Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW16-066 - Change Order - #6 - Scarsella Bros, Inc. - 72nd Ave S Extension - 07/27/2018
itl Records e e/m /r'' Document / /, , / CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Scarsella Brothers Inc. Vendor Number: )D Edwards Number Contract Number: PW16-066 " 00(o This is assigned by City Clerk's Office Project Name: 72"d Ave S Extension Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 2/28/16 Termination Date: 220 working Days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Ken Lanqholz Department: PW Engineering Contract Amount: S2,692,81.3.f)1 Approval Authority: (CIRCLE ONE) apartment DirectorYj Mayor City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Chanqe Order #6 As of: 08/27/14 *, T CHANGE ORDER NO. #6 NAME OF CONTRACTOR: Searsella Brothers, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: 72"d Avenue South Extension ORIGINAL CONTRACT DATE: February 26, 2016 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Install cable gate at entrance to Boeing property access STA. 52+50, Rt. to discourage unauthorized vehicle access. Replace existing manhole lid for Western Processing monitoring well 5A in new sidewalk with ADA approved slip-resistant coating. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $2,692,813.01 _. (including applicable alternates and WSST) ........................................................._.....................................................__.................. Net Change by Previous Change Orders $217,593.89 (incl. applicable WSST) Current Contract Amount $2,910 ,406.90 (incl. Previous Change Orders) Current Change Order $1,937,89 Applicable WSST Tax on this Change $0.00 Order ..�._................ .—... ........................... Revised Contract Sum $2,912,344.79 CHANGE ORDER - 1 OF 3 _. ._...... ......................... Original Time for Completion 220 working days (insert date) Revised Time for Completion under 0 working days prior Change Orders (insert date) Days Required (f) for this Change 0 calendar days Order Revised Time for Completion 220 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. ilk CONTRACTOR: C;li-"'ICY OF KENT: By By: �y9 ignarure Print Name: 'eW w.cJ ��L/62G0` Print Name: Timothy ] LaPorte, P.E. Its Itc Piihlir Vdorkc nirprtnr (title) ..., ..{title .._... DATE: DATE:. '7 14 CHANGE ORDER - 2 OF 3 . � � � CHANGE ORDER 30F ] ,TFILE NO: 200.2 KIENT � CHANGE ORDER WORIKSHEET NO. 6 _ Construction Management Division - Public Works t th Extension Pro 08-30 Projec : 72nd Avenue Sou � sect No.: 04C Project Engineer: Ken Langholz Fed-Aid Nil N/A Owners Rep: Jason Barry Contractor: Scarsella Bros Inc ,..., . , .-......�—.-. . .,Fv ... ,,m..-Rw,.. Date: 05/24/18 I. PROPOSED CHANGE Install cable gate at entrance to Boeing property access STA. 52+50, Rt. Replace existing MH lid for Western Processing monitoring well 5M4A in new sidewalk with ADA approved slip-resistant coating. II. REASON AND BACKGROUND FOR CHANGE In order to satisfy project close-out with stakeholders, two items additional to original scope were required to be complete. The cable gate is installed to discourage unauthorized vehicle access to private property now unrestricted with opening of the road. This serves to discourage unwanted or derilict vehicle parking after hours in a secluded location. The addition of a slip- resistant coated manhole lid within the sidewalk is part of new ADA surfacing requirements for MH lids within pedestrian walking areas. III. METHOD OF PAYMENT NEW PAY ITEM(S) [-J Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY Sch.