Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW18-215 - Original - Stripe Rite, Inc. - 2018 Paint Line Striping and RPM Replace - 05/31/2018
.--ANT Records Management Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to the City Clerk's Office. All portions are to be completed. If you have questions, please contact the City Clerk's Office at 253-856-5725. ❑ Blue/Motion Sheet Attached ® Pink Sheet Attached Vendor Name: Stripe Rite, Inc. - Vendor Number (JDE): Contract Number (City Clerk): Category: Contract Agreement Sub-Category (if applicable): Project Name: 2018 Paint Line Stripinq and RPM Replacement Contract Execution Date: Date of the Mayor's signature Termination Date: ao working days Contract Manager: Joe Araucto Department: PW: Operations Contract Amount: $256,855.00 Approval Authority: ❑ Director ❑ Mayor ® City Council Other Details: The proiect consists of installing paint stripina over existing lane markings, and installing replacement raised pavement markings on various city streets. �������� ,� � �u �� �a �� � � �� �Vu��a alw JNtl )Ally � "�„ dlllillalll ' �� �� IVY bG� ��� �AW °, tl�IP �9� � �� �M1'& I�Bb �Wu N i � n� ",m"L�,� rw^^. �C 9PW . ' WdW I UAW Mi �7N �,� p w .' ��iu�i i � ,ems. @1 011lb �+. N Ali � . mw���u �����41i �) '�� , d li� W �i,��l�� �� i��a�i� �� i��`pliw � ���" � � �� M nb �� �� i px� ; , ���� �V�u. Omni 9ie� i r�rc o i , ��u � � � � � � � � a v¢.u;, as � � ����� �u � ���°� &fled ���� �� � w, �° ��� � ��� � ��'�������� �u ou �.� ;� � a ,��� on. m �Y���. �� �W�Ng�i �( i�w� '�� � �K ;n OC .u: �N9:n fl PUBLIC WORKS DEPARTMENT Timothy J, LaPorte, P.E. Public Works Director 0 0�0 40C West Gowe Kent, WA 98032 kms,nmwmmidY K lei e�ryy,�T Fax: 253-856-6500 WASHINOTan i PHONE: 253-856-5500 CITY OF KENT KING COUNTY, WASHINGTON 2018 Paint Line Striping and RPM Replacement Project Number: R00602 ADDENDUM No. 1 May 1, 2018 FROM: The Office of the City Engineer, Kent Washington TO: All Plan Holders of the Project Specifications and Plans This addendum forms a part of the Contract documents and modifies the Project Proposal and Specifications and Contract Drawings in accordance with the following: A.N..L. CHANGES ARE IN R11.111.1'�113 I — BIDDER'S, DOCUMENTS The following changes are included in the attached replacement pages 6 and 7 of the Bidder's Document. Page 7 is included due to the added bid item noted below shifted bid items to the next page. Bidders must use the replacement pages. ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1..002 8..27.5 6,000 IRemoviirng Paint Il...iirne $ WSDo,ir N...N IFT Per LF II — ICENT SPECIAL PROVISIONS Page 8-5 — Section 8-22.3(3)E — Installation REV11SE the second sentence as follows: One coat application of paint will be required to complete all paint markings installed over existing paint markings. Two applications of paint will be required to complete all paint markings installed on new surface-treated roadways, on re•••channnelized street or whein centeiii rnarNkings are reprised to doubile yeNNow ceinterNiine, or as noted o in the Appendix A. Vehicle and pedestrian tracking of newly applied striping shall be m removed per section 8-22.3(6), and the affected portion of marking reinstalled by the end of the next working day. J- C N Y 1 ' a Mayor Dana r ! Page 8-6 — Section 8-22.4 — Measurement I ADD the following to this section: PAP fx At a wta 1 b tl inlll..1121w �3l a llgi.. .�" .PdA .il.pi 9 u9W1 �:Y� . iP. t9.lg .. . fPn to .afla..0-CI b n: ag r.1r ..g.f")u2 jj,yjL9. Eiu�OP..�fe, . eft tit��n9P;ui�..9.Cw�?;��,girt"�.t �°u .:�.Ps..t:P._Pa�awu, fm� u7uui0,_Ptl"._itu� Pn_ ��a+�,_,uwt�rf�aut.�"a�n tpi ramt*�� P ��� warumPilP . urvu a Pf t ,_ o ,w itP u u .:a,qa un cM z t a a 1 1"'Q V t P:P.u� P�...... �°nt�roltlaanP tt�?waw�°,�t1P.it�_Rit.P?�P�.Pw4 ffti",.�I�rouuu ,wsya3u,..��m�Ptw�i9...P�a���2tiu"�at*uP 'w.iiri�ou�ttPll �g!.:�P%t�.��d�ii �q� :Puau , 1 t ,Eu tt tma;u i IV - APPENDIX Appendix 2 —Appendix A and Location Maps RIE'P1Af,'E page 4 of 19 of the 2018 Paint Line Striping Contract Location Map. ADD the attached S. 132otl Ave. SE Re-Channelization Plan. RIE1111PIILACE the 2018 RPM Replacement Location Map. END OF ADDENDUM No. 1 61, Chad Bieren, P.E. Date Deputy Director/City Engineer Attachments: Proposal Pages: 6 and 7 Appendix 2: - Page 4 of 19 - S. 132nd Ave. SE Re-Channelization Plan - 2018 RPM Replacement Location Map 2 / / ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1000 1-00.7 1 Mobilization $ $ VVSD0T LUMP SUM PerLS 1002 8~2 2.5 6/000 Remnov[ng P`�,iiinitL�ine $ $ � WSDO'lr' LN FT FlerLF � 1005 8-22.5 400,000 Painted Double Solid Line $ $ KSP LN FT PerLF 101O 8'22.5 5/5/000 Painted Single Solid Line $ $ KSP LN FT PerLF 1013 8'22.5 150/000 Painted Skip Lane Line $ $ KSP LN FT PerLF 1020 8-22.5 12/000 Painted Dotted Line $ $ KSP LN FT PerLF 1025 8'22] 130,000 Painted 7'VVLl'LLine $ KSP LN F7' Pe[ LF 1030 8-22.5 30/000 Painted Wide Lane Line $ $ VVSD{)T LN FT PerLF 1035 8-22.5 120/008 Painted Bike Lane Line $ $ KSP LN FT PCrLF 1040 8-00.5 35 Raised Pavement Marker $ $ VVSDOT HUNDRED Type Per HUND 2ozo Paint Line Striping aupm/x,a000 6 xpn| 3n, 2nz8 ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT I 1045 8-09.5 110 Raised Pavement Marker $ $ WSDOT HUNDRED Type 2 Per HUND I 1050 1-10.4(1) 1 Project Temporary Traffic $ $ KSP LUMP SUM Control Per LS 1055 1 1 SPCC Plan $ $ 07.15(1) LUMP SUM Per LS WSDOT 1060 1-04.4(1) 1 Minor Changes $5,000.00* $5,000.00 WSDOT CALC Per CALC *Common price to all bidders Total $� 2018 Paint Line Striping &RPM/Araucto 7 April 30, 2018 Project Number: R00602 ti J e ry m so- lravrr.. .... { w f Irtll I ha•.e im usiEtFi PI <,IU'Cl fo a -C,WO is t .. 1aaPi 3 'I �.« sE,aatI 1 sy v 5F lluz.r J sE let st a5 t _ _ _ e � wi vryl fil I n SE tex Pi —._ _rLFtkl tit F {t im Pi I sE nk mf', m a r`t "v418fl 5t .5 ^0 W 11 I1 n n-a I � B 9E f nv Int..t f )o tit f sE lesw� f � 1 i �'>< l ' t n. K N... al,o f �zk dmE V �1aes E me n yP rQQfir ° t 'Nf / 1 E T 4�rrr, ir Pi 41 r en f A tar Pl � " r, �C it, .,,�.� �sEiao1,9 61, Y1Y L A Gd f M 41119'�i Ju I� ", n P) n 1090,1 �' Bii EIH 11 f p S„ 1 m I xf nW. II1Q14'1 µ�;tv toI w �df�QdTMn, il�AGrvlavvuvuururims;rramRrrnraumm.,,cn',�tuvmlaurw✓Rl,7ApprrvmmttPflAimarurc .y...., r �I .... vi I ., 1 r 7. ln��� " � ..,,f °E.94YP 64 ( ,♦ tt � d f I't rvM � ad tj�ryh /m" es t V 4 m { 5 tyk se 'ri 1 r i .xm fIYG;Wlpdlll",Yllr',M4dY1M1IPYIY%TIIIIIM IPYI�;��ry��11'tGYXJU/N�hle b ��, �, � I� a�Wlyl4@piY Win IlAXi05idVIlWdlli,tt�rPW'iJ4r✓uYNAlXYNI dd1 IwINYUUYYM �p a� yam' �, f } 4 w n ' w t, f t"" tt tYtq sl rt '"f q J IIB w Qmr w r to nl s1 �inz1 rrtQ,SI.. e Itt � �Y � ...t pnr T• iac -.I_ QI a .t �..� _ p p I7 r f 7 �t rHFOn '� se m' °fr.mun f yd K Iry FF m tYkMl"NnIflS,k V 4.{t,.ry W 4i { .4 f w R I f - III r ti;�clj Pi SE,.0)PI � T 21� '111 rn V sezoaai a, y ¢; 1 N e / Pyt "xOa yiR... y] nrn be JNli.•. y ,101,wy " a du s d K Q I nuM'�a b I! w 6 y vur 9a ( o r 57 nt mrwi urvv £ iz r A eMvrrmr umaw� x�rr0ure � I m �� 7t➢+1 . f ro. Ia mmmnd iuwmmru^ uw.Mnixa vvr � i i .�,•�� I% P r 1 s In �� uiu'Uailrvmvrvurarlvmcugmv'wunw tpdwervvvuuvurrJ/vl'✓'ivarvvm;umrvmmlmm A zurvn Y ,, N E 76 m e p 7 �.. a� 5 � B 8 f mQa rm �1i p 0 In 14 �0 J h rn ne I � nl 11 Nax a pC r,Ili ��" ,~ n ... tp8 rc �u o .n ,nrr sa_�a yal ... r 62 at rrl' ° 1 32nd nnelS aY afoY 1 n Plane. MI a n�iP xko 4 .n>� 0: ...................... . ...._ .. a Q{ ae l m zsrn w r J — PAGE L7QW�I "M ' r 2018 Paint Line Striping Contract Location Map Legend '- "'KENT IM;vuvmibxmu Paint ONOWCOord Painting w!Paving .Convert to DYCL,coord painting w/paving 0 i00 9,000 t tea Map Key(see Appendix A) ®Fee Produced by Pavement Manager:Joseph AMLJCEO U'1M%U@018 Paint SMping Map book mxd PrintedApri12018 4 OF 19 Y .i SE 'YH-STD G LIMEn jj NNI Mir' � ,��Id'JIIY{ �nwJl � ;� I ;11,1011111 d941N't�IIOW�I'X I 'S jqV 1 111, J!i�'N, w,�7 a I'll ifI m (k!9/ fi 1 p .�itii7N@iNCY7YYrduVJdPoPI � (6�I ,� � � g ''q I E w, a fN .� I "> I, If, IZ 0 w 4 I 4 Vo -'Ni 11 'r I i o r�YI�IVi�I�WM vl � y�✓ w Z ,.a Y �J f'�: N� I f JA 11 IN f I is A l/ IhVlfi� ��„ pyY IN � M�a Y�O of D in A��i JiW F ry fP _v 51 IN INN .d7iWyl%Y, f ro mi I / ry 0 3 1 F a n � SE 210TH ST ,. pT�V�� tl!� MYiNM F 9 w � >< N O 1 , ,� aTCN, s t _ "Ilk P � a E SE, H-STdo ; �5, or, mall 100, F �° a✓er I � e�i���, z w Ravr w air 4 B 0 4 J m N .. ��� w♦l'.ii � ��I � n aor,�iw.rv. �!AT f fi �mve� v.S f a h ' iyIfO o 6 g m r Ei Q 9W1, ! B p fi+i 7 i i SE 2 ' ffyy 'tF��,�FF ill �Ivi" J ! ID, �t of Mvi��l W Ilia i; F t, o i N'✓ /// y �qyy /( I' AF mr v � Uvhi ma yy Na warn 1" r �uA u, + SE 210TH ST �p ' W d AN" er slti D aiIFI 9 mi 5 ro n' r f °,t±aF�ur '�i F r ti F i arTa„ d tr n• Br Fr D If �iJ ,nw, „ v �, -y� ww " -,gA7CH �) ,y v o w r > r yy U Q J yr is "IVan IF � WA w 00 -13 do+/dtl a+7 x r e �; i�.=nvd riUt 0 e µ�. t17 e h I +c owO ti'+fayi .F? x 99 �. tl A i r'tl i n41'a:u F"l, '3 If w � � vus � oil FaovW a t. k YY zN Fa .emn JVd 8. s" n+ v. f ti" v+p rr� u F f o .y e f Sa69' a.uey qv dI�1G bag � a u R u!_�qa ce d af t 1 7 f ' a� A ism ! qa —01 , 5 y o- ..ems wJ I NDEX i Section 1 Bidder's Package Section 2 Payment and Performance Bond and Contract Section 3 Table of Contents Section, 4 Kent Special Provisions Section 5 Kent Standard Plans Section S Appendix A and Location Flaps Section 7 Traffic Control Plans Section 8 Prevailing Wage Rates BIDDER'S NAME _ 1t Is CITY OF KENT KING COUNTY, WASHINGTON KENT SPECIAL PROVISIONS FOR 2418 Paint Line :striping an RPM Replacement Project Number: R006,02 BIDS ACCEPTED UNTIL BID OPENING May 8, 2015 May S., 2018 9:45 A.M. 10:00 A.M. DELIVER TO CITY OF KENT, CITY HALL 220 4th Avenue S., Kent, WA 98032-5895 TIMOTHY J. LAPORTE, P.E. PUBLIC WORKS DIRECTOR KENTw a s H I N G 2 D N ORDER OF CONTENTS Invitation to Bid Contractor Compliance Statement Declaration — City of Kent Equal Employment Opportunity Policy Administrative Policy 1 .2 — Minority and Women Contractors City of Kent Equal Employment Opportunity Compliance Statement Proposal City of Kent Subcontractor List (over $100K) Subcontractor List (over $1 million) Contractor's Qualification Statement Certification of Compliance with Wage Payment Statutes Proposal Signature Page Bid Bond Form Combined Declaration Form Non-Collusion, Minimum Wage Change Order Bidder's Checklist Payment and Performance Bond Contract Table of Contents Kent Special Provisions Kent Standard Plans Appendix A and Location Maps Traffic Control Plans Prevailing Wage Rates INVITATION TO BID � Notice is heiieby given that the City of Kent, Washington, will receive seailed bids at the City | Clerk's office through May 8^ 2018 up t09�45 am. ns shown 8n the clock ¢nthe east wall of | the City Clerk's Office on the first floor of City Hall, 220 4th Avenue South, Kent, Washington. All bids must beprupedV marked and sealed in accordance with this ^InVitab0n t00id " Bids nnusthoddivVrwd and received at the City Clerk's ufhceby the above-stated drne, regardless of delivery method, including U.S, Mail. All bids will be opened and read publicly aloud at 10,00 a.mm. for the City uf Kent project named Jyfollows; 2018 Paint Line Striping and RPM Replacement Project Number: R00602 The project consists of installing paint striping over existing lane markings, and installing replacement raised pavement markings oD various City of Kent Streets asdetailed in Appendix A, all in accordance with Kent Special Provisions, and the WSDOT Standard Specifications. The Engineer's estimated range for this p �e(tiaapproxinmote|y �I85/RVV0o $JlAQ00 Bid docu*Hentsmxaybe obtained byc0ntacdog 'City mrKent Engineering Uep8,trneni/ N'nty^ YoShhakeGt253-856^S5U8 For que�U��� p|casc �a|| ]¢ue Joseph ho P.E.. ' p rawc ' 8t25J' 856'5604. Bids nibe clearly marked "Rid^ with the Amcneufthe project on the outside of the envelope addressed to the ��yQ /\ Clerk, 2284�hAvenu� South, Kent, 98O32-S8�5. On|ysealed bids /will i|| be accepted, No facsimiles mre|e(Lnoo>c submittals will be considered. Each bid shall be in accordance with the plans and specifications and other contract documents now on file inthe office o[ the City Engineer, City ofKent, Washington. Paper copies ufthe plans and Kent Special provisions may bcpurchayedatanon-refundable cost of $25 for each set. Plans and: specifications can also be downloaded at no charge at Copies of the VVSDOTStandard Specifications are available for perusal only. A cashier's check, cash or surety bond in the amount of 5% of the bid must be included with the bid. The City of Kent reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. Bidders must submit with their initial bid a signed statement as to whether they have previously performed work subject to the President's Executive Order No. 11246. No bidder may withdraw his/her bid for a period of sidv (60) days after the day of bid opening. Dated this l8m day of April, 2818. BY: ii�r6berley Aj�orri City Clerk Published in Daily Journal uf Commerce on April Z4and May 1, 3018, CONTRACTOR COMPLIANCE STATEMENT (President's Executive Order #11246) i Date..... _. ....... 5/07/18 This statement relates to a proposed contract with the City of Kent named 2018 Paint Line Striping and RPM Replacement Project Number: R00602 I am the undersigned bidder or Prospective contractor. I represent that - 1. I ._.... X _ have, __ .,,., have not, participated in a previous contract or subcontract subject to the President's Executive Order #11246 (regarding equal employment opportunity) or a preceding similar Executive Order. STRIPE RITE , INC. ..... NAME OF BIDDER BY: _._ SIGNATUR -/TITLE Steven Bateman /President Stripe Rite, Inc. 1813 137th Ave. E. Sumner„ Wa. 98390 _ ......__.ADDRESS ........ ........ _.. . (Note to Bidders: The information required in this Compliance Statement is informational only) 2018 Paint Line Striping &. RPM/Araucto 1 April 18, 2018 Project Number: ROMW DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such, all contractors, subcontractors and suppliers who perform work with relation to this contract shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific contract to adhere to. An affirmative response is required on all of the following questions for this contract to be valid and binding. If any contractor', subcontractor or supplier willfully misrepresents themselves with regard to the directives outlined, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the contract; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this contract I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this contract the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the contract I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this contract, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. By: /Steven Bateman For: Stripe Rite, Inc. Title: President Date: 5107/18 2018 Paint Line Striping to RPM/Araucto 2 April 18, 2018 Project Number: R00602 � / | � | CITY K�� W���T | ~" ^^"~"~ ADMINISTRATIVE POLICY � NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 � � � SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1/ 1990 CONTRACTORS APPROVED 8Y Jim White, Mayor ''='==Q�: Equal ernPlOYMent opportunity requirements for the City of Kent will confoj-m to federal and state laws. All contractors, suhcmmtracto,$, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, i/ holding contracts with the City amounting to $lO,DR8n, more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment asan equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall hc considered in breach of contract and subject to suspension or termination for all or part of the contract. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. l. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy, 2. Monitoring to assure adherence tofederal, state and local laws, policies and guidelines, zo.o Paint Line sm,*yuxpM/x'auuO ] xp.| /omxv ,rn]ectwumbecx0000z � I CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the contract. I, the undersigned, a duly represented agent of Stripe Rite, Inc. Company, hereby acknowledge and declare that the before- mentioned company was the prime contract for the contract known as 2018 Paint Line Striping and RPM Replacement/Project Number: R00602 that was entered into on the CDtr},.... 5/08/18 between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned contract. By: e _ /Steven Bateman For: Stripe Rite, Inc. Title: President Date: 5107/18 2018 Paint Line Striping b RPM/AraLICM q April 1.8, 20tS Project Number R00602 I i PROPOSAL To the City Clerk City Hall Kent, Washington 98032 The undersigned hereby certifies that , Stripe Rite, Inc. has examined the job site and construction details of the work as outlined on the plans and described in the specifications for the project named 2018 Paint Line Striping and RPM Replacement/Project Number: R00602 for the City of Kent, Washington, and has read and thoroughly understands the plans and specifications and contract governing the work embraced in this improvement and the method by which payment will be made for that work and hereby proposes to undertake and complete the work embraced in this improvement in accordance with the bid and contract, and at the following schedule of rates and prices: NOTE TO BIDDERS: 1) All bid items are described in the Kent Special Provisions (KSP) or the Standard Specifications (WSDOT). Reference the Section No. listed in this proposal, where the bid item is described. 2) Proposal items are numbered in sequence but are non-continuous. 3) Unit prices for all items, all extensions, and total amount of bid must be shown. 4) Should bid items with identically worded bid item descriptions, marked with asterisk (*), appear in more than one schedule of the proposal, the bidder must bid the same unit price on corresponding items for each schedule. If the Contractor enters different unit prices on these items, the City will unilaterally revise the bid amounts to the lowest unit price on each corresponding item and recalculate the Contractor's total bid amount. The corrected total bid amount will be used by the City for award purposes and fix the amount of the contract bond. EXAMPLE, SCHEDULE I - STREET ITEM SECTION APPROX. ITEM UNIT TOTAL NO NO. QUANTITY PRICE AMOUNT 1006 2-03.5 100 Roadway Excavation, $14.00 $1,400.00 WSDOT CU YDS Including Haul Per CY Any bids not filled out properly may be considered non-responsive. 2018 Paint Line Striping & RPM/Araucta S April 18, 201A Proyrt Number: R00602 STEM ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1000 1-09.7 1 Mobilization $ 5,500.00 5,500.00 WSDOT LUMP SUM Per LS 10G2 8-22,5 6,000 Reirnoving Paint Line $ 1.49 8,940.00 WSDO F LN Ff Per LF 1005 8-22.5 400,000 Painted Double Solid Line $ 0.14 $ 56,000.00 KSP LN FT Per LF 1010 8-22.5 575,00() Painted Single Solid Line $ 0.12 $ 69,000.00 KSP LN Fr Per LF 101S 8-22.5 150,000 Painted Skip Lane Line $ 0.10 $ 15,000.00 KSP LN FT Per LF 1020 8-22.5 12,000 Painted Dotted Line 0.22 $ 2,640.00 KSP LN Fr Per LF 1025 8-22.5 130,000 Painted TWLTL Line $ 0.12 15,600.00 KSP LN FT Per LF 1030 8-22.5 30,000 Painted Wide Lane Line $ 0.22 $ 6,600.00 WSDOT LN Fr Per LF 1035 8-22.5 120,000 Painted Bike Lane Line $ 0.14 $ 16,800.00 KSP LN FT Per LF 1040 8-09.5 35 Raised Pavement Marker $ 233.00 $ 8,155.00 WSDOT HUNDRED Type I Per HUND 2018 Pawl:Line Striping & RPM/Araucto 6 April 30,2019 PFO)PC,t Number: R00602 I I ITEM SECTION APPROX. ITEM UNIT TOTAL "-- NO. NO. QUANTITY PRICE AMOUNT 1045 8-09.5 110 Raised Pavement Marker $ 322.00 $ 35,420.00 WSDOT HUNDRED Type 2 Per HUND 1050 1-10,4(1) 1 Project Temporary Traffic $ 11,700.00 $ 11,700.00 KSP LUMP SUM Control Per LS 1055 1- 1 SPCC Plan $ 500.00 $ 500.00 07.15(1) LUMP SUM Per LS WSDOT 1060 1-04.4(1) 1 Minor Changes $5,000.00* $5,000.00 WSDOT CALC Per CALC *Common price to all bidders Total $ 256,855.00 2018 Paint Line Striping &RPMJAraucto 7 April 30, 2018 Project Number: R00602 CITY OF KENT SUBCONTRACTOR LIST (Contracts over $100,000) List each subcontractor, from any tier of subcontractors, that shall perform subcontract work amounting to more than 10% of the total bid contract price. List each bid item to be performed by each designated subcontractor in numerical sequence, If no subcontractors will be performing 10% or more of the work, indicate this by writing "None" and signing this form at the bottom of the page. Failure to submit a fully completed and signed subcontractor list after the time set for bid opening may disqualify your bid. Project Name: 201A Paint Line Stri�pna and RPM ReoJacement Project Number: R00602 Subcontractor Name NONE Item Numbers — ...... ....... Subcontractor Name Item Numbers __ _..... .... -- . .... __.... --- ... Subcontractor Name w..... Item Numbers Subcontractor Name Item Numbers Subcontractor Name _.w__..�. . ..__... Item Numbers ...... _- .... .... ..__ ..---- Subcontractor Name Item Numbers Subcontractor- Name Item Numbers CONTRACTOR'S SIGNATURE., c r /Steven Bateman /President 2018 Paint Line Striping & RPM/Araucto t3 April 18, 201n Project Number: R00602 SUBCONTRACTOR LIST (Contracts over 1 million dollars) Name of Bidder: Stripe Rite, Inc. Project Name: 2918 Paint Line Striping and RPM Replacement Project Number: R00602__ . Pursuant to RCW 39.30.060, Bidder shall list the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of heating, ventilation, and air conditioning; plumbing; and electrical, or to name itself for the work. Failure of the Bidder to submit, as part of the Bid, the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the Bidder's Bid non-responsive and, therefore, void. Heating, Ventilation, and Air Conditioning Subcontractor Name: N/A Plumbing Subcontractor Name: N/A Electrical Subcontractor Name; N/A 5/07/18 Signature of Bidder Steven Bateman Date 2018 11 Line Striping & RPM/Arauctc 9 April 18, 2018 Project Number: R00602 i CONTRACTOR'S QUALIFICATION STATEMENT (RCW 39„04.350) THE CITY WILL REVIEW THE CONTRACTORS RESPONSES TO THIS FORM TO DETERMINE WHETHER THE BIDDING CONTRACTOR IS RESPONSIBLE TO PERFORM THE CONTRACT WORK. THIS FORM INCLUDES CRITERIA ESTABLISHED BY STATE LAW THAT MUST BE MET TO BE CONSIDERED A RESPONSIBLE BIDDER AND QUALIFIED TO BE AWARDED THIS PUBLIC WORKS PROJECT AS WELL AS SUPPLEMENTAL CRITERIA ESTABLISHED BY THE CITY THAT ARE APPLICABLE TO THIS PUBLIC WORKS PROJECT. THE BIDDER SHOULD READ AND RESPOND TO THIS FORM CAREFULLY. Indicia of contractor's responsibility inherently involve subjective determinations as to the contractor's ability to perform and complete the contract work responsibly and to the owner city's satisfaction. The city has an obligation and a duty to its citizens and its taxpayers to administer its budgets and complete its projects in a businesslike manner. Accordingly, it has a duty to exercise the type of inquiry and discretion a business would conduct when selecting a contractor who will be responsible to perform the contract work. The city's supplemental criteria are based, in large part, on the qualification statement form used by the American Institute of Architects. The city provides these criteria so as to provide the most objective framework possible within which the city will make its decision regarding the bidder's ability to be responsible to perform the contract work. These criteria, taken together, will form the basis for the city's decision that a bidder is or is not responsible to perform the contract work. Any bidder may make a formal written request to the city to modify the criteria set forth in this qualification statement, but that request may only be made within 48 hours of the date and time that the bidder first obtains the bid doCUrnents or three (3) business clays prior to the scheduled bid opening date, whichever occurs first. If the city receives a modification request, it will consider any information submitted in the request and will respond before the bid submittal deadline. If the city's evaluation results in changed criteria, the city will issue an addendum establishing the new or modified criteria. If the city determines that, based on the criteria established in this statement, a bidder is not responsible to perform the contract work, the city will provide written notice of its determination that will include the city's reason for its decision. The bidder has 24 hours from the time the city delivers written notice to the bidder that the bidder is not responsible to perform the contract work to appeal the city's determination. No appeal;, will be received) after the expiration of this 24 hour appeal period. The city may deliver this notice by Land delivery, email, facsimile, or regular mail.. fn the event the city uses regular mail, the delivery will be deemed complete three days after being placed in the U.S. Mail. The bidder's right to appeal is limited to the single remedy of providing the city with additional information to be considered before the city Tissues a final determination. Bidder acknowledges and undeitstands that, as provided by RCW 39.04.350, no other appeal is allowed and no other remedy of any kind or nature is available to the bidding contractor if the City determines that the bidder is not responsible to perform the contract work. 2018 Paint Llne Striping & RPM/Aiaucto 10 April 18, )018 Prujwt 6dUni R00602 If the bidder fails to request a modification within the time allowed, or fails to appeal a determination that the bidder is not responsible within the time allowed, the city will make its determination of bidder responsibility based on the information submitted. COMPLETE AND SIGN THIS FORM AS PART OF YOUR BID. FAILURE TO PROPERLY COMPLETE THIS FORM MAY ALSO RESULT IN A DETERMINATION THAT YOUR BID IS NON-RESPONSIVE AND THEREFORE VOID. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. The undersigned certifies under oath that the information provided herein is true and sufficiently Complete so as not to be misleading. SUBMITTED BY: Stripe Rite, Inc. NAME: Justin Williams .. ........ ------------ ADDRESS: 1813 137th Ave. E. .. ............... Sumner, Wa. 98390 PRINCIPAL OFFICE: "Stripe Rite, Inc. ADDRESS: 1813 137th Ave. E. Sumner, Wa. 98390 PHONE: 253.863.2987 ........... FAX: 253.863.3120 ... ...... ...... -------- STATUTORY REQUIREMENTS — Per state law a bidder must meet the following responsibility criteria 1. Required Responsibility Criteria 1.1 Provide a copy of your Department of Labor and Industries certificate of registration in compliance with chapter 18.27 RCW. SEE ATTACHED 1.2 Provide your current state unified business identifier number, 601048084 1.3 Provide proof of applicable industrial insurance coverage for your employees working in Washington as required in Title 51 RCW, together with an employment security department number as required in Title 50 RCW, and a state excise tax registration number as required in Title 82 RCW. Providing a copy of a state of Washington "Master License Service Registration and Licenses" form is typically sufficient evidence of the requirements of this subsection. SEE ATTACHED 1.4 Provide a statement, signed by a person with authority to act and speak for your company, that your company, including any subsidiary companies or affiliated companies under majority ownership or under 20J0 Paint Line striping & IrJIM/Aiaucto 17. April 18, 20J8 Project Nurnbel P00602 j control by the owners of the bidder's company, are not and have not l been in the past three (3) years, disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3). SEE ATTACHED 1.5 Provide a signed statement, signed under penalty of perjury by a person with authority to act and speak for your company, that within the three- year period immediately preceding the bid solicitation date, your company is not a "willful" violator as defined in RCW 49.48.082, of any provisions of chapters 49.46, 49.48, or 49,52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. SEE ATTACHED SUPPLEMENTAL CRITERIA — Established by the City to determine bidder responsibility 2. ORGANIZATION 2.1 How many years has your organization been in business as a Contractor? 34 YRS. 2.2 How many years has your organization been in business under its present business name? 34YRS. 2.2.1 Under what other or former names has your organization operated? N/A 2.3 If your organization is a corporation, answer the following 2.3.1 Date of incorporation: 4/17/1984 2.3.2 State of incorporation: WASHINGTON 2.3.3 President's name: STEVEN BATEMAN 2.3.4 Vice-president's name(s): N/A 2.3.5 Secretary's name: N/A 2.3.6 Treasurer's name: N/A 2.4 If your organization is a partnership, answer the following: N/A 2.4.1 Date of organization: 2.4.2 Type of partnership (if applicable): 2.4.3 Name(s) of general partner(s): 2.5 If your organization is individually owned, answer the following: N/A 2.5.1 Date of organization: 2.5.2 Name of owner: 2.6 If the form of your organization is other than those listed above, describe it and name the principals: 3. LICENSING 3.1 List jurisdictions and trade categories in which your organization is legally qualified to do business, and indicate license numbers, if applicable. 2018 Pain[Line striping rs RPM/Araucto 12 GENERAL CONTRACTOR April 1R, 2018 Project Number: R00e02 STRIPRI 121 JM I 3.2 List jurisdictions in which your organization's partnership or trade name is filed. WA. STATE 4. EXPERIENCE 4.1 List the categories of work that your organization normally performs with its own forces. PAVEMENT MARKINGS, SEAL COATING, CURBING, SIGNAGE 4.2 Claims and Suits. (If the answer to any of the questions below is yes, please attach details.) 4.2.1 Has your organization ever failed to complete any work awarded to it? NO 4.2.2 Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? NO 4.2.3 Has your organization filed any law suits or requested arbitration with regard to construction contracts within the last five years? NO 4.3 Within the last five years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If the answer is yes, please attach details.) NO 4.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of project, owner, architect or design engineer, contract amount, percent complete and scheduled completion date. SEE ATTACHED 4.4.1 State total worth of work in progress and under contract: SEE ATTACHED 4.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the name of project, owner, architect or design engineer, contract amount, date of completion and percentage of the cost of the work performed with your own forces. SEE ATTACHED 4.5.1 State average annual amount of construction work performed during the past five years: SEE ATTACHED 4.6 On a separate sheet, list the construction experience and present commitments of the key individuals of your organization. SEE ATTACHED 4.7 On a separate sheet, list your major equipment. SEE ATTACHED 5„ REFERENCES 5.1 Trade References: SEE ATTACHED 5.2 Bank References: SEE ATTACHED 5.3 Surety: PROPEL INSURANCE COMPANY 5.3.1 Name of bonding company: MERCHANTS BONDING 5.3.2 Name and address of agent: SEE ATTACHED 2018 Paint Line Striping & RPM/AraUC10 13 April 10, 2016 Project Number: R00602 6. FINANCING 6.1 Financial Statement. After bid opening, the City may require the following financial information from any of the three apparent low bidders. If so required, the selected bidder(s) must respond with this financial information within 24 hours of the City's request for that information. The City's request for this information shall not be construed as an award or as an intent to award the contract. A bidder's failure or refusal to provide this information may result in rejection of that bidder's bid. 6.1.1 Attach a financial statement, preferably audited, including your organization's latest balance sheet and income statement showing the following items: Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses); Net Fixed Assets; Other Assets; Current Liabilities (e,g., accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes); Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings). 6.1.2 Name and address of firm preparing attached financial statement, and date thereof: 6.1.3 Is the attached financial statement for the identical organization named on page one? 6.1.4 If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent- subsidiary). 6.2 Will the organization whose financial statement is attached act as guarantor of the contract for construction? 7. SIGNATURE 7.1 Dated at this TH day of MAY 20M Name of Organization: STRIPE RITE, INC. By ....W ._....... _ .._. Title: PRESIDENT/ STEVEN BATEMAN ......._. 2018 Paint Line striping & RPM/Ai aucto 14 April A8, 2018 Project NUITlber: R00602 I 7,2 Steven Bateman _ being duly sworn, deposes and says that the Information provided herein is true and sufficiently complete so as not to be misleading. ...~ 4 .,, V l, oa tt Notary Public �c Subscribed and sworn befor is this 8t h , day of _ 2018. *'� xyp ¢yWOi)0 P My Commission Expires41 10/29/20 ��� ��o,, o/ ..._......_ otur°� aM ✓f �fi '� ,�C'Y ✓Y,rpv� "'Fti s "11 P . 2018 Paint Line Striping &RPM/Araucto 15 April 18, 2018 Project Number: R00602 Department of Labor and Industries STRIPE RITE INC PO Box 44450 Olympia, WA 98504-4450 Reg: CC STRIPRI121JM UBI: 601-048-084 Registered as provided by Law as: Construction Contractor (CCO1) -GENERAL 328 STRIPE RITE INC Effective Date: 4/14/1988 1813 137TH AVE E Expiration Date: 4/17/2019 SUMNER WA 98390 5/10/2018 STRIPE RITE INC W � w SIA I h Ot WASHINGI ON Department of Labor & Industries Certificate of Workers' Compensation Coverage May 10, 2018 WA UBI No. 601 048 084 L&I Account ID 477,182-01 Legal Business Name STRIPE RITE INC Doing Business As STRIPE RITE INC Workers' Camp Premium Status. Account is current. Estimated Workers Reported Quarter 1 of Year 2018 "76 to 100 Workers" (See Description Below) Account Representative Employer Services Help Line, (360) 902-4817 Licensed Contractor? Yes License No. STRIPR1121JM License Expiration 04/17/2019 What does "Estimated Workers Reported" mean? Estimated workers reported represents the number of full time position requiring at least 480 hours of work per calendar quarter. A single 480 how position may be filled by one person, or several part time workers. Industrial Insurance Information Employers report and pay premiums each quarter based on hours of employee work already performed, and are liable for premiums found later to be due. Industrial insurance accounts have no policy periods, cancellation dates, limitations of coverage or waiver of subrogation (See 1.CNJ,5 11,1.L&. and !.;-l- 1,&1,I Kg)). https./Jsecure.lni.wa.govlverify/Oetallslliabi lityCertiflcate.aspx?U B I=601048084&L IC=STR IPR I121 JM&V IO=&SAW=ralse&ACCT=47718201 1/1 t`Mr. .m„ (414 '.._/ 1 I AIr (If Unified Business ID#: 601048084 Corporation Business ID#: 001 �r Location 0001 STRIPE RITE, INC. Expires. Sep 30, 2018 1813 137TH AVE E SUMNER, WA 98390-9645 UNEMPLOYMENT INSURANCE - ACTIVE INDUSTRIAL INSURANCE -ACTIVE f TAX REGISTRATION #601-048-084 -ACTIVE .v 07 s CITY ENDORSEMENTS: RICHLAND SERVICE BUSINESS #FOC685 -ACTIVE 1 SAMMAMISH GENERAL BUSINESS -ACTIVE ; h� SULTAN GENERAL BUSINESS-ACTIVE �p GIG HARBOR GENERAL BUSINESS -ACTIVE g; ISSAQUAH GENERAL BUSINESS 4BUS03-00209 -ACTIVE TUMVVATER GENERAL BUSINESS 9R-005141 -ACTIVE ;. SPOKANE VALLEY GENERAL BUSINESS - ACTIVE MARYSVILLE GENERAL BUSINESS #0484CON500 -ACTIVE SHORELINE GENERAL BUSINESS -ACTIVE p ANACORTES GENERAL BUSINESS - ACTIVEa SUMNER GENERAL BUSINESS #BUS2002-408 - ACTIVE BONNEY LAKE GENERAL BUSINESS - ACTIVE << LAKE STEVENS GENERAL BUSINESS - ACTIVE COVINGTON GENERAL BUSINESS#BL03-257 -ACTIVE STANWOOD GENERAL BUSINESS #100137 - ACTIVE LONG BEACH GENERAL BUSINESS 411773- ACTIVE , PROSSER GENERAL BUSINESS - ACTIVE BLAINE GENERAL BUSINESS - ACTIVE i FIRCREST GENERAL BUSINESS - ACTIVE LONGVIEW GENERAL BUSINESS 4760918 - ACTIVE EATONVILLE GENERAL BUSINESS - ACTIVE Ih d i umenl li Iv [he rel;'ulr�[I m nrinr t nu II5 and h ne-Wirth v mJ for the Main,', /`/{y�^� I " mid aliflul By aapung lhiv di u�ucnl,the hrrn u.<<rlihi the inlet nti ilnii the ypphcallun ����/..�'�-✓� ��iw��� ���� ie v.a ....plcic hw and nunlo I i Iht h l i h or h�r I nut h dl;r, u d II d I i.ins ill 6i Conti ,l d in I ompinna N'iIII dl Wadhind i Iv I Wady and I It' I -ulili m I n { tiw mr McT -nu + r ry ry - Y 8 &o4w.:urnw..o.wiw...«row.w STATE OF WA$MING1 ON n NS6ww;;"in ,-y. ,.�d,.. ,„..uu. BUSINESS LICENSE ll Ati IIN(,fON F Unified Business ID #: 601048084 Corporation Business ID#: 001 r Location: 0001 Ij STRIPE RITE, INC. Expires: Sep 30, 2018 1813 137TH AVE E SUMNER, WA 98390-9645 PORT ORCHARD GENERAL BUSINESS #B000621 -ACTIVE LEAVENWORTH GENERAL BUSINESS - ACTIVE ` PORT TOWNSEND GENERAL BUSINESS#1386 - ACTIVE f OLYMPIA GENERAL BUSINESS #7452 - ACTIVE DUPONT GENERAL BUSINESS #416 - ACTIVE MILTON GENERAL BUSINESS#5468 -ACTIVE CONNELL GENERAL BUSINESS #1858 - ACTIVE { EDGEWOOD GENERAL BUSINESS - ACTIVE UNIVERSITY PLACE GENERAL BUSINESS #1_2602 - ACTIVE NEWCASTLE GENERAL BUSINESS #1482 - ACTIVE f SEDRO WOOLLEY GENERAL BUSINESS - ACTIVE POULSBO GENERAL BUSINESS #896 - ACTIVE 3 ENUMCLAW GENERAL BUSINESS#CUST00005786 - ACTIVE CARNATION GENERAL BUSINESS-ACTIVE I SPOKANE GENERAL BUSINESS -ACTIVE $ BELLINGHAM GENERAL BUSINESS 4018094 - ACTIVE NORTH BEND GENERAL BUSINESS #001829 0-ACTIVE `. FIFE GENERAL BUSINESS - NON-RESIDENT -ACTIVE LACEY GENERAL BUSINESS #2030 - ACTIVE WOODINVILLE GENERAL BUSINESS - ACTIVE KELSO GENERAL BUSINESS - NON-RESIDENT - ACTIVE " MOUNT VERNON GENERAL BUSINESS - NON-RESIDENT - ACTIVE EAST WENATCHEE GENERAL BUSINESS - NON-RESIDENT - ACTIVE ELLENSBURG GENERAL BUSINESS - NON-RESIDENT #13844 - ACTIVE MUKILTEO GENERAL BUSINESS - NON-RESIDENT -ACTIVE PASCO GENERAL BUSINESS - NON-RESIDENT #9345- ACTIVE .G Ylth rinx In1L ni livl he un..au[Ball'AI Iemv�R¢, ;uial1 . r 'milk ru n..I nIil bu " - // ? mwlr ldMtnu^.fkt.vrt pling If,;,d rr.qluttrnl,Ow k lnvs•+trill Ihi !nG�rn r.iso.un llir apq iL,Ill.in G�rvw loalpIvIv, It in Lid xtrau'att lw Illn lwq l w n or hrr Ih.;a^,,�gal Ili nrnlhll Cl rl ilr+'nmllllanir mil h al% IplrRie Ili de W�iIli li7lary Iw � vwnlr. uid+il, p;,lq,lllun,. iuo � .e iia.Itopra4 rain Il i' I.. t„k .S ,,,,,,m. ._ STATE OF ASFIIWGTON ' .. ITZ mW 1 ` BUSINESS LICENSE IML U1 44'iSHlh'G R:7PJ ,i, Unified Business ID #: 601048084 Corporation Business ID #:001 Location: 0001 STRIPE RITE, INC.1813 137TH AVE E Expires: Sep 30, 2018 SUMNER, WA 98390-9645 L1 WEST RICHLAND GENERAL BUSINESS - NON-RESIDENT 41930 -ACTIVE 'd ""i LICENSING RESTRICTIONS: Not licensed to hire minors without a Minor Work Permit. _ r Ij B;F tti I �e- a , r Thu d n:unttnt liar Ihi iegistralu ux ndo,cenwil_, and li<ui I v "d....in d i r IficLnvni a fJj,,r^ "i nanfompl,1.F,7au ep l0d JI l bitid,<u I I"fihr MIi, i.anliL Ih" ill) y"., linmlhvapph'allon ����✓�.���-���' f�� 'eras I �mpl�lc,In;r Ind amuck to the hcsl m Ir nr hur Lnm,h Igr,and Ihil fuslne. ,��ill be iundu lid I i ompliana wdll all "ppl it i�l nlaha n �i � I� ........ n Ir„c nun ....... ,h ,. --. .,... STATa_P`..NJ,P., .'tlJ.CIGTON ..._.,_, _w.. . ..,... -, ._. . . ....„,..,,...._..,..., ,.,..._,...W...,�... TRIPE RITE 5/08/201S City Of Kent 2018 Paint Line Striping & RPM Replacement Project#R00602 Stripe Rite, Inc. is not and has not been in the past (3)years, disqualified from bidding on any public works contract under RCW 39,06.010 or 3912.065 (3) . Steven Bateman / President Stripe Rite, Inc. 1813 137"Ave. E. Sumner, Wa. 98390 Ph: 253.863.2987 Fax: 253,863.3120 www.striperite.com ti"mutimvraa Al E �� jf�l'Outuumrrt���aiimru��i�°,l�Jlfl���� IUIfl�`JJu�I'kF16 , r " g/,I.'("p lY 1 Q l✓FYII6''Mb1�Y1"�'�I �M1�"II��ll✓W�U61 J Iid!�l/N/ry 44444�biYlll�' i11..eH V�.;kp(I' TO: City of Kent FROM: Stripe Rite, Inc. DATE: May 07, 2018 RE: 2018 Paint Line Striping &RPM Replacement Stripe Rite, Inc. has been in the Extruded Curbing and Pavement Marking Business for 33 years. We perform work for customers ranging from the private homeowner to general contractors, along with various cities, counties, and WSDOT. Our key personnel are as follows: Steve Bateman— 42 years in all fields of pavement marking, estimating, scheduling, and all aspects of managing the corporation David Stetson— 46 years in all fields of pavement marking and estimating Dawn Wilhoyte— 32 years in accounting and office management Justin Williams— 14 years in all fields of pavement marking and estimating Frank Artz - 28 years in project management and estimating Jim Johnson— 29 years in project management and estimating Jeff McHugh— 14 years in project management and estimating Jake Bateman - 7 years in project management and estimating Eben Erickson- 25 years in all fields of pavement marking, estimating, scheduling And management Patrick McSorley- 36 years in road construction consisting of estimating, scheduling And management Following are some contracts awarded/completed by Stripe Rite, Inc.;, 2016 PAVEMENT MARKING CONTRACT ($317,808.) 2015 PAVEMENT MARKING CONTRACT ($297,879.) GRAYS HARBOR CNTY 2014 PAVEMENT MARKING CONTRACT($295,235.) TROY FREEMAN 2013 PAVEMENT MARKING CONTRACT ($301,930.) 100 W. BROADWAY 2012 PAVEMENT MARKING CONTRACT ($303,000.) MONTESANO, WA 98563 2011 PAVEMENT MARKING CONTRACT ($283,006.) 360-249-4222 2010 PAVEMENT MARKING CONTRACT ($247,284.) 2009 PAVEMENT MARKING CONTRACT ($240,015.) 2008 PAVEMENT MARKING CONTRACT ($351,086.) 2007 PAVEMENT MARKING CONTRACT ($284,927.) �Tah" RE 77� pwm) "If s � !b h1Pu 2006 PAVEMENT MARKING CONTRACT ($279,476.) 2005 PAVEMENT MARKING CONTRACT ($304,250.) GRAYS HARBOR CNTY 2004 PAVEMENT MARKING CONTRACT ($266,296.) TROY FREEMAN 2003 PAVEMENT MARKING CONTRACT ($197,622.) 100 W. BROADWAY 2002 PAVEMENT MARKING CONTRACT ($207,222.) MONTESANO, WA 98563 2001 PAVEMENT MARKING CONTRACT 360-249-4222 2000 PAVEMENT MARKING CONTRACT 1999 PAVEMENT MARKING CONTRACT 1998 PAVEMENT MARKING CONTRACT 1997 PAVEMENT MARKING CONTRACT 2016 PAVEMENT MARKING CONTRACT ($132,854.) 2015 PAVEMENT MARKING CONTRACT ($127,782.) 2014 PAVEMENT MARKING CONTRACT ($123,425.) PACIFIC COUNTY 2013 PAVEMENT MARKING CONTRACT($106,428.) KAREN BANISH 2012 PAVEMENT MARKING CONTRACT ($82,398.) PO BOX 66 2011 PAVEMENT MARKING CONTRACT ($81,890.) SOUTH BEND, WA 98586 2010 PAVEMENT MARKING CONTRACT ($67,673.) 360-875-9368 2009 PAVEMENT MARKING CONTRACT ($69751.) 2016 PAVEMENT MARKING CONTRACT($220,520.) 2015 PAVEMENT MARKING CONTRACT ($284,224.) 2014 PAVEMENT MARKING CONTRACT ($233,720.) 2013 PAVEMENT MARKING CONTRACT ($231,225.) BENTON COUNTY 2010 PAVEMENT MARKING CONTRACT ($228,434.) NORM CHILDRESS 2009 PAVEMENT MARKING CONTRACT ($212,279.) PO BOX 1001 2008 PAVEMENT MARKING CONTRACT ($194,561.) PROSSER, WA 99350 2007 PAVEMENT MARKING CONTRACT ($202,429.) 2015 CITYWIDE TRAFFIC STRIPING CONTRACT(100,835.) 2009-2012 STRIPING MAINT. CONTRACT ($308,739.) 2005 STRIPING MAINTENANCE CONTRACT ($58,253.) 2004 STRIPING MAINTENANCE CONTRACT ($51,430.) 2003 STRIPING MAINTENANCE CONTRACT ($53,000.) 425-452-4439 2002 PAVEMENT MARKING CONTRACT CITY OF BELLEVUE 2001 PAVEMENT MARKING CONTRACT ROBERT TAMMEN 2000 PAVEMENT MARKING CONTRACT 2901 115TH AVE NE 1999 PAVEMENT MARKING CONTRACT BELLEVUE, WA 98004 �$V1A � Sf111I1 �� �p �a'M�t��"4u� wr�mu4 "� �`1 (�tilWlMOiNidAt1i11NR',i1�1 ,�w 14 1998 PAVEMENT MARKING CONTRACT CITY OF BELLEVUE (CON'T) 1997 PAVEMENT MARKING CONTRACT 2016 PAVEMENT MARKING CONTRACT ($492,997.) 2015 PAVEMENT MARKING CONTRACT ($458,032.) 2014 PAVEMENT MARKING CONTRACT ($442,502.) GRANT COUNTY 2012 PAVEMENT MARKING CONTRACT ($430,121.) PUBLIC WORKS DEPT. 2010 PAVEMENT MARKING CONTRACT ($286,886.) ROD FOLLET 2009 PAVEMENT MARKING CONTRACT ($271,000.) 124 ENTERPRISE ST SE 2008 PAVEMENT MARKING CONTRACT ($244,362.) EPHRATA, WA 98823 509-754-6082 2010—PRESENT PAVEMENT MARKING JBLM BASE WIDE Average $1.1 million per year UNICEN-IMPEX & ALUTIIQ The following are some of our major pieces of equipment used to perform our work: 750 Gal. Capacity Highway Striping Truck 2000 Lb. Capacity Thermoplastic Truck Bituminous RPM Truck Miscellaneous Pick-Up Trucks for Traffic Control Road Pro Grinder/Recessed Cutter Wiltgen Rumble Cutter Sweeper Trucks Sealcoating Applicators Signage Vehicles Walk Behind Line Lazer Paint Machine's Hydroblaster Line Removal Truck "All Equipment is owned by Stripe Rite, Inc." CONTRACTOR REGISTRATION NUMBER - STRIPRI121JM, Expires 04/17/19 UBI NUMBER: 601 048 084, Expires 09/10/18 '4 E rux %�r ��m�ul�� ; 1 f iinmw rN � V wi BANK REFERENCE: COMMENCEMENT BANK, JOHN MANOLIDES 877-284-1880 BONDING COMPANY: MERCHANTS BONDING COMPANY ( MUTUAL) POLICY NO. WA27602 INSURANCE AGENT: SHARNEL DI VONA-PROPEL INSURANCE 253-310-4047 SALES REVENUE 2016 $15.8 MILLION PROFITABLE YEAR 2015 $14.5 MILLION PROFITABLE YEAR 2014 $13.5 MILLION PROFITABLE YEAR 2013 $13.4 MILLION PROFITABLE YEAR OTHER REFERENCES: TUCCI & SONS 4224 WALLER RD. TACOMA, WA 98443 JOE HARRISON 253-922-6676 LAKERIDGE PAVING PO BOX 5430 KENT, WA 98064 JOE HABENICHT 253-631-8290 LAKESIDE INDUSTRIES PO BOX 7016 ISSAQUAH, WA 98027 JUSTIN BOU1N 425-313-2600 BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes I This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (May 8, 2018), the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Stripe Rite, Inc. Bidder` usiness me gi tut of Authorized Official* Steven Bateman Printed Name President Title 5/08/18 Sumner Vila, Date City.............. State ............ ,,,.. * If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner. 2018 Paint Line striping &RPM/Araucto 16 April 18, 201B Project Number: R00602 i PROPOSAL SIGNATURE PAGE The undersigned bidder hereby proposes and agrees to start construction work on the Contract, if awarded to him/her, on or before ten (10) calendar days from the date of the Notice to Proceed, and agrees to complete the Contract within forty (40) working days after issuance of the City`s Notice to Proceed. The City anticipates issuance of Notice to Proceed on or after July 5, 2018. The undersigned bidder hereby agrees to submit all insurance documents, performance bonds and signed contracts within ten (10) calendar days after City awards the Contract. The City anticipates issuance of the Notice to Proceed on the day of the preconstruction meeting. No bidder may withdraw his/her bid for a period of sixty (60) calendar days after the day of bid opening. The required bid security consisting of a bid bond, cashier's check or cash in an amount equal to 5% of the total amount is hereto attached. Notice of acceptance of this bid or request for additional information shall be addressed to the undersigned at the address stated below. J Receipt of Addendum No.'s I to the plans and/or specifications is hereby acknowledged. Failure to acknowledge receipt of the addenda may be considered an irregularity in this proposal. By signing this Proposal Signature Page, the undersigned bidder agrees to accept all contract forms and documents included within the bid packet and to be bound by all terms, requirements and representations listed in the bid documents whether set forth by the City or by the Bidder. DATE: 5/08/18 Stripe Rite Inc FAtlu c of Authorized Representative Steven Bateman / President ..._ r . .....�.._.__.._e.. (Print Name and Title) 1813 137th Ave. E . ........ - — Address Sumner, Wa. 98390 261E Pelnt Line striping & RPM/AraUCt0 17 April 18, 201H Pro1ea Plumber! R00602 PUBLIC WORKS DEPARTMENT Timothy]. LaPorte, P.E. Public Works Director iwinfi 400 West Gowe Kent, WA 98032 IItlN' K E N T Fax: 253-856-6500 W e e re nnu rro n PHONE: 253-856-5500 CITY OF KENT � KING COUNTY, WASHINGTON 2018 Paint Line Striping and RPM Replacement Project Number: R00602 ADDENDUM No. 1 May 1, 2018 FROM: The Office of the City Engineer, Kent Washington TO: All Plan Holders of the Project Specifications and Plans This addendum forms a part of the Contract documents and modifies the Project Proposal and Specifications and Contract Drawings in accordance with the following: ALL CHANGES ARE REFLECTED IN RED - BIDDER"S DOCUMENTS The following changes are included in the attached replacement pages 6 and 7 of the Bidder's Document. Page 7 is included due to the added bid item noted below shifted bid items to the next page. Bidders mus use the replacement pages. ITEM SECTION APPROX. ITEM UNIT TOTAL NO. NO. QUANTITY PRICE AMOUNT 1.002 8 22 5 6,000 Removing Paint I...ine $ WSIDOT LIN FT IPer I...F II -. KENT SPECIAL PROVISIONS Page 8-5 - Section 8-22.3(3)E - Installation REVISE the second sentence as follows: One coat application of paint will be required to complete all paint markings installed over existing paint markings. Two applications of paint will be required to complete all paint markings installed on new surface-treated roadways, on re-channelized street or when centerline markings are revised to double yellow centerline, or as noted o in the Appendix A. Vehicle and pedestrian tracking of newly applied striping shall be 7 removed per section 8-22.3(6), and the affected portion of marking reinstalled by the 3 end of the next working day. Y C Ol Y 1 . a Mayor Dana ......... Page 3-6 - Section 8-22.4 - Measurement ADD the following to this section: I-Im wolle..faL_Ljli� osasm( firni _q I?Ylr`y ti",ICILA'-rill!�gE� fog:.. the. I Jim( (if III- qlftu! Ikz IV - APPENDIX Appendix 2 -Appendix A and Location Maps REPLACE page 4 of 19 of the 2018 Paint Line Striping Contract Location Map, ADD the attached S. 132 Id Ave, SE Re-ChannelIzation Plan. REPLACE the 2018 RPM Replacement Location Map. END OF ADDENDUM No. I Chad Bieren, P.E. Date Deputy Director/City Engineer Attachments: Proposal Pages: 6 and 7 Appendix 2: Page 4 of 19 S. 132"' Ave. SE Re-Channelization Plan 2018 RPM Replacement Location Map 2 BID BOND FORM KNOW ALL MEN BY THESE PRESENTS: That we, Strine Rite- Inc. as Principal, and Merchants Bouding Company(Mutual) , as Surety, are held and firmly bound unto the CITY OF KENT, as Obligee, in the penal sum of Five Perccnt(5'"r'n)of Bid Amount Dollars, for the payment of which the Principal and the Surety bond themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. The condition of this obligation is such that if the Obligee shall make any award to the Principal for 2018 Paint Line Striping and RPM Replacement/ Project Number: R00602 According to the terms of the proposal or bid made by the Principal thereof, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the invitation to bid, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damaged, the amount of this bond. SIGNED, SEALED AND DATED THIS 8th DAY OF May 2018 Strip ,Rite c. o M i nts Bondin , , )Pat], ( usual) S Carley 1)pin u, Att rney-in-Fact 20 Received return of deposit in the sum of $ 2018 Paint Line Striping&RPMAraucto 18 April 18,2018 Project Number:R00602 MLERCHAN BONDING COMPANYn. POWER OF ATTORNEY Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING, INC., i bath being corporations of the State of Iowa(herein collectively called the"Companies")do hereby make,constitute and appoint, individually, Aliceon A Kellner;Annelies M Richie; Brandon K Bush; Brent E Heilesen;Carley Espiritu;Christopher Kinyom Cynthia L Jay; Eric A Zimmerman, Heather L Allen James B Binder;Jamie L Marques',Julie R Truitt;Karen C Swanson;Kyle Joseph Howell Mary S Norrell;Tamara A Ringeisen; Taylor Renee Kornell their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16,2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation, It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner- Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation, In Witness Whereof,the Companies have caused this instrument to be signed and sealed this lgth day of December 2017 ll CO "`+.�q,• PpR" «•«U� �p,p0 'ry"•« MERCHANTS BONDING COMPANY(MUTUAL) .'K. " rp •�,,.Z•.� • ".^y� MERCHANT NATIONAL BONDING,INC. 2003 ws" 1933 ci` By .7y, ....,,,.