Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW18-426 - Original - Industrial Coatings Unlimited, LLC - Reith Road Water Tank Exterior Cleaning - 11/02/2018
,0 I ENT Records Management Document i CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to the City Clerk's Office. All portions are to be completed. If you have questions, please contact the City Clerk's Office at 253- 56-5725. ❑ Blue/Motion Sheet Attached ❑ Pink Sheet Attached Vendor Name: Industrial Coatings Unlimited, LLC ..____--- -___________ __ .... Vendor Number (JDE): Contract Number (City Clerk) PW 1$ - q2,U Category: Contract Agreement Sub-Category (if applicable): Other Project Name: Reith Road Water Tank Exterior Cleaning Contract Execution Date: 11/2/18 Termination Date: 6/30/19 Contract Manager: Jim Reed Department: PW: Operations Contract Amount: $14,459.50 Approval Authority: ® Director ❑ Mayor ❑ City Council Other Details The„!Contractor shall wprovi.de,pr o ofess nal services to clean the exterior of the Reith Rd Water Tank for the City's Water Department. ...., ._. .... .... ___..... ._w . ....._----- I +-�✓ �* T PUBLIC WORKS AGREEMENT i between City of Kent and Industrial Coatings Unlimited, LLC THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Industrial Coatings Unlimited, LLC organized under the laws of the State of Washington, located and doing business at 18420 6811 Ave S., # 110, Kent, WA 98032, Phone: (425) 251- 3268, Contact: Greg Snider (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall provide professional services to clean the exterior of the Reith Rd Water Tank for the City's Water Department. For a description and contractor's proposal, see Exhibit A which is attached and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I by June 30, 2019. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Fourteen Thousand, Four Hundred and Fifty-Nine Dollars and Fifty Cents ($14,459.50), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor eighty-five percent (85%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is appropriate. The City will pay the remaining Contract amount upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Band. Because this contract, including applicable sales tax, is $150,000 or less, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the City retain the final ten percent (10%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. PUBLIC WORKS AGREEMENT - 1 ($20K or Less and No Performance Band) B. Retainaoe. The City shall also hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. The amount retained shall be placed in a fund by the City pursuant to RCW 60.28.011(4)(a), unless otherwise instructed by the Contractor within fourteen (14) calendar days of Contractor's signature on the Agreement. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Payri Walver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. PUBLIC WORKS AGREEMENT - 2 ($20K or Less and No Performance Bond) G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause"shall include, without limitation, any one or more of the following events: A, The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E, The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. PUBLIC WORKS AGREEMENT - 3 ($20K or Less and No Performance Bond) VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor,may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A, Notice of Claim. Provide a signed written notice of claim that provides the following information: 1, The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Dv t Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination), IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor shall promptly correct all defects in workmanship and materials: (1) when Contractor knows or should have PUBLIC WORKS AGREEMENT - 4 ($20K or Less and No Performance Bond) known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or discovery of the defect. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period applicable to the overall work. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's duty to defend, indemnify, and hold the City harmless, and Contractor's liability accruing from that obligation shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys'fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's awn risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. PUBLIC WORKS AGREEMENT- 5 ($20K or Less and No Performance Bond) XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. R cnhifinn, of r)icniifac And Gnverrinn Law This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; 2ravided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assicinment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Camphance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Public Records Act. The Contractor acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington and documents, notes, emails, and other records prepared or gathered by the Contractor in its performance of this Agreement may be subject to public review and disclosure, even if those records are not produced to or possessed by the City of Kent. As such, the Contractor agrees to cooperate fully with the City in satisfying the City's duties and obligations under the Public Records Act. J. City Business. License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 6 ($20K or Less and No Performance Bond) K. Cguntaparts and SL9noWresE . This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. Further, upon executing this Agreement, either party may deliver the signature page to the other by fax or email and that signature shall have the same force and effect as if the Agreement bearingthe original si natur wa s as received in person. 9 IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. All acts consistent with the authority of this Agreement and prior to its effective date are ratified and affirmed, and the terms of the Agreement shall be deemed to have applied. CONTRACTOR: CITY KENT: By ey. 6_ , �, ku_ r � a gnakurel Pr t Name: Print Name: Timothy J. LaPorte, P.E. Its b � 1PaF� Its: Public W ks Director (klkle) DATE: t i/ ,A6 DATE: l� � :z tf NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Greg Snider Timothy 1. LaPorte, P.E. Industrial Coatings Unlimited, LLC City of Kent 18420 6V Ave S., # 110 220 Fourth Avenue South Kent, WA 98032 Kent, WA 98032 (425) 251-3268 (telephone) (253) 856-5500 (telephone) (425) 251-3269 (facsimile) (253) 856-6500 (facsimile) ATTES ; w, 4u) Kent City Clerk PUBLIC WORKS AGREEMENT - 7 ($20K or Less and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The Cityof Kent is committed to conform m to Federal and State laws regarding a garde g equal opportunity. As such all contractors subcontractors and suppliers who perform work with relation to this PP Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied wlth the requirements as set forth above. By signing low, I g e Ulfill the five requirements referenced above. By: For: Title: Dater EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1, Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the _ (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: ...................................................... For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that within the period three-year y p d immediately preceding the bid solicitation date (September 14, 2018), the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Industrial Coatings U im , LLC By: Sl ture o..f_Authorized Official* /r // Printed NameC ,r A4. Title: , Date: City and State: 'r-,�, *If a corporation, proposal must be executed in the corporate name by the president or vice- president (or any other corporate officer accompanied by evidence of authority to sign). If a co- partnership, proposal must be executed by a partner. BIDDER RESPONSIBILITY CRITERIA - 1 EXHIBIT A Scope of Work Industrial Coatings Unlimited will provide the labor, materials, and equipment to clean the exterior surface, including roof, sides and stairwell of the City of Kent Water Departments Reith Road Reservoir located at 25601 Reith Road, Kent WA 95032 in the amount of 14,459.50 including Washington State sales tax. i COATINGS UNLIMITED INC 18420 68`I' AVE. S # 110 KENT WA 98032 PH-425-251-3268 FAX-425-251-3269 gsnidcr@co at ingsun l imited.com Please Deliver The Following Page(s) To: NAME: Jim Reed FIRM: City of Kent FAX#: FROM: Greg Snider DATE: 9-14-t8 We are transmitting 1 pages including cover sheet. If you do not receive all pages, please contact us as soon as Possible at(425)251-3268. THANK YOU REGARDING: City of Kent Water Departments Reith Road Tank: 25601 Reith Rd, Kent WA 98032 Price includes all Labor and Equipment to pressure wash the exterior only. City of Kent to provide all water and 110 volt power. Price: $11,950.00 Please call if more information is needed. Please visitor .coatingsunlimited.cam EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liabilitv insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2. Automobile Liability insurance covering all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers` Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liabuiity insurance shall be written with limits no less than $2,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. I EXHIBIT B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. SPOPE �r�,,.r-^+�,,,.yy---�^��""��rr'��,04 INDUCOA-05 J"'f_4::X> iEIr DATE(MM/DDNYYY) CERTIFICATE OF LIABILITY INSURANCE 1012212018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the pollcy(les)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the Ipollcy,certain pollcles may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endarsomoni s. PRODUCER cT Sharon Pope PAx Hub international Northwest LLC p a ,NE 480 W.Tudor Road a"rc.Np.'ardr=(907)348 1105 F ,N,),(907)782-4429 Anchorage,AK'99603 a-Sharon.pOpeCT?hubink rrlellonal.cGM IN8'.RE .F ....D...OCOVERAOE NAIC0 psuRERA:EYeleatlndamnl lnaurtnneCam a 10851 INSURED INSURERS-Alaska National Insumn a,Company 38733 Industrial Coatings Unlimited,LLC _INSURERC: P Anchorage,AK 99511.2629O Box 112829 INSURER D: - --_--- fLs.Qilj=N a L.......... INSURER F: COVERAGES71 TE NUMBER: REVISION E. . THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAJMS. INSR TYPE OF INSURANCE Audi SUOR POLICYNUMBER POLICY 6PP dMaDCY E%P LIMITS A. X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE 1,000,'og0. CWMS-MADE 1KOCCUR X OAMA r�RENTED EFiML00022-181 09l0112018 09101/2019 RBEh11�E uE EG-lEaatutmDAal_. 