CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Scarsella Brothers, Inc.
Vendor Number:
ID Edwards Number
Contract Number: PW18-312 -06L
This is assigned by City Clerk's Office
Project Name: Downey and Naden Clearinq and Grading
Description: ❑ Interlocal Agreement M Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 8/1/2018 Termination Date: 35 Working Days
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Thomas Leyrer Department: PW Engineering
Contract Amount: $857,754.81
Approval Authority: (CIRCLE ONE) Department Director {` Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Change Order #1
As of: 06/27/14
KF_ IT
CHANGE ORDER NC►. # 1
NAME OF CONTRACTOR: Scarsella Bros.. Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Downey and Naden Clearing and Grading
ORIGINAL CONTRACT DATE: August 1, 2018
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add
additional work or revise existing work as follows:
In addition to work required under the original Agreement and any prior
Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
This change order increases the clearing and grubbing from half of the
site to the entire Naden site. The original bid was to clear approximately
half of the site.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
___.................
Original Contract Sum, $857,754.81
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $0.00
(incl. applicable WSST)
Current Contract Amount $0.00
(incl. Previous Change Orders)
.......................................
_
Current Change Order g $19,118.80
Applicable WSST Tax on this Change $1,911.88
Order
Revised Contract Sum $878,785.49
CHANGE ORDER - 1 OF 3
Original Time for Completion 35 working days
(insert date)
Revised Time for Completion under 0
prior Change Orders
(insert date)
Days Required (f) for this Change Order 0 calendar days
Revised Time for Completion I!!
rking days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including,
without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the
Contractor from strict compliance with the guarantee and warranty provisions of the original
contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project
to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
w�
(signature) (signature)
Print Name: i^ni r)0 SCnrSe-[lGt Print Name: [1% Dana Ralph
Its V lCei Fre.Ode vtt- Its Mayor
(title) (title)
DATE: ICI L4. 16 DATE:
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
ent Law Department
Mayor[In this role,you may enter the electronic hie0ath where the contract has been saved]
CHANGE ORDER - 3 OF 3
T FILE NO: 200.2
�✓ KENT
CHANGE ORDER WORKSHEET NO. 1
Construction Engineering Division — Public Works
Project: Downey/Naden Clearing&Grading Project No.: 18-3007.1
Project Engineer: Thomas Leyrer Fed-Aid No.:
Capital Projects Paul Kuehne Contractor: Scarsella Bros.
Manager:
Date: 9/25/2018
I. PROPOSED CHANGE
This change increases clearing and grubbing to include the entire Naden site. The original plan
was to clear a22roximately half of the site.
II. REASON AND BACKGROUND FOR CHANGE
This change prepares Naden to take additional soil from the Downey site. King County Flood
Control District has made available additional King County Cooperative Watershed Management
Grant ($780,000) to excavate, haul and place this material. Naden proves to be a less expensive
alternative to other soil dump sites. As a further benefit the market value of the Naden property
is enhanced by the import of this soil.
III. METHOD OF PAYMENT
All Costs For This Change Are Paid By Increasing The Quantity of Bid Item 3005 From
1 Lump Sum To 1,95594 Lump Sum.
TOTAL ESTIMATED COST OF CHANGE ORDER * 19 118.s0
*Total of the Cost of Item Columns
THIS PAY ESTIMATE 0
IV. WORKING DAYS
Original Contract 35 Due This Change Order* 10 Previous Total [ 35
TOTAL WORKING DAYS* 3S
*This Change Order + Previous Total
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
1 REV. DATE:
3/27/18
FILE NO: 200.2
Capital Projects Manager: Date: Z I
Construction Engineering sate:
Supervisor:
Construction Manager: - y G %yr� Date: x9 d
2 REV. DATE;
3/27/18
Kuehne, Paul
From: Connor, Eric
Sent: Wednesday, September 19, 2018 2:49 PM
To: Kuehne, Paul
Subject: FW: Downey/Naden Clearing/Grading/Fill contract
From: Maloney, Carla
Sent: Tuesday, September 18, 2018 12:18 PM
To: Ellis, William
Cc: Leyrer, Thomas; Bieren, Chad; Taylor, Brennan; Connor, Eric
Subject: RE; Downey/Naden Clearing/Grading/Fill contract
All -
I have confirmed with Chad that the project change to add the additional fill and related cost has
been OK'd by the Mayor, Derek, Tim and others.
