CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: SB Structures LLC,
Vendor Number:
JD Edwards Number
Contract Number: PW17-369 -OUI
This is assigned by City Clerk's Office
Project Name: LID 363: S. 224th St Improvements - 881h Ave. S. to 88' Ave. S.
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 6/23/17 Termination Dater 400 Working Days
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Garrett Inouye Department: PW Engineering
Contract Amount: $15.330.729.25
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order #6
As of: 08/27/14
CHANGE ORDER NO. #C
NAME OF CONTRACTOR: SB Structures,, PLC,. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: LID:363 S. 224111 St Improvements 841" to 88th
ORIGINAL CONTRACT DATE: June 23, 2017
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Replace a new type 8 junction box with a with a new type 2 junction
box due to incorrect fit in the new traffic island. Modify the new traffic
signal pole due to incorrect position of luminare mount arm.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
_..........
Original Contract Sum, $15,330,729.25
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $136,932.56
(incl. applicable WSST)
Current Contract Amount $15,467,661.81
(incl. Previous Change Orders)
Current Change Order $6,328.17
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $15,473,989.98
CHANGE ORDER - 1 OF 3
Y
Original Time for Completion 400 working days
(insert date)
....... .....
Revised Time for Completion under 0
prior Change Orders
(insert date)
Days Required (f) for this Change 0 calendar days
Order
Revised Time for Completion ...__..............
_ 400 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written bellow—')
CONTRACTOR: CITY OF KENT:
By a!
(signature) 3�1. (signature)
Print Name: ? / ;✓ wS> s^ is Print Name: Timothy J. LaPorte, P.E.
Its i e� i✓ X' -A- Its Public Works Director
(title) Ir �
DATE: DATE:_10
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
[Ri tins field,You rn,enter the electronic fJepath where the contract has been savedj
CHANGE ORDER - 3 OF 3
FILE NO: 200.2
KENT
CHANGE ORDER 'WORKSHEET NO. 6
Construction Management Division - Public Works
P_rojWt:, LID 363 24t St Improvem.ents
Project No.: 99-3003
Project Engineer: Garrett Inouye Fed-Aid No.:
Owners Rep: Jason Bryant Contractor: SB Structures
Date: 9/6/18
I. PROPOSED CHANGE
This change will remove a new type 8 junction box and reinstall in its place a new type 2
junction box. This change order will also modify the new traffic signal pole.
II. REASON AND BACKGROUND FOR CHANGE
The type 8 Junction box is too large to fit in the new traffic island.
The new signal pole luminaire mount arm is aimed in the wrong direction. Shop drawings were
approved with the error. The contractor made a reasonable interpretation based on the contract
plans. The plans lacked clarity sufficient to rule out the mistake.
III. METHOD OF PAYMENT
Change Order No. _ FOR ACCOUNTING USE ONLY
_._ _._ ........_.. ........... _....... .-_.. ..... . _-. ....
Sch.No. Item Description Total Est Oty this Unit Unit Price Total Estimated Cost of
oty PE Item
6 Signal Pole Modifications 1 1 FA $3,444.00 $3,444.00
6 Remove and Replace Type 8 J 1 1 FA
$2,884.17 $2,884.17
Box with a Tvoe 2 J Box
Independent Estimate Attached CREATE PAY ITEM ONLY Payment to be THIS PAY ESTIMATE made PAY
at a later date noon com Dlehon of work C ._
TOTAL ESTIMATED COST OF CHANGE ORDER $6�,328.17
THIS PAY ESTIMATE $6,328.17
IV. WORKING DAYS
Original Contract 400 Due This Change Order* 0 Previou1s Total 400
d
DATE: 1 9/6/18 _ DATE: 9/6/18
* Explanation/Justification Reguired: On critical oath for Droiect completion
TOTAL WORKING DAYS* �00> n� w„
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
1 REV. DATE: 4/01/10
KEN• T FILE NO: 200.2
Prepared By: Date: r C
JaBryarff�` �� f
Construction Engineering
Supervisor: w Date
P/Uluine
Construction Engineering
Manager: ' L R ?.l Date: 1/6 /✓ ...__.
Eric Connor
2 REV. DATE: 4/01/10
FA Sheet No 22
DAILY REPORT OF
FORCE ACCOUNT WORKED Z
Project Name: LID 363 224th ST Improvements Project No: 99-3003
Item No.. Date. 8/3 112 0 1 8
Description of Work: Repair Si nal Pole
Warn by Subcontractor?: yes
Prime Contractor: SB Structures Sub-Contractor: MT Electric
LABOR
STRAIGHT TIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
Tom Judge Foreman 90.27 $
'Steve G Ground Person 53.61 $
SUBTOTAL-LABOR. $
LABOR OVERHEAD&PROFIT @ 29% $
LABOR TOTAL $
EWPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs Standby Rate AMOUNT
Service Truck Ford 15.07 $
Service Truck Chevy 15,07 $
185 Compressor 8,00 $
303..5 excavator 21.37 $
SUBTOTAL-EQUIPMENT $
EQUIPMENT OVERHEAD&PROFIT @ 21% $
EQUIPMENT TOTAL $
MATER IALSFS ERV ICE SIREN TA LS
MATERIALS l SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Garmire 1 ea $ 3,075,00 $ 3,075,00
SUBTOTAL $ 3,075,00
OVERHEAD&PROFIT @ 21% $
TOTAL $ 3,075.00
Verification of Hours Worked. TOTAL: $ 3,075.00
12%MARKUP (for prime when
subcontract work) $ 369,00
Contractors Reprasentative Date `'m ��✓� SHEET TOTAL: $ 3,444.00
r
Ownefs Representative Date f ,,
Pay E imaf tered:
Date.
