Loading...
HomeMy WebLinkAboutPW18-095 - Change Order - #4 - HCI Industrial & Marine Coatings, Inc. - Cambridge Reservoir Recoating - 08/29/2018 ��,�9%l Records t' ,,,,,,,,,, emOhV KENT was�,�o,o� Document r„s CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. i If you have questions, please contact City Clerk's Office. Vendor Name: HCI Industrial & Marine Coatings, Inc. Vendor Number: JD Edwards Number Contract Number: PW18-095 -0017 This is assigned by City Clerk's Office Project Name: Cambridge Reservoir Recoating and Fall Protection Improvements Description: ❑ Interlocal Agreement M Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 3/6/18 Termination Date: 125 working Days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Mike Almaroof Department: PW Engineering Contract Amount: $1,334,850.00 -- Approval Authority: (CIRCLE ONE) (Department Direct or Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Chanqe Order #4 As of: 08/27/14 T CHANGE ORDER NOV . # 4 NAME OF CONTRACTOR: H('1 fnriiichrial R Marina r'nafinnc Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Cambridge Reservoir Recoating and Fall Protection Im ORIGINAL CONTRACT DATE: March 6, 2018. This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Cut the catwalk directly behind the ladder to meet OSHA ladder clearance requirements. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: ------ ........................................ Original Contract Sum, $1,334,850.00 (including applicable alternates and WSST) Net Change by Previous Change Orders $26,070.86 (incl. applicable WSST) ..................... .......-- ----- Current_ Contract Amount $1,360,920.86 (incl. Previous Change Orders) Current Change Order $1,498.38 .................... Applicable WSST Tax on this Change $149.84 Order .......... Revised Contract Sum $1,362,569.08 CHANGE ORDER - 1 OF 3 __.._-..m.m.m.m.___ ._....._.m................ Original Time for Completion 125 working days (insert date) Revised Time for Completion under 141 working days prior Change Orders (insert date) .. ..................._.................. Days Required (f) for this Change Order 1 calendar days Revised Time for Completion 142 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITfY KENT: By: By: (signature) J ( gnat re) Prin ame: } f H Print Name: Ti othy 3 LaPorte. P.E, Its ,3.r �'11.E Its Public Works Dir ctor (rtr6ei r (t�tre� DATE: DATE: CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department [In th,,flew,Yau..,enter the eleRro I,fllepeth where the contraR hac h.,raved] CHANGE ORDER - 3 OF 3 KENT FILE NO: 200.2 W u CHANGE ORDER WORKSHEET NO. 4 CONSTRUCTION ENGINEERING DIVISION — PUBLIC WORKS Project: Cambridge Reservoir Recoating Project No.: 17-7999.2 and Fall Protection Improvements - REBID #2 Project Engineer: Joe Araucto Fed-Aid No.: W20058 Capital Projects Contractor: HCI Industrial & Marine Coatings, Manager: Inc. Date: July 19, 2018 I. PROPOSED CHANGE Cut the catwalk directly behind the ladder to meet OSHA ladder clearance re uirements. II. REASON AND BACKGROUND FOR CHANGE The existing ladder is welded directly to the catwalk and does not provide adequate clearance behind the ladder to meet OSHA requirements. Cutting the catwalk will provide the necessary clearance. The existing as-built drawin s do not orovide sufficient detail to determine OSHA compliance. III. METHOD OF PAYMENT NEW PAY ITEM($) Not Applicable Change Order No. I - 1 1j FOR ACCOUNTING USE ONLY SON. ITEM DEECRIPTIDN TOTAL QTY UNIT UNIT PRICE TOTAL ESTIMATED No. EST. THIS PE COST OF ITEM QTY Independent Estimate Attached — I CREATE P'AX Ni O X7EN1y— Payment to be made PAY THIS PAY ESTIMATE REQUIRED 1 at a later date upon completion of work It'laterial Suhm.(ttill& Rag�j,L�_—CC:_ a7. tt. _... ..New Sulu Regrd7 I No ........ DELETE EXISTING PAY ITEM(S) per 1-09.5 , Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY SON. B.I. NO. ITEM DESCRIPTION QTY UNIT UNIT PRICE COST OF ITEM No. Independent Estimate Attached -REQUIRED E INCREASE/DECREASE TO EXISTING PAY ITEM(S) Not Applicable Change Order Na. - J FOR ACCOUNTING USE ONLY 1 REV. DATE: 3/27/18 I i d FILE NO: 200.2 KEt4T ITCM DE9 CRIPTION QTY UNIT UNIT PRICE � COST OF ITEM NO. 1 Safety Modifications 1 LS $1,648.22 k $1r648.22 i j Independent Estimate Attached -mREQUSREO TOTAL ESTIMATED COST OF CHANGE ORDER * 1648.22 1 *Total of the Cost of Item Columns THIS PAY ESTIMATE $0.00 IV. WORKING DAYS Original Contract ' 125 Due This Change Order* 1 1 Previous Total 1141 _. DATE: �..� - ,,,,, , ..., . L.DATE:_ * EXI)I rnationl3us tifiration Reoulredt The existing ladder and catwalk connection and proximity does not provide adequate clearance to meet OSHA requirements. By trimming the catwalk behind the ladder, the necessary clearance will be provided. The additional work requires additional field time for cutting the catwalk. Cutting the catwalk will also require additional abatement and cleanup due to the existing lead based paint on the reservoir. This change has been vetted with Joe Araucto of the TOTAL WORKING DAYS* 14 *This Change Order+ Previous Total All work, materials and measurements to be In accordance with the Standard Specifications and Contract Special Provisions for the type of work described. ,X Project Manager: „' J,. Date: l`nr/ g'-41�()r _ r Construction Engineering /Ivt/jf Date: 7-2-0 Supervisor: Construction Manager. Date: 2 REV. DATE: 3/27/18 I CITY OF KENT CAMBRIDGE RESERVOIR RECOATING AND FALL PROTECTION IMPROVEMENT- REB1D NO. 2 G&O #17530 ENGINEER'S C04 COST ESTIMATE NO. DESCRIPTION OTY UNITS UISI C PRIC.E, AMOUNT 1 Layout and Trim Catwalk I LS $ 1,000 $ 1,000 2 Lead based Paint Abatement,Cleanup, and Disposal 1 LS $ 300 $ 300 3 Overhead and Profit 1 CALC $ 260 S 260 Subtotal: $ 1,560 State of Washington Sales Tax @ 10.0% $ 156 TOTAL: $ 1,716 Russell Porter,P.E. �c MCI PO Box 1573, Brush Prairie,WA 98606 CONTRACT CHANGE ORDER NO. PROJECT: W20058 CAMBRIDGE RESERVOIR RECOATING CO NO: COP-4 CONTRACTOR: HCI INC. DESCRIPTION OF CHANGE ORDER WORK: Cut Catwalk to Increase clearance behind Ladder The Contractor agrees that this change order represents full and final compensation to add the work described herein, Original Contract Amount: Amount of Previous Change Orders: $ 1,213,500.00 $ CHANGE ORDER PRICE: increase/decrease T Bailey layout and field trim catwail $ 971.86 HCI abatement,cleanup and disposal of LBP $ 300.00 Overhead, @ 5% $ 63.59 Profit @ 10% $ 133.55 Insurance/Bonds @ 2% $ 29.38 Subtotal $ 1,498.38 WA State Sales Tax 10% $ 149.84 Subtotal $ 1,648.22 No Sales Tax TOTAL CHANGE ORDER PRICE $ 1,648.22 REVISED CONTRACT AMOUNT $.... 1,215,148.22 This Change Order adds 1 day,modifying the contract time to 126 W days. The payments and/or additional time specified and agreed to in this Change Order shall include any claim by the Contractor for any extra compensation or extension of time with respect to the work described herein,including anytime which may have resulted prior to executing this Change Order. Except as herein modified,the terms of the basic contract shall remain in full force and effect. Receipt acknowledged and terms and conditions agreed to by: /Conrracror's Authorize Oglclal) ue Approved for CM/GC/Owner: (Owner) (Oooe) (CM/GO) lmreJ wojn't n"neer oore comments: field trim compression ring flush with existing catwalk surface;grind cut edge smooth price does not include fully seal welding catwalk surface to compression ring as noted previously:setting the new platform flush with the catwalk will result in a OSHA Non Compliance in- elevation difference between the ladder rung and step off platform price includes lead based paint removal and disposal I i