be safeguarded by the Consultant. Consultant shall make such data, documents,
and files available to the City upon the City's request. The City's use or reuse of any of the
documents, data and files created by Consultant for this project by anyone other than
Consultant on any other project shall be without liability or legal exposure to Consultant.
XI. CITY'S RIGHT OF INSPECTION. Even though Consultant is an independent
contractor with the authority to control and direct the performance and details of the work
CONSULTANT SERVICES AGREEMENT - 3
(Over$10,000)
42
authorized under this Agreement, the work must meet the approval of the City and shall be
subject to the City's general right of inspection to secure satisfactory completion.
XII. WORK PERFORMED AT CONSULTANT'S RISK. Consultant shall take all
necessary precautions and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of the contract work and shall utilize all protection necessary
for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be
responsible for any loss of or damage to materials, tools, or other articles used or held for use in
connection with the work.
XIII. MISCELLANEOUS PROVISIONS.
A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City
requires its contractors and consultants to use recycled and recyclable products whenever
practicable. A price preference may be available for any designated recycled product.
B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of
any of the covenants and agreements contained in this Agreement, or to exercise any option
conferred by this Agreement in one or more instances shall not be construed to be a waiver or
relinquishment of those covenants, agreements or options, and the same shall be and remain in
full force and effect.
C. Resolution of Disputes and Governing Law. This Agreement shall be governed by
and construed in accordance with the laws of the State of Washington. If the parties are unable
to settle any dispute, difference or claim arising from the parties' performance of this
Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by
filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court,
King County, Washington, unless the parties agree in writing to an alternative dispute resolution
process. In any claim or lawsuit for damages arising from the parties' performance of this
Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or
bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award
provided by law; provided, however, nothing in this paragraph shall be construed to limit the
City's right to indemnification under Section VII of this Agreement.
D. Written Notice. All communications regarding this Agreement shall be sent to the
parties at the addresses listed on the signature page of the Agreement, unless notified to the
contrary. Any written notice hereunder shall become effective three (3) business days after the
date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to
the addressee at the address stated in this Agreement or such other address as may be
hereafter specified in writing.
E. Assignment. Any assignment of this Agreement by either party without the written
consent of the non-assigning party shall be void. If the non-assigning party gives its consent to
any assignment, the terms of this Agreement shall continue in full force and effect and no
further assignment shall be made without additional written consent.
F. Modification. No waiver, alteration, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of
the City and Consultant.
G. Entire Agreement. The written provisions and terms of this Agreement, together
with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or
CONSULTANT SERVICES AGREEMENT - 4
(Over$10,000)
43
other representative of the City, and such statements shall not be effective or be construed as
entering into or forming a part of or altering in any manner this Agreement. All of the above
documents are hereby made a part of this Agreement. However, should any language in any of
the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms
of this Agreement shall prevail.
H. Compliance with Laws. The Consultant agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become applicable
to Consultant's business, equipment, and personnel engaged in operations covered by this
Agreement or accruing out of the performance of those operations.
I. City Business License Required. Prior to commencing the tasks described in Section
I, Contractor agrees to provide proof of a current city of Kent business license pursuant to
Chapter 5.01 of the Kent City Code.
3. Counterparts. This Agreement may be executed in any number of counterparts,
each of which shall constitute an original, and all of which will together constitute this one
Agreement.
IN WITNESS, the parties below execute this Agreement, which shall become
effective on the last date entered below.
CONSULTANT: CITY OF KENT:
By: By:
(signature) (signature)
Print Name: Print Name: Suzette Cooke
Its Its Mayor
(title)
DATE: DATE:
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
CONSULTANT: CITY OF KENT:
Alberto Pujol Timothy 3. LaPorte, P.E.
GEI Consultants, Inc. City of Kent
180 Grand Ave., Suite 1410 220 Fourth Avenue South
Oakland, CA 94612 Kent, WA 98032
(510) 350-2900 (telephone) (253) 856-5500 (telephone)
(510) 350-2901 (facsimile) (253) 856-6500 (facsimile)
APPROVED AS TO FORM:
Kent Law Department
GEI-Briscoe-0eslmone Levee 4/L ngholz
CONSULTANT SERVICES AGREEMENT 5
(Over$10,000)
44
DECLARATION
CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY
The City of Kent is committed to conform to Federal and State laws regarding equal opportunity.
As such all contractors, subcontractors and suppliers who perform work with relation to this
Agreement shall comply with the regulations of the City's equal employment opportunity
policies.
The following questions specifically identify the requirements the City deems necessary for any
contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative
response is required on all of the following questions for this Agreement to be valid and binding.
If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the
directives outlines, it will be considered a breach of contract and it will be at the City's sole
determination regarding suspension or termination for all or part of the Agreement;
The questions are as follows:
1. I have read the attached City of Kent administrative policy number 1.2.
2. During the time of this Agreement I will not discriminate in employment on the basis of
sex, race, color, national origin, age, or the presence of all sensory, mental or physical
disability.
3. During the time of this Agreement the prime contractor will provide a written statement to
all new employees and subcontractors indicating commitment as an equal opportunity
employer.
4. During the time of the Agreement I, the prime contractor, will actively consider hiring and
promotion of women and minorities.
5. Before acceptance of this Agreement, an adherence statement will be signed by me, the
Prime Contractor, that the Prime Contractor complied with the requirements as set forth
above.
By signing below, I agree to fulfill the five requirements referenced above.
By:
Fo r:
Title:
Date:
EEO COMPLIANCE DOCUMENTS - 1
45
CITY OF KENT
ADMINISTRATIVE POLICY
NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998
SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996
CONTRACTORS APPROVED BY Jim White, Mayor
POLICY:
Equal employment opportunity requirements for the City of Kent will conform to federal and
state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee
equal employment opportunity within their organization and, if holding Agreements with the City
amounting to $10,000 or more within any given year, must take the following affirmative steps:
1. Provide a written statement to all new employees and subcontractors indicating
commitment as an equal opportunity employer.
2. Actively consider for promotion and advancement available minorities and women.
Any contractor, subcontractor, consultant or supplier who willfully disregards the City's
nondiscrimination and equal opportunity requirements shall be considered in breach of contract
and subject to suspension or termination for all or part of the Agreement.
Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public
Works Departments to assume the following duties for their respective departments.
1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these
regulations are familiar with the regulations and the City's equal employment opportunity
policy.
2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines.
EEO COMPLIANCE DOCUMENTS - 2
46
CITY OF KENT
EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT
This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the
Agreement.
I, the undersigned, a duly represented agent of
Company, hereby acknowledge and declare that the before-mentioned company was the prime
contractor for the Agreement known as that was entered
into on the (date), between the firm I represent and the City of
Kent.
I declare that I complied fully with all of the requirements and obligations as outlined in the City
of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity
Policy that was part of the before-mentioned Agreement.
By:
Fo r:
Title:
Date:
EEO COMPLIANCE DOCUMENTS - 3
47
EConsultants
Glotld'-'al February 13,2014
P,nn nmCnM
\team[Remv¢ce.
Mr. Ken Langholz
City of Kent
Public Works Department
220 Fourth Avenue South
Kent, WA 98032
Re: Scope and Cost estimate for Construction Phase Engineering Support
Reach 2 and 3 Briscoe-Desimone Levee Improvements
Dear Mr.Langholz:
This letter presents our proposed scope and budget estimate for the Constriction Phase
Engineering Support for the Reach 2 and 3 Briscoe-Desimone Levee Improvements. The
proposed levee improvements in Reaches 2 and 3 consist of installing a sheet pile floodwall
landward of the existing levee. The space between the sheet pile wall and the landward slope of
the existing embankment will be filled, and the existing trail will be relocated on top of the fill. A
reinforced concrete cap beam and barrier will be constructed on top of the sheet piles,and the
exposed surface of the sheet piles above the landside finished grade will be painted. The upper
portion of the riverbank slope will be excavated to create a flatter slope with a planting bench just
above the ordinary high watermark along most of the design reach. Reach 2 is located between
River Miles 15.44 and 15.57. Reach 3 is located between River Miles 15.98 and 16.36.
We will work closely with the City and our proposed structural subconsultant Shearer Design
LLC to provide engineering support during construction in regards to the following design
elements:
c Steel Sheet Piles
o Construction Noise and Vibration Control Activities
o Settlement Monitoring Activities
o Concrete cap beam
o Concrete barrier
o Hand Railing
o Deadman and Anchors '..
o Earthwork
o Floodgate
o Stairs
o Retaining Walls
Scope of Services
We propose to perform the following scope of services:
wwva.ye ieu nsuIton ts.com GEI Cevs.I ants,Inc.
180 Grnnd Ave,Suite 1410,Oakland,CA 94612
510.350.2900 fax 510.350.2901
48
i
Mr. Ken Langholz 2 February 13, 2014
• Attend an early construction meeting to review the City's needs and expectations and meet
project personnel.
• Participate in select construction meetings by conference call. Participation will be limited
to meetings where discussion of the following activities will be a significant topic of the
meeting:
o Pre-Construction Inspection Activities
o Sheet Piles
o Construction Noise and Vibration Control Activities
o Settlement Monitoring Activities
o Concrete cap beam
o Concrete barrier
o Hand Railing
o Deadman and Anchors
o Earthwork
o Floodgate
o Stairs
o Retaining Walls
• Support City in reviewing contractor submittals with significant engineering content,
including contractor work plans and proposed materials for earthwork,sheet piles,
construction noise and vibration monitoring, settlement monitoring, sheet piles, concrete
cap beam and barrier,retaining walls, stairs,hand railing, deadman and anchors,
earthwork and floodgate,
• Review material certificates and QC and QA test reports for noise and vibration
monitoring, settlement,fill,sheet piles, concrete and other items associated with the work
outlined above,
• Support City in reviewing and responding to RFI's that involve significant engineering
content,
• Participate onsite at the startup of the following construction activities:
o Sheet Pile Installation Test Program
o Sheet Pile Installation
o Earthwork
o Deadman and anchors
o Concrete cap beam and barrier
o Stair and Retaining wall construction
The purpose of the onsite participation at the startup of these activities is to evaluate site
conditions and construction procedures to confirm they are consistent with design
assumptions.
• Support City in reviewing change order requests if desired by the City
• Support City with evaluation of contractor claims if needed
• Perform design evaluations and prepare design modifications as required to conform
design to conditions exposed during construction
49
Mr. Ken Langholz 3 February 13, 2014
• Assist the City in reviewing As-built Drawings prepared by the City or the Contractor as
requested
Materials testing, daily inspections, and other construction management duties are not included in
this scope. We have assumed that they will be performed by the City's construction management
personnel and an inspection/testing firm such as Jason Engineering.
Schedule
We are prepared to begin the work within two weeks of receiving a Notice to Proceed. We have
assumed the following schedule:
• Early construction meeting will occur in February or March 2014,
• Sheet pile installation will occur between May and August 2014,
• Earthwork activities will occur between June and September 2014,
• Concrete cap beam and barrier installation will occur between July and October 2014,
• Construction will be substantially complete by mid November 2014.
Cost Estimate
The proposed scope and level of effort are dependent on actual project duration, contractor
activities,submittals,requests for information,and other items outside our control. For budgeting
purposes, a preliminary breakdown of the estimated costs is included in the table below. We will
not exceed the total estimated amount of$152,552 without your written authorization.
