Loading...
HomeMy WebLinkAboutPW17-369 - Change Order - #5 - SB Structures, LLC - LID 363: S 224th St Improvements - 10/18/2018 Records M - , ONrileat % SENT Document i CONTRACT COVER SHEET I This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: SB Structures LLC. Vendor Number: JD Edwards Number Contract Number: PW17-369 -UUID This is assigned by City Clerk's Office Project Name: LID 363: S. 224th St Improvements - 88th Ave. S. to 88th Ave. S. Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 6/23/17 Termination Date: aom Working Days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Garrett Inouye Department: PW Engineering Contract Amount: $15,33Q,729.25 Approval Authority: (CIRCLE ONE) Department Director Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Change Order #5 As of: 08/27/14 ••+�' K E➢til T CH�ANGE ORDER NO. #5 NAME OF CONTRACTOR: SB Structures. LLC. ("Contractor') CONTRACT NAME & PROJECT NUMBER: LIId:363 S. 224t'l St Improvements 84111 to 88th ORIGINAL CONTRACT DATE: June 23, 2017 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This change will apply a protective coating to the new metal stormwater filter catch basins to protect against water corrosion. 2. The contract amount and time for performance provisions of Section 11 "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $15,330,729.25 (including applicable alternates and WSST) Net Change by Previous Change Orders $133,582.56 (incl. applicable WSST) Current Contract Amount $15,464,311.81 (incl. Previous Change Orders) ­_..�.._....__._................... Current Change Order $3,350.00 Applicable WSST Tax on this Change $0.00 Order Revised Contract Sum $15,467,661.81 CHANGE ORDER - 1 OF 3 Original Time for Completion 400 working days (insert date) Revised Time for Completion under 0 prior Change Orders (insert date) Days Required (f) for this Change 0 calendar days Order Revised Time for Completion 400 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below.) , .................................................... � . CONTRACTOR: CI VY KENT: v By: (signature) ,,Z, (signature) Print Name: ,emu„ ,$r ^ rr' l" Print Name: Timothy ]. LaPorte, P.E. Its 1Gs',a Its Public Works Director (title) DATE: /t ✓/j za mm DATE: tt Orr+/ CHANGE ORDER - 2 OF 3 .......... ...... ......... APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department [In this flew,Ved rnaY enter the electmnie filepalh where the contrast has been saved] CHANGE ORDER - 3 OF 3 " KETIT FILE NO: 200.2 CHANGE ORDER 'W'ORKSHEET NO. 5 _ Construction Management Division - Public Works Project: LID 363 224`"-St Improvements Project No.: 99 3003 Project Engineer: Garrett Inouye Fed-Aid No.: Contractor: SB Structures Owners, Rep: Jason Bryant - . .� .� ,... ...,..,.«......,, . .. .v.... .,,,. ,.. Date: 9/6/18 I. PROPOSED CHANGE This change will apply a protective coating to the new metal stormwater filter catch basins. II. REASON AND BACKGROUND FOR CHANGE The City has experienced early deteriation of similar structures. The coating is designed to greatly diminish water corrosion thereby extending the useful lifecycle of these structures. III. METHOD OF PAYMENT Change or No. - FOR ACCOUNTING USE ONLY _ � _.. _-- Sch No Item Description Total Est Qty this Unit Unit Price Total Estimated Cost of Qty PE Item 4 Catch Basin Storm Filter Z 2 EA $1675.00 $3 350.00 System Independent Estimate Attached CREATE PAY ITEM Payment to be made M PAY THIS PAY ESTIMATE ttr�yy REOUIREO at a later date UDon completion of work -. .... ., _ o......... ........ .... _. _.. . tta Er1al Submittals Re u_ired - C0: Cor ykrn:rtio Coo i — .._.