Thanks
Carla
From: Maloney, Carla
Sent: Monday, September 17, 2018 4:44 PM
To: Ellis, William <WEllis@kentwa.gov>
Cc: Leyrer, Thomas <TLeyrer@kentwa.gov>; Bieren, Chad <CBieren@kentwa.gov>;Taylor, Brennan
<BTaylo r @ ke ntwa.gov>
Subject: Downey/Naden Clearing/Grading/Fill contract
Hi Bill -
With the additional fill to be added by change order on the Naden site, we expect that the total
amount applied to Naden will be approximately $200K. That is an increase of approximately
$60K to more than double the amount of fill on the site (19,000 CY original + 36,000 CY Change
Order = 55,000 CY total).
Please let us know if you have any questions or require additional information.
Thanks,
Carla Maloney, P.E. Design Engineering Manager
Design Engineering I Public Works Department
220 Fourth Avenue South, Kent, WA 98032 -
Phone 253-556-5523
CMalbn:.�.YC'?.KenY..:A,.g.2v
R.:Pll`k" OF IKIE IM1N'T, WASIHIRNWG"N'&'AN
KeirRWA.,gov Fac ell ook 'Youirulbe
4.ti#„ ao ,pu'IWO rM, ,¢'r.lVO PkT,,WhW hunk HI;U,
t
Kuehne, Paul
From: Connor, Eric
Sent: Wednesday, September 19, 2018 2:49 PM
To: Kuehne, Paul
Subject: FW: Downey/Naden Clearing/Grading/Fill contract
From: Maloney, Carla
Sent: Tuesday, September 18, 2018 12:18 PM
To: Ellis, William
Cc: Leyrer, Thomas; Bieren, Chad; Taylor, Brennan; Connor, Eric
Subject: RE: Downey/Naden Clearing/Grading/Fill contract
All -
I have confirmed with Chad that the project change to add the additional fill and related cost has
been OK'd by the Mayor, Derek, Tim and others.
Thanks
Carla
From: Maloney, Carla
Sent: Monday, September 17, 2018 4:44 PM
To: Ellis, William <WEllis@kentwa.gov>
Cc: Leyrer, Thomas<TLeyrer@kentwa.gov>; Bieren, Chad <CBieren@kentwa.gov>; Taylor, Brennan
<BTaylo r@ ke ntwa.gov>
Subject: Downey/Naden Clearing/Grading/Fill contract
Hi Bill -
With the additional fill to be added by change order on the Naden site, we expect that the total
amount applied to Naden will be approximately $200K. That is an increase of approximately
$60K to more than double the amount of fill on the site (19,000 CY original + 36,000 CY Change
Order = 55,000 CY total).
Please let us know if you have any questions or require additional information.
Thanks,
Carla Maloney, P.E. Design Engineering Manager
Design Engineering I Public Works Department
220 Fourth Avenue South, Kent, WA 98032 -
Phone 253-856-5523
qan„any nrK�rttit�_
CITY OF IKI@INT, WASHIIh GTOl°N
IKentWA.gov Eaceboola YouTuuhe
1
Kuehne, Paul
From: Kuehne, Paul
Sent: Wednesday, September 19, 2018 2:28 PM
To: 'Mason Dhanens'
Subject: RE: Change Order 1 - Downey Naden
I will change it to twenty days.
Maybe you could haul it fast while restoration could be more relaxed.
Paul Kuehne, construction Engineering supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 I Cell 253-740-5015
YKIi,.M1mQ-Ld)K=tWA,99.v
CITY OF KENT, WASHINGTON
From: Mason Dhanens [mailto:Mason.D@SCARSELLABROS.comj
Sent: Wednesday, September 19, 2018 2:21 PM
To: Kuehne, Paul <PKuehne@kentwa.gov>
Subject: RE: Change Order 1 - Downey Naden
EXTERNAL EMAIL
Paul —
I got your message. I have had a chance to go through it but have not had a chance to review it with Bob. Once I do that
I'll get back to you. I do feel like we'll probably need more like 20 additional days on the contract.
