Loading...
HomeMy WebLinkAboutCity Council Committees - Public Works/Planning - 05/20/2013 (3) 1 Public Works Committee Agenda /'''► Councilmembers: Dana Ralph+Dennis Higgins+Elizabeth Albertson, Chair �1 KENT WAs Ill I4�roN May 20, 2013 4:00 p.m. Item Description Action Speaker Time Pace 1. Approval of Minutes Dated May 6, 2013 YES None 03 03 2. DRAFT 2014-2019 Six-Year Transportation YES Cathy Mooney 15 09 Improvement Program (TIP) 3. Information Only/Hawley Road Levee NO Mark Howlett 10 73 Improvements - Phase II Change Order 4. Information Only/Recycling Event for NO Gina Hungerford 05 75 Residents - June 1, 2013 5. Information Only/Kent Litter Free Event - NO Gina Hungerford 05 77 June 8, 2013 Unless otherwise noted, the Public Works Committee meets at 4:00 p.m. on the 1"& 3rd Mondays of each month. Council Chambers East, Kent City Hall, 220 4th Avenue South, Kent, 98032-5895. For information please contact Public Works Administration (253) 856-5500. Any person requiring a disability accommodation should contact the City Clerk's Office at (253) 856-5725 in advance. For TDD relay service call the Washington Telecommunications Relay Service at 1-800-833-6388. z This page intentionally left blank. PUBLIC WORKS COMMITTEE 3 May 6, .2013 COMMITTEE MEMBERS PRESENT: Committee Chair Elizabeth Albertson and Committee members Dana Ralph and Dennis Higgins were present. The meeting was called to order at 4:10 p.m. Item 1 — Approval of Meetina Minutes Dated April 15, 2013: Committee member Higgins MOVED to approve the minutes of April 15, 2013. The motion was SECONDED by Council member Ralph and PASSED 3-0. Item 2 — Information Only/Water Festival - Update: Gina Hungerford gave a brief overview of the Water Festival that took place on March 26 and 27 at Green River Community College in Auburn. The Water Festival has taken place for the past 14 years. This year there were 1,600 registered fourth and fifth graders from 14 schools; 8 from Kent and 6 from Auburn, Lake -Haven Water District, in Federal Way also participated in this event. The two day event included the following presentations: • The Water Magic Show with Master Magician Steffan Soule. Steffan awed the kids with his magic when he took water and turned it into a solid (ice) and then into a gas (steam). • Critters from Point Defiance Zoo — taking care of the environment not just for people, but for all living things. • Awesome Water Bugs — the kind of bugs found indicate water quality • Trees & Our Water — kids planted small trees learning how trees play an important role in the water cycle, moving water from the earth to the air. • Marine Science Technology Center — Underwater Sea Life where Sponge Bob Square Pants started the conversation and inspired learning about life in Puget Sound. Hungerford gave committee members a handout of the campus maps and a list of presenters and schools that attended the Water Festival. Committee member Higgins thanked Gina for the success of this festival stating that his wife works in the school district and is reminded by their daughter not to drink bottled water but to purchase a refillable bottle instead. Public Works Director, Tim LaPorte and committee members Albertson and Ralph also thanked Hungerford for a job well done. Information Only/No Motion Required Item 3 —Waiver of Bidding and Signature Procurement Code Reauirements• Fleet Superintendent, Ron Green briefed the committee regarding the city's practice to expedite purchase of services, materials and supplies to repair PUBLIC WORKS COMMITTEE 4 May 6, .2013 equipment that has been damaged or isn't working and put it back in service as quickly as possible. The purpose of this motion is to authorize this limited exception to the city's procurement code. There was much discussion among staff and committee members as to what the motion includes and what it really means. Green noted that fleet is the largest procurement card user in the city. Green went over the following items: • Current Procurement Practices • Procurement Process & Steps • Benefits of using this type of procurement code • How Often they are 'over the limit" • Dollar Limit Safeguards - against abuse • Fuel Charges account for 50% of the total purchases for fleet • Parts for New Equipment - when equipment has been damaged? • Expensive Repairs - Vactor truck needed a new fan at a cost of $27,000 • Accident Damage - i.e., 3 new police vehicles were in an accident and need to be replaced as soon as possible. City Attorney, Tom Brubaker noted that it is important to get vehicles and equipment back in service. Brubaker noted this has been the past practice and what we have always done. He would like to make it official with the committee's authorization. Higgins stated he would like staff to prepare quarterly reports for large expenditures and share them with the committee. It was decided that a motion would not be made at this time. This item will come back to the Public Works Committee meeting with more detailed information. Item 4 - Information Only/Street Vegetation - Update Scott Schroeder went through a series of pictures showing what the street vegetation crews are responsible for. Schroeder noted the following: • Color Zoned & Inventory Map stating when and what zones particular parts of the city are mowed. Information can be found on the city's website at http://www.ci.kent.wa.us/L)ublicworks/maL)s.asL)x?id=16163. • There are 320 lane miles of roadside to mow • We have 11 lane miles of planted traffic islands to mow • There are 3 side arm mowers in use at all times during the season, one mowing each portion of the city - east, west and the downtown core of Kent. PUBLIC WORKS COMMITTEE 5 May 6, .2013 • There is 16 million square feet of side arm mowing done each mowing season. That equals 15,000 square feet of land per hour. Schroeder went on to explain the different areas that his crew maintains on a weekly, bi-weekly or monthly basis and the challenges encountered in maintaining those areas. Information Only/No Motion Required Item 5 — Consultant Services Agreement/Noel, Inc. for Engineering Services/Green River Flood Protection, Emeraencv Flood Response & Ecosystem Restoration Proiect: Toby Hallock stated that the City of Kent is working on a number of projects along the Green River which involve flood protection and ecosystem restoration. The flood protection projects include levee repair and other improvements along the Green River. Ecosystem restoration projects include projects along the Russell Road Levee, Boeing Levee, Leber Homestead and Downey Farmstead Projects. With over 35 years of service with the Army Corps of Engineers, Noel Gilbrough will provide the City guidance and consultation on the Corps' processes for flood protection and ecosystem restoration projects. In addition, Mr. Gilbrough has significant first-hand experience with flood fights and could provide this service if necessary during a flood event. Committee member Ralph MOVED to recommend Council authorize the Mayor to sign a Consultant Services Contract with Noel, Inc. for Engineering Services related to Green River Flood Protection, Ecosystem Restoration Projects and Emergency Flood Response in the amount of $22,100 subject to final terms and conditions acceptable to the City Attorney and Public Works Director. The motion was SECONDED by committee member Higgins and PASSED 3-0. Item 6 — Briscoe/Desimone Levee - Interlocal Agreement with King County Flood Control District for Levee Construction, Operation and Maintenance City Engineer, Chad Bieren and Public Works Director, Tim LaPorte met with the King County Flood Control District regarding the Interlocal Agreement with them for the Briscoe/Desimone Levees. The State of Washington included in its 2011- 2013 biennial budget a $7 million grant for the Briscoe/Desimone Levee. This funding was directed through the King County Flood Control District and is intended to pay for improvements to the levee needed for FEMA accreditation. The Flood Control District also has funding set aside in their budget for this levee segment. PUBLIC WORKS COMMITTEE 6 May 6, .2013 After prolonged discussions between the City and Flood Control District Staff on the best alternative for the reconstructing weak levee sections, the Flood Control District Board of Supervisors, at their February 26, 2013 meeting, adopted the city's setback floodwall alternative. Because half of the project is located in Tukwila, the City of Kent will enter into a separate interlocal agreement with Tukwila to complete the work. The interlocal agreement describes the procedure for King County to reimburse the City for the reconstruction effort on the Briscoe/Desimone Levee using state grant money and Flood Control District Funds. This item passed through Committee 3-0, and will go on the Council Agenda under Other Business at the May 21, 2013 meeting. Committee member Higgins MOVED to recommend Council authorize the Mayor to sign an Interlocal Agreement with the King County Flood Control District for the City to receive reimbursement for improvements to and FEMA accreditation of the Briscoe Desimone Levee, subject to final terms and conditions acceptable to the City Attorney and the Public Works Director. The motion was SECONDED by Ralph and PASSED 3-0. Item 7 — SE 256th Street Proiect Status: Public Works Director, Tim LaPorte went over the current status for funding SE 256th street road improvements. He noted that the idea was first conceived in 1990 and reaffirmed annually in the Six-Year Transportation Improvement Program. The loss of the $2 million funds, from the failure of the Local Improvement District, has created a budget shortfall in the project. The exact amount of the shortfall cannot be known until the bids are opened. It was decided by the committee that we should bid the project and return to the Public Works Committee on June 3, for further discussion. Committee member Albertson stated that this project needs to move forward and that she would contact the apartment owners if need be to explain to them the importance of the project and what the benefit would be to their property. Albertson noted the following: • 60% assessed value was needed to defeat the LID — 62.35% was received • Four of the 131 property owners had the capacity with 1 signature to vote this LID down. Higgins handed out information about the area being discussed giving very detailed information about the area. PUBLIC WORKS COMMITTEE 7 May 6, .2013 • Census block groups not 1 to 1 match - 6,600 people live in this area • 11 Apartment buildings with 2,281 people • The medium income in the area is $41,000, • in Kent $58,000 • in Seattle $59,000 Higgins stated he would like to continue with LID's and that staff should proceed with the non-covenanted properties. Finance Director, Bob Nachlinger noted that we don't have the money right now in our budget to pay for it Committee members stated they would like at a minimum to see this go out to bid. It was decided that the project needs to go forward that the covenant needs to move forward and that the B & 0 tax needs to be looked at. SE 256th Street will have the bid opening on May 29, will come to Public Works Committee on June 3, and to Council on June 4, 2013. Items 8, 9 and 10 where not heard at this meeting. It was decided they wouldn't come back to committee until after SE 256th Street bids are opened. Item 8 - SE 256th Street Agreement w/Puget Sound Energv for Utility Underaroundina: On hold Item 9 - SE 256th Street Agreement w/Comcast for Utility Underaroundina: On hold Item 10 - SE 256th Street Aareement w/Century Link for Utility Underaroundina: On hold The meeting was adjourned at 6:15 p.m. Cheryl Viseth Council Committee Recorder 8 This page intentionally left blank. 9 PUBLIC WORKS DEPARTMENT Timothy J LaPorte P.E., Public Works Director Phone: 253-856-5500 KEN T Fax: 253-856-6500 WASH IN GTO N Address: 220 Fourth Avenue S. Kent, WA 98032-5895 Date: May 10, 2013 To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: May 20, 2013 From: Cathy Mooney, Senior Transportation Planner Through: Chad Bieren, P.E., City Engineer Subject: DRAFT 2014-2019 Six Year Transportation Improvement Program (TIP) Motion: Move to recommend that the Public Works Committee forward the Draft 2014-2019 Six Year Transportation Improvement Program (TIP) to the full Council and recommend that Council set a date for a Public Hearing. Summary: The Draft 2014-2019 Six Year TIP represents the City's proposed transportation improvement work program for the next six years. It includes planning studies, street, bicycle, pedestrian, traffic signal, and transit improvements as well as street maintenance and preservation projects. Including these projects in the Six Year TIP allows the City to look for funding partners and apply for grants. All of the state agencies require that every project submitted for a grant application must be included in a city's adopted Six Year TIP. Budget Impact: None 10 This page intentionally left blank. 11 � CITY OF KENT WASHINGTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2014 - 2019 � e II t'v�a—�. `�'.