Loading...
HomeMy WebLinkAboutPW18-357 - Change Order - #1 - Road Construction Northwest, Inc. - S 228th St UPRR Underground Utilities - 12/20/2018 %%l� % /��%/ /�jj % /// Records by ' y' unle KEN T Document "//UN CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Road Construction Northwest. Inc. Vendor Number: JD Edwards Number Contract Number: PW18-357 -O) 7- This is assigned by City Clerk's Office Project Name: S. 228" St. Union Pacific Railroad Underground Utilities Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 9/13/18 Termination Date: 60 Wmrkirwg Drys Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Susanne Smith Department: PW Engineering Contract Amount: $1 92 ,246.25, Approval Authority: CIRCLE O Department Director Mayor City Council Detail: (i.e. address, location, parcel num"b6F, , etc.): Change Order #1 As of: 08/27/14 N'1 CHANGE ORDER NO. #1 NAME OF CONTRACTOR: Raad Construction Irwa . ("Contractor') CONTRACT NAME & PROJECT NUMBER' c 120cn cf ; ; • ::mis.leAfn.M2.. .r1'a•,,_I 1 ;—R.B..0 _;F I ORIGINAL CONTRACT DATE: PtOCIIC_l% 2Q1. This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Procure 13 ft. pipe lengths for placement at STA 3+13.92 and STA. 9+12. The existing 72" CMP carrier pipe has many deformities. Shorter pipe length improves deflection and flexibility characteristics for slip lining. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: ____....._...... Original Contract Sum, $1,923,246.25 (including applicable alternates and WSST) ......... -- ..m.... ...... ...............-- Net Change by Previous Change Orders $0.00 (incl. applicable WSST) Current Contract Amount $1,923,246.25 (incl. Previous Change Orders) Current Change Order $21,584.80 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $1,944,831.05 CHANGE ORDER - 1 OF 3 .. .... ..... .......... ...-. ..... Original Time for Completion 60 working days (insert date) Revised Time for Completion under a prior Change Orders (insert date) ....... Days Required (t) for this Change Order o calendar days Revised Time for Completion 66 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. 1 YI ., CONTRACTOR... .� —CITY",OF.KENT: '­ __...,__ (i l Y T �s?ggnature) e&4 signature) Print Narne' - f"Jeffrey_M Kpay Lr Print Name Timothv J. LaPorte. P.E. Its Y"losilew Its Public Works Director (title)//._.... . .. ..... _____ (title) ..... _................ DATE: ) 2/ I I" ._ _. -------- DATE _..._t`` .2. CHANGE ORDER - 2 OF 3 ATTEST: APPROVED AS TO FORM: '... (applicable if Mayor's signature required) Kent City Clerk Kent Law Department -- [in this need.You may enter the eeamntc Illeoatn where the contract has been saved] CHANGE ORDER - 3 OF 3 FILE NO: 200.2 CHANGE ORDER WORKSHEET NO. 1 ,...w.,....� Construction M ment Division — Public, Works ,,,,,,, ama e . �a.,. Project: S. 2281h St UPRR Underground Project No.: 07-3022C Utilities Project Engineer: Mark Madfai Fed-Aid No.: N/A Owners Rep: Jason Barry Contractor: Road Construction NW Date: 11/8/18 I. PROPOSED CHANGE Procure 13 ft, pipe lengths for placement STA 3+13.92 & STA 9+12. II. REASON AND BACKGROUND FOR CHANGE Existing 72" CMP carrier pipe has many deformaties. The annular space between a true 72" ID CMP pipe and true 66.5" OD Spirolite pipe can be no greater than 2.5" typical. Pipe investigation in the field shows