•�"�' «' resident y STATE OF IOWA «"•«.r......rr• `'"««ee«"«� COUNTY OF DALLAS as. On this this 19th day of December 2017 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies;and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. E ALICIA K.GRAMCommission Number 767430 My Commission Expires April 1,2020 Notary Public (Expiration of notary's commission does not invalidate this instrument) I,William Warner,Jr., Secretary of MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING, INC.,do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 6th day of May 2016 �t-IO.."' q�NG Cp ti Qt P D/p4 yy+u ql p 4✓* ,iffy : X '•. 2003 ; r , 1933 ;w Secretary «"' f� •... ... a,",•' «. pry$ .,(y...•� tCy« POA 0018 (3/17) "'.........•++" ''+•«.»•' CITY OF KENT COMBINED DECLARATION FORM: NON-COLLUSION, MINIMUM WAGE NON-COLLUSION DECLARATION I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States that the following statements are true and correct: 1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. 2. That by signing the signature page of this proposal, I am deemed to have signed and to have agreed to the provisions of this declaration. AND MINIMUM WAGE AFFIDAVIT FORM 1, the undersigned, having duly sworn, deposed, say and certify that in connection with the performance of the work of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of such work not less than the prevailing rate of wage or not less than the minimum rate of wage as specified in the principal contract; that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. 2018 Paint Line Striping and RPM Replacement Project Number: R00602 _... ..... -- _ ....,...v NAME OF PROJECT Stripe Rite Inc. ......... ....... .... ... _.. ...._ ._.............. ...._._. . .... NAME OF BIDDER'S FIRM .: --- -. (Steven Bateman .__..._ E *IGNrATURE OF AUTHORIZED REPRESENTATIVE OF BIDDER 2018 Paint Line Striping U' RPMJAraucto 19 April 18, 2018 Project Number. R00602 � � This change order form is for example purposes only. By submitting a bid, the bidder agrees to be bound by the terms of this change order form for any change orders. CHANGE ORDER NO. (Enter # lv21 3vetc"] NAME OFCONTKACT0K� ("Contractor") CONTRACT NAME & PROJECT NUMBEK: � ORIGINAL CONTRACT DATE: | This Change Order amends the above-referenced contract; all other provisions of the � � contract that are not inconsistent with this Change Order shall remain in effect, For valuable consideration and by mutual consent nfthe parties, the project contract ismodified as follows: 1. Section l of the Agreement, entitled "Description of Work," is hereby modified to add additional work nr revise existing work asfollows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: [Insert detailed description of additional materials, services, etc., that are needed which necessitate this change order Be as detailed as possible. You may also refer to an attached exhibit, but clearly identify the exhibit by title and date] 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, ^[unnpenyaUnn,'' are hereby modified as follows: Original Contract Sum, $ - � �_ alternatesd sChange0rdersCurrent Contract (incl. applicable WSST) Amount � moxsChangeOndend -- ' _ Applicable WSST Tax on this 6arge Order Revised Contract Sum 2o10 Paint Line Striping uxpw/xauc,o 20 April 1o, /o10 Project Number nnoaoz 'i Original Time for Completion (insert date) Revised Time for Completion under prior Change Orders (insert date) Days Required (t) for this Change working days Order Revised Time for Completion (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent Special Provisions and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By ..�' _ - BY rpn�aoec ._._.... _. ... ( ���(Signature) Print Name: Steven Bateman Print Name Timnthv 1 I aPartE- P F_ .,.. .__..�_.....,.. ._.w.,. President - -i" " ' Its .........__ ....... _...... ....... Its ... ........ . Puhli Wnrka f)iCector ......_... (title) (title) DATE: 5108118 DATE: APPROVED AS TO FORM: (applicable ifMay„r's signature required) Kent Law Department 2018 faint Line Striping [s RI'M/Araucto 21 April lfi 2018 PI'Uject Number', R00602 BIDDER'S CHECKLIST ' The following checklist is a guideline to help the Contractor make sure all forms are complete. The bidder's attention is especially called to the following forms. Failure to execute these forms as required may result in rejection of any bid. Bidder's Package should include the following: Bid Document Cover Sheet filled out with Bidder's Name .................... Orderof Contents.................................................................................E' Invitationto Bid..................................................................................J:I- Contractor Compliance Statement........................................................a- Date............................................................................................E Y Have/have not participated acknowledgment..............................0 Signature and address .................................................................0' Declaration - City of Kent Equal Employment Opportunity Policy ........ZT' Date and signature .....................................................................14� Administrative Policy ...........................................................................El- Proposal...............................................................................................E� First line of proposal - filled in ...................................................4T Unit prices are correct ................................................................C3� Subcontractor List (contracts over $100K) ...........„.............................AEI" Subcontractors listed properly....................................................&A Signature .....(......... . .......... . .....„....')....... ...................,,..,...,.a, Subcontractor List contracts over 1 million Z Subcontractors listed properly...................................................e , Dateand signature ......................................................................1� Contractor's Qualification Statement ,,,,,,,,,„„„„.... ,,,,,. „,,„.„,,,.........*.....` r Complete and notarized ............................................................... of Compliance with Wage Payment Statutes....................p' Proposal Signature Page ......................................................................0'" AllAddenda acknowledged .........................................................E]', Date, signature and address .......................................................0- BidBond Form .....................................................................................0, Signature, sealed and dated .......................................................[I Powerof Attorney.......................................................................El" (Amount of bid bond shall equal 5% of the total bid amount) Combined Declaration Form................................................................... Signature...................................................................................�8' ChangeOrder Form.............................................................................�iS Bidder's Checklist ............................................................................... 13� The following forms are to he executed after the Contract is awarded: A) CONTRM-71' This agreement is to be executed by the successful bidder. 8) I"AYMfNfj- ND,PER ORMANCE11B.0 Np To be executed by the successful bidder and its surety company. The following form is to be executed ysflef the Contract is completed: A) CITY Of,KEN E(,'`UAL.EMPLQyMC Ni QPpQ,RTUN1 TM COMP&G"1�EQ'aF, �}I rh1f_(�'i,�N'E; To be executed by the successful bidder AFTER COMPLETION of this contract. 2018 Paint Line Striping & RPM/Araucto 22 APril 18, 2018 Project Number: R00602 PAYMENT AND PERFORMANCE BOND ' T TO CITY OF KENT Bond No. WAC54851 KNOW ALL MEN BY THESE PRESENTS: That we, the undersigned, Stripe Rite Inc. as Principal, and Merchants Bonding Company (Mutual) a Corporation organized and existing under the laws of the State of VVWAXiaxgx> * as a Surety Corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of $256,85500 , together with any adjustments, up or down, in the total contract price because of changes in the contract work, for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. "Iowa This obligation is entered into in pursuance of the statutes of the State of Washington, and the Codes and Ordinances of the CITY OF KENT. Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to a motion, duly made, seconded and passed by the City Council of the City of Kent, King County, Washington, the Mayor of the City of Kent has let or is about to let to the above bounden Principal, a certain contract, the said contract providing for construction of 2018 Paint Line Striping and RPM Replacement/Project Number: R00602 (which contract is referred to herein and is made a part hereof as though attached hereto), and WHEREAS, the Principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for in the manner and within the time set forth: NOW, THEREFORE, for non-FHWA projects only, if the Principal shall faithfully perform all the provisions of said contract in the manner and within the time herein set forth, or within such extensions of time as may be granted under the said contract, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work and shall indemnify and hold the CITY OF KENT harmless from any damage or expense by reason of failure of performance as specified in said contract or from defects appearing or developing in the material or workmanship provided or performed under said contract, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their separate seals. The name and corporate seal (if required by law) of each corporate party is hereto affixed and duly signed by its undersigned representatives pursuant to authority of its governing body. 201E Paint Line Striping & RPM/Ara LIC[n 23 April 18, 2018 Project Number R00602 TWO WITNESSES: Stripe Rite, Inc. j PRINCIPAL (enter principal's narre above) WAa�. ..... TITLE: ..., .P.�a1ta) 14IGwhly DATE: 05/21/2018 ... DATE: 05/21/2018 ;L u - CORPORATE SEAL: 4 ` PRINT NAME DATE:05/21/2018 Merchants Bonding Company (Mutual) SURETY CORPORATE SEAL: BY: C . piritu � DATE: 0 5/2 1/2018 TITLE: Attorney-in-Fact ADDRESS: 5400 Carillon Point Kirkland, WA 98033 CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within Bond; that Who signed the said bond on behalf of the Principal of the said Corporation; that I know his signature thereto is genuine, and that said Bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. SECRETARY OR ASSISTANT SECRETARY 2018 Paint Line Striping & RPM/Araucto 24 April 18, 2018 Project Number; R00602 M BONDING COMPANY,. POWER OF ATTORNEY i Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING, INC., I both being corporations of the State of Iowa(herein collectively called the"Companies")do hereby make,constitute and appoint, individually, Aliceon A Kellner,Annelies M Richie; Brandon K Bush, Brent E Heilesen;Carley Espiritu;Christopher Kinyon;Cynthia L Jay; Eric A Zimmerman; Heather L Allen;James B Binder, Jamie L Marques; Julie R Truitt;Karen C Swanson; Kyle Joseph Howat;Mary S Norrell;Tamara A Ringeisen; Taylor Renae Kornell their true and lawful Altorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc_on October 16,2015„ "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances,contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the Stale of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner- Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation_ In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 19th day of December 2017 .�,µpOR4 �4�;y ,.�r,y`�©T p 0,9%.7/^p'6a MERCHANTS BONDING COMPANY(MUTUAL) F� MERCHANTS NAT50NAL BONDING, INC. 2aa3 :y 1933 c. By ((( w e .. +y�1,s 4M ..g4 • 1,.'ti.e« preSadenl STATE OF IOWA °Y""®^" " COUNTY OF DALLAS ss. On this this 19th day of December 2017 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies;and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. o"s�t IA ALICIA K.GRAM t Commission Number767430 , "r My Commission Expires �r y April 1,2020 Notary Public (Expiration of notary's commission does not invalidate this instrument) I,William Warner,Jr.,Secretary of MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING, INC.,do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 21st day of May 2018 t 1011"". �,e 0,4111 C0,114. tv Qr 41 @".. Secretary POA 0018 (3/17) " "'"ye CONTRACT j THIS AGREEMENT, is entered into between the CITY OF KENT, a Washington municipal corporation ("City"), and Stripe Rite. Inc. organized under the laws of the State of Washn„gton located and doing business at 1A1 1 -�7th Ayp F,a CiimnpL WA WR qf1 ("Contractor"). WITNESS:. In consideration of the terms and conditions contained in this Agreement and in the project documents, plans, and specifications all of which are a part of this Agreement, the parties agree as follows: 1. The Contractor shall do all work and furnish all tools, materials, and equipment for: 2018 Paint Line Striping and RPM Replacement/Project Number: R00602 in accordance with and as described in the Contract and shall perform any alterations in or additions to the work provided under the Contract and every part thereof. The Contract shall include all project specifications, provisions, and plans; the City's general and special conditions; the 2018 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations, if applicable ("Standard Specifications"); the City's bid documents; and the Contractor's response to the City's bid. The Contractor is responsible to obtain copies of the 2018 WSDOT Standard Specifications including the latest amendments issued by WSDOT as of the date of bid opening. Unless otherwise directed by the City, work shall start within ten (10) days after the City issues its Notice to Proceed and be completed within forty (40) working days after issuance of the City's Notice to Proceed. The City anticipates issuance of Notice to Proceed on or after July 5, 2018. The Contractor shall provide and bear all expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing all the work provided for in the Contract, except where the specifications allocate that responsibility to the City. 2„ The City hereby promises and agrees with the Contractor to employ, and does employ, the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the Contract and the terms and conditions herein contained and hereby contracts to pay for the same according to the Contract and the schedule of unit or itemized prices provided by Contractor in its response to the City's bid, at the time and in the manner and upon the conditions provided for in the Contract. 3. The Contractor for itself, and for its heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all covenants herein contained upon the part of the Contractor. 4. It is further provided that no liability shall attach to the City by reason of entering into this contract, except as expressly provided herein. 2018 Paint Line Striping & RPM/Araucto 25 April 18, 2018 Project Number: R00602 5. Contractor shall defend, indemnify, and hold the City, its officers, officials, employees, agents, volunteers and assigns harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this contract, except for injuries and damages caused by the sole negligence of the City. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competentjurisdiction determine that this contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL 6NSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this contract. 6. Contractor agrees, upon the City's written demand, to make all books and records available to the City for inspection, review, photocopying, and audit in the event of a contract related dispute, claim, modification, or other contract related action at reasonable times (not to exceed three (3) business days) and at places designated by the City. 7, The Contractor shall procure and maintain, during the term of construction and throughout the specified term of maintenance, insurance of the types and in the amounts described in Exhibit A attached and incorporated by this reference. 8, Contractor is responsible for locating any underground utilities affected by the work and is deemed to be an excavator for purposes of RCW Ch. 19.122, as amended. Contractor shall be responsible for compliance with RCW Ch. 19,122, including utilization of the "one call" locator service before commencing any excavation activities. 2018 Paint Line striping & RPM/Araucto 26 April 18, 2018 Project Number. R00602 j CITY OF KENT DANA RALIPH, MAYOR DATE: ATT ST`r KIMBERLEY . KOM( ERK APPROVED AS TO FORM: KENT LAW DEPARTMENT CONTRACTOR BY: � PRINT NAME: � f, eX\ TITLE: `Prp'S lie ' DATE: ----)J( 8 Il� 2018 Paint Line Striping & RPM/Araucto 27 April 18, 2018 Project Number: R00602 EXHIBIT A INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Mmirnum Scope of Insurance Contractor shall obtain insurance of the types described below: 1, Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 or its equivalent, with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. The Commercial General Liability insurance shall be endorsed to provide the Aggregate per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an Additional Insured under the Contactor's Commercial General Liability insurance policy with respect to the work performed for the City. All endorsements adding Additional Insureds shall be issued on form CG 20 10 11 85 or a form deemed equivalent, providing the Additional Insureds with all policies and endorsements set forth in this section. 2. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1 . Commercial General Liability insurance shall be written with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. 2018 Paint Line striping & RPM/Araucto 28 April 18, 2016 Project Number. R00602 EXHIBIT A (Continued) 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1 ,000,000 per accident. C. Other insurance Pr•ovisians, The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability: 1 . The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Contractor's Insurance for other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. E. Waiver of Subrogatiori The Contractor and the City waive all rights against each other any of their Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. 2018 Paint Line striping & RPM/Araucto 29 April 18, 2018 Project Number, R00602 EXIT l B 1 T A (Continued) i F. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. G. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. H„ Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. 2018 Paint Line striping & RPM/Araucto 30 April 18, 2018 Project Number: R00602 Client#: 25674 STRIRITE ACORDTM CERTIFICATE OF LIABILITY INSURANCE DATE(MM()D(YYYY) 511 812 01 8 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED ! REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. PORTANT: If the ate h INSURED, certificolder is an ADDITIONAL INSUREe policy(ies)must have ADD ITIONAL DITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsements). PRODUCER CONTAC' Sharnel Di Vona NAME' Propel Insurance PHONE -__-- FAX (AIC.No Ext1 800 499 0933 IAIG Si577-1326 Tacoma Commercial Insurance €MA¢L" """"""._. AUOREss, Sharnel.DivOila@PrOpolinsurance.com prapelinsurance.com 1201 Pacific Ave,Suite 1000 Tacoma,WA 964U2 INSURERS),AFFORDING COVERAGE NAICN ......._ --,... ...... .........._.......... INSURERA co...... Immsurancccomy.,�y 10804 INSURED Stripe Rite Inc. INSURER B.EvauslOnl men ancccoyy 35378 ___-- 1813137th Ave E INSURERc: Sumner,WA 98390 INSURER D: INSURER E INSURER COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS I NSR ADGL SUBR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE IN SR Ave POLICY NUMBER IMMIDDIVVYVI IMMIDDIYVYYL LIMITS A X COMMERCIAL GENERAL LIABILITY CPAGO13651 4111/2018 04/11/2019 EACH�O,�CCJRRENCE 51,000,000 CLfJMS MALE I X1 OCCUR kRE A M ES fRESI11I bN ... e2 !(anon) .,,.. 500,000 X PD Ded:1,000 MeD exP lnnv o(n person) S10,000 �AA P E R ynAI&ADV INJURY S 1 0001000 GENERAL GRE CO UP 52,000,000 PRO UGIFS AAUTomosaE�ua�IU LIABILITY nr�l E_u� Efr,r!` CPA6013651 41111201804/11/201� gNMIeIr.�„at('Irvc;I�r'I Nl�il 1000000- 4Fldm,al S . X ANY AUTO BODILY INJURY(Per permO I H I RED NOON ONED IIRrPF: SnitlV(E rarr ne rp.. Hnol I Y INJU _ Ar0"ONEY AUEO, MMA`ML X AUf0 ONLY X q t S X A0001 10113 A X UMBRELLA LAB X OCCUR CPA6013651 4/11/2018 041111201EI E ACA I OccURRl NC E s5.000.000 EXCESS LIAR ,CLAIMS MADF AGGRE Cd IT $5.000.000, LLD � X�RLTH MrIcn+y0... a _. _...... ......___ ........_ A ANY fEMPREY EMPLOYERS �ILR I ORF WORKERS CO WA Stop Gap only f � IA AND EMPLOYERS LIABILITY a ua.e,. ...... ., (:l RYWATIfNERIEXECUTIVE YIN CPA6013651 4/11/2018 041111201° E L FACHAC(IDE Nr s1 000,000 OFFICERIMEMMI-REXCITUDED^ � NIA -- -" - - (MapdalocyinNi E.I. DISEASE-EAEMELOY11 T1,000,000 If yes,describe((del "-- _ DescRIPTONOFOPERATONSbAL, EL LISEASE POucr uMlT s1,000,000 B "Contractors MKLV5ENV100852 4/11/2018 041111201E $2,000,000 CPL&TPL Pollution Liab. $5,000 deductible incl Mold DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be allached if more space is required) RE: 2018 Paint Line Striping &RPM Replacement/R00602. CERTIFICATE HOLDER CANCELLATION City of Kent SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 400 West GOWe ACCORDANCE WITH THE POLICY PROVISIONS. Kent,WA 98032 AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION.All rights reserved, ACORD 25(2016103) 1 of 1 The ACORD name and logo are registered marks of ACORD #S3198391/M3181946 KTR00 COMMERCIAL GENERAL LIABILITY CL CG FS 01 09 08 i Policy Number: CPA 6013651 -25 SCHEDULE OF FORMS AND ENDORSEMENTS The following Declarations, Coverage Forms, Conditions, and Endorsements are applicable to: Commercial General Liability State' Number Edition Description ALL B CG IDS 01 10-2001 Commercial General Liability Declarations ALL CL CG 99 32 01-2015 Commercial General Liability Supplemental Declarations Schedule ALL CL CG FS 01 09-2008 Schedule of Forms and Endorsements ALL CG 00 01 04-2013 Commercial General Liability Coverage Form ALL CG 01 97 12-2007 Washington Changes- Employment- Related Practices Exclusion ALL CG 03 00 01-1996 Deductible Liability Insurance ALL CG 04 35 12-2007 Employee Benefits Liability Form ALL CG 04 42 11-2003 Stop Gap - Employers Liability Coverage Endorsement-Washington ALL CG 04 50 05-2008 Washington Changes-Who Is An Insured ALL CG 20 12 04-2013 Additional Insured - State Or Governmental Agency Or Subdivision Or Political Subdivision - Permits Or Authorizations ALL CG 21 09 06-2015 Exclusion - Unmanned Aircraft ALL CG 21 54 01-1996 Exclusion - Designated Operations Covered By A Consolidated (Wrap - Up) Insurance Program ALL CG 21 75 01-2015 Exclusion of Certified Acts of Terrorism & Exclusion of Other Acts of Terrorism Committed Outside The United States ALL CG 21 86 12-2004 Exclusion - Exterior Insulation And Finish Systems ALL CG 21 96 03-2005 Silica Or Silica - Related Dust Exclusion ALL CG 22 92 12-2007 Snow Plow Operations Coverage ALL CG 26 77 12-2004 Washington - Fungi or Bacteria Exclusion ALL CL CG 00 20 01-2012 Contractor General Liability Platinum Endorsement ALL CL CG 00 48 01-2013 Continuing Damage Coverage Assurance ALL CL CG 01 14 09-2016 Primary and Noncontributory-Other Insurance Condition (Additional Insured) ALL CL CG 01 74 09-2016 Amendment of Insured Contract Definition ALL CL CG 02 02 01-2012 Notice Of Cancellation To Designated Person(s)Or Organization(s) Other Than The Named Insured ALL CL CG 04 52 08-2016 Electronic Data Liability (When There is Physical Injury to Tangible Property) ALL CL CG 04 92 09-2016 General Liability Ultra Plus Endorsement ALL CL CG 05 29 10-2017 General Liability Ultra Platinum Enhancement Coverages ALL CL CG 20 69 09-2016 Additional Insured - Contractors -Ongoing and Completed Operations - Scheduled Person(s) Or Organization(s) -Acts or Omissions ALL CL CG 20 70 09-2016 Additional Insured -Contractors - Ongoing and Completed Operations- Scheduled Person(s) or Organization(s) ALL CL CG 20 71 09-2016 Additional Insured -Owners, Lessees, Contractors or Others - Completed Operations-Automatic Status, Including Primary Noncontributory ALL CL CG 21 08 07-2002 Asbestos Exclusion ALL CL CG 21 45 11-2010 Exclusion - Lead Exclusion ALL CL CG 24 01 09-2016 Bodily Injury Redefined ALL CL CG 99 30 09-2016 Waiver Of Transfer Of Rights Of Recovery Against Others To Us As Required By Virtue Of A Written Contract When the word'ALL"appears in the state column, the farm applies to all states on the policy. CL CG FS 01 09 08 Page 1 of 1 COMMERCIAL LIABILITY UMBRELLA CL CU FS 01 09 08 Policy Number: CPA 6013651 -25 SCHEDULE OF FORMS AND ENDORSEMENTS The following Declarations, Coverage Forms, Conditions, and Endorsements are applicable to: Commercial Umbrella State' Number Edition Description ALL B CU DS 01 09-2016 Commercial Liability Umbrella Declarations ALL CL CU FS 01 09-2008 Schedule of Forms and Endorsements ALL CL CU 0003 01-2013 Continuing Damage Coverage Assurance ALL CL CU 1056 09-2016 Amendment Of Insured Contract Definition ALL CL CU 21 05 03-2008 Driver Exclusions ALL CL CU 21 67 01-2007 Exclusion Punitive Damages ALL CL CU 21 75 01-2007 Exclusion - Lead ALL CL CU 22 11 09-2016 Asbestos Exclusion WA ALL CL CU 22 23 09-2016 Exclusion - Electronic Data Liability ALL CL CU 22 76 09-2015 Exclusion - Cyber Liability ALL CL CU 24 04 01-2007 Changes - Premium Audit ALL CL CU 2405 12-2016 Per Location, Per Project And Products-Completed Operations Aggregate Limits Of Insurance ALL CL CU 24 16 01-2007 Employee Benefits Liability Coverage ALL CL CU 24 70 09-2016 Additional Insured - Primary Non Contributory ALL CL CU 2473 09-2016 Waiver of Transfer of Rights of Recovery Against Others to Us as Required by Virtue of a Written Contract ALL CL CU 9942 06-2008 Contractors Limitation Endorsement ALL CU 00 01 04-2013 Commercial Liability Umbrella Coverage Form ALL CU 01 21 09-2000 Washington Changes ALL CU 01 24 12-2001 Washington Changes- Employment-Related Practices Exclusion ALL CU 21 23 02-2002 Nuclear Energy Liability Exclusion Endorsement ALL CU 21 35 01-2015 Exclusion of Certified Acts of Terrorism and Exclusion of Other Acts of Terrorism Committed Outside The United States ALL CU 21 42 12-2004 Exclusion - Exterior Insulation And Finish Systems ALL CU 21 50 03-2005 Silica Or Silica-Related Dust Exclusion ALL CU 21 71 06-2015 Exclusion - Unmanned Aircraft ALL CU 21 86 05-2014 Exclusion -Access or Disclosure of Confidential Or Personal Information and Data-Related Liability-With Limited Bodily Injury Exception ALL CU 21 90 11-2016 Public or Livery Passenger Conveyance and On-Demand Delivery Services Exclusion ALL CU 24 14 09-2000 Fellow Employee Auto Coverage ALL CU 24 32 04-2013 Limited Coverage Territory ALL CU 26 77 12-2004 Washington - Fungi Or Bacteria Exclusion 'When the word"ALL"appears in the state column, the form applies to all states on the policy, CL CU FS 01 09 08 Page 1 of 1 COMMERCIAL AUTO CL CA FS 01 09 08 Policy Number: CPA 6013651 -25 I SCHEDULE OF FORMS AND ENDORSEMENTS The following Declarations, Coverage Forms, Conditions, and Endorsements are applicable to; Commercial Auto State* Number Edition Description ALL B CA DS 03 06-2015 Business Auto Declarations ALL CL CA FS 01 09-2008 Schedule of Forms and Endorsements ALL CA 00 01 10-2013 Business Auto Coverage Form ALL CA 01 35 10-2013 Washington Changes ALL CA 04 44 10-2013 Waiver of Transfer of Rights of Recovery Against Others to Us (Waiver of Subrogation) ALL CA 20 48 10-2013 Designated Insured For Covered Autos Liability Coverage ALL CA 21 34 10-2013 Washington Underinsured Motorists Coverage ALL CA 23 45 11-2016 Public Or Livery Passenger Conveyance And On-Demand Delivery Services Exclusion ALL CA 23 92 10-2013 Washington Exclusion of Terrorism ALL CA 23 94 10-2013 Silica Or Silica-Related Dust Exclusion For Covered Autos Exposure ALL CA 99 03 10-2013 Auto Medical Payments Coverage ALL CA 99 89 05-2001 Washington Loss Payable Form Reg-335 ALL CL CA 01 08 02-2015 Asbestos Exclusion ALL CL CA 01 49 06-2017 Commercial Automobile Expansion Endorsement Platinum When the word"ALL"appears in the state column, the form applies to all states on the policy, CL CA FS 01 09 08 Page 1 of 1 COMMERCIAL GENERAL LIABILITY CL CG 04 92 09 16 i THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. GENERAL LIABILITY ULTRA PLUS ENDORSEMENT This endorsement modifies insurance provided under the following; COMMERCIAL GENERAL LIABILITY COVERAGE PART SUMMARY OF COVERAGE EXTENSIONS Provision Name Of Coverage Extension Included or Limit of Insurance ... ............................._.................... A. Miscellaneous Additional Insureds Included _.... .. _......