PW18-095 - Change Order - #1 - HCI Industrial & Marine Coatings, Inc. - Cambridge Reservoir Recoating - 07/16/2018
/rirr%��% Records � // ��1y' 0 Fii �EI ! ///r//r i r Jrr / �' Document qu i CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: HCI Industrial & Marine Coatings, Inc. Vendor Number: JD Edwards Number Contract Number: PW18-095 - 002 This is assigned by City Clerk's Office Project Name: Cambridge Reservoir Recoating and Fall Protection Improvements Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 3/6/18 Termination Date: 125 Working Days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Mike Almaroof Department: PW Engineering Contract Amount: $1,334L850.00 Approval Authority: (CIRCLE O Z) Department Direc r Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Chanqe Order #1 _ _. .............................................. .................... . . As of: 08/27/14 K E 1�J T CHANGE ORDER NO. # i NAME OF CONTRACTOR: HCI Industrial & Mar ne Coatings, InC. ("Contractor') i CONTRACT NAME & PROJECT NUMBER: Cambrid e Reservoir Recoating and Fall Prptectipn Imp. ORIGINAL CONTRACT DATE: March 6. 2018 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments Contractor shall r p ovide all labor, materials, and equipment necessary to: Eliminate the existing ladder platform and upper platform. Extend the ladder to an enlarged upper platform which improves access to the reservoir roof and eliminate the need for stairs. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: --------- _ ---------_ ...... .........._ Original Contract Sum, $1,334,850.00 (including applicable alternates and WSST) Net Change by Previous Change Orders $0.00 (incl. applicable WSST) - Cnt Contract Aount $1,334,850.00 urre m (incl. Previous Change Orders) __... Current Change Order $7961.68 Applicable WSST Tax on this Change $796.17 Order Revised Contract Sum $1,343,607.85 CHANGE ORDER - 1 OF 3 ------------. ............ Original Time for Completion 125 working days (insert date) Revised----Time for Completion under w—or ki ng--- prior Change Orders (insert date) Days Required (t)Jor this Change Order 15 calendar days Revised Time for Completion 140 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. il 1)-1 CONTRACTOR: CITY OF KENT: By: By 7 I-fsignature) at re)er Print Na Print Name: llet4_ 0-Ar Its Its4�4�)/"e__ Cafe _C i papa inter DATE: DATE: '7 '116 L................. .................. ......................... .............. ......... —-------- CHANGE ORDER - 2 OF 3 .......... .......... i. APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department I['lhls field,MI may 111,th,MM, f,I e,,th where th L ra ft has nee.... CHANGE ORDER - 3 OF 3 • FILE NO: 200.2 KENT .,,. CHANGE ORDER 'NVI/'OR,KSHEET NO. 1 �- w .............. ... Construction EngineerinDivision Public Works Project: Cambridge Reservoir Recoating Project No.: 17-7999.2 and Fall Protection Improvements - REBID #2 Project Engineer: Joe Araucto Fed-Aid No.: W20058 Capital Projects Contractor: HCI Industrial & Marine Coatings, Manager: Inc. Date: June 28, 2018 I. PROPOSED CHANGE Eliminate the existing ladder platform and upper platform and extend the ladder to an enlarged upper platform. II. REASON AND BACKGROUND FOR CHANGE The enlarged upper platform would improve access to the reservoir roof and eliminate the need for steep stairs. Additionally, the existing roof platform framing allows for accumulation of water and debris at the platform edge, accelerating coating failure. These design modifications would eliminate the location where water and debris accumulation occurs. III. METHOD OF PAYMENT NEW PAYITEMI(S) L Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Item Descri ti _...�—__ _ .._ _ p on I Total 1 Qty this ! Unit ' Unit Price Total Estimated Cost_of Est. Qty PIE Item Independento Estimate Attached r Ci PAY ITEM ONLY — Payment to be made ❑ 1 PAY THIS PAY ESTIMA I.i I - REOUIRED at a later date upon completion of work ❑ 1`7.?.55�_u'i. .