Kuehne, Paul From: Ryan Hale <rhale@g-o.com> Sent: Thursday, July 19, 2018 4:29 PM To: Kuehne, Paul Cc: Connor, Eric; Araucto, Joseph, rporter@g-o.com Subject: RE: Cambridge CO-4 Attachments: CO-4 and Cost Estimate.pdf EXTERNAL EMAIL Paul, Please find attached a scan of the revised CO-4 worksheet and the independent cost estimate. Thanks, Ryan From: Kuehne, Paul [mailto:PKuehne@kentwa.gov] Sent:Tuesday, July 17, 2018 4:03 PM To: 'Ryan Hale (rhale@g-o.com)' <rhale@g-o.com> Cc: Connor, Eric<econnor@kentwa.gov>; Araucto, Joseph <jaraucto@kentwa.gov>; 'rporter@g-o.com' <rporter@g- o.co m> Subject: FW: Cambridge CO-4 Hello Ryan, Please provide your independent cost estimate for this change. Please sign both your estimate and the change order worksheet. Please complete the change order worksheet. The worksheet is a tool that you may modify to fit the change being made. By signing the estimate and worksheet you indicate; the cost is reasonable based on your independent estimate, the change is necessary (you indicated it is in your email included below), specify whether any of the cost for this change order will be compensated on the soonest progress payment (if not put $0), specify the units of payment (Lump Sum) or Force Account/Equitable Adjustment/Each/Lineal Foot/Square Yard/etc. Specify whether you vetted the change with ]oe'Araucto or possibly other members of the owner's project team. The Contractor's worksheet may function as support documentation but not replacement for owner generated documentation for the change. Please call me to discuss. Paul Kuehne, Construction Engineering Supervisor Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-856-5543 1 Cell 253-740-5015 Mrehne(2"tKS ntWA.,aov CITY OF KENT, WASHINGTON 1 From: Ryan Hale [rna ltw.r.hale.@L-o..corn] Sent: Tuesday, July 17, 2018 1:08 PM To: Kuehne, Paul <µ l<u, l net crest ya.€'civ> Cc: 'Russ Porter <pporterLgo,com>; Araucto,Joseph <JAraua;to tkentwa.gov> Subject: Cambridge CO-4 EXTERNAL E AIL Paul Please find attached the Change Order Worksheet No. 4 and the HCl Change Order Proposal.This change order is for the additional work and lead abatement to cut the existing catwalk behind the reservoir ladder to meet OSHA ladder clearance requirements. The existing ladder is welded directly to the catwalk and does not provide adequate clearance behind the ladder to meet OSHA requirements. Cutting the catwalk will provide the necessary clearance. The additional work requires additional field time for cutting the catwalk. Cutting the catwalk will also require additional abatement and cleanup due to the existing lead based paint on the reservoir.The benefit to the City is the compliance of the existing ladder with OSHA clearance requirements. The reason for this change is the existing as-built drawings do not provide sufficient detail to determine OSHA compliance. We at this point see no further issues with the change order and recommend the change order for City review and approval. I have attached the change order worksheet and change order proposal. Please let me know if you need further information for your process. Thanks, Ryan Ryan Hale, EIT, NACE Coating Inspector—Level 1 / 206.284.0860 p / 206.283.3206 f Gray& Osborne, Inc. f 1130 Rainier Avenue South, #300, Seattle, WA 98144 F',iearsecanaie'Aergw evrviraanienp twparr {rriafiatu tans email. Electronic File Transfer- Note that these electronic files are provided as a courtesy only. Gray&Osborne, Inc. in no way guarantees the accuracy or completeness of the digital data contained within these files. Furthermore, Gray&Osborne, Inc. assumes no liability for any errors or omissions in the digital data herein. Anyone using the information contained herein should consult the approved or certified hard copy drawings or reports for the most current information available. 2