Project ShearerI
Staff: Engr. Nickerson Pujol GE] Labor GEI Direct Design Total
Total Expenses Subcontract
Rate: $122 $218 $246
Early Const. 4 2 $1,364 $3,878 $5,242
Meeting
Conference 24 24 8 $10,128 $10,128
Calls
Submittal 24 36 6 $12,252 $12,252
Review
Review QA/QC Documentation 96 48 12 $25,128 $16,109 $41,237
Support RFI 12 40 6 $11,660 $13,515 $25,175
Response
Const.t 64 24 6 $14,516 $7,200 $7,505 $29,221
Site V
Support CO 2 4 2 $1,608 $1,608
Request
Support Claims 2 4 2 $1,608 $1,608
Request
Design Modifications 12 6 2 $3,264 $3,264
I
Review
lts 12 8 2 $3,700 $3,700
Project 24 8 $7,200 $11,918 $19,118
Management
Subtotals $92,428 $7,200 $52,924
Suggested Budget $152,552
50
Mr. Ken Langholz 4 February 13, 2014
Conditions
Our services will be provided in accordance with previously negotiated contract terms and
conditions for the Briscoe-Desimone Levee. We will perform the above scope of work on a time
and materials basis. Invoices will be submitted monthly based on the service performed as of the
end of each billing period.
Closing
Thank you for the opportunity to submit this scope and cost estimate. We look forward to
continuing to work with you on this project. Please call meat 510-350-2908 or Jim Nickerson at
781-712-4023 if you have any questions.
Sincerely,
GET CONSULTANTS,INC.
W
Alberto Pujol, P.E.
Vice President,Project Manager
Attachments: Shearer Design Letter of Scope
C: Jim Nickerson
i
it
I
51
Ell SHEARER DEstoN LLG.
SHEARER DESIGN iteso Bridge Design, Construction Engineering and Infrastructure Aesthetics
3613 Phinney Ave N#3
Seattle,WA 98103
(206)781-7830
January 24, 2014
GEI Consultants, Inc.
180 Grand Avenue, Suite 1410
Oakland, CA 94612
Subject: Kent Briscoe-Desimone Levee Improvements Construction Support
i
Attn: Alberto Pujol, P.E., G.E. and Jim Nickerson P.E.
Dear Jim;
We are happy to provide continued engineering services for the Kent Briscoe-Desimone Levee
Improvement Project. This attached scope pertains to Construction Support for Levee Reaches
2& 3.
As discussed I believe the best way we can support the project is in the following areas:
Task 1.1 Pre-Construction Meeting
This task will cover the review of the current bid documents and attendance at the pre-
construction meeting.
Task 1.2 RFI &Shop Drawings
Under this task we will review and comment on project submitted shop drawings and request for
information (RFI) from the Contractor that pertain to drawings prepared by Shearer Design in the
bid set.
Areas Covered
• Stairs
• Retaining Wall
• Railing
• Materials
Task 1.3 Routine Inspections
This task will cover onsite inspections for compliance with the bid documents or for construction
problem solving.
Areas Covered
• Stairs
• Cap Beam
• General Sheet Pile to support GEI
11SHEARERSERVER\D-Ddve\ADMIN\Job Contracts\C-0219 Kent Levee\Contract\0219 scope 5 Construction Support.docx
52
ER
N LLC.
SHEARER DESIGN I1p� B 9 EngineeringInfrastructure
3613 Phinney Ave N#3
Le Bridge Design, Construction En inneeee,iinn` and Infrfi�cart e,Aesthetics
th 03
(206)781-7830
Task 1.4 Monitoring Program Q.C.
This task will cover review of the Contractors "Construction monitoring program"for compliance
with the project bid documents.
Areas Covered
• Verification of instrumentation placement
• Periodic Inspection
Areas Not Covered
• Review of Monitoring Plan for compliance with bid documents
• Pre- Construction Building Condition Verification
Task 1.5 Administration
This task will cover the general project coordination and project meeting points. Included will be:
• Conference calls with GEI to discuss the project progress.
• Communicate periodically through the advancement of the construction to discuss
any interim results, challenges and directions.
Items not included in this proposal.
Full time onsite inspection (Assumed to be City of Kent).
Materials testing services.
Please see the enclosed spreadsheet for a summary of our estimated cost& hours for this phase
of the project. We look forward to working with you again on this project. If you have any
questions please feel free to call.
Sincerely,
D,_
»
David R. Shearer S.E. Principal
SHEARER DESIGN
11SHEARERSERVERID-Drive1ADMIN\Job Contracts\C-0219 Kent Levee%Contract10219 Scope 5 Construction Support.docx �I
53
m
�a M
E I w I y w w
O - -
`g+
c c
o
E f- W N
W m
y N o 3
qo
N
N
R -
z °
- o
a — o00
Qo
2a N �.mna w
O d
E � voEq
M vNg
V. of tONOpW ro < VI.4' N [mONC Vi
N g I
.0 cujt
W C I N O N
J UNm �
N
N C N > N
at lly ac m
y a 7i y a N 2 u N U o > c K
K12o U 2
� E
U U =U
C O rv � l
N
m o mE m m = a
0
s
Lq
Ll
YN N R
54
EXHIBIT C
INSURANCE REQUIREMENTS FOR
CONSTRUCTION PROJECTS
Insurance
The Contractor shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may
arise from or in connection with the performance of the work hereunder by the
Contractor, their agents, representatives, employees or subcontractors.
A„ Minimum Scope of Insurance
Contractor shall obtain insurance of the types described below:
1. Commercial General Liability insurance shall be written on ISO
occurrence form CG 00 01 or its equivalent, with minimum limits of
$5,000,000 per occurrence and in the aggregate for each 1 year policy
period. This coverage may be any combination of primary, umbrella or
excess liability coverage affording total liability limits of not less than
$5,000,000 per occurrence and in the aggregate. Products and
Completed Operations coverage shall be provided for a period of 3 years
following Substantial Completion of the work. The Commercial General
Liability insurance shall be endorsed to provide the Aggregate per Project
Endorsement ISO form CG 25 03 11 85. The City, King County and
the King County Flood Control District shall be named as an
Additional Insureds under the Contactor's Commercial General
Liability insurance policy with respect to the work performed for
the City, the District and the County. All endorsements adding
Additional Insureds shall be issued on form CG 20 10 1185 or a
form deemed equivalent, providing the Additional Insureds with
all policies and endorsements set forth in this section.
2. Automobile Liability insurance covering all owned, non-owned, hired
and leased vehicles. Coverage shall be written on Insurance Services
Office (ISO) form CA 00 01 or a substitute form providing equivalent
liability coverage. If necessary, the policy shall be endorsed to provide
contractual liability coverage.
3. Workers' Compensation coverage as required by the Industrial
Insurance laws of the State of Washington. +
4. Professional Liability (Errors & Omissions) insurance appropriate to
the Consultant's profession.
55
EXHIBIT C (Continued)
B. I14iiiniiirmuirn Airnoanirnts of :Unsanrairnce
Contractor shall maintain the following insurance limits:
1. Commercial General Liability insurance shall be written with minimum
limits of $5,000,000 per occurrence and in the aggregate for each 1 year
policy period. This coverage may be any combination of primary,
umbrella or excess liability coverage affording total liability limits of not
less than $5,000,000 per occurrence and in the aggregate. Products and
Completed Operations coverage shall be provided for a period of 3 years
following Substantial Completion of the work.
2. Automobile Liability insurance with a minimum combined single limit
for bodily injury and property damage of at least $2,000,000 per accident.
3. Professional Liability (Errors & Omissions) insurance shall be written
with limits no less than $5,000,000 per claim and $5,000,000 policy
aggregate limit.
C. Othier :I:irnsanrairnce IProviisiioins
The insurance policies are to contain, or be endorsed to contain, the following
provisions for Automobile Liability and Commercial General Liability:
1. The Contractor's insurance coverage shall be primary insurance as respect
the City. Any insurance, self-insurance, or insurance pool coverage
maintained by the City shall be excess of the Contractor's insurance and
shall not contribute with it.
2. The Contractor's insurance shall be endorsed to state that coverage shall
not be cancelled by either party, except after thirty (30) days prior
written notice by certified mail, return receipt requested, has been given
to the City.
3. The City of Kent, King County Flood District and King County shall be
named as an additional insureds on all policies (except Professional
Liability) as respects work performed by or on behalf of the contractor
and a copy of the endorsement naming the City as additional insured shall
be attached to the Certificate of Insurance. The City reserves the right to
receive a certified copy of all required insurance policies. The Contractor's
Commercial General Liability insurance shall also contain a clause stating
that coverage shall apply separately to each insured against whom claim
is made or suit is brought, except with respects to the limits of the
insurer's liability.
56
EXHIBIT C (Continued)
D. Coimbra tor's :Unsuiiraim a for OtIheir ILosses
The Contractor shall assume full responsibility for all loss or damage from any
cause whatsoever to any tools, Contractor's employee owned tools, machinery,
equipment, or motor vehicles owned or rented by the Contractor, or the
Contractor's agents, suppliers or contractors as well as to any temporary
structures, scaffolding and protective fences.
E. Waiver of Suulbirog atiioin
The Contractor and the City waive all rights against each other any of their
Subcontractors, Sub-subcontractors, agents and employees, each of the other, for
damages caused by fire or other perils to the extend covered by Builders Risk
insurance or other property insurance obtained pursuant to the Insurance
Requirements Section of this Contract or other property insurance applicable to the
work. The policies shall provide such waivers by endorsement or otherwise.
IF., Accelptalbillity of ;I;un uair it
Insurance is to be placed with insurers with a current A.M. Best rating of not less
than A:VII.
G. V iriiffiic atiioin of Coverage
Contractor shall furnish the City with original certificates and a copy of the
amendatory endorsements, including but not necessarily limited to the additional
insured endorsement, evidencing the Automobile Liability and Commercial General
Liability insurance of the Contractor before commencement of the work.
H. Suulbc untiractoir
Contractor shall include all subcontractors as insureds under its policies or shall
furnish separate certificates and endorsements for each subcontractor. All
coverages for subcontractors shall be subject to all of the same insurance
requirements as stated herein for the Contractor.
57
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 220 Fourth Avenue S.
Kent, WA 98032-5895
Date: March 7, 2014
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: March 17, 2014
From: Paul Kuehne, Construction Management Supervisor
Through: Chad Bieren, P.E., City Engineer
Subject: Consultant Services Agreement with Jason Engineering and
Consulting Business, Inc. - Materials Testing & Inspection
Briscoe-Desimone Levee Reaches 2 & 3
Item - 5
Motion: Move to recommend Council authorize the Mayor to sign a
Consultant Services Agreement with Jason Engineering and Consulting
Business, Inc., in an amount not to exceed $97,870 for materials testing
and inspection services related to the Briscoe-Desimone Levee Reaches 2 &
3 project, subject to final terms and conditions acceptable to the City
Attorney and the Public Works Director.
Summary:
The Briscoe-Desimone Levee is located along the Green River between S. 180th St.
and S. 200th St. The levee floodwall will consist of driven sheet piles and reinforced
concrete and will be approximately 3,200 feet long. This project will also include
asphalt pavement for levee trail and parking lot reconstruction and two cement
concrete retaining walls.