actual space to be 1.5" or less in several locations. Shorter pipe length improves deflection and flexibility characteristics for slip lining. The change reduces long-lead procurement duration that would otherwise be necessary to perform a more thorough pipe cleaning and survey to ensure the stiffer, industry standard 20 foot pipe lengths can be pushed through. City agrees to pay material cost difference associated with increased production costs of shorter length pipe. Contractor agrees to waive further mark-up costs on difference. III. METHOD OF PAYMENT NEW PAY ITEM(S) ❑ Not Applicable Change Order No. i FOR ACCOUNTING USE ONLY Sch. No Item Description Total City this Unit I Unit-Price Total Estimated Cost of Est. City PE Item IV 60" 13 ft. pipe lengths 1 I 1.00 LS $21,584.80 $21,584.80 � _ _ _m__ Independent Estimate Attached Ct3EA,7E PA'V I7- — Reimhur_seent. m to be ade I ® ; PAY THIS PAY ESTIMATE - REQUIRED ��based on actual work performed ._...... ............ Material Submittals Renuir�d --CC: ConstrLiCtlon Coordinator New Sub Reqrd? I No DELETE EXISTING PAY ITEM(S) per 1-09.5 Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY sch. No. B.I. No. Item Description Unit Umt Price Cost of Item Independent Estlmate Attached -REQUIRED f INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable 1 REV. DATE: 1/10/18 /TFILE NO: 200.2 T Change Order No. - I FOR ACCOUNTING USE ONLY it Unit Price Cost of Item � � Y II Sch No. B.I.8 I No Item Descnption Ot I Ids ate Attach - REQUIRED Independent Estimate ....._..._...�_� -. _....... r ..... _ .. .,.. _- _ --Attached i � I TOTAL ESTIMATED COST OF CHANGE ORDER 21 5d- *Total of the Cost of Item Columns THIS PAY ESTIMATEw$2115„84.80wwwwwa IV. WORKING DAYS Original Contract 60 Due This Change Order* „0 Previous Total L..60 DATE: .... ,,,,,,,,,,,,,,,,,,,,,, I. DATE: .. _ Explanation ired:sificatian Re a TOTAL WORKING DAYS* 60 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: _ Date: J Barry } 1 Construction Supervisor: � ti Date. Paul Kuehne Construction Manager: "� = ; ;,- - ar. — Date: "n Connor 2 REV. DATE: 1/10/18 Road Construction Northwest, Inc , PO Box 2228 Renton, Washington 98056 (425) 254-9999 (425) 254-1334 fax October 29, 2018 'I'o: City of Kent 2M Fourth Ave. South Kent, WA 98032 ATTN.: Mr. Jason Barry RR: City of Kent—S. 228" Street Union Pacific Railroad Underground Utilities SUBJz Request for Change Order ft t—Additional Costs for 13' Sticks of Spirolite Pipe Jason, Per our in-person meeting on 4 October 2018, and as requested in your response to RFI 005, we are providing below the cost proposal to reduce the standard pipe length from 20' to 13` sticks of pipe in this Phase 1 production run. The total difference in cost for Phase 1 is $26,117.61. Please see below for cost Breakdown. As a reminder, and to document for the record, Phase 1 pipe procurement shop drawings were approved on 24 October 2018 (except for the MI I located at STA 6+93.2, shop drawings for which are pending City of Kent review) and includes 481' of 13' sticks and 80' of 10' sticks. We are awaiting the City of Kent decision regarding the Phase 2 pipe procurement(MH at STA 3+13.92 west to STA 0+33.92). A separate cost proposal for that portion will be submitted once the City reviews the diver investigation report and determines any changes to RAM 007 Part 2. 