HomeMy WebLinkAboutPW18-357 - Change Order - #1 - Road Construction Northwest, Inc. - S 228th St UPRR Underground Utilities - 12/20/2018 %%l� % /��%/
/�jj % ///
Records by ' y' unle
KEN T
Document
"//UN
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Road Construction Northwest. Inc.
Vendor Number:
JD Edwards Number
Contract Number: PW18-357 -O) 7-
This is assigned by City Clerk's Office
Project Name: S. 228" St. Union Pacific Railroad Underground Utilities
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 9/13/18 Termination Date: 60 Wmrkirwg Drys
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Susanne Smith Department: PW Engineering
Contract Amount: $1 92 ,246.25,
Approval Authority: CIRCLE O Department Director Mayor City Council
Detail: (i.e. address, location, parcel num"b6F, , etc.):
Change Order #1
As of: 08/27/14
N'1
CHANGE ORDER NO. #1
NAME OF CONTRACTOR: Raad Construction Irwa . ("Contractor')
CONTRACT NAME & PROJECT NUMBER' c 120cn cf ; ;
• ::mis.leAfn.M2.. .r1'a•,,_I 1 ;—R.B..0 _;F
I
ORIGINAL CONTRACT DATE: PtOCIIC_l% 2Q1.
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Procure 13 ft. pipe lengths for placement at STA 3+13.92 and STA.
9+12. The existing 72" CMP carrier pipe has many deformities. Shorter
pipe length improves deflection and flexibility characteristics for slip
lining.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
____....._......
Original Contract Sum, $1,923,246.25
(including applicable alternates and
WSST)
......... -- ..m.... ...... ...............--
Net Change by Previous Change Orders $0.00
(incl. applicable WSST)
Current Contract Amount $1,923,246.25
(incl. Previous Change Orders)
Current Change Order $21,584.80
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $1,944,831.05
CHANGE ORDER - 1 OF 3
.. .... ..... .......... ...-. .....
Original Time for Completion 60 working days
(insert date)
Revised Time for Completion under a
prior Change Orders
(insert date)
.......
Days Required (t) for this Change Order o calendar days
Revised Time for Completion 66 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
1 YI
., CONTRACTOR... .� —CITY",OF.KENT: ' __...,__
(i
l
Y T �s?ggnature) e&4 signature)
Print Narne' - f"Jeffrey_M Kpay Lr Print Name Timothv J. LaPorte. P.E.
Its Y"losilew Its Public Works Director
(title)//._.... . .. ..... _____ (title) ..... _................
DATE: ) 2/ I I" ._ _. -------- DATE _..._t`` .2.
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
'... (applicable if Mayor's signature required)
Kent City Clerk Kent Law Department
--
[in this need.You may enter the eeamntc Illeoatn where the contract has been saved]
CHANGE ORDER - 3 OF 3
FILE NO: 200.2
CHANGE ORDER WORKSHEET NO. 1
,...w.,....�
Construction M ment Division — Public, Works
,,,,,,, ama e
. �a.,.
Project: S. 2281h St UPRR Underground Project No.: 07-3022C
Utilities
Project Engineer: Mark Madfai Fed-Aid No.: N/A
Owners Rep: Jason Barry Contractor: Road Construction NW
Date: 11/8/18
I. PROPOSED CHANGE
Procure 13 ft, pipe lengths for placement STA 3+13.92 & STA 9+12.
II. REASON AND BACKGROUND FOR CHANGE
Existing 72" CMP carrier pipe has many deformaties. The annular space between a true 72" ID
CMP pipe and true 66.5" OD Spirolite pipe can be no greater than 2.5" typical. Pipe investigation
in the field shows actual space to be 1.5" or less in several locations. Shorter pipe length
improves deflection and flexibility characteristics for slip lining. The change reduces long-lead
procurement duration that would otherwise be necessary to perform a more thorough pipe
cleaning and survey to ensure the stiffer, industry standard 20 foot pipe lengths can be pushed
through. City agrees to pay material cost difference associated with increased production costs
of shorter length pipe. Contractor agrees to waive further mark-up costs on difference.
