Vendor Name: HCI Industrial & Marine Coatings, Inc.
Vendor Number:
JD Edwards Number
Contract Number: PW18-095 -0017
This is assigned by City Clerk's Office
Project Name: Cambridge Reservoir Recoating and Fall Protection Improvements
Description: ❑ Interlocal Agreement M Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 3/6/18 Termination Date: 125 working Days
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Mike Almaroof Department: PW Engineering
Contract Amount: $1,334,850.00 --
Approval Authority: (CIRCLE ONE) (Department Direct
or Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Chanqe Order #4
As of: 08/27/14
T
CHANGE ORDER NOV . # 4
NAME OF CONTRACTOR: H('1 fnriiichrial R Marina r'nafinnc Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Cambridge Reservoir Recoating and Fall Protection Im
ORIGINAL CONTRACT DATE: March 6, 2018.
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Cut the catwalk directly behind the ladder to meet OSHA ladder
clearance requirements.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
------ ........................................
Original Contract Sum, $1,334,850.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $26,070.86
(incl. applicable WSST)
..................... .......-- -----
Current_ Contract Amount $1,360,920.86
(incl. Previous Change Orders)
Current Change Order $1,498.38
....................
Applicable WSST Tax on this Change $149.84
Order
..........
Revised Contract Sum $1,362,569.08
CHANGE ORDER - 1 OF 3
__.._-..m.m.m.m.___ ._....._.m................
Original Time for Completion 125 working days
(insert date)
Revised Time for Completion under 141 working days
prior Change Orders
(insert date)
.. ..................._..................
Days Required (f) for this Change Order 1 calendar days
Revised Time for Completion 142 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITfY KENT:
By: By:
(signature) J ( gnat re)
Prin ame: } f H Print Name: Ti othy 3 LaPorte. P.E,
Its ,3.r �'11.E Its Public Works Dir ctor
(rtr6ei r (t�tre�
DATE: DATE:
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
[In th,,flew,Yau..,enter the eleRro I,fllepeth where the contraR hac h.,raved]
CHANGE ORDER - 3 OF 3
KENT FILE NO: 200.2
W u CHANGE ORDER WORKSHEET NO. 4
CONSTRUCTION ENGINEERING DIVISION — PUBLIC WORKS
Project: Cambridge Reservoir Recoating Project No.: 17-7999.2
and Fall Protection
Improvements - REBID #2
Project Engineer: Joe Araucto Fed-Aid No.: W20058
Capital Projects Contractor: HCI Industrial & Marine Coatings,
Manager: Inc.
Date: July 19, 2018
I. PROPOSED CHANGE
Cut the catwalk directly behind the ladder to meet OSHA ladder clearance re uirements.
II. REASON AND BACKGROUND FOR CHANGE
The existing ladder is welded directly to the catwalk and does not provide adequate clearance behind the
ladder to meet OSHA requirements. Cutting the catwalk will provide the necessary clearance. The existing
as-built drawin s do not orovide sufficient detail to determine OSHA compliance.
III. METHOD OF PAYMENT
NEW PAY ITEM($) Not Applicable
Change Order No. I - 1 1j FOR ACCOUNTING USE ONLY
SON. ITEM DEECRIPTIDN TOTAL QTY UNIT UNIT PRICE TOTAL ESTIMATED
No. EST. THIS PE COST OF ITEM
QTY
Independent Estimate Attached — I CREATE P'AX Ni O X7EN1y— Payment to be made PAY THIS PAY ESTIMATE
REQUIRED 1 at a later date upon completion of work
It'laterial Suhm.(ttill& Rag�j,L�_—CC:_ a7. tt. _... ..New Sulu Regrd7 I No ........
DELETE EXISTING PAY ITEM(S) per 1-09.5 , Not Applicable
Change Order No. _ FOR ACCOUNTING USE ONLY
SON. B.I. NO. ITEM DESCRIPTION QTY UNIT UNIT PRICE COST OF ITEM
No.