°Y`a... _�:_h. 3Anu £.i ' �4rn'.A•'+'�_� �i Mayor Suzette Cooke T Timothy I LaPorte, PE, Director of Public Works 12 i i I I i 13 CITY OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2014 m 2019 Table of Contents: 1. Resolution adopting the 2014 - 2019 Six Year TIP 2. Introduction i 3. Listing of the Projects 4. Project Descriptions 5. Map of the Projects 6. Contact Information i On the cover: Street Preservation project on 104th Avenue SE 14 f I 15 CITY OF KET SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2014 - 2019 This page intentionally left Blank i For Resolution j i 16 CITY OF KNT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2014 - 2019 I i This Page Intentionally Left Blank For Resolution i 17 CITY of KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2 1 - 29 Introduction Overview The 2014-2019 Six-Year Transportation Improvement Program (TIP) is a short-range planning document that is updated annually based on needs and policies identified in the City's adopted Comprehensive Plan and 2008 Transportation Master Plan. It represents Kent's current list of needed projects that may begin work in the next six years. The document identifies secured or reasonably expected revenue sources for each of the projects. The Six-Year TIP serves as a draft work plan for the development of the local transportation network. Once adopted, the TIP helps to guide funding and implementation priorities during the development of the transportation portion of the Six - Year Capital Improvement Program (CIP). The CIP can be considered a subset of the TIP. The CIP shows the City-funded portion of projects and is constrained by current budget forecasts, whereas the TIP shows the complete project list with the variety of funding sources and partners involved. Mandated by State Law State law requires that each city,develop a local TIP, that it be updated annually (RCW 35.77.010), and that it be submitted to the State Department of Transportation not more than thirty days after its adoption but before July 1st. It,represents an important planning component under the state's Growth Management Act. For cities to compete for transportation funding grants from Federal and State sources, granting agencies require that projects be included in the TIP. The Six-Year Transportation Improvement Program may be revised at any time during the year by a majority of the Council, after a Public Hearing. How is the 2014-2019 SIX-YEAR TIP different from the previous year? PROJECTS ADDED PROJECT TYPE COMMENTS #5-- Traffic Signal S stem Upgrade Enhancement Grant awarded @ 100% #6 -- Panther Lake Signal System Enhancement Grant awarded @ 100% #16 - Willis/BNSF rade se aration Safety Congestion/conflicts/coal trains #17 - S 212th/BNSF grade separation Safety Congestion/conflicts/coal trains #19 - Willis/UPRR grade separation Safety Congestion/conflicts/coal trains #20 - S 212"' /UPRR grade separation Safety Con estion/conflicts/coal trains PROJECTS REMOVED Kent Kangley Road & 108T" Ave Operations Combined with #21 - 108thAve Intersection Improvements Enhancement SE Extension Transit Now Partnership with King Transit Combined with #43 - Countly Enhancement Community Based Shuttles OTHER #34 - Street Preservation Maintenance Now shows full estimated cost 18 CITY OF SCENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2 14 - 2019 I i This page left blank . i 19 CITY OF KEENT 2014-2019 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Project Project Name Number Project Location and Extent 1. Southeast 2561h Street Widening, Phase II SR 516 (Kent Kangley Road) to 116th Avenue Southeast 2. Kent Kangley Road Pedestrian Safety Improvements 104th Avenue SE to 124th Avenue SE 3. South 228th Street/Union Pacific Railroad Grade Separation Grade separation crossing at Union Pacific Railroad 4. 72"d Avenue South Extension South 200th Street to South 196th Street S. Traffic Control Signal System Citywide 6. Panther Lake Signal System Integration 7. Safe Routes to Schools.Improvements at Horizon Elementary Horizon Elementary School, 27641 144th'Avenue SE 8. Safe Routes to Schools Improvements at Meridian Elementary Meridian Elementary School,25621 140th Avenue SE 9. Safe Routes to Schools Improvements at Meadow Ridge Elementary Meadow Ridge Elementary School, 27710 108th Avenue SE 10. !Sent Regional Trails Connector Green River Trail to Interurban Trail at S 218th St 11. James Street Bicycle Lanes Interurban Trail to Washington Avenue (SR 181) and 800 feet east of the Green River Trail: 12. SE 208th Street & loath Avenue SE (SR 515/Benson Highway) Intersection Improvements Intersection Operations Enhancement 13. South 224th Street Extension 84th Avenue South to 104th Avenue Southeast (SR 515/Benson Highway) 14. Central Avenue South Improvements Green River Bridge to East Willis Street (SR 516) 20 CITY OF KENT 2014-2019 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Project Project Name Number Project Location and Extent 15. Willis Street and Central Avenue Intersection Improvements Intersection Operations Enhancement 16. Willis Street (SR 516)/Burlington Northern Santa Fe Railroad Grade Separation Grade separation crossing at Burlington Northern Santa Fe Railway 17. South 212t" Street/Burlington Northern Santa Fe Railroad Grade Separation Grade separation crossing at Burlington Northern Santa Fe Railway 18. Military Road South at Reith Road Intersection Operations Enhancement 19. Willis Street (SR 516)/Union Pacific Railroad Grade Separation Grade separation crossing at Union Pacific Railroad 20. South 212t" Street/Union Pacific Railroad Grade Separation Grade separation crossing at Union Pacific Railroad 21. 1081" Avenue Southeast Extension Southeast Kent Kangley Road (SR 516) to Southeast 256t" Street 22. Smith Street and Central Avenue Intersection Improvement Intersection,Operations Enhancement 23. a 212t" Street and 72"d Avenue South Intersection Improvement Intersection Operations Enhancement 24. SE 240t" Street and '104t" Avenue SE (SR 515/Benson Highway) Intersection Improvement Intersection Operations Enhancement 25. Military Road South Widening South 272nd Street to Kent-Des Moines Road (SR 516) 26. 132nd Avenue Southeast Widening - Phase I Kent Kangley Road (SR 516) to Southeast 248th Street 27. 132"d Avenue Southeast Widening - Phase II Southeast 248`h Street to Southeast 240th Street 21 CITY OF KENT 2014-2019 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Project Project Name Number Project Location and Extent 28. Kent Kangley Road (SR 516) and 132"d Avenue SE Intersection Improvement Intersection Operations Enhancement 29. South 260th Street and Pacific Highway South (SR 99) Intersection Improvement Intersection Operations Enhancement 30. SE 256th Street and 104th Avenue SE (SR 515/13enson Highway) Intersection Improvement Intersection Operations Enhancement 31. South 212th Street and 84th Avenue South Intersection Improvement Intersection Operations Enhancement 32. Meeker Street and Washington Avenue (SR 181) Intersection Improvement Intersection Operations Enhancement 33. South 272"d Street and Military Road Intersection Improvement Intersection Operations Enhancement ONGOING CITYWIDE PROGRAMS 34. Street Preservation Program Ongoing Citywide Program 35. Residential Traffic Calming Program Ongoing Citywide Program 36. Traffic Signal Management Program Ongoing Citywide Program 37. Miscellaneous Intersection Improvements Ongoing Citywide Program 38. comprehensive Plan Update Ongoing Citywide Program 22 CITY OF KENT 2014-2019 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Project Project Name Number Project Location and Extent 39. Channelization (Street Markings) Improvement Program Ongoing Citywide Program 40. Bicycle System Improvements Ongoing Citywide Program 41. Sidewalks, Sidewalk Repair and the Americans with Disabilities Act Compliance Program Ongoing Citywide Program 42. Guardrail and Safety Improvements Ongoing Citywide Program j 43. Community Based Circulating Shuttles Ongoing Citywide Program 44. Railroad Quiet Zone for Downtown Urban Center Ongoing Citywide Program j i 23 Individual project and program descriptions Pagesl - 44 24 This &-% age intention left blank 25 t CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 PROJECT#I: Southeast 256« Street Widening, Phase II SR 516 (Kent Kangley Road) to 116h Avenue Southeast DESCRIPTION: Construct a three lane roadway from SR 516 (Kent Kangley Road) to 116 Avenue SE. This project includes bike lanes on both sides of the roadway. The project will, include construction of full-width paving; concrete curbs, gutters, and sidewalks; street lighting; storm drainage; landscaping; utilities; and appurtenances. PROJECT COST: Preliminary Engineering .............$1,100,000 Right of Way Acquisition...............$350,000 Construction ................................$5,550,000 TOTAL..... ......... ............$7,000,000 . FUNDING SOURCE(S): City of Kent, TW I PROJECT JUSTIFICATION: Southeast 2560' Street is a two-lane roadway with no curbs, gutters or sidewalks and a limited street light system. Despite the lack of suitable pedestrian facilities and extremely harsh weather in January 2012, over 650 pedestrians per day walked along this segment of roadway. During peak hours, the roadway cannot acconanodate the traffic volumes due to the large number of vehicles blocking the roadway while waiting to turn left into driveways. The widening of Southeast 256`I' Street also alleviates traffic on SR 516 (Kent Kangley Road) as the two roads serve east/west travel demand. The project will increase the capacity of this roadway by adding a center two-way left turn lane. This project provides a multi-modal connection between improvements west and east of this segment. s �Q 8 t n v c.nan H0'f .4son BFtd "a 0,ntl€1W It E-E'911�FA% F eJ;,EiN. i uVt'et_a[egy go,I v€101 efaekS Cp 1 1 i.,irfuor; r, Ye±P 441if. Ya afegit E7 esirtkes€titr.n[St az"1.PIS ..P f.sa sit rU"Fjia€i�tr,ndiao it tIs iivii n4 !,rd rA],6-h-RB90iipc tY`;xs�speri.e cni';",ea it,jivlrisPl:islr-C.orat Pala;t A)ve 11 a t�1 6)rlra scf,11%VITk 4nI4ie S°Jwk 1 iv&f Iar a l _.O.JStg11,. .I' .far zs -0enrrelaat= soa.4-ou-rorxt tfid 3-r_71d @aus i'rare>po-ta€,an?sfi�x is men>L€os-< �';fafc3 26 2 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 PROJECT #2: Kent Kangley Pedestrian Safety Improvements 104rh Avenue SE to 124`h Avenue SE DESCRIPTION: Add a new mid-block pedestrian crossing of Kent Kangley Road with median refuge island and Rectangular Rapid Plashing Beacons. Restripe crosswalks and stop bars, upgrade pedestrian crossings to countdown message modules and Americans with Disability Accessible (ADA) standard pedestrian push buttons. There are a total of 8 intersections that will be improved by this project and proper signage will be updated along the entire project length. This project also includes education and enforcement elements. i PROJECT COST: Preliminary Engineering...................$36,000 Education/Enforcement............ ........$38,000 Construction ................$342,000 TOTAL...................... ....................$416,000 FUNDING SOURCE(S): Washington Stale Department of Transportation PROJECT JUSTIFICATION. ,Kent Kangley Road (SR 516) is one of the most densely populated corridors in.the City. The section from 104" Ave SE to 124°i Ave SE is a congested, mixed land use, Principal Arterial that is a designated truck route currently operating at a Level of Service (LOS) E during the 13M Peak. The majority of housing along this portion of SR 516 is high density 'multifamily housing that generates a substantial amount of pedestrian traffic. This section of Kent Kangley is a high boarding area for transit and is also a popular destination for senior citizens due to the high concentration of shopping facilities, banks, medical offices and senior housing. The project area includes two of the highest collision incident locations in the City (1041h Avenue SE at 256r` Street and 1161h Avenue SF, at Kent Kangley Road). The majority of collisions reported in the project area from 2006-2008 occurred during the daylight hours with pedestrians over the age of 18. This project will improve safely through the constmetion of these engineering improvements combined with education and enforcement. T'.41£S4) Qafrf;;c EPEoFf�?f J.....repi khQk IrAit;,jfeardj MSA rf 'Eg,E£€ A,,n sEa'Oc„-err'H 'e:'cif c.vfF._ Rn.mrfn�..fe'ttFar: F 14£'�r�- fR.3t;�ll l4't6Q)RF b{p'q('Pif,P[af �§5ltiC!Fi�13, (:'*Y3,'t5�: ,£ �L4'PeH';1 ri OJ316 ti,�;i3Va.Ltl SPAe'kn fP .I,k }I�.:9 Y,I.z }r;BSOi'P] 'i 3 LeFgdl➢°fkJ[1 4'{i$Y$1� YH g—kldRiige Ei I enn9 puC Nliun.ip h}4S!t �{volo ];d' £R',+ (5fii ImpreA'e:YPefo"i,Ir:H P 1,1V I i'E¢r1he M,'drul, ifxt 8..Wo P .,,:.f I'An .i,v 1 P '+etf 1 xae Fe,awn mdo.i,c coM_ a P r 0A,;"1; R W6 3 stesi,a f%ibtt 6eeirr 4Mn�eoi€Roan) J"41'4c' 27 3 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 PROJECT 43: South 228"' Street/Union Pacific Railroad Grade Separation Grade Separation crossing at Union Pace Railroad DESCRIPTION. Construct grade separation of the 1lnioij Pacific Railroad mainline tracks at South 2281h Street. The project vJfL,.ffic1ud fire construction of a bridge; four-lane vehicle crossing; full-width p virig; conare�_curbs, gutters and sidewalks; street lighting; utilities and appurtenances, i Ff.._ PROJECT COST: Preliminary Lnginccring � 00,000 � Right of Way Acquisit14n ,...........