Sound Engineering practices dictate that aggregates, asphalt, and cement/concrete,
be tested by a geotechnical laboratory to assure the construction materials meet
contract specifications. This materials analysis requires a laboratory with certified
testing equipment that the City does not own. Onsite nondestructive density and
moisture content tests are also necessary for quality control and quality assurance.
Jason Engineering and Consulting Business, Inc., has the appropriate certifications
and expertise to perform these duties and was selected through a competitive process
based upon their qualifications. City staff will perform all other construction
inspection and construction management duties. Jason Engineering and Consulting
Business is an Auburn firm. There are no equivalent firms within the City limits of
Kent.
Budget Impact:
This contract will be funded out of the $18 million which was allocated to the Briscoe-
Desimone Levee project through an Interlocal Agreement with the KCFCD.
58
This page intentionally left blank.
59
KENT
CONSULTANT SERVICES AGREEMENT
between the City of Kent and
Jason Engineering & Consulting Business, Inc.
THIS AGREEMENT is made between the City of Kent, a Washington municipal corporation
(hereinafter the "City"), and Jason Engineering & Consulting Business, Inc. organized under the
laws of the State of Washington, located and doing business at PO Box 181, Auburn, WA 98071,
Phone: (206) 786-8645/Fax: (253) 833-7316, Contact: Jason Bell (hereinafter the
"Consultant").
I. DESCRIPTION OF WORK.
Consultant shall perform the following services for the City in accordance with the
following described plans and/or specifications:
The Consultant shall provide special inspection services for the Briscoe-Desimone
Levee Improvements Reach 2 and 3 Project. For a description, see the Consultant's
Scope of Work which is attached as Exhibit A and incorporated by this reference.
Consultant further represents that the services furnished under this Agreement will be
performed in accordance with generally accepted professional practices within the Puget Sound
region in effect at the time those services are performed.
II. TIME OF COMPLETION. The parties agree that work will begin on the tasks
described in Section I above immediately upon the effective date of this Agreement. Consultant
shall complete the work described in Section I by December 31, 2015.
III. COMPENSATION.
A. The City shall pay the Consultant, based on time and materials, an amount not to
exceed Nine Seven Thousand, Eight Hundred Seventy Dollars ($97,870.00), for the
services described in this Agreement. This is the maximum amount to be paid
under this Agreement for the work described in Section I above, and shall not be
exceeded without the prior written authorization of the City in the form of a
negotiated and executed amendment to this agreement. The Consultant agrees
that the hourly or flat rate charged by it for its services contracted for herein shall
remain locked at the negotiated rate(s) for a period of one (1) year from the
effective date of this Agreement. The Consultant's billing rates shall be as
delineated in Exhibit B.
CONSULTANT SERVICES AGREEMENT - 1
(Over$10,000)
60
B. The Consultant shall submit monthly payment invoices to the City for work
performed, and a final bill upon completion of all services described in this
Agreement. The City shall provide payment within forty-five (45) days of receipt of
an invoice. If the City objects to all or any portion of an invoice, it shall notify the
Consultant and reserves the option to only pay that portion of the invoice not in
dispute. In that event, the parties will immediately make every effort to settle the
disputed portion.
IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent
Contractor-Employer Relationship will be created by this Agreement. By their execution of this
Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following
representations:
A. The Consultant has the ability to control and direct the performance and
details of its work, the City being interested only in the results obtained
under this Agreement.
B. The Consultant maintains and pays for its own place of business from which
Consultant's services under this Agreement will be performed.
C. The Consultant has an established and independent business that is eligible
for a business deduction for federal income tax purposes that existed before
the City retained Consultant's services, or the Consultant is engaged in an
independently established trade, occupation, profession, or business of the
same nature as that involved under this Agreement.
D. The Consultant is responsible for filing as they become due all necessary tax
documents with appropriate federal and state agencies, including the Internal
Revenue Service and the state Department of Revenue.
E. The Consultant has registered its business and established an account with
the state Department of Revenue and other state agencies as may be
required by Consultant's business, and has obtained a Unified Business
Identifier (UBI) number from the State of Washington.
F. The Consultant maintains a set of books dedicated to the expenses and
earnings of its business.
V. TERMINATION. Either party may terminate this Agreement, with or without
cause, upon providing the other party thirty (30) days written notice at its address set forth on
the signature block of this Agreement. After termination, the City may take possession of all
records and data within the Consultant's possession pertaining to this project, which may be
used by the City without restriction. If the City's use of Consultant's records or data is not
related to this project, it shall be without liability or legal exposure to the Consultant.
VI. DISCRIMINATION. In the hiring of employees for the performance of work under
this Agreement or any subcontract, the Consultant, its subcontractors, or any person acting on
behalf of the Consultant or subcontractor shall not, by reason of race, religion, color, sex, age,
sexual orientation, national origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform the work to which the
employment relates. Consultant shall execute the attached City of Kent Equal Employment
CONSULTANT SERVICES AGREEMENT - 2
(Over$10,000)
61
Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion
of the contract work, file the attached Compliance Statement.
VII. INDEMNIFICATION. Consultant shall defend, indemnify and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits, including all legal costs and attorney fees, arising out of or in
connection with the Consultant's performance of this Agreement, except for that portion of the
injuries and damages caused by the City's negligence.
The City's inspection or acceptance of any of Consultant's work when completed shall not
be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Consultant
and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability
hereunder shall be only to the extent of the Consultant's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF
IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF
THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
In the event Consultant refuses tender of defense in any suit or any claim, if that tender
was made pursuant to this indemnification clause, and if that refusal is subsequently determined
by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the
Consultant's part, then Consultant shall pay all the City's costs for defense, including all
reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and
fees incurred because there was a wrongful refusal on the Consultant's part.
The provisions of this section shall survive the expiration or termination of this
Agreement.
VIII. INSURANCE. The Consultant shall procure and maintain for the duration of the
Agreement, insurance of the types and in the amounts described in Exhibit C attached and
incorporated by this reference.
IX. EXCHANGE OF INFORMATION. The City will provide its best efforts to provide
reasonable accuracy of any information supplied by it to Consultant for the purpose of
completion of the work under this Agreement.
X. OWNERSHIP AND USE OF RECORDS AND DOCUMENTS. Original documents,
drawings, designs, reports, or any other records developed or created under this Agreement
shall belong to and become the property of the City. All records submitted by the City to the
Consultant will be safeguarded by the Consultant. Consultant shall make such data, documents,
and files available to the City upon the City's request. The City's use or reuse of any of the
documents, data and files created by Consultant for this project by anyone other than
Consultant on any other project shall be without liability or legal exposure to Consultant.
XI. CITY'S RIGHT OF INSPECTION. Even though Consultant is an independent
contractor with the authority to control and direct the performance and details of the work
CONSULTANT SERVICES AGREEMENT - 3
(Over$10,000)
62
authorized under this Agreement, the work must meet the approval of the City and shall be
subject to the City's general right of inspection to secure satisfactory completion.
XII. WORK PERFORMED AT CONSULTANT'S RISK. Consultant shall take all
necessary precautions and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of the contract work and shall utilize all protection necessary
for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be
responsible for any loss of or damage to materials, tools, or other articles used or held for use in
connection with the work.
XIII. MISCELLANEOUS PROVISIONS.
A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City
requires its contractors and consultants to use recycled and recyclable products whenever
practicable. A price preference may be available for any designated recycled product.
B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of
any of the covenants and agreements contained in this Agreement, or to exercise any option
conferred by this Agreement in one or more instances shall not be construed to be a waiver or
relinquishment of those covenants, agreements or options, and the same shall be and remain in
full force and effect.
C. Resolution of Disputes and Governing Law. This Agreement shall be governed by
and construed in accordance with the laws of the State of Washington. If the parties are unable
to settle any dispute, difference or claim arising from the parties' performance of this
Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by
filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court,
King County, Washington, unless the parties agree in writing to an alternative dispute resolution
process. In any claim or lawsuit for damages arising from the parties' performance of this
Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or
bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award
provided by law; provided, however, nothing in this paragraph shall be construed to limit the
City's right to indemnification under Section VII of this Agreement.
D. Written Notice. All communications regarding this Agreement shall be sent to the
parties at the addresses listed on the signature page of the Agreement, unless notified to the
contrary. Any written notice hereunder shall become effective three (3) business days after the
date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to
the addressee at the address stated in this Agreement or such other address as may be
hereafter specified in writing.
E. Assignment. Any assignment of this Agreement by either party without the written
consent of the non-assigning party shall be void. If the non-assigning party gives its consent to
any assignment, the terms of this Agreement shall continue in full force and effect and no
further assignment shall be made without additional written consent.
F. Modification. No waiver, alteration, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of
the City and Consultant.
G. Entire Agreement. The written provisions and terms of this Agreement, together
with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or
CONSULTANT SERVICES AGREEMENT - 4
(Over$10,000)
63
other representative of the City, and such statements shall not be effective or be construed as
entering into or forming a part of or altering in any manner this Agreement. All of the above
documents are hereby made a part of this Agreement. However, should any language in any of
the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms
of this Agreement shall prevail.
H. Compliance with Laws. The Consultant agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become applicable
to Consultant's business, equipment, and personnel engaged in operations covered by this
Agreement or accruing out of the performance of those operations.
I. City Business License Required. Prior to commencing the tasks described in Section
I, Contractor agrees to provide proof of a current city of Kent business license pursuant to
Chapter 5.01 of the Kent City Code.
J. Counterparts. This Agreement may be executed in any number of counterparts,
each of which shall constitute an original, and all of which will together constitute this one
Agreement.
IN WITNESS, the parties below execute this Agreement, which shall become
effective on the last date entered below.
CONSULTANT: CITY OF KENT:
By: By:
(signature) (signature)
Print Name: Print Name: Suzette Cooke
Its Its Mayor
(title)
DATE: DATE:
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
CONSULTANT: CITY OF KENT:
Jason Bell Timothy J. LaPorte, P.E.
Jason Engineering & Consulting Business, Inc. City of Kent
PO Box 181 220 Fourth Avenue South
Auburn, WA 98071 Kent, WA 98032
(206) 786-8645 (telephone) (253) 856-5500 (telephone)
(253) 833-7316 (facsimile) (253) 856-6500 (facsimile)
APPROVED AS TO FORM:
Kent Law Department
]ECB-Briscoe-0eslmone/Kuehn
CONSULTANT SERVICES AGREEMENT - 5
(Over$10,000)
64
DECLARATION
CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY
The City of Kent is committed to conform to Federal and State laws regarding equal opportunity.
As such all contractors, subcontractors and suppliers who perform work with relation to this
Agreement shall comply with the regulations of the City's equal employment opportunity
policies.
The following questions specifically identify the requirements the City deems necessary for any
contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative
response is required on all of the following questions for this Agreement to be valid and binding.
If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the
directives outlines, it will be considered a breach of contract and it will be at the City's sole
determination regarding suspension or termination for all or part of the Agreement;
The questions are as follows:
1. I have read the attached City of Kent administrative policy number 1.2.
2. During the time of this Agreement I will not discriminate in employment on the basis of
sex, race, color, national origin, age, or the presence of all sensory, mental or physical
disability.