—No. Item Description � TotalQty this Unit ' Unit Price Total Estimated Cost of Est. Qty PE Item 1 Install cable gate and replace 1 1 LS $1,937.89 $1,937.89 MH lid r I ® Independent Estimate Attached CREATE PAY ITEM ©N1..5/ - Payment to be made ® '' PAY THIS PAY ESTIMATE - REQUIRED at a later date upon completion of work ` htakirial Stubmiktals Required - CC Construction Coordinator New Sub Reqrd? No ----- DELETE EXISTING PAY ITEMS) per 1-09.5 ® Not Applicable Change Order No. - l FOR ACCOUNTING USE ONLY .— Sch. No. B.I. No. Item Description i Unit Unit Price Cost of Item .. ..._..---.I.. ..... m�1 .... ........ --- Independent Estimate Attached - REQUIRED u 1 REV. DATE: 4/01/10 - '/^�► T FILE NO: 200.2 KENT INCREASE/DECREASE TO EXISTING PAY ITEM(S) Z Not Applicable Change Order No. ; - FOR ACCOUNTING USE ONLY -- .. .. Sch. No. - B.I. No, Item Description Qtv Unit Unit Price 7 Cost of Item .... .. ...... .,., ., ..., ., . Independent 7 p ent Estimate Attached - REQUIRED �ml TOTAL ESTIMATED COST OF CHANGE ORDER *Total of the Cost of Item Columns THIS PAY ESTIMATE $1,937 89 m..,. . . IV. WORKING DAYS Original Contract 1 220 Due This Change Order* 0 Previous Total 220 DATE: ,,,, .. f_. ,,,,, ,,, ,,,, ,,,,,,, DATE: _. * j Explanation u5tification Re uired: ... TOTAL WORKING DAYS* I 220mP *This ChenWOrder + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Date: _ N Ll Y . __ .... ... on Barry 2-4 Construction Supervisor: L Date: ✓ aul Kuehne r Construction Manager: Date; Eric Connor 2 REV. DATE: 4/01/10 Prepared by: Mike Wilson 5/17/2DI8 3:26 PM C-83004 72nd Ave Extension REA for Cable Gate and MH Lid 1"Y Work Included'. This pricing includes installing ecology blocks, a cable gate, and a non-slip manhole cover as directed. Note: Jay had 2 more hours than the others because he replaced the manhole lid Equip# Item Description Units Q Unit Cost Extension Labor ------ Jay_Kri e r- Foreman Hour 9 7 31985 'P_6bEliig - Oper. Foreman Hour 3.00 $ 72.82 $218.46 .............. Jared Seward ---perator Hour 3.00 $ 68.68 $206.04 Subtotal $744.35, Scarsella Markup % 2900% $21586 Total $960.21 Equipment 2-237 '2006—Ford F_350 4A our 5.00 $ 18.40 $92.00 Ford F 250 4X4 Hour 00 14,47 !93 41 15:98 2007 Cat 950H Loader Hour--------— 3.00.1-$ 63.90 $191.70 Subtotal $327.11 Scarsella Markup % 21.00% $68.69 Total $395.80 Materials Cut off Wheel LS 1.00 q$ 3089 $530.89 Ecology Blocks (From Scarsella Yard) EA 4.00 _$_25.00 0 0-0 0 L-16 wlThermion Coating FA T m 1.00 $ 350,00 ___$_3_5000 $0.00 Subtotal Scarsella Markup % Total $581.88 Change Order Total: $1,937.89 Invoice Page �xx-aFtePrint*"** Invoice No 06001012,19 Olympic Foundry,file, Inure Dam. 511112018 5200 Airport Way South Inure No ScaBro &cattle, WA 98108 Olympic�ound1y �zo6�76�6zoo era���h_ 06 11 gxxntrr cu[rxe9xl „� Satespersom Lee H. I900 Our Order No: SO-M59276 SH Codc: W/C 5earsella Brothers,Inc Scalsella Brothers Inc PO Box 6S697 Will Call Seattle,WA 98168-0697 USA Seattle,WA 98108-1725 17SA 83004 Will Cali OYCO-SEA 1% 10 Net 30 I1-4112 06 MIl41 CVR STORM 2HL 1 350.000 3511.00 