III. METHOD OF PAYMENT
NEW PAY ITEM(S) ❑ Not Applicable
Change Order No. i FOR ACCOUNTING USE ONLY
Sch. No Item Description Total City this Unit I Unit-Price Total Estimated Cost of
Est. City PE Item
IV 60" 13 ft. pipe lengths 1 I 1.00 LS $21,584.80 $21,584.80
� _ _ _m__
Independent Estimate Attached Ct3EA,7E PA'V I7- — Reimhur_seent. m to be ade I ® ; PAY THIS PAY ESTIMATE
- REQUIRED ��based on actual work performed
._...... ............
Material Submittals Renuir�d --CC: ConstrLiCtlon Coordinator New Sub Reqrd? I No
DELETE EXISTING PAY ITEM(S) per 1-09.5 Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
sch. No. B.I. No. Item Description Unit Umt Price Cost of Item
Independent Estlmate Attached -REQUIRED f
INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable
1 REV. DATE: 1/10/18
/TFILE NO: 200.2
T
Change Order No. - I FOR ACCOUNTING USE ONLY
it Unit Price Cost of Item
� � Y II
Sch No. B.I.8 I No Item Descnption Ot I
Ids ate Attach - REQUIRED
Independent Estimate ....._..._...�_� -. _....... r ..... _ .. .,.. _- _ --Attached i � I
TOTAL ESTIMATED COST OF CHANGE ORDER 21 5d-
*Total of the Cost of Item Columns
THIS PAY ESTIMATEw$2115„84.80wwwwwa
IV. WORKING DAYS
Original Contract 60 Due This Change Order* „0 Previous Total L..60
DATE: .... ,,,,,,,,,,,,,,,,,,,,,, I. DATE: .. _
Explanation ired:sificatian Re a
TOTAL WORKING DAYS* 60
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Prepared By: _ Date:
J Barry } 1
Construction Supervisor: � ti Date.
Paul Kuehne
Construction Manager: "� = ; ;,- - ar. — Date:
"n Connor
2 REV. DATE: 1/10/18
Road Construction Northwest, Inc ,
PO Box 2228 Renton, Washington 98056 (425) 254-9999 (425) 254-1334 fax
October 29, 2018
'I'o: City of Kent
2M Fourth Ave. South
Kent, WA 98032
ATTN.: Mr. Jason Barry
RR: City of Kent—S. 228" Street Union Pacific Railroad Underground Utilities
SUBJz Request for Change Order ft t—Additional Costs for 13' Sticks of Spirolite Pipe
Jason,
Per our in-person meeting on 4 October 2018, and as requested in your response to RFI 005, we are
providing below the cost proposal to reduce the standard pipe length from 20' to 13` sticks of pipe in this
Phase 1 production run. The total difference in cost for Phase 1 is $26,117.61. Please see below for cost
Breakdown.
As a reminder, and to document for the record, Phase 1 pipe procurement shop drawings were approved
on 24 October 2018 (except for the MI I located at STA 6+93.2, shop drawings for which are pending
City of Kent review) and includes 481' of 13' sticks and 80' of 10' sticks. We are awaiting the City of
Kent decision regarding the Phase 2 pipe procurement(MH at STA 3+13.92 west to STA 0+33.92). A
separate cost proposal for that portion will be submitted once the City reviews the diver investigation
report and determines any changes to RAM 007 Part 2.
2y1.v0 �t
Cost for 20' sticks 2/e. — 480' @.$262.07/cr $125,793.60
Cost for I " sticks 37ea = 481' @$306.40/ar $147,378.40.
SUBTOTAL $21 5$4,#
37 Q$3,983-ZO
TOTAL
11 111 r'"
Please issue us a Change Order for this difference in cost so that we can order materials and schedule&
coordinate this work. Should you have any questions or concerns, please. contact me at (425) 777-7327.