2y1.v0 �t Cost for 20' sticks 2/e. — 480' @.$262.07/cr $125,793.60 Cost for I " sticks 37ea = 481' @$306.40/ar $147,378.40. SUBTOTAL $21 5$4,# 37 Q$3,983-ZO TOTAL 11 111 r'" Please issue us a Change Order for this difference in cost so that we can order materials and schedule& coordinate this work. Should you have any questions or concerns, please. contact me at (425) 777-7327. Very truly yours, George fucker Project Manager Road Construction Northwest, Inc, Page I of I 0FERGUSON"' FEI-TACOMA WW#3156 Deliver To: 2042 SOUTH 112TH ST From: Lance Hayes WATERWORKS TACOMA,WA 98444-0000 Comments: Phone:253-538-8275 Fax: 253-531-9909 14,01,53 OCT 29 2018 Page 1 of 1 FEI -SEATTLE WW#3011 Price Quotation Phone: 253-538-8275 Fax 253-531-9909 Bid No: B313286 Cust Phone: 425-254-9999 Bid Date: 10/29/18 Terms: NET 10TH PROX Quoted By: LJH Customer: ROAD CONSTRUCTION NW INC Ship To: ROAD CONSTRUCTION NW INC 1815 SOUTH 228TH ST UNION 1815 SOUTH 228TH ST UNION DBA RCNW DBA RCNW PO BOX 2228 PO BOX 2228 RENTON; WA 98056 RENTON, WA 98056 Cost PO#: CITY OF KENT 228TH Job Name: REVISED QUOTE Item Description Quantity Net Price UM Total CITY OF KENT 228TH ST S RR UTILITIES SP-PSCP60400 60"SPIROLITE SCP PIPE CLASS 400 481 306,400 FT 147378,40 13'LENGTHS BxS SCP SP-PSCP60400 60"SPIROLITE SCP PIPE CLASS 400 80 312.930 FT 25034.40 10'LENGTHS BxS SCP SUBTOTAL 172412.80 .......... ...-.. ,...,__.......,... ___................ __ - - ___ .... .. ............ __..____-.......__................____.,. Net Total: $172412.80 Tax: $0.00 Freight: $0.00 Total: $172412,80 Quoted prices are based upon receipt of the total quantity for immediate shipment(48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE.QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE. CONTACT YOUR SALES REPRESENTATIVE IMMEDIATELY FOR ASSISTANCE WITH DBE/MBEAVBE/SMALL BUSINESS REQUIREMENTS. Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control,and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce, This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions,which are incorporated by reference and found either following this document, or on the web at hltp.//wolseleyna,com/terms_conditionsSale.html. Govt Buyers. All items are open market unless noted otherwise. L.F.AID LAW WARNING: It is Illegal to bruslall products that are not"lead free"in accordance with US Federal or other applicable law in potable water systems anlict ated.for human cons w rnpiton,Products ith'NP in the description are NOT lead free and can only be Installed in non-potable applications, Royer Is solely responsible for product selection,. Barr , Jason i From: George Tucker <george@rcnw,corn> Sent: Monday, October 29, 2018 1:51 PM To: Barry, Jason Cc: Jeff Kanyer; Matt Wagester; Brian Menard Subject: RE: 1815 Kent S 228th UPR - Request for Change Order#1 - Additional Cost for 13 Ft Spirolite Pipe Attachments: A014420860.pdf EXTERNAL EMAIL W Jason, Below is the relevant portion of the original quote from Ferguson. Attached is their updated pricing received this morning. Bid Item 4015 Slipline 72" CIVIP Storm Swr Pipe wIll Storm Swr 600 FT 60" Spirollte SCP Pipe Class a00 SpeUll BLrry Note fot the pia ect' . ead tcs be Cias5, I or 0s Thank you George Tucker Prole,t Marsger Road Construction Northwest, Inc. xsz Nro r Rey r r VA 4�I7v 8520 Holly['n) �t] P prett N4 N 1',. .a°•""""^'" t t)y CV. . O Bos Renton , o rel. /7 TJ FdY 19 2 8 J�Si Y).