Must he Inek'mg Grind blank 00-11 06 Thermion Coating 6 0.000 0.00 POyment/Credd Gom Docure ra V� I III I Contact. Nancy Pon erey Subtotal 350.00 Sinfal"irg ar Flood]lag 0.00 Sales Tax 0.00 kr uis tangy cogrrd)'ir'en of n 'Srrlia Trade Diacount 0,do Fayment/Credit Amount 0.00 Quantity variations must be reported within 5 days of receipt of material 4. -- ---� �-�S0 nQ-- All other claims and returns must he accompanied by an invoice within 30 days, All returns are subject to a re-stocking fee. ** You may deduct$3.50 if paid by 5/21/2018** d , Sty-Packing List Page 1 of I Olympic Foundry, Inc. Order Number: M59276 5200 Airport Way South Customer Class: 06 ./'�y117�1�',C OU1'11 1�1 Seattle,WA 99109 USA Order Date: 3/l/2018 (206)764-6200 Change Order: 0 °a"'A"wCOVIN"SINS¢,.r Salesperson: LeoH. Customer: ScaBro Customer PO: 83004 SH Code W/C Date Shipped: v' ,' Gf J Scarsella Brothers,Inc Scarsella Brothers Inc l PO Box 68697 Will Call Seattle,WA 98168-0697 USA Seattle, WA 98108-1725 USA I =3/1/2018 3/13/2018 Will Call ;OFCO- EA 1% 10 Net 30_ a1 L1-4112 M1141 CVR STORM 2HL W1uc06 M24 126 Must be Lacking.Grind btaak, 2 00-1 L Ihemtion Coating Whse:a6 P L 0 Vie( Drins rrrt-- G'-xrr-r`Pttr t ra ale Pulled H h t�� r1G Checked .,, Quantity variations must be reported within 5 days of 13 ------ receipt t2P'ntt+terial. All other claims,and rewros must Date: ✓� Total: t2 lacy >. � be ac,courpalnied by an invoice within 30 dayj. All returns are subject to a re-stocking fee. .d Tacoma Screw Products, Inc. Invoice INVOICE # 15432047 Wcomascrew.com LOCATION KENT c� ruin DATE 05/10/18 REMIT TO Tacoma Screw Products, Inc. PAGE _ 1 OF 1 Attn:Accounta Receivable -- ----- 35,B5 IIIIII lull IUII IIII1 EII�11111111II Seattle, U.S.A. WA 95124-5185 BILL TO SHIP TO F-485634 FSCARSELLA BROTHERS SCARSELLA BROTHERS INC ATTN RECEIVING 84TH AVE SO ATTN ACCOUNTS PAYABLE 1944084TH AVE SO PO BOX 68697 KENT, WA 98032 SEATTLE, WA 98168-0697 _...' — ORDER NUMBER ..ORDER DATE ORIGINAL QUOTE CUSTOMER P/O NUMBER PAYMENT TERMS KE18932 05/10118_ 83004 1% 10TH, NET 30 DAYS WRITTEN BY SALES REP CUST RELEASE# JOB NUMBER SHIP VIA RSP H 83004 CUSTOMER PICK-UP T .._.h....._..... 11 ._ E. Ah ms G Y C1tfAN1 Iro'Yr t� iHN i"Yialv3L Y d Utnn l Ax I'-- x rLNGIi a K >P6i�Y&AU4Tdt)8,aU111P'kd'C7MF „ dlrFN"' StdIPP.5�3 6Y(7 � 624-908 4 4 O 4.7047 EA 18,82 SAIT 22130 METAL CUT-OFF WHEEL T27 4-1/2"x 1/8" 5/8"-11 n624-603 � 3 3 0 3.0875 EA �9.26 CGW 35618 MASONRY CUT-OFF WHL 4-1/2 X 1/6 X 7/8 TYPE 27 vr" F r o c, 6 Thank you for your order. Please note that all sales are subject to Tacoma Screw Products, Inc.'s Terms of Sale and Conditions of Sale. If there should be env questions, or if we can be of further service, please call 12530 572-3444 or (800) 562-8192, We appreciate and value your continued business. MERCHANDISE DEPOSIT DEPOSIT TOTAL HANDLING MISC CHARGE TAX FREIGHT AMOUNT APPLIED INVOICE TOTAL 28.08 0.00 0.00 2.81 0.00_ 0.00 0.00 i PICK-UP SIGNATURE: JA Y KR/ER Barry, Jason From: Mike Wilson <mike.w@SCARSELLABROS.com> Sent: Thursday, May 17, 2018 3:32 PM To: Barry, Jason Subject: C-83004 72nd Ave - Added Gate and MH Cover Pricing Attachments: 0461_001.pdf EXTERNAL AIL Hi Jason, Here is the pricing for the work that we did last week on 72" , We used ecology blocks from our own stock so I had to come up with a value. $25 apiece seemed fair. I think they are typically around $35, Let me know if you have any questions. Thanks, Mike t it I r j I i I I I I a1 � W i ,I Vol t.