__tend ................ B. Expected Or Intended Injury Or Damage Included C. Knowledge Of Occurrence Included D......... Legal—Liability—Damage To Premises Rented To You (Fire, Lightning, $300,000 Explosion. Smoke. Or L_e_aka_oe From Automatic Fire Protective Svstems) E, Medical Payments $10,000 F. Mobile Equipment Redefined Included ............._._.._.................... .......- G. Newly Formed Or Acquired Organization, Partnership Or Limited Liability Included Companv And Extended Period Of Coverage H. Who Is An Insured—Amendment Included � ..... ry„ Non-Owned Watercraft (Increased to maximum length of less than 51 Included feet) .................._..... ...... J. Supplementary Payments—Increased Limits 1. Bail Bonds $ 3,000 2. Loss Of Earnings $ 1,000 K. Unintentional Omission Or Unintentional Error In Disclosure Included L. Waiver Of Transfer Of Rights Of Recovery Against Others Included _........._.w........................... —................. M. Liberalization Clause Included ......,__-w........................ ._..__ � ..._..._..._.___.d.......,.............. , N, Incidental Medical Malpractice Included The above is a summary only. Please consult the specific provisions that follow for complete information on the extensions provided. The provisions of the Commercial General Liability additional insured on your policy, provided Coverage Part apply except as otherwise provided in that: this endorsement. This endorsement applies only if a. The written contract or written agreement such Coverage Part is included in this policy. Is A. MISCELLANEOUS ADDITIONAL INSUREDS (1) Currently in effect or becoming 1. Section II —Who Is An Insured is amended effective during the term of this to include as an insured any person or policy, and organization (referred to as an additional insured below) described in Paragraphs (2) Fully executed by you and the A.1.c.(1) through A.1.c.(8) below when you additional insured prior to the "bodily and such person or organization have agreed injury", 'property damage" or "per- in writing in a contract or agreement that sonal and advertising injury'. such person or organization be added as an CL CG 04 92 09 16 Includes copyrighted material of Insurance Services Office, Inc., Page 1 of 7 with its permission b. The insurance afforded by this provision performed by or on behalf of does not apply to any person or such additional insured. organization included as an additional (q) Lessor Of Leased Equipment insured by a separate endorsement issued by us and made a part of this Any person(s) or organization(s) policy or coverage part. from whom you lease equipment but c. Only the following persons or organi- only with respect to liability for"bodily zations are additional insureds under this injury", "property damage" or "per- provision, with coverage for such sonal and advertising injury" caused, additional insureds limited as provided in whole or in part, by your herein: maintenance, operation or use of equipment leased to you by such (1) Managers Or Lessors Of Premises person(s) or organization(s). A manager or lessor of premises but A person's or organization's status only with respect to liability arising as an additional insured under this out of the ownership, maintenance or endorsement ends when their written use of that part of the premises contract or written agreement with leased to you and subject to the you for such leased equipment ends. following additional exclusions'. This insurance does not apply to any This insurance does not apply to: "occurrence" which takes place after (a) Any "occurrence" which takes the equipment lease expires. place after you cease to be a (5) State, Municipality, Governmental tenant in that premises. Agency Or Subdivision Or Other (b) Structural alterations, new con- Political Subdivision — Permits Or Authorizations Relating To struction or demolition operations performed by or on behalf of Premises such additional insured. Any state, municipality, govern- (2) Mortgagee, Assignee Or Receiver mental agency or subdivision or other political subdivision subject to A mortgagee, assignee, or receiver the following additional provisions: but only with respect to their liability (a) This insurance applies only with as mortgagee, assignee, or receiver and arising out of the ownership, respect to maintenance, or use of a covered (i) The following hazards for premises by you. which the state, municipality, This insurance does not apply to governmental agency or structural alterations, new con- subdivision or other political struction or demolition operations subdivision has issued a performed by or on behalf of such permit or authorization in additional insured. connection with premises you own, rent or control and (3) Owners Or Other Interests From to which this insurance Whom Land Has Been Leased applies' An owner or other interest from (1.1) The existence, whom land has been leased to you maintenance, repair, but only with respect to liability construction, erection arising out of the ownership, mainte- or removal of adver- nance or use of that part of the land tising signs, awnings, leased to you and subject to the canopies, cellar following additional exclusions: entrances, coal holes, This insurance does not apply to driveways, manholes, marquees, hoist away (a) Any "occurrence" which takes openings, sidewalk place after you cease to lease vaults, street banners that land. or decorations and (b) Structural alterations, new con- similar exposures: or struction or demolition operations CL CG 04 92 09 16 Includes copyrighted material of Insurance Services Office, Inc, Page 2 of 7 with its permission (1.2) The construction, erec- The insurance afforded the tion or removal of vendor does not apply to: elevators; or Oi "Bodily in urY or "property (1.3) The ownership, main- damage" for which the tenance or use of any vendor is obligated to pay elevators covered by damages by reason of the this insurance. assumption of liability in a (ii) Operations performed by you written contract or written or on your behalf for which agreement. This exclusion the state, municipality, does not apply to liability for governmental agency or damages that the vendor subdivision or other political would have in the absence of subdivision has issued a the written contract or written permit or authorization. agreement; (b) This insurance does not apply to (ii) Any express warranty unau- "bodily injury", "property dam- thorized by you; age" or"personal and advertising (iii)Any physical or chemical injury" arising out of operations change in the product made performed for the state, munici- intentionally by the pality, governmental agency or vendor, subdivision or other political subdivision. (iv) Repackaging, except when unpacked solely for the (6) Controlling Interest purpose of inspection, Any person(s) or organization(s) with demonstration, testing, or the a controlling interest in the Named substitution of parts under Insured but only with respect to their instructions from the manu- facturer, and then ability arising out of: repackaged in the original (a)Their financial control of you; or container; (b) Premises they own, maintain or (v) Any failure to make such control while you lease or occupy inspections, adjustments, these premises. tests or servicing as the This insurance does not apply to vendor has agreed to make structural alterations, new con- or normally undertakes to make in the usual course of struction or demolition operations performed by or for such person(s) business, in connection with or organization(s). the distribution or sale of the products; (7) Co-Owner Of Insured Premises (vi) Demonstration, installation, A co-owner of a premises co-owned servicing or repair opera- by you and covered under this tions, except such operations insurance but only with respect to the performed at the vendor's co-owner's liability as co-owner of premises in connection with such premises. the sale of the product; (8) Vendors (vii) Products which, after distri- (a) Any person(s) or organization(s) bution or sale by you, have been labeled or relabeled or (referred to as vendor), but only with respect to "bodily injury" or used a container, part or "property damage" arising out of ingredient of any other thing or substance by or for the ..your products" which are distributed or sold in the regular vendor; or course of the vendor's business. CL CG 04 92 09 16 Includes copyrighted material of Insurance Services Office, Inc., Page 3 of 7 with its permission (viii)"Bodily injury" or "property 3. With respect to the insurance afforded to the damage" arising out of the additional insureds within this Provision A. sole negligence of the Miscellaneous Additional Insureds, the vendor for its own acts or following is added to Section III — Limits Of omissions or those of its Insurance'. employees or anyone else The most we will pay on behalf of the ever, thiss exclusion does not acting its behalf. How- additional insured is the amount of insurance: apply to a. Required by the written contract or (1.1) The exceptions written agreement, or contained in Sub- b. Available under the applicable Limits Of paragraphs (iv) or (vi), Insurance shown in the Declarations, or whichever is less. (1.2) Such inspections, ad- justments, tests or This endorsement shall not increase the servicing as the applicable Limits Of Insurance shown in the vendor has agreed to Declarations. make or normally B. EXPECTED OR INTENDED INJURY OR undertakes to make in DAMAGE the usual course of business, in con- Exclusion 2.a. Expected Or Intended Injury of nection with the Section I — Coverage A — Bodily Injury And distribution or sale of Property Damage Liability is deleted and the products replaced by the following: (b) This insurance does not apply to a. Expected Or Intended Injury Or Damage any insured person or organi- "Bodily injury" or"property damage"expected zation, from whom you have or intended from the standpoint of the acquired products, or any insured. This exclusion does not apply to ingredient, part or container, "bodily injury" or "property damage" resulting entering into, accompanying or from the use of reasonable force to protect containing such products, persons or property. 2. With respect to coverage provided by this C. KNOWLEDGE OF OCCURRENCE Provision A. Miscellaneous Additional Insureds, the following additional provisions Paragraph 2.a. Duties In The Event Of apply: Occurrence, Offense, Claim Or Suit of Section IV — Commercial General Liability Conditions a. Any insurance provided to an additional is deleted and replaced by the following: insured designated under Paragraphs A.1.c.(1) through A.1.c.(8) above does a. You must see to it that we are notified as not apply: soon as practicable of an "occurrence" or an offense which may result in a claim only (1) To "bodily injury" or "property when the "occurrence" or offense is known damage" included within the to. .'products-completed operations hazard", or (1) You, if you are an individual, (2) To "bodily injury', "property damage" (2) A partner, if you are a partnership, or "personal and advertising injury" (3) A manager, if you are a limited liability arising out of the sole negligence of company, or such additional insured. (4) An "executive officer" or the "employee" b. The insurance afforded to such additional designated by you to give such notice, if insured only applies to the extent you are an organization other than a permitted by law. partnership or a limited liability company. c. The insurance afforded to such additional To the extent possible, notice should include' insured will not be broader than that which you are required to provide by the (i) How, when and where the "occurrence" written contract or written agreement. or offense took place, CL CG 04 92 09 16 Includes copyrighted material of Insurance Services Office, Inc., Page 4 of 7 with its permission (ii) The names and addresses of any injured you, or in the case of damage by fire, persons and witnesses, and lightning, explosion, "smoke", or leakage (iii) The nature and location of any injury or from automatic fire protective systems, damage arising out of the "occurrence" while rented to you or temporarily i or offense. occupied by you with permission of the owner. D. LEGAL LIABILITY — DAMAGE TO PREMISES j RENTED TO YOU (Fire, Lightning, Explosion, This limit will apply to all damage Smoke, Or Leakage From Automatic Fire proximately caused by the same event, Protective Systems) whether such damage results from fire, lightning, explosion, "smoke", leakage If damage to premises rented to you is not from automatic fire protective systems, or otherwise excluded from this policy or coverage other covered causes of loss or any part, then the following provisions apply: combination thereof. 1. Under Section I — Coverage A — Bodily 4. Subparagraph b.(1)(a)(ii) of Paragraph 4. Injury And Property Damage Liability, the Other Insurance of Section IV — last paragraph (after the exclusions) is Commercial General Liability Conditions deleted and replaced by the following: is deleted and replaced by the following: Exclusions c. through n. do not apply to dam- (ii) That is fire, lightning, explosion, "smoke" age by fire, lightning, explosion, "smoke", or or leakage from automatic fire protective leakage from automatic fire protective systems insurance for premises rented to systems to premises while rented to you or you or temporarily occupied by you with temporarily occupied by you with the permission of the owner, permission of the owner. A separate limit of 5. Subparagraph a. of Definition 9. "Insured insurance applies to this coverage as contract" of Section V — Definitions is described in Section III — Limits Of deleted and replaced by the following: Insurance. 2. The paragraph immediately after Sub- a. A contract for a lease of premises. paragraph j.(6) of Paragraph 2. Exclusions However, that portion of the contract for of Section I — Coverage A — Bodily Injury a lease of premises that indemnifies any And Property Damage Liability is deleted person or organization for damage by and replaced by the following: fire, lightning, explosion, "smoke" or leakage from automatic fire protective Paragraphs (1), (3) and (4) of this exclusion systems to premises while rented to you do not apply to "property damage" (other or temporarily occupied by you with than damage by fire, lightning, explosion, permission of the owner is not an "smoke", or leakage from automatic fire "insured contract". protective systems) to premises, including 6. As used in this Provision D. Legal Liability— the contents of such premises, rented to you Damage To Premises Rented To You: for a period of seven or fewer consecutive days. A separate limit of insurance applies to "Smoke" does not include smoke from Damage To Premises Rented To You as agricultural smudging, industrial operations described in Section III — Limits Of or"hostile fire". Insurance. E. MEDICAL PAYMENTS 3. Paragraph 6. of Section III — Limits Of If Coverage C — Medical Payments is not Insurance is deleted and replaced by the otherwise excluded from this policy or coverage following: part, the Medical Expense Limit is changed, 6. Subject to Paragraph 5. above, the subject to the terms of Section III — Limits Of greater of: Insurance, to the greater of: a. $300,000, or a. $10,000, or b. The Damage To Premises Rented b. The Medical Expense Limit shown in the To You Limit shown in the Declarations. Declarations, F. MOBILE EQUIPMENT REDEFINED is the most we will pay under Coverage Subparagraph f.(1) of Definition 12. "Mobile A for damages because of "property equipment" of Section V— Definitions is deleted damage" to premises while rented to and replaced by the following: CL CG 04 92 09 16 Includes copyrighted material of Insurance Services Office, Inc., Page 5 of 7 with its permission (1) Equipment with a gross vehicle weight of partnership or limited liability company 1,000 pounds or more and designed primarily are the same or similar to the operations for: of insureds already covered under this (a) Snow removal; insurance, (b) Road maintenance, but not construction (v) Coverage only applies for those limited or resurfacing, or liability companies who have established a date of formation as recorded within (c) Street cleaning, the filed state articles of organization, G. NEWLY FORMED OR ACQUIRED ORGANIZA- certificates of formation or certificates of TION, PARTNERSHIP OR LIMITED LIABILITY organization; and COMPANY AND EXTENDED PERIOD OF (vi) Coverage only applies for those part- COVERAGE nerships who have established a date of Paragraph 3. of Section II —Who Is An Insured formation as recorded within a written is deleted and replaced by the following: partnership agreement or partnership certificate. 3. Any organization you newly acquire or form, H. WHO IS AN INSURED—AMENDMENT other than a joint venture, and over which you maintain ownership or. The last paragraph of Section II — Who Is An a. Majority interest of more than 50% if you Insured is deleted and replaced by the following. are a corporation, No person or organization is an insured with b. Majority interest of more than 50% as a respect to the conduct of any: general partner of a newly acquired or a. Current partnership or limited liability formed partnership, and/or company, unless otherwise provided for c. Majority interest of more than 50% as an under Paragraph 3. of Section II — Who Is An Insured; owner of a newly acquired or formed limited liability company, b. Current joint venture, or will qualify as a Named Insured if there is no c. Past partnership, joint venture or limited other similar insurance available to that liability company, organization. However, for these organza- that is not shown as a Named Insured in the tions: Declarations. (i) Coverage under this provision is afforded I. NON-OWNED WATERCRAFT only until the next anniversary date of this policy's effective date after you Subparagraph (2) of Exclusion 2.g. Aircraft, acquire or form the organization, Auto Or Watercraft of Section I — Coverage A partnership or limited liability company, — Bodily Injury And Property Damage Liability or the end of the policy period, whichever is deleted and replaced by the following: is earlier; (2) A watercraft you do not own that is: (ii) Section I — Coverage A — Bodily Injury And Property Damage Liability does (a) Less than 51 feet long, and not apply to "bodily injury" or "property (b) Not being used to carry persons or damage" that occurred before you property for a charge. acquired or formed the organization, �. SUPPLEMENTARY PAYMENTS — INCREASED partnership or limited liability company, LIMITS (iii) Section I — Coverage B — Personal And Advertising Injury Liability does Section I — Supplementary Payments — not apply to "personal and advertising Coverages A And B is changed as follows: injury" arising out of an offense 1. The limit shown in Paragraph 1.b. for the committed before you acquired or formed cost of bail bonds is changed from $250 to the organization, partnership or limited $3,000, and liability company; 2. The limit shown in Paragraph 1.d. for loss of (iv) Coverage applies only when operations earnings because of time off from work is of the newly acquired organization, changed from $250 a day to $1,000 a day. CL CG 04 92 09 16 Includes copyrighted material of Insurance Services Office, Inc, Page 6 of 7 with its permission K. UNINTENTIONAL OMISSION OR UNINTEN- M. LIBERALIZATION CLAUSE TIONAL ERROR IN DISCLOSURE The following is added to Section IV — The following provision is added to Paragraph 6. Commercial General Liability Conditions: Representations of Section IV — Commercial If we adopt a mandatory attachment form change General Liability Conditions: which broadens coverage under this edition of However, the unintentional omission of, or the Commercial General Liability CG0001 for no unintentional error in, any information given or additional charge, and those changes are provided by you shall not prejudice your rights intended to apply to all insureds under this edition under this insurance. of CG0001, that change will automatically apply This provision does not affect our right to collect to your insurance as of the date we implement additional premium or to exercise our right of the change in your state. This liberalization cancellation or non-renewal. clause does not apply to changes implemented through introduction of a subsequent edition of L. WAIVER OF TRANSFER OF RIGHTS OF the Commercial General Liability form CG0001 RECOVERY AGAINST OTHERS N. INCIDENTAL MEDICAL MALPRACTICE The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us 1. Paragraph Insured does 2. of Section II Who Is p does d) of Section IV — Commercial General Liability nu not apply to physician, Conditions: nurse practitioner, physician assistant, ptant, nurse, emergency medical technician or paramedic We waive any right of recovery we may have employed by you if you are not in the against any person or organization because of business or occupation of providing medical, payments we make for injury or damage arising paramedical, surgical, dental, x-ray or out of your ongoing operations or"your work" and nursing services. included in the "products-completed operations 2. This provision is excess over any other valid hazard" when you have agreed in a written and collectible insurance whether such contract or written agreement that any right of insurance is primary, excess, contingent or recovery is waived for such person or organization. This waiver applies only to the on any other basis. Any payments us will persons) or organization(s) agreed to in the follow Paragraph of Sectionn IV — written contract or written agreement and is Commercial Generaall Liability Conditions. subject to those provisions. This waiver does not apply unless the written contract or written agreement has been executed prior to the "bodily injury" or"property damage". However, if any person or organization is separately scheduled on a separate waiver of transfer of rights of recovery which is attached to this policy, then this waiver does not apply. CL CG 04 92 09 16 Includes copyrighted material of Insurance Services Office, Ina, Page 7 of 7 with its permission I lils page has been left blank intentionally. COMMERCIAL GENERAL LIABILITY CL CG 05 29 10 17 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. GENERAL LIABILITY ULTRA PLATINUM ENHANCEMENT COVERAGES This endorsement modifies insurance provided under the following. COMMERCIAL GENERAL LIABILITY COVERAGE FORM A. The following coverage is added: paragraph 2.a. above, the words caused in ADDITIONAL INSURED - OWNERS, LESSEES whole or in part by are replaced by the OR CONTRACTORS - AUTOMATIC STATUS words arising out of. INCLUDING PRIMARY NON-CONTRIBUTORY c. The insurance afforded to such additional 1. Section II -Who is An Insured is amended to insured only applies to the extent include as an additional insured any person(s) permitted by law; and or organizations) for whom you are required d. If coverage provided to the additional by virtue of a written contract or agreement insured is required by a contract or that such person(s) or organization(s) be agreement, the insurance afforded to such added as an additional insured on your policy additional insured will not be broader than 2. The insurance provided to the additional that which you are required by the contract insured is limited as follows or agreement to provide for such additional insured. a. Such person or organization is an e. This insurance ends at the earliest of the additional insured only with respect to following times: liability for "bodily injury", "property damage" or "personal and advertising (1) When any Named Insured(s) work injury" caused in whole or in part by: called for in the written contract has (1) Acts or omissions of the Named been completed Insured; or (2) When all of any Named Insured(s) (2) The acts or omissions of those acting work done at a job site has been on behalf of the Named Insured; completed if the written contract calls for work at more than one job site in the performance of the Named Insureds (3) When that part of any Named work for the additional insured(s) specified Insured(s work done at a job site has in the written contract provided the been put to its intended use by any contract or agreement requires you to person or organization other than the provide the additional insured such Named Insured or those acting on the coverage and is: Named Insured(s) behalf. i. Currently in effect or becomes Work that may need service, maintenance, effective during the term of this correction, repair or replacement, but is policy, and otherwise complete, will be treated as ii. Was executed prior to the "bodily completed injury", "property damage" or f. This insurance does not apply to any "personal and advertising injury". additional insured scheduled on your b. If the written contract specifically requires policy by separate endorsement. you to provide additional insured coverage g. For purposes of paragraph A of this via the 10/01 edition of CG2010 (aka CG endorsement the terms "you" and "your" 20 10 10 01) or via the 11185 edition of refer to the Named Insured shown in the CG2010 (aka CG 20 10 11 85), then in Declarations. CL CG 05 29 10 17 Includes copyrighted material of Insurance Services Office, Inc., Page 1 of 3 with its permission. 