By:
I Sheet No,: 21
DAILY REPORT OF ��I�,,,,,
FORCE ACCOUNT WORKED '
Project Name: LID 363 224th ST Improvements Project No: 99.3003
Item No.; Date 8/20/2018
Description of Work Replace Type 8 Jbox with Type 2 in traffic Island
work by Subcontractor?: yes
Prime Contractor: SB Structures Sub-Contractor: MT Electric
LABOR
STRAIGHTTIME OVERTIME DOLLAR
NAME CODE OCCUPATION Hrs Hourly Rate Hrs OT Rate AMOUNT
Tom Judqe Foreman 8 9027 $ 722.16
Steve G Ground Person 8 53.61 $ 42888
$
$
SUBTOTAL LABOR: $ 1,15104
LABOR OVERHEAD&PROFIT @ 29% $ 333.80
LABOR TOTAL $ 1'.,464.84
EQUIPMENT
EQUIPMENT OR ATTACHMENTS OPERATED STANDBY DOLLAR
Equipment# Equipment Description Hrs Hourly Rate Hrs I Standby Rate AMOUNT
Service Truck Ford B 15.07 $ 120,56
Service Truck Chevv 8 15.07 $ 120.56
185 Compressor 8 8.00 $ 64,00
303.5 excavator 8 21,37 $ 170,96
SUBTOTAL-EQUIPMENT $ 476.08
EQUIPMENT OVERHEAD&PROFIT @ 21% $ 99.98
EQUIPMENT TOTAL $ 576.06
MATERNALSIS ERVICESIRENTALS
MATERIALS f SERVICES Quantity Units Unit Price DOLLAR AMOUNT
Tvoe 2 Jbox 1 ea $ 425,00 $ 425,00
$
SUBTOTAL $ 425.00
OVERHEAD&PROFIT @ 21% $ 8925
TOTAL $ 514.25
Verification of Hours Worked: TOTAL: $ 2,575.15
12%MARKUP (for prime when
subcontract work) $ 309.02
r
'Contractor's psoeassa,eiv, ✓' &�. .... Date `/' ' SHEET TOTAL: $ 2,664.17
Owners Representative --
Pay ES ' ate ed:
Date:
By:
DAILY REPORT OF FORCE ACCOUNT WORKED
Date 8120(2018
Project Kent Lid S224th
Prime Contractor SB Structures
Subcontractor MT Electric
Work Performed Excavate roadway and extend conduits to conform to new type Il}box in island as directed
i Date Workman andlor Docupatton of worker hre rate of Amount
of Sem" equipment working and equipment typalske worked pay
Tom Judge Journeyman foreman 8 90.27 $722.16
Journeyman 0 82.19 $0.00
Steven Gribowsk amoundperson 8 53.61 $428.88
groundperson 0 53.61 $0.00
$0,00
$0.00
Labor subtotal $1 J51.04
2911.mark u $333.80
Labor total $1.484,84
service truck 16 $15.07 $241.12
580M Backhoe 0 $40.3�7({ $0.00
185OFMcompressor 8 $B.bV $64.00
303.5 Excavator 8 $21.37 $170,96
5yd Dump Truck 0 3$.23 $0.00
Bucket truck 0 69,57 $0.00
Equipment subtotal $476.08
21%markE $99.98
E u menttotal $576.06
►Aatertalal&ubmtraotor
Misa PVC 0 0 $0,00
Type 2 J-box 1 425 $425.00
$0.00
$0.00
$0.00
$0.00
$0.00
Materials subtotal $425.00
21%mafkup $89.25
Materials total $514.25
Subtotal for labor,equipment.materials $2,575.15
Iota'1a Subcontract $2.575.15
PrimeMarku 12% $309.02
InspwlorSignature TOTALI $2,884.17
Gamine lronWerks,Inc CONTRACTOR: MT ELECTRIC
5620-48ds Drive N.E. • Marysville, WA 98270 CONTRACT: LID 363 224th St Bridge-Steel Pole
(360)651-1001 -Pax(360)651-1002-sales@garrnireiromvorks,com POLE: STD NI AND 82
PROCEDURE FOR ROTATING LA NIOUNLING PLATE
STEP 1:CUT EXISTING POLE SHAFT 0'-2"BELOW LUM ARM MOUNTING PLATE
STEP 2: ROTATE LUM ARM PLATE TO 0-DEGREES FROM MA SIMPLEX AND REMOVE/GRIND
GALVANIZE FROM WELD AREA
STEP 3: INTSTALL BACK UP RIND AND WELD THE POLE WITH A
az� ca. 5/16"SINGLE BEVEL GROOVE WELD PER AWS D1.1
STEP 4: : GRIND/BRUSH WELD AREA OF ANY SHARP EDGES OR DUST
STEPS: REPAIR GALVANIZE IN THE WELD ARE PER ASTM A780-HOT STICK