$2,50(i 000 Construction ... C$+2i 1,0{d0�g0� 0p00 T$}TAll� ;. ..... >49Wpd,a S2 s,11110g0®® I+IJNDING SOURCES}: City of Kent Port of Seattle, FAST, F'MSIB, LID, Union Pacific Railroad PROJECT, JUSTIkIC'f4'i`TO.M The project will lead to a seamless connection between major freight handlers and their, primary destinations. This project will support freight moving through jf�_cnt to the-Pores of Seattle and Tacoma, SeaTac Airport and the freeway system. Grad(` separating this, arlerial will increase ruadv%fay sapa6t! domlasc oon tibn, enharrcc: safety and irnlnovc freight mobility in this corridor and throughout the region. This project will provide regional connections for thousands of businesses, employers, and the 40 million srlmare feet of warc;house/industrial space in the valley. arc 4!r OmOi'..S'I v MnfO I;Pr 0, Bar:€gltt Act;un"0o lima r,r, 1,i CU"Cap ewom,a d or a iunr; tsxicJ ❑ tR,1 B r.a, ( °s cl a ,a rd!ah r tan<ux[& tl j IFi s 7 nrd i fun uen Pt n �t ( =.e17, 7 Rr r(1tgr as ¢ )�rsi atioaa t, ! m as la rEr, ➢..11 E tar reog a a nc n 1?ivLtU. c° E, 2 tP$€t bR4arits s ags36rtmE f ofm S a..rf,riB .aeOCrr t.,rw l eu,c'a.3u [Nd, alf; fPd SrseS,r mi(fo imp ar atnof Ea'aas r,.Euf+,j 2s 4 I CITY OF KFNT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 PROJECT#4: 72°1 Avenue South Extension South 200"'Street to Sozah 19e Street DESCRIPTION- This project completes a missing by constructing a new three-lane roadway from South 200"' Street.to South 196"' Street. The project will include the crossing of Mill Creek and construction of full-width paving; concrete curbs, gutters, sidewalks, street. lighting, storm drainage, landscaping, utilities and appurtenances. i PROJECT COST. Preliminary Ltigineermg . $250,000 Right of Way AcquiItion............ $75,000 Construction .. ..$2.0'7s;000 T6DTP a2,400,000 FUNIDINCo SOURCE(g): TIB,IRggional Fire Authority, City of Kent PROJECT JUSTIFICATION; 'Continued de,9Qlopmcnt in the northern Kent industrial area,, and high F_ lcvel',o"f congestion along West Valley highway between the South 180"' Street and South 190h Street corridors, mandate additional north-south arterial capacity. This projcct provides some relief for South i 801" Street, � South 19,e Street, and South 212r' Street intersections along West Valley IIIg? vay, li. also provides unproved access to the South 1961t' Street d€ lidor 'froin industrial development along 72" Avenue South 17y constructing the missing link between South 200d' Street and South 196"' Street. This roadway cornrcetion provides a direct link from the existing Fire Station can 72"d Avenue SoL'th to the 196"' Sheet corridor, grade sepa ated over bolls the B_NSF and UPRR mainline railroad tracks, d£ alratEeally improving Cmergency reSporse tinif s to a harj.?e, a.iea Cf the Kent Mai ulticturnng/lndustrial Center and warehouse land uses. e_i2 Q- i odes?t«ra lna� ah�O9t an,l 4a �r»3it:il a.i`a xtt, S,6 . sx�€tP. <9run 9(t-pi -e e� nu-cE>-nair7. 9„zoana a._uri lery R ' ti-Ff"w If(.3uho € rt is i❑ u r t "en „f!4,nEll,+ (A f edea a f t ¢u.3t tatraaansts (it: 13 effu rEa 41ks H ss lyd tut„i@ig_¢et f nla,,Epus M bfm S),mwf I ,EI, t 17 Local impr n,om eclat 6I laii i r I E�,t H,' P ixt0k SVorl.s €P 'SVt1.Et ".arsEuo � t .ahvo„'Tu [Fvd; IrD „a n:gfog 9.1 t.im.mri W,evs,-_aaia: eJ �„ntof , 29 s i CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 PROJECT #5: 'Traffie Control Signal System Cityivide DESCRIPTION: The City will purchase and install a master signal controller unit capable of supporting flashing yellow left turn arrow (FYI,TA) displays for permitted left turns. This project will also purchase and install traffic signal controllers for approximately 29 indiyfdi6af intersections TO& signals will be modified at approximately 14 intct dons to display iVI,TA signal indications for pernrissive left turn moverriots. PROJECT COST Preliminary Engineering . .,...........$80 000 Rig ht of Way Acquit tiou .....„ ....... $W ,,.. . tinstuction a......$32q 000 T TAL...... ......... .........$400,000 F[7Al)1NQ SOURCE PedtFal llighw>ay Safety Improvement Program (HS1P) PROJEC'T i JUSTIFICATION: The currcuL central traffic signal control system is not compatible with flaslvng yellow 110ft'turn arrow displays I'Or peramssive left tut Inovernents. This type of sivnal .d Malay has been demonstrated to be mush rnore readily understood by rnotorists'and has resulled in reduced collision rates involving vehicles turning lefttl ii ing persnrssive Left rein signal phases. The upgrade to the legacy central control systern and rr(ote advanced inteiscetioa traffic signal controllers will allow greater operation flexibility and improved transportation system efficiency. £ M1.a(- , ,n,t.r ina'auk ,,LCa red ra t is tPiy�,aeG.;,,j, £':4 fsr :aigteS. ,.,m tr�ay5 t,.r eseY-S al.ec a'a:.n n .tr'.Eatnrr, I €tl'�i11£- ,,hP 6aooe,rts `ar.a1°e�!cicFa.mene Gtr rrvt(Rrakrj,� ra- 5e.ltrnr3i l CA All arn h'ri#Son11vd7j €1„.r>.. n., er't. . @.0 noion Ir t 0 ry4A 19r %ufzliieti( srn'4,miiioln rk'n III,r 70 r,oeid fni ,l""W"d@ Oj €,I,:,;By F hlidic%vrmi,e 6 vil"t Fu W I rr,r.IM"W( .I G ' I'nl,l(ro rr (,ogi^:r r;r e 9a[,e€I, 11N .'s,as7„r tl.t nr €r,p; nvemel_Roa d I Sill Czl I 30 6 CITE' OF KENT � SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I YEAR: 2014 PROJECT 96: Panther hake Signal System Integration DESCRIPTION: This project includes extension of corripninication cable to traffic signals in the recently annexed area of Tarrther Late to allow remote monitoring and management of the traffic signals, replacQ eat of the existing traffic signal controllers to be capable of-displaying flashing yellow left turn arrow (FYLTA) for permissive left turn tilduements and allow flexible coordination of the traffic signals along arterial corridor PROJECT COST: Preliminary Engineering ..... ...$0 Right of Way Acquisrtiori „ 'r:f $0 pf pn .... ,,,.�,$342,04:,; Constru r d >. TOTAL...Al ....... $342 6iDi9 FUNDING S URCE(S): 2013 Quick.'Rosponse Safety Program Federal Highway Safety"Improvement Prograrn (FTSTP) PROJECT JUSTIFICATION: The tra(frc signals in the recently annexed area of Panther Lake are not connected to the City's central traffic signal control system; hence, they cannot by remotely monitored or managed from the City's Traffic 1 Ianaoclo,,nt Ct-finer. � The ntersection controllers are not capable of displaying flashing yellow left turn 1rrow (FYLTA) for permissive left turn movcrncnts. This type of signal display has been demonstrated to be much more readily understood by motorists aid bas resulted in reduced collision sates involving vehicles turning left during pernnssive lcfi turn signal phases. The integration of these signals into the City's signal system will allow operation flexibility and improved transportation .system efficiency i t,4 - n ;,,;01on %fluvanort nine,Alt O,,00p1s at.qI;li 6 Vrv;giro Aciit,i Sivg fir f"tl Iveoet-`t,(fit R:zr�atna Corrt3rfr, P iSSYi._ ,_fu 3✓'„� a� �41',akgk Re .c-.imcnt Hv,tt d [Statef.e A A P,Oo 1 tl;,nw A613tnn riteIilm IF cite I?P1.3Wi, iIful,,d .H IldiI"tiH I Fvll,i Al,E tz. PnaditgoTrttnsit I t,Iiio n SjSlim,,J7 ed.,1PU;1,Si71..✓✓a!r;Y,Ewa,eeOemf 6 itJ i u lg i'C2e IV 1144i"'W",I., 4:,esY Fund s.,w (S!to. J; ,.4 - ,ire,t,zc lsa,�..tpartwimi i,oprturc td t�s.ral;, t'gi trans,�ent.,fiat.:,aspe.,vi,irn.;�oan.i ��Sble1 31 7 CITY OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM STAR: 2014 PROJECT 97: Safe Routes to Schools Improvements at Horizon Elementary School 27641 144'1'Avenue V, DESCRIPTION: Install a paved pathway on the ea,t side of)44th Avenue SE from SE 278t" Street to SE 276rh Place in41a11� anew nvdblock school crosswalk across 140' Avenue SE on the sojith side of the :school driveway. Install Rectangular Rapid FIashtr�g` Beacons at the new,,crosswalk and install advance school crossing signs. This project alsd',lnchrdes education and enforcement elements includijl$ the purchase of an additional Lidar Radar Unit for police,enforecment. PROJECT COST: Preliminary Engineering,.................$9`Q 000 Right of Way Acquistron $'t3 Construction ........ , , ........$220 000 TOTAL....`r„s ...,... 4 3I0,000 F I1NDII C. CYITRCEq� ): W Z)C)T, City of Kent PROJECT . 1US'I FICArI ON: The purpose of the Safe Routes to Schools Program is to encourage more students to',walk and bicycle to and horn school railhei th, being driven by them parents, Throrigh a combination of engineering enhancements to the built environment plus education efforts aimed at the students and the rr parents, it is hoped that fandlies will rnecease the number of walling and biking trips they make to their local school, { FPft—t en3ccntxot�futF 14un;F;aa7.�u °en�Seiti � Jt�,��°=y5. � Ft•n;lt[2�f,u7.v 3t�gr 4rt .,�Eeed-.-h. tie3e ieEro-ai.a 6�s r[a9an; rIDsFA,- 4, wbil14ohiW 'i,,,,rp,rc 7ane'EI'M B1Vf 11 [SIII) y .A InOtA00 lim lliur [( t�f 01;47f"; kia+vn? x Rtdtvatt,on i t ,._ndj,r:S rt..n^w:vn L.n. .,ua1 ( Eu_rftlt;„as hwal r t,lpi r,,wncnt N;lz h t. 1 "S r ..>iriv'wP, r,unstl,m I d LEI It i]ISit th1 I S,[ `—SvIr , I [tr,In 1Vuf,-r1111 € rov,n 9ntpr„tnwilI =o�n A— 32 s CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 PROJEA CT 48: Safe Routes to Schools Improvements at Meridian Elementany School 25621 140`j'Avenue SE DESCRIPTION: Install a traffic signal at the fin--e et16n of SE 256r1' Street and 140"' Avenue SE and construct an asphalt-pa' enient walkway with an extruded curb along SE 2561h Street frorn:approximatcly 134" Avenue SL to 140t" � Avenue SE. The traffic sign l'includes a t1'26e surveillance camera and interconnect cable to connect this signal to the;rest of the City's traffic control system. This pf�ect also includes edde'att(?n and enforcement elements including the purchase of an additional Lrdat° Radar Unit for the j police enforcement. PROJECTC0ST: Preliminary Lngine nb ..... i01000 Right of Way Acgtusitiort Construction ....... ; ....,i . ,..3625,000 `' TOTAL—."-, ......e SS35; o0 FUNDING SOURCE(S)R, ',WSDOI, r ityorKent PR(A.IF'C Jt)S'IWATION: Meddian EleYnentary School is located near the intersection of SE 256°i Strc�ot and 140`t' Avenue SE. The school provides adult crossing b lards to help students 61'4ss SE 256'i' Street. The level of development in the area has ircreased to the point that local traffic in the neighborhood and in the cq�juuuuiliesto the east of the school has become especialty heavy at tine afternoon bell times. A full traffic signal would assist th4. crossing 964r&,the school children, the parents and teachers arriving/leaving the school arnd all tic, local motorists to maneuver in an orderly way during times of heavy corrtiict. Currently students most walls or 'bike along a wide shoulder on Sr 256°i Street, This project:would provide an asphalt walking path which would be separated from the roadway by a raised c€rb providing ((dearly cl(dii eatsd locations for pedestrians, bicyc liar and motorists. i.`.P.t`)- �E�w;xBm�Cc7 r(;�e_uat ant Orr 4laixli€ti�[iit.�nt�;G�;ih4 Mrer3izr iQnsa hirxtt_vs t,v l.�ereC4- ..�ltk 6aouaE L,. �EBw: 3 g3,'sIY- @�E rE.. VdrS;rP it ra t_�i€�i + f.n€uF;4„ae t�ura,.l,i ➢ i ai :cra dj au:it �sd Eae sac=Frs Eie3rt In Urea at[,iEP..t k6xsHri$ )nlarnimEtd�n [�.a:erx ll,[f4 ?3yteldi[. at 4-a:aE��nn N_+z1§ysfem [f c�3-r�11;;.IlY -F err<€ina;u arv,uazn'17who [.,1T'�= r°arh4ir F4�cmtbS r�i�t&jai�.1 e ,ue_(.9iait ��6'—!sm Tiau.vav� as S gcsai E ( crfsr-s1�{ X"s d bzn5�<f'€a t�reaF im�n n�ct:vc�tt�oriaF iS€rticl I 33 4 CITE' OF KE T SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 PROJECT 89: Safe Routes to Schools improvements at Meadow Ridge Elementary School 27710108"'Avenue SE DESCRIPTION: Install a 6 foot concrete sidewalk with curb and gutter along the west side of 108th Avenue SE from SE 2730,Stiect to SE 272nd Street. Install a 6 foot concrete sidewalk with,Qui�b and guttey',along the south side of SE 272°d Street from 108ti' AY�e6 SE to 105th Avenue SE. This project will install a new crosswalk:stet Bing 10811' Avenue with Rectangular Rapid Flashing Beacons and appropriate signage on the'north side of the onramp to the westbound 277t1' ,:S(r et Corridor. This � Ject also includes education and enforcement<element9' including the purchase of an additional Lidai R£7dar Unit for police enforcement. PROJECT COST: Preliminary Fngipcgrrt , q..... ....$175900 Education/Enforcer ut . .$2.0.000 Ctinstnictiori .....$425�t100 T�STAI .e...e ..e.ar... .............e..$620,000 11 lJ V Ill :ST_JI3C L(S) E ity of Kent PROJECT JST1W,'ATION: Few students currently walk or bicycle to Meadow Fidgc Elementary � School :' The Kent School District provides bus transportation for all students living west of 108ft' (avenue South and for students living north of the ,w ool. This projecl will make the pedestrian envilorn-lent frientkher:0-tr all users and make it an invithtg alternative for parents and students to choose. The City of Kent has a number of programs that chcourage p opke of all ages to live a more active lift slyht and makes it a City priority to provide atlaractive walking and bicycling facilities, Once these additional sidewalk facilities tare built and the :-taw crosswalk across 108th Avenue SE with t�ectartgular Rapid Flashing Beacons is installed; it is anticipated that many more families will be enf-ouraged to walls their children to Meadow Ridge rather than drive then to school. i f i sd?—g arra -�st'9 a a t a t lr.d l Q1"J Ey t t l t fit r-,i 3 :eu. b t d r i raft[ }�e N 4 rn=f2- e. i e ur a i i idaf'; .f l M r2h€ Alohilen St ttt'A 1 ne Nlcl,t&5a 6 d t P7gL!. t ? 1,1h"F l d .a f Ella d,vx ii(w lB cd,a'al1,f A S l,ttel3igt�tfi'tsn a4hart'rnem a ry oieaskc lied_t:,Ii;S_H@+ E nn°7 rPnl.a>tvcanerst iltvit tC4,3'S�'k'E 3`nf tm taaa7rl snfjsr l'.a 1i'm 5 „ram lk eie:ail; 1 5a @t :armor-ineW l&;at d lYtei+) I 34 to CITY OF KEN T SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 PROJECT 410: Kent Regional Trails Connector Green River Trail to Interurban Trail at South 218"',%vel DESCRIPTION.