CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to the City Clerk's Office. All portions are to be completed.
If you have questions, please contact the City Clerk's Office at 253-856-5725.
Vendor Name: RH2 Engineering, Inc.
Vendor Number (JDE):
Contract Number (City Clerk): pvvl�- - Z S,�— 00 Z
Category: Contract Agreement
Sub-Category (if applicable): Amendment__._--_____
_
Project Name: Kent Springs and Pump Station No. 4 Electrical Upgrades
Contract Execution Date: 12/7/18 Termination Date: 3/31/19
Contract Manager: Phil McConnell Department: PW: Engineering
Contract Amount: Amended Amount $9,301.00; Revised contract $25,302.00
Budgeted: ® Grant?
Part of NEW Budget: ❑ Local: ❑ State: ❑ Federal:
Related to a New Position: ❑
Basis for Selection of Contractor?
Bid: ❑ RFP: ❑ Small Works Roster: ❑ Quotes: ❑
Approval Authority: ® Director ❑ Mayor ❑ City Council
Other Details: Continue to nrnvide on-call services durino the construction of the Kent
Springs and Pump_Station No. 4 Electrical and Standby Generator Up raq de Project. For a
description, see the Consultant's Scope of Work which is attached as Exhibit A and
incorporated by this reference.
KN T
W�s ,a
AMENDMENT NO. 1
NAME OF CONSULTANT OR VENDOR: RH2 Engineering, Inc.
CONTRACT NAME & PROJECT NUMBER: Surin-gs and- Pump_Station No, A_ Electrical
Upgrades
ORIGINAL AGREEMENT DATE: June 27, 20I.8
This Amendment is made between the City and the above-referenced Consultant or Vendor
and amends the original Agreement and all prior Amendments. All other provisions of the original
Agreement or prior Amendments not inconsistent with this Amendment shall remain in full force
and effect. For valuable consideration and by mutual consent of the parties, Consultant or
Vendor's work is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, the Consultant or Vendor shall:
Continue to provide on-call services during the construction of
the Kent Springs and Pump Station No. 4 Electrical and Standby
Generator Upgrade Project. For a description, see the
Consultant's Scope of Work which is attached as Exhibit A and
incorporated by this reference.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are modified as follows:
Original Contract Sum, $16,001 00
including applicable WSST
Net Change by Previous Amendments $0
including applicable WSST
Current Contract Amount $16,001.00
including all previous amendments
Current Amendment Sum $9,3o1A0
_......................................................._.............. ..._ _....
Applicable WSST Tax on this $NA
Amendment
Revised Contract Sum $25,302.00
AMENDMENT - 1 OF 2
riginal Time for Completion December 31, 2018
(insert date)
Revised Time for Completion under NA
prior Amendments
(insert date)
Add'l Days Required for this 90 calendar days
Amendment
�
(insert date)
The Consultant or Vendor accepts all requirements of this Amendment by signing below, by
its signature waives any protest or d8irn it may have regarding this Ann8Ddrneni/ and
acknowledges and accepts that this Amendment constitutes full payment and final settlement uf
all claims of any kind or nature arising from Or connected with any work either covered uraffected
by this Amendment, including, without limitation, claims related to contract time, contract
acceleration, onoiteur home office overhead, or lost profits, This Amendment, unless otherwise
provided, does not relieve the Consultant or Vendor from strict compliance with the guarantee and
warranty provisions of the original Agreement.
All acts consistent with the authority of the Agreement, previous Amendments (if aDy\, and
this Arnendnneni, prior to the effective date Of this Arnendrnent/ are hereby ratified and a<fi�rned,
and the terms of the Agreement, previous Amendments (if any), and this Amendment shall be
deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this Amendment, which is binding on the parties of this contract.
IN WITNESS, the parties below have executed this Amendment, which will
become effective «»n the last date written below.
By
Print Name;?7-,, Print Name: Timothv 3. LaPorte. P.E.
Utle) le
DATE: DATE:
-.ATTEST. APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent City Clerk Kent Law Department
AMENDMENT - 20F2
EXHIBIT A
Scope of Work
City of Kent
I Amendment No. 1
Kent Springs and Pump Station No. 4 Electrical and Standby Generator
Upgrades Services During Construction
November 2018
Background
This Scope of Work includes additional assistance by RH2 Engineering, Inc., (RH2)with specific services during
construction(SDC)tasks,as directed by the City of Kent(City),during the construction of the Kent Springs and
Pump Station No.4 Electrical and Standby Generator Upgrades.The City will continue to perform the majority
of the SDC tasks for this project.This Scope of Work details the SDC tasks that will be performed by RH2 on
an on-call basis.
Task 3— Additional Services During Construction On-Call Support
Objective: Provide continued on-call services during construction of the project.
Approach:
3.1 Review Submittals: Review and approve or reject, if necessary remaining submittals that the City
requires 11112's assistance in reviewing.
3.2 Respond to Technical Questions from the City: Provide discussion,via telephone or email, with City to
respond to questions that arise during project construction and testing.
3.3 Review and Respond to Requests for Information (RFIs)Submitted by the Contractor: Provide review
and responses to RFIs submitted bythe contractor to the City.
3.4 Provide Testing and Startup Support:Provide technical support during testing,startup, and
observation. This support includes up to one(1)site visit to both the Kent Springs and Pump Station
No. 4 sites to review the completed work and assist the City in developing a project punch list. RH2 is
not responsible for site safety, nor for determining means and methods or directing the Contractor in
their work.
Assumptions:
o RH2 will review submittals and respond to technical questions and RFIs as supplied by the City and
provide services up to the fee amount allocated for Task 3 in the Fee Estimate (Exhibit 8), If the fee
amount for Task 3 is reached, RH2 will notify the City, and if further assistance is required above and
beyond the fee amount allocated forTask 3, the City and RH2 will mutually agree upon an additional
fee amount for continued on-call support.
RH2 Deliverables:
Deliverables depend on the assistance requested by the City.
1
11120/2 0 18 4:0835 PM \\rhl\dls\BotAell\pata\KEN\ll&101\Contracl\Amendment No,1\PSA S0W Amend 1 Kent Springs and Pump Station No 45Df don
EXHIBIT 8
City of Kent
Amendment No.1•Kent Springs and Pump Station No.4 Electrical and
Standby Generator Upgrades Services During Construction
Fee Estimate
Descri Lion Total
P Hours Total Labor Total Eapense Total Cart
[lassl0wtlon
rr
Task es During Construction On-Call Support 44 $ 8,982 $ 319 $ 9,301
31 Review5ubMIttaIS 20 $ 3,,7261$ 132 $ 3.858
32 Respond Co Cttehrdeal Questions fromthe[Iry 8 ,$ 1,752 $ 485 18001
33 Pav'lewand ReSPmld to RFls Submitted by the Comranor 8 $ 1.75215 48 $ 1,800
.. ._..o:
34 Prawido fesklnB and Startup SuPbrort „8 _ ��$ 1,752 5 91 $ ������1,843
PROJECT TOTAL 44 $ 8,982 1 $ 319 $ 9,301 '..