3. Exclusions a. Required by the contract or agreement; or With respect to the insurance afforded to these b. Available under the applicable Limits of additional insureds, the following additional Insurance shown in the Declarations, exclusions apply to "bodily injury", 'property damage" or 'personal and advertising injury" whichever is less. arising out of This endorsement shall not increase the a. The rendering of or failure to render any applicable Limits of Insurance shown in the professional services by you or on your Declarations. behalf, but only with respect to either or 5. Other Insurance both of the following operations: For purposes of this endorsement, the (1) Providing engineering, architectural or following is added to the Section IV - surveying services to others in your Commercial General Liability Conditions, 4. capacity as an engineer, architect or Other surveyor, and Insurance condition and supersedes any (2) Providing, or hiring independent provision to the contrary: professionals to provide, engineering, architectural or surveying services in This insurance is excess of all other connection with construction work you nsurance available to an additional perform. insured whether on a primary, excess, contingent or any other basis. But, if b. Subject to Paragraph C. below, required by a written contract or written professional services include. agreement to be primary and (1) Preparing, approving, or failing to noncontributory, this insurance will be prepare or approve, maps, shop primary to and will not seek contribution drawings, opinions, reports, surveys, from any insurance on which the additional field orders, change orders, or insured is a Named Insured. drawings and specifications, and No other coverage or limit in the policy (2) Supervisory or inspection activities applies to loss or damage insured by this performed as part of any related coverage. architectural or engineering activities, B. The following coverage is added c. Professional services do not include CONTRACTUAL LIABILITY - RAILROADS services within construction means, methods, techniques, sequences and 1. With respect to operations performed for a procedures employed by you or performed Railroad within 50 feet of railroad property, the by or for the construction manager, its definition of "insured contract' in Section V - employees or its subcontractors in Definitions is replaced by the following. connection with your ongoing operations. 9. 'Insured Contract' means: This exclusion applies even if the claims a. A contract for a lease of premises. against any insured allege negligence or other However, that portion of the contract wrongdoing in the supervision, hiring, for a lease of premises that employment, training or monitoring of others indemnifies any person or by that insured, if the "occurrence' which organization for damage by fire to caused the "bodily injury" or 'property premises while rented to you or damage", or the offense which caused the temporarily occupied by you with "personal and advertising injury', involved the permission of the owner is not an rendering of, or the failure to render, any "insured contract`, professional architectural, engineering or surveying services. b. A sidetrack agreement, 4. Limits of Insurance c. Any easement or license agreement, With respect to the insurance afforded to these d. An obligation, as required by additional insureds, the following is added to ordinance, to indemnify a municipality, Section III - Limits Of Insurance: except in connection with work for a If coverage provided to the additional insured municipality, is required by a contract or agreement, the e. An elevator maintenance agreement; most we will pay on behalf of the additional f. That part of any other contract or insured is the amount of insurance: agreement pertaining to your business Page 2 of 3 Includes copyrighted material of Insurance Services Office, Inc., CL CG 05 29 10 17 with its permission. (including an indemnification of a C. AGGREGATE LIMITS OF INSURANCE municipality in connection with work The General Aggregate Limit under SECTION III - which per-formed for a municipality) under you assume the tort liability of LIMITS OF INSURANCE applies separately to which i another party to pay for "bodily injury" each of your: or property damage" to a third person 1. Projects away from premises owned by or or organization. Tort liability means a rented to you. liability that would be imposed by law in the absence of any contract or 2. "Locations"owned by or rented to you. agreement. "Location" means premises involving the same Paragraph f. does not include that part or connecting lots, or premises whose of any contract or agreement: connection is interrupted only by a street, (1) That indemnifies an architect, roadway, waterway or right-of-way of a engineer or surveyor for injury or railroad, damage arising out of. When paragraph B. Construction Project (a) Preparing, approving or failing General Aggregate Limit on form CL CG 00 20 is to prepare or approve maps, a part of this policy, then this endorsement shop drawings, opinions, CL CG 05 29 paragraph D. Aggregate Limits Of reports, surveys, field orders, Insurance does not apply. change orders or drawings and specifications, or (b) Giving directions or instructions, or failing to give them, if that is the primary cause of the injury or damage, (2) Under which the insured, if an architect, engineer or surveyor, assumes liability for an injury or damage arising out of the insured's rendering or failure to render professional services, including those listed in Paragraph (1) above and supervisory, inspection, architectural or engineering activities, 2. Otherinsurance For purposes of this endorsement, the following is added to the Section IV - Commercial General Liability Conditions, 4. Other Insurance condition and supersedes any provision to the contrary: This insurance is excess of all other insurance that is Railroad Protective Liability or similar coverage for"your work" performed for a Railroad. But, if required by a written contract or written agreement to be primary and noncontributory, this insurance will be primary to and will not seek contribution from any insurance on which the Railroad is a Named Insured_ No other coverage or limit in the policy applies to loss or damage insured by this coverage. CL CG 05 29 10 17 Includes copyrighted material of Insurance Services Office, Inc., Page 3 of 3 with its permission. This page has been Ieft blanlc intentionally, COMMERCIAL GENERAL LIABILITY CL CG 20 71 09 16 i THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES, CONTRACTORS OR OTHERS - COMPLETED OPERATIONS - AUTOMATIC STATUS, INCLUDING PRIMARY NONCONTRIBUTORY This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. SECTION II -WHO IS AN INSURED is amended For purposes of this endorsement, throughout to include as an additional insured any person(s) the policy, the terms "you" and "your" refer to or organization(s) when you are obligated by the Named Insured shown in the Declarations. virtue of a written contract or agreement that B. Exclusions such person or organization(s) be added as an additional insured to your policy. With respect to the insurance afforded to these Such person(s) or organization(s) is an additional additional insureds, the following additional insured only with respect to liability for "bodily exclusions apply to "bodily injury' and "property injury" or 'property damage" or 'personal and damage" arising out of: advertising injury" caused, in whole or in part by: 1. The rendering of or failure to render any (1) Acts or omissions of the Named Insured; professional services by you or on your behalf, or but only with respect to either or both of the following operations. (2) The acts or omissions of those acting on behalf of the Named Insured; a. Providing engineering, architectural or surveying services to others in your and included in the 'products-completed capacity as an engineer, architect or operations hazard" surveyor, and This insurance applies only when you are required b. Providing, or hiring independent to add the additional insured by virtue of a written professionals to provide, engineering, contract or agreement, provided the contract or architectural or surveying services in agreement is', connection with construction work you 1. Currently in effect or becomes effective during perform. the term of this policy, and This exclusion applies even if the claims against 2. Was executed prior to the "bodily injury" or any insured allege negligence or other "property damage' or 'personal and wrongdoing in the supervision, hiring, advertising injury". employment, training or monitoring of others by that insured, if the"occurrence" which caused the However: "bodily injury"or"property damage", or the offense a. The insurance afforded to such additional which caused the 'personal and advertising insured only applies to the extent permitted al injury", involved the rendering of, or the failure to law; and render, any professional architectural,engineering or surveying services. b. If coverage provided to the additional insured 2. Subject to Paragraph 3. below, professional is required by a contract or agreement, the services include' insurance afforded to such additional insured will not be broader than that which you are a. Preparing, approving, or failing to prepare required by the contract or agreement to or approve, maps, shop drawings, provide for such additional insured opinions, reports, surveys, field orders, change orders, or drawings and specifications, and CL CG 20 71 09 16 Includes copyrighted material of Insurance Services Page 1 of 2 Office, Inc., with its permission b. Supervisory or inspection activities D. Other Insurance performed as part of any related For purposes of this endorsement, the following is architectural or engineering activities. added to the Section IV - Commercial General 3. Professional services do not include services Liability Conditions, 4. Other Insurance within construction means, methods, condition and supersedes any provision to the techniques, sequences and procedures contrary employed by you or performed by or for the This insurance is excess of all other insurance construction manager, its employees or its available to an additional insured whether on a subcontractors in connection with your ongoing operations. primary, excess, contingent or any other basis But, if required by a written contract or written C. Limits of Insurance agreement to be primary and noncontributory, this With respect to the insurance afforded to these insurance will be primary to and will not seek additional insureds, the following is added to contribution from any insurance on which the Section III - Limits Of Insurance: additional insured is a Named Insured. f coverage provided to the additional insured is No other coverage or limit in the policy applies to ass or damage insured by this coverage. required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations, whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. Page 2 of 2 Includes copyrighted material of Insurance Services CL CG 20 71 09 16 Office, Inc., with its permission COMMERCIAL AUTO CL CA 01 49 06 17 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL AUTOMOBILE EXPANSION ENDORSEMENT - PLATINUM This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to the coverages provided by this endorsement, the provisions of the Business Auto Coverage Form apply unless modified by this endorsement. A. NEWLY ACQUIRED OR FORMED "property damage": because of the conduct of ORGANIZATIONS an "insured" under Paragraphs a. or b. under The following is added to Paragraph A.I. Who Is Paragraph A.I.Who Is An Insured of Section 11 An Insured of Section II - Covered Autos Liability b - Covered Autos Liability Coverage, caused Coverage: by an "accident" and resulting from the ownership, maintenance or use of a covered Any organization you newly acquire or form, other "auto", than a partnership, joint venture or limited liability 2. The written contract or agreement described company or any organization excluded either by above must have been executed prior to the this Coverage Part or by endorsement, and over "accident" that caused the "bodily injury" or which you maintain ownership or majority interest ..property damage"and be in effect at the time of more than 50 percent will qualify as a Named of such"accident", Insured. However: 1. This insurance does not apply to any newly 3. The insurance afforded to any such additional acquired or formed organization that is an "insured" does not apply to any "accident" "insured"under any other automobile policy or beyond the period of time required by the written contract or agreement described would be an "insured" under such policy but for its termination or the exhaustion of its Limit above; of Insurance. 4. The most we will pay on behalf of such 2. Coverage does not apply to "bodily injury" or additional "insured(s)" is the lesser of: "property damage" that occurred before you a. The Limits of Insurance specified in the acquired or formed the organization. written contract or agreement described 3. Coverage under this provision is afforded only above; or until the 180th day after you acquire or form b. The Limits of Insurance shown in the the organization or the end of the policy Declarations. period, whichever is earlier. This provision shall not increase the Limit of B. ADDITIONAL INSURED BY CONTRACT OR Insurance shown in the Declarations in this AGREEMENT policy or coverage part; and The following is added to Paragraph A.1., Who Is 5. The following changes are made to Paragraph An Insured of Section II - Covered Autos Liability 5. Other Insurance of B. General Conditions Coverage: under Section IV- Business Auto Conditions: When you have agreed in a written contract or a. The following is added to Paragraph 5.a.: agreement to include a person or organization as If required by the written contract or or additional "insured", such person or agreement described above, the organization is included as an "insured"subject to insurance afforded to the additional the following: insured under this provision will be 1. Such person or organization is an additional primary to, and will not seek contribution "insured" only to the extent such person or from, the additional insured's own organization is liable for "bodily injury" or insurance. CL CA 01 49 06 17 Includes copyrighted material of Insurance Services Page 1 of 5 Office, Inc., with its permission h. Paragraph 5.c. is deleted in Its entirety 2. We will also pay reasnnahle. and necessary 6. Paragraph A.1.c. under Section II - Covered expenses to facilitate the return of the stolen "auto"to you. Autos Liability Coverage is deleted in its entirety. 3. It is agreed and understood and it is our stated 7. The definition of "insured contract" under intent that expenses incurred by you under the Section V - Definitions is amended to add the Transportation Expenses Coverage following: Extension will not also be covered or paid under the Rental Reimbursement Coverage An "insured contract" does not include that provided by this endorsement or any rental part of any contract or agreement: reimbursement coverage added by separate That pertains to the ownership, maintenance endorsement to this policy. or use of an "auto" and which indemnifies a H. EXTENDED COVERAGE -AIRBAGS person or organization for other than the The following is added to Exclusion B.3.a. of vicarious liability of such person or Section III - Physical Damage Coverage: organization for bodily injury" or "property damage" caused by your operation or use of However, this exclusion does not apply to the a covered "auto". unintended discharge of an airbag. However, a person or organization is an This coverage is excess over any other collectible additional "insured" under this provision only insurance or warranty providing such airbag to the extent such person or organization is coverage, not named as an "insured" by separate I. AUTO LOANILEASE GAP COVERAGE endorsement to this policy. C. EMPLOYEES AS INSUREDS The following is added to Section III - Physical Damage Coverage, Paragraph C. Limits of The following is added to Paragraph A.I. Who Is Insurance. An Insured Section II - Covered Autos Liability 4. In the event of a total "loss" to a covered Coverage, "auto", we will pay the lesser of: Any "employee" of yours is an "insured" while using a covered "auto" you don't own, hire or a. Any unpaid amount due on the lease or borrow in your business or your personal affairs. loan for a covered "auto", less: D. INCREASED COVERAGE - BAIL BONDS (1) The amount under the Physical Damage Coverage section of the The Supplementary Payments Coverage policy, and Extension of Section II - Covered Autos Liability Coverage is amended as follows: (2) Any: The Limit of Insurance in paragraph A.2.a.(2) is (a) Overdue lease/loan payments at increased to $5,000. the time of the "loss'; E. INCREASED COVERAGE - LOSS OF (b) Financial penalties imposed EARNINGS under a lease for excessive use, abnormal wear and tear or high The Supplementary Payments Coverage mileage, Extension of Section II - Covered Autos Liability (c) Security deposits not returned by Coverage is amended as follows: the lessor; The Limit of Insurance in paragraph A.2.a.(4) is increased to $1,000. (d) Costs for extended warranties, Credit Life Insurance, Health, F. FELLOW EMPLOYEE COVERAGE Accident or Disability Insurance The Fellow Employee Exclusion contained in purchased with the loan or lease; Section II-Covered Autos Liability Coverage does and not apply. This coverage is excess over any other (e) Carry-over balances from collectable insurance. previous loans or leases; or G. COVERAGE EXTENSION -TRANSPORTATION b. $5,000. EXPENSES However, this provision does not apply to the Paragraph A.4.a. Transportation Expenses of extent loan/lease gap coverage has been Section III - Physical Damage Coverage is provided by separate endorsement to this amended as follows: policy. 1. The Limits of Insurance are increased to $75 per day to a maximum of$2,500, Page 2 of 5 Includes copyrighted material of Insurance Services CL CA 01 49 06 17 Office, Inc., with its permission J. GLASS REPAIR- NO DEDUCTIBLE When fire extinguishers are kept in your covered The following is added to Paragraph D. Deductible "auto" and any are discharged in an attempt to of Section III - Physical Damage Coverage: extinguish a fire, we will pay the lesser of the actual cost of recharging or replacing such fire Any Comprehensive Coverage deductible shown extinguisher(s). in the Declarations does not apply to "loss" to No deductible applies to this coverage. glass when you elect to patch or repair rather than replace the glass. O. HIRED AUTO PHYSICAL DAMAGE K. INCREASED COVERAGE - ELECTRONIC COVERAGE EQUIPMENT The following is added to Paragraph A.4. The $1,000 limit indicated in Paragraph CA.b. Coverage Extensions of Section III - Physical under Section III - Physical Damage Coverage is Damage Coverage: increased to $2,500. If hired "autos" are covered "autos" for Covered L. EXTENDED COVERAGE - PERSONAL Autos Liability Coverage and if Physical Damage PROPERTY Coverage is provided for any"auto"you own,then the Physical Damage coverages provided are The following is added to Paragraph A.4. extended to"autos"you lease, rent, hire or borrow Coverage Extensions of Section III - Physical from someone other than your "employees", Damage Coverage: partners or members of their households subject Physical Damage Coverage on a covered "auto" to the following: may be extended to "loss" to your personal 1. The most we will pay in any one "loss" is the property or, if you are an individual, the personal lesser of: property of a family member, that is in the covered a. The actual cash value of the"auto"; "auto" at the time of "loss" and caused by an .'accident" and resulting from the ownership, b. The cost to repair or replace the"auto" or maintenance or use of a covered "auto". c. $100,000. The insurance provided by this coverage extension is excess over any other collectible s 2. The deductible shall s equal to the amount of Paragraph 1. above i subject to a deductible. insurance. The most we will pay for any one"loss" the highest deductible shown for any owned under this coverage extension is $500. However, our payment for "loss" to personal property will "auto" of the same classification for that only be for the account of the owner of the coverage. In the event there is no owned property. "auto" of the same classification, the highest deductible for any owned "auto" will apply for Under this provision, personal property does not that coverage. include and we will not pay for "loss" of currency, No deductible will apply to "loss" caused by coins, securities or contraband. fire or lightning. No deductible applies to this coverage extension. 3. Hired Auto Physical Damage Coverage is M. TOWING subject to the following: Paragraph A.2. Towing of Section III - Physical a. If symbol 8 is shown in the Covered Auto Damage Coverage, is replaced by the following, section of the Declarations page for any of If a private passenger type "auto" or light truck the Physical Damage coverages, then the "auto" (0-10,000 Lbs. GVW) is provided both Hired Auto Physical Damage coverage Comprehensive and Collision Coverage, we will described in this endorsement does not pay up to$150 for towing and labor costs incurred apply. each time such "auto" is disabled. If a medium, b. Other than indicated in Paragraphs a. heavy or extra-heavy truck or extra-heavy Truck- directly above, coverage provided under tractor "auto" (greater than 10,000 Lbs. GVW) is this provision will be excess over any provided both Comprehensive and Collision other collectible Insurance or coverage. Coverage, we will pay up to $250 for towing and labor costs incurred each time such "auto" is 4. In addition to the limit set forth in Paragraph 1. disabled. However, the labor must be performed above we will pay up to $500 per day, to a at the place of disablement. maximum of$3,500 per"loss"for: N. FIRE EXTINGUISHER RECHARGE a. Any costs or fees associated with the "loss"to a hired "auto'; and The following is added to Paragraph A.4. Coverage Extensions of Section IV - Physical b. Loss of use of the hired "auto", provided it Damage Coverage: is the consequence of an "accident" for which you are legally liable, and as a CL CA 01 49 06 17 Includes copyrighted material of Insurance Services Page 3 of 5 Office, Inc., with its permission result of which a monetary loss is (1) You, if you are designated in the sustained by the leasing or rental Declarations as an individual; concern. (2) Your partners or members, if you are However, Paragraph A.4.b. Loss of Use designated in the Declarations as a Expenses under Section III - Physical Damage partnership or joint venture', Coverage of the Business Auto Coverage Form (3) Your members or managers, if you does not apply. are designated in the Declarations as P. RENTAL REIMBURSEMENT COVERAGE a limited liability company, We will pay for rental reimbursement expenses (4) Your executive officers if you are incurred by you for the rental of an "auto" because designated in the Declarations as an of"loss"to a covered "auto". organization other than an individual, 1. Payment applies in addition to the otherwise partnership, joint venture or limited applicable amount of each coverage you have liability company, and on the covered "auto". (5) The spouse of any person named in 2. No deductible applies to this coverage. Paragraphs 1.a.