Vendor Name: Axum General Construction Inc,
Vendor Number:
JD Edwards Number
Contract Number: PW18-225 - 00:6
This is assigned by City Clerk's Office
Project Name: 132nd Ave. SE Pedestrian Improvements North
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 6/18/18 Termination Date: so working Days
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Drew Holcomb Department: PW Engineering
Contract Amount: 511 61f.15
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order #2
As of: 08/27/14
I
�"�-�"" K E N1 T
w,.'3111t,,.,u
CHANGE ORDER NO. # 2
NAME OF CONTRACTOR: Axum General Construction Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: 1321d Ave. SE Pedestrian Improvements (North),
ORIGINAL CONTRACT DATE: June�Q„1,8
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Adjust existing gas valves to finished grade which wasn't accounted for
in paving area. Billed to PSE.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
-.................
Original Contract Sum, $511,616.15
(including applicable alternates and
WSST)
......................... ............................._... .......................
Net Change by Previous Change Orders $5,483.19
(incl. applicable WSST)
Current Contract Amount $517,099.34
(incl. Previous Change Orders)
Current Change Order $335.00
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $517,434.34
CHANGE ORDER - 1 OF 3
...... ....... _._.. .....
Original Time for Completion 50 working days0
(insert date)
Revised Time for Completion under 0
prior Change Orders
(insert date)
Days Required (f) for this Change Order 5 calendar days
Revised Time for Completion 55 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below
CONTRA O s CITY OFKENT:
'signature) c::l.: ( ignature)
Print Name: a -Q Yr, '-' Ci n alt. Print Name: Timothy J. LaPorte, P.E.
Its Ow 6e Its Public. Works Director
(title) titleJ
DATE:1 ll . �(. . (��/ DATE: 'w e
CHANGE ORDER - 2 OF 3
ATTEST: APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent City Clerk Kent Law Department
[In this field,you may enter the eIeCtmnlc fllepa[h where the mntrad hae been saved]
CHANGE ORDER - 3 OF 3
�* T FILE NO: 200.2
... .a,.<,.. CHANGE ORDER WORKSHEET NO. 2
vision — Publik Construction Engineerlfr„ Di c Works
�.�...�.�_-... ,.... ... �
Project: 13211 Pedestrian Improvements Project No.: 17-3020
Project Engineer: Carla Maloney Fed-Aid No.: N/A
Capital Projects Phil McConnell Contractor: Axum General Construction
Manaqer:
Date: 10/16/2018
I. PROPOSED CHANGE
Adjust existing gas valves to finished grade - Billed to PSE
II. REASON AND BACKGROUND FOR CHANGE
VJVes
[—Existing as eren't accounted for in paving area
III. METHOD OF PAYMENT
NEW PAY ITEM(S) Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
—.. —
Sch No. Item Description Total Qty this Unit Unrt Price Total Estimated Costof
Est. Qty PE Item
1 Este qas valves to qrade 1 2 �F EA $167.50 $335.00
I I I
- --
Independent Estimate Attached � i CREATE PAY ITEM ONLY - Payment to be made � 0 PAY THIS PAY ESTIMATE
- REQUIRED at a later date upon completion of work i
n MAteri�il-Sbrn�tq,J Retluirecf - CC: C.cnstr¢��ckvora Coordinatoe New Sub Reqrd? No
DELETE EXISTING PAY ITEMSper 1-09.5 Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
_ .. .. ...
Sch. No. B.I.-No. Item Description Qtv 1 Unit Unit Price Cost of Item.
® Independent Estimate Attached - REQUIRED
INCREASE DECREASE TO EXISTING PAY ITEMS NotApplicable
Change Order No. - FOR ACCOUNTING USE ONLY
_ . — � .. _
Sch. No. r B.I. No. Ite m Description cityUnit r Unit Price Cost of Item
.. ........... .. .....---...... .....m....... ............._......... .._.. .... ....._..._______
Independent Estimate Attached REQUIRED ❑
1 REV. DATE:
3/27/18
�* T FILE NO: 200.2
TOTAL ESTIMATED COST OF CHANGE ORDER _[_..........
*Total of the Cost of Item Columns
THIS PAY ESTIMATE
IV. WORKING DAYS
Original Contract So Due This Change Order* Previous Total
DATE: DATE:
TOTAL WORKING DAYS*
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Capital Projects Manager: Date:
Phil McConnell
Construction Engineering Date:
Supervisor:
A/ e .. . ...
Construction Manager: Date:
ric Connor
2 REV. DATE:
3/27/18
McConnell, Phillip
From: Helton, Glenn <Glenn.Helton@pse.com>
Sent: Thursday, September 13, 2018 1:31 PM
To: ARUM; McConnell, Phillip
Cc: Holcomb, Drew; Kuehne, Paul
Subject: RE: Kent 132nd and 244th Overlay
EXTERNAL EMAIL
I'm fine with that price. PSE approves. Please have invoice to PSE be from the city of Kent and you can send it to me. An
emailed invoice will be fine.