___.. q_ _ nsaS.2 I New Sub Reqrd. I�No 00350 TOTAL ESTIMATED COST OF CHANGE ORDER * $3�� *Total of the Cost of Item Columns THIS PAY ESTIMATE � $3r350.00 IV. WORKING DAYS Original Contract 400 Due This Change Order* C Previous Total 400 DATE: /18 . . -.... . .... ...... DATE 9 6 18 Ex Ianetitifigillion Re ulr : On critical path for project completion -- I REV. DATE: 4/01/10 e FILE NO: 200.2 KENT TOTAL WORKING DAYS* *This Change Order+Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. _ Prepared By: Date: o . Jasan,,Ekrpa n#. . Construction Engineering - Date: C Supervisor: Paul Kuehne Construction Engineering '� Date Manager: — -- Connor Eric ..r 2 REV. DATE:4/01/10 INVOICE PAGE NO. 1 INVOICE NO. _ 16227970 E Contech Engineered Solutions LLC PO Box 936362 ENGINEERED SOLUTIONS i Atlanta,GA 31193-6217 B ABA:121000248(Wells Fargo) Y Account:2052700385107 E SWIFT:WFBIUS6S CHIPSO407 f REMIT INFO:ach@quikrete.com T B 1 439034 H 508534 L Scarsella Brothers I S 224TH ST IMPROVEMENTS-84TH AVE S TO L P O BOX 68697 P 22200 84TH AVE S T SEATTLE WA 98168 T KENT WA 98032 01 O CUSTOMER P.O.NUMBER ORDER DATE REF. NO DATE DUE DUNS NUMBER Signed CONTECH Quote 02/0512018 0311012018 INVOICE SHIPDATE SHIP VIA TERMS TAXIS 02/0811018 Prepaid .5% 10,Net 30 EXEMPT ORDERED SHIPPED PIECES SO# ITEM NO, DESCRIPTION PRICE WM AMOUNT 1 13046975 5584064/10-01 Storm Filter,Catch Basin,Conc 20,620.0000 EA 20,620.00 BOL#9001975818 Proj.#:558406 SB#:09418938 1 13046976 558406-020-01 StormFilter,Catch Basin,Conc 20,620.0000 EA 20,620.00 BOL#9001975818 Proj.#:658406 SB#:09418938 THIS MATERIAL SHIPPED SUB TOTAL 41,240.001 FROM PLANT NUMBER: 5135 TAX 0 00i All sales are subject to applicable lazes-to be paid by buyer-unlossthelawprovides INVOICE TOTAL a specific exemption from tax and buyer provides a valid tax exemption cami0cate.If you are tax exempt and have been charged tax,send your tax exemption to us by 41,240.00. fax at(678)4174770 or by email to salestax(@quikrete.com,The certificate should be made out to Contech Engineered Solutions LLC All sales are subject to Contech's terms and ales lions of sale available at PLEASE PAY FROM Ittipmonthly cruse maxi um alcos(effective if sales ill e).A pats charge p st%d THIS INVOICE monthly or Ne maximum allowed by law,if less will be imposed on all past due amounts USA This invoice is issued by Contech Engineered Solutions LLC for itself an Moron behalf ofone or more of its subsidiaries,Including but not limited to, Keystone Retaining Wall system LLC If you have questions on this invoice please contact CUSTOMER SERVICE REP (513)645-7000 Page#1/4 0 Quotation ENGINEERED SOLUTIONS A QWKRETEO COMPA,, V ,..,,Ott#QUO-273321-G7H3H9 Date 3/23/2017 Account Name Scarsella Brothers Quote# QUO.273321-G7H3H9 Contact Name Mason Dhanans Contech Rep. Steven Costello 'Phone ,,(253)872-7173 Address 6523 188th St.N.E.,Arlington,WA, 98223 Project Name S 2241h St Fax (253)395-1209 Phone 206-730-8090 Improvements-84th Ave S to 88th Ave S Project# 558406 Email mason.d@scarsellabros.com Fax 800-561-1271 Project Kent,WA SCostello@conteches.com City/State 'Conteoh`s otter to serl ifio products dowerhad In this quotation leoapresery cgndhloned apYMf Buyer's assent to the Conlach Conditions or Sale("Comech COS")Included herewith andlor vleWaUla at www.csnlaghae.igmAcqd.A Void tax exempticn cellulosic must be Issued Io IContach of solos tma will he sddad. Sto"Filter,Catch Basin,Steel,4 Cartridges- Configuration :Catch 1.00 1 1.00 $18,945.00 EA $18,945,00 Basin,Site Designation :CB 6,#Carts:4,Call Height:18",Media Type:PhosphoSorb, Rim Elev:36,94,IE In:34.01,IE Out:34.01, Powder Coating :No,Heaviest Pick Weight:Approx.3,000 Ibs, Notes for Quote -System as shown on plans cannot build up the required amount of head for the cartridges to activate(3.05')without overtopping the upstream structure. Phosphosorb media is proposed since It Is approved by WA DOE for basic treatment at a higher flow rate,thus 18"cartridges