100000 - MED9X (A1ygi0,Re Girt S %000 R 1,000,000 GENT-.AGGREGATE LIM T APPLIES PER C y4046ELypq 2,000,000 X POLICY ^J MT 1:1 Loc 'i 2,000,000 Pagp—U ,�CQK$!q Npp E_.`.,., - ... O. ER Pollution 1,000,000 B AUTOMOBILEUA13ILM OONISINEDFINOVEUMIT 1,000',00g a X ANY AUTO g� DU X 18URS11251 0910112018 0910112019 g YIN Par rwn � AU�UTqT�O�SONLY ApUpTNSN6 LEDq Bppyy ILY IN.IURYVPordPSGpnn ,,,, - AUTOSONLY AVTOM1ILtl Pmr6 'Rdo fA MA6E R N OP' A UMBREW LIABI X I OCCUR 4 900r0flD ...... EACHOiOyPoREN�„E �,,,,,_ r X excess JAB _LICLA[M&bME EFIC000016.181 0910112018 09/01/2019 aG TE � 1 4,80D,olio' Den X REIENnONs A m EE°NPBL� fN�+C r P R )( OTVR. YIN EFIMLOOG22.181 0910112018 09/01/2019 EL Faces D Nr ER AnYRPR ET���R�TPPARTNERIMCUTIVE ❑XCLUDED? NIA 1,000,000 I�ian�Eln NR) E. asaABEEAEMPLGYP 1,000ro00 a s,desrdhe wxAmr OISE ' E=P I Y IM 1,000,DOg 6ESCRIMON OFOPLRWnOKWLOCAVON0f VEN6CLEa tIaACARD1er A.dd&aonvl Rafievka avhadu9m.mny lam oaocnmd ifittawm Mti It raqulratl) RE a19-7752.1,Ralth Road Water Tank Extsrlor Ctl'saningoniract located at 25601 ReNh Read,Kent,If�1A. ^This contract Is registered and delivered as a surplus line coverage under the insurance code of the state of Washington,Title 48 RCW.It Is not protected by any Washington state guaranty association law.'Worldwide Facllles,LLC-WAOIC#110100,Carrier A.. Whore mqulmd by written contract or agreement,Certificate Holder Is an Additional Insured on the General Liability and Auto Liability poltclee.The insurance provided for the Insured,scheduled above,Is primary Insurance.Any other Insurance maintalnod by the additional Insured will be considered excess over, and non-contributory with the Insurance provided by the General Liability policy,but only with respect to wort done by or on behalf of the named Insured. CERTIFIICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Kent THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Engineering Administration,Public Works Department ACCORDANCE WITH THE POLICY PROVISIONS. 720 4th Ave S. Kent,WA 98032 A'UTTHOR2ED REPRESENTATIVE ,suau�6L ALI0 , ACORD 25(2016103) 01988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD JW Alaska National INSURANCE COMPANY BUSINESS AUTO COVERAGE ENHANCEMENT ENDORSEMENT THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM Various provisions in this endorsement restrict SECTION IV — Business Auto Conditions, coverage. Read the entire policy carefully to Paragraph A. 5. — Transfer of Rights of Recovery determine rights, duties, and what is and is not Against Others To Us is amended to include: covered. 5. Transfer of Rights of Recovery Against Throughout this policy, the words "you" and "your" Others to Us refer to the Named Insured shown in the Declarations. The words "we", "us", and "our" refer to This condition does not apply to any the company providing this insurance. person(s) or organization(s) to the extent that subrogation against that person or Other words and phrases that appear in quotation organization is waived prior to the "accident" marks have special meaning. Refer to SECTION V— or the "loss" under a contract with that person DEFINITIONS in the Business Auto Coverage Form. or organization. The coverages provided by this endorsement apply SECTION II — COVERED AUTO LIABILITY per "accident" and, unless otherwise specified, are COVERAGE, Paragraph A.2.a. (2) — Supplementary subject to all of the terms, conditions, exclusions and Payments is replaced by the following: deductible provisions of the policy, to which it is attached. (2) Up to $10,000 for cost of bail bonds (including bonds for related traffic law SECTION II — COVERED AUTO LIABILITY violations) required because of an COVERAGE, Paragraph A.I. Who Is An Insured is "accident" we cover. We do not have amended to include: to furnish these bonds, d. Any "employee" of yours while operating SECTION II — COVERED AUTO LIABILITY an "auto" hired or rented under a COVERAGE, Paragraph A.2.a. (4) — Supplementary contract or agreement in an "employee's" Payments is replaced by the following: name, with your permission, while performing duties related to the conduct (4) All reasonable expenses incurred by of your business. the "insured" at our request, including actual loss of earnings up to $500 a e. Any person or organization for whom you day because of time off from work. have agreed in writing to provide insurance such as is afforded by this Coverage Form, but only with respect to liability arising out of the ownership, maintenance or use of"autos" covered by this policy. If such person or organization has other insurance then this insurance is primary to and we will not seek contribution from the other insurance. AN IC CA 1150 10 13 Page 1 of 4 Alaska National INSURANCE COMPANY c. "Loss" caused by falling objects or SECTION II — COVERED AUTO LIABILITY missiles. COVERAGE, Paragraph A.2.c. —Voluntary Property Damage is added as follows: However, you have the option of having glass breakage caused by a covered "auto's" c. Voluntary Property Damage collision or overturn considered a "loss" under Collision Coverage. At your written request, we may make a voluntary payment for Property Damage Glass Repair—Waiver of Deductible caused by an "insured", but without liability to a third party, up to $25,000. We No deductible applies to glass breakage, if will not make a Voluntary Property the glass is repaired rather than replaced. Damage payment to anyone who is an "insured" under this policy. SECTION III — PHYSICAL DAMAGE COVERAGE, Paragraph A.4.a. — Transportation Expenses is SECTION III — PHYSICAL DAMAGE COVERAGE, replaced by the following: Paragraph A.2.—Towing is replaced by the following: Towing a. Transportation Expenses We will pay up to $200 per day to a We will pay up to $500 for towing and labor maximum of $1.500 for temporary costs incurred each time a covered "auto" transportation expense incurred by you that Is a: because of the total theft of a covered "auto" that is a: a. Private passenger; b. Truck; (1) Private passenger; c. Pick-up truck; (2) Truck; d. Panel ; or (3) Pick-up truck; e. Van (4) Panel; or type vehicle under 20,000 lbs. of Gross (5) Van Vehicle Weight is disabled. However, the type vehicle under 20,000 lbs. of Gross labor must be performed at place of Vehicle Weight. We will pay only for disablement. those covered "autos' for which you carry SECTION III — PHYSICAL DAMAGE COVERAGE, either Comprehensive or Specified Paragraph A.3. — Glass Breakage — Hitting a Bird Causes of Loss Coverage. We will pay or Animal — Falling Objects or Missiles is replaced for temporary transportation expenses by the following: incurred during the period beginning 48 hours after the theft and ending, Glass Breakage—Hitting a Bird or Animal regardless of the policy's expiration, —Falling Objects or Missiles when the covered "auto" is returned to use or we pay for its "loss If you carry Comprehensive Coverage for the damaged covered "auto", we will pay the following under Comprehensive Coverage: a. Glass Breakage; b. "Loss" caused by hitting a bird or animal; and AN IC CA 1150 10 13 Page 2 of 4 Alaska National INSURANCE COMPANY (2) Specified Causes of Loss only If the SECTION III — PHYSICAL DAMAGE COVERAGE, Declarations indicate that Specified Paragraph AA.b. — Loss of Use Expenses is Causes of Loss Coverage is provided replaced by the following: for the "auto' withdrawn from service; or b. Loss of Use Expenses— Hired, Rented, (3) Collision only if the Declarations or Borrowed Automobiles indicate that Collision Coverage is provided for the "auto" withdrawn We will pay expenses for which an from service. "insured" becomes legally responsible to pay for loss of use of a vehicle hired, SECTION III — PHYSICAL DAMAGE COVERAGE, rented or borrowed without a driver under Paragraph AAA. — Airbag Coverage is added as a written rental contract or agreement. follows: We will pay for loss of use expenses, if caused by: d. Airbag Coverage (1) Other than Collision, only if the We will pay for the cost to repair, replace, Declarations indicate that or reset an airbag that inflates for any Comprehensive Coverage is provided reason other than as a result of a for the vehicle withdrawn from collision, if the Declarations indicate that service. the covered "auto" has Comprehensive Coverage or Specified Causes of Loss (2) Specified Causes of Loss only if the Coverage. Declarations indicate that Specified Causes of Loss Coverage is provided SECTION III — PHYSICAL DAMAGE COVERAGE, for the vehicle withdrawn from Paragraph A.4.e. — Rental Reimbursement service. Coverage is added as follows: (3) Collision only if the Declarations e. Rental Reimbursement Coverage indicate that Collision Coverage is provided for the vehicle withdrawn We will pay up to $75 per day for rental from service. reimbursement expenses incurred by you for the rental of an "auto' because of However, the most we will pay for any "loss" to a covered "auto" that is a: expenses for loss of use is $200 per day, to a maximum of$1,500. (1) Private Passenger; SECTION III — PHYSICAL DAMAGE COVERAGE, (2) Truck; Paragraph AA.c. — Non-Transportation Loss of Use Expenses is added as follows: (3) Pick-up truck; c. Non-Transportation Loss of Use (4) Panel; or Expenses (5) Van We will pay up to $2,000 for non- transportation expense incurred by you, type vehicle under 20,000 lbs. of Gross because of "loss" to a covered "auto", if Vehicle Weight. Payment applies in caused by: addition to the otherwise applicable amount of each coverage you have on a (1) Other than Collision, only if the covered "auto". No deductibles