When do you need the parts by? My inspector for that area is on vacation but will be back on Monday. If you need them
sooner there has to be someone covering for him but I gotta go talk to his supervisor to see who's covering. If it can wait
until next week I'll call him first thing Monday morning.
Thanks,
Glenn Helton
Gas - Project Manager
PUGET SOUND ENERGY
C: (425) 559-4647
6905 S 228"St
Kent, WA 98032
From: AXUM [mailto:axumgc@gmail.com]
Sent: Thursday, September 13, 2018 1:26 PM
To: McConnell, Phillip
Cc: Holcomb, Drew; Kuehne, Paul; Helton, Glenn
Subject: Re: Kent 132nd and 244th Overlay
$167.50 per each.
Darcee Sanders ) Owner
Axum General Construction, Inc.
27474 210th Ave. SE, Maple Valley, WA 98038
p. 206.786,5383 • f. 424.433.7928
www.axumpc.com
t
On Sep 13, 2018, at 12:00 PM, McConnell, Phillip <PMcConneI1 wkentv�w_> wrote:
Darcee,
I need a price to raise the 2 gas valves at S 2441h St. PSE will supply 2 new valve box tops.
Phil McConnell, Capital Projects Manager
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5542 1 Cell 253-261-5685
�rn�r,g��ne IlKpnK,,,NW{amgav
CITY OF KENT, WASHINGTON
KentWA.gov Facebook YouTube
From: Helton, Glenn [niailto:Glenh.Helton@pse.cm7]
Sent: Thursday, September 13, 2018 10:41 AM
To: Holcomb, Drew <DHolcomb@kentwa.Rov>
Cc: McConnell, Phillip <IPMcConnell G kentwa. ov>
Subject: RE: Kent 132nd and 244th Overlay
ICY®WY�
EXTERNAL AIL
Thanks my gas inspector who will deliver parts is on vacation but he will be back on Monday. I'll put him
in touch with Phillip when he gets back.
Glenn Helton
Gas - Project Manager
PUGET SOUND ENERGY
C: (425) 559-4647
6905 S 228"St
Kent, WA 98032
<image001.jpg>
From: Holcomb, Drew [Mailto:OHoIcomb kentvva,gav]
Sent: Thursday, September 13, 2018 10:39 AM
To: Helton, Glenn
Cc: McConnell, Phillip
Subject: RE: Kent 132nd and 244th Overlay
Glenn,
Yes, those are the two which need adjusting,
Drew Holcomb, Design Engineer 11
Design Engineering I Public Works Department
400 West Gower Kent, WA 98032
2
Main 253-856-5561 Cell 253-561-1587
dh,01o0nnb@4aenl;W a;,ggv_
C E"IIfY OF II<II,%`nlr6 YVA IH IIIINCa'-66",.•N
Keinilk'1d4A,gcvr IFacelbou ll+: You"Tu be
W6.5A,ry,Y ORF ,LOF k (F xNVW01V1C in 1." 3N,PIN UP0"1Q4N. i "A>l.
From: Helton, Glenn [mailto:Glenn.Helton@pa e.com]
Sent: Thursday, September 13, 2018 10:35 AM
'f To: Holcomb, Drew
Cc: McConnell, Phillip
Subject: RE: Kent 132nd and 244th Overlay
EXTERNAL EMAIL
Hi Drew,
I looked on my gas map and I wanted to confirm which valves need adjusting. Can you look at my
attached gas map and let me know the valve and test lead box I've got circled is the 2 that need
adjusting?
Thanks,
Glenn Helton
Gas - Project Manager
PUGET SOUND ENERGY
C: (425) 559-4647
6905 S 228tl St
Kent, WA 98032
<image001.jpg>
From: Holcomb, Drew [n;lailto:,CDHocombukentw ._qov]
Sent: Wednesday, September 12, 2018 8:50 AM
To: Helton, Glenn
Cc: McConnell, Phillip
Subject: Kent 132nd and 244th Overlay
Glenn,
Per our conversation, the City is adding an additional paving section at 244th and 132nd due to the poor
condition of the existing asphalt and pounding. As part of the overlay we will get a quote from the City's
contractor to lower and chip out the existing PSE gas valve and bring them to grade and then PSE will
reimburse the City. I will email the quoted price when we get it.
Additionally, please contact the inspector Phil McConnell [(253) 261-5685 and cc'd on this email] to
coordinate dropping off 2 new valve can lids because the current ones are falling apart.
Thank you,
Drew Holcomb, Design Engineer 11
Design Engineering I Public Works Department
3
400 West Gowe, Kent, WA 98032
Main 253-856-5561 Cell 253-561-1587
gjhplrprnfi�Qv
CITY OF IKPgir';,&9NVauaSIMl1UNQi$"W01N
IN:e"tWA.gov q^.BGeWboolk _ Ytmi°T'uu lbe
QILLASL M1ONu„p6)t,k 11 HLi 'B'V'111490W1N1 hi I;,F IRV V+ItVW IN G TPI f-I10I!L
CAUTION:This email originated from outside of the organization. Exercise extra caution when
responding, opening attachments, and clicking links.
4