can be used since they only require 2.3'of head. StormFilter,Catch Basin,Steel,4 Cartridges- Configuration:Catch 1.00 1.00 $18,945.00 EA $18,945.00 Basin,Site Designation :CB 7,#Carts:4,Cart Height: 18",Media Type:Phosphosorb, Rim Elev:36.72, IF In:34.01, IE Out :34.01, Powder Coating :No,Heaviest Pick Weight:Approx.3,000 lips, Notes for Quote:-System as shown on plans cannot build up the required amount of head for the cartridges to activate(3.05')without overtopping the upstream structure.Phosphosorb media is proposed since It Is approved by WA DOE for basic treatment at a.higher flow rate,thus 18"cartridges can be used since they only require 2.3'of head. Total $37,890.00 (Tax not Included) Net Total $37,890.00 1.All orders must be shipped within 30 days of manufacture or a storage charge applies equal to a maximum of 5/ per month of the selling price of the stored material. 2.Allowabie unloading time for delivery trucks is one(1)hour. Demurrage charges of$75.00 per hour thereafter will he added. freight j 9 y ..._"_,__t"�_____ ...._.._�..,_.._..._,.,._.._....._. 3.Prices are f.o.b.origin with irel ht allowed to the obsite with unloadin b others at a truck accessible location, ------------- 4.Ptoduut-Spurc is Terms&Conditions: Price: Prices are FOB plant with freight allowed to jobsite and unloading by others. Order Cancellation For Stormwalov Troalmerr product only. Superesdes cancellation terms on company T&C's Purchaser may cancel this order due to project cancellation.. In the event of such cancellation,Purchaser will be liable for payment as follows:15'%of the quoted amount It the order is cancelled prior to approval of submittals;250/6 of the quoted amount If the order is cancelled after the approval of submittals;:50 fa of the quoted amount if the order has been released to manufacture,plus any amounts Seller Incurs from outside vendors(forecasters.fabricators). Orders cancelled for reasons other than project cancellation maybe billed at greator amounts at the sole discretion of Seller. Seller's security interest shall survive any cancellation or termination of this agreement.. Submittal Approval Purchaser acknowledges that Seller or his agent shall accomplish production of ordered products in accordance with approved submittals signed by Purchaser, Production of said products will.commence only upon recalpt of purchase order and receipt by Settler of approved submittals. Delivery and Installation Purchaser agrees to provide suitable access:for Seiler s delivery trucks,traffic control and labor,and at Beast two people to assist.In the unloading of the products. Price Includes one-hour waiting time and one hour off-load time. Delays caused by the Purchaser,which are over and above the two-hour period,will be billed at a cost of no Was than$125 per hour and based upon vendor charges to Seller, Unit price does not induce Uhing equipment. Customer Is responsible for supplying a crane of sufficient lilt and reach capacity and rigging for Ifling systems)andlor system Components off delivery trucks,setting In place and Wi related construction and site activity to and from the system including bad proparatlon of crnoshed stone or other. Seller will under no circumstances accept back-charges without prior written approval. Should problems arse during ory/Installation,Seller must be notified by Purchaser immediately. Failure to do so may result In additional costs to Purchaser that cannot be credited.. h .Chaser agrees to provide a safe delivery site and comply with all Federal,State and local safety requirements. Purchaser further agrees to hold Seller armless and to defend any and all actions,claims sulks and proceedings that may subject Seller to liability due to Purchaser's failure to provide a safe delivery site.