- Construct 4,400 foot multi-use trail connecting the Green River and Interurban Regional Trails at a point,approximately mid-way between the South 212°' Street and South 228t1' 51ff et Corridors at about South 218°' Street in the heart of the Dent Valley` This 12-foot wide multi-use trail for non-motorized users will rnGludiktrail lighting to enhance visibility and encourage year round usage. Rectangular Rapid Flashing Beacons and marked crosswalks will be'��tnstolled where the Blew trail crosses midblock at 641u' Avenue South and,,, 72nd Avenue South. A traffic signal for pedestrians and bicyclists o#_ssing mid-block wilDbe installed on 68"' Avenue South (aka West Valley highway/SR 181). A-mcchanism for Performance rrialartoring (counlmg),,will be installed at or near the new traffic signal e .pr'ojcct will install a. steel pedestrian/bicycle bridge over the Mill Creep betwee"11 72° Avenue South and the Interurban Trail. PROJECT COST: p0ium1gsx3,Lngineerrng ........'......$125,000'-' Right of\r('6Acquisituon .......:...$0 Construction ........ $1,17.5,000 i l A a dx. $1,300,000 FUN'IA11'IG SCIIIRC'E(S), CMA0, WSD0T, b ty of Kent PROJECT JUSTIFICATION.. One of tIicihighest priority projects in the City's Non-Motorized flan and Transportation Master Flan, this new trail would fill a missing east/v,rest l'i in the'oity's and the region's bicycle network, it would conneet two k1he most heavily used regional trails to each other and provide access For tens of thousand's of peop e to a concentrated employmcni (;enter. It would provide alternative mode access to The Dent Manufacturing/Industrial Center's 1,800 employers, to recreational activities along the Green River and the Cneen Riwsr Natural 'Resources A- ea and provide <n lditional safety for all users crm:,ing three rmn_jor arterial streets in an area with a heavy mix of truck tra('hc. 4 &. �- .�,gcat¢n i(rti,;.Nnni aaer 1 tb�ralliy pir3 �t�P;S+'k�i d'eeigiri?�tion�t`rnfz,}10 bvcregt..6 aRft ',S.enr.i<art9r�r: :>0,4cj,I IA Fe,k,,Eii r,Of fldlr. o-usL flitrPe] �N �a�al h'S?;i l�nir3'sp rfurxnsfms �ri,t.<Ei,6I Pttul;i� ar Eon;ror€ Loil S-,Am3,Wedclall,LID— m,il Bur I(w000d DiA( ;,L d"w'rt' Y'iFlac'Wetr'Iss i 9ru.-f Grin eiaa[e€ant -k` Srn.ae, R Ps`orrn:a J!"He' I, de i"ante pm tt.vwhnpv( n,Wknarr r;lAei 35 tt CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 i PROJECT HI1: James Street Bicycle Lasses Interurban Trail to Washington Avenue ($lt 187) and 800 feet east of the Green River Trail DESCRIPTICIN. Install bike lanes along Jamcs?;5treet ,from the Interurban Trail to Washington Avenue South (5R 181). This"project will also eliminate the gap of approximately 800 feet at the west eltti of South 240"' Street where it intersects with the Greer'River Trail. PROJE CT COST: Preliminary Engineering ......$150,000 Right of Way Acquisition........ „ .. :...$0 Construction ;Z`,000 TOTAL..aa.. a'A ..$1,375ij00 a D F'IlI` DING SOURCE _Crty of Kent PROJECT � ,JUSTIFICATION- The proposed ,bicycle hies_ would complete a missing bicycle link � between the Oia66il river Trail and the Kent Regional Growth Center. his project would provide the first dedicated bicycle lanes to penetrate what bad here-to-for been a barrier to east/west bicycle travel, State Route 1F7. Bike lanes ewrently extend easterly from this paint providing connections to the{fling County Regional Justice Center,Dent Station (an 18 acre shopping and entertainrnent complex), and the Dent Transit Center. Nearby land uses include lnstoric downtown Kent, City Hall and the gout City Center project scheduled to add 164 urban-style apartments tli the downtown core starting in 2014. Pilling in the missing links of this bicycle corridor is expected to encourage more people to utilize bicycling for more of their trip,, The anticipated mode shift from single-occapan( vehicle to bicycle will allow Kent to meet growth management goals while continuing to comply with its adopted level of service staanchirds and federal clean a:h standards. i S'3,AQ—€ n eM4,u191 g,ni �..nO A 4'akirsili fyi 1xedvnr!),FAN 11 's,i ateF, fo, Iv;,i U I r-Sca I Ve . �couvC' iron, rQ.[i€ Yfrr7n3 ?r rn ,;r e tast2ea;t Flour i,t�iu€nLt¢.� [P s•derai�,5f;* Y¢uhii�y.nt )ekr�;1�JF'k Hu ;r}ati uc91 fiurupr ax f ID,H,0i,ut VV€lY11, Pubgl —WiAkc r 'rest R'tad n,¢. ,S 1 P—4uu;Hrr P i anspa tamr Pwp,t1 i& 41'1rd 16l3 'E(5antel i i 36 12 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM ICI i YEAR: 2014 I PROJECT 812: SE 208th Street and 108th Avenue SE (SR 515/Benson Highway) Intersection Improvement Intersection Operations Enhancement- DESCRIPTION: Add dual southbound left stor ge lane on 1087';Avenue SE, widen the receiving lane on SE 208tal St and modify the signal phasing, PROJECT COST: Preliminary Engineering....................$60,000 Right of Way Acquisition ................$75,000 Construction ......... :,,.........$575 000 ....., ...A71t10a0 -` FUNDING SOURCES) City{t f Ktt?t, WSDOT (Highway Safety Improvement Program) PROJECT JUSTIFICATION: State Route 515,.also Imown as The Benson Highway or 108°i Avenue SF, is the prinr,jry north south route on the East Hill and serves as a major transit route, With four to rive lanes in its current configuration, this roadway liar been widened to its practical limits. Irnpiovernents to ()ltenseTti6lis along the corridor can leave positr,e fdl'€cis on corridor cotigestio r and improve efficiency. This project would add queuing capacity for the southbound tell tai n movement wliile continuing to provide two Lanes ofthrough travel. orc a1019 rr Q,mAI?� n S..B r'L,ig Eti.a sun -Irate¢, €ts 3 VC ,,Ii- ,,.tfv'fit r..... f >.-'idorp F 'ISM- M A.$[hrz,ta>€h5 .Es;;reS,ias,f,nrne iiu.ud ; 'UwJ,3 ... e¢ inm{f<dr r a it A3E& A�;,ja'E T i"n"Titr we �a�cderal�,i%:� aretet4ii, �f p rarRsye.fama 3y xtc� ji;es;efTMj; LID Coca€€nst (AIUIPIIl Dki ,I6 Vt4 S� &❑€fl, Wori;.a t r¢"s Put,; Law,!( ;hst*1iTV—,;Y�ue€ar, ,a;,,pot i c nr Parosr;ri t i c `.u'saJ,i .ad iz-::zeFPw astc i eataVx u.ra,a z Sw'w', Xta[cj 37 13 CITY OF KENT SIX YEARTRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 PIPROJECT#13: South224uE Street Extension 84`h Avenue South to 104'h Avenue Soutd t(SR 5I5/Benson Highway) DESCRIPTION: Construct a three-lane road from 8'4�,;Avenue South to 100' Avenue � Southeast (SR 515/Benson Highway), ik ttdl ng new bridges over SR 167 and Garrison Creek. Ihe"project will motQe the construction of full- width paving; concrete curbs, gutters and sidewalks; street lighting; storm (hainage; landscaping; utilities and appurtenances, PROJECT COST: Preliminary Engmecting �3'�000'000 Right of Way At, 'riistlon.............$4 tl ,005�,,000 Construction22,000(1O0. TOTAL., ............ $29 !1 U9D9D n$1 18s..Q, FUNDING SOURCE(S)o City uf`Kent, Lll), TfI$ PROJECT 3d1STILIC A I7(AI dusting roadway sy s1&rn cannot accommodate the current or forecast cast wsi traClic vvlunres betwcero Kenfa East Hill and the Green River Valley floor. In order to meet transportation concurrency requirements of the Growth Management Act, additional cast:west vehicle capacity is ,required. Intersections along South 2081"/212°i Strcct and ,limes/Southcast 240`f' streets are also at or over capacitor. !t is not "ible to widen the James/Southeast 240"' Street and South 208°i/2)12m Street `corridors' enough to accontrnodate forecast traffic volumes without additional caskwest capacity be ausc of existing devclopfrent and topographic constraints. MAO _s orq aOhl,, ME ,,,Minn xnal as E>EvAO, (W tdtna] f'A@ .rihd'!Avool,h#:aB;"'y Y.. P rare€b ,EieL-n acons.r Cln t&m; v RiRYy�-- r ir(hr%oLE IgryE �.F+r Ct.i t.ove3f l'i tx€g� ,E.:!ct,! t'S, f .3cra[ 9 ,.�.r. ".�luEuu.ti.� stn [Fir ¢ d�,.7 E,F; "si,ao,rsrF f:Rr-fite2Y€n.,)a .t_rTai).� IEtich6ier sa l.a�e�a>�t'tvk.�aY ,vefan� [Fed�.,(�; 3,Hrl Irrt..oE:ntfreete6rFestf RJiahu`,&'EY'9'P kzUlic".Muelcs 7andlFLni4f „nr iSt4iflt�, i4 �Eni!nv'ira•iol.i9tm 7°rogYF{r,� �"'ede,nYlt ti+t Ie=t;as�Yot r,6anl�npEEt+�xn'7;;i � f . i 38 14 CITY GE KENT � SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2015 PROJECT #14; Central Avenue South Improvements Green River Bridge to East Mllis Street,.(SR J 16) DESCRIPTION: Remove and rehabilitate the existing roa pavement to add service life to the roadway, between t}r 'Green River l3r•dge and East Willis Street (SR 516). This project Will include the removal and replacement of failing pavement sections and a full-width asphalt concrete overlay of the entire roadway. Also included iii this project is the sclottive replacement of curbs, gutters,usidewalks and st>e as well as minOrstorm drainage improvements.' i PRoJEcr COST: Ptehnnnary Engineetig $5 20,00t Right of*4kAcquisit4 $D C6ristruction .......... ....r:.......$4,000,000 7'C}T- «aa . ...,... _$4,500,000 FUNDING 9OURCE(S} f 1 F; City of Kent PROJECT JUSTIF'ICATIONl Th c,kisting pavement along this section of t cntral Avenue Mouth is exhibiting signs of distress, as demonstrated by "alligatoring„ longitudinal cracking, and cracking of the curbs and gutters, The service ht� of this roadway has bccn reached, necessitating reconstruction of the roadway, 'lhc. sidewalk system is sub-standard ia, many lot ul€>,v: and in need of replacement. ( ',I t o egestfou°G o nf'apui id Ak Q mAii1iY[V,ft a@I, F,kht s iaS V±t: f 6cI, trAtt�,u i rtnAt_tea it6=1FsC('31a Ca iridw 9 tsr,hi b;aicgic III,c LWe,A ili,zo t Siwc I,B 1 S &nbutai I a wit.x�Bcrt r r„¢„itinn [f� thea4[,00€1 R3 wzava 'Eh itittnboii I Fedcrtsl[,tr FIY4 Mgetltt2;,nspm' vttn,_rate;u d [f c,cr'siJ;l I" u.o—Akmpr raV,gw"I Axirnirt,i`JJfI€'—P'11411r Worlis eAu, h[a.i i[5I t�49hi T- 3lerie fpfl-'Spi { mIFo-ra llf Ir '�e".l'e)N- P P 4�o EN;I tic;btu„tio,N m,Pi bl.Hit n t irOfl [-;;iA(G] 39 is CITE' OF KEN�T SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2015 i i PROJECT #15: Willis Street and Central Avenue Intersection Improvements Intersection Operations Enhancement i DESCRIPTION Improve the intersection of Willis StW6titnd Central Avenue to provide a right turn lane from southbound on (en[ral Avenue to westbound Willis Street. Project includes sidewalk, curb and gutter replacement and improvements to traffic signal system. PROJECT COST: Preliminary Engineering $40,000 Right of Way Acquisition........ ...$150,000 Construction ...$2b0 000 I TOTAL.... yr L. 450,000 FUNDING SOI) CE(u) City*Kent, Developer Mitigation PR0.IR11 .IPJSTI FICA TiON Tfih 'project is a traffic mitigation requiremcnt for additional trips genera-Led by the k ce It Sta,iorr, Development, The City of Kent will be irreplcinenting this project that is required of the developer. d M A 0- t, aeluon Pa rh,aar;eu li'iti 'ra Ok"'ik`y(f r•d ,arts F' 3 r,re!I Cr r V ur"i, €tte f w u,m P.._rulr,rt F r,4°&S—f rrs,iaf M(4) k 94 iti,,t P,.ill,flt wilt fsa rd IsAMe ],I f A r adrRrt R " ?d?!r a .Pi...: (r 1 .,P]'._IEF 0 r frna, !a6ra- fr�r 0"AI.i F�i IitIeMt ;_rer'dr.it,pmi"r honS:;,teem,I F1'd.n tit I; iM Llmal lnptm rarcrI Pig C r.t; PW'IT Gu69i, ti'rra€aa Me43IFl"r .in.n114"nieI!SFT 1- eaxf,.r.e .r mta1 run 3rogrllr,iIlcdamn]; rrh 3r.tri"por¢tt'arr1rly5('c:It)orrffio,rrdISIatcI 40 16 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM i YEAR: 2015 i PROJECT #16: Willis Street (SR 516)/Burlington Northern Santa Fe Railroad Grade Separation Grade Separation Crossing at Burlington-Norihern Santa Fe Railway i DESCRIPTION: Construct grade separation at the butlington Northern Santa Fe Railway mainline tracks at Willis Street (SR 516). The projegt will include the construction of a bridge; four-lane vehicle erog�ing; full width 1' ing; concrete curbs, gutters; and sidewalks; street lighting riltrlities and appurtenances. PROTECT COST: Preliminary Engineering :,.........$2.50,0,000 Right of Wa} acquisition $3"000,000 Construction ...........$2f;500,000 TOTAL Al ....a .,,x;,,.$27,000,000 IsUNDINC SOURCE(S). City tit ent, Bwhngtori Northern Santa Fe Railway, FAST, i FMS7B.Port of Sqgtfle, TIB PROJT+CT. . JUST]FftCA'I'ION: 'Phis pio�eyt=supports e i tllsest freight and commuter mobility in the Green River Valley. More,than 26,000 vehicles per day travel on Willis Street, including over e00 freight-.bearing trucks. Tlie level of freight and passenger rail traffic on the BNSF',Railway mainline is also increasing to approximately 45 trains a day plus th6-b:brssibility of another 18 coal trains. Grade separation provides more efficient iia'ovements of goods and provides a solution to the costly problem of congestion; The railroad crossing will no longer impede freight and other traffic flow. Reduction in traffic congestion on adjoining streets and reduced envirofunental impacts caused by traffic congestion is c;xp,�,cted. This projection will enhance Kent as an eeonoone generator and provide regional connect ens for thousands of businesses, W°nliployers, and connnuters. CftIA,i—Q n-icetioro- ',md ;,ir 01mli 1', 11 Nd mI„Ir'Val art`iteateg, for i ac€nnzc r.'ridu3. h3caili S,A fr�,r. 8� c„rs.2:rN 00a 7 ,[-.tin],€ r€aars;� s�s pit rlun tut 1r`3iin�f(der , ntj.12£5 LN.�ard R�rbr.uir krederndJ.iTS InM4L, n Gransp¢Ytrumx;,:vlercru Modes Xi];Ljii —lenm Parpeo.crutsalii@.rs SEE iL'rP�' L'ti kdic ki'orka P"4M l'n rw l r„s?r(crtstea S'IT st fiwl 1l anadmt i�t r .urflr, r edc�-aEj; 9�i, f u eirnp x ,ira.r irrrpr a r� :rt Einat.f� is�Pat i 41 17 CITY OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2015 I PROJECT ##17: South 212th Street/Burlington Northern Santa Fe Railroad Grade Separation Grade Separation Crossing at Burlington"Northern Santa Fe Railivay DESCRIPTION: Construct grade separation at tha tcn Northern Santa Fe Railway mainline tracks at South 212th Sheet. The project I include the construction of a bridge; six-lane vehicle crossing; full width paving; concrete curbs, gutters, and sidewalks; a bicycle facility;street lighting, utTliti s and appurtenances. PROJECT COST: Preliminary Engineering 0000 . 1 Right of Way Acquisition........ $1,5005 000 Construction .. �....$3Q0t10000 TOTAL ..... ....:.. 