(Sub l.i�l" Re.quJr d — �C _,_C.4.n rut�tir � C r unartQiw. New Sub 1i ' No.. , .. DELETE EXISTING PAY ITEM(S) per 1-09.5 Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY .... — — — Sch No Item Description Qty Unit Unit Price _ Cost of Item ❑ Independent Estimate Attached - REQUIRED -.... INCREASE/DECREASE TO EXISTING PAY ITEM(S) ❑ Not Applicable 1 REV. DATE: 3/27/18 ICETIT FILE NO: 200.2 Change Order No. - FOR ACCOUNTING USE ONLY Sch. No B.I. No. J ,-Item Description City Unit Unit Price FCost of Item $8,757.85 r _ . I Independent Estimate Attached - REQUIRED r TOTAL ESTIMATED COST OF CHANGE ORDER * 8� 7.85 _ *Total of the Cost of Item Columns THIS PAY ESTIMATE IV. WORKING DAYS Original Contract 125 --! Due This Change. Order* 15 Previous Total 125 DATE: DATE: * Explanation f iion Required: The original platform design called for reusing the original platform attachments, however, the enlarged platform design requires attachment to the tank in other locations. The existing as-built drawings do not provide sufficient detail for designing the new platform supports and attachment points, therefore the Contractor needs an additional site visit to take as-built measurements and additional] time for the, engineering/design of the enlarged roof platform, TOTAL WORKING DAYS 14 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. r Capital Projects Manager: !i /F Date: Construction Engineering Date: L- I Supervisor: f ,✓"l�r "-,,.. 2 REV. DATE: 3/27/18 FILE NO: 200.2 KENT Construction Mana ger: r Date. 3 REV. DATE: 3/27/18 CITY OF KENT CAMBRIDGE RESERVOIR RECOATING AND FALL PROTECTION IMPROVEMENT - REBID NO. 2 G&O #17530 ENGINEER'S COP-1 COST ESTIMATE NO. DESCRIPTION 211UNITS UNIITPRIC:E AMOUNT t Stringer Stair and Small Roof Platform -Materials 1 LS $ (7,500) $ (7,500) 2 Stringer Stair and Small Roof Platform-Labor 40 HR $ (170) $ (6,800) 3 Enlarged Platform-Materials 1 LS $ 11,000 $ 11,000 4 Enlarged Platform -Labor 34 HI2 $ 170 $ 5,780 5 Additional Engineering 8 HR $ 125 $ 1,000 6 SiteAs-built-Labor 12 FIR $ 115 $ 1,380 7 SiteAs-built-Equipment 1 LS $ 1,000 $ 1,000 8 General Contractor Supervision 10 HR $ 100 $ 1,000 9 Overhead and Profit 1 CALC $ 1,372 $ L372 Subtotal: $ 8,232 State of Washington Sales Tax @ 10.0% $ 823 TOTAL: $ 9,055 Kuehne, Paul I From: Ryan Hale <rhale@g-o.com> Sent: Thursday, June 28, 2018 10,02 AM To: Kuehne, Paul Cc: 'Russ Porter';Araucto, Joseph; Almaroof, (Mike) Meqdam Subject: Cambridge COP-1 Attachments: HCI COP-l.xlsx, Enlarged Platform.pdf; RFI No. 9.pdf i Paul, Please find attached HCI's COP-1 regarding the roof platform and the RFI that elaborates on the justification for the change. HCI is requesting 15 additional days for the work. The cost includes all materials and services for the attached roof platform schematic. T Bailey recommends eliminating the existing ladder platform and upper platform and extending the ladder to an enlarged upper platform. The enlarged upper platform would improve access to the reservoir roof and eliminate the need for steep stairs. Additionally, the existing roof platform framing allows for accumulation of water and debris at the platform edge, accelerating coating failure. These design modifications would eliminate the location where this accumulation occurs. The original platform design called for reusing the original platform attachments, however, the enlarged platform design requires attachment to the tank in other locations. The existing as-built drawings do not provide sufficient detail for designing the new platform supports and attachment points, therefore T Bailey needs an additional site visit to take as- built measurements and additional time for the engineering/design of the enlarged roof platform. The COP includes a credit for the materials and labor of the original stairs and roof platform and the new cost of materials for the enlarged platform, additional engineering T Bailey will need to perform to design the platform, the labor to fabricate and install the platform, and the cost of the added site layout visit that T Bailey performed to get precise measurements of where the platform will attach to the tank. The "HCl Site Supervision @ 10 hours" item for$750 is included because T Bailey anticipates requiring additional time on site to complete the enlarged platform, and HCl will need to have one of their own employees on site during that time to supervise the work. The additional supervision over that which was included in the bid is reasonable considering the amount of work that has been added. We at this point see no further issues with the change order and recommend the change order for City review and approval. I have attached the COP-1 and additional backup information. Please let me know if you need further information for your process. Thanks, Ryan 1 ��47,�tuk.G M931WE PO4 r/,o,s2 C PO Box 1573,Brush Prairie,WA 98606 CONTRACT CHANGE ORDER NO. PROJECT: W20058 CAMBRIDGE RESERVOIR RECOATING CO NO: COP-1 CONTRACTOR: W HCI INC. DESCRIPTION OF CHANGE ORDER WORK: Supply and Installation of Enlarged Roof Platform: extend existing Ladder and Cag and cage The Contractor agrees that this change order represents full and final compensation to add the work described herein. Original Contract Amount: Amount of Previous Change Orders: �,. .... 