3. During the time of this Agreement the prime contractor will provide a written statement to
all new employees and subcontractors indicating commitment as an equal opportunity
employer.
4. During the time of the Agreement I, the prime contractor, will actively consider hiring and
promotion of women and minorities.
5. Before acceptance of this Agreement, an adherence statement will be signed by me, the
Prime Contractor, that the Prime Contractor complied with the requirements as set forth
above.
By signing below, I agree to fulfill the five requirements referenced above.
By:
Fo r:
Title:
Date:
EEO COMPLIANCE DOCUMENTS - 1
65
CITY OF KENT
ADMINISTRATIVE POLICY
NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998
SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996
CONTRACTORS APPROVED BY Jim White, Mayor
POLICY:
Equal employment opportunity requirements for the City of Kent will conform to federal and
state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee
equal employment opportunity within their organization and, if holding Agreements with the City
amounting to $10,000 or more within any given year, must take the following affirmative steps:
1. Provide a written statement to all new employees and subcontractors indicating
commitment as an equal opportunity employer.
2. Actively consider for promotion and advancement available minorities and women.
Any contractor, subcontractor, consultant or supplier who willfully disregards the City's
nondiscrimination and equal opportunity requirements shall be considered in breach of contract
and subject to suspension or termination for all or part of the Agreement.
Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public
Works Departments to assume the following duties for their respective departments.
1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these
regulations are familiar with the regulations and the City's equal employment opportunity
policy.
2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines.
EEO COMPLIANCE DOCUMENTS - 2
66
CITY OF KENT
EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT
This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the
Agreement.
I, the undersigned, a duly represented agent of
Company, hereby acknowledge and declare that the before-mentioned company was the prime
contractor for the Agreement known as that was entered
into on the (date), between the firm I represent and the City of
Kent.
I declare that I complied fully with all of the requirements and obligations as outlined in the City
of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity
Policy that was part of the before-mentioned Agreement.
By:
Fo r:
Title:
Date:
EEO COMPLIANCE DOCUMENTS - 3
i
67
Jason Geotechnical Engineering Date; 02-22-2014
\ Engineering& Retaining Wall/Pavement Design Project:Briscoe-Desimone
Consulting Construction Management Levee,Kent#09-3010
Business,Inc. WABO/AASHTO Inspection&Testing Dille#: p14-015
Scope of Services, ExhibitA
" Provide special inspection including density tests to confirm compaction and testing specification
requirements for soils and asphalt, and concrete inspection and sampling.
" Sample imported material to evaluate and confirm specification requirements according to current
applicable standards.
" Provide miscellaneous professional services related to this project as directed.
" Provide to the owner within two hours of discovery, notification of failing test results related to
materials testing, concrete cylinder breaks or other critical test results as determined by the Owner's
Representative.
" Provide time sheets with each invoice that verify consultant employee(s), day, date and times worked,
hourly rate, total per day, tests performed and test fees, and any other pertinent information required
to verify invoiced charges.
" Hourly rates include all test equipment for our services (there are no hidden extra costs involved). A
Licensed P.E.reviews all reports. Reports are sent to all parties on the project distribution list.
" The hourly rate is based upon portal-to-portal time. The hourly rates shown below are applicable for
all work performed. There is a minimum charge of 2 hours for normal inspection and professional
engineering services. (Weekends are minimum 4 hours)
" An overtime rate of 1.5 times the hourly rate will be charge for all work in excess of the normal S hour
working day,weekends,nights and legal holidays,
" Equipment & materials will include equipment used by an inspector the field in the performance of
normal inspection duties. We request a minimum of 24 hours notice for scheduling.
9- Liability is limited to invoiced amounts.
sti No mileage is charged within Auburn and Kent City limits
I
I
a' rin.
Phone: (206)-786-8645 Email:Jason(Jlasonenginee b
PO Box 181 Auburn WA.98071
68
Jason Geotechnical Engineering Date: 02-22-201.4
<" Engineering& Retaining Wall/Pavement Design Project:Briscoe-Desimone
T 1 Consulting Construction Management Levee,Kent#09-3010
Business,Inc. WABO/AASITTO Inspection&Testing File#:p14 015
Schedule of Fees £d Services, Exhibit B j
PROFESSIONAL SERVICES Qty. Unit Rate Total Est.
Inspection TESC Supervisor 100 $50.00 per hour $5,000.00
Asphalt/Soils w/Densometer 750 $50.00 per hour $37,500,00
i
Reinforced Concrete/Masonry 100 $50.00 per hour $5,000.00
Inspection Structural Steel/Welding $75.00 per hour $0.00
Administrative Services 120 $40.00 per hour $4,800.00
Construction Manager,Report review&Evaluation 600 $60.00 per hour $36,000.00
Staff Engineer/Geologist $75.00 per hour $0.00
Senior Geotechnical Engineer,PE 40 $95.00 per hour $3,800.00
LABORATORY SERVICES Unit Rate
ASPI IALT,HMA
Asphalt,Ignition&Gradation(AASJTTO T27,ASTM D2172) 2 $150.00 each $300.00
Asphalt,Rice Specific Gravity(ASTM D2041,AASHTO T245) 2 $85.00 each $170.00
CONCRETE
Concrete,Cylinders Compression(ASTM C39) $18.00 each $0.00
SOILS/AGGREGATE X
Soil,AtterbergLimits 5 $160.00 each $900,00
Soil,California Bearing Ratio (CBR) 1 $550.00 each $550.00
Soil,Clay lumps and Friable Particles (ASTM C142) $125.00 each $0.00
Soil,Fracture Count(ASTM D5821) 5 $75.00 each $375.00
Soil,Hydrometer 5 $160.00 each $800.00
Soil,Moisture Content $30.00 each $0.00
Soil,Organic Content $55.00 each $0.00
Soil,Permeability(Falling Head,ASTM D5084) $295.00 each $0.00
Soil,Proctor/Moisture-Density Relation(ASTM D1557,D698) 5 $150.00 each $750.00
Soil,Sand Equivalent'lest(ASTM D2419) 5 $75.00 each $375.00
Soil,Sieve Analysis of Fine and Coarse Aggregates(T27-06) 10 $125.00 each $1,250.00
Soil,Topsoil(ASTM D2974) 1 $400.00 each $400,00
Soil,Specific Gravity(ASTM D127/128/D854,coarse,fine) $80.00 each $0.00
OTIIER $0.00
Overtime, 1.5 times hourly rate 1.5 x hourly rate per hour
Equipment&Materials Costs Cost+15%
Estimated Project Total: $97,870.00
Phone: (206)-786-8645 Email:JasonCQjasonengineering.com
PO Box 181 Auburn WA. 98071
69
EXHIBIT C
INSURANCE REQUIREMENTS FOR
CONSULTANT SERVICES AGREEMENTS
Insurance
The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may
arise from or in connection with the performance of the work hereunder by the
Consultant, their agents, representatives, employees or subcontractors.
A„ Minimum Scope of Insurance
Consultant shall obtain insurance of the types described below:
1. Commercial General Liability insurance shall be written on ISO
occurrence form CG 00 01 or its equivalent, with minimum limits of
$1,000,000 per occurrence and $2,000,000 in the aggregate for each 1
year policy period. Stop Gap and Employer's Liability coverage shall be
included. Products and Completed Operations coverage shall be provided
for a period of 3 years following Substantial Completion of the work. The
Commercial General Liability insurance shall be endorsed to provide the
Aggregate per Project Endorsement ISO form CG 25 03 11 85. The City,
King County and the King County Flood Control Zone District shall
be named as Additional Insureds under the Contactor's
Commercial General Liability insurance policy with respect to the
work performed for the City, the District and the County. All
endorsements adding Additional Insureds shall be issued on form
CG 20 10 1185 or a form deemed equivalent, providing the
Additional Insureds with all policies and endorsements set forth in
this section.
2. Automobile Liability insurance covering all owned, non-owned, hired
and leased vehicles. Coverage shall be written on Insurance Services
Office (ISO) form CA 00 01 or a substitute form providing equivalent
liability coverage. If necessary, the policy shall be endorsed to provide
contractual liability coverage.
3. Workers' Compensation coverage as required by the Industrial
Insurance laws of the State of Washington.
4. Professional Liability (Errors & Omissions) insurance appropriate to
the Consultant's profession.
70
EXHIBIT C (Continued)
B. I14iiiniiirmuirn Airnoanirnts of :Unsanrairnce
Consultant shall maintain the following insurance limits:
1. Commercial General Liability insurance shall be written with minimum
limits of $1,000,000 per occurrence and $2,000,000 in the aggregate for
each 1 year policy period. Products and Completed Operations coverage
shall be provided for a period of 3 years following Substantial Completion
of the work.
2. Automobile Liability insurance with a minimum combined single limit
for bodily injury and property damage of at least $1,000,000 per accident.
3. Professional Liability insurance shall be written with limits no less than
$1,000,000 per claim and $1,000,000 policy aggregate limit.
C. Othier :I:irnsanrairnce IProviisiioins
The insurance policies are to contain, or be endorsed to contain, the following
provisions for Automobile Liability and Commercial General Liability:
1. The Consultant's insurance coverage shall be primary insurance as
respect the City. Any insurance, self-insurance, or insurance pool
coverage maintained by the City shall be excess of the Consultant's
insurance and shall not contribute with it.
2. The Consultant's insurance shall be endorsed to state that coverage shall
not be cancelled by either party, except after thirty (30) days prior
written notice by certified mail, return receipt requested, has been given
to the City.
3. The City of Kent, King County Flood Control Zone District and King County
shall be named as an additional insureds on all policies (except
Professional Liability) as respects work performed by or on behalf of the
Consultant and a copy of the endorsement naming the City, the Flood
Control Zone District and King County as additional insured shall be
attached to the Certificate of Insurance. The City reserves the right to
receive a certified copy of all required insurance policies. The
Consultant's Commercial General Liability insurance shall also contain a
clause stating that coverage shall apply separately to each insured against
whom claim is made or suit is brought, except with respects to the limits
of the insurer's liability.
71
EXHIBIT C (Continued)
D. Coimsulltaint's :Unsuiiraim a for OtIheir ILosses
The Consultant shall assume full responsibility for all loss or damage from any
cause whatsoever to any tools, Consultant's employee owned tools, machinery,
equipment, or motor vehicles owned or rented by the Consultant, or the
Consultant's agents, suppliers or contractors as well as to any temporary
structures, scaffolding and protective fences.
E. Waiver of Sulbirogatioin
The Consultant and the City waive all rights against each other any of their
Subcontractors, Sub-subcontractors, agents and employees, each of the other, for
damages caused by fire or other perils to the extend covered by Builders Risk
insurance or other property insurance obtained pursuant to the Insurance
Requirements Section of this Contract or other property insurance applicable to the
work. The policies shall provide such waivers by endorsement or otherwise.
IF., Accelptalbillity of ;I;un uair it
Insurance is to be placed with insurers with a current A.M. Best rating of not less
than A:VII.
G. V iriiffiic atiioin of Coverage
Consultant shall furnish the City with original certificates and a copy of the
amendatory endorsements, including but not necessarily limited to the additional
insured endorsement, evidencing the Automobile Liability and Commercial General
Liability insurance of the Consultant before commencement of the work.