(1). through 1.a.(4)while a resident of the same 3. We will pay only for those expenses incurred household, during the policy period beginning 24 hours Except: after the "loss" and ending, regardless of the expiration date of the policy, with the lesser of (a) Any "auto" owned by that the following number of days: individual or by any member of his a. The number of days when the covered or her household. "auto" has been repaired or replaced, or (b) Any"auto" used by that individual b. 45 days. or his or her spouse while working in a business of selling, servicing, 4. Our payment is limited to the lesser of the repairing or parking "autos". following amounts: 2. Changes In Auto Medical Payments And a. Necessary and actual expenses incurred, Uninsured And Underinsured Motorists or Coverages b. Not more than $75 for any one day, The following is added to Who Is An Insured: 5. We will pay up to an additional $300 for the Any individual named in 1.a above and his or reasonable and necessary expenses you her "family members" are "insured" while incur to remove your materials and equipment "occupying" or while a pedestrian when being from the covered "auto" and replace such struck by any"auto"you don't own except: materials and equipment on the rental"auto". Any"auto" owned by that individual or by any 6. This coverage does not apply while there are "family member". spare or reserve "autos" available to you for 3. Changes In Physical Damage Coverage your operations. 7. If"loss"results from the total theft of a covered Any private passenger type "auto" you don't "auto" of the "private passenger type", we will own, hire or borrow is a covered "auto" while pay under this coverage only that amount of n the care,custody or control of any individual your rental reimbursement expenses which is named in Q.1.a. above or his or her spouse while a resident of the same house-hold not already provided for under the Physical Damage Coverage Extension of the Business except Auto Coverage Form or any endorsements a. Any "auto" owned by that individual or by thereto. any member of his or her household, or However, this provision does not apply to the b. Any"auto"used by that individual or his or extent that rental reimbursement is provided her spouse while working in a business of by separate endorsement to this policy. selling, servicing, repairing or parking Q. DRIVE OTHER CAR COVERAGE "autos". 1. The following is added to Section II - Covered 4. The most we will pay for the total of all Autos Liability Coverage: damages under Covered Autos Liability Uninsured Motorists Coverage and a. Any "auto" you don't own, hire or borrow Underinsured Motorists Coverage is the Limit is a covered "auto" for Liability Coverage Of Insurance shown in the Declarations as while being used by: applicable to owned "autos". Page 4 of 5 Includes copyrighted material of Insurance Services CL CA 01 49 06 17 Office, Inc., with its permission 5. Our obligation to pay for, repair, return or T. UNINTENTIONAL OMISSIONS replace damaged or stolen property under The following is added Paragraph B.2. of Section Physical Damage Coverage, will be reduced by a deductible equal to the amount of the IV- Business Auto Conditions: highest deductible shown for any owned If you fail to disclose any hazards existing at the private passenger type "auto" applicable to inception date of this policy, such failure will not that coverage. If there are no owned private prejudice the coverage provided to you. However, passenger type "autos", the deductible shall this provision does not affect our right to collect be $250 for Comprehensive Coverage and additional premium or exercise our right of $500 for Collision Coverage. No deductible cancellation or nonrenewal. will apply to "loss"caused by fire or lightning. U. LIBERALIZATION 6. Additional Definition If we revise this endorsement to provide greater As used in this DRIVE OTHER CAR coverage without additional premium charge, we Provision: will automatically provide the additional coverage "Family member" means a person related to to all endorsement holders as of the day the the individual named in 1.a. by blood, revision is effective in your state. marriage or adoption who is a resident of the individual's household, including a ward or foster child. R. KNOWLEDGE OF AN ACCIDENT, CLAIM, SUIT OR LOSS The following is added to Paragraph A.2. of Section IV- Business Auto Conditions: Your obligation to provide prompt notice of an "accident", claim, "suit" or "loss" is satisfied if you or a person designated by you to be responsible for insurance matters is notified of, or in any manner made aware of an"accident", claim, "suit" or "loss" and provides us such notice as soon as practicable S. WAIVER OF SUBROGATION BY CONTRACT OR AGREEMENT The following is added to Paragraph A.5 of Section IV- Business Auto Conditions: We waive any right of recovery we may have against a person or organization because of payments we make for"bodily injury" or "property damage" when you and such person or organization have agreed in writing in a contract or agreement to waive such right of recovery, provided: 1. Such written contract or agreement was: a. Made prior to the "accident" or "loss" resulting in the covered "bodily injury" or "property damage" and b. Was in effect at the time of the covered "bodily injury" or"property damage". 2. The covered "bodily injury" or "property damage" must arise out of the operations specified in such written contract or agreement. 3. At our request you must provide us with a copy of the aforementioned written contract or agreement. CL CA 01 49 06 17 Includes copyrighted material of Insurance Services Page 5 of 5 Office, Inc., with its permission This page has heen Ick Wank intcntiunally. COMMERCIAL UMBRELLA j CLCU24700916 f THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - PRIMARY NON CONTRIBUTORY This endorsement modifies insurance provided under the following: COMMERCIAL LIABILITY UMBRELLA COVERAGE FORM Paragraph 5. Other Insurance of SECTION IV - CONDITIONS, COMMERCIAL LIABILITY UMBRELLA COVERAGE FORM is replaced with the following. 5. Other Insurance a. This insurance is excess over, and shall not contribute with any of the other insurance, whether primary, excess, contingent or on any other basis except as shown under 5.c.below. This condition will not apply to insurance specifically written as excess over this Coverage Part. When this insurance is excess, we will have no duty under Coverages A or B to defend the insured against any "suit" if any other insurer has a duty to defend the insured against that "suit". If no other insurer defends, we will undertake to do so, but we will be entitled to the insured's rights against all those other insurers. b. When this insurance is excess over other insurance, we will pay only our share of the "ultimate net loss" that exceeds the sum of: (1) The total amount that all such other insurance would pay for the loss in the absence of this insurance; and (2) The total of all deductible and self-insured amounts under all that other insurance. c. The insurance is excess of all other insurance available to an additional insured whether on a primary, excess, contingent or any other basis. But if required by a written contract or written agreement to be primary and noncontributory, this insurance will be primary to, and will not seek contribution from, any insurance on which the additional insured is a Named Insured. No other coverage or limit in the policy applies to loss or damage insured by this coverage. CL CU 24 70 09 16 Includes copyrighted material of Insurance Services Page 1 of 1 Office, Inc., with its permission This page has been lcfi blank intentionally. I COMMERCIAL UMBRELLA CL CU 24 73 09 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US AS REQUIRED BY VIRTUE OF A WRITTEN CONTRACT This endorsement modifies insurance provided under the following: COMMERCIAL LIABILITY UMBRELLA COVERAGE PART Paragraph 9. Transfer Of Rights Of Recovery Against Others To Us under Section IV - Conditions is deleted and replaced with the following: If you and the insurer of scheduled underlying insurance, waive any right of recovery we may have because of payments we make for injury or damage arising out of your ongoing operations or "your work' done under a contract requiring such waiver with that person(s) or organization(s) or other parties you are performing operations for when you are obligated to provide such waiver by virtue of a written contract or agreement,we will also waive any rights we may have against such person(s) or organ ization(s). However, our rights may only be waived prior to the 'occurrence"giving rise to the injury or damage for which we make payment under this Coverage Part. The insured must do nothing after a loss to impair our rights. At our request, the insured will transfer those rights to us and help us enforce those rights. CL CU 24 73 09 16 Includes copyrighted material of Insurance Services Page 1 of 1 Office, Inc., with its permission This page liav been left blank inlenlionally. KEINT SPECIAL PROVISIONS TABLE OF CONTENTS PAGE !; DIVISION 1 GENERAL REQUIREMENTS ...................................... 1-1 1 -01 Definitions and Terms....................................................... 1-1 1 -02 Bid Procedures and Conditions........................................... 1-2 1 -03 Award and Execution of Contract........................................ 1 -5 1-04 Scope of the Work ............................................. .............. 1-5 1-05 Control of Work ............................................................... 1-7 1-06 Control of Material ........................................................... 1-10 1-07 Legal Relations and Responsibilities to the Public.................. 1 -13 1 -08 Prosecution and Progress ..................... ............................. 1 -16 1 -09 Measurement and Payment ............................................... 1-20 1 -10 Temporary Traffic Control ................................................. 1 -21 DIVISION 8 MISCELLANEOUS CONSTRUCTION ...................... 8-1 8-09 Raised Pavement Markers .......... ......... 8-1 8-22 Pavement Marking ,.......--... .... ...... . .....—- 8-2 KENT STANDARD PLANS ..............................................„................... A-1 APPENDIX A AND LOCATION MAPS ............„„......... .....—... A-2 TRAFFIC CONTROL PLANS ......................................................„„,...... A-3 PREVAILING WAGE RATES.........„....„„.......„..,,...„.„.............................. A-4 2018 Paint Line striping & RPM/Araucto April 18, 2018 Project Number: R00602 KENT SPECIAL PROVISIONS ( The Kent Special Provisions ("Kent Special Provisions" or "KSP") modify and supersede any conflicting provisions of the 2018 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations ("WSDOT Standard Specifications"). Otherwise all provisions of the WSDOT Standard Specifications shall apply. All references in the WSDOT Standard Specifications to the State of Washington, its various departments or directors, or to the contracting agency, shall be revised to include the City and/or City Engineer, except for references to State statutes or regulations. Finally, all of these documents are a part of this contract. 1-01 DEFINITIONS AND TERMS SECTION 1-01. 1 IS SUPPLEMENTED BYADD/NG THE FOLLOWING: 1-01.1 General When these Kent Special Provisions make reference to a "Section," for example, "in accordance with Section 1 -01 ," the reference is to the WSDOT Standard Specifications as modified by these Kent Special Provisions. SECTION 1-01.2(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-01.2(2) Items of Work and Units of Measurement EA Each Eq. Adj. Equitable Adjustment FA Force Account FIR Hour M GAL Thousand gallons NIC Not In Contract SF Square Feet SECTION 1-01.3, "CONTRACT"DEFINITION, IS DELETED AND REPLACED WITH THE FOLLOWING: 1-01.3 Definitions Contract The written agreement between the Contracting Agency and the Contractor. It describes, among other things: 1 . What work will be done, and by when; 2. Who provides labor and materials; and 2018 Paint Line Striping & RPM/Araucto 1 - 1 April 18, 2018 Project Number R00602 3. How Contractors will be paid. The Contract includes the Contract (agreement) Form, Bidder's completed Proposal Form, Kent Special Provisions, Contract Provisions, Contract Plans, WSDOT Standard Specifications (also including amendments to the Standard Specifications issued by WSDOT as of the later date of bid advertisement or any subsequent addenda), Kent Standard Plans, Addenda, various certifications and affidavits, supplemental agreements, change orders, and subsurface boring logs (if any). Also incorporated in the Contract by reference are: 1 . Standard Plans (M21-01) for Road, Bridge and Municipal Construction as prepared by the Washington State Department of Transportation and the American Public Works Association, current edition; 2. Manual on Uniform Traffic Control Devices for Streets and Highways, current edition, and; 3. American Water Works Association Standards, current edition; 4. The current edition of the "National Electrical Code." Responsibility for obtaining these publications rests with the Contractor, SECTION 1-01.3, "DEFINITIONS" IS SUPPLEMENTED BYADDING THE FOLLOWING DEFINITION: Incidental Work The terms "incidental to the project," "incidental to the involved bid item(s)," etc., as used in the Contract shall mean that the Contractor is required to complete the specified work and the cost of such work shall be included in the unit contract prices of other bid items as specified in Section 1 -04.1 (Intent of the Contract). No additional payment will be made. 1-02 BID E!ROCEL3!JREr1 AND CONDITIONS SECTION 1-02. 1 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.1 Qualification of Bidders Bidders shall be qualified by ability, experience, financing, equipment, and organization to do the work called for in the Contract. The City reserves the right to take any action it deems necessary to ascertain the ability of the Bidder to perform the work satisfactorily. This action includes the City's review of the qualification information in the bid documents. The City will use this qualification data in its decision to determine whether the lowest responsive bidder is also responsible and able to perform the contract work. If the City determines that the lowest bidder is not the lowest responsive and responsible bidder, the City reserves its unqualified right to reject that bid and award the contract to the next lowest bidder that the City, in its sole judgment, 2018 Paint Line Striping & RPM/Araucto 1 - 2 April 18, 2018 Project Number: R00602 determines is also responsible and able to perform the contract work (the "lowest responsive and responsible bidder"). SECTION 1-02.2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.2 Plans and Specifications Upon awarding the Contract, the City shall supply to the Contractor, for its own use, up to ten (10) copies of the plans and specifications. If the Contractor requests more than ten (10) copies, the City may require the Contractor to purchase the additional sets. SECTION 1-02.5 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.5 Proposal Forms Prospective bidders may obtain Bid Documents including a "Bid Proposal" for the advertised project from the City upon furnishing a non-refundable payment as specified in the "Invitation to Bid" or by downloading at no charge at Ken,fl�1�Vlk ov/dolrtg bf�s�u7pss/bids- p1jocuEement; however, a prospective bidder remains responsible to obtain Bid Documents, even if unable to download all or any part of the documents, whether or not inability to access is caused by the bidder's or the City's technology. Bid Documents may be requested by mail, or picked up at the Public Works Engineering Department, 400 West Gowe Street, Second Floor, Kent, Washington 98032. SECTION 1-02.6 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-02.6 Preparation of Proposal It is the Bidder's sole responsibility to obtain and incorporate all issued addenda into the bid. In the space provided on the Proposal Signature Page, the Bidder shall confirm that all Addenda have been received. All blanks in the proposal forms must be appropriately filled in. SECTION 1-02.6 IS SUPPLEMENTED BY ADDING THE FOLLOWING TO THE LAST PARAGRAPH: Proposals must contain original signature pages. FACSIMILES OR OTHER FORMS OF ELECTRONIC DELIVERY ARE NOT ACCEPTABLE AND ARE CONSIDERED NON-RESPONSIVE SUBMITTALS. SECTION 1-02.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.7 Bid Deposit A deposit of at least 5 percent of the total Bid shall accompany each Bid. This deposit may be cash, cashier's check, or a proposal bond (Surety bond). Any proposal bond shall be on the City's bond form and shall be signed by the Bidder and the Surety. A proposal bond shall not 2018 Paint Line Striping & RPM/Araucto 1 - 3 April 18, 2018 Project Number R00602 be conditioned in any way to modify the minimum 5-percent required. The Surety shall: (1) be registered with the Washington State Insurance Commissioner, and (2) appear on the current Authorized Insurance List in the State of Washington published by the Office of the Insurance Commissioner. The failure to furnish a Bid deposit of a minimum of 5 percent with the Bid shall make the Bid nonresponsive and shall cause the Bid to be rejected by the Contracting Agency. SECTION 1-02.9 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.9 Delivery of Proposal All bids must be sealed and delivered in accordance with the "Invitation to Bid." Bids must be received at the City Clerk's office by the stated time, regardless of delivery method, including U.S. Mail. SECTION 1-02. 10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.10 Withdrawing, Revising, or Supplementing Proposal After submitting a Bid Proposal to the Contracting Agency, the Bidder may withdraw or revise it if: 1 . The Bidder submits a written request signed by an authorized person, and 2. The Contracting Agency receives the request before the time for opening Bids. The original Bid Proposal may be revised and resubmitted as the official Bids Proposal if the Contracting Agency receives it before the time for opening Bids. SECTION 1-02. 11 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-02.11 Combination and Multiple Proposals No person, firm or corporation shall be allowed to make, file, or be interested in more than one bid for the same work unless alternate bids are specifically called for; however, a person, firm, or corporation that has submitted a subproposal to a bidder, or that has quoted prices of materials to a bidder is not disqualified from submitting a subproposal or quoting prices to other bidders or from making a prime proposal. SECTION 1-02.13 IS REVISED BY DELETING ITEM 1(a) AND REPLACING ITEM 1(a) WITH THE FOLLOWING: 1-02.13 Irregular Proposals a. The bidder is not prequalified when so required. 2018 Paint Line Striping & RPM/Araucto 1 - 4 April 18, 2018 Project Number R00602 SECTION 1-02. 14 IS REVISED BY DELETING ITEM 3 AND REPLACING WITH THE FOLLOWING: 1-02.14 Disqualification of Bidders 3, The bidder is not qualified for the work or to the full extent of the bid. 1-n3 AWAPg ANn EXECUTION OF CONTRACT SECTION 1-03.1 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SECOND PARAGRAPH IN THAT SECTION: 1-03.1 Consideration of Bids The City also reserves the right to include or omit any or all schedules or alternates of the Proposal and will award the Contract to the lowest responsive, responsible bidder based on the total bid amount, including schedules or alternates selected by the City. SECTION 1-03.2 IS REVISED BY REPLACING "45 CALENDAR DAYS" WITH "60 CALENDAR DAYS"RELATING TO CONTRACT AWARD OR BID REJECTION. 1-03.2 Award of Contract SECTION 1-03.3 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.3 Execution of Contract No claim for delay shall be granted to the Contractor due to its failure to submit the required documents to the City in accordance with the schedule provided in these Kent Special Provisions, SECTION 1-03.7 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-03.7 Judicial Review Any decision made by the City regarding the award and execution of the contract or bid rejection shall be conclusive subject to the scope of judicial review permitted under Washington State Law. Such review, if any, shall be timely filed in the King County Superior Court, located in Kent, Washington. 1-04 SCOPE OF THE WORK SECTION 1-04.1(2) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.1 (2) Bid Items Not Included in the Proposal The Contractor shall include all costs of doing the work within the bid item prices. If the contract plans, contract provisions, addenda, or any other part of the contract require work that has no bid item price in the 2016 Paint Line Striping & RPM/Araucto 1 - 5 April 18, 2018 Project Number: R00602 proposal form, the entire cost of labor and materials required to perform that work shall be incidental and included with the bid item prices in the contract. SECTION 1-04.2 IS SUPPLEMENTED BY ADDING THE WORDS, "KENT SPECIAL PROVISIONS, KENT STANDARD PLANS"FOLLOWING THE WORDS, "CONTRACT PROVISIONS" IN THE FIRST SENTENCE OF THE FIRST PARAGRAPH. SECTION 1-04.2 IS REVISED BY DELETING ITEMS 1 THROUGH 7 IN THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING 8 ITEMS: 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda 1 . Approved Change Orders 2. The Contract Agreement 3. Kent Special Provisions 4. Contract Plans 5. Amendments to WSDOT Standard Specifications 6. WSDOT Standard Specifications 7. Kent Standard Plans 8. WSDOT Standard Plans SECTION 1-04.4 IS REVISED BY DELETING THE THIRD PARAGRAPH (INCLUDING SUBPARAGRAPHS A AND B). SECTION 1-04.4 IS REVISED BY DELETING THE FIFTH PARAGRAPH AND REPLACING IT WITH THE FOLLOWING: 1-04.4 Changes For Item 2, increases or decreases in quantity for any bid item shall be paid at the appropriate bid item contract price, including any bid item increase or decrease by more than 25 percent from the original planned quantity. SECTION 1-04.4 IS REVISED BY DELETING THE EIGHTH PARAGRAPH (NEXT TO THE LAST PARAGRAPH) AND REPLACING WITH THE FOLLOWING: Within 14 calendar days of delivery of the change order the Contractor shall endorse and return the change order, request an extension of time for endorsement or respond in accordance with Section 1 -04.5. The Contracting Agency may unilaterally process the change order if the Contractor fails to comply with these requirements. Changes normally noted on field stakes or variations from estimated quantities, will not require a written change order. These changes shall be made at the unit prices that apply. The Contractor shall respond immediately to changes shown on field stakes without waiting for further notice. 2018 Paint Line striping & RPM/Araucto 1 - 6 April 18, 2018 Project Number: R00602 SECTION 1-04.6 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.6 Variation in Estimated Quantities i Payment to the Contractor will be made only for the actual quantities of Work performed and accepted in conformance with the Contract. f SECTION 1-04.11 ITEM 2 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-04.11 Final Cleanup 2. Remove from the project all unapproved and/or unneeded material left from grading, surfacing, paving, or temporary erosion control measures. 