-.r [F!)Y4f fVW ny Native:This message,mcludrng ott' frne Its,coot( c1nfl0ep tial op privileged information for the exduslve use of the Intended recipient(,).Any urmuUmmed use is prorrhRed If this unrtil lviot%or vuu,Prr,•Se na+fp the senderurd then destroy the message.Thor,k you. From: Barry,Jason <JBariyC lceflfwq.aaav> Sent: Monday, October 29, 2018 1:42 PM To: George Tucker<georgt(Jrs;rlw.cnrri> Cc: Jeff Kanyer <jeff@rcrw.corn>; Matt Wagester<matt(@rcnw.com>; Brian Menard <brian ukrcnw.corn> Subject: RE: 1815 Kent S 228th UPR - Request for Change Order#1 - Additional Cost for 13 Ft Spirolite Pipe Please provide back-up from supplier supporting these numbers. We will be in touch, 1 I Barry, Jason From: George Tucker <george@rcnw.com> Sent: Monday, October 29, 2018 12:01 PM To: Barry, Jason Cc: Jeff Kanyer, Matt Wagester; Brian Menard Subject: 1815 Kent S 228th UPR - Request for Change Order#1 - Additional Cost for 13 Ft Splrolite Pipe Attachments: RCNW Letter 001 -Request for Change Order #1 - Additional Costs for 13 Ft Splrollte.pdf Jason, Please see the attached Request for Change Order#1 —Additional Cost for 13' sticks of Spriolite pipe. This is for the RAM 007 Part 1 portion approved on 24 October 2018. Let me know if you have any additional questions or concerns. Thank you George ruder Proje,I M,,r,,t^r Road Cons&ruction (Northwest, Inc. WA ,851 m 4°i St,Renton,WA 9y05y 8620 II o l ry Drive,'In .10 l vl re_It,m!q M,0£! PO 11 22 t,,Renlon,WA 9t305 C> Tel4. , Ili /32 4! �2L2957 [icgug,er�FYCCd W:r:2rrrr No", h it oaal v, ll d'eI'a0)(1)n ,II , unl'derP to'Of pnvnegeJ n(ornat)na lot Or Nsluclve c!r of ll it,lntenrhd ( lielIr() /nluniau trl ON!Ad use fl/,n'hvwl it r1 fhk PMO i t'!latlo! oo IA rr;e note, fA ""Jer "id th ! Irs,uc Mr nwl,ages Inord<you , 1 i From: George Tucker [nrailtor qe rr rwv,ct r,] Sent: Monday, October 29, 2018 12:01 PM To: Barry, Jason Cc: Jeff Kanyer; Matt Wagester; Brian Menard Subject: 1815 Kent S 228th UPR - Request for Change Order #1 - Additional Cost for 13 Ft Spirolite Pipe =EXTERNALE AIL Jason, Please see the attached Request for Change Order#1—Additional Cost for 13' sticks of Spriolite pipe. This is for the RAM 007 Part 1 portion approved on 24 October 2018. Let me know if you have any additional questions or concerns. Thankyou George Tucker H,roierr,Nr I,"Kei IRoad Cons tifluctlion IIJoQhwest, IInc �856 W b1°s�Renf nt \ k5>ill:3 Iif ZO InIIH Ulive, i' <IV 1 were(, VVA"2L03. ff IHox B,RenhuNA V�036 Te 1) IU J,i7F ,4l '1- 1957 vjiario,,�e(�Ik(M1,�W. trrro IVON hp, rrv9yi,,I' , lmynt+i<h» w,ron✓Il rrig5lentisl l,ld stinn,l� Ih, ithwv' ,e ,(beSnte,,(ko pwi,i .f,A),yunauthoriseduse is hd,t. r INot eor,lr rti4: v u, n4 "e 1,hf,It" m iri<n "?'i,oy iN, lv,,ie i"i Lyou- 2 [bl . tll „t wlw tip, - r 'p 1144 j 1 r � d 5 w ell 0 r ✓ 1 —— �� T. I � + r � tTjTA A on r ' a long Is oval hod Ago mg �b Pi �a ,x d y� a w 1 4 {! i I w i i l - r a� ul i hi jil .�. a a i t a Y � T , w� i pe; /MF -M) w4gam", v "Aspic f? of T1 k. AM look 0 h6paw hot. O'sm P4'^ Olson S fluCA"OONJ uUMIPIM& AE 05 6 TFo/Al- ,al 1 TE", l "till. ET 51 7-E-- SM. OOXS UF,rwm>3 cc a�i 1 —7- C4 DEL ,r pOj re') nTY PJEIXICJA)�,., PKAJEF17]; ti 6 rd- 0" ,tp f- 7Z