H. SuIbcointiractoirs
Consultant shall include all subcontractors as insureds under its policies or shall
furnish separate certificates and endorsements for each subcontractor. All
coverages for subcontractors shall be subject to all of the same insurance
requirements as stated herein for the Consultant.
72
This page intentionally left blank.
73
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 220 Fourth Avenue S.
Kent, WA 98032-5895
Date: March 13, 2014
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: March 17, 2014
From: Toby Hallock, P.E., Environmental Engineer
Through: Chad Bieren, P.E., City Engineer
Subject: Boeing Levee Ecosystem Restoration Project — Funding Transfer
Item - 6
Motion: Move to recommend Council authorize the Mayor to transfer
$100,000 from the Lake Meridian Outlet Ecosystem Restoration Project to
the Boeing Levee Ecosystem Restoration Project, subject to final terms and
conditions acceptable to the City Attorney and the Public Works Director.
Summary:
The Corps of Engineers (Corps) needs additional funds to design the Boeing Levee
Ecosystem Restoration Project (ERP). The additional funds will allow the City to
achieve a design which meets a number of multi-objective goals, including salmon
habitat restoration, recreational interest, flood risk reduction, and levee
improvements, which then benefits the economic vitality of the valley.
As the initial Design Agreement for the Boeing Levee ERP, signed in 2012, focused
on the ecosystem portion of the project, additional funding is necessary to
accommodate the other project goals. The additional funds for the Boeing Levee ERP
are available from a previous contribution by the City to the Corps for the Lake
Meridian Outlet ERP, which was constructed in 2012. The Corps has estimated that
the City will be reimbursed $100,000 for its contribution into the project as the total
project cost was lower than anticipated. City staff is requesting that these funds are
transferred to the Boeing Levee ERP to complete a design that better fits our multi-
objective goals for the City.
Budget Impact:
There will be no impact to the budget as the credits available from the Lake Meridian
Outlet Project can be transferred to cover the additional cost of design.
74
This page intentionally left blank.
75
DEPARTMENT OF THE ARMY
I' SEATTLE DISTRICT,CORPS OF ENGINEERS
-� P.O. BOX 3755
SEATTLE,WASHINGTON 98124-3755
REPLY TO
ATTENTION OF
CENWS-PM-CP 03 February 2014
Toby Hallock
Project Engineer
City of Kent
400 West Gowe Street
Kent, WA98032
Dear Mr. Hallock:
In 2012 the City of Kent executed a Design Agreement with the U.S. Army Corps of Engineers
for the design of the Duwamish-Green Mainstream Maintenance Boeing Restoration Project, a
separable element of the Green/Duwamish Ecosystem Restoration Project. As outlined in the
Design Agreement, total design costs were estimated at $600,000.00, with the Non-Federal share
being $150,000.00 and the Federal share being $450,000.00. The total design costs included in
the Design Agreement was the Corps' best estimate at the time the parties signed the Design
Agreement.
The new estimated design costs are $955,000 with the Non-Federal share being $238,750 and the
Federal share being $716,250. The Corps has already received $130,000.00 from the City of
Kent which in combination with the $20,000.00 sponsor in-kind estimate constitutes the City's
25% Non-Federal cost-share to complete the design of the project. Additional non Fed funds
requested to complete design of the project are $100,000. Please review the attached design cost
allocation breakdown.
The Corps looks forward to continuing to work with the City of Kent on this important project.
Please let me know if you any questions at(206) 316-3966.
Sincerely,
Gordon Thomson
Project Manager
cc:
RM (Gapasin/Schmitz-Robinson)
PM-PB (Swanson)
PM-CP (Winkler)
N-PL-FILE
76
This page intentionally left blank.
77
A �
DESIGN AGREEMENT V"'1
BETWEEN
THE DEPARTMENT OF TH&ARMY _
AND
CITY OF KENT
FOR
DESIGN : (u f +' P
FOR THE
DUWAMISH/BOEING LEVEE ECOSYSTEM RESTORATION PROJECT
THIS AGREEMENT is entered into this /1A day of �eGb� , by
mid between the Department of the Andy (hereinafter the "Gove ent"), represented by
the U.S. Army Engineer, Seattle District and City of Kent(hereinafter the "Non-Federal
Sponsor"), represented by the Mayor of City of Kent.
WITNESSETH, THAT:
WHEREAS, Federal Construction, General funds for Fiscal Year 2003, included
funds for the Government to initiate design of the Duwamish/Green River Basin Project
for ecosystem restoration (hereinafter the"Parent Project") at Ding County, Washington;
WHEREAS,the Government and the Non-Federal Sponsor desire to enter into an
agreement(hereinafter the"Agreement") for the provision of design for the Duwamish/
Boeing Levee ecosystem restoration project (an element of the Parent Project and
hereinafter the "Project", as defined in Article I.A. of this Agreement);
WHEREAS, construction or implementation of the Project is authorized by
Section 101(b) (26) of the Water Resources Development Act of 2000,Public Law 106-
541 in accordance with the plans, and subject to the conditions, recommended in a final
report of the Chief of Engineers if a favorable report of the Chief is completed not later
than December 31, 2000; and a favorable final report of the Chief was completed on
December 29, 2000;
WHEREAS, Section 105(c) of the Water Resources Development Act of 1986,
Public Law 99-662 (33 U.S.C. 2215), provides that the costs of design of a water
resources project shall be shared in the same percentage as the purposes of such project;
WHEREAS, the Government and the Non-Federal Sponsor agree that, during the
period of design, the Non-Federal Sponsor shall contribute 25 percent of total design
costs and that, if a Project Partnership Agreement for construction of the Project is
executed between the Government and a non-Federal interest, such non-Federal interest
shall contribute any remaining portion of the non-Federal share of the costs of design in
accordance with the provisions of such Project Partnership Agreement;
78
WHEREAS, the Government and Non-Federal Sponsor have the full authority and
capability to perform as hereinafter set forth and intend to cooperate in cost-sharing and
financing of the Project in accordance with the terms of this Agreement; and
WHEREAS,the Government and the Non-Federal Sponsor, in connection with
this Agreement, desire to foster a partnering strategy and a working relationship between
the Government and the Non-Federal Sponsor through a mutually developed formal
strategy of commitment and communication embodied herein, which creates an
environment where trust and teamwork prevent disputes, foster a cooperative bond
between the Government and the Non-Federal Sponsor, and facilitate the successful
design and implementation of the Project.
NOW, TIIEREFORE,the Government and the Non-Federal Sponsor agree as
follows:
ARTICLE 1 -DEFINITIONS
A. The term"Project" shall mean levee improvements including setting back the
existing levee and habitat restoration along the right bank of the Green river from River
Mile 17.1 to River Mile 18 as generally described in the final report of the Chief of
Engineers dated December 29, 2000, and in the "Green/Duwamish River Basin
Ecosystem Restoration Study, Final Feasibility Report," dated October 2000 and
approved by the District Engineer, U.S. Army Corps of Engineers, Seattle District, on
October 30, 2000,
B. The term"total design costs" shall mean the sum of all costs incurred by the
Non-Federal Sponsor and the Government in accordance with the teens of this Agreement
directly related to design of the Project. Subject to the provisions of this Agreement,the
term shall include, but is not necessarily limited to:the Government's costs of engineering
and design, economic and environmental analyses, and evaluation performed after a
feasibility report whether performed prior to or after the effective date of this Agreement
that were not previously shared with a non-Federal interest pursuant to any other
agreement; the Government's supervision and administration costs;the Non-Federal
Sponsor's and the Government's costs of participation in the Design Coordination Team in
accordance with Article III of this Agreement;the Government's costs of contract dispute
settlements or awards; and the Non-Federal Sponsor's and the Government's costs of audit
in accordance with Article VILB. and Article VII.C. of this Agreement. The term does not
include any costs of betterments under Article iI.E. of this Agreement; any costs of dispute
resolution under Article V of this Agreement; any costs incurred as part of reconnaissance
studies for the Project; any costs incurred as part of feasibility studies under any other
agreement for the Project; the Non-Federal Sponsor's costs of negotiating this
Agreement; or any costs of negotiating a project partnership agreement for the Project or
separable element thereof.
C. The term`period of design" shall mean the time from the effective date of this
Agreement to the date that a Project Partnership Agreement for construction of the
2
79
Project, or a separable element thereof, is executed between the Government and a non-
Federal interest or the date that this Agreement is terminated in accordance with Article
X of this Agreement, whichever is earlier.
D. The tenor"financial obligations for design"shall mean the financial obligations
of the Government that result or would result in costs that are or would be included in total
design costs.
E. The tenn"non-Federal proportionate share" shall mean the ratio of the Non-
Federal Sponsor's total contribution of funds required by Article II.B.1. of this Agreement to
financial obligations for design, as projected by the Government
F. The terns "betterment" shall mean a difference in the design of an element of the
Project that results from the application of standards that the Government determines
exceed those that the Government would otherwise apply to the design of that element. The
terns does not include any design for features not included in the Project as defined in
paragraph A. of this Article.
G. The term"Federal program funds' shall mean funds provided by a Federal
agency, other than the Department of the Army, plus any non-Federal contribution
required as a matching share therefor.
H. The term "fiscal year"shall mean one year beginning on October 1 and ending
on September 30.
ARTICLE II - OBLIGATIONS OF THE GOVERNMENT AND
THE NON-FEDERAL SPONSOR
A. The Government, subject to receiving funds appropriated by the Congress of the
United States (hereinafter the"Congress") and using those runds and funds provided by the
Non-Federal Sponsor, expeditiously shall design the Project, applying those procedures
usually applied to Federal projects, in accordance with Federal laws,regulations, and
policies.
1. The Government shall not issue the solicitation for the first contract for
design of the Project or commence design of the Project using the Government's own
forces until the Non-Federal Sponsor has confinned in Nvriting its willingness to proceed
with design of the Prroject.
2. To the extent possible, the Government shall design the Project in
accordance with the Project Management Plan for the Project developed and updated as
required by the Government after consultation with the Non-Federal Sponsor.
3. The Government shall afford the Non-Federal Sponsor the opportunity to
review and comment on the solicitations for all contracts, including relevant scopes of work,
3 '
80
prior to the Government's issuance of such solicitations. To the extent possible, the
Government shall afford the Non-Federal Sponsor the opportunity to review and comment
on all proposed contract modifications, including change orders. In any instance where
providing the Non-Federal Sponsor with notification of a contract modification is not
possible prior to execution of the contract modification,the Government shall provide such
notification in writing at the earliest date possible. To the extent possible, the Government
also shall afford the Non-Federal Sponsor the opportunity to review and comment on all
contract claims prior to resolution thereof The Government shall consider in good faith the
comments of the Non-Federal Sponsor, but the contents of solicitations, award of contracts
or commencement of design using the Government's own forces, execution of contract
modifications,resolution of contract claims, and performance of all work on the Project
shall be exclusively within the control of the Government.
4. At the time the U.S. Army Engineer, Seattle District(hereinafter the
"District Engineer")furnishes the contractor with the Government's Written Notice of
Acceptance of Completed Work for each contract awarded by the Government for the
Project,the District Engineer shall furnish a copy thereof to the Non-Federal Sponsor.