Thank you,
Mason Dhanens
Scarsella Bros., Inc.
From: Kuehne, Paul [mailto:PKuehne Zkentwa.pov]
Sent: Tuesday, September 18, 2018 4:21 PM
To: Mason Dhanens <Mason.D@SCARSELLABROS.com>
Cc: Bobby Scarsella <bobby.s SCARSELLABR05.corn>; Connor, Eric <[Connorkcntw_gov>; Knox, Matthew
<MKnox kentwa. ov>; Leyrer, Thomas<Tl eyrer kentwa,gov>
Subject: Change Order 1- Downey Naden
Hello Mason,
i
Kuehne, Paul
From: Kuehne, Paul
Sent: Tuesday, September 18, 2018 4:21 PM
To: 'Mason Dhanens'
Cc: 'Bobby Scarsella'; Connor, Eric; Knox, Matthew; Leyrer, Thomas
Subject: Change Order 1 - Downey Naden
Attachments: Change Order Spreadsheet- Downey Naden 180918.xlsx; COI Worksheet 180917
PK.docx
Hello Mason,
Please review the attached preliminary change order and confirm that you agree to bid item
pricing for the proposed work. I have it mostly vetted on my end. Might have some minor
tweaks but this should be pretty close.
Paul Kuehne, Construction Engineering Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 1 Cell 253-740-5015
FKmehnc a)KQ.!?4'-WA-c99Y
CITY OF KENT, WASHINGTON
t
Kuehne, Paul
From: Kuehne, Paul
Sent: Tuesday, September 11, 2018 2:47 PM
To: 'Mason Dhanens'
Cc: Bieren, Chad; Connor, Eric; Knox, Matthew; 'Bobby Scarsella'
Subject: FW: Downey and Naden Clearing and Grading - Revision No. 1
Attachments: Naden Clearing and Grading - Revision l.pdf; Naden Demolition Plan (Revsion No.l)
REDUCED.pdf; Naden Grading Plan (Revision No.l) REDUCED.pdf; Additional Work -
Clear& Grub Naden Site.pdf
Hello Mason,
Please proceed with the additional clearing and grubbing work at the Naden site as shown in the
attached plans for the amount presented in your attached proposal ($19,118.80).
Paul Kuehne, Construction Engineering Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 1 Cell 253-740-5015
P_Kuef)�Rq(a!—en lNq,,aov
CITY OF KENT, WASHINGTON
From: Kuehne, Paul
Sent: Wednesday, August 15, 2018 9:47 AM
To: 'Mason Dhanens' <Mason.D@SCARSELLABROS.com>
Cc: Connor, Eric (EConnor@kentwa.gov) <EConnor@kentwa.gov>; Leyrer,Thomas <TLeyrer@kentwa.gov>; Knox,
Matthew<MKnox@kentwa.gov>; Hansen, Kit<KHansen@kentwa.gov>
Subject: Downey and Naden Clearing and Grading- Revision No. 1
Hello Mason,
Revision 1 attached,
The revision clarifies; construction staking information, adds clearing and grubbing of the entire
Naden site, and shows the existing Naden PSE gas line.