1-05 CONTROL OF WORK SECTION 1-05.4 IS REVISED BY DELETING THE LAST FOUR PARAGRAPHS. SECTION 1-05.4 IS REVISED BY ADDING A PARAGRAPH AFTER PARAGRAPH 7 1-05.4 Conformity With and Deviations From Plans and Stakes To the extent a conflict exists between the requirements of WSDOT Section 1-05.4 and Kent Special Provision Section 1 -05.5, the requirements of KSP Section 1 -05.5 will prevail. DIVISION 1 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTION: 1-05.8 City's Right to Correct Defective and Unauthorized Work If the Contractor fails to remedy defective or unauthorized work within the time specified by the Engineer, or fails to perform any part of the work required by the contract, the Engineer may provide the Contractor written notice establishing a date after which the City will correct and remedy that work by any means that the Engineer may deem necessary, including the use of City forces or other contractors. If the Engineer determines that the Contractor's failure to promptly correct any defective or any unauthorized work creates a situation that could be potentially unsafe or might cause serious risk of loss or damage to the public, the Engineer may have the defective and unauthorized work corrected immediately, have the rejected work removed and replaced, or have the work the Contractor refuses to perform completed by using City or other forces. Direct and indirect costs incurred by the City attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment may be deducted by the Engineer from monies due, or to become due, the Contractor. Direct and indirect costs shall include, without limitation, compensation for additional professional services required, 2018 Paint Line Striping & RPM/Araucto 1 - 7 April 18, 201B Project Number: R00602 compensation and engineering and inspection services required, and costs for repair and replacement of work of others destroyed or damaged by correction, removal, or replacement of the Contractor's unauthorized work. No increase in contract time or compensation will be allowed because of the delay in the performance of the work attributable to the exercise of the City's rights provided by this section nor shall the exercise of this right diminish the City's right to pursue any other remedy available under law with respect to the Contractor's failure to perform the work as required. SECTION 1-05.9 IS SUPPLEMENTED WITH THE FOLLOWING NEW SUBSECTION: 1-05.9 Equipment 1-05.9(1) Operational Testing It is the intent of the City to have at the Physical Completion Date a complete and operable system. Therefore when the work involves the installation of machinery or other mechanical equipment, street lighting, electrical distribution of signal systems, building or other similar work, it may be desirable for the Engineer to have the Contractor operate and test the work for a period of time after final inspection but prior to the Physical Completion Date. Whenever items of work are listed in the contract provisions for operational testing they shall be fully tested under operating conditions for the time period specified to ensure their acceptability prior to the Physical Completion Date. In the event the contract does not specify testing time periods, the default testing time period shall be twenty-one (21) calendar days. During and following the test period, the Contractor shall correct any items of workmanship, materials, or equipment that prove faulty or that are not in first class operating condition. Equipment, electrical controls, meters, or other devices and equipment to be tested during this period shall be tested under the observation of the Engineer, so that the Engineer may determine their suitability for the purpose for which they were installed. The Physical Completion Date cannot be established until testing and corrections have been completed to the satisfaction of the Engineer. The costs for power, gas, labor, material, supplies, and everything else needed to successfully complete operational testing shall be included in the various contract bid item prices unless specifically set forth otherwise in the contract. Operational and test periods, when required by the Engineer, shall not affect a manufacturer's guaranties or warranties furnished under the terms of the Contract. 2018 Paint Line Striping & RPM/Araucto 1 - 8 April 18, 2018 Project Number: R00602 SECTION 1-05. 10 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-05.10 Guarantees i In addition to any other warranty or guarantee provided for at law or in the parties' contract, the Contractor shall furnish to the Contracting Agency any guarantee or warranty furnished as a customary trade practice in connection with the purchase of any equipment, materials, or items incorporated into the project. Upon receipt of written notice of any required corrective work, the Contractor shall pursue vigorously, diligently, and without disrupting city facilities, the work necessary to correct the items listed in the notice. Approximately sixty (60) calendar days prior to the one year anniversary of final acceptance, the Contractor shall be available to tour the project, with the Engineer, in support of the Engineer's effort to establish a list of corrective work then known and discovered. SECTION 1-05. 13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE FIRST PARAGRAPH: 1-05.13 Superintendents, Labor, and Equipment of Contractor Within ten (10) days of contract award, the Contractor shall designate the Contractor's project manager and superintendent for the contract work. SECTION 1-05.13 IS REVISED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE THIRD PARAGRAPH (AS PRINTED IN THE 2018 WSDOT STANDARD SPECIFICATIONS): If at any time during the contract work, the Contractor elects to replace the contract manager or superintendent, the Contractor shall only do so after obtaining the Engineer's prior written approval. THE LAST PARAGRAPH OF 1-05. 13 IS DELETED AND REPLACED WITH THE FOLLOWING: Whenever the City evaluates the Contractor's qualifications or prequalifications pursuant to Section 1 -02.1 or RCW 47.28.070, the City may take these or other Contractor performance reports into account. SECTION 1-05. 14 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 1-05.14 Cooperation With Other Contractors Other Contracts Or Other Work It is anticipated that the following work adjacent to or within the limits of this project will be performed by others during the course of this project and will require coordination of the work: 2018 Paint Line striping & RPM/Araucto 1 - 9 April 18, 2018 Project Number, R00602 r • LID 363: S 2241h St Improvement — this project will close a section of 88`h Ave S to thru traffic. SECTION 1-05 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-05.16 Water and Power The Contractor shall make necessary arrangements, and shall bear the costs for power and water necessary for the performance of the work, unless the Contract includes power or water as bid items, or unless otherwise provided for in other bid items. 1-05.17 Oral Agreements No oral agreement or conversation with any officer, agent, or employee of the City, either before or after execution of the contract, shall affect or modify the terms or obligations contained in any of the documents comprising the contract. Such oral agreement or conversation shall be considered unofficial information and in no way binding upon the City, unless subsequently recorded and/or put in writing and signed by an authorized agent of the City. 1-06 CONTROL OF MATERIAL SECTION 1-06.2(2) IS DELETED IN ITS ENTIRETY, 1-06.2(2) Statistical Evaluation of Materials for Acceptance SECTION 1-06 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-06.7 Submittals 1-06.7(1) Submittal Procedures All information submitted by the Contractor shall be clear, sharp, high contrast copies. Contractor shall accompany each submittal with a letter of transmittal containing the following information: 1 . Contractor's name and the name of Subcontractor or supplier who prepared the submittal. 2. The project name and identifying number. 3. Each new submittal shall be sequentially numbered (1 , 2, 3, etc.). Each resubmittal shall include the original number with a sequential alpha letter added (1 A, 1B, 1C, etc.). 4. Description of the submittal and reference to the Contract requirement or technical specification section and paragraph number being addressed. 5. Bid item(s) where product will be used. 2018 Paint Line Striping & RPM/Araucto 1 - 10 April 18, 2018 Project Number R00602 1-06.7(2) Schedule of Submittals The Contractor shall create and submit three (3) copies of a schedule of submittals showing the date by which each submittal required for product review or product information will be made. The schedule can be modified, deducted, or added to by the City. The schedule shall be available at the preconstruction conference (see 1-08.0 of the Kent Special Provisions). The schedule of submittals must be accepted prior to the City making the first progress payment. The schedule shall identify the items that will be included in each submittal by listing the item or group of items and the Specification Section and paragraph number and bid item under which they are specified. The schedule shall indicate whether the submittal is required for product review of proposed equivalents, shop drawings, product data or samples or required for product information only. The Contractor shall allow a minimum of 21 days for the Engineer's review of each submittal or resubmittal. All submittals shall be in accordance with the approved schedule of submittals. Submittals shall be made early enough to allow adequate time for manufacturing, delivery, labor issues, additional review due to inadequate or incomplete submittals, and any other reasonably foreseeable delay. 1-06.7(3) Shop Drawings, Product Data, and Samples The Contractor shall submit the following for the Engineer's review: 1 . Shop Drawings: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 2. Product Data: Submit an electronic copy or three paper copies. Submittals will be marked, stamped and returned to the Contractor. The Contractor shall make and distribute any required copies for its superintendent, subcontractors and suppliers. 3. Samples: Submit three labeled samples or three sets of samples of manufacturer's full range of colors and finishes unless otherwise directed. One approved sample will be returned to the Contractor. Content of submittals: 1 . Each submittal shall include all of the items required for a complete assembly or system. 2. Submittals shall contain all of the physical, technical and performance data required to demonstrate conclusively that the items comply with the requirements of the Contract. 3. Each submittal shall verify that the physical characteristics of items submitted, including size, configurations, clearances, mounting points, utility connection points and service access points, are suitable for the space provided and are compatible with other interrelated items. 2018 Paint Line Striping & RPM/Araucto 1 - 11 April 18, 2018 Project Number: R00602 4. The Contractor shall label each Product Data submittal, Shop Drawing or Sample with the bid item number and, if a lump sum bid item, provide a reference to the applicable KSP paragraph. The Contractor shall highlight or mark every page of every copy of all Product Data submittals to show the specific items being submitted and all options included or choices offered. The City encourages a creative approach to complete a timely, economical, and quality project. Submittals that contain deviations from the requirements of the Contract shall be accompanied by a separate letter explaining the deviations. The Contractor's letter shall; 1 . Cite the specific Contract requirement including the Specification Section bid item number and paragraph number for which approval of a deviation is sought. 2, Describe the proposed alternate material, item or construction, explain its advantages, and explain how the proposed alternate meets or exceeds the Contract requirements. 3. State the reduction in Contract Price, if any, which is offered to the City. The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed deviation with or without cause. The Engineer will stamp and mark each submittal prior to returning it to the Contractor. The stamps will indicate one of the following: 1 . "APPROVED AS SUBMITTED" — Accepted subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. 2. "APPROVED AS NOTED" — Accepted subject to minor corrections that shall be made by the Contractor and subject to its compatibility with the work not covered in this submission. This response does not constitute approval or deletion of specified or required items not shown in the partial submission. No resubmission is required. 3. "AMEND AND RESUBMIT" — Rejected because of major inconsistencies, errors or insufficient information that shall be resolved or corrected by the Contractor prior to subsequent re- submittal. An amended resubmission is required. Re-submittals that contain changes that were not requested by the Engineer on the previous submittal shall note all changes and be accompanied by a letter explaining the changes. 1-06.7(4) Proposed Equivalents The Engineer retains the exclusive right, at his or her sole discretion, to accept or reject any proposed equivalent with or without cause. 2016 Paint Line Striping & RPM/Araucto 1 - 12 April 18, 2018 Project Number: R00602 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC I 1-07.2 State Taxes 1-07.2(1) State Sales Tax: WAC 458-20-171—Use Tax SECTION 1-07.2(1) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to use tax under Section 1-07.2(1) in the proposal bid items. 1-07.2(2) State Sales Tax: WAC 458-20-170—Retail Sales Tax SECTION 1-07.2(2) IS REVISED BY DELETING THE SECOND PARAGRAPH AND REPLACING WITH THE FOLLOWING: Without waiving the Contractor's obligation to understand and apply these tax rules correctly, the City has indicated those parts of the project that are subject to retail sales tax under Section 1 -07.2(2) in the proposal bid items. SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.6 Permits and Licenses The City has obtained the following permits: None SECTION 1-07.6 IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPHS AFTER THE LAST PARAGRAPH: A copy of each permit and/or license obtained by the Contractor shall be furnished to the City. Approved permits shall be furnished to the City upon completion of the project and prior to final acceptance. The Contractor shall promptly notify the City in writing of any variance in the contract work arising from the issuance of any permit. 1-07.9 Wages SECTION 1-07.9(1) IS SUPPLEMENTED BY INSERTING THE FOLLOWING PARAGRAPH AFTER THE SIXTH PARAGRAPH: 1-07.9(1) General To the extent allowed by law, the wage rates that will be in effect during the entire contract work period are those in effect on the day of bid opening, unless the City does not award the Contract within six months of the bid opening. 2018 Paint Line Striping & RPM/Araucto 1 - 13 April 18, 2018 Project Number: R00602 1-07.13 Contractor's Responsibility for Work SECTION 1-07. 13(4) IS REVISED BY DELETING THE SECOND SENTENCE OF THE FIRST PARAGRAPH AND DELETING THE LAST PARAGRAPH. 1-07.13(4) Repair of Damage SECTION 1-07. 14 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE BEGINNING OF THAT SECTION: 1-07.14 Responsibility for Damage To the extent a conflict exists between the terms of this Section 1 - 07.14 and Section 5 of the Contract, the terms of the Contract will control, Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07. 15(1) IS REVISED BYADDING THE FOLLOWING PARAGRAPH AFTER THE LAST PARAGRAPH: 1-07.15 Temporary Water Pollution Prevention 1-07.15(1) Spill Prevention, Control, and Countermeasures Plan When the proposal form includes multiple bid schedules and the "SPCC Plan" bid item is present in only one bid schedule, the lump sum payment item for the "SPCC Plan" in that one schedule will apply to all bid schedules for all costs associated with creating and updating the accepted SPCC Plan, and all costs associated with the setup of prevention measures and for implementing the current SPCC Plan as required by this Specifications. SECTION 1-07. 17 IS REVISED BY ADDING THE FOLLOWING SENTENCE TO THE END OF THE SECOND PARAGRAPH: 1-07.17 Utilities and Similar Facilities If a utility is known to have or suspected of having underground facilities within the area of the proposed excavation and that utility is not a subscriber to the utilities underground location center, the Contractor shall give individual notice to that utility within the same time frame prescribed in RCW 19.122.030 for subscriber utilities. SECTION 1-07. 17 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTIONS: 1-07.17(3) Utility Markings Once underground utilities are marked by the utility owner or its agent, and/or once new underground facilities have been installed by the Contractor, the Contractor/excavator is responsible to determine the 2018 Paint Line Striping & RPM/Araucto 1 - 14 April 18, 2018 Project Number: R00602 precise location of underground facilities that may conflict with other underground construction. The Contractor shall maintain the marks or a record of the location of buried facilities for the duration of time needed to avoid future damage until installation of all planned improvements at that location is complete. 1-07.1711 Payment All costs to comply with subsection 1 -07.17(3) and for the protection and repair of all identified or suspected underground utilities specified in RCW 19.122 are incidental to the contract and are the responsibility of the Contractor/excavator. The Contractor shall include all related costs in the unit bid prices of the contract. No additional time or monetary compensation shall be made for delays caused by utility re- marking or repair of damaged utilities due to the Contractor's failure to maintain marks or to locate utilities in accordance with this section. 1-07.17(5) Notification of Excavation Within ten business days but not less than two business days prior to the commencement of excavation, the Contractor shall provide written notice (or other form of notice acceptable to the Engineer) to all owners Of underground facilities, whether public or private, that excavation will occur, and when excavation will occur. 1-07.17(6) Site Inspection Contractor warrants and represents that it has personally, or through its employees, agents and/or subcontractors, examined all property affected by this project and that it is knowledgeable of specific locations for water, gas, telephone, electric power and combined sewerage utilities within those areas. The following list of contacts is provided only as a convenience to the Contractor. It may not be accurate and may not constitute a complete list of all affected utilities. Centur Link Comcast Jason Tesdal Bill Walker 206-345-3488 253-288-7538 206-683-4242 (cell) 206-255-6975 (cell) Puget Sound Energy Gas Puget Sound Energy Power Glenn Helton Dennis Booth 253-395-6926 425-417-9188 (cell) 425-559-4647 (cell) Verizon Brad Landis 425-201-0901 425-766-1740 (cell) 2018 Paint Line Striping & RPM/Araucto 1 - 15 April 18, 2018 Project Number, R00602 SECTION 1-07. 18 IS REVISED BY ADDING THE FOLLOWING PARAGRAPH BEFORE THE FIRST PARAGRAPH: 1-07.18 Public Liability and Property Damage Insurance To the extent a conflict exists between the terms of this Section 1 - 07.18 and the insurance requirements in Section 7 of the Contract, the terms of the Contract will control. Any reference to the State, Governor, Commission, Secretary, or all officers and employees of the State also will include the City, its officers and employees. SECTION 1-07.24 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.24 Rights of Way Street right of way lines, limits of easements and limits of construction are indicated or defined on the plans. The Contractor's construction activities shall be confined within these limits, unless arrangements for use of private property are made. It is anticipated that the City will have obtained all right of way, easements or right of entry agreements prior to the start of construction. Locations where these rights have not been obtained will be brought to the Contractor's attention prior to start of construction. The Contractor shall not proceed with any portion of the work in areas where right of way, easements or rights of entry have not been acquired until the Engineer certifies to the Contractor that the right of way or easement is available or that the right of entry has been received. SECTION 1-07.26 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-07.26 Personal Liability of Public Officers Neither the City, the Engineer, nor any other official, officer or employee of the City shall be personally liable for any acts or failure to act in connection with the contract, it being understood that, in these matters, they are acting solely as agents of the City. 1-08 PROSECUTION AND PROGRESS SECTION 1-08 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 1-08.0 Preconstruction and Preconstruction Conference The Engineer will furnish the Contractor with up to ten (10) copies of the plans and specifications. Additional documents may be purchased from the City at the price specified by the City or in the Invitation to Bid. Prior to undertaking each part of the work, the Contractor shall carefully study and compare the Contract and check and verify all 2018 Paint Line striping & RPM/Araucto 1 - 16 April 18, 2018 Project Number: R00602 pertinent figures shown and all applicable field measurements. The Contractor shall promptly report in writing to the Engineer any conflict, error or discrepancy that the Contractor discovers. i After the Contract has been executed, but prior to the Contractor beginning the work, a preconstruction conference will be held with the Contractor, the Engineer and any other interested parties that the City determines to invite. The purpose of the preconstruction conference will be: 1 . To review the initial progress schedule. 2. To establish a working understanding among the various parties associated or affected by the work. 3. To establish and review procedures for progress payment, notifications, approvals, submittals, etc. 4. To verify normal working hours for the work. 5. To review safety standards and traffic control. 6. To discuss any other related items that may be pertinent to the work. The Contractor shall prepare and submit for approval, at or prior to the preconstruction conference the following: 1 . A price breakdown of all lump sum items. 2. A preliminary construction schedule. 3. A list of material sources for approval, if applicable. 4. Schedule of submittals. (See 1 -06.6(2)) 5. Temporary Erosion/Sedimentation Control Plan (TESCP) for approval. 6. Traffic Control Plan (TCP) for approval. 7. Request to sublet, for approval by the Engineer, of all subcontractors. SECTION 1-08.4 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-08.4 Notice to Proceed, Prosecution and Hours of Work Notice to Proceed will be given after the contract has been executed and the contract bond and evidence of required insurance have been approved by and filed with the City. Unless otherwise approved in writing by the Engineer, the Contractor shall not commence the work until the Notice to Proceed has been given by the Engineer. The City anticipates issuance of Notice to Proceed on or after July 5, 2018. The Contractor shall commence construction activities on the Project Site within ten working days of the Notice to Proceed Date. The Work thereafter shall be prosecuted diligently, vigorously, and without unauthorized interruption until physical completion of the work. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time(s) specified in the Contract. 2018 Paint Line Striping & RPM/Ara LICYO 1 - 17 April 18, 2018 Project Number: R00602 Except in the case of emerqency or unless otherwise approved by the Engineer, the normal straight time working hours for the Contractor shall be any consecutive 8 hour period between 7:00 a.m. and 6:00 p.m. Monday through Friday, unless otherwise specified in the Kent Special Provisions, with a 5-day work week, plus allowing a maximum one-hour lunch break in each working day. The normal straight time 8-hour working period for the contract shall be established at the preconstruction conference or prior to the Contractor commencing work. If a Contractor desires to perform work on holidays, Saturdays, Sundays, or before 7:00 a.m. or after 6:00 p.m. on any day, the Contractor shall apply in writing to the Engineer for permission to work those times. The Contractor shall notify the Engineer at least 48 hours in advance (72 hours in advance for weekend work) so that the Inspector's time may be scheduled. Permission to work longer than an 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. Permission to work between the hours of 10:00 p.m. and 7:00 a.m. during weekdays and between the hours of 10:00 p.m. and 9:00 a.m. on weekends or holidays may also be subject to noise control requirements. Approval to continue work during these hours may be revoked at any time the Contractor exceeds the City's noise control regulations or the city receives complaints from the public or adjoining property owners regarding noise from the Contractor's operations. The Contractor shall have no claim for damages or delays should this permission be revoked for these reasons. The Engineer may grant permission to work Saturdays, Sundays, holidays or other than the agreed upon normal straight time working hours, but may be subject to other conditions established by the City or Engineer. These conditions may include, but are not limited to the following: hours worked by City employees; impacts to the construction schedule; or accommodations to adjoining properties affected by the contract work. The Contractor shall coordinate its work around scheduled events that will likely impact its Work. The Contractor shall have no claim for damages or delays for work schedule conflicts. The following are known events that could impact the work: 1. Kent Cornucopia Days: July 13-15, 2018 1-08.4(A) Reimbursement for Overtime Work of City Employees Following is a non-exclusive list of work that may require Contractor reimbursement for overtime of City employees. The City will bill the Contractor at the OVERTIME RATE in order for locate crews to complete other work. If the locate request is for nights, weekend, holidays or at other times when locate crews are not normally working, all locate work and expenses, including travel, minimum call out times, and/or Holiday premiums will be borne by the Contractor. 2018 Paint Line Striping & RPM/Araucto 1 - 18 April 18, 2018 Project Number: R00602 1 . Locate work required to re-establish marks for City-owned underground facilities that were not maintained or recorded by the 1 Contractor in accordance with RCW 19.122.030. 2. Work required by City personnel or independent testing laboratories to re-test project materials, utility pressure or vacuum tests, camera surveys or water purity tests as the result of initial test failure on the part of the Contractor. 