5. The Government shall afford the Non-Federal Sponsor the opportunity
to review and comment on all design products that are developed by contract or by
Government personnel during the period oj'design. The Government shall consider in
good faith the comments of the Non-Federal Sponsor, but the final approval of all design
products shall be exclusively within the control of the Government.
6. Notwithstanding paragraph A.4. of this Article, if the award of any
contract for design of the Project, or continuation of design of the Project using the
Govennnent's own forces, would result in total design costs exceeding $600,000, the
Government and the Non-Federal Sponsor agree to defer award of that contract, award of
all remaining contracts for design of the Project, and continuation of design of the
Project using the Govemment's own forces until such time as the Government and the
Non Federal Sponsor agree in writing to proceed with further contract awards for the
Project or the continuation of design of the Project using the Government's own forces,
but in no event shall the award of contracts or the continuation of design of the Project
using the Government's own forces be deferred for more than three years.
Notwithstanding this general provision for deferral, in the event the Assistant Secretary
of the Army (Civil Works)makes a written determination that the award of such contract
or contracts or continuation of design of the Project using the Government's own forces
must proceed in order to comply with law or to protect human life or property from
imminent and substantial harm, the Government, after consultation with the Non-Federal
Sponsor, may award a contract or contracts, or continue with design of the Project using
the Government's own forces.
7. As of the effective date of this Agreement, $10,538,118 of Federal
funds for design and construction have been provided by Congress for the Parent Project
of which$700,000 is currently projected to be available for the Project. The Government
makes no commitment to request Congress to provide additional Federal funds for the
4
81
Parent Project or the Project. Further, the Government's financial participation in the
Project is limited to the Federal funds that the Government makes available to the
Project.
B. The Non-Federal Sponsor shall contribute 25 percent of total design costs in
accordance with the provisions of this paragraph.
1. The Non-Federal Sponsor shall provide funds in accordance with Article
N.B. of this Agreement in the amount necessary to meet the Non-Federal Sponsor's share
of 25 percent of total design costs if the Government projects at any time that the collective
value of the Non-Federal Sponsor's contributions under Article III and Article VlI of this
Agreement will be less than such share.
2. The Government, subject to the availability of funds, shall refund or
reimburse to the Non-Federal Sponsor any contributions in excess of 25 percent of total
design costs if the Government determines at any time that the collective value of the
following contributions has exceeded 25 percent of total design costs: (a) the value of the
Non-Federal Sponsor's contributions under paragraph B.1. of this Article; and (b)the value
of the Non-Federal Sponsor's contributions under Article III and Article VII of this
Agreement.
C. Upon conclusion of the period of design, the Government shall conduct an
accounting,in accordance with Article N.C. of this Agreement, and furnish the results to
the Non-Federal Sponsor.
D. The Non-Federal Sponsor shall not use Federal program,fiends to meet any of its
obligations for the Project under this Agreement unless the Federal agency providing the
Federal portion of such funds verifies in writing that expenditure of such funds for such
purpose is expressly authorized by Federal law.
E. The Non-Federal Sponsor may request the Government to include betterments
in the design of the Project. Such requests shall be in writing and shall describe the
betterments requested to be included in the design of the Project. If in its sole discretion
the Government elects to include such betterments or any portion thereof in the design of
the Project, it shall so notify the Non-Federal Sponsor in a writing that sets forth any
applicable terms and conditions, which must be consistent with this Agreement. In the
event of conflict between such a writing and this Agreement, this Agreement shall
control. The Government shall allocate the costs of the Project features that include
betterments between total design costs and the costs of the betterments. The Non-Federal
Sponsor shall be solely responsible for all costs of design of the betterments by the
Government under this paragraph and shall pay all such costs in accordance with Article
N.D. of this Agreement.
F. If the Government and a non-Federal interest enter into a Project Partnership
Agreement for construction of the Project, or a separable element thereof, the
Government, in accordance with the provisions of this paragraph, shall include the
5
82
amount of total design costs in total project costs for the Project or separable element
thereof. Further, the Government, in accordance with the provisions of this paragraph,
shall afford credit toward the non-Federal interest's share of total project costs for the
Project, or separable element thereof, for the Non-Federal Sponsor's contributions
toward total design costs under this Agreement.
1. If the Government and a non-Federal interest enter into a Project
Partnership Agreement for construction of the entire Project,the Government shall
include the amount of total design costs in total project costs for the Project. Further, the
Government shall afford credit toward the non-Federal interest's share of total project
costs for the Non-Federal Sponsor's contributions toward total design costs, including
any excess amount determined in accordance with Article IV.C.2. or Article IV.D.3.b. of
this Agreement that was not refunded or reimbursed by the Government.
2. If the Government and a non-Federal interest enter into a Project
Partnership Agreement for construction of a separable clement of the Project,the
Government shall determine the portion of total design costs that are allocable to such
separable element and include such amount in total project costs for such separable
element. Further, the Government shall determine the amount of the Non-Federal
Sponsor's contributions toward total design costs, including any excess amount
determined in accordance with Article IV.C.2. or Article IV.D.3.b. of this Agreement that
was not refunded or reimbursed by the Government, that are allocable or attributable to
such separable element and shall afford credit for such amount toward the non-Federal
interest's share of total project costs of such separable element.
3. If the Government and a non-Federal interest do not enter into a Project
Partnership Agreement for construction of the Project or a separable element thereof,the
Government shall not be obligated to refund or reimburse the Non-Federal Sponsor, in
whole or in part, for the Non-Federal Sponsor's 25 percent contribution of total design
costs. Further, rcfand or reimbursement by the Government for any excess amount
determined in accordance with Article IV.C.2. or Article 1V.D.3.b. of this Agreement is
subject to the availability of funds.
4. Notwithstanding any other provisions of Article ILF of this Agreement,
any amount credited for the value of the Non-Federal Sponsor's contributions toward
total design costs provided in accordance with Articles Ill an VIl of this Agreement shall
not be applied toward the 5 percent cash share required by Section 103(a)(1)(A) of the
Water Resources Development Act of 1986, Public Law 99-662, as amended (33 U.S.C.
2213(a)(1)(A))•
G. This Agreement shall not be construed as obligating either party to seek funds
for, or to participate in, construction or implementation of the Project or a separable
element thereof or as relieving the Non-Federal Sponsor of any future obligation under
the terms of any Project Partnership Agreement.
6
83
ARTICLE III - DESIGN COORDINATION TEAM
A. To provide for consistent and effective communication, the Non-Federal Sponsor
and the Government,not later than 30 calendar days after the effective date of this
Agreement, shall appoint named senior representatives to a Design Coordination Team.
Thereafter,the Design Coordination Team shall meet regularly until the end of the period of
design. The Government's Project Manager and a counterpart named by the Non-Federal
Sponsor shall co-chair the Design Coordination Team.
B. The Government's Project Manager and the Non-Federal Sponsor's counterpart
shall keep the Design Coordination Team informed of the progress of design and of
significant pending issues and actions,and shall seek the views of the Design Coordination
Team on matters that the Design Coordination Team generally oversees.
C. Until the end of the period of design, the Design Coordination Team shall
generally oversee the Project, including matters related to: design; completion of all
necessary environmental coordination and documentation; scheduling of reports and work
products;plans and specifications;real property and relocation requirements for
construction of the Project; design contract awards and modifications; design contract costs;
the Government's cost projections; anticipated requirements and needed capabilities for
performance of operation,maintenance,repair,rehabilitation,and replacement of the
Project including issuance of permits; and other matters related to the Project. This
oversight of the Project shall be consistent with a project management plan developed by
the Government after consultation with the Non-Federal Sponsor.
D. The Design Coordination Team may make recommendations to the District
Engineer on matters related to the Project that the Design Coordination Team generally
oversees,including suggestions to avoid potential sources of dispute. The Government in
good faith shall consider the recommendations of the Design Coordination Team. The
Government, having the legal authority and responsibility for design of the Project,has the
discretion to accept or reject, in whole or in part,the Design Coordination Team's
recommendations.
E. The Non-Federal Sponsor's costs of participation in the Design Coordination
"ream shall be included in total design costs and shared in accordance with the provisions
of this Agreement, subject to an audit in accordance with Article VII.C. of this
Agreement to determine reasonableness, allocability, and allowability of such costs. The
Government's costs of participation in the Design Coordination Team shall be included
in total design costs and shared in accordance with the provisions of this Agreement.
ARTICLE IV - METHOD OF PAYMENT
7
84
A. In accordance with the provisions of this paragraph, the Government shall
maintain current records and provide to the Non-Federal Sponsor current projections of
costs, financial obligations, and the contributions provided by the parties.
1. As of the effective date of this Agreement, total design costs are
projected to be$600,000; the Non-Federal Sponsor's contribution of funds required by
Article II.13.1. of this Agreement is projected to be $150,000; the non-Federal
proportionate share is projected to be 21.7 percent; and the Government's total financial
obligations to be incurred to include betterments in the design of the Project and the Non-
Federal Sponsor's contribution of funds for such costs required by Article II.F,. of this
Agreement are projected to be$0. These amounts and percentage are estimates subject to
adjustment by the Government, after consultation with the Non-Federal Sponsor, and are
not to be construed as the total financial responsibilities of the Government and the Non-
Federal Sponsor.
i
2. By September 2012 and by each quarterly anniversary thereof until the
conclusion of the period of design and resolution of all relevant claims and appeals, the
Government shall provide the Non-Federal Sponsor with a report setting forth all
contributions provided to date and the current projections of the following: total design
costs; the Non-Federal Sponsor's total contribution of fiords required by Article II.B.1. of
this Agreement;the non-Federal proportionate share; the total contribution of finds
required from the Non-Federal Sponsor for the upcoming contract and upcoming fiscal
year; and the Government's total financial obligations to be incurred to include
betterments in the design of the Project and the Non-Federal Sponsor's contribution of
funds for such costs required by Article II.E. of this Agreement.
B. The Non-Federal Sponsor shall provide the contribution of fiords required by
Article I1.B.1. of this Agreement in accordance with the provisions of this paragraph.
1. Not less than 30 calendar days prior to the scheduled date for issuance
of the solicitation for the first contract for design of the Project or commencement of
design of the Project using the Government's own forces, the Government shall notify
the Non-Federal Sponsor in writing of such scheduled date and the funds the Government
determines to be required from the Non-Federal Sponsor to meet: (a)the non-Federal
proportionate share of financial obligations for design incurred prior to the
commencement of the period of design; (b)the projected non Federal proportionate
share of financial obligations for design to be incurred for such contract; and (c)the
projected non-Federal proportionate share of,financial obligations_for°design using the
Government's own forces through the first fiscal year. Not later than such scheduled
date, the Non-Federal Sponsor shall provide the Government with the full amount of such
required funds by delivering a check payable to "FAO, USACD, USACE Seattle District"
to the District Engineer, or verifying to the satisfaction of the Government that the Non-
Federal Sponsor has deposited such required funds in an escrow or other account
acceptable to the Government, with interest accruing to the Non-Federal Sponsor, or by
presenting the Government with an irrevocable letter of credit acceptable to the
8
85
Government for such required funds, or by providing an Electronic Funds Transfer of
such required funds in accordance with procedures established by the Government.