Very truly yours,
George fucker
Project Manager
Road Construction Northwest, Inc,
Page I of I
0FERGUSON"' FEI-TACOMA WW#3156 Deliver To:
2042 SOUTH 112TH ST From: Lance Hayes
WATERWORKS TACOMA,WA 98444-0000 Comments:
Phone:253-538-8275
Fax: 253-531-9909
14,01,53 OCT 29 2018 Page 1 of 1
FEI -SEATTLE WW#3011
Price Quotation
Phone: 253-538-8275
Fax 253-531-9909
Bid No: B313286 Cust Phone: 425-254-9999
Bid Date: 10/29/18 Terms: NET 10TH PROX
Quoted By: LJH
Customer: ROAD CONSTRUCTION NW INC Ship To: ROAD CONSTRUCTION NW INC
1815 SOUTH 228TH ST UNION 1815 SOUTH 228TH ST UNION
DBA RCNW DBA RCNW
PO BOX 2228 PO BOX 2228
RENTON; WA 98056 RENTON, WA 98056
Cost PO#: CITY OF KENT 228TH Job Name: REVISED QUOTE
Item Description Quantity Net Price UM Total
CITY OF KENT
228TH ST S RR UTILITIES
SP-PSCP60400 60"SPIROLITE SCP PIPE CLASS 400 481 306,400 FT 147378,40
13'LENGTHS BxS SCP
SP-PSCP60400 60"SPIROLITE SCP PIPE CLASS 400 80 312.930 FT 25034.40
10'LENGTHS BxS SCP
SUBTOTAL 172412.80
.......... ...-.. ,...,__.......,... ___................ __ - - ___ .... .. ............ __..____-.......__................____.,.
Net Total: $172412.80
Tax: $0.00
Freight: $0.00
Total: $172412,80
Quoted prices are based upon receipt of the total quantity for immediate shipment(48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE
AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE.QUOTES FOR PRODUCTS SHIPPED FOR RESALE
ARE NOT FIRM UNLESS NOTED OTHERWISE.
CONTACT YOUR SALES REPRESENTATIVE IMMEDIATELY FOR ASSISTANCE WITH DBE/MBEAVBE/SMALL BUSINESS REQUIREMENTS.
Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control,and/or based upon
Local, State and Federal laws governing type of products that can be sold or put into commerce, This Quote is offered contingent upon the
Buyer's acceptance of Seller's terms and conditions,which are incorporated by reference and found either following this document, or
on the web at hltp.//wolseleyna,com/terms_conditionsSale.html.
Govt Buyers. All items are open market unless noted otherwise.
L.F.AID LAW WARNING: It is Illegal to bruslall products that are not"lead free"in accordance with US Federal or other applicable law in potable water
systems anlict ated.for human cons w rnpiton,Products ith'NP in the description are NOT lead free and can only be Installed in non-potable
applications, Royer Is solely responsible for product selection,.
Barr , Jason
i
From: George Tucker <george@rcnw,corn>
Sent: Monday, October 29, 2018 1:51 PM
To: Barry, Jason
Cc: Jeff Kanyer; Matt Wagester; Brian Menard
Subject: RE: 1815 Kent S 228th UPR - Request for Change Order#1 - Additional Cost for 13 Ft
Spirolite Pipe
Attachments: A014420860.pdf
EXTERNAL EMAIL
W
Jason,
Below is the relevant portion of the original quote from Ferguson. Attached is their updated pricing received this
morning.
Bid Item 4015 Slipline 72" CIVIP Storm Swr Pipe wIll Storm Swr
600 FT 60" Spirollte SCP Pipe Class a00
SpeUll BLrry Note fot the pia ect' . ead tcs be Cias5, I or 0s
Thank you
George Tucker
Prole,t Marsger
Road Construction Northwest, Inc.
xsz Nro r Rey r r VA 4�I7v
8520 Holly['n) �t] P prett N4 N 1',. .a°•""""^'"
t t)y CV. .
O Bos Renton , o
rel. /7 TJ FdY 19 2 8 J�Si
Y).-.r [F!)Y4f fVW ny
Native:This message,mcludrng ott' frne Its,coot( c1nfl0ep tial op privileged information for the exduslve use of the Intended recipient(,).Any urmuUmmed use
is prorrhRed If this unrtil lviot%or vuu,Prr,•Se na+fp the senderurd then destroy the message.Thor,k you.