apply to Declarations indicate that this coverage. Comprehensive Coverage is provided for the"auto' withdrawn from service; ANIC CA 1150 10 13 Page 3 of 4 Alaska National INSURANCE COMPANY (1) We will pay only for those expenses SECTION IV - BUSINESS AUTO CONDITIONS - incurred during the policy period Paragraph B.5.1b. - Other Insurance is replaced by beginning 24 hours after the "loss" the following: and ending, regardless of the policy's expiration, with the lesser of the b. For Hired Auto Physical Damage following number of days: Coverage, the following are deemed to be covered "autos" you own: (a) The number of days reasonably required to repair or replace the (1) Any covered "auto" you lease, hire, covered "auto". rent, or borrow; and (b) 30 days. (2) Any covered "auto"' hired or rented by your "employee" under a contract (2) This coverage does not apply while in that individual "employee's" name, there are spare or reserve "autos" with your permission, while available to you for your operations. performing duties related to the (3) The Rental Reimbursement conduct of your business. Coverage described above does not However, any "auto" that is leased, hired, apply to a covered "auto" that is rented or borrowed with a driver is not a described or designated as a covered covered "auto". "auto" on Rental Reimbursement Coverage Form CA 99 23. SECTION V - DEFINITIONS - Paragraph C. - SECTION IV - BUSINESS AUTO CONDITIONS - Bodily injury" is replaced by the following: Paragraph B.2. - Concealment, Misrepresentation Or C. "Bodily injury" means bodily injury, sickness or Fraud is amended by adding Unintentional Failure disease sustained by a person including death or to Disclose Hazards at the end of Paragraph B.2. as mental anguish resulting from any of these. follows: Mental anguish means any type of mental or Unintentional Failure to Disclose Hazards emotional illness or disease If you unintentionally fail to disclose any hazards existing at the inception date of your policy, we will not deny coverage under this Coverage Form because of such failure. However, this provision does not affect our right to collect additional premium or exercise our right of cancellation or non-renewal. This endorsement changes the policy to which it is attached and, unless otherwise stated, is effective on the date issued at 12:0'1 A.M. standard time at your mailing address shown in the policy. The information below is required only when this endorsement is issued'subsequent to commencement of the policy. Endorsement Effective 09/01/2018 Policy No. 18IAS11251 Insured Industrial Coatings Unlimited, LLC Endorsement No. 2 Countersigned By © Insurance Services Office, Inc., 2009 ANIC CA 1150 10 13 Page 4 of 4 POLICY NUMBER: EF1ML00022-181 COMMERCIAL GENERAL LIABILITY CG 2010 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERSr LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or O anization e : Locations Of Covered Operations 'Blanket where required by written contract. Information required to complete this Schedule,if not shown above,will be shown in the Declarations A. Section II — Who Is An Insured is amended to B. With respect to the Insurance afforded to these Include as an additional insured the person(s) or additional Insureds, the following additional exclu- orgenization(s) shown In the Schedule, but only slons apply: with respect to liability for "bodily Injury", "property This insurance does not apply to "bodily injury" or damage„ or "personal and advertising Injury' "property damage"oocurring after: caused,In whole or In part,by: 1. Your acts or omissions;or 1- All work. including materials, parts or equip- ment fumished In txmnection with such work, 2. The acts or omissions of those acting on your on the project(other than service,maintenance behalf, or repairs) to be performed by or on behalf of In the performance of your ongoing operations for the additional insured(s) at the location of the the additional Insured(s) at the locations) desig- covered operations has been completed;or noted above. 2. That portion of "your work" out of which the Injury or damage arises has been put to Its in- tended use by any person or organization other than another contractor or subcontractor an- gaged in performing operations for a principal as a part of the same project. CO 2010 07 04 0 ISO Properties, Inc.,2004 Page 1 of 1 13 POLICY NUMBER: EFIML00022-181 ECG 24 588 12 15 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY PROVISION - YOUR ONGOING AND/OR COMPLETED OPERATIONS This endorsement modifies Insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART CONTRACTOR'S POLLUTION LIABILITY COVERAGE PART MOTOR VEHICLES POLLUTION LIABILITY COVERAGE PART Paragraph 4.,Other Insurance of Conditions (Section IV)is amended by the addition of the following: If other liability insurance similar to this insurance listing as a Named Insured a person or organization that is: a. An owner of real or personal property on which you are performing operations; or b. A contractor on whose behalf you are performing operations, and this policy names those persons or organizations as additional insureds for those operations,then this insur- ance is primary to that other Insurance, and that other insurance shall not contribute to amounts payable under this Insurance, for liability arising out of your ongoing and/or completed operations performed for that person or organization under a written contract which requires that this insurance be primary. However, this does not apply if the written contract was not executed prior to the date that your operations for that person or organization oum- menced. ECG 24 588 12 15 Copyright Everest Reinsurance Company,2015 Page'I of 1 O Includes copyrighted material of Insurance Services Office, Inc.,with Its permission. 1011612018 about blank State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 10/16/2018 County Trade Job Classification Wage Holiday Overtime Note King Asbestos Abatement Workers Journey Level $46.57 5D 1H King Boilermakers Journey Level $66.54 5N 1C King Brick Mason Journey Level $57.32 5A 1M King Brick Mason Pointer-Caulker-Cleaner $57.32 5A 1M King Building Service Employees Janitor $24.63 5S 2F King Building Service Employees Traveling Waxer/Shampooer $25.08 5S 2F King Building Service Employees Window Cleaner (Non-Scaffold) $28.13 5S 2F King Building Service Employees Window Cleaner (Scaffold) $29.03 5S 2F King Cabinet Makers In Shop) Journey Level $22.74 1 King Carpenters Acoustical Worker $60.04 5D 4C King Carpenters Bridge, Dock And Wharf $60.04 5D 4C Carpenters King Carpenters Carpenter $60.04 5D 4C King Carpenters Carpenters on Stationary Tools $60.17 5D 4C King Ca n ers Creosoted Material $60.14 5D 4C King Carpenters Floor Finisher $60.04 5D 4C King Car enters Floor Layer $60.04 5D 4C King Carpenters Scaffold Erector $60.04 5D 4C King Cement Masons Journey Level $60.07 7A 4U King Divers Ft Tenders Bell/Vehicle or Submersible $113.60 5D 4C Operator (Not Under Pressure) King Divers Et Tenders Dive Supervisor/Master $76.33 5D 4C King Divers.Et Tenders Diver $113.60 5D 4C 8V King Divers Et Tenders Diver On Standby $71.33 5D 4C King Divers Et Tenders Diver Tender $64.71 5D 4C King Divers 8 Tenders Manifold Operator $64.71 5D 4C King Divers Et Tenders Manifold Operator Mixed Gas $69.71 5D 4C King Divers Q Tenders Remote Operated Vehicle $64.71 5D 4C Operator/Technician King Divers 8 Tenders Remote Operated Vehicle Tender $60.29 5A 4C King Dredge Workers Assistant Engineer $56.44 5D 3F King Dredge Workers Assistant Mate (Deckhand) $56.00 5D 3F aboutblank 1117 1011612018 about blank King Dredge Workers Boatmen $56.44 5D 3F King Dredge Workers Engineer Welder $57.51 5D 3F King Dredge Workers Leverman, Hydraulic $58.67 5D 3F King Dredge Workers Mates $56.44 5D 3F King Dredge Workers Oiler $56.00 5D 3F King Drywall Applicator Journey Level $58.48 5D 1 H King Drywall Tapers Journey Level $59.32 5P 1 E King Electrical Fixture Maintenance Journey Level $28.99 5L 1E Workers King Electricians - Inside_ Cable Splicer $77.51 7C 4E King Electricians - Inside Cable Splicer (tunnel) $82.84 7C 4E King Electricians - Inside Certified Welder $74.90 7C 4E King Electricians - Inside Certified Welder (tunnel) $80.37 7C 4E King Electricians - Inside Construction Stock Person $39.69 7C 4E King Electricians - Inside Journey Level $72.30 7C 4E King Electricians - Inside Journey Level (tunnel) $77.51 7C 4E King Electricians - Motor Shop Journey Level $45.08 5A 1B King Electricians - Powerline Cable Splicer $79.43 5A 4D Construction King Electricians- Powerline Certified Line Welder $69.75 5A 4D Construction King Electricians - Powerline, Groundperson $46.28 5A 4D Construction King Electricians - Powerline Heavy Line Equipment Operator $69.75 5A 4D Construction King Electricians - Powerline Journey Level Lineperson $69.75 5A 4D Construction King Electricians - Powerline Line Equipment Operator $59.01 5A 4D, Construction King Electricians - Powerline Meter InstaUer $46.28 5A 4D 8W Construction King Electricians - Powerline Pole Sprayer $69.75 5A 4D Construction King Electricians - Powerline Powderperson $52.20 5A 4D Construction King Electronic Technicians Journey Level $48.06 7E 1E King Elevator Constructors Mechanic $91.24 7D 4A King Elevator Constructors. Mechanic In Charge $98.51 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $17.72 5B 1 R Products Work Only King Fence Erectors Fence Erector $41.45 7A 31 King Fence Erectors Fence Laborer $41.45 7A 31 King Flaggers Journey Level $41.45 7A 31 King Glaziers Journey Level $63.06 7L 1y King Heat & Frost Insulators And Journeyman $73.58 5J 4H Asbestos Workers King Heating Equipment Mechanics Journey Level $82.51 7F 1E, King Hod Carriers Et Mason Tenders Journey Level $50.42 7A 31 King Industrial Power Y'acuum Cleaner Journey Level $11.50 1 aboutblank 2l17 I 1 0/1 612 01 8 about.blank King Inland Boatmen Boat Operator $61.41 5B 1K King Inland Boatmen Cook $56.48 5B 1K King Inland Boatmen Deckhand $57.48 5B 1K King Inland