�P1. _.+. ,� r a n.[,r� Y �:.`,:v .a� + I a .�. `"'? v 4' 44, . P f 1 r , .,�. ' vvea M Ir 7ae.I .Wk':;:. „„f CxLwN. � YuA 9 6" � � 4 A.✓ 6 V 1 w �.. P, 1uPY w i,>9w'� ? ����� µ med Y'N�� 1i"^1 w.�k»k. "'�;"rw, u j + f pp Ww" yyn .e( V� N��✓'P8m!��v (YILi71"d �' v : �.Y r r. Ca' a' � uP' PP��� m tl 7 l r _ qO ti.Y J"V-ffvo'W o P .tr'. �.w I r 6 9`V +'�r ua al s a �p'war�p.rlr:J �...�,� r~�Sf^� ' �r� u ✓ ' �n rc „• F c"ow� n k W d � [ c�!"d�"�Yx� -+V.u1 fY�•rcp®sd P'wP , rv•-y .... 0..1..Ev ,�� ' % �� d.rbW,rd P�� �.y � r; Yyr ur;�,"P,� S` r`,nw"d r� *�r�� d�•r "�t"�f'� �';° GYi 1 Barry, Jason From: Barry, Jason Sent: Monday, February 26, 2018 12:57 PM To: Kuehne, Paul Subject: FW: RE: C-83004 72nd Ave Ext. - Olympic Foundry Paul, FYI... I have given Scarsella direction to proceed with the alternative nonskid product, available locally.The application cost is nearly the same as the WSDOT preapproved products (sounds basically the same as far as application method and technique,just a DOT formality on approvals best I can tell), but the difference in shipping costs to Poulsbo versus Detroit equates in nearly a 50% reduction to cost and better than 50% reduction in procurement time. Worth giving it a shot. Thanks, Jason Barry From: Barry, Jason Sent: Monday, February 26, 2018 12:49 PM To: 'Mike Wilson' Subject: RE: RE: C-83004 72nd Ave Ext. - Olympic Foundry Let's go ahead and go the Thermion route. You're good to get that in the works.Thanks Mike! From: Mike Wilson [mullto.miKgm C,KARSELlAC3ROScorr] Sent: Monday, February 26, 2018 10:50 AM To: Barry, Jason Subject: FW: RE: C-83004 72nd Ave Ext. - Olympic Foundry Makes sense to me! Half the cost and half the time. From: Lee Hubenthal [mallto-RL'e ll ?trW„ympual nclry.c it ] Sent: Monday, February 26, 2018 10:48 AM To: Mike Wilson <mlkG w- CA+Rafl:l_4.,11BFt,.. S.coJn, Subject: RE: RE: C-83004 72nd Ave Ext. - Olympic Foundry Hi Mike. The cost for the coating is about the same. The big savings is in the shipping cost. We go to the Bremerton area every week so delivery is about 2 weeks. SlipNot is in Detroit and delivery is 4-5 weeks. Your price for thermion is $350.00 including the cover. Thanks, Lee Hubenthal SPG Sales Manager Olympic Foundry Inc. S200 Airport way S Seattle,WA 98108 Ph: (206) 764-1200 x225 Fx: (206)763-1701 1 Lrzce.h�!o�Aictaundry„KGS m, Did you know we sell fabrications and railing? From: Mike Wilson [,rnailtn'ml,Itew ?SCARSELLA6ROS.Cont] Sent: Monday, February 26, 2018 10:43 AM To: Lee Hubenthal <l,ec ki_ to[y pTlicfocincl¢y.com> Subject: RE: RE: C-83004 72nd Ave Ext. - Olympic Foundry Lee, The City is interested in using a more cost effective product. They'd like to try "Thermion TH 335". How would that compare with "SlipNot" for cost and lead time? wwvw.thermioninc.c:orn They're out of Poulsbo or Silverdale. Thanks, Mike From: Lee Hubenthal [InaifLQ:Lee [1d).y1rq,J,Sir(aunc9r' .cog?] Sent: Monday, February 19, 2018 11:11 AM To: Mike Wilson <rnike. v(7S i5F.I.LAf3_ OS—.