2. "thereafter, amid the design of the Project is complete, the Government
shall notify the Non-Federal Sponsor in writing of the funds the Government determines
to be required from the Non-Federal Sponsor, and the Non-Federal Sponsor shall provide
such funds in accordance with the provisions of this paragraph.
a. The Government shall notify the Non-Federal Sponsor in
writing,no later than 60 calendar days prior to the scheduled date for issuance of the
solicitation for each remaining contract for design of the Project, of the funds the
Government determines to be required from the Non-Federal Sponsor to meet the
projected non-Federal proportionate share offinancial obligations for design to be
incurred for such contract. No later than such scheduled date, the Non-Federal Sponsor
shall make the full amount of such required funds available to the Government through
any of the payment mechanisms specified in paragraph B.1. of this Article.
b. The Government shall notify the Non-Federal Sponsor in
writing, no later than 60 calendar days prior to the beginning of eachfiscal year in which
the Government projects that it will make financial obligations.for design of the Project
using the Government's own forces, of the funds the Government determines to be
required from the Non-Federal Sponsor to meet the projected non-Federal proportionate
share of financial obligations.for design using the Government's own forces for that
fiscal year. No later than 30 calendar days prior to the beginning of that fiscal year the
Non-Federal Sponsor shall make the full amount of such required funds for that fiscal
year available to the Government through any of the payment mechanisms specified in
paragraph B.1. of this Article.
3. The Government shall draw from the funds provided by the Non-
Federal Sponsor such sums as the Government deems necessary to cover: (a)the non-
Federal proportionate share of financial obligations for°design incurred prior to the
commencement of the period of design; and(b)the non-Federal proportionate share of
financial obligations for design as financial obligations for design are incurred. Hat any
time the Government determines that additional funds will be needed from the Non-
Federal Sponsor to cover the Non-Federal Sponsor's share of such financial obligations
for the current contract or to cover the Non-Federal Sponsor's share of such financial
obligations for work performed using the Govermnent's own forces in the current fiscal
year the Government shall notify the Non-Federal Sponsor in writing of the additional
funds required and provide an explanation of why additional funds are required. Within
60 calendar days from receipt of such notice, the Non-Federal Sponsor shall provide the
Government with the full amount of such additional required funds through any of the
payment mechanisms specified in paragraph B.1. of this Article.
C. Upon conclusion o f the period of design and resolution of all relevant claims
and appeals,the Government shall conduct a final accounting and famish the Non-
Federal Sponsor with written notice of the results of such final accounting. if outstanding
9
86
relevant claims and appeals prevent a final accounting from being conducted in a timely
manner, the Government shall conduct an interim accounting and furnish the Non-
Federal Sponsor with written notice of the results of such interim accounting. Once all
outstanding relevant claims and appeals are resolved, the Government shall amend the
interim accounting to complete the final accounting and furnish the Non-Federal Sponsor
with written notice of the results of such final accounting. The interim or final
accounting, as applicable, shall determine total design costs. In addition, the interim or
final accounting, as applicable, shall determine each party's required share thereof, and
each party's total contributions thereto as of the date of such accounting.
1. Should the interim or final accounting, as applicable, show that the
Non-Federal Sponsor's total required share of total design costs exceeds the Non-Federal
Sponsor's total contributions provided thereto, the Non-Federal Sponsor, no later than 90
calendar days after receipt of written notice from the Government, shall make a payment
to the Government in an amount equal to the difference by delivering a check payable to
"FAO,USAED, USACE Seattle District" to the District Engineer or by providing an
Electronic Funds Transfer in accordance with procedures established by the Government.
2. Should the interim or final accounting, as applicable, show that the
total contributions provided by the Non-Federal Sponsor for total design costs exceed the
Non-Federal Sponsor's total required share thereof, the Government, subject to the
availability of funds, shall refund or reimburse the excess amount to the Non-Federal
Sponsor within 90 calendar days of the date of completion of such accounting. In the
event the Non-Federal Sponsor is due a refund or reimbursement and fiords are not
available to refund or reimburse the excess amount to the Non-Federal Sponsor,the
Government shall seek such appropriations as are necessary to make the refund or
reimbursement. If such appropriations are not received or,if the Non-Federal Sponsor
requests that the Government not refund or reimburse the excess amount to the Non-
Federal Sponsor, the Government shall apply the excess amount toward the share of total
project costs for the Project that is required of the non-Federal interest executing a
Project Partnership Agreement or agreements for[lie Project or separable element thereof
in accordance with Article II.F. of this Agreement.
D. The Non-Federal Sponsor shall provide the contribution of funds required by
Article ILE. of this Agreement to include betterments in the design of the Project in
accordance with the provisions of this paragraph.
1. Not less than 60 calendar days prior to the scheduled date for the first
financial obligation to include betterments in the design of the Project, the Government
shall notify the Non-Federal Sponsor in writing of such scheduled date and of the full
amount of funds the Government determines to be required from the Non-Federal
Sponsor to cover the costs of design of such betterments. No later than 30 calendar clays
prior to the Govermuent incurring any financial obligation for design ol'such hettermenis,
the Non-Federal Sponsor shall provide the Government with the full amount of the funds
10
87
i
required to cover the costs of design of such betterments through any of the payment
mechanisms specified in paragraph B.1. of this Article.
2. The Government shall draw from the funds provided by the Non-
Federal Sponsor such sums as the Government deems necessary to cover the
Government's financial obligations for design of such betterments as they are incurred.
Hat any time the Government determines that the Non-Federal Sponsor must provide
additional funds w pay for design of such betterments, the Government shall notify the
Non-Federal Sponsor in writing of the additional funds required and provide an
explanation of why additional funds are required. Within 30 calendar days from receipt
of such notice, the Non-Federal Sponsor shall provide the Government with the full
amount of such additional required funds through any of the payment mechanisms
specified in paragraph B.1. of this Article.
3. At the time the Government conducts the interim or final accounting,
as applicable, the Government shall conduct an accounting of the Government's financial
obligations to include betterments in the design of the Project and furnish the Non-
Federal Sponsor with written notice of the results of such accounting. If outstanding
relevant claims and appeals prevent a final accounting of design of such betterments from
being conducted in a timely manner,the Government shall conduct an interim accounting
of design of such betterments and furnish the Non-Federal Sponsor with written notice of
the results of such interim accounting. Once all outstanding relevant claims and appeals
are resolved, the Government shall amend the interim accounting of design of such
betterments to complete the final accounting of design of such betterments and furnish
the Non-Federal Sponsor with written notice of the results of such final accounting. Such
interim or final accounting, as applicable, shall determine the Government's total
financial obligations for design of such betterments and the Non-Federal Sponsor's
contribution of funds provided thereto as of the date of such accounting.
a. Should the interim or final accounting, as applicable, show that
the total obligations for including betterments in the design of the Project exceed the total
contribution of funds provided by the Non-Federal Sponsor for design of such
betterments, the Non-Federal Sponsor, no later than 90 calendar days after receipt of
written notice from the Government, shall make a payment to the Government in an
amount equal to the difference by delivering a check payable to "FAO, USAED, USACE
Seattle District"to the District Engineer or by providing an Electronic Funds Transfer in
accordance with procedures established by the Government.
b. Should the interim or final accounting, as applicable, show that
the total contribution of funds provided by the Non-Federal Sponsor for including
betterments in the design of the Project exceeds the total obligations for design of such
betterments, the Government, subject to the availability of funds, shall refund the excess
amount to the Non-Federal Sponsor within 90 calendar days of the date of completion of
such accounting. In the event the Non-Federal Sponsor is due a refund and funds are not
available to refund the excess amount to the Non-Federal Sponsor,the Government shall
seek such appropriations as are necessary to make the refund. If such appropriations are
11
88
not received or, if the Non-Federal Sponsor requests that the Government not refund the
excess amount to the Non-Federal Sponsor, the Government shall apply the excess
amount toward the share of total project costs for the Project that is required of the non-
Federal interest executing a Project Partnership Agreement or agreements for the Project
or separable element thereof in accordance with Article II.F. of this Agreement.
ARTICLE V -DISPUTE RESOLUTION
As a condition precedent to a party bringing any suit for breach of this
Agreement, that party must first notify the other party in writing of the nature of the
purported breach and seek in good faith to resolve the dispute through negotiation. If the
parties cannot resolve the dispute through negotiation, they may agree to a mutually
acceptable method of non-binding alternative dispute resolution with a quali I-ed third
party acceptable to both parties. Each party shall pay an equal share of any costs for the
services provided by such a third party as such costs are incurred. The existence of a
dispute shall not excuse the parties from performance pursuant to this Agreement.
ARTICLE VI—HOLD AND SAVE
Subject to the provisions of Article XIII of this Agreement, the Non-Federal Sponsor
shall hold and save the Government free from all damages arising from design of the
Projeel and any betterments,except for damages due to the fault or negligence of the
Government or its contractors.
ARTICLE V11- MAINTENANCE OF RECORDS AND AUDIT
A. Not Later than 60 calendar days after the effective date of this Agreement, the
Government and the Non-Federal Sponsor shall develop procedures for keeping books,
records, documents, or other evidence pertaining to costs and expenses incurred pursuant to
this Agreement. These procedures shall incorporate, and apply as appropriate,the standards
for financial management systems set forth in the Uniform Administrative Requirements for
Grants and Cooperative Agreements to State and Local Governments at 32 C.P.R. Section
33.20. The Government and the Non-Federal Sponsor shall maintain such books,records,
documents, or other evidence in accordance with these procedures and for a minimum of
three years after completion ol'the accounting for which such books,records, documents, or
other evidence were required. To the extent permitted under applicable Federal laws and
regulations,the Government and the Non-Federal Sponsor shall each allow the other to
inspect such books,records, documents, or other evidence.
B. In accordance with 32 C.F.R. Section 33.26,the Non-Federal Sponsor is
responsible for complying with the Single Audit Act Amendments off996 (31 U.S.C. 7501-
7507), as implemented by Office of Management and Budget(OMB) Circular No. A-133
and Department ol'Defense Directive 7600.10. [Jpon request of the Non-Federal Sponsor
12
89
and to the extent permitted under applicable Federal laws and regulations,the Government
shall provide to the Non-Federal Sponsor and independent auditors any information
necessary to enable an audit of the Non-Federal Sponsor's activities under this Agreement.
The costs of any non-Federal audits performed in accordance with this paragraph shall be
allocated in accordance with the provisions of OMB Circulars A-87 and A-133, and such
costs as are allocated to the Project shall be included in total design costs and shared in
accordance with the provisions of this Agreement.
C. In accordance with 31 U.S.C. 7503,the Govemment may conduct audits in
addition to any audit that the Non-Federal Sponsor is required to conduct under the Single
Audit Act Amendments of 1996. Any such Government audits shall be conducted in
accordance with Government Auditing Standards and the cost principles in OMB Circular
No. A-87 and other applicable cost principles and regulations. The costs of Government
audits perdonned in accordance with this paragraph shall be included in total design costs
and shared in accordance with the provisions of this Agreement.