Boatmen Deckhand Engineer $58.81 5B 1K King Inland Boatmen Launch Operator $58.89 5B 1K King Inland Boatmen Mate $57.31 5B 1K King Inspection/Ct nmg/Sealing Of Cleaner Operator, Foamer $31.49 1 Sewer Et Water ystems By Operator Remote Control King InspectipnlClec3nng/Sealing Of Grout Truck Operator $11.50 1 Sewer Et Water Systems By Remote Control King Insppc of/Cteoj rlg/Sealing Of Head Operator $24.91 1 Sewer a Water Systems By Remote Control King Inspection/ pirjjugg/Sealing Of Technician $19.33 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer Ft Water Systems By Remote Control King Insulation Applicators Journey Level $60.04 5D 4C King Ironworkers Journeyman $69.28 7N 10 King Laborers Air, Gas Or Electric Vibrating $48.90 7A 31 Screed King Laborers Airtrac Drill Operator $50.42 7A 31 King Laborers Ballast Regular Machine $48.90 7A 31 King Laborers Batch Weighman $41.45 7A 31 King Laborers Brick Pavers $48.90 7A 31 King Laborers Brush Cutter $48.90 7A 31 King Laborers, Brush Hog Feeder $48.90 7A 31 King Laborers Burner $48.90 7A 31 King Laborers, Caisson Worker $50.42 7A 31 King Laborers Carpenter Tender $48.90 7A 31 King Laborers Caulker $48.90 7A 31 King Laborers Cement Dumper-paving $49.81 7A 31 King Laborers Cement Finisher Tender $48.90 7A 31 King Laborers Change House Or Dry Shack $48.90 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $48.90 7A 31 King Laborers Chipping Gun(30 Lbs. And Over) $49.81 7A 31 King Laborers Choker Setter $48.90 7A 31 King Laborers Chuck Tender $48.90 7A 31 King Laborers Clary Power Spreader $49.81 7A 31 King Laborers Clean-up Laborer $48.90 7A 31 King Laborers Concrete Dumper/chute Operator $49.81 7A 31 King Laborers Concrete Form Stripper $48.90 7A 31 King Laborers Concrete Placement Crew $49.81 7A 31 King Laborers, Concrete Saw Operator/core $49.81 7A 31 Driller about:blank 3/17 10/16/2018 about blank King Laborers Crusher Feeder $41.45 7A 31 King Laborers Curing Laborer $48.90 7A 31 King Laborers Demolition: Wrecking Et Moving $48.90 7A 31 (incl. Charred Material) King Laborers Ditch Digger $48.90 7A 31 King Laborers Diver $50.42 7A 31 King Laborers Drill Operator $49.81 7A 31 (hydrau tic,diamond) King Laborers Dry Stack Walls $48.90 7A 31 King Laborers Dump Person $48.90 7A 31 King Laborers Epoxy Technician $48.90 7A 31 King Laborers Erosion Control Worker $48.90 7A 31 King Laborers Falter It Bucker Chain Saw $49.81 7A 31 King Laborers Fine Graders $48.90 7A 31 King Laborers Firewatch $41.45 7A 31 King Laborers Form Setter $48.90 7A 31 King Laborers Gabian Basket Builders $48.90 7A 31 King Laborers General Laborer $48.90 7A 31 King Laborers Grade Checker Ft Transit Person $50.42 7A 31 King Laborers Grinders $48.90 7A 31 King Laborers Grout Machine Tender $48.90 7A 31 King Laborers Groutmen (pressure)including $49.81 7A 31 Post Tension Beams King Laborers, Guardrail Erector $48.90 7A 31 King Laborers Hazardous Waste Worker (level A) $50.42 7A 31 King Laborers Hazardous Waste Worker ((eve[ B) $49.81 7A 31 King Laborers Hazardous Waste Worker (level C) $48.90 7A 31 King Laborers High Scaler $50.42 7A 31 King Laborers Jackhammer $49.81 7A 31 King Laborers Laserbeam Operator $49.81 7A 31 King Laborers Maintenance Person $48.90 7A 31 King Laborers Manhole Builder-mudman $49.81 7A 31 King Laborers Material Yard Person $48.90 7A 31 King Laborers Motorman-dinky Locomotive $49.81 7A 31 King Laborers Nozzteman (concrete Pump, $49.81 7A 31 Green Cutter When Using Combination Of High Pressure Air It Water On Concrete 8 Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $49.81 7A 31 King Laborers Pilot Car $41.45 7A 31 King Laborers Pipe Layer Lead $50.42 7A 31 King Laborers Pipe Layer/tailor $49.81 7A 31 King Laborers Pipe Pot Tender $49.81 7A 31 King Laborers Pipe Reliner $49.81 7A 31 King Laborers Pipe Wrapper $49.81 7A 31 King Laborers Pot Tender $48.90 7A 31 about:blank 4/17 10/16/2018 about blank King Laborers Powderman $50.42 7A 31 King Laborers Powderman's Helper $48.90 7A 31 King Laborers Power Jacks $49.81 7A 31 King Laborers Railroad Spike Puller - Power $49.81 7A 31 King Laborers Raker - Asphalt $50.42 7A 31 King Laborers Re-timberman $50.42 7A 31 King Laborers Remote Equipment Operator $49.81 7A 31 King Laborers Rigger/signal Person $49.81 7A 31 King Laborers Rip Rap Person $48.90 7A 31 King Laborers Rivet Buster $49.81 7A 31 King Laborers Rodder $49.81 7A 31 King Laborers Scaffold Erector $48.90 7A 31 King Laborers Scale Person $48.90 7A 31 King Laborers Sloper (over 20") $49.81 7A 31 King Laborers Sloper Sprayer $48.90 7A 31 King Laborers Spreader (concrete) $49.81 7A 31 King Laborers Stake Hopper $48.90 7A 31 King Laborers Stock Piler $48.90 7A 31 King Laborers Tamper & Similar Electric, Air 8 $49.81 7A 31 Gas Operated Tools King Laborers Tamper (multiple Ft Self- $49.81 7A 31, propelled) King Laborers Timber Person - Sewer (Lagger, $49.81 7A 31 Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $48.90 7A 31 King Laborers Topper $48.90 7A 31 King Laborers Track Laborer $48.90 7A 31 King Laborers Track Liner (power) $49.81 7A 31 King Laborers Traffic Control Laborer $44.33 7A 31 8R King Laborers Traffic Control Supervisor $44.33 7A 31 8R King Laborers Truck Spotter $48.90 7A 31 King Laborers Tugger Operator $49.81 7A 31 King Laborers, Tunnel Work-Compressed Air $107.60 7A 31 8Q Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $112.63 7A 31 8Q Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $116.31 7A 31 8Q Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $122.01 7A 31 8Q Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air $124.13 7A 31 8Q Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $129.23 7A 31 8Q Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $131.13 7A 31 8Q Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $133.13 7A 31 8Q Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $135.13 7A 31 8Q aboutblank 5/17 10/16/2018 about blank Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $50.52 7A 31 8Q Tender King Laborers Tunnel Work-Miner $50.52 7A 31 8Q King Laborers Vibrator $49.81 7A 31 King Laborers Vinyl Scanner $48.90 7A 31 King Laborers Watchman $37.67 7A 31 King Laborers Welder $49.81 7A 31 King Laborers Well Point Laborer $49.81 7A 31 King Laborers Window Washer/cleaner $37.67 7A 31 King Laborers - Un ground Sewer Et General Laborer Et Topman $48.90 7A 31 Water King Laborers - Underground Sewer £t Pipe Layer $49.81 7A 31 Water King Landscape Construction Landscape Laborer $37.67 7A 31 King Landscape Construction Landscape Operator $59.49 7A 3C 8P King Lathers Journey Level $58.48 5D 1H King Marble Setters Journey Level $57.32 5A 1M King Metal Falaric ton )In Shop) Fitter $15.86 1 King MQtl Frjeasi�n-(In Shop). Laborer $11.50 1 King Metal Fabrlcatlnn-(In Shop), Machine Operator $13.04 1 King Metal Fabrication In Shop), Painter $11.50 1 King Metat Fabrirc:a ion (In Shop) Welder $15.48 1 King Millwright Journey Level $61.54 5D 4C King Modujar Ouildings_ Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $11.50 1 King Modular Buildings Tool Maintenance $11.56 1 King mlarLimga Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $42.50 6Z 2B King Pile Driver Crew Tender $54.99 5D 4C King Pile Driver Hyperbaric Worker - Compressed $74.87 5D 4C Air Worker 0-30.00 PSI King Pile Driver Hyperbaric Worker - Compressed $79.87 5D 4C Air Worker 30.01 - 44.00 PSI King Pile Driver Hyperbaric Worker - Compressed $83.87 5D 4C Air Worker 44.01 - 54.00 PSI King Pile Driver Hyperbaric Worker - Compressed $88.87 5D 4C Air Worker 54.01 - 60.00 PSI King Pile Driver Hyperbaric Worker - Compressed $91.37 5D 4C Air Worker 60.01 - 64.00 PSI King Pile Driver Hyperbaric Worker - Compressed $96.37 5D 4C Air Worker 64.01 - 68.00 PSI King Pile Driver Hyperbaric Worker - Compressed $98.37 5D 4C Air Worker 68.01 - 70.00 PSI King Pile Driver Hyperbaric Worker - Compressed $100.37 5D 4C about blank 6/17 10/16/2018 about blank Air Worker 70.01 - 72.00 PSI King Pile Driver Hyperbaric Worker - Compressed $102,37 5D 4C Air Worker 72.01 - 74.00 PSI King Pile Driver Journey Level $60.29 5D 4C King Plasterers Journey Level $56.54 M 1R King Playground 8 Park Equipment Journey Level $11.50 1 Installers King Plumbers li Pipefitters Journey Level $83.69 6Z 1G King Power Equipment Operators Asphalt Plant Operators $60.49 7A 3C 8P King Power Equipment Operators Assistant Engineer $56.90 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $59.96 7A 3C 8P King Power Equipment Operators Batch Plant Operator, Concrete $59.96 7A 3C 8P King Power Equipment Operators Bobcat $56.90 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition $56.90 7A 3C 8P Equipment King power Equipment Operators Brooms $56.90 7A 3C 8P King Power Equipment Operators Bump Cutter $59.96 7A 3C 8P King Power Equipment Operators Cableways $60.49 7A 3C, 8P King Power Eouipment Operators Chipper $59.96 7A 3C 8P King Power Equipment Operators Compressor $56.90 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $60.49 7A 3C 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $56.90 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $59.49 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $59.96 7A 3C 813 With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $59.49 7A 3C 8P King Power Equipment Operators Cranes Friction: 200 tons and $62.33 7A 3C 8P over King Power Equipment Operators Cranes: 20 Tons Through 44 Tons $59.96 7A 3C 8P With Attachments King Power Equipment Operators Cranes: 100 Tons Through 199 $61.10 7A 3C 8P Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment perators Cranes: 200 tons- 299 tons, or $61.72 7A 3C 8P 250' of boom including jib with attachments King Power Equipment Operators Cranes: 300 tons and over or 300' $62.33 7A 3C 8P of boom including jib with attachments King Power Equipm n rpe ators Cranes: 45 Tons Through 99 Tons, $60.49 7A 3C 8P Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $56.90 7A 3C 8P Under King Power Equipment Operators Cranes: Friction cranes through $61.72 7A 3C, 8P 199 tons about.blank 7117 10/15/2018 