35,000,000 FUNDING SOU RCE(S) City'gf Kent, FTv4$W, FAST, T113, Burlington Northern Santa Fe Jtailvay . PROJEC`1' JUSTIFICATION: This project supports east-west freight and commuter rnohili.ty in the Green River Valley. Approximately 29,000 vehicles per day travel on South 212th Sticct, tpludirlg nearly 3,500 freight-bearing. trucks. The level of freight and passcngei .,Tail traffic on the BNSF Railway mainline is also increasing to „approxiin*ly 4.5 trains per day plus the hkelihood of another 18 coal trains. Grade ,separation provides more ctTicient movement of goods and provides a sailut104 `to the costly problem of congestion. The railroad crossing will no longar impede freight and other traffic flow. Reduction in traffic congestion on adjoining streets and rede.0 ed environmental impacts causacd by traffic congestion is eybpected. This project will enhance Vent as an coonomic, generator and provide regional connections for thousands of businesses, employcrs and commuters. 4.iC,lil—, r vg 4,ttr<a f4 a1r <a4iiaa i5alAli i}d.dit)'Iaa uGal I; 4 - '3tE'aier,, 1m PA,rcii CVItc'%fte-'1.".1l, rIk�w i a,IN- f reil3M 1i I WA,Uqlr ,;siC get,e%tmcffI l;n aa3 eS9e1,1, V i : #=<1sa a! flt 4tnni! mhwvW24nl II C d 'a(1,f V,; -l:s._n8 Eli miimaion !Fd.n''I ,I lnleigaiat pana,puri4rit. , sitina€11,CTkralj;i,ID IGui€iReUat.erren(Dkli,,P M 6F Pieb9ic:i'af'h, r s,as;;aanli @.o,,,:[z±b i..,11, €'rid . x 1-")'1;toa afi,W 1 11 ell,:a[7 a&€ 11; t 9 i rnaisp;ra Car€ia:a fa.apl ,r RWnI Board weilk 42 18 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM i VEAR: 2016 PROJECT 418: Military Road South at Reith Road Intersection Operations Enhancement DESCRIPTION: Widen all approaches of Military Road S"' at Reith Road intersection to provide exclusive left t4,q lalttos for each '60pi9ach, and exclusive right turn lanes for northbound-,and southbound ttafAC:on Military Road South and westbound traffic or Reith Road. Replace tfr existing traffic signal. The project will include `the construction of full '%yi4th paving, paved shoulders, street lighting; storm drairiaO'utilities and ap 4rtenances. The intersection will acgo miodate the tture bicycle lanes which are planned for both Military 6'ad.South and It- Road. i PROJECT COST: Preltltii"lary Engincerjug $1.80,000, light of WayAcquisrtlpn .,.::.......$20bi(lt)0 Construct o1l ..... .........$1 300 000 TOTAL ..... � . ......... ...$2,180,000 I'L1T4Ikt NG S11RCY(S) E1F4; City #rent, 3evelopment Mitigalron funds PROJECT .1TSTIFI€'AT'1ON— The.#-Sol of development on the Kent West Hill coupled with the growth in 'tbc Puget Sound area and the regularly occurring congestion along berth Pacific Highway South and Interstate ; results in significant congestion at this intersection in the morning and evening peak hours. CtdAQ c vlpOml SP Goed tla utasl A, Qu_lVtg in 3s.aI:i';4 .a I i d'-hl' ciiml :Et afery i�>e a nit KrF rrt[^ d'2caei �tsn'�'is9ot'; 'wrhl L'- 9 4,h,a MIA r bsat tic,i I r"I r1 Irat A 1'State1,9 d^, 9,it111 f i.JY ,..,crhu nkIt a Pion ti elkra3J,iiE h earc6 ' ..InHirzFi i r.ii I'd CT III:t f, rD tv.[ligelti'P'i Ili r-rd.l?ru,4y,PvFsl, ,cde'r.IJ;&,itD LI)UlI§al,r,a)'�m(n,Diviu P_t. P"T€' F o4i Wort 1, i i l"Im F mgd X 1)rty I st"rIc J,S I f, 3,93aa91a'I:fmt„tx,tn .no E alf, f I,&')w]1109!, Itanspa 1 a Gem in,PM J ctu ent sate it[Q'lats.] 43 19 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM M YEAR: 2016 PROJECT 919: Willis Street (SR516)/Union Pacific Railroad Grade Separation Grade Separation Crossing at Union Pacific Railroad DESCRIPTION: Construct grade separation of thQ �Rfj#bn Pacific Railroad's mainline tracks at Willis Street (SR 516). The projept wI include the construction of a bridge,; a four-lane roadway; full width 'pabing; cilngrete curbs, gutters, and sidewalks; street lighting; utilities and appurtenances. PROJECT COST: Preliminary Engineering ,..........$2,000,000 Right of Way Acquisition a$0 Construction �l$,000,000 TOTAL_ ....... .$20,66. 00 i FUNDING SOURCE(S) C`t-cif Kent 17M r5 l MSIB, POT(chi'Seattle, TIB, Union Pacific Railroad JUS'i'II'+ O I'ION: This project supports �ast­west freight and coimnuter mobility in the Green E ivcr,,V all ov more than 26,000 vehicles per day travcl on Willis Street, including ove S100,freight-bearing Tracks. The level of freight traffic on the UP Railroad>mannlmeti�Is also increasing to approximately 20 trails a day. Grade separations,provide a solation to the costly problem of congestion. 'Ihe railroad crossing will no longer impede freight and other traffic flow. Reductions in ltaffIc eotiRcstion 01) adjoir ing� streets and reduced envnornilerital impal is cgmri ed by traffic congestion tine also expected. This project will onhance lzent as an er01101rac generator and provide regional connections for thousands of businesses, employers, and connnuters. 9 fir;6;3._ tr„._Srtr;PS te„a4oPt sx 8u f)!tMO, !6t6 ,SI;; 1,"S i t,ri^6ia h.,..:,aaid[. ant C¢, rdt, s,31. 4r?Coe.me 0) 54(5,; t t!'�I —➢ro-rgfii h'o ttbiErte s r,iI, NV60mcnQ r=i'I al .t-t�],r a 0. I erierA I.,.t.:; 1 Itrs=i. E[3, m �F.('.r 31( F t'S SLi.,tc,a It.trv:om I itticrxlj,9Y ,. sWIoarispc"fAiuu w�ivmn E:.t:E r alll, nd(!, 1�ca i`4}'n S kutlia�rvet�teart i#islr, F, t+ llir ,I;[lo , r.�Ir or no,l CL;rkd Loton I:'iNfil;S10 1"limpms ii4m, r_;,rlw, I, IIk "th rumsp!sK Wiwi ftnrm x,V,rwrt➢3oat 4JMmel 44 20 �i CITY GE DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I YEAR: 2016 � PROJECT €I20: South 212th Sheet/Union Pacific Railroad Grade Separation Grade Separalion Crossing al Union Pde�fi.e Railroad DESCRIPTION: Construct grade separation of the Union Pacific Railroad's mainline tracks at South 212"' Street. The project till hi0 ide the construction of a bridge; a six- lane vehicle crossing, rill width paving; coincrete curbs, gutters, and sidewalks; a bicycle facility; street hglA*.utilities and appurtenances. PROJECT COST: Preliminary Engineering ..,.. .....$3,OOQ,-000 Right of Wa .Ac uisrtion.......: .$1 5 0 B Y. 9 f Q',000 Construction $21901000 TOTAL ..... ...$30,000 000 FUNDING SOURCE(S): City of Kent, FMSW, FAST, Tll Ainion Pacific Railroad 1 PROJI C 1 . IUSTrPI Pl<?N: This project supports east west freight and cor unuter mobility in the Green 12tet Valley. Approximately 29,000 vehicles per day travel on South 212°i Strcet, including nearly 3,500 freight bearing trucks. The level of freight traffic on the UP.Rarhoad#�Ynainline is also increasing to approximately 20 trains a day. Grade separations provide a solution to the costly problem of congestion. The railroad a tossing will no longer impede freight and other traffic flow. Reduction in traffWlw `^n7lgestiorl on adjoining streets and reduced cnvirorrneatal impacts cansed by traffic congestion is also expected. This project will enhance Kent as an economic generator and provide regional connections for thousands of businesses, employers, and commu(ers. t Ii'hSR + okI2i-A 14,,Lllaw,I.,HA A 9 Q 1,Blip I Iu .r AI;VA P Pot .ighfr egq, n.Esgr ias E. .,eck-Ss il - „aomx Co'e'is!oc' n 14,ili E v taq'povc"I ment l 3E l ��tatej, a : f,star.¢ n,uvxt irtlru a fim gt4ou tr.E3et alb:47i;: 1 aea,'� 8 6mi"A(m li cdvndj,i E S fiwl p,,nt ?"w!p„ h'any Ntip Ievn lr''em il]z)AD L.ou it hnp� a v,"i(w 1; Uvi Y"VI r Works ;E, ,).v,T -""TPNC^ rro6snor hat Y rnnsa a (f t erall; F=lt 1:-8nvy m'€adoci 7m,�4 4tia rti 9so,u-.Isi trj 45 21 CITY OF KEN T SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2017 PROJECT 421: 108th Avenue Southeast Extension Southeast Kent Kangley Road(SR 516) to Southeast 256"'Street i DESCRIPTION Construct a new three. lane roadway, 6tv`Southeast Dent Kangley Road ( ) ' ding rebuilding the traffic signals SR 516 to Southeast 256 Stccet rfi l" at the intersection of Southeast Kenf ,gngley Road and 108"' Avenue Southeast and installing one neNv traffic signal at the intersection of Southeast 256`' Street and 1`09th Avenue Southeast and replacing the traffic signal at Kent Kangley Road and 108a' Avenue SE. The project includes right turn lanes northbound on 109"' at Southeast 256th Street and Southbound on 109" at Ken#Nangley,Road. The pfolr et will also include construction of full width pa'itih e6tic" to curbs gutteM and sidewalks; Sharrows; street lighting; storm drainage; landscaping; utilities and appurtenances. As part of this proleC#,the eastbound lell-turn lane front Kent Kangley Road to Southast 256� xStieet will be eliminated. PROJECT COST: Mliminar'y Engine ing ...,,{„ F . 30,0;000 Right of Why+>Acquisitron . .. '2,100 000 Construction ....... .....$2,800,000 .,,,—.$5,200,000 t+CJNDTld SOURCE(S), cityof.Kent PROJECT JUSTIFICATION: This project will relieve congestion at the Y intcrsection of 104"' Avenuc Southeast (Benson Highway) (SR 515)/Kent Kangley Road (SR 16)/Southeast 256t' Street by improving the. traffic flow along SR 516. if will clieninate the left turn pocket from SR 516 to Southeast 256"' Street=and redirect that traffic along SR 516 to 108"' Avenue Southeast. There will be a new loft turn pocket constructcd f'f) ' motorists wishing to travel north on 108t" Avenue Southeast to Southeast 2-56t1 Street. By moving three let"" turning ar oven7enta RAher to the east, away front the congested t' intersection, all dircetions of traffic will be able to flow ItI'k Q 1,ue,y rs6r to= Ng, nun ai;,a A n (,DHAi€}')�ed�3 a3 ij,F'h T r:�r;'�t,*iri�,.Strzi.c�,;, Tut I ,i rent Si 'toIr nee;a.S,D.`sidnr, Crrwht i4-IO)iI M +Pcger tar,,dime q rn sIS,Eafsy,ti ip,ir="l.l tl '_i �i i..z.a i,.,:zit° [:,der 01• WN 8-:=a,d a,lhnirnfa.a �L2�Ie�aij,,F•. zzfttii�rztt ttan,c��rtaPzU,x.,,sitca,�`rart.z..t�,1.fiS: loc:aY dzzrFae Er.rn�earP t>iYie,9=4`v'!S-' If:Faie i;'orPi.a 11-aEf r¢in. aaia (5{� <�.DTP—°pan fa�a Yz eat)t�z taia<a !i��iaz�s it€zEzvlJ{ €4Y2 Niarzspre�,tEorz�aara� ra€acn=Nu�er114tnie� 'i 46 22 CITY OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR. 2019 PROJECT P22: Smith Street and Central Avenue Intersection improvement Interseelion Operations Fnhancement s DESCRIPTION: Revise southbormd and northbeu tmunlaneassignment. I PROJECT COST: Preliminary Engineering .....$100,000 Right of Wa y Acquisition $40d,000 Construction :.;> ......... .....$900,Oo0 FUNDING S01IRCF4S} City,ot Kent i P1tt;:Jl;f""p JUSTIFICATION: The southbotind vehicle movement is heaviest in the afternoon peak eriodi The predominant p t � vehicle flout in the peals period i., sonthbound on Central Avenue and then left on Smith Street to proceed eastbound lip the hill. This revision in lane configuration, queu capacity, and turning opacity reduces congestion. This pro}ect could rc:dcsue She interscction d61ay in the afternoon peak period from 167 seconds per vehicle to I I I seconds per vehicle. I aaLi:o-n>aMg1,-fj011 am Ai e +`l,r.tlkit, t9 eu. .d; YA't1 vrnigI,1 xy b3.mi ,Yt'otic€t for.t,:rc4{��tnd€, iW ropy 1 Vor,Ww: tv 17ak lno Gm si;, ) e ,I,( V t Ifr i a i i '4)mij7 b I Viol1l vd IJ ➢ P' tf n I t [r3iinjhn ( �Ival];k N)Ediigvai' r an,slimlatif,it S„(ewsI rd,r.;ij,LID €mpr ,enlmi iho4< , Y iii' Flqdk.W"'K, P� sY Fw �fou;t�lx6�. rHtr- S`;r�lna lta�o-vptrl �in� 7rasrnnt� i< rRj, iF{ - rP'R31;€rt F rc+Seet3;o 3.��rk Y,;ta `��%t'aiel 47 23 CITY OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM M YEAR. 2018 PROJECT #23: S 212"' Street and 72m1 Avenue Souir jnterseetion Improvement Intersection Operations L'nhanA# DESCRIPTION: Add southbound dual left turn lanes northbound lane configuration. PROJECT COST: preliminary 1Jtteering $60,000 Right of Way Acquisition:,...... $f5,Q00 Construction $505;000-. T(D]CAI. R4me.a aaRi S(r90,000 FUNDING SOURCE S PROJECT JUSTIFtCATION� Kcni is an imppKtant freight distribution center in the Puget Sound Region, The efffeicni. movement of freight, through and within the ('ity is critical. to Kent's eoonomic health. With the completion of the furai road segment of 72id Avenue South between South 196`" Street and South 200°' Strcct; 72md Avenue South becorms a key freight corridor -and this intersection of two important freight corridors (72"d Ave S and S 2.1?tr Str6et)`takes on a Highly significant role in refieving the congestion often loured on 4h/cst vailry lfighvay at peak periods. Ihis improvement: reduces future; southbound vehicle que`.ting and congestion and has the Potential to improve intersection delay fiom 193 scoonds per vehicic to 63 seconds per vehicle. i `. CR,b.(}—f ra,-gtlo,R t� E3y,�fu,n uE;T �a= 4F+R,liBy �7a , c..i1, ',dJ 6 E argpap h<tu t�.r a,cg,7 ke Pltre{(-k..tt9 t, rzcsnn .�o.ci+rors P i.3'^nrr—rrewfi 1- (Air 45giE ;i i 1-7r 4n v;v anent E$a. '�o jy� t [. dt<n,€s r.fiirsr iVClel6„B;I'S ff_3:^f'1t s rdnietngS'a, ➢ra,cnllI,_I_. 5r„ dligR3ra st3spoR`9.t6nu )'sdeni�I,.r IkPA R ,r gI IWp, ,+e... p,I�Psttufl'Yt5"i1' e 1,l tad 1,Vrrtr`r<e v,-[Flu r2 E.6 rr] , I Star€err 9 r S,11q)pt rs hon tl'r'ogrs mi € di'l t; 0 0t. rt,::RSpo,i0Rom I pi( cm F M S,Far,f 1 ' 48 24 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2018 PROJECT ##24: SE 240`h Street and 104"' Avenue SE (SR 515/Benson Ilighway) Intersection Improvement Intersection Operations Enhancement DESCRIPTION: Add dual northbound and southbound let kturn lanes. Add southbound right turn pockets. Modify sTgpal phasing g. € rr PR®JEC.TCOST: PreliminaryRYz >ineerm .......$120000 Right of Way Aeqursition........ $275,000 Construction r.....$1,205,000 TOTAL—. ..,.$1009000 L+'UNDING SOURC E(S): City of Kent PROJECT' JIJSTIFIC,ATIOM I'01th Averu( (SR 515, also known as The Benson Highway), is the primtu';, north south route on the Fast Ili" and serves as a major transit route. With four to five lanes in its current configuration, this roadway has been vlidened to its practical limits. Improvements to intersections along the �oraidor can have positive effects on corridor congestion and improv€: efficiency. 