1,7.'13,500.00 1 - 1 CHANGE ORDER PRICE: increase/decrease delete stringer stair&small roof platform -Labor and materials credit $ (14,212,00) material procure and fad $ 10,582.00 engineering $ 1,000.00 labor 34 hrs $ 5,399.20 added layout site visit _ $2,165.00 HCI Site Supervision @ 10 hours $ 750.00 Overhead, @ 5% $ 724.85 Profit @ 10% $ 1,522.19 Insurance/Bonds @ 2% $ 30.44 ....... .....— Subtotal $ 7,961.68 ..._........ .. WA State Sales Tax 10 $ 796.17 Subtotal $ 8,757.85 No Sales Tax TOTAL CHANGE ORDER PRICE $ 8,757.85 REVISED CONTRACT AMOUNT $ _ 1,222,257.85 This Change Order adds 15 day, modifying the contract time to 140 W days, The payments and/or additional time specified and agreed to in this Change Order shall include any claim by the Contractor for any extra compensation or extension of time with respect to the work described herein,including any time which may have resulted prior to executing this Change Order. Except as herein modified,the terms of the basic contract shall remain In full force and effect. Receipt acknowledged and terms and conditions agreed to by: (Conhoctor's Authorize OfficfalJ Approved for CM/GC/Owner (Owned (Date) (CM/GC) fOateJ �..m._......m._._..... 7o"e�[E.n...fn e'e'Y ..............—„ nm'e comments: Credit_is provided for deleting the stringer stairs and small roof platform.The credit Includes demo and waste haul of handrails and existing stairs, along with grinding and cleanup. Pricing for proposed platform includes platform design, material,fabrication and shop coating. Extending the existing ladder to the top of the new platform is included, Demo and waste haul of both platforms and stairs are included,along with grinding and cleanup,See attached sketch for approximate layout and dimensions. * Consumables(grinders,grinding discs,welding rod, etc.)are billed at$10/boilermaker hour * Equipment costs include RT crane,generator,welding machines,compressor, rental manlift,and small tools, * Handralling Is sized per engineering design performed on the catwalk and roof handrails(current layout). *Temporary relocation of existing antenna counterclockwise from ladder is included. Additional site visit covers costs for a second trip to finalize new platform dimensions,shell connection,etc. Equipment cost is for an 85' manlift rental for a single day, including roundtrip delivery. Platform framing and structural support sizes are estimated.A professional engineer will verify sizing.T BAILEY reserves the right to adjust material pricing to reflect additional structural steel that might be required following structural analysis. ICSn/� GRM�2.rN�� Qoa� pL-�l-r�oP�v, Sc-Ff�M�L i Ip EtCTE'�$.OQ I FRAMF� L4 '4 *3�8 ' S�PPc7iZ'TS W/ K�PADS SJPpnRr w� ' Sttelr_ Koa� S�aPE REFc/FapcEM¢i.Sr �S A'p�P D�MtI� - I,zn eiClEn1A E�:TS-r1rJ� SCR LE LAbz,5V Arib cAy6� 0/ S+fow PoR LEA 2s-ry PLATr*a�w1 PFLaFzt-E LEVEL C1AVC�E EXTErJD=/jay TD FLD FbRM FLAW) yEnlr nror 544A' i i I i iy m N o c m 3 oX xm aW, a o upa L„ v mv �9;c w� rt nN = a w`og � c oo .i mvi ar mmm Sm vm..i G2$ m -51 vE._mcm A Q m� am L N ac.- $ m OQ ;" o me mm im rcs�i ro o � m v E o of mm m x. � mmEmm � rym g4 m �E� a aim m �allw = w � FGU d oaL i9 � v o-i eonv d � oy� N [ . �.j y m O � ,y W Tihm may m m._ m �+ roN�' mc.' mv`G w 7'm� ci O N C N W9 T.]L 49 W C N ryry n L r.� n� c + mam ¢ oa 20= w� m omvm � a yw� N c d cn. A0P >. aw men,1? mc,m .+yam O W wV � a m o i0 -x E u� g, ub� mds� m c m cmr3 'd. Y r� O L•�Ti V m O j L C m W > m 4 C n 4 m ME m = ❑O W❑ OQ �d ° � m m ° uW v -S-o 2 OE LqaG} u I i � � \�d ° � / :^^ � \���\ 2���� / � �2/ , , �: , �� \\ . , z »/�». \ � � 6, ^ : ��� � \ :�\z �° «\ d \ :\��y« : §�� maya��« 2:�«^&/� : /������ /����}�} i ! �\ `� \\ �\ \ ` �� � % \ w `\, � .�_ �.�\2 �� ��� �\ �/\! ���: w ! � \ � y>� � j `���/ � / � «w \ \\% - « <�/ \� ; | , 7 ! . . � _+��: « . � . y. � � ! . i ' � ���� / � � r�2 � ® ^ � wd . »»�, ° . . � © :�! . i �, ��"�� � �' �� `' ��J� �s � �, � �i1 m ,,,���� i � t�, ��i �'' �I �/ "c°a P" ,� a // . .... if ��� � i � � ,r� �N�����j 1 1 4 m A�� l � I� �JA��O �,. N � "^I �";; i ,a t� a .ems. o. f { d C ' m 5 Q 1 A � m a m � m m a m %,O.D a m m �✓5 r I N / ///l// f�/ uj/ tl .. r rl�/ / p6 1 �1 t lb f C r/rrJ b + ey IN e &9 n��� ka �u r gaz %j �rrr� s r ; r /gliprr/. ro y yy uui I � r q'y,✓, � r�f�� /l l ' � � ,+°'�,r!� ✓Grit w y p LL }j a 17 at r((' �,j9�fF jJ V�IILfj U/ �1� � ��,,.; ,,,, '} •rvnv ....... �� 4 � � rr'✓<���i�� ��r�� rN 'l�Jl�Y/f� l