aboutblank King Power Equipment Operators Cranes: Through 19 Tons With $59.49 7A 3C 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $59.96 7A 3C BP King Power Equipment Operators Deck Engineer/deck Winches $59.96 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $60.49 7A 3C 8P King Power Equipment Operators Dozers D-9 8 Under $59.49 7A 3C 4P King Power Equipment Operators Drill Oilers: Auger Type, Truck Or $59.49 7A 3C 8P Crane Mount King Power Eauipme_,nt Operators Drilling Machine $61.10 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: Permanent $56.90 7A 3C And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $59.96 7A 3C Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over With $59.49 7A 3C Be Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $56.90 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $59.96 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $56.90 7A 3C 8P King Power Equipment Operators Guardrail Punch $59.96 7A 3C 8P King Power Equipment Operators Hard Tail End Dump Articulating $60.49 7A 3C SPP Off- Road Equipment 45 Yards. Et Over King Power Equipment Op re ators Hard Tail End Dump Articulating $59.96 7A 3C P Off-road Equipment Under 45 Yards King Power E uipment peratorsHorizontal/directional Drill $59.49 7A 3C 8P Locator Locator King Power Equipment Operators Horizontal/directional Drill $59.96 7A 3C 8P, Operator King Power Equipment Operators Hydralifts/boom Trucks Over 10 $59.49 7A 3C Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 Tons $56.90 7A 3C 8P And Under King Power Equipment Operators Loader, Overhead 8 Yards. Ft $61.10 7A 3C 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $60.49 7A 3C 8P Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 Yards $59.96 7A 3C BP King Power Equipment Operators Loaders, Plant Feed $59.96 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $59.49 7A 3C BP King Power Equipment Operators Locomotives, All $59.96 7A 3C, 8P King Power E _uikm_e_nLDperators Material Transfer Device $59.96 7A 3C 8P King Power Equipment Operators Mechanics, All (leadmen - $0.50 $61.10 7A 3C 8P Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol Graders $60.49 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $60.49 7A 3C 8P Drill, Boring, Road Header And/or Shield about:blank 8117 10/16/2018 about blank King Power Equipment Operators Oil Distributors, Blower $56.90 7A 3C 8P Distribution Ft Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $59.49 7A 3C 8P Manlifts), AirTuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: 20 $59.96 7A 3C 8P Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 Tons $61.10 7A 3C 8P And Over King Power Equipment Operators Overhead, Bridge Type: 45 Tons $60.49 7A 3C 8P Through 99 Tons King PowerEqui m nt perators Pavement Breaker $56.90 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $59.96 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $59.49 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $56.90 7A 3C 8P King Power Equipment Operators Power Plant $56.90 7A 3C 8P King Power Equipment perators Pumps - Water $56.90 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $60.49 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under 100 $56.90 7A 3C 8P Feet In Height Based To Boom King Power EoLL1oment Operators Remote Control Operator On $60.49 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Bellman $56.90 7A 3C 8P King Power Equipment Operators Rigger/Signal Person, Bellman $59.49 7A 3C 8P (Certified) King Power Equipment Operators Rollagon $60.49 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $56.90 7A 3C 8P King Power Equipment perators Roller, Plant Mix Or Multi-lift $59,49 7A 3C 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $59.96 7A 3C 8P King Power Equipment Operators Saws - Concrete $59.49 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under-45 $59.96 7A 3C 8P Yards King Power Equipment Operators Scrapers - Concrete li Carry All $59.49 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled: 45 Yards $60.49 7A 3C 8P And Over King Power Eouipment Operators Service Engineers - Equipment $59.49 7A 3C 8P King Power Equipment Operators Shotcrete/gunite Equipment $56.90 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $59.49 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Opel Shovel, Excavator, Backhoe: Over $60.49 7A 3C 8P 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $59.96 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $61.10 7A 3C, 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $61.72 7A 3C 8P Over 90 Metric Tons abouCtalank 9/17 1 0/1 612 0 1 8 about blank King Power Equipment Operators Slipform Pavers $60.49 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et Screedman $60.49 7A 3C, 8P King Power Equipment Operators Subgrader Trimmer $59,96 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $59.49 7A 3C 8P King Power Equipment p rators Tower Crane Up To 175' In Height $61.10 7A 3C BP Base To Boom King Power Equipment Operators Tower Crane: over 175' through $61.72 7A 3C 8P 250' in height, base to boom King Power yinment Operators Tower Cranes: over 250' in height $62.33 7A 3C BP from base to boom King Power Equipment Operators Transporters, All Track Or Truck $60.49 7A 3C ASP Type King Power Equipment Operators Trenching Machines $59.49 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $59.96 7A 3C �' Tons And Over King Power Equipment Operators Truck Crane Oiler/driver Under $59.49 7A 3C 88P 100 Tons King Power Equipment perators Truck Mount Portable Conveyor $59.96 7A 3C 8P King Power Equipment Operators Welder $60.49 7A 3C 8P King Power Equipment Op re ators Wheel Tractors, Farman Type $56.90 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $59.96 7A 3C ESP King Power Equipment Operators- Asphalt Plant Operators $60.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $56.90 7A 3C 8P Underground Sewer Et Waxer King Power Equipment Operators- Barrier Machine (zipper) $59.96 7A 3C 8P Underground Sewer It Water` King Power Equipment Operators- Batch Plant Operator, Concrete $59.96 7A 3C 8P Underground Sewer Et Water, King Power Equipment p r r - Bobcat $56.90 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $56.90 7A 3C 8P Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $56.90 7A 3C 8P Underground Sewer Et Water' King Power Equipment Operators- Bump Cutter $59.96 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cableways $60.49 7A 3C 8P Underground Sewer Ek Waiter King Power Equipment Operators- Chipper $59.96 7A 3C 8P Underground Sewer a Water King Power Equipmen r ors- Compressor $56.90 7A 3C BP Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $60.49 7A 3C BP' Underground Sewer& Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $56.90 7A 3C 8P. Underground Sewer Et Water Screed King Power E Nipment perators- Concrete Pump - Mounted Or $59.49 7A 3C BP, Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $59.96 7A 3C 8P derground Sewer Et Water With Boom Attachment Up To about blank 10/17 1 0/1 612 01 8 about blank 42m King Power Equipment Oper rs- Conveyors $59.49 7A 3C 8P Undergiouiid Sewer E' Wakor King Power Equipment Operators- Cranes Friction: 200 tons and $62.33 7A 3C BP Undergrornd ew r ft Water over King Power Equipment Op r rs- Cranes: 20 Tons Through 44 Tons $59.96 77A 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Cranes: 100 Tons Through 199 $61.10 Z X 8P Underground Sewere_Wter Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Equipment Operators- Cranes: 200 tons- 299 tons, or $61.72 7A 3C aP Underground Sewer tr to 250' of boom including jib with attachments King Power Equipment Operators- Cranes: 300 tons and over or 300' $62.33 7A 3C 8P Underground Sewer Ft Water' of boom including jib with attachments King Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, $60.49 7A 3C 8P Underground-5ewel_ -Water: Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $56.90 7A X 8P Underground Sewer tt Water Under King Power Equipment Operators- Cranes: Friction cranes through $61.72 7A 3A Underground Sewer Et Water 199 tons King Power Equipment Operators- Cranes: Through 19 Tons With $59.49 7A 3C 8P n -rground Suwer Et Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $59.96 7A 3C 8P Undergr nod Sewer tC Water King Power Equipment Operators- Deck Engineer/deck Winches $59.96 7A A 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $60.49 7A 3A BP Underground Sewer Et Water King Power Equipment Operators- Dozers D-9 Et Under $59.49 7A 3C BP Underground Sewer Et Wo er King Power Equipment Operators- Drill Oilers: Auger Type, Truck Or $59.49 Z 3C, 8P UndeA'geound Sewer, a Water' Crane Mount King Power Equipment Operators- Drilling Machine $61.10 7A 3, 8P Underground Sewer a Water King Power Equipment Operators- Elevator And Man-lift: Permanent $56.90 7A 3C BP Underground Sewer ft Water And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $59.96 Z K 8P Underground Sewed ft Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over With $59.49 7A 3C 8P Underground Sewer It Water Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $56.90 77A 3C 8P Underground 5ewer Ft Water Attachments King Power Equipment Operators- Grade Engineer: Using Blue $59.96 7A X R Underground Sewer Et. Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $56.90 7A 3A SP Underground w r W King Power Equipment Operators- Guardrail Punch $59.96 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Hard Tail End Dump Articulating $60.49 Z 3A 8P about blank 11117 10/16/2018 about blank Underground Sewer Ea Water Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump Articulating $59.96 7A 3C 8P Undergrourl $ewer Et Water Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $59.49 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $59.96 7A 3C 8P Udd4zrgr ur d ewer Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over 10 $59.49 7A 3C 8P Underground Sewer Et Water Tons King Power Eouipment Operators- Hydralifts/boom Trucks, 10 Tons $56.90 7A 3C 8 Underground Sewer Et water And Under King Power Equipment Operators- Loader, Overhead 8 Yards. 