'Phis project woutld add alusuing canac ty for both tlic ritartfth.pund and southbound left tuna rnovements while: continuing, to provide two lanes of through travel. It could reduce the intersection delay in the afternoon peak period from an average 110 seconds per vehicle to about 56 seconds per vehicle. j t ., :EJ i n.gceifon l'3.n.;,,hun c(d ai ctn�lity tl(d. a'p.i4i I i'tei;;ki2-� nu 4[ratcg} rr k.,a°c;i:. . ,tit,-Pas��na.¢ u(�c.v; '. 6 aseeEnxtu s l;.rdeKRl],6 —s'ca Eel�it(n ip;n1 [5or'6d?m❑Sv:;ierm(bruesal�;p_,[t3 r,ys(_a1Rris�,a carenY&.°iafuif Ss,="i'i' 8 aisq i§'a('Ict I I k'A [1m, 3_.4 IS1,-E,ti sa;'—SmNv ;mypn.i l � 11; m:: h 36wq I 00(H kliwe 'Ve nu Bmw4f Sinn I 49 25 CITY OF KENT, SIX YEAR TRANSPORTATION N IMPROVEMENT PROGRAM YEAR: 2019 PROJECT #25: IiRilitary Road South Widening South 272"d Streel to Kent-Des Moines Road( R 510) I DESC IUPTION: This project will widen Military R,oad"fro n South 272"d Street to Kent- Des Moines Road adding a center left-tum lane, bicycle lanes, curb, gutter and sidewalk. Also inelnded' is the construction of stomi drainage improvement and illumination system improvements. (Note: The Reith Road intersection is a separ to project and is noOhd ided in this project.) PROJECT C4)ST: Preliminary Bnginecring ;;,,$2,QOQ 000 g y . q n........ $1000,000 Right of Way Ac tusiYro Construction .. $]S,SOOQ00 TQTAI ,.... �Ig,S00,00U FUNDING SOURCF(1). City of:Kent, I7e416ruent Mitigation Funds, TIB PRO,ID+CIF" f JUSTIFICATION: Tfie�level oU.6velopment along this section of Military Road South has ;cached q point where a, separate ceriter two left turn lane is required. During peak traflit''flow hours, the roadway cannot acconmiodate the traffic voltunes due to the large number of vehicles blocking the roadway . waiting to make left turns. Most sections of Military Road arc lacking � 41d 3lks and an adequate storm drainage system t.i,l lfi—tt wsttnrr P,t Frr_tfro. Asa+? et €,�IiPf'�C t.rmJ ?<ASs F,,;g lit F=.u,m sir a,.!ibfw Lve¢"U hay.1.: € b7`sfl�=-_�f f i,t IbiEFn.rds ,r.a€a _=e tt 6 ;east IVI,n I d(ask ri,l,fi t , E'€dera€ f s :a :,7 nog n., U,r]t4dE,,eJ, 9i�i s)hartf d 6aEio.(:'.i",Al,R I 90,phi,,r kail"I"m mtins.,x stems F,ror 4111: :,isu Loisl-b:,'Pa camp €.i&n a<t; 1`k,tl B'WxwVVorks o "It vi"Ic Loan[;�taae].4 i im, i 1 amjlog( iv,o tntge`irtj tr,,n' j, zlt Viman+ Mfm lm '),o ,m.n,:Soa d [°lief(] 50 2.6 CITY OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2019 PROJECT ##26: 132"d Avenue Southeast Widening—Phase I Kent Kangley Road(SR 510) to Southegq 2#8'h Slreel I DESCRIPTION: Widen 132Id Avenue Southeast to provide a five lane roadway, including four general purpose travel lat es,.`a center le$-turn lane, and a facility for bicycle travel; modifying tie existing traffic signal systems at the intersections of Kent Kmgley Road and Southeast 256"' Street. The project will include the G,ttnstrucfion of full-width paving; bicycle lanes; concrete curbs, gutters acid sndewallcsy street lighft,ag;, storm drainage; utilities; and appurtenances. PROJECT COST- Preliminary Lngine'ermg 'f..,.. Vi,80 ,000 Right tit Way Acquisition < .$3,100,00(i'.;, Col irstiuctiq; �18,20( Q00 >" i a..n..e.a PC�R,. .1_,. TOTAL .., ..,,.S25,100,0Q0 i FUNPJNG SObRCE( ); Ch of Kcnt PROJECT ,T1STIFICATION: The levetr f development along this section of 132°1 Avenue has already rcaclied the point whereby a consistent five land roadway section is needed.to providc efficient icft faun iccess into adjoiiiing ptoperties and ac4o,,xinkiidatc torecast traffic volumes 1 xistin- traffic volumes that execcd l d,{)00 AD] (n,ar (lie intersceticn of l32"VAvcnue southeast and Dent Langley Road) necessiiaie a five lane sectinrr. Sidewalks and bicycle facilities will provide inaultiniodal access to adjacent land uses. HiUy Cc,3pcsfiar lM a,ionan, o, Q,ulhi) I W,dcl, j.2'.hi.'I �Iig'j,I tf mut,,t I m k gy 1',rrlyoH(-, L-A evom,ry con idw 7iI M I i6,lat14 b; s, @� dti�,iC lin.Eetn�eni]Bu <Ci�Sta t+if,FLA 9etkls� vant ilA(Inu m w'w, 1P,e4ve.Vl n ;,S kujmd 6 IINI[hAP ! �e ctl?ra€�, pro PnPtllil;tmt Hd;��e*tie=r�� �n 4,&ns PoJ(1] Impim"w"{9;NO rcFI V puEthic lVorl'k Insea i re d i n,3cat<r.S"82"-iiu� a ,� u; toe pa it n. enge-- „ If,rla..cr;'; a Hi F Faanj(3'atej 51 27 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2019 PROM CT 427: 132°d Avenue Southeast Widening---Phase If ! Southeast 248`h Street to Southeast 240"'Street DESCRIPTION: Widen 132°d Avenue Southeast to proy de a live lane roadway, including four general purpose travel lands, a eCi#ter left-turn lane, and a bicycle facility; modifying the ehrstlug traffic sign#q system at the intersection of Southeast 240`" Street Tlaioject will nrcJ(tde the construction of full- width paving; bicycle latres,`concrete curbs, gutters, and sidewalks; street lighting; storm drainage;utilities and appurtenances, PROJECT COST: Preliminary Engireer t7 $150 000 Right of Way Acqu Sition $1,560,000 LSxnslt4ctl(?I7 $ 70;060 TOTAL ...-...... 5 7,0U0 d➢IibE i FUNDING S URCi*(S) Citytof KWI PROJECT J JSTIFICAl"JO d: The level,of development along this section of 132"d Avenue has already reached tte point whereby a consistent five lane roadway seetion is needed to provide efficient left turn access to adjoining properties and accommodate forecast traffic volumes. Sidewalks and bicycle facilities ruilt provide multimodal access to adjacent land uses. Loiagctit{on NIi01,1t(4m and[ tit I (i.i€ItIA 1,'0 d i,ei;iu A Ow a krr;twe' Dui =.5��€ef!-.ti,.r,3s�.h�.t onn.i t,mlitlmo; lad 8I:- F vci (is "'}built gitve4 6E all ol( i i Istet f,k i Vpd""'�i & ➢ :1;=EYI JS�I i�i+l5�1 t 1 t f� �d'`i '� �'fi rli e7 in, jt.dmIq.l S 9uiJHI""T� "'pAmIa uc,a]'�,, W 6IIII); aunt ;F"VO' PtAWic iiwL' "!�i�,4E iiu r a r,ap i"3fek�(.4t�--6ari.rte j'r.�aspcu ie t�aoe Fsi;�r�m !t p.fe,rrsl� 'laF tlraeFsprork.tPu ea Im" r .'n"JI Etna?d l`r1Nte7 52 2s CITY CAE KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I YEAR: 2018 PROJECT 928: Dent Kangley Road (SR 516) and 132rt4(::Avenue SE intersection Improvement Intersection Operations Enhancernent It .. i)ESCRIPTION: Add northbound and dual left turn lanes. � I PROJECT COST: Preliminary Engineering 0,51600 Right of Way Acgyisition ..... ...$1.75,000 Construction $940 000 TOTAL..... $1,200,000 Y. . P'iAdDINCBSOURCE(S'); city ,of-Kent PROJECT' t JUS'IIFIC:ATTOM Keitt Kangley Road (5R 516) is a Principal Arterial with over 32,000 daily vehicle trips,_I32"`1 Avenue SE is a Minor Arterial with over 14,000 daily Aiyle trips. 'The demand on hot]) roads is anticipated to grow in the nee>t �;dccadc as growth in households and jobs on Kent's East Hill continues fd develop. Over the next 20 years the growth of traffic on 132„d Pvi`zfarc, is prcJected to arovr at an average rate of 0.8% pcl year. This tiacans the demand on the roadway would be 15% higher by 2033. The intersection of these two key roadways bceomcs a chokepoint for both local and ii,Lioral cormaute_.r's, Tills imptoverneril reduces existing and 1liture southbound congestion. Tt has the potential to reduce the intersection delay from 109 seconds per vehicle to 44 seconds per vehicle. f'"4,2C's- t�i{ '4�na`a¢i3F .hdn ara is Qt�€a'i3r�a td ia( ,Yhs➢ .9g@it,t Yin,,:f�A egv d w -rcEt-ti rtiFle-4hnnun Lar¢'ida¢'q R'Sd3a- r eight%IaM 3 . . ,g,&l N ,Sa3,. iHw' l,SPar�,ViA R e&,,11 Vedelall,2iL'S ifwar'; Vliwm"0c'n GFederstif, i T`, 1,011it,n! s r ii3s}umfi ul ui11°:;0t;n I Vedendj;ti» F oc"I ompio,'wen Y2i teao,FVVT6 'aWir works "3rua9 tl,un To;r¢[ €efet.,,@P—Sul s cc Ir2n�po !aa r ' I aram 11e i..yi [ Bpd` 9rNna1: rs.iattt%o�.m i,ute_tE ixca � �hafet 53 2.9 OITV OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM PEAT,: 2019 PROJECT #29: South 260eh Street and Pacific highway South (SR 99) Intersection Improvement Intersection Operations Enhurtcentettl,.,'' I DESCRTPTIONl Add westbound dual left Auin lanes. Add eastbound right turn pocket. Modify signal phasing. , i gi $ PROJECT COST: Preliminary� Engineering 100,000 Right of Way Acgws Ilan ,. .. 9 2S0 000 , CoiLstruction j,�„ $90(k000 x i T 0TAI:,.. .......... $1,M),000 FUNDINC St3IJRCE(S} .`. City,,o Kent JUSTiF1CATION: S 26W" Street provides cre of the few direct ce mnections betwecii the Pacific llighway otridor and the downtown City Core. South 260th is a MUltimbdal coizidor which acconurrodates vehicles, pedestrians, bicyclists and bus traffic. As the IVlidway area redevelops into a more t innwicial/residential mixed-use zone, the traffic connections to the Military Road neighborhood and connections to the valley retail and civic, center "need to be updated to highest effi6ency. 'Phis irrfersection i1wrovetnomt reduces fituic westbound vehicle queuing and congestion of over 500 vehicles per hour and improves the rntersectiorr_ delay from 180 seconds per vehicle (3 minutes) to approximatoly 87 seconds Per vehicle in the PM Peak Period. C Ali wr,j Air Q4g,"'14 i,flu O •9'Ar l t+151zi A,! le Sit,:zrml l f�IcraSi-a,n ttlC 6 n v f,lw, :ul,isdor; i �efl—kteu,€ii sHaD dt '§l slc;i, eed,..v3 rrns,1.4Ulneafss*e t d 31G� d E, 1p ➢trnPj,11 S hArWp' at .i,W-,poZS,ntsi vt,mr ji c cico rll;LID tons')pro,ens,oro Dkij'i; n4"lI`&r—public'svrrrprs i S.,u,i'iud Ionf lS+fxl j, :Ls -SlU asa HrAn"P ?i> sua P^rn�;r, �,'cr;,,r'aR], sr#e �rtes�ap� P.,i3na 1`Tgo ,sill at roz,u "ii+ftcI 54 30 CITY OF NT` SIX YEAR TRANSPORTATION ION IMPROVEMENT PROGRAM YEAR: 2019 PROM CT#30: SE 256rt' Street and 1041"Avenue SE (S1R 515/Benson ITighway) Intersection Improvement Intersection Operations Enhancement i IDESCRIPTION: Add northbound right h R01, Modify sigiv phasing. i PROJECT COST: Preliminary hugineennp $ ,0oo '.a Right:of Way Acq,&,$ ton ....... $150,000 f Construction $22` 0 T'OT'AL..... ..,:'o ...,... FUNDING SOURCE(S) City of#Kent f" i PROM C T 3USTIFICATION: At the cotnfl4€nce of two state highways (SR 516 and SR 515) this °intct�I rtion Ajae iences congestion during most times of the day. Approoiiriately 33000 daily vehicle trips are 'traveling east/west on SR_ ' 516 (ICent'Kangley) where it meets SE 25611' Street and 100 Avenue SE at what is commonly known as the Rent Kangley"Y". 'ro help facilitate nolthbou nd movement at this intersection, this project wilt provide a dedicated right tarn lane for traffie flowing eastbound. This project also provides some signal improvements (upgrades) to allow changes to tine signal timing and phasing at this in%ersectiorn. The combined improvements are estimated to reduce delay on the northbound segment from 156 seconds per vehicle to 86 seconds bier vehicle in the peals period. i C tin sir»h«ic�i tiSct:�It.'iG—der{cfEip,•Eis tlr.ns,ans3rn�r� .•,yt�nss t FeEieralI;6133 €,...�l l�a��.eovea�rFeir z;b n . rT,,I t'. .Public Ww,Ls e;tFund Ix r.i Yu,j.ST9,—S461 MU I IAIMMIA r f m;M"Y111 JVM;,eAlP 6 art 55 31 CITY OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR. 2019 � PROJECT #31: South 2121" Street and 84th Avenue Sq r Intersection Improvement Inter,veelion Operations Enhancement.:.; DESCRIPTION: Extend eastbound left turn lane and add noxlhbound and southbound dual ign left turn lanes. Modify sal phasing. PROJECT COST: Preliminary Eggmeering ... 130 000 Right of Way V tagtfisitton......... $420,000 C OnStrUCtlon .. $1 nlY" 00 TQT AL ..... $19800,000 FUNDING SOURCE(S): City 7f-Kent PROJ1 ECT JUSTIFICJA'TION� This rtlrersection experiences congestion dming most times of the day. Both roads are'Principal Arterials arud each carries over 25,000 vehicle trips per day. The demand on both of these roads is expected to grow in th< next-�decade as growth in both freight movernent and residential developny'ot in Kent's valley continues to develop. `Phis l�srojec( also provideg §one signal improvements (upgrades) to allow ehanges to the sig ai timing and phasing of this intersection. The improvenents would reducc congestion because of heavy demand for left Urrn movemcnts. It. is anticipated that the;sc, irrhsevenients could reduuc the in'terscetion delay to as little as 47 seconds per vehicle. r,r41's�— n atsots�43neg rtiitot_Id A it +'wiIi;.y IN t (1 1E.. I'll` 6 i 6jA A,11i,.`sCYOtC„r P.a.rrtf-r*t ir(r r isrety Co!t-idoi': +tghr H.obYiRii Si alCgi2 rnrr,i md'-If no'":!I`seRzej,? 3 A, Artw3d ir.trm zEa ttl ,O iI,Hi flPar.'ttd i sy.f...,: ll cdct'a87,I ij1 f v;aI @turn OVII eCrrl Vi-4r3.. p I':'F'i'. r u€vL,t%s;rb. ifit,a 1,4adc] ol: 'Tw hi.r t;itTFif'I t.I t 4tilurt;t7 [R de. i,i1: (Pi: @iAn ns()Iz ier:f) IT,t F i EnTq rtt!]tatej 56 32 CITY OF KENT SIX YEAR TRANSPORTAI`ION IMPROVEMENT PROGRAM YEAR: 2019 PROJECT #32: Meeker Street and Washington Avenvgjnterseetion improvement Intersection Operations Enhanccnzent . >° DESCRIPTION: Add eastbound and westbouud right turn "ekets. Extend left turn storage pockets. Modify signal phitg. i PROJECT COST: Preliminary Engineering ...$W,000 Right of Way Acquisition ... ` 50,000 Constraction .... %850,000 TOTAI...... :. ...$96(;600 I Ii UNDINC SOURCE (S): City:of Kent PROJECT I' i JtJSTIFICATION., This is one of the b6l0st intersections in the City. Washington Avenue 81) i3'a Principal Arterial and Meeker Street is a Minor Arterial, Was"Wton Avenue carries about 25,000 vehicle trips per day and Meeker carries about 16,000 vehicle trips per day at this location. Much of the vehicle volume on Washington Avenge is truck trips headed for the regionaf%ighways and the Ports of Seattle acid "['aeonxa. At the same. tinle, int trial automobile, bicycle, and pedestrian traffic between the west side ofKont and the Downtmvo City, Center needs to main-'river through this busy intersection. These improvements will have the greatest effect on improving the efficiency of that cast/west movement. It is anticipated that these improvements could reduce the ioterseetion delay to as little as `i"r seconds per vehicle. tM1 4ip- tio, ;esiltm 3&tti' xttm,Rind An .Ji,ft (i Futig h t AvOonstrut"g, 7ueLmi.U-`7e al(le-PaeoeI,e t fo'noo, f sraRi' S }t M0143 s f &9 e m.t�.