Paul Kuehne, Construction Engineering Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 1 Cell 253-740-5015
PK,gehne KenfWA,_W.0
CITY OF KENT, WASHINGTON
From: Leyrer,Thomas
Sent:Tuesday, August 14, 2018 5:20 PM
To: Connor, Eric <EConnor_ kentvua. ov>
1
9/5/2018 8:19 AM
Project No. 18-3007.1 '4
City ofKent i
Downey and Naden Clearing and Grading ° +
Clear& Grub All of Naden Site
Work Description: ar'
Clear and grub an additional 2.8 AC at the Naden Fill Site
Item # Item Description Units Quantity Unit Cost Extension
Qty. Labor
1.00 Supervisor HR 10.00 $ 78.62 $ 786.20
2.00 Operator HR 25.00 $ 73.15 $ 3,657.50
1.00 Tree Faller HR 20.00 $ 100.00 $ 2,000.00
1.00 Teamster HR 10.00 $ 63.19 $ 631.90
Subtotal $ 7,075.60
Markup 29.00% $ 2,051.92
Labor Total $ 9,127.52
Equipment
1.00 Supervisor's Pickup HR 10.00 $ 25.00 $ 250.00
1.00 Komatsu PC 308 HR 25.00 $ 129.39 $ 3,234.75
1.00 Komatsu PC 200 HR 25.00 $ 93.46 $ 2,336.50
1.00 Mack Dump Truck HR 10.00 $ 68.60 $ 686.00
Subtotal $ 6,507.25
Markup 21.00% $ 1,366.52
Equipment Total $ 7,873.77
Materials
1.00 Brush Disposal Fees CY 50.00 $ 35.00 $ 1,750.00
1.00 LS - $ - $ -
1.00 LS $ $
1.00 LS $ $ -
Subtotal $ 1,750.00
Markup 21.00% $ 367.50
Material Total $ 2,117.50
Subcontractor
LS $ - $ -
LS $ - $
Subtotal $
Markup 12.00% $
Subcontractor Total $ -
Total $ 19,118.80
Total per Acre 2.80 AC $ 6,828.14
PUBLIC WORKS DESIGN ENGINEERING
Carla Maloney
Design Engineering Manager
400 West Gowe
Kent, WA 98032
W........... Fax: 253-856-6500
PHONE: 253-856-5500
Date: August 14, 2018
To: Eric Connor, Construction Engineering Manager
Cc: Paul Kuehne, Construction Supervisor
Eric Knowles, City Surveyor
Joe Fraumeni, Survey Party Chief
Carla Maloney, Design Engineering Manager
From: Thomas Leyrer, Project Engineer TL
Regarding: Downey and Naden Clearing and Grading
Project No. 18-3007.1 & 17-3017
Revision No. 1
REPLACE Naden Demolition Plan Sheet 5 of 7 and Naden Grading Plan Sheet 6 of 7
with the attached Revision No. 1 plans.
The Naden Revision Sheets differ from the bid documents by showing the existing PSE
gas, clearing and grubbing of the entire site east of Naden Avenue, and construction
staking information.
Attachments: Naden Demolition Plan Sheet 5 of 7
Naden Grading Plan Sheet 6 of 7
City of Kent Public Works Department
Tim LaPorte, Public Works Director
I u v Q czi
e' u 1 I� •y -` ��
; l Jf
z 1. �� — � . wa
g y�, � � y .. ., �ls i9N33W a- .._.. �z
V �•%F,. �� �� � ICJ �JF ', �"e✓' nj ✓J✓,, /.1�✓' `��1 m� W�
oa
P �� � IOC{p �/✓' ✓�. �A '' ° %�wJ• (`� F�.a� w�
r'✓ Jm i Y u
jf
0 V1111 1 fjIMS ' ! � � "'�! / J✓ ./ yy +/
w / / �l A!'"J//f�✓`/^✓ d� � shy
9 � of � 4✓J ✓ /���^� o
�,`1� a 2-:.w Y✓f�, ��i�'�� rf� 4'd�'��° � � ',� }'
.. I i' ,.J�I�{ ',�'tp I� �' �.'if,/,�"//,.zr1�.%✓? /,�✓�✓;y,",i,�,✓ v�� , �� IIr a�
'i I , °� L ��_ �,.� /� r'�Fl .'f;/,✓�, xJf',✓, J' ' �'�r � ' � 4 ��
/ "
v ,
A f
r 4
NI a I:. r. � J 9 Fr, I a� IJ�M/ P � �"'�gf/^ /� '^'" ✓F ��,� � r` j, ��,1, � �' ..