8 $61.10 7A 3C 8P, Underground Sewer Et Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. But $60.49 7A 3C 8P Underground Sewer 8,Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 Yards $59.96 7A 3C 8P Underground Sewer Et water, King Power Equipment Operators- Loaders, Plant Feed $59.96 7A 3C 8R Unde ground Sewer Et water King Power Eqlj1pment Operators- Loaders: Elevating Type Belt $59.49 8A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $59.96 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Material Transfer Device $59.96 7A 3CC 8P Underground Sewer Et Watea King Power Equipment Operators- Mechanics, All (leadmen - $0.50 $61.10 7A 8P Undergr°ound Sewer Et Water Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Graders $60.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $60.49 7A 3C 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $56.90 7AEP Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment 0 era ors- Outside Hoists (elevators And $59.49 7A 3C 8P Underground Sewer 1s Watt Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: 20 $59.96 77A 8C 9E Underground Sewer & Water Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 Tons $61.10 7A 3C 8P Underground Sewer Et Water And Over King Power Equipment Operators- Overhead, Bridge Type: 45 Tons $60.49 7A 3C 8P Underground Sewer a water Through 99 Tons King Power Equipment Operators- Pavement Breaker $56.90 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $59.96 7A 3C 8P Underground Sewer ft Water' Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $59.49 ZA 3C 8P Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $56.90 7A 2C_ 8P Underground Sewer Et Water about blank 12117 10116l2018 about:blank King Power Equipment Operators- Power Plant $56.90 7A 3C 8P Uncle gj:QundiQwer Et I&Aq King Power Equipment Operators- Pumps - Water $56.90 7A 3C 8P UndergrLq and Sewer Ea Wa er King Power Equipment Operators- Quad 9, Hd 41, DI And Over $60.49 7A 3C 8P Underground Sewer ft Water King Power Equipment Operators- Quick Tower - No Cab, Under 100 $56.90 7A 3C 8P Underground Sewer Et Water Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $60.49 7A 3C 8P Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $56.90 7A 3C 8P Underground Sewer ft Water King Power Equipment Operators- Rigger/Signal Person, Bellman $59.49 7A 3C 8P JWdpig[pund 5twer & Water (Certified) King Power Equipment Operators- RoUagon $60.49 7A 3C 8P YPndgrground Sewer Et Water King Power Eouipment Operators- Roller, Other Than Plant Mix $56.90 7A 3C 8P Und(Lrgro5rnd Suwer& ater. King Power Eouipment Operators- Roller, Plant Mix Or Multi-lift $59.49 7A 3C 8P u.Ddergr-ot-in-cl—se-Ee-Lk-vLa-LeL Materials King Power Equipment Operators- Roto-mill, Roto-grinder $59.96 7A 3C 813 Underground Sewer—Ft Watgwr King Power Equipment Operators- Saws - Concrete $59.49 7A 3C 8P n erground sewer Ft Water King Rgwer Equipment Operators- Scraper, Self Propelled Under 45 $59.96 7A 3C 8P Un&grou% de,q Water Yards King P a w r Equ»pment Operators- Scrapers - Concrete Et Carry All $59.49 7A 3C 8P Udtdcrgrr0un0.So er 6 Water King Power Equipment Operators- Scrapers, Self-propelled: 45 Yards $60.49 7A 3C 8P U'ndgrground Sewer& Water And Over King Power Equipment Operators- Service Engineers - Equipment $59.49 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Shotcrete/gunite Equipment $56.90 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $59.49 7A 3C 8P Underground Sewer ft Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: Over $60.49 7A 3C 8P Underground Sewer Er Water 30 Metric Tons To 50 Metric Tans King Power Equipmen Operators- Shovel, Excavator, Backhoes, $59.96 7A 3C 8P Undergrgund Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $61.10 7A 3C 8P Underground Sewer fx Water. Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $61.72 7A 3C 8P Undergrgund Sew Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $60.49 7A 3C 8P Underground Sewer ft Water King Power Equipment Operators- Spreader, Topsider Et Screedman $60.49 7A 3C SP Underground Sewer Et Water King Power Equipment Operators- Subgrader Trimmer $59.96 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $59.49 7A 3C 8P about:blank 13/17 10/16/2018 about blank UndergMUld_Sewer_Ct Water King Power Equipment Operators- Tower Crane Up To 175' In Height $61.10 7A 3C 8P qadffgtJQpnd Sewer ft Water Base To Boom King Power Equipment Operators- Tower Crane: over 175' through $61.72 7A 3-C 8P Underground Sewer €t Water 250' in height, base to boom King Power Equipment Operators- Tower Cranes: over 250' in height $62.33 7A 3C 8P Underground ewer 6:Water from base to boom King Power Equipment Operators- Transporters, All Track Or Truck $60.49 7A 3 8P Unde grQWod 5e; gr fuVAIVI Type King Power Equipment Operators- Trenching Machines $59.49 7A 3C 8P Underground Sewer 4 Water King Power Eouipment Op ra or - Truck Crane Oiler/driver - 100 $59.96 7A 8P Undergrounds Sewer a Wa ter Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $59.49 7A 3C 8P Underground Sewer a Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $59.96 7A 3C, 8P Underground Sewer £t Water King Power Equipment Operators- Welder $60.49 7A 8P Underground Sewer-Et Water King Power Equipment Operators- Wheel Tractors, Farma(l Type $56.90 7A 3-C 8P Under graund Sew- £t Warr King Power Equipment Operators- Yo Yo Pay Dozer $59.96 7A 3C 8P Undergrourid Seewer fa Water King Power Line Clearance Tree Journey Level In Charge $49.96 5A 4A. Trimmers King Power Line C(earance Tree Spray Person $47.37 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $49.96 5A 44 Trimmers King Power Line Clearance Tree Tree Trimmer $44.57 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $33.60 5A 4A Trimmers King Refrigeration a Aar Conditioning Journey Level $79.51 6Z I-Q Mechanics King Residential Brick Mason Journey Level $57,32 5A IM King Residential Carpenters Journey Level $45.05 5D c King Residential Cement Masons, Journey Level $60.07 7A 4U King R S' rYt ) fylpp i r Journey Level $45.05 5D 4C King Residentiai Drywpers Journey Level $45.19 5P JE King Residential Electricians Journey Level $37.26 SQ 20 King Residential Glaziers Journey Level $42.05 7L 1H King ResidenUallnsulation Applicators Journey Level $45.05 5D 4C King Residential Laborers Journey Level $36.68 7A 11H King Residential Marble Setters Journey Level $57.32 5A 1M King Residential Painters Journey Level $42.50 6Z 26 King Rosidentia( Plumbers & Pipefitters Journey Level $51.37 5A 1G King RQ Cjdg 31 llgeration 8 Air Journey Level $51.37 5A 1G Conditioning Mechanics King Residential Sheet Metal Workers Journey Level (Field or Shop) $50.01 7F 1R King Resider ki (Soft 1 or ayers Journey Level $19.43 5A about blank 14117 10l16l2018 about blank King Residential Sprink er Fitters (Fire, Journey Level $46,58 5C 2R Protection) King Residential Stone Masons Journey Level $57.32 5A 1M King Residential Terrazzo Workers Journey Level $52.61 5A 1M King Residential Terrazzo/Tile Journey Level $43.44 5A 1B Finishers King Residential Tile Setters Journey Level $52.61 5A 1M King Roofers, Journey Level $51.52 5A 3H King Roofers Using Irritable Bituminous $54.52 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $82.51 7F 1E King Shipbuilding Et Ship Repair New Construction Boilermaker $36.36 7V 1 King Shipbuilding Et Ship Repair New Construction Carpenter $36.36 7V 1 King Shipbuilding Et Ship Repair New Construction Crane Operator $36.36 7V 1 King Shipbuilding Et Ship Repair New Construction Electrician $36.36 7V 1 King Shipbuilding Et Ship Repair New Construction Heat Et Frost $73.58 5J 4H Insulator King Shipbuilding Et Ship Repair New Construction Laborer $36,36 7V 1 King Shipbuilding Et Ship Repair New Construction Machinist $36.36 7V 1 King Shipbuilding Et Ship R��ir New Construction Operating $36.36 7V 1 Engineer King ShipbUi ding Et Ship Repair New Construction Painter $36.36 7V 1 King $aipbuilding Et Ship Repair New Construction Pipefitter $36.36 7V 1 King Shipbuitdmg Et Ship Repair New Construction Rigger $36.36 7V 1 King 5hi b it iilg_Et Ship Repair New Construction Sheet Metal $36.36 7V 1, King Shipbuildi g Et Ship Repair New Construction Shipfitter $36.36 7V 1 King Shipbuilding Et Ship Repair New Construction $36.36 7V 1 Warehouse/Teamster King 5hipbuilding Et Ship Repair New Construction Welder / $36.36 7V 1 Burner King Shipbuilding Et Ship�R Ship Repair Boilermaker $44.95 7X 4J King Shipbuilding Et Ship Repair Ship Repair Carpenter $44.95 7X 4J King Shipbuilding Et Ship Repair Ship Repair Crane Operator $44.06 7Y 4K King Shipbuntcjing Et Ship Repair Ship Repair Electrician $44.95 7X 4J King Shipbuilding Et Ship Repair Ship Repair Heat Et Frost Insulator $73.58 5J 4H King Shipbuilding Et Ship Repair Ship Repair Laborer $44.95 7X 4J King Shipbuil ing Et Ship Repair Ship Repair Machinist $44.95 7X 4J King Shipbuilding Et Ship Repair Ship Repair Operating Engineer $44.06 7Y 4K King Shipbuilding Et Ship Repair Ship Repair Painter $44.95 7X 4J King Shipbuilding Et Ship Repair Ship Repair Pipefitter $44.95 7X 4J King Shipbuilding Et Ship Repair Ship Repair Rigger $44.95 7X 4J King Shipbuilding Et Ship Repair Ship Repair Sheet Metal $44.95 7X 4J King Shipbuilding Et Ship Repair Ship Repair Shipwright $44.95 7X 4J King Shipbuilding Et Ship Repair Ship Repair Warehouse / $44.06 7Y 4K Teamster King 5ign-M-akers EtBnstaLe-ta Journey Level $49.70 0 1 ,(Electrical), King Sign Makes°s F Ill rs_(Non- Journey Level $31.52 0 1 Electrical) about:blank 15/17 1 0/1 612 01 8 about blank King Soft Floor Layers Journey Level $49.43 5A 3J, King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire P'ra ion) Journey Level $77.39 5C 1x King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $57.32 5A 1M King Street And Parking Lot Sweeper Journey Level $19.09 1 Workers King Surveyors Assistant Construction Site $59.49 7A 3C 8P Surveyor King Surveyors Chainman $58.93 7A 3C 8P King Surveyors Construction Site Surveyor $60.49 7A 3C 8P King