[3t a Ce'2],I PA di, i it ?dmh n t i.€itm &liiti BrA ar'[€ €.Es anatu t I1(dirn1j; 14 bo,pine¢t e in"Pt3r1 ti;f i tt,Semn t3 comi'jt I W t v aE Di to.et !,') rF 9 nfiiir Ot'oi is d tae[p'uld iofm Swd; �4"— h w1i'r,r tiaqe.dtz d3dion fit,rsz „aE mtpowd18tata] j 57 33 CITY OF DENT SIB: YEAR TRANSPORTATION IMPROVEMENT PROGRAM i YEAR: 2019 PROJECT #33: South 272oi1 Street and Military Road l<l"tersectiou Improvement Intersection Operations Fnhancernent�,m' I DESCRIPTION: Add a southbound through lanQ at the innte'xsection. Modify signal phasing. i PROJECT COST: Preliminary Engineering , .......$20,000 Right ofWaV �ginisrtnon ,,,, tt, t...$0 Construction ......... 240.000 TOTAL...., FUNDING SOURCF;(S) C rty'',#f Kent PROJECT,, JUSTIFICATION- ate increased developaawn on the Kent West bill combined with the lack of alternative north/sb th arterials places significant local congestion on Military Roxlel, Oil those occasions vAien the Mate highway Systoln (1-5 andlor State Canute 99, aka Pacific Highway South,) breaks down, Military Road becomes the alternative of choice for regional diversion tra(lic, This project reduces existing and E'ulu e southbound congestion, i ai�uugnd tra 41(htiifW td dUPooll1, I""1 r_11401.ttna0 ,ta,l Ler, n Y>vr"fl- C411e imcull'.)1-1'I idmZ 4cPSlis a,€a,I,a is roffAiiy n[€„i"Ins.,tmfv€& I y d ISioteI,k1 + -I,if,7 1rarf,ij1 nsi as„n jitd .fl�•@f9S ale-nrd i vnsat t i C avtij,�a krl s`6rEcIft 9 is rtsportuon stc;ar. I"€d o';fII: a,lA 1 r,,..I rtuys IIs Iidt tj1VPF tublic';vw 4v cussVjmdra.anIS>sI,I,S1P—Rw ra" 'I.;nsix,r i[ '3.,a ndram 1 Fc6,t aii;. IY . IIi"]"1a Il,ii ,IA .... sna n4 F'lw d JSlafet 58 34 CITY OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM i YEAR: 2014 - 2019 PROJECT#34: Street Preservation Program Ongoing Cilylvklc Program DESCRIPTION: Projects that maintain bine existing` trat6ortation system by overlaying, rehabilitating, and reeoni'structing the existing; _asphalt and concrete streets throughout the City. PROJECT COST: Preliminary Engineermg .$4 000 000 Right:x4.Way Acquisition Ct nstructain 56,OtitYy100 TdBTAh...,. .. --$60,000,000 FUNI}, SOURCK(S) City of Kent I PROJECT JUSTIFICATION: The C rty.�qsscssed the condition of its street network in 2011. It was found that »rang of. tho streets exhibit deficiencies that reflect they are beyond tlneh° expected#„rfbrrri;:nce lif4: and in weer; of a maintenance or reliahililation overlay, or some' amount of reconstruction. Moreover, historically, the amount. of pavement resurfacing, rehabilitation, eoid reconstruction monies the City has budgeted cacti year has been insuffic iont to address the deficiencics of its, street network, Insufficient budgets to Perform this ne< rssary warty _results in more expensive maintenance and rehabilitation options, t4l=^�}- COJ ge511il3A Yoliir-tA1:,AYtd t4Ba,i i:ge Jt ,{eL1�,r, .`,9 if,f±lpf,� PI4L I,11 to, rr4fCHl et'Me WII'vw[e€urfi'ft' t;P .€t, "viMmlif ,itate?u an+e,U,..,aIe a I,Iaiej,.IT iA w L:e;, n,,,n,>.I Adwi,aIiA radim,Ir e e,r,t,.o-d.i soh-<�et9 r fiwi Aoii lt,.d,,Al,iI , Sara r_f€i�.se is eogpocb 0f) tiy'SIm3 lFede;ntt:a Ph; 3.or tI lh'pr� u?i,taru:;F'W t'F F n,thv 44fwk[ 1,„ap grpia d a oll" I`"+1¢i't,4(k —i§[n P.0 7takaspm,3 NOWT V ronr.IT It, ae o'A iy t [s rt anu3,,�r l.i Eam€:tnpt + .aai Motud 1St3etc1 59 35 CITY OF KENT SIX YEAR TRANSPORTATION ION IMPROVEMENT PROGRAM i YEAR: 2014 - 2019 i PROJECT #35: Residential Traffic Calming Program Ongoing Citywide Program DESCRIPTION: This project will develop and implement residential traffic calming throughout the City on a priority basis as furtiliiig allows I Engineering ........; $750:bo0 PROJECT COST: Preliminary Right of Way �gUisition........ .w Construction ... ......... $105q"o TOTAL..... .` �1,800,00 FUNDING SOURCES) City:0-Kent PROJECT JUSTIFICATTONF Theprografia,was originally established in 1999 to address traffic concerns on residential :treets. The City Council recently adopted a revised `fraff7c Calming Program in order to make informed, systematic decisions about actions 10 correct those concerns, There has been a substantial increase in requests to the City for inslallat`gI n of physical devices within the last couple of years that resulted in a s gra£eai1t'mcmase in the number of speed and volume studies acid required numerous public meetings, 'Phis program will allow for adequate traffic studies to heep up with the increased demand, support slat!'resources to perform the studies and vl=ork with residents toward resolving traffic conccrns, and fiord the purl base, installation and constinction of physical devices fnr res'idemial traffic calming. t.aasp_ sotF .:Es��c;°H[f�a tics ttQaS k�. ey�n�l:4y,I. dri.�SJ.�i as F 9„•i�,hF.,otw r;, rn€et>q 1� p; r„,:l.4- nrp snsro er;orri�'er; 4i4?S7P3- .p o2ht%iobdnv AE;aZeAk Iin e'OuVO" rA „tat(i,} €} It (17'd rtn'a[ice��9 ?mile'jii <r II.'k,"i1, 1 is ln dlipe 'i rs l q'kx nips i Srsteeo Ci r 1 aYL z-6t. .,rra @nq Jsuuidl D ioaY, i'VY i i,-ir0fie tror;.s "4eir,t Fo-cu.l4 n,r' iiatr1 yU Sill .I' :-rsEsp,,, IgHml r't o2r.mu muoy,iuit'io ti eld Waal tt 1ti1a10I 60 36 CITY OF KENT' SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM VFA.R: 2014 -2019 PROJECT #36: Traffic Signal Management Programs Ongoing Citywide Program i DESCRIPTION: This program will analyze interseations:for potential installation of traffic signals or other traffic control to insure safe and ellicient use of the existing and planned transportation network Anly'Sis of turn movements and collision history will be used to prioritize new trafa Signal installation's. PROJECT COST: Preliminary eering........:t. ,..$600,000 Right of Way Acquisition........ ........$0 Construction $3,600,000 TOTAL..... 'w�.9,200,OQ19 :a; FUNDING SGIJRCF(S : City(xf=Kent PROJ�E,CT JUSTIFICATIC91'sd: Historically the City justifies the need for two new traffic signals per year to meet safety an([ mobility needs. This program budgets for projects needed to meet the`increasing>s'demand for signalized intersection control and the constant need f0ftifllic counts to monitor vehicle volumes and behavior. It also supports the replaecei rent of old, outdated traffic signal equipment at currently signalized intrrrcctio'ns, The priorities for traffic signals will be set by transportation system signal warrant studios which include studies of volumes, collision hisi.ory, pedestrian mobility needs, and roadway geometry. This program also hcips the City maintain level of service standa_rdq necessary to maintain concurrence as required by the Grov,th Mauagensent Act. % AQ— n sh�7s'�% o-fi;6at rt u.l SFe r 4t.'�E�Y;€o-E a-i t I r IdA ru�i e#a i[¢{it for r ,di ➢,do-d r ,.o- a tlrt vo-, reruaro-�F,<i .a4,r&i.'v tra.aui u .lhroi�rriteo-i (n o-,6,vats,ti , .r1r -m';k tear'ovemcm Di l l°r W I F Public Wl"-&s &-ust ro-o-...... r on (`Tto-6,1:s i' - Itxfnr.;r esnsro r,dw;Peo„r im Ir-ukr2r):I o-r T r:urstt ivion Jolprov,mot Holy !'Aair1 i 61 37 CITY GP KENTT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM i YEAR: 2014 - 2019 PROJECT 437: Miscellaneous Intersections Improvements Ongoing Citywide Program DESCRIPTION: Improve miscellaneous interseptiorts Within the City to accommodate future ry oemeits to the operational efficiency of the traffic volumes. Provides for'f` p roadway system incluc]uqg�r- echanneliration signing, signal coordination programs, transit signa . priority, Intelligent transportation Systems, signal upgrades such as protective/permissive phasing and LED signal indications upgrades. i PROJECT COST: Preliminary Fngmedtlittg ,........ 5,000 Right of Way Acgtisition i W$Iriiction ....$255,000 TOTAL..,,o: $304 6{6(I I+UNDIlNCa 56 T tC1 (S} City;,,of ICerit PROJECT JUSTII+IC"ATION. The IYausportationMaster Plan identified several intersections that will nccd to he irnI to acconrmodctte Future traffic volumes. These intersections are spread th, ghoutthc City and are not included as separate projects will-d ) this Ct-Year`TIP. Increasing the capacity and efficiency of the existing roadway systesm�through operational inlprovcIncuts is a very cost effective element of the trap pcirtation program. i COAQ—r"n;,e_kii rf iV7s.Ft,RcUv 3ns3 An I,.a1.xnlf9�-�. " Lreagis3 s€ ur @r iQ6`g} jnr ttef u F iB i:�I83—zv ea„hs IFBer[7ilrt .its aei�:2uveslnseu:nd . u[Nor( fi € 4 5 d,rvi € .ens.(Alin*nkI!^ Jmli[1 r a,r.€t�tRj,�; �1 aaiineii.z a is; tertiJ,q9w Irtel@g rt i,dxs;ru3 i m.rsr 4i,c_mr,j.'tM MI;NO g,nil Ikon (,l cmrnt Ills ore, V'k I i, W.b N& Flan tzu i'nrto"",.Utc tic=isrAII; II a—'Pennsp'wli iIwli Bmp!m"foz6,f Wiii et '-'i iI 62 38 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 - 2019 PROJECT #38: Comprehensive Plan Update Ongoing Ci",ide ProgTarn DESCRIPTION: This project consists of an update of the"lransportation Element of the City's Comprehensive Plan and the Transportation Master Plan including near-teem and long range planning of the C.tiv's: trau�p_ortation system needs. Project costs include consultant contracts'" for transportation planning, concurrency management, public mvolvenlent, travel denrla0 and traffic operations modeling and analysis of potential financing strategies-to-construct, operate and maintain the City's transportation Aolwork. The project includes staff resources, hardware and software to analyze itil e and monitor the transportation network. PROJECT COST: Preliminary F inecrm $450 000 Right of Way Acquisition-,..... ..:,.......$0 Construction ....,�'' FUNDING SOURCE (S): City of Kent PIfC),IEC,T JUSTIFICATION: ,The C:ty'=ai2008 Traospoftat on Master Plan identified the City's transportation sygle:n ne ds out to f1k year 2030 but was based on the City's 2004 Comprehensive Plan. This project will support the City's 2014-2015 Comprehensive Plan Update by incorporating the City's updated household and jobs forcoms, into future transportation demand model forecast scenarios and develop possible transportation alternatives to accommodate the new, growth 7 Projections" he Cify must be in compliance with all stag✓, county and regional policies in order to be eligible to apply for corilpetitive grants. The City el[deallears to maxinn.ize transportation cfticiency, investigate methods of measuring coticurrency that incol:p0latc all modes of travel; better reflects the ways our Community is changing, engages the connimAr iy irr discussions about futtsc transportation inves'Unents, and investigates various ways of funding cur future teanspo tation needs, i r?Oio, i,xte3o ¢f, [xrse in..e¢a ile iavml s ur-i;i+i3. l i.4 FA,,�dlnl ,ii " n i"imni€ooni eG' ani� fii3 &taznad `Anfeir.aP rn �1,edc all, e o kidli Sy,d,,m,, LID A mr 0 Brae..*,we,u Di,irief;I tfr'S F n valtcV"A', '. Sav ;f F'v iai i�u rrnnal;mt rer iq{rre IN,, raid:. 3 YI ikion Butpen .n rt;:as!€ .F,l tavel 63 39 CITY OF DENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 -2019 PROJECT P39: Ch.annelization (Street Markings) Improvement Program Ongoing Citywide Program DESCRIPTION: Provide street marking projects thronghout the City to separate and regulate conflicting movements, define paths af;travel, and facilitate safe and orderly movement on City Streets. PROJECT COST: Preliminary Engincering .......; (7;000 Right of Way Acquis}taon........ .......$0 Construction ' ` TA ,�g+ ,.., ..SG9Q..q��r1 A$,P' .L .,. is ,.,.. ,. 9FPV� '. FUNDING SOURCE(S): City of Kent PROJECT aintains and updates The eharrnelization throughout the JUSTIFICATION: This ongoing program m � City. The City 1sas 1,648,8 73 hncar feei (LF) of channalizatiorl striking, 445,300 raised pavement m�rlungs, 22,012 LF of C curb ar)d 7,179 LF of painted C curb. Channclization helps to limit contlict points and directs motorists through areas Of complexity. These markings are also used to delineate left Win storage queue '11.reas and (teceler•ation areas li)r 601t fill-,ing vehicles. This project pt, scrves the capacity and efficiency of the existing roadv✓ay system. l t,'„j—r >�te non iYi ¢ aE+3� A .3 aAinalit, `idea€,:had' Ail , ,n ,+.gio,p+ca S e84:Nfk- z np€i Mo'bifih 'wgi". wNI'm"fl Bo d i 4,;wj.i i A .Wl,ral m;l h,hmn ,,+w J4,,�[. d�° @tI",R �t.iv2od 6 f.,u nR i,rer I R vd,"al],a['ts I11i01ige 7YaeYts or9,,.w.,s,a�,3a I Fedee1I1;7._l€ a "wf lmpe E"w,at li€Sk tc! :z ':° v t'. P[Na •'LmJ, lint'„o0 lee.erI„nmI, ;I'-SuIN,. 4„ripen; ,Iiwf P-(,gp r, I],odz,MIS Tj i� y k F,fl hp 01 061a)rrtparo. NY Es(slci ' 64 40 CITY OF KENT SIX YEAR TRANSPORTATION NSPORTATION IMPROVEMENT PROGRAM i YEAR: 2014 - 2.019 PROJECT 440: Bicycle System Improvements Ongoing Citywide Program DESCRIPTION: Make miscellaneous improvements to the city's bicycle routes as identified in the Nonmotorized Chapter (Chapter'6) of the adopted 2008 Transportation Master Plan (TD4P) and the hill 200?) onmotorrrec sub-plan. Bicycle lanes are usually j part of individual street ttriprovement projects and each of those projects would be itemized individually. The costs of the bike lanes added to TMP Street projects, estimated at approximately 49 000,0.00 in 2007 dollars, are not reflected here. This project is,for shared lane Iitrjjnhg and signing, thatching grant dollars for filling in bike lane gaps, and for the extension of the shared-use path network. PROJECT COST: Preliminary Engineering ! .. .. 000 i Right of fty Acquisition .$75r000 " 'Const uctioh ......... .....