ARTICLE VIII -FEDERAL AND STATE LAWS
In the exercise of their respective rights and obligations under this Agreement, the
Non-Federal Sponsor and the Government shall comply with all applicable Federal and
State laws and regulations, including, but not limited to: Section 601 of the Civil Rights
Act of']964, Public Law 88-352 (42 U.S.C. 2000d) and Department of Defense Directive
5500.11 issued pursuant thereto and Army Regulation 600-7, entitled "Nondiscrimination
on the Basis of Handicap in Programs and Activities Assisted or Conducted by the
Department of the Army".
ARTICLE IX - RELATIONSIIIP OF PARTIES
A. In the exercise of their respective rights and obligations under this Agreement,
the Government and the Non-Federal Sponsor each act in an independent capacity, and
neither is to be considered the officer, agent, or employee of the other.
B. In the exercise of its rights and obligations under this Agreement,neither party
shall provide,without the consent of the other party, any contractor with a release that
waives or purports to waive any rights the other party may have to seek relief or redress
against that contractor either pursuant to any cause of action that the other party may have or
for violation of any law.
ARTICLE X - TERMINATION OR SUSPENSION
A. If at any time the Non-Federal Sponsor fails to fulfill its obligations under this
Agreement,the Assistant Secretary of the Army (Civil Works) shall terminate this
Agreement or suspend future performance under this Agreement unless he determines that
13
90
continuation of design of the Projeet is in the interest of the United Stales or is necessary in
order to satisfy agreements with any other non-Federal interests in connection with the
Project.
B. In the event the Government projects that the amount of Federal fiords the
Government will make available to the Project through the then-current fiscal year, or the
amount of Federal funds the Government will make available for the Project through the
upcoming fiscal year, is not sufficient to meet the Federal share of total design costs that
tine Government projects to be incurred through the then-current or upcoming.fiscal year,
as applicable, the Government shall notify the Non-Federal Sponsor in writing of such
insufficiency of funds and of the date the Government projects that the Federal funds that
will have been made available to the Project will be exhausted. Upon the exhaustion of
Federal funds made available by the Government to the Project, future performance
under this Agreement shall be suspended. Such suspension shall remain in effect until
such time that the Government notifies the Non-Federal Sponsor in writing that sufficient
Federal funds are available to meet the Federal share of total design costs the
Government projects to be incurred through the then-current or upcoming fiscal year, or
the Government or the Non-Federal Sponsor elects to terminate this Agreement.
C. In the event the Government determines that modifications to the Project are
required and that additional authorization by Congress will be required before the
Government may construct such modifications,the Government shall notify the Non-
Federal Sponsor in writing of such determinations and shall terminate this Agreement.
D. In the event that this Agreement is terminated pursuant to this Article,both
parties shall conclude their activities relating to the Project and conduct an accounting in
accordance with Article IV.C. of this Agreement To provide for this eventuality,the
Government may reserve a percentage of total Federal funds made available lot the
Project and an equal percentage of the total funds contributed by the Non-Federal
Sponsor in accordance with Article II.B.1. of this Agreement as a contingency to pay
costs of termination, including any costs of resolution of contract claims and contract
modifications.
E. Any termination of this Agreement or suspension of future pertonnance under
this Agreement in accordance with this Article shall not relieve the parties of liability for
any obligation previously incurred. Any delinquent payment owed by the Non-Federal
Sponsor shall be charged interest at a rate,to be determined by the Secretary of the
Treasury, equal to 150 per centum of the average bond equivalent rate of the 13 week
Treasury bills auctioned immediately prior to the date on which such payment became
delinquent, or auctioned immediately prior to the beginning of each additional 3 month
period if the period of delinquency exceeds 3 months.
ARTICLE XI -NOTICES
14
91
A. Any notice, request, demand, or other communication required or permitted to be
given under this Agreement shall be deemed to have been duly given if in writing and
delivered personally or sent by telegram or mailed by first-class,registered, or certified mail,
as follows:
If to the Non-Federal Sponsor:
Public Works Department
City of Kent
220 Fourth Ave S
Kent, WA 98032-5895
If to the Government:
Chief,Planning Branch,PPNM
Seattle District, Corps of Engineers
P.O. Box 3755
Seattle,WA 98124-3755
B. A party may change the address to which such communications are to be
directed by giving written notice to the other party in the manner provided in this Article.
C. Any notice,request, demand, or other communication made pursuant to this
Article shall be deemed to have been received by the addressee at the earlier of such time as
it is actually received or seven calendar days after it is mailed.
ARTICLE XII- CONFIDENTIALITY
To the extent permitted by the laws governing each party, the parties agree to
maintain the confidentiality of exchanged information when requested to do so by the
providing patty.
ARTICLE XIII - OBLIGATIONS OF FUTURE APPROPRIATIONS
A. Nothing herein shall constitute, nor be deemed to constitute, an obligation of
future appropriations by the City Council of City of Kent, where creating such an
obligation would be inconsistent with Section 35A.33.075 of Revised Code of
Washington.
B. The Non-Federal Sponsor intends to fulfill its obligations under this
Agreement. The Non-Federal Sponsor shall include in its budget request or otherwise
propose appropriations of fiords in amounts sufficient to fulfill these obligations for that
15
92
year and shall use all reasonable and lawful means to secure those appropriations. The
Non-Federal Sponsor reasonably believes that funds in amounts sufficient to fulfill these
obligations lawfully can and will be appropriated and made available for this purpose. In
the event funds are not appropriated in amounts sufficient to fu1f111 these obligations, the
Non-Federal Sponsor shall use its best efforts to satisfy any requirements for payments or
contributions of funds under this Agreement from any other source of funds legally
available for this purpose. Further,if the Non-Federal Sponsor is unable to fulfill these
obligations, the Government may exercise any legal rights it has to protect the
Government's interests related to this Agreement.
IN WITNESS WHEREOF,the parties hereto have executed this Agreement,which
shall become effective upon the date it is signed by the District Engineer.
DEPARTMENT OF THE ARMY CITY OF KENT
BY: BY:
CE A. ESTOK ZE.TE COOICE
Colonel, Corps of Engineers ,,,/IvIAY6R, CITY OF KENT
DISTRICT ENGINEER
DATE: 1 DATE: 5/2 `
16
93
CERTIFICATE OF AUTHORITY
do hereby certify that I am the principal legal officer of
the City of Kent,that the C ty of Kent is a legally constituted public body with full authority
and legal capability to perform the terms of the Agreement between the Department of the
Army and the City of Kent in connection with design of the Duwamish/Boeing Levee
Ecosystem Restoration Project, and to pay damages, if necessary, in the event of the failure
to perform in accordance with the terms of this Agreement and that the persons who have
executed this Agreement on behalf of the City of Kent have acted within their statutory
authority.
rN WITNESS WHEN OF,I have made and executed this certification this
day of r200,
r ,
y F
RE �o� ✓
Al quir Fit2patricic
Depu City Attorney
17
94
CEKIWWATION REGARDING LOBBYING
The undersigned certifies, to the best of his or her knowledge and belief that:
(1)No Federal appropriated funds have been paid or will be paid, by or on behalf
of the undersigned,to any person for influencing or attempting to influence an officer or
employee of any agency, a Member of Congress, an officer or employee of Congress, or
an employee of a Member of Congress in connection with the awarding of any Federal
contract, the making of any Federal grant, the making of any Federal loan, the entering
into of any cooperative agreement, and the extension, continuation, renewal, amendment,
or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be
paid to any person for influencing or attempting to influence an officer or employee of
any agency, a Member of Congress, an officer or employee of Congress, or an employee
of a Member of Congress in connection with this Federal contract, grant, loan, or
cooperative agreement,the undersigned shall complete and submit Standard Form-LLL,
"Disclosure Form to Report Lobbying," in accordance with its instructions.
(3) The undersigned shall require that the language of this certification be
included in the award documents for all subawards at all tiers (including subcontracts,
subgrants; and contracts under grants, loans, and cooperative agreements) and that all
subrecipients shall certify and disclose accordingly.
'Phis certification is a material representation of fact upon which reliance was
placed when this transaction was made or entered into. Submission of this certification is
a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352.
Any person who fails to file the required certification shall be subject to a civil penalty of
not less than $10,000 and not more than $100,000 for each such failure.
$u tte dooke
:mayor;City of'Kent
/j 1f
DAFE:
1x
95
NON-FEDERAL SPONSER'S
SELF-CERTIFICATION OF FINANCIAL CAPABILITY
FOR AGREEMENTS
I, R. J. Nachlinger, do hereby certify that I am the Director of Finance of the City of Kent,Washington;
that I am aware of the financial obligations of the City of Kent for the Boeing Levee Ecosystem
restoration project; and that the City of Kent has the financial capability to satisfy the City of Kent's
obligations under the Design Agreement for the Duwamish/Green Boeing Levee Ecosystem
restoration project.
In witness whereof, i have made and executed this certification this first day of June, 2012.
I,.
t
R.J. Nachlinger
Finance Director
i
96
This page intentionally left blank.
97
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 220 Fourth Avenue S.
Kent, WA 98032-5895
Date: March 7, 2014
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: March 17, 2014
From: Gina Hungerford, Conservation Coordinator
Through: Kelly Peterson, AICP, Environmental Conservation Supervisor
Mike Mactutis, P.E., Environmental Engineering Manager
Chad Bieren, P.E., City Engineer
Subject: Information Only/City-Wide Spring Clean Event
Item - 7
Motion:
Information Item/No Motion Required
Summary:
The 2"" Annual City-Wide Litter Cleanup has been postponed to May 17, 2014,
to facilitate partnering with the Kent Downtown Partnership. The May timeframe will
likely be more accommodating with the weather. Residents are encouraged to sign
up online at www.KentWA.aov/LitterFreeEventRegistration.
Budget Impact:
None
98
This page intentionally left blank.
99
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 220 Fourth Avenue S.
Kent, WA 98032-5895
Date: March 6, 2014
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: March 17, 2014
From: Bill Thomas, Street Superintendent
Through: Dave Brock, P.E., Interim Operations Manager
Subject: Update on Pavement Conditions
Item - 8
Information Only/No Motion Required
Summary:
Staff will give an update on the condition of the city's pavement following the winter
season and our efforts to keep up with deteriorated pavement and potholes.
Budget Impact:
N/A
100
This page intentionally left blank.
101
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 220 Fourth Avenue S.
Kent, WA 98032-5895
Date: March 6, 2014
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: March 17, 2014
From: Bill Thomas, Street Superintendent
Through: Chad Bieren, P.E., City Engineer
Subject: Information Only/Update on Bridge Inventory and Inspection
Item - 9
Information Only/No Motion Required
Summary:
Staff will update the Committee on the city's bridge inventory, inspection and
maintenance program.
Budget Impact:
N/A
102
This page intentionally left blank.
103
PUBLIC WORKS DEPARTMENT
Timothy J. LaPorte P.E., Public Works Director
Phone: 253-856-5500
KEN T Fax: 253-856-6500
WASH IN GTO N Address: 220 Fourth Avenue S.
Kent, WA 98032-5895
Date: March 6, 2014
To: Chair Dennis Higgins and Public Works Committee Members
PW Committee Meeting Date: March 17, 2014
From: Chad Bieren, P.E., City Engineer
Subject: Information Only/Coal and Crude Oil Train Update
Item - 10
Information Only/No Motion Required
Summary:
Staff will update the Committee on coal and crude oil trains.
Budget Impact:
N/A