�` J'u
/ty C 1e.
y �(f \�
✓
t
I 1 r >+' `',,� ,�"s�`�,,.ti rt� �"J'�%✓ j''��nnf'.✓' YYI,� � P�� '�j 'J�{ - o�
� a
v
w.
s
---�--- nixx uunv`.r�n ��w wxnu Maxrerv+na ix uF ii��•"� u%�^v+�'�x'ev u
17
Arn
{ e is a3H33w u3 p -
It
H �I
� 111 IS
0
Li
�.,
"
91Ll� tl
P
•- � � I I' � �' �� x ... � U I ti � � 1 6 �.� bu
d V
N P
a
19 N �
I �^ c
� 11 r
Kuehne, Paul
From: Bieren, Chad
Sent: Tuesday, September 11, 2018 11:13 AM
To: Connor, Eric
Cc: Kuehne, Paul
Subject: RE: 18-3007.1 Downey and Naden Clearing and Grubbing - Notice of Change
Please proceed with a Change Order for the additional clearing. Are the limits clear, or should
we send out a new plan sheet with clearing limits?
From: Connor, Eric
Sent:Tuesday, September 11, 2018 11:00 AM
To: Bieren, Chad <Ct3ieren cDkentwa.gov>
Subject: Fwd: 18-3007.1 Downey and Nader Clearing and Grubbing- Notice of Change
Sent from my iPhone
Begin forwarded message:
From: "Kuehne, Paul" <PKuehn dkentwa-zov>
Date: September 11, 2018 at 10:51:03 AM PDT
To: "Connor, Eric" <EConnorfrakentwa.t ov>
Subject: FW: 18-3007.1 Downey and Naden Clearing and Grubbing- Notice of Change
They are requesting double the money for double the work. See attached.
Paul Kuehne, construction Engineering Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 I Cell 253-740-5015
LKyt;,tit��,�il K.g_ntUWfi r0av
CITY OF KENT, WASHINGTON
From: Mason Dhanens [malito Mason D SCARSELLABROS.com]
Sent:Tuesday, September 11, 2018 9:51 AM
To: Kuehne, Paul <PKuehneCkentwa.eov>
Cc: Knox, Matthew <MKnox kentwa.gov>; Bobby Scarsella <bobb .s SCARSELLABROS.corn>
Subject: RE: 18-3007.1 Downey and Naden Clearing and Grubbing - Notice of Change
EXTERNAL EMAIL
Good Morning Paul—
1
I know that you were out of the office but I wanted to follow up with the attached pricing for this
project. We were going to move into the Naden site tomorrow but we were able to get our gear back in
there today. I told them to just clear what's in the plans for now but if you approve this, we'll go ahead
and remove the other remaining trees.
Let me know.
Thank you,
Mason Dhanens
Scarsella Bros., Inc.
From: Mason Dhanens
Sent: Wednesday, September 05, 2018 8:21 AM
To: 'Kuehne, Paul' <Pktaelrnel<entwa.gby>
Cc: Knox, Matthew<I IKnox@kentwa.gov>; Bobby Scarsella <bobbv s SCARSELLABROS.com>
Subject: RE: 18-3007.1 Downey and Naden Clearing and Grubbing - Notice of Change
Good Morning Paul—
Taking a look at the additional clearing and grubbing, I come up with approximately 2.8 additional acres
of clearing of which there are some significant trees close to the existing phone line. Here is the
proposed pricing for the additional clearing and grubbing. Let me know if you have any questions or
concerns regarding this pricing.
Thank you,
Mason Dhanens
Scarsella Bros., Inc.
Office- 253.872.7173
Fax-253.395.1209
misDn.d@scarsellabros.com
estimating@scarsellabros.com
From: Kuehne, Paul [road o:PKuehne kentwa.gov]
Sent: Wednesday, August 29, 2018 1A2 PM
To: Mason Dhanens <Mason DC V)SCARSELLABROS.com>
Cc: Knox, Matthew <MKnox@kerrtw ov>; Bobby Scarsella <tob by.s_@ SCARS[LLABROS.com>
Subject: RE: 18-3007.1 Downey and Naden Clearing and Grubbing- Notice of Change
Hello Mason,
The City grants your request to add days for the time your critical path is impacted
by the strike.
Have you provided a price for clearing and grubbing all of Naden?