$734,600 ....$905,000 &1JND!)I 861 RCE�S) Ck#y_ofKerit JUSTIF'1C/i'3 ON: the 2008 Transpoi6tion Master Plan and the 2007 Nonmotorired System Study proposed urnetwork of shared lane routes on 'transportation corridors throughout the city t elp connect the bicycle, system. Lane markings and sign postings can iniorrn mer'torists and cyclists of those corridors best suited for significant bike use, These shared-lane facilitics, can provide critical linkages to major cycling activity centers and comicedons to the shared use path systems. The city has a priodti,'ed list of projects for bike lanes, sparrows, and shared use pafhs. Tiris project can help achieve the City',; goals for improving mobility, -reducing � vehicle trips, increasing physical exercise, and improving t�ansporlwion connectedness. ('"JAQ ( )Igemina hf FP.e{CQP}L91iJ h jlE,hl,Y P4lcr;01rr''ASt 1t'i'htA flu"Sllal' 4a �fiCulf.t 1,'n Odi'1; i �104}p; [gXnhrWy M'-Magic wt c.,,,u to f t Iz';Wcl.F 4 , S ef4z;i . €imiw'@i'm I 3c:aI I,BI Vn# IR OTl itw..r ie.rm a1];1_ria 1oc3lhnj 'rent fI'DW. s. h'CYI'V Pupae S+/asr' €r io'i d r m["hr I'"i'i'-.fSutb es'G':''m4yo i rbnrr Pro,rEta i. C @$ i rt hai pi o,r r r zr;t;nai ; �4yrp� '� 65 41 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR; 2014 - 2019 PROJECT H41: Sidewalks, Sidewalk Repair and the Americans with Disabilities Act Compliance Program j OngoingCityivide Program DESCRIPTION: Systematically construct new sidewalks throughout the City as identified by prioritized project lists in the 2008 'rah ortation Master Plan. Reconstruct and repair existing sidewalks and curb ramjns and install new truncated domes and hard-surfaced sidewalks to rtli}5lement the re4nirements of the Federal Americans with Disabilities Act (ADA) consistent with tl* findirigs of the Nonmotorized Chapter(Chapter 6) of the 2008 Transportation Maste Plan, PROJECT COST: Preliminary Engineering ........ 5�10000 g y ct l ,000 Fight of Way ur Ac strJon .... '$�50 Construction $2,254000 T ,TAL_... .......: FUNDING SOURCP(a): City Kent PROJECT JUSTIFICATIONv,.- This project is mandated bOTTitle II of the Americans with Disabilities Act. Title 11 requires,that a puyhuePtttvinust evaluate its services, programs, policies, and p'actipcs 'to determine whether they are in compliance with the; nondi-v,rimination requirements of the ADA_. The ADA requires that an .ADA TransidoYl Plan be prepared to describe any structural or physical changes required tr`make programs accessible. The City has conducted a self-evaluation and prepared a 'Transition Plan including a prioritized list of projects to bring ' itself into compliance with (lie Federal ADA regulations. This program begins wor6itlp' on that list of projects to construct and repair the City's sidewalk and street/sidewalk transition zones Stir accessibility for all users Find begins to address the pedestrian improwraents identified in the. Transportation Master Plan. This project t3ait help achieve the Ci y''s goals for improving mobility, reducing vehicle oipii increasing physical activity, and improving transportation connectedness, F -its- u ,sunn f M;"I,(if)J fmd 't u,k)lmp Y'(l c.ret alI; FA sC 1 tvL x Yr n Wiwke, tot k tFreff-°E sr f rce. #w i ki,n'; E ...,HS- a t .„III r N lr iih, ,ArI. eEi,ac,s,tilmd hoard gat Eej,b E i k e7crii i t„rzsu Oil t rfkt lw; n t(_dvest t LI, 3br a=d t Pc uirxrt En+t] t,t.rail,b.S I0,Mg. , UurlIE;6.n. i,wvl11 ntgt,eleanr.'nt swlkl:r ,V fg, Pu€li2 1471tlaa 1 vast ht,d barns lSdzL 1 . e P fiea€.. . P t'in,p77'r[ .,,.at[t-tt,r;mt 11 tir;atl: r W i vftw ,tw,HHots h npt o"melit..oa rai (Siakel 66 42 CITY GE DENT SIX YEAR TRANSPORTATION I1VII'ROVEMENT PROGRAM YEAR: 2014 - 2019 PROJECT #42: Guardrail and Safety improvements Ongoing Citywide Program DESCRIPTION: Make miscellaneous guardr'ai1 improve:neuts..,each year to enhance motorist � safety, Candidate prolects1helude Frager Road; H 240°i/t48"' Avenue Southeast hillside, Lake Fenwick Road north or S 272n" Street:and 100ts Avenue Southeast. Upgrade existing guardrail end treatments as mandated by State and Federal regulations. PROJECT COST: � elimiriaryl ngiueermg $20000 F Right of Waylcquisitrort ,;... ...........$0 "on5tructio` ......$160,000 TOTAL'6.' »P S180,000 FUNDING SOi1T !,CF;(S): City oMent, IlES PROJECT JUSTII+ICA'1 TOM fuis project is mandated by compliance wi(b Federal and State regulation ; and the requirement to cli ni hate potentially ha/.ardous roadway conditions. t.Y E,3(p_ anw 43,dmP.t fr, fii_xr ar=.w r#ir rYut+li i;} �1� arai) Pfa„B I, =E�'€t,ream rrota'aPrg, S,. aauE etd d..it,lt 5' .er , C_r.riuue; i nLiNii- R=raghi lt(ri,u of �.! fvt=ie€ p r,�ecscr'?*r„ r'�°ta'ai. . asori€;�t 9 I4.aet'xR3,v� + d 11"I i<n, e d isnepm't .im,„)4 em .t td.rnk],LID Lott i Wtr su,tW'tit"ili,i+ry E PIVFn n jk "t1'er:" I east jl 6,i1 r r ase hillII f V YP kiI.tf v , !P,L';5o�f.tiftn 4 u.�r r i �A'ed,rai1; i 49, TracrspnviArta lmp' er.'.nf t;os[ 1 i 67 43 CI`➢'Y GF KENT I SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 - 2019 PROJECT #43: Community Based Circulating Shuttles Ongoing 01jivide Programs DESCRIP'T'ION: Continue to provide enhanced ttan,540rtice to meet the needs of the community through the use of fixed-route shuttle.svice, with demand-responsive routing capabilities. Routes 914/916 serve the Kent Transit Center, Regional Justice Center, Kent City Hall, Greer River Community College's Kent campus, and local shopping and medical facilities. The Rctfk�913 shuttle connects the City's manufacturing/industrial deiiter with the regional""i7us and commuter train services at the Kent Transit Center. PROJECT COST: Preliminary Engt ering ,, ..........$60 000 Implementation ,.$930,000 ' OIAI..... 't $99Ui0(10 I+IIllI5IP�1C S4JllIbt�E(S) 0 �of Kent, CMAC , Bing County, ITS PROJECT JUS'IIP'ICA"h' ON: Routes p14/916 provide mobility and independence to many of the eity's seniors and zcduGo the need for expensive ACCESS service for many wheelchair-lift service tfiPs. Community circulating shuttles encowrage the participation of all ages nil= economic groups, all physical abilities, and virtually all of our ctlnrtrrrmzf 7 in evcr3'day civic life without the isolation and pollution of the autonrubile for every trip. Commuter shutdcs enhance the regional transit/tr•airr service by providing the vital link Coal home or work to the Traiesit (,enter, eareot agitrg people to travel without their personal verucks thus avoidillp the cold-start impacts to air quality and reducing congestion on toe al streets. i C)Ml)—C xn.afitur ix5,t Gilt.x;;u is Q7Fo�itifyt�eti.utt); QiA`sffi KZE.,uhfh tzi� rL.�Ft7;e�. G,grglg-> i��. F..,caat»gym ".:3nrg 6i6EE;S—f i�+P Pa,tin , r,.nn;ic tiv<< € 3anf�i lf31�4[�iej,Jfi3 Es,7„-r;ai Ci .n'aP;�r_�=e <<tiarh(iun lErE .tf� 9�;A5 „�s�r.t I 'I f a7r die � ) s 39t,I P €at#1 as u! G r }r,,!s i�a ie�irs I td a L� S.fl�7 +v� i icrE�ac ar cii d41,e in B Yi 3 ;- f ukdu -r'crs .ta.(Rxnr,i 6. .,l.tat�3 .,t1 nEarlat J��i,pari6�is n@ . �n�rr t4cx ,e1�. (tk ur 3ts;;t�i�at,oy.£tatrasu •r,f'.$3U�4t is_� 68 44 CITY OF KENT SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM YEAR: 2014 - 2019 PROJECT #44; Railroad Quiet Zone for Downtown>Clrhan Center Ongoing Cil g g Yrvide r .Pro gram I DESCRIPTION: Establishment of a railroad quiet zone,-,::for the Burlington Northern Santa Pe Railway (BNSF) hacks and„,tll iTnion Pacific Railroad (UPRR) tracks through the City of Kent. The grad��,'' rossings to be included in the quiet zone on the BNSF railroad mainlin S 259rs Sheet,CiWillis Street, Titus Street, Gowe Street, Meeker Street it, Sheet, James Street, and S 212`" Street. The grade crossings included in the ri et zone fqr the LIP RR "mtthiline tracks are; Willis Street (SR 516), W it Street, W ecker Street, W- James Street, S 228" Street, and S 2iYi;Street. f; 11ROTFCT COST. Preliminary Engtneenng , . ......$3,500_,000 Righf of.Way Acquisition .......... .> $0 , Con}stJ♦upctia Qy TOTAL. a..e.eee..„DJg ®®yl➢V qP i+UNDMOURCI# (S): City UfKent' F0 eral Rail Administration, PHWA PROJECT JUSTWICA7TON. Locomotrs;e.;engincers begin sounding the trail-mounted horn approximately 1/4 mile f-om the intersection of a highway/railroad crossing. This warning device is an eflecof e deterrent to accidents at grade crossings but exposes the local coinmuMY to Significant levels of noise that often deprecates the quality of life for those livilig closest to the railroad facilitic,s. 1 nP,i,t- to3 , siiin� & ra„?nt�i as5it.4 . tmtta3liy�.�L.nij�i`-5 I „�„,P�i.'�cY�ca�t.atrgv „3„ Earnri tf9le-racman n'nrv`i<4cer; � P I'J 4p� f i cv I I a ish i ry 4r ..vI,# tCl'Ell [t E6�owtowl (I wei 1j.I &¢WI k's a+ r is „03i a o+4ti ik`mIe 13i t ralJ 1,111 B EwaI Imt, oplfl DI 0r flI b rT F��b71c 14`o�f�s li N r LU �x s O v w � 6U C x O O O L O L cm In m W ca CL J j 11 WIN M P f a 4 i t: ti y. 4 n - CI 3 y A4 y � L t.,� ✓ 7 a O U 5 •rVn � e t o 70 I i 71 CITY OF KENT WASHINGTON SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2014 — 2019 Klomw '1L N pqrw WA S H I N G T 0 N For more information or additional copies of this document contact: Steve Mullen, Transportation Engineering Manager City of Kent, Public Works, Engineering 220 Fourth Avenue South Kent, WA 98032-5895 (253) 856-5585 smullen@kentwa.gov 72 i i i i 73 PUBLIC WORKS DEPARTMENT Timothy J LaPorte P.E., Public Works Director Phone: 253-856-5500 KEN T Fax: 253-856-6500 WASH IN GTO N Address: 220 Fourth Avenue S. Kent, WA 98032-5895 Date: May 16, 2013 To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: May 20, 2013 From: Mark Howlett, P.E., Design Engineering Manager Through: Chad Bieren, P.E., City Engineer Subject: Information Only/Hawley Road Levee Improvements — Phase II Change Order Motion: Information Only/No Motion Required Summary: The City is pursuing accreditation of the Hawley Road levee from the Federal Emergency Management Agency (FEMA). As part of this accreditation effort, the City prepared a Conditional Letter of Map Revision (CLOMR) which determined that the Hawley Road Levee does not meet current FEMA standards. The City, in conjunction with the King County Flood Control District, was successful in obtaining a $900,000 grant from the Washington State Legislature to fund reconstruction of this levee. This grant was budgeted in the state's 2011 to 2013 biennium and it is possible that these funds may be reallocated by the state and would no longer be available to the City after July 1' Because of the potential loss of the grant money, the City began construction of Phase I of this project this spring. Phase I is nearly complete and we have now acquired the property rights needed to complete Phase II the project. We are pursuing a potential change order to expedite the project change order with the existing contractor, SCI, as well as the option to bid the remainder of the work. The Phase I work was $541,925.36. The remaining Phase II work is approximately $450,000 and will complete the work for this levee reach. Budget Impact: This work is included in the overall project budget and will be paid partially through the grant from the Washington State Legislature and partially through the City's stormwater utility. 74 This page intentionally left blank. 75 PUBLIC WORKS DEPARTMENT Timothy J. LaPorte P.E., Public Works Director Phone: 253-856-5500 KEN T Fax: 253-856-6500 WASH IN GTO N Address: 220 Fourth Avenue S. Kent, WA 98032-5895 Date: May 8, 2013 To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: May 20, 2013 From: Gina Hungerford, Conservation Specialist Through: Kelly Peterson, Environmental Conservation Supervisor Chad Bieren, P.E., City Engineer Subject: Information Only/Recycling Event for Residents on June 1, 2013 Motion: Information Only/No Motion Required Summary: The City of Kent will host a Special Recycling Event and Recycled Products Sale for city residents on June 1, 2013 at the Phoenix Academy parking lot located at 11000 SE 264th from 9:00 AM until 3:00 PM. Residents can bring items not easily recycled at the curb. In addition, they may purchase Composters, Rain barrels, and, new this year — Worm Bins, while supplies last. A flyer will be going out in the mail. This event is paid for by grants from King County's Solid Waste Division and Local Hazardous Waste Management Program, and Washington State Dept. of Ecology grants. Budget Impact: No impact 76 This page intentionally left blank. 77 PUBLIC WORKS DEPARTMENT Timothy J. LaPorte P.E., Public Works Director Phone: 253-856-5500 KEN T Fax: 253-856-6500 WASH IN GTO N Address: 220 Fourth Avenue S. Kent, WA 98032-5895 Date: May 8, 2013 To: Chair Elizabeth Albertson and Public Works Committee Members PW Committee Meeting Date: May 20, 2013 From: Gina Hungerford, Conservation Specialist Through: Kelly Peterson, Environmental Conservation Supervisor Chad Bieren, P.E., City Engineer Subject: Information Only/Kent Litter Free - Event on June 8, 2013 Motion: Information Only/No Motion Required Summary: On June 8, 2013 the City will host the first Kent Litter Free Event. Residents, businesses, youth groups and faith-based organizations have been invited to help beautify Kent by picking up litter throughout the community. Volunteers will sign in and pick up litterbags at the event table stationed between City Hall and the Police Department located at 220 4th Avenue South at 9:00 AM. From there, they will head to their cleanup sites and return with their filled bags by noon. Local restaurants have been invited to offer discounts as a means of thanking volunteers for their efforts. It should be a fun day. Budget Impact: Materials are provided by the Solid Waste fund and labor, from volunteers.