HomeMy WebLinkAboutCity Council Committees - Public Works/Planning - 09/03/1991 WITY CLERK
PUBLIC WORKS COMMITTE'E,
September 3, 1991 — --- -- - -------
PRESENT: Jim White Carol Morris
Leona Orr Ed White
Steve Dowell Jack Cosby
Don Wickstrom Charlie Kieffer
Mr. and Mrs. Rust
Cuiberson Street Reservoir
Wickstrom reminded the Committee that the landscaping would be
about $30, 000 with about $8,000 in yearly maintenance costs.
Wickstrom stated he was recommending that we not proceed with the
project at this time. While the cost for the landscaping would
come from the water utility and funds are available, because of the
current budget constraints and the freeze on hiring, Wickstrom
stated he can not be assured that he can maintain the staff
required to keep up with the current maintenance needs let alone
adding new projects. Leona Orr suggested the Committee send this
item to IBC with a recommendation this project be completed as soon
as the personnel needed to maintain it can be added. She stated
she has a problem with putting in the landscaping without being
able to meet the maintenance requirements and then in a couple of
years it would have to be redone. The Committee unanimously
approved proceeding with the project subject to the approval of
IBC.
VMS Upgrade
Wickstrom explained that ,$137,164 in Federal Aid funds have been
allocated to the City to upgrade our VMS. We are applying now for
preliminary engineering funding in the amount of $20,7 82 with the
City's match approved in the 1991 Grant Matching Fund. We are
requesting the Mayor be authorized to sign the grant application
and to establish the budget for the grant funding. The Committee
unanimously approved.
Ordinance Correcting the Recorded Plat of Walker's Acres
Wickstrom stated the City obtained the property through a drug
seizure. We short platted the property and the plat was sent to
the County for recording. Somehow, the plat was amended at the
County and the recorded plat is different that what we sent. We
are proposing to adopt an ordinance authorizing the correction of
the plat of Walkers Acres. The Committee unanimously approved.
Public Works -Committee -
September 3, 1991
Page 2
East Hill Annexation
Mr. Kieffer asked this item be placed on the agenda for discussion.
Wickstrom explained that on tonight's Council agenda is an item
setting a public meeting with the petitioners for October 1. At
that time, Council will determine whether to accept the petition as
is, whether to amend the boundaries, place conditions on the 60%
petition, etc. Wickstrom added that an optional action before the
Council is to direct the annexation to the Public Works Committee
for a recommendation at the October 1 meeting. It was confirmed
for Leona that the Annexation Committee has discussed the
annexation and has left it up to Public Works. Kieffer raised
questions as to the procedure used in determining that the
signatures on the petition represented 10% ownership of the
assessed value of the property in the annexation boundary. Kieffer
stated he was not happy about the annexation. Jim White explained
that when the City receives a petition it has to respond to it.
Kieffer asked how the County's school impact ordinance would apply
to this. It was explained that the County's ordinance would not
apply if the property were annexed but the City is working on
similar type of legislation.
Kent Springs Transmission Main ,
Kieffer asked this item be placed on the agenda for discussion. He
stated he has been looking at the revisions to the project. He
continued that the application for the Army Corps Permit states
that the purpose is to replace the deteriorated Kent Springs
Transmission Main, yet the latest revision cut out about 2, 000 feet
of the project. Wickstrom explained that the original design
included a portion to serve the future Tacoma intertie and
impoundment reservoir. That portion has been deleted from this
project but we will construct it later when tho intertie is
constructed and will address the environmental issues at that time.
Wickstrom further responded to Kieffer's comments about the purpose
of the project that it is to replace the old Kent Springs
Transmission Main but it also takes into consideration the needs
which are included in our 50-year water plan. Kieffer said he
still had a concern that the purpose of the project is not to
replace the transmission main and that he feels it is to have an
intertie with the Tacoma Pipeline project. Wickstrom reiterated
that the primary, purpose is to replace the transmission main and
that it is being replaced in an alignment that will fit with the
needs identified in the Water Comprehensive Plan. Kieffer stated
he thought the environmental study didn't include the scope of the
project. Wickstrom offered a differing opinion. It was determined
that Kieffer's comments needed to be made to the Army Corps of
Engineers. Kieffer asked about lead agency status on the SEPA
review of the reservoir when it is designed.