2
Paul Kuel Construction Engineering Supervisor
Construction Management I Public Works Department
220 Fourth Avenue South, Kent, WA 98032
Phone 253-856-5543 I Cell 253-740-5015
P,K.uehng{dtKontWA ggy
CITY OF KENT,WASHINGTON
From: Mason Dhanens Imailto:Mason.D SCARSELLABROS.conr]
Sent: Wednesday, August 29, 2018 1:18 PM
To: Kuehne, Paul <PKuehne@ker rrov>
Cc: Knox, Matthew<Ml<nox@kentwa,gov>; Bobby Scarsella <bobb ,s SCARSELLABROS.com>
Subject: 18-3007.1 Downey and Naden Clearing and Grubbing- Notice of Change
Good Afternoon Paul—
I'm not sure if you're aware but last Tuesday, August 2111, the International Union of Operating
Engineers Local 302 went on strike bringing almost all construction to a halt in King and Snohomish
Counties. As soon as we're finished with the clearing and grubbing, we will be unable to continue work
due to the inability to get operators. Please see the attached letter requesting an extension of time for
this project.
Feel free to contact me if you have any questions or concerns regarding this issue.
Thank you,
Mason Dhanens
Scarsella Bros., Inc.
Office-253,872,7173
Fax-253.395,1209
mason.d@scarsellabros.com
estimating@scarsellabros.com
3
Kuehne, Paul
From: Leyrer, Thomas
Sent: Thursday, August 30, 2018 12:25 PM
To: Maloney, Carla
Cc: Madfai, Mark; Bieren, Chad; Connor, Eric; Kuehne, Paul
Subject: FW: 10021 - City of Kent Naden Site Improvements Comments
Attachments: 1034_001.p d f
Hi Carla,
Chad mentioned to me briefly that we will be adding more fill to the Naden site as part of the
Downey/Nader project.
Given the Operators Union strike, there may be enough time for me to prepare Revision No. 2
when I return from vacation September 17. If Revision No. 2 needs to be issued sooner, I am
proposing the attached revisions to also incorporate Olympic Pipeline's comments (see below).
Asking Olympic Pipeline for comments was a condition of the SEPA MDNS.
Since we have to fill the PSE parcel (that we are in the process of acquiring for the Nader/Willis
access) anyway after the completion of the Downey/Naden project, I am proposing to move the
easterly toe of slope 15' west of the PSE R/W line (please see attached sketch) to accommodate
the Olympic Pipeline comments below. We will need to talk with Olympic Pipeline (BP) about the
proposed slope easement over their pipeline as soon as we get clearer direction from ECD about
the future commercial site development.
Having the toe of slope 15' west of the PSE R/W fine would leave enough room for compaction to
the property line later in case we can't get a slope easement over Olympic Pipeline's easement
within PSE R/W for the Naden site development.
To accommodate the additional fill as part of Downey/Naden, I propose that the northerly toe of
slope line be moved north as necessary (while maintaining 15' horizontal separation to the PSE
R/W line).
Thank you,
Thomas
Thomas Leyrer, P.E. Design engineer rr
Design Engineering I Public Works Department
400 West Gowe Street, Kent, WA 98032
Phone 253-856-5562
ttevrer0kentwa.9nv
c�N"1ry OF IKIr.N»e'ir„ WASHIII:IC G1140It1
AyiiAcoav Pacetiook Y-0u. ih8
,N D F-R fN rV !81,OW1+N Rrv3Sfi�1� W N, hG,14 A..
1
jj
WIN
w s iuuuae�my y p^ ff f fr e IIIIII
MIM�FIR "", Md RNnWiI Mn.yS WPAm oays lull
fi �MP6R AY ml'�Yi--
re�fimlmri�l�p� �u h�r�um�mmm�r°mmm�r�sm� '�; uuui
r�°°"����""�x'���� L��� I �III�II II�III III �IIIIIIIIIIIIIIIIII IIIIII II �
luumi illlluuuuullllluuuullllluuuuuwiull
IIIIIIIIIIY .uA nmp�w�y4.. pmmm�
e
I
uuu i i u w ,.' i �zY r iwiY'�
�Mw"�,' ii a I� qi n lu�l� iill�Jl a �u ��� �lllllll
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII��`