-cc)ro> Subject: RE: RE: C-83004 72nd Ave Ext. - Olympic Foundry Hey Mike, Your cost is $654.00 for the blank MH41 cover coated in SlipNot. That price includes the cover and you are looking at 4 week delivery time. Thanks, Lee Hubenthal SPG Sales Manager Olympic Foundry Inc. 5200 Airport Way 5 Seattle,WA 98108 Ph'. (206) 764-1200 x225 Fx'. (206) 763-1701 L e.It; ,(51y,otr,gric4fuummnd ry:mm Did you know we sell fabrications and railing? F;L�LA From: Mike Wilson [ry aiIto,nrlke.wt�SCAR UOS,cmi S„m_m_ Sent: Monday, February 19, 2018 10:59 AM To: Lee Hubenthal <Lee*,,19,. �Wgrgfyicfound . x Ir> Subject: FW: RE: C-83004 72nd Ave Ext. - Olympic Foundry Thanks! From: Mike Wilson Sent: Monday, February 19, 2018 10:47 AM To: 'LeeH@olympicfoundry.com' <Le0,I,CC�oly:iipiUound y.corn> Subject: RE: RE: C-83004 72nd Ave Ext. - Olympic Foundry Hi Lee, 2 I need a slip resistant lid for a manhole on this job. Do you have one in stock? If not— how long will it take to get? We don't want any print on the lid: ADD - Plan Sheet 4 of 15, W.P. well 5M4A Manhole lid must be slip-resistant, Slip-Knot or Mebac qio . yip„r � r0 i I / ' i / or"Y�a '.i Thanks, Mike From: Mike Wilson Sent: Friday,January 20, 2017 3:33 PM To: l,.rr�ri-i�lc:l rr�,l?fa f'ocirrcE.?'Y�crirn Subject: RE: C-83004 72nd Ave Ext. -Olympic Foundry Lee, We're getting ready to install the storm sewer on this job next month on the 13`n. We'd like to get the following items delivered on the week of the 6m 13 EA 4120 Vaned Catch Basin Frame and Grate 2 EA 4125 Thru-Curb Inlet Frame and Vaned Grate It looks like everything is approved so long as you meet the City's Standard Plans. Thanks, Mike Wilson Scarsella Brothers, Inc. (253) 872-7173 Office (360) 710-9432 Cell (253) 479-1365 Fax 3 "IlY LX) ,'J�4Ve all- Rp, Ps a— Co") Y� x 1V�-rrd 42,6,1. R f Z,:, Barry, Jason From: Barry, Jason Sent: Friday, March 09, 2018 10:46 AM To: 'Mike Wilson' Cc: Kuehne, Paul Subject: RE: 72nd Ave. S. access to T.L. 5 Attachments: 170.10-01_e.pdf, 020.JPG Hi Mike, The Boeing property managers have decided they would like a cable gate placed at their property access on the SW corner of the bridge. Instead of bollards,they request an ecology block placed on both sides with 12 foot clear space between, having a lockable cable with warning sign like the state detail attached. We'll want to set the blocks for cable attachment far enough back to allow a pick-up truck to safely pull clear of 72" before exiting to unlock the gate. Please provide pricing for approval prior to beginning work. This will be our final addition to this contract. If you have any questions or comments please let me know. Thank you very much, Jason Barry, capital Projects Manager Construction Management I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-SS6-5546 I Cell 253-797-8462 KENT A wrvva.K'ervt4Nd.ttov PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING THIS E-MAIL From: Mike Wilson [mailto:mike.w@SCARSFLLABROS.com] Sent: Thursday, February 22, 2018 10:50 AM To: Barry, Jason Cc: Kuehne, Paul Subject: Re: 72nd Ave. S. access to T.L. 5 Sounds good to me. You can buy yellow vinyl chain too. Sent ti`om my Verizon, Samsung Gata_xy smartphone -------- Original message -------- From: "Barry, Jason" <IBtarry(ctJlapn¢w . caw> Date: 2/22/18 10:36 AM (GMT-08:00) To: Mike Wilson <;rnnlcc.w,ti54 Att�I;1_.,i 11fCZ(:54 ,cri°n> Cc: "Kuehne, Paul" <PlCuulJ;aJ,e(tt)I<crtt aw:> t Subject: FW: 72nd Ave. S. access to T.L. 5 Hi Mike, Below is correspondence received this morning regarding that gravel property access to