Telecarnmunication Technician Journey Level $48.06 7E 1 E King Tele ne Line Construction - Cable Splicer $41.22 5A 2B, Outside King Telephone Line ConstrUCtiOu - Hole Digger/Ground Person $23.12 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $39.53 5A 2B Outside King Telephone Line Construction Special Aparatus Installer 1 $41.22 5A 2B Outside King TeleplMag_L neeCConsttuctign - Special Apparatus Installer II $40.41 5A 2B Outside King Telephone, Line Con truction - Telephone Equipment Operator $41.22 5A 2B Outside (Heavy) King TelegbongrLine Construction • Telephone Equipment Operator $38.36 5A 2B Outside (Light) King Tele hp one Line C ns r igion Telephone Lineperson $38.36 5A 2B Outside King TeteeQhone Line Construction - Television Groundperson $21.92 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $29.13 5A 2B Outside King Telephone Line Construction - Television System Technician $34.68 5A 2B Outside King Telephone Line Construction - Television Technician $31.18 5A 2B Outside King Telephone Line Construction - Tree Trimmer $38.36 5A 2B Outside King Terrazzo Workers Journey Level $52.61 5A 1M King Tile Setters Journey Level $52.61 5A 1M King Tile,_Marl& TerrazzoFini, r Finisher $43.44 5A 1B King Traffic ControlStripes Journey Level $45.53 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards $54.30 5D 3A 8L King Truck Drivers Asphalt Mix To 16 Yards $53.46 SD 3A 8L King Truck Drivers Dump Truck $53.46 5D 3A 8L King Truck Drivers Dump Truck 8L Trailer $54.30 5D 3A 8L King Truck Drivers Other Trucks $54.30 5D 3A 8L King Truck Driver's, Ready Mix Booster 9 Yards and Over $52.78 5A 4T King TrrV k Drivers - Rudy Mix Non-Booster Loads Under 9 Cubic $52.53 5A 4T about blank 16117 10/16/2018 about blank Yards King Well Dr'iller's Et Vrrig i r u1 p Irrigation Pump Installer $17.71 1 I nstatIet King Wptl Dril ers a Irrrs;a[ian„Pump Oiler $12.97 1 Instakcs- King Well pt'ilters kt Ir lgaton Ptrp Well Driller $18.00 1 Insr a�llet=s. about:blank 17/17 i Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker.On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. I. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two(2) hours after eight (8)regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a five-eight(8) hour workweek day or a four-ten(10)hour workweek day and the first eight(8) hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. U The first two(2) hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten(10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four- ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess often (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H, All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The First two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All hours worked over ten(10)hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. N,. All hours worked on Saturdays(except makeup days)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 Overtime Codes Continued L O. The first ten(10)hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten(10)hours on Saturday shall be paid at double the hourly rate of wage. P., All hours worked on Saturdays (except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage. All(tours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two (2) hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer))shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four(4)hours after eight(8)regular(tours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve(12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day (10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays (except labor day) shall be paid at one and one-half times the hourly rate of wage.(except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day(10 in a 4 x 10 workweek)or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 Overtime Codes Continued 2. ALL HOURS WORKED 1N EXCESS OF FIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE:AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B, All hours worked on holidays shall be paid at one and one-half limes the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-hal£times the hourly rate of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage. F, The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay. All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60) in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2) hours after eight(8) regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten- hour weekly schedule,either Monday thru Thursday or rFuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage. The first eight (8) hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage. All other hours worked on the fifth, sixth, and seventh days and on holidays shall be paid at double the hourly rate of wage. 3, ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE I IOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day, or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours worked over twelve hours (12) in a single shift and all work perforated after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar ($1.00) per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight(8)hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage. After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 3 Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 Overtime Codes Continued 3.. E, All hours worked Sundays and holidays shall be paid at double the hourly rate of wage.Each week,once 40 hours of straight time work is achieved,then any hours worked over l0 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two (2) times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. L All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,) then Saturday may be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All hours worked Monday through Saturday over twelve (12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. J. All hours worked between the hours of 10:00 pm and 5:00 am, Monday through Friday, and all hours worked on Saturdays shall be paid at a one and one-halftimes the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4.. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RA11; OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday, the first four (4) hours of overtime alter eight (8) hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay,unless a four(4) day ten(10) hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or "Tuesday through Friday,the first two (2)hours of overtime after ten (10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay. On Saturday, the first twelve (12) hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay, except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer,the first ten (10) hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve IL 2)hours in a day and all hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate of pay. 4 Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 Overtime Codes Continued 4. D. All (tours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturday,Sundays and holidays shall be paid at double the hourly rate of pay. Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines, switching stations, regulating, capacitor stations, generating plants, industrial plants, associated installations and substations, except those substations whose primary function is to feed a distribution system, will be paid overtime under the following rates: The first two (2) hours after eight(8) regular hours Monday through Friday of overtime on a regular workday, shall be paid at one and one-halftimes the hourly rate of wage. All hours in excess of ten(10)hours will be at two(2)times the hourly rate of wage. The first eight(8) hours worked on Saturday will be paid at one and one-half(1-1/2) times the hourly rate of wage. All hours worked in excess of eight(8)hours on Saturday,and all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized, shall be paid at the double the hourly rate of wage. E. The first two(2) hours after eight(8)regular hours Monday through Friday and the first eight(8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage.The Monday or Friday not utilized in the normal four- day, ten hour work week,and Saturday shall be paid at one and one half(I Y,)times the regular shift rate for the first eight (8) hours. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F, All hours worked between the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid at a premium rate of 20%over the hourly rate of wage. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. G, All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. The first two (2) hours after eight(8) regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day, and all hours on Sunday shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. 1. The First eight(8) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight (8)per day on Saturdays shall be paid at double the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. J. The first eight(8) hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight(8) hours on a Saturday shall be paid at double the hourly rate of wage. All hours worked over twelve (12) in a day,and all hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. K. All hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage, so long as Saturday is the sixth consecutive day worked. All hours worked over twelve(12) in a day Monday through Saturday, and all hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. 5 Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 4. L. The first twelve(12)hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on a Saturday in excess of twelve(12) hours shall be paid at double the hourly rate of pay. All hours worked over twelve (12) in a day Monday through Friday, and all hours worked on Sundays shall be paid at double the hourly rate of wage.All hours worked on a holiday shall be paid at one and one-half times the hourly rate of wage, except that all hours worked on Labor Day shall be paid at double the hourly rate of pay. M. All hours worked on Sunday and Holidays shall be paid at double the hourly rate. Any employee reporting to work less than nine(9) hours from their previous quitting time shall be paid for such time at time and one-half times the hourly rate. N. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays, and all work performed between the hours of midnight(12:00 AM)and eight AM (8:00 AM) every day shall be paid at double the hourly rate of wage. O. All hours worked between midnight Friday to midnight Sunday shall be paid at one and one-half the hourly rate of wage. After an employee has worked in excess of eight (8) continuous hours in any one or more calendar days, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of six (6) hours or more. All hours worked on Holidays shall be paid at double the hourly rate of wage. P. All hours worked on Holidays shall be paid at one and one-half times the hourly rate of wage. Q. The first four(4) hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday shall be paid at double the hourly rate. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. R. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage, so long as Saturday is the sixth consecutive day worked. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. R. Placeholder HrsYidn e 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: New Year's Day,Presidents'Day,Memorial Day, Independence Day, Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day, And Christmas Day(8). Holiday Codes+Continued 5. D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day(8). H, Holidays: New Year's Day, Memorial Day, Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6). 6 Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 5. 1. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). J. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day, And Christmas Day(7). K, Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas, And Christmas Day(9). L. Holidays:New Year's Day,Martin Luther King Jr.Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day(8). N, Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day(9). P.. Holidays: New Year's Day,Memorial Day, independence Day, Labor Day, Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day(6). R. Paid holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, One-Half Day Before Christmas Day, And Christmas Day.(7 1/2). S. Paid I tolidays:New Year's Day,Presidents' Day,Memorial Day, Independence Day,Labor Day,Thanksgiving Day, And Christmas Day (7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And The Day Before Or After Christmas(9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(8). 6. A. Paid Holidays:New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and a Half- Day On Christmas Eve Day. (9 1/2). G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and Christmas Eve Day(1 1). H. Paid Holidays:New Year's Day,New Year's Eve Day,Memorial Day, Independence Day, Labor Day,Thanksgiving Day, Friday After Thanksgiving Day,Christmas Day,The Day After Christmas, And A Floating Holiday(10). I. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, And Christmas Day(7). 7 Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 11olida Codes Continued 6. T. Paid holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,The Last Working Day Before Christmas Day,And Christmas Day(9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day. Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. I Iolidays:New Year's Day,Martin Luther King Jr. Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, the Friday after 'Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as aholiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays:New Year's Day,Martin Luther King Jr. Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 11olidal Codes Continued I. Holidays: New Year's Day,President's Day, Independence Day,Memorial Day, Labor Day,Thanksgiving Day, The Friday After Thanksgiving Day,The Day Before Christmas Day And Christmas Day(9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be 8 Benefit Cade Key—Effective 8/31/2018 thru 3/2/2019 observed as a holiday on the preceding Friday. 7. J. Holidays:New Year's Day,Independence Day,Memorial Day, Labor Day,"Thanksgiving Day and Christmas Day(6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day,Thanksgiving Day,the Last Work Day before Christmas Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M„ Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day, And the Day after or before Christmas Day (10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as aholiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P, Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. R, Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after T hanksgiving Day, Christmas Day, and the day afteror before Christmas Day(I0).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday. If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Day, the Day after Christmas, and A Floating Holiday(9). If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. T, Paid holidays: New Year's Day, the Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day,and The Day after or before Christmas Day. (10). If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. V, Holidays: New Year's Day, President's Birthday,Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,Christmas Day,the day before or after Christmas,and the day before or after New Year's Day. If any of the above listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. 9 Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 11olida l Codes Continued 7. W. Holidays: New Year's Day, Day After New Year's, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after'I'hanksgiving Day,Christmas Eve Day,Christmas Day,the day after Christmas,the day before New Year's Day, and a Floating Holiday. X. Holidays:New Year's Day,Day before or after New Year's Day,Presidents'Day,Memorial Day,Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day before or after Christmas day.If a holiday falls on a Saturday or on a Friday that is the normal day off,then the holiday will be taken on the last normal workday.If the holiday falls on a Monday that is the normal day off or on a Sunday,then the holiday will be taken on the next normal workday. Y. Iolidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,and Christmas Day. (8)If the holiday falls on a Sunday,then the day observed by the federal government shall be considered a holiday and compensated accordingly. Z. Holidays: New Year's Day, President's Day, Independence Day, Memorial Day, Labor Day,Thanksgiving Day, The Friday After Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 15. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the day before Christmas Day and Christmas Day. (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. B. Holidays:New Year's Day, Martin Luther King Jr. Day, President's Day, Memorial Day, Independence Day,Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day. (9) C. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the day before Christmas Day and Christmas Day.(8) D Holidays:New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day, Christmas Day,and the day after Christmas. Note Codes 8. D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. L, Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0,50, And Level C: $0.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00,Level B: $0.75, Level C:$0.50, And Level D: $0.25. 10 Benefit Code Key—Effective 8/31/2018 thru 3/2/2019 Note Codes Continued 8. P, Workers on hazmat projects receive additional hourly premiums as follows -Class A Suit: $2.00, Class B Suit: $I.50, Class C Suit: $1.00, And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shift shall be used in determining the scale paid. R. Effective August 3 1,20 12—A Traffic Control Supervisor shall be present on the project whenever flaggingor spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle,and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon, Montana,or Idaho.These classifications are only effective on or after August 31,2012. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012. T. Effective August 31,2012 -A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana, or Idaho.This classification is only effective on or after August 31,2012. U. Workers on hazmat projects receive additional hourly premiums as follows—Class A Suit: $2.00,Class B Suit: $1.50, And Class C Suit: $1.00, Workers performing underground work receive an additional $0.40 per hour for any and all work performed underground, including operating, servicing and repairing of equipment. The premium for underground work shall be paid for the entire shift worked. Workers who work suspended by a rope or cable receive an additional$0.50 per hour.The premium for work suspended shall be paid for the entire shift worked. Workers who do "pioneer" work(break open a cut, build road, etc.)more than one hundred fifty (150) feel above grade elevation receive an additional$0.50 per hour. V. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. The premiums are to be paid one time for the day and are not used in calculating overtime pay. Depth premiums apply to depths of fifty feet or more. Over 50'to 100'-$2.00 per foot for each foot over 50 feet.Over 101'to 150'-$3.00 per foot for each foot over 101 feet.Over 151'to 220' -$4.00 per foot for each foot over 220 feet. Over 22 F-$5.00 per foot for each foot over 221 feet. Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels) where there is no vertical ascent and is measured by the distance travelled from the entrance.25'to 300' - $1.00 per foot from entrance. 300' to 600' -$I.50 per foot beginning at 300'. Over 600' -$2.00 per foot beginning at 600'. W, Meter Installers work on single phase 120/240V self-contained residential meters.The Lineman/Groundmen rates would apply to meters not fitting this description. 11