Independent Estimate Attached -REQUIRED E
INCREASE/DECREASE TO EXISTING PAY ITEM(S) Not Applicable
Change Order Na. - J FOR ACCOUNTING USE ONLY
1 REV. DATE:
3/27/18
I
i
d FILE NO: 200.2
KEt4T
ITCM DE9 CRIPTION QTY UNIT UNIT PRICE � COST OF ITEM
NO.
1 Safety Modifications 1 LS $1,648.22 k $1r648.22
i
j Independent Estimate Attached -mREQUSREO
TOTAL ESTIMATED COST OF CHANGE ORDER * 1648.22 1
*Total of the Cost of Item Columns
THIS PAY ESTIMATE $0.00
IV. WORKING DAYS
Original Contract ' 125 Due This Change Order* 1 1 Previous Total 1141 _.
DATE: �..� - ,,,,, , ..., . L.DATE:_
* EXI)I rnationl3us tifiration Reoulredt The existing ladder and catwalk connection and proximity does not provide adequate
clearance to meet OSHA requirements. By trimming the catwalk behind the ladder, the necessary clearance will be provided.
The additional work requires additional field time for cutting the catwalk. Cutting the catwalk will also require additional
abatement and cleanup due to the existing lead based paint on the reservoir. This change has been vetted with Joe Araucto of
the
TOTAL WORKING DAYS* 14
*This Change Order+ Previous Total
All work, materials and measurements to be In accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
,X
Project Manager: „' J,. Date: l`nr/ g'-41�()r _
r
Construction Engineering /Ivt/jf Date: 7-2-0
Supervisor:
Construction Manager. Date:
2 REV. DATE:
3/27/18
I
CITY OF KENT
CAMBRIDGE RESERVOIR RECOATING AND FALL PROTECTION IMPROVEMENT-
REB1D NO. 2
G&O #17530
ENGINEER'S C04 COST ESTIMATE
NO. DESCRIPTION OTY UNITS UISI C PRIC.E, AMOUNT
1 Layout and Trim Catwalk I LS $ 1,000 $ 1,000
2 Lead based Paint Abatement,Cleanup, and Disposal 1 LS $ 300 $ 300
3 Overhead and Profit 1 CALC $ 260 S 260
Subtotal: $ 1,560
State of Washington Sales Tax @ 10.0% $ 156
TOTAL: $ 1,716
Russell Porter,P.E.
�c
MCI
PO Box 1573, Brush Prairie,WA 98606
CONTRACT CHANGE ORDER NO.
PROJECT: W20058 CAMBRIDGE RESERVOIR RECOATING
CO NO: COP-4
CONTRACTOR: HCI INC.
DESCRIPTION OF CHANGE ORDER WORK: Cut Catwalk to Increase clearance behind Ladder
The Contractor agrees that this change order represents full and final compensation to add the work described herein,
Original Contract Amount: Amount of Previous Change Orders:
$ 1,213,500.00 $
CHANGE ORDER PRICE: increase/decrease
T Bailey layout and field trim catwail $ 971.86
HCI abatement,cleanup and disposal of LBP $ 300.00
Overhead, @ 5% $ 63.59
Profit @ 10% $ 133.55
Insurance/Bonds @ 2% $ 29.38
Subtotal $ 1,498.38
WA State Sales Tax 10% $ 149.84
Subtotal $ 1,648.22
No Sales Tax
TOTAL CHANGE ORDER PRICE $ 1,648.22
REVISED CONTRACT AMOUNT $.... 1,215,148.22
This Change Order adds 1 day,modifying the contract time to 126 W days.
The payments and/or additional time specified and agreed to in this Change Order shall include any claim by the Contractor
for any extra compensation or extension of time with respect to the work described herein,including anytime which may
have resulted prior to executing this Change Order.
Except as herein modified,the terms of the basic contract shall remain in full force and effect.