the private lot on the west side of the 72nd bridge. The properties management preference appears to be two fixed bollards with a lockable, chain gate draped between. Clearly this is extra work to the contract. I'm thinking something along the lines of a couple 8-12" diarneter, 6 foot steel pipes buried three feet and Filled with concrete and painted with a yellow safety paint could work. If you have other ideas or suggestions I'm open to them as well. I'd just like to tell them what we intend to install and give them the opportunity to say different. If Scarsella is open to accepting this work we can compensate through an agreed lump sum price or track as time and materials. If you could let me know what you think, I'll respond to the property accordingly. Thanks for your continued patience. Jason Barry From: Mahrt, Lindsey E [rTailta:EindSy.e,t7J7hrC21boeiccan7] Sent: Thursday, February 22, 2018 7:50 AM To: Langholz, Ken Cc: Barry, Jason; Maloney, Carla; Chris Kimmel (CKimmel(11andauinc.com) Subject: RE: 72nd Ave. S. access to T.L. 5 Hi Ken, After looking at the driveway our preference would be 2 bollards on each side of the gravel path with a chain across. The 2 bollards on each side would prevent people from driving around the chain. It would be helpful if this was set back approximately 20 ft from 72°d to provide a safe area to pull off and disconnect the chain when we need access to the driveway. Please let me know if you need more information or if you would like to walk the area. Thank you, Lindsey From: Langholz, Ken [mailto:KLanaholz cz keattwa.gdv] Sent: Tuesday, February 20, 2018 3:03 PM To: Mahrt, Lindsey E <lindseyme.matort boein .cam> Cc: Barry, Jason <JBarry@ ken twa cov>; Maloney, Carla <CMaloneVftkentwa.Vov>; Chris Kimmel (CKirrimel@landauinc.com) <CKimmelC landauinc.com> Subject: 72nd Ave. S. access to T.L. 5 Lindsey, As we discussed today: The City is in the process of closing out our contract with Scarsella Bros.for construction of the 72,1 Ave. S. extension. The Boeing Company is the owner of Tax Lot 382900-0005 (aka Tax Lot 5). Tax Lot 5 is generally located between Mill Creek on the north and west, Western Processing on the east, and the warehouse on the south. The City of Kent obtained a surface easement over Tax Lot 5 from Boeing for construction of the roadway (copy attached). 2 Western Processing's utilities (gas, power, telephone, storm drainage, monitoring wells, vaults, etc.) are located across Tax Lot 5 and under the roadway. The gas meter, power transformer, telephone connection, monitoring well and the utility bridge are on the west side of 72^". The City installed a driveway to provide access to the area west of 72^d. We have observed vehicles parking in this area and are concerned with site security. We recommend placing bollards, a gate or ecology blocks across the driveway to limit access. Please take a look at this and let us know your preference so we can have our contractor complete the work. We would appreciate a response by next Tuesday. Please contact me if you have any questions. Thanks, Ken Langhi lz, Design Engineering Supervisor Design Engineering I Public Works Department 220 Fourth Avenue South, Kent, WA 98032 Phone 253-556-5516 1 Fax 253-556-6500 k 1ingAQl7,Qn)Kor ,V&a1Cv CITY OF KENT, WASHINGTON Kenl CuV,_,-o4.1}nYA Q"t _ 'db liTub,, 3