From: Barry,Jason <JBariyC lceflfwq.aaav>
Sent: Monday, October 29, 2018 1:42 PM
To: George Tucker<georgt(Jrs;rlw.cnrri>
Cc: Jeff Kanyer <jeff@rcrw.corn>; Matt Wagester<matt(@rcnw.com>; Brian Menard <brian ukrcnw.corn>
Subject: RE: 1815 Kent S 228th UPR - Request for Change Order#1 - Additional Cost for 13 Ft Spirolite Pipe
Please provide back-up from supplier supporting these numbers. We will be in touch,
1
I
Barry, Jason
From: George Tucker <george@rcnw.com>
Sent: Monday, October 29, 2018 12:01 PM
To: Barry, Jason
Cc: Jeff Kanyer, Matt Wagester; Brian Menard
Subject: 1815 Kent S 228th UPR - Request for Change Order#1 - Additional Cost for 13 Ft
Splrolite Pipe
Attachments: RCNW Letter 001 -Request for Change Order #1 - Additional Costs for 13 Ft
Splrollte.pdf
Jason,
Please see the attached Request for Change Order#1 —Additional Cost for 13' sticks of Spriolite pipe. This is for the
RAM 007 Part 1 portion approved on 24 October 2018.
Let me know if you have any additional questions or concerns.
Thank you
George ruder
Proje,I M,,r,,t^r
Road Cons&ruction (Northwest, Inc. WA
,851 m 4°i St,Renton,WA 9y05y
8620 II o l ry Drive,'In .10 l vl re_It,m!q M,0£!
PO 11 22 t,,Renlon,WA 9t305 C>
Tel4. , Ili /32 4! �2L2957
[icgug,er�FYCCd W:r:2rrrr
No", h it oaal v, ll d'eI'a0)(1)n ,II , unl'derP to'Of pnvnegeJ n(ornat)na lot Or Nsluclve c!r of ll it,lntenrhd ( lielIr() /nluniau trl ON!Ad use
fl/,n'hvwl it r1 fhk PMO i t'!latlo! oo IA rr;e note, fA ""Jer "id th ! Irs,uc Mr nwl,ages Inord<you
,
1
i
From: George Tucker [nrailtor qe rr rwv,ct r,]
Sent: Monday, October 29, 2018 12:01 PM
To: Barry, Jason
Cc: Jeff Kanyer; Matt Wagester; Brian Menard
Subject: 1815 Kent S 228th UPR - Request for Change Order #1 - Additional Cost for 13 Ft Spirolite Pipe
=EXTERNALE AIL
Jason,
Please see the attached Request for Change Order#1—Additional Cost for 13' sticks of Spriolite pipe. This is for the
RAM 007 Part 1 portion approved on 24 October 2018.
Let me know if you have any additional questions or concerns.
Thankyou
George Tucker
H,roierr,Nr I,"Kei
IRoad Cons tifluctlion IIJoQhwest, IInc
�856 W b1°s�Renf nt \ k5>ill:3
Iif ZO InIIH Ulive, i' <IV 1 were(, VVA"2L03.
ff IHox B,RenhuNA V�036
Te 1) IU J,i7F ,4l '1- 1957
vjiario,,�e(�Ik(M1,�W. trrro
IVON hp, rrv9yi,,I' , lmynt+i<h» w,ron✓Il rrig5lentisl l,ld stinn,l� Ih, ithwv' ,e ,(beSnte,,(ko pwi,i .f,A),yunauthoriseduse
is hd,t. r INot eor,lr rti4: v u, n4 "e 1,hf,It" m iri<n "?'i,oy iN, lv,,ie i"i Lyou-
2
[bl . tll
„t
wlw
tip, -
r
'p 1144
j
1
r �
d 5 w
ell
0
r ✓ 1 —— ��
T.
I �
+ r
� tTjTA A
on
r '
a long Is
oval hod
Ago mg �b
Pi
�a ,x
d
y�
a
w
1
4 {! i
I w
i
i
l -
r
a�
ul
i
hi
jil .�.
a
a
i
t a
Y �
T
,
w� i
pe;
/MF -M) w4gam",
v "Aspic f? of
T1
k. AM look
0 h6paw hot. O'sm
P4'^
Olson S
fluCA"OONJ uUMIPIM& AE 05 6
TFo/Al-
,al 1 TE", l
"till. ET
51 7-E--
SM. OOXS UF,rwm>3 cc a�i 1 —7- C4
DEL ,r pOj re')
nTY PJEIXICJA)�,., PKAJEF17]; ti
6 rd- 0" ,tp f- 7Z