Loading...
HomeMy WebLinkAboutCAG2019-012 - Other - Otak, Inc. - Scope Revision & Notice to Proceed - 01/24/2019 ADMINISTRATION Timothy]. LaPorte, P.E. Public Works Director 400 West Gowe Kent, WA 98032 Fax: 253-856-6500 PHONE: 253-856-5500 January 24, 2019 Greg Laird, Principal Lori McFarland, PE Sr. Project Manager Otak, Inc. 11241 Willows Road NE, Suite 200 Redmond, WA 98052 Re: Contract Scope Revisions and Notice to Proceed Mill Creek at 76111 Ave S Culvert Design Project Number 08-3019 Mr. Laird and Ms. McFarland, In conjunction with the notice to proceed, please revise the contract scope as follows: Project Schedule Site Boundary and Topographic Surveys and Base Map Preparation (by City) - at NTP Critical Areas Review (by City) - at NTP Preliminary Geotechnical Report (by others) - withln-2--woeks-after-NTP City will provide geotedmical data at NTP Task 2 - Stream Simulation Technical Memorandum —Podl4 44aoeayy- &V9 after TS&L Task 3 - Hydraulic Design Alternatives - after TS&L Task 3 - Type, Size and Location memos - end of March, February 2019, highest priority Task 4 - Preliminary Design Report and 30-percent Plans and Cost Estimate --eod-of-May_(rIjd March, 2019 Task 5 - Zero-Rise Report - end of May 2019 Tasks Task 1 - The City will develop the project kickoff meeting agenda Incorporating comments from Otak however Otak will begin work upon NTP. Task 2 •- The City will provide Geotechnical data from previous explorations In the surrounding area for the TS&L, Since the vicinity Is relatively uniform In Its cross.-section we are looking for a design that can be moved to where property negotiations and environmental permitting dictate. please remove or modify the first paragraph In Task 2.1. "ll 3.1 .• Second paragraph, three alternatives are not necessary„ please remove the word I'three". Task 3.2 - The City will provide the HEC-RAS model from the drainage master plan however It will need to be updated with the proposed culvert sizes to make sure they are sufficiently sized. Due to the flat grades and tallwater In this area of the valley, standard charts and Manaing's equation will not give an accurate assessment of the flow volumes or needed culvert sizes. Please modify or remove the last bullet point:"Else the Planning's equation to estimate the velocities for the recommended flow rates and use those velocities to recommend materials for the streambed and strearnbanks In the ditches and In the culverts Task 3.3 - please limit initial anallysls to basic information needed for TS&L. Further, in-depth analysis Is anticipated as the project progresses. No modification of this section is necessary since the tasks state "'Topics may include". Assumptions: Please remove the bridge option.. Otak Scope Revisions and NTP Page 1 of 2 City of Kent Public Works Department Please review and incorporate these scope revisions no later than January 251h, 2019. Notice to Proceed is effective Immediately after acknowledgment and incorporation of these scope revisions. Sl r ly, // anne P. Smith roject Engineer Received and Approved by: Greg Laird or Lori McFarland Date: Ota' , Tnc, Otak Scope Revisions and NTP Page 2 of 2 City of Kent Public Works Department