Receipt acknowledged and terms and conditions agreed to by:
/Conrracror's Authorize Oglclal)
ue
Approved for CM/GC/Owner:
(Owner) (Oooe) (CM/GO) lmreJ
wojn't n"neer oore
comments:
field trim compression ring flush with existing catwalk surface;grind cut edge smooth
price does not include fully seal welding catwalk surface to compression ring
as noted previously:setting the new platform flush with the catwalk will result in a OSHA Non Compliance in-
elevation difference between the ladder rung and step off platform
price includes lead based paint removal and disposal
I
i
Kuehne, Paul
From: Ryan Hale <rhale@g-o.com>
Sent: Thursday, July 19, 2018 4:29 PM
To: Kuehne, Paul
Cc: Connor, Eric; Araucto, Joseph, rporter@g-o.com
Subject: RE: Cambridge CO-4
Attachments: CO-4 and Cost Estimate.pdf
EXTERNAL EMAIL
Paul,
Please find attached a scan of the revised CO-4 worksheet and the independent cost estimate.
Thanks,
Ryan
From: Kuehne, Paul [mailto:PKuehne@kentwa.gov]
Sent:Tuesday, July 17, 2018 4:03 PM
To: 'Ryan Hale (rhale@g-o.com)' <rhale@g-o.com>
Cc: Connor, Eric<econnor@kentwa.gov>; Araucto, Joseph <jaraucto@kentwa.gov>; 'rporter@g-o.com' <rporter@g-
o.co m>
Subject: FW: Cambridge CO-4
Hello Ryan,
Please provide your independent cost estimate for this change. Please sign both your estimate
and the change order worksheet. Please complete the change order worksheet. The worksheet is
a tool that you may modify to fit the change being made. By signing the estimate and worksheet
you indicate; the cost is reasonable based on your independent estimate, the change is
necessary (you indicated it is in your email included below), specify whether any of the cost for
this change order will be compensated on the soonest progress payment (if not put $0), specify
the units of payment (Lump Sum) or Force Account/Equitable Adjustment/Each/Lineal
Foot/Square Yard/etc. Specify whether you vetted the change with ]oe'Araucto or possibly other
members of the owner's project team. The Contractor's worksheet may function as support
documentation but not replacement for owner generated documentation for the change.
Please call me to discuss.
Paul Kuehne, Construction Engineering Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 1 Cell 253-740-5015
Mrehne(2"tKS ntWA.,aov
CITY OF KENT, WASHINGTON
1
From: Ryan Hale [rna ltw.r.hale.@L-o..corn]
Sent: Tuesday, July 17, 2018 1:08 PM
To: Kuehne, Paul <µ l<u, l net crest ya.€'civ>
Cc: 'Russ Porter <pporterLgo,com>; Araucto,Joseph <JAraua;to tkentwa.gov>
Subject: Cambridge CO-4
EXTERNAL E AIL
Paul
Please find attached the Change Order Worksheet No. 4 and the HCl Change Order Proposal.This change order is for the
additional work and lead abatement to cut the existing catwalk behind the reservoir ladder to meet OSHA ladder
clearance requirements. The existing ladder is welded directly to the catwalk and does not provide adequate clearance
behind the ladder to meet OSHA requirements. Cutting the catwalk will provide the necessary clearance. The additional
work requires additional field time for cutting the catwalk. Cutting the catwalk will also require additional abatement
and cleanup due to the existing lead based paint on the reservoir.The benefit to the City is the compliance of the
existing ladder with OSHA clearance requirements. The reason for this change is the existing as-built drawings do not
provide sufficient detail to determine OSHA compliance.
We at this point see no further issues with the change order and recommend the change order for City review and
approval. I have attached the change order worksheet and change order proposal. Please let me know if you need
further information for your process.
Thanks,
Ryan
Ryan Hale, EIT, NACE Coating Inspector—Level 1 / 206.284.0860 p / 206.283.3206 f
Gray& Osborne, Inc. f 1130 Rainier Avenue South, #300, Seattle, WA 98144
F',iearsecanaie'Aergw evrviraanienp twparr {rriafiatu tans email.
Electronic File Transfer-
Note that these electronic files are provided as a courtesy only. Gray&Osborne, Inc. in no way guarantees the accuracy or completeness of the digital
data contained within these files. Furthermore, Gray&Osborne, Inc. assumes no liability for any errors or omissions in the digital data herein. Anyone
using the information contained herein should consult the approved or certified hard copy drawings or reports for the most current information available.
2