1-08.4(B) General The City allocates its resources to a contract based on the total time allowed in the contract. The City will accept a progress schedule indicating an early physical completion date but cannot guarantee the City resources will be available to meet the accelerated schedule. No additional compensation will be allowed if the Contractor is not able to meet its accelerated schedule due to the unavailability of City resources or for other reasons beyond the City's control. Unless previously approved by the Engineer, the original and all supplemental progress schedules shall not conflict with any time and order-of-work requirements in the contract. If the Engineer deems that the original or any necessary supplemental progress schedule does not provide adequate information, the City may withhold progress payments until a schedule containing needed information has been submitted by the Contractor and approved by the Engineer. The Engineer's acceptance of any schedule shall not transfer any of the Contractor's responsibilities to the City. The Contractor alone shall remain responsible for adjusting forces, equipment, and work schedules to ensure completion of the work within the times specified in the contract. SECTION 1-08.5 IS REVISED BY DELETING THE THIRD PARAGRAPH AND REPLACING WITH THE FOLLOWING: 1-08.5 Time for Completion Contract time shall begin on the day of the Notice to Proceed. The Contract Provisions may specify another starting date for Contract time, in which case, time will begin on the starting date specified. SECTION 1-08.6 IS REVISED BY DELETING THE FIFTH, SIXTH, AND SEVENTH PARAGRAPHS AND REPLACING WITH THE FOLLOWING: 1-08.6 Suspension of Work If the performance of all or any part of the Work is suspended for an unreasonable period of time by an act of the Contracting Agency in the administration of the Contract, or by failure to act within the time 2018 Paint Line Striping & RPM/Ai aucto 1 - 19 April 18, 2018 Project Number: R00602 specified in the Contract (or if no time is specified, within a reasonable time), the Engineer will make an adjustment for any increase in the cost or time for the performance of the Contract (excluding profit) necessarily caused by the suspension. However, no adjustment will be made for any suspension if (1) the performance would have been suspended by any other cause, including the fault or negligence of the Contractor, or (2) an equitable adjustment is provided for or excluded under any other provision of the Contract. If the Contactor believes that the performance of the Work is suspended for an unreasonable period of time and such suspension is the responsibility of the Contracting Agency, the Contractor shall immediately submit a written notice of protest to the Engineer as provided in Section 1 -04.5. No adjustment shall be allowed for any costs incurred more than 10 calendar days before the date the Engineer receives the Contractor's written notice to protest. In any event, no protest will be allowed later than the date of the Contractor's signature on the Final Pay Estimate. The Contractor shall keep full and complete records of the costs and additional time of such suspension, and shall permit the Engineer to have access to those records and any other records as may be deemed necessary by the Engineer to assist in evaluating the protest. The Engineer will determine if an equitable adjustment in cost or time is due as provided in this Section. The equitable adjustment for increase in costs, if due, shall be subject to the limitations provide in Section 1- 09.4, provided that no profit of any kind will be allowed on any increase in cost necessarily caused by the suspension. SECTION 1-08.7 MAINTENANCE DURING SUSPENSION IS REVISED BY DELETING THE FOURTH AND SIXTH PARAGRAPHS. 1-09 MEASUREMENT AND PAYMENT SECTION 1-09.9 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 1-09.9(2) City's Right to Withhold Certain Amounts In addition to the amount that the City may otherwise retain under the Contract, the City may withhold a sufficient amount of any payments otherwise due to the Contractor, including nullifying the whole or part of any previous payment, because of subsequently discovered evidence or subsequent inspections that, in the City's judgment, may be necessary to cover the following: 1 . The cost of defective work not remedied. 2. Fees incurred for material inspection, and overtime engineering and inspection for which the Contractor is obligated under this Contract. 3. Fees and charges of public authorities or municipalities. 4. Liquidated damages. 2018 Paint Line Striping & RPM/Araucto 1 - 20 April 18, 2018 Project Number: R00602 i 5. Engineering and inspection fees beyond Completion Date. 6. Cost of City personnel to re-establish locate marks for City-owned facilities that were not maintained by the Contractor in accordance i with RCW 19.122.030 (3). 7. Additional inspection, testing and lab fees for re-doing failed, i water, other utility tests. , SECTION 1-09. 11(3) IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.11 (3) Time Limitations and Jurisdiction This contract shall be construed and interpreted in accordance with the laws of the State of Washington. The venue of any claims or causes of action arising from this contract shall be exclusively in the Superior Court of King County, located in Kent, Washington. For convenience of the parties to this contract, it is mutually agreed that any claims or causes of action which the Contractor has against the City arising from this contract shall be brought within 180 days from the date of Final Acceptance of the contract by the City. The parties understand and agree that the Contractor's failure to bring suit within the time period provided shall be a complete bar to any such claims or causes of action. It is further mutually agreed by the parties that when any claims or causes of action that a Contractor asserts against the City arising from this contract are filed with the City or initiated in court, the Contractor shall permit the City to have timely access to any records deemed necessary by the City to assist in evaluating the claims or actions. SECTION 1-09. 13 IS DELETED AND REPLACED WITH THE FOLLOWING: 1-09.13 Final Decision and Appeal All disputes arising under this contract shall proceed pursuant to Section 1 -04.5 and 1 -09.11 of the WSDOT Standard Specifications and any Kent Special Provisions provided for in the contract for claims and resolution of disputes. The provisions of these sections and the Kent Special Provisions must be complied with as a condition precedent to the Contractor's right to seek an appeal of the City's decision. The City's decision under Section 1-09.11 will be final and conclusive. Thereafter, the exclusive means of Contractor's right to appeal shall only be by filing suit exclusively under the venue, rules and jurisdiction of the Superior Court of King County, located in Kent, Washington, unless the parties agree in writing to an alternative dispute resolution process. 1-10 TEMPORARY TRAFFIC CONTROL SECTION 1-10.2(1) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 2018 Paint Line Striping & RPM/Araucto 1 - 21 April 18, 2018 Project Number, R00502 1-10.2(1) General The TCS shall be certified as a work site traffic control supervisor by one of the following: Evergreen Safety Council 401 Pontius Avenue North Seattle, WA 98109 1-800-521-0778 or206-382-4090 The Northwest Laborers-Employers Training Trust 27055 Ohio Avenue Kingston, WA 98346 360-297-3035 The American Traffic Safety Services Association 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 Training Dept. Toll Free (877) 642-4637 or (540) 368-1701 1-10.3(3) Traffic Control Devices SECTION 1-10.3 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTION: 1-10.3(3)L Temporary Traffic Control Devices When the bid proposal includes an item for "Temporary Traffic Control Devices," the work required for this item shall be furnishing barricades, flashers, cones, traffic safety drums, and other temporary traffic control devices, unless the contract provides for furnishing a specific temporary traffic control device under another item. The item "Temporary Traffic Control Devices" includes: 1 . Initial delivery to the project site (or temporary storage) in good repair and in clean usable condition, 2. Repair or replacement when they are damaged and they are still needed on the project, and 3. Removal from the project site when they are no longer on the project. SECTION 1-10.4(1) IS SUPPLEMENTED BYADDINGTHEFOLLOWING; 1-10.4(1) Lump Sum Bid for Project (No Unit Items) The proposal contains the item "Project Temporary Traffic Control," lump sum. The provisions of Section 1-10.4(1) shall apply. 2018 Paint Line Striping & RPM/Araucto 1 - 22 April 18, 2018 Project Number: R00602 8-09 RAISED PAVEMENT MARKERS SECTION 8-09. 1 IS DELETED AND REPLACED WITH THE FOLLOWING: I 8-09.1 Description This work shall consist of furnishing, and installing new raised pavement markers (RPM) to replace damaged and missing RPMs upon the roadway surface in accordance with applicable Kent Standard Plans and/or WSDOT Standard Plans at locations shown on 2018 RPM Replacement Location Man or as directed by the Engineer. Removal of existing damaged RPMs shall be included in the unit bid price for this item unless otherwise specified. This Work also includes cleanup and disposal of cuttings and other resultant debris. The color of pavement markers shall conform to the color of the marking for which they supplement, substitute for, or server as a positioning guide for. Unless otherwise noted, new raised pavement markers shall be installed in strict conformance to Kent Standard Plans 6-73M and 6-74M. The 2018 RPM Replacement Location Map show more than what can be completed under this contract. The Contractor shall approach this project as follows: The Contractor shall install new Type 2 RPM upon roadway(s) requiring Type 2YY and/or Type 2W, with the smallest priority number first before proceeding with the same activity upon roadway with the next lowest priority number. The Contractor shall immediately cease installation of Type 2 RPM when the total installed amount equal the contract quantity for Type 2 RPM or as directed by the Engineer. The Contractor shall replace all damaged and missing Type 1 RPMs upon roadway(s) requiring Type 1Y and/or Type 11N, with the smallest priority number first before proceeding with the same activity upon roadway with the next lowest priority number. The Contractor shall immediately cease installation of Type 1 RPM when the total installed amount equal the contract quantity for Type 1 RPM or as directed by the Engineer. SECTION 8-09.3 IS SUPPLEMENTED BY ADDING THE FOLLOWING NEW SECTION: 8-09.3(8) Reporting For each week that RPM Work is performed, the Contractor shall submit a report summarizing the accomplished work. The report shall be in adequate detail to determine the number of RPM, color and type, 2018 Paint Line Striping & RPM/Araucto S - 1 April 18, 2018 Project Number. R00602 installed on each location described on the location map. The report shall be submitted to the Engineer by the end of the week following the RPM Work or some other mutually agreed upon submittal time. The Contractor shall sign each report certifying that material was installed and the linear footage installed are based on actual measurements in accordance with the specifications. At the end of the Contract, the Contractor shall provide the total amount of RPM installed for each type and color. SECTION 8-09.3(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-09.3(2) Surface Preparation In removing raised pavement markers and plastic traffic buttons, the Contractor shall: 1 . Haul broken-up pieces of raised pavement markers, plastic traffic buttons and all waste material to an off-project site, unless otherwise directed by the Engineer, or permitted by the Kent Special Provisions. 2. Remove all sand, or other waste materials deposited on the pavement, or within the City's stormwater management system, as a result of the removal process selected by the Contractor. 3. Install temporary lane markings at their sole expense, unless the street is going to be remarked, or overlaid immediately after the completed removal of raised pavement markers and/or plastic traffic buttons. 4. Take suitable care so as not to damage the underlying pavement surface more than necessary, clean all underlying pavement, including the complete removal of all remaining adhesive, and fill any surface voids caused by the removal work. 8-22 PAVEMENT MARKING THE LAST SENTENCE OF THE SECOND PARAGRAPH OF SECTION 8-22. 1 IS REVISED AS FOLLOWS: 8-22.1 Description Traffic letters used in word messages shall be 6-feet high with the exception of the "R" in the railroad crossing symbol which shall be as shown on the standard plans. SECTION 8-22. 1 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.1 Description This Work also consists of furnishing, and installing traffic paint upon existing traffic curbing. 2018 Paint Line Striping & RPM/Araucto 8 - 2 April 18, 2018 Project Number: R00602 SECTION 8-22.2 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.2 Materials Painted striping and curbing paint shall be installed using Low VOC Solvent Based Paint meeting the requirements of Section 9-34. 8-22.3(3) Marking Application SECTION 8-22.3(3)B IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(3)B Line Patterns Double Solid Yellow Center Line - Two solid yellow lines, each 4 inches wide, separated by a 4-inch space. Single Solid Yellow Center Line - One solid yellow line, 4 inches wide, to delineate adjacent curb, barrier, etc. at select locations. Skip Center Line - A broken yellow line 4 inches wide. The broken pattern shall be based on a 40-foot unit consisting of a 10-foot line and a 30-foot gap. Skip center stripe may be used as centerline delineation on select two way highways and streets. Two Way Left Turn Line (TWLTL) - A solid yellow line, 4 inches wide, with a broken yellow line 4 inches wide, separated by a 4-inch space. The broken pattern shall be based on a 40-foot unit consisting of a 10-foot line and a 30-foot gap. The solid line shall be installed to the right of the broken line relative to the direction of travel and for each direction of travel. Skip Lane Line - A broken white line 4 inches wide to delineate adjacent lanes traveling in the same direction. The broken pattern shall be based on a 40-foot unit consisting of a 10-foot line and a 30-foot gap. Gore / Wide Line - A solid white line 8 inches wide used for delineation at ramp connections, to separate left and right turning movements from through movements, to separate high Occupancy Vehicle (HOV) lanes from general purpose lanes, for traffic islands, hash marks, chevrons, and other applications. Wide Dotted Line - A broken white or yellow line, 8 inches wide, matching color with its associated solid or broken line. The dotted pattern shall be based on an 8-foot unit consisting of a 2-foot line and a 6-foot gap. Dotted Line - A broken white or yellow line, 4 inches wide, matching color with its associated solid or broken line, an extension of an edge line, lane line, or centerline used at exit ramps, intersections, horizontal curves, multiple turn lanes, and other locations where the direction of travel for through traffic is unclear. The dotted pattern shall be based on a 6-foot unit consisting of a 2-foot line and a 4-foot gap. 2018 Paint Line striping & RPM/Araucto 8 - 3 April 18, 2018 Project Number R00602 Edge Line / Solid Lane Line - A single solid white line 4 inches wide used for road edge and lane delineation, bike lane delineation, adjacent lanes traveling in the same direction or bus pull-outs. Bike Lane Line - A solid white line 8 inches wide that is used to delineate a bike lane adjacent general purpose lanes. Dotted Bike Lane Line - A dotted white line 8 inches wide with the dotted pattern based on an 8-foot unit consisting of a 2-foot line and a 6-foot gap. Bike Lane Dotted Line is used to discontinue a Bike Lane Line in advance of right-turns at major intersections or corresponding with transit stops. Curbing Painting — Existing traffic curbing shall be painted with one full coat of paint. The paint can be applied by brush or spray on all side of curbing visible to vehicular traffic. The Contractor shall install glass traffic paint beads sprinkled in the wet paint at the rate of 12 pounds per 100 linear feet of curbing. The beads shall conform to the requirements of Section 9-34.4. 8-22.3 Construction Requirements 8-22.3(1) Preliminary Spotting THE FIRST SENTENCE OF SECTION 8-22.3(1) IS REVISED AS FOLLOWS: The Engineer will provide necessary begin/end control points for work sections where begin/end points cannot be readily discerned per existing permanent markings and/or newly installed permanent markings. A list of intersections where newly installed permanent markings are likely to be encountered, and therefore excluded from this Contract, can be provided before work commences. THE THIRD SENTENCE IS REVISED AS FOLLOWS: Approval by the Engineer is required before marking begins unless other mutually agreed upon inspection and approval process is proposed and approved. SECTION 8-22.3(2) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(2) Preparation of Roadway Surfaces Traffic curbing surfaces shall be dry, and within the proper temperature range prior to painting. SECTION 8-22.3(3) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(3) Marking Application The Contractor is responsible for providing traffic control and traffic control devices as necessary to direct vehicular traffic away from freshly painted traffic stripes until such time as the marking paint has 2018 Paint Lino Striping & RPM/Araucto 8 - 4 April 18, 2018 Project Number. R00602 completely dried. Failure to ensure reasonable protection for the undried paint stripes will result in the Engineer's decision to adjust the method of payment for damaged paint stripes. The Engineer's decision regarding the means of payment adjustment for vehicle damaged paint stripes is final in this matter. THE FIRST SENTENCE OF THE FOURTH PARAGRAPH OF SECTION 8-22.3(3)E IS REVISED AS FOLLOWS: 8-22.3(3)E Installation One coat application of paint will be required to complete all paint markings installed over existing paint markings. Two applications of paint will be required to complete all paint markings installed on new surface-treated roadways or as noted in the Appendix A. Vehicle and pedestrian tracking of newly applied striping shall be removed per section 8-22.3(6), and the affected portion of marking reinstalled by the end of the next working day. THE FIRST PARAGRAPH OF SECTION 8-22.3(3)F IS SUPPLEMENTED WITH THE FOLLOWING: 8-22.3(3)F Application Thickness Marking Material Application HMA PCC BST .......mmmm _ Groove Depth _ Paint — one coat spray 1 15 15 15 SECTION 8-22.3(4) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(4) Tolerances for Lines Length of Line: The longitudinal accumulative error within a 40-foot length of dotted line shall not exceed plus or minus 1 inch. The dotted line segment shall not be less than 2 feet. The gap spacing specified for skip/broken and dotted lines in Section 8-22.3(B) of Kent Special Provisions are anticipated to be the shortest gaps that exists. Regardless of the specified gap spacing, the Contractor shall paint over skip/broken and dotted paint lines to reasonably match the existing pattern. SECTION 8-22.3(6) IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.3(6) Removal of Pavement Markings Only hydroblasting equipment will be allowed for the removal of pavement markings as called for in Appendix A. Vacuum shrouded equipment, or other equally effective means, shall be used to contain and collect all pavement marking debris and excess water. Collected water and debris shall be disposed of off the project site in accordance with Department of Ecology or other federal, state or local regulations. The removal of raised pavement markers shall be incidental to the removal of the associated marking. 2018 Paint Line Striping & RPM/Araucto 8 - 5 April 18, 2018 Project Number: R00602 SECTION 8-22.3 IS SUPPLEMENTED BYADDING THE FOLLOWING NEW SECTION: 8-22.3(7) Reporting For each week that Work is performed, the Contractor shall submit a report summarizing the accomplished work. The report shall be in the same format and detail as Appendix A, for each street section painted, showing the total installed linear footage for each line pattern and color. The report shall be submitted to the Engineer by the end of the week following the Work or some other mutually agreed upon submittal time. The Contractor shall sign each report certifying that material was installed and the linear footage installed are based on actual measurements in accordance with the specifications. At the end of the Contract, the Contractor shall provide the total amount of paint in gallons used for each color and the total amount of beads in pounds used to perform the Work. SECTION 8-22.4 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.4 Measurement "Painted Double Solid Line" "Painted Single Solid Line„ "Painted Skip Lane Line„ "Painted Dotted Line" "Painted TWLTL Line" The measurement for the above items will be based on a marking system capable of simultaneous application of three 4-inch lines with two 4-inch spaces. No deduction will be made for the unmarked area when the marking includes a broken line such as center line, dotted extension line, center line with no-pass line, lane line, reversible lane line, or two-way left-turn center line. No additional measurement will be made when more than one line can be installed on a single pass such as center line with no-pass line, double center line, double lane line, reversible lane line, or two-way left-turn center line The measurement for "Painted Wide Lane Line" or "Painted Bike Lane Line" will be based on the total length of each painted line installed. No deduction will be made for the unmarked area when the marking includes a broken line such as, wide broken lane line, drop lane line, or wide dotted lane line. The measurement for double wide lane line will be based on the total length of each wide lane line installed. The measurement for "Painting Traffic Curb" will be based on the total length of painted curb. No additional measurement will be made for curbing painted on both sides of the curbing. 2018 Paint Line Striping & RPPA/Araucto 8 - 6 April 10, 2018 Project Number R00602 SECTION B-22-5 IS SUPPLEMENTED BY ADDING THE FOLLOWING: 8-22.5 Payment "Painted Double Solid Line," per linear foot "Painted Single Solid Line," per linear foot "Painted Skip Lane Line," per linear foot "Painted Dotted Line," per linear foot "Painted TWLTL Line," per linear foot "Painted Bike Lane Line," per linear foot "Painting Traffic Curia," per linear foot 2018 Paint Line Striping & RPM/Araucto 8 - 7 April 18, 2018 Project Number: R00602 IKENT STANDARD PLANS The following Kent Standard Plans supplement all other plans, which have been prepared for this project and are considered to be a part of the project plans. STREET 6-73M Typical RPM Lane Markings 6-74M Typical Lane Markings 2018 Paint Line Striping & RPM/Araucto A - 1 April 18, 2018 Project Number: R00602 41' !. 12' 30-___ 0 0 o a o Ono 0 0 0 0 o a o 0 0 0 0 Ono 0 0 0 0 0 0 0 0 0 0 0 o D o 0 0 0 0 o a a a o 0 0 o a o 0 0 0 r a 0 0 0 0 0 0 0 0 0 a 0 0 0 0 a 0 a 0 0 VARIES (300 MBAX.I .... .....-_ ..._.,.. tl 5 TWO WAY LEFT ' TURN LANE '"� f 0 0 0 0 0 0 0 0 0 o a 0 0 0 a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 a o 0 0 0 0 o a o 0 0 0 0 0 o a o 0 0 0 0 0 0 0 21 TYPE 1Y RPM 4' GAP — TYPE 2YY RPM TRAFFIC DIRECTION TWO WAY LEFT TURN LINES .................... _...._....__— ._..__._._._............. TRAFFIC DIRECTION TRAFFIC DIRECTION __. 21'_ p� 3' TYPE 2W OR Y RPM a o 0 0 0 0 0 a o 0 0 0 0 0 0 a 0 0 I0 TYPE 1W OR Y RPM tk 00 0000000 000 0aaa000 21 `. TYPE 1Y RPM 4"GAP `� 3. TYPE 2YYRPM 8a8888/8 /88888888888 NO GAP TRAFFIC DIRECTION �,r 51— DOUBLE YELLOW CENTER LINE WIDE LINE ---.............................. _--._...,..-...____.....,..,..... _ TRAFFIC DIRECTION TRAFFIC............DIRECTION 42" ..1 42' .... ___. mm.. ... 12' _ 12' 30 3q'.... ..__" 31 aL0000 pa pp a,,a•..a 00 no 000 y TYPE 1W RPM ``•—TYPE 2W RPM ---TYPE 1W RPM �-TYPE 2W RPM ,TRAFFIC DIRECTION TRAFFIC DIRECTION LANE LINE SKIP CENTER LINE ........., ...... ......... ........ — TYPE 2Y RPM 6'«{_ 21 ... TYPE 1Y RPM _3 --- _.�,a_ - 3 8 8 88 88 88 88 88 88 �__...... �I - k8 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 ''^r, y'``—TYPE IW RPM 00 00 00 00 00 0o °o0 00000 000000 000000 4„— TYPE 2W RPM 18"-RPM'S EQUALLY SPACED -- TRAFFIC DIRECTION BARRIER LINE DOTTED WIDE LINE ._.............. m. ...m....... �� 12' 1E._..- 8 42' 3 `* 0 0 0 0 0 0 0 0 0 0 0 a Be —I—o a 0 0 0 0 0 0 0 0 �''`, `"- TYPE 1W RPM q^., �``—TYPE 2W RPM TYPE 2W RPM TYPE 1W RPM DROP LANE LINE TRAFFIC DIRECTION EDGE LINE - '��}Ol y;.��,�Pr FZF'�-���y NOTE:THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT """" ------------- ^ AN ELECTRONIC DUPLICATE,THE ORIGINAL, SIGNED BY THE ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT NOTES � v t1l THE CITY OF KENT, A COPY MAY BE OBTAINED UPON REQUEST 1. RAISED PAVEMENT MARKERS WS OT STANDARD SPECIFICATIONS 4 w , CITY NG KENT (RPM'S)SHALL BE INSTALLED PER ENGINEERING DEPARTMENT 8-09, 9-02.1(8),9-26.2 AND e-21tikrGlsr , c. �� * / KENT TYPICAL RPM LANE a„„ MARKINGS .�IQNAL " '� ...._. ._-........................................ _...... D&.SO4ED Dw �.S�t.:ntE, IllrJfi STANDARD PLAN DRAWN .PG .. _....._,._,..� ...,. -. DArE rfiFcllc"ir - - � 6-73M n�Ps¢uvets �,u�.„ TRAFFIC DIRECTION --4" CAP VARIES (800 MAX.) 5. 2 5' TWO WAY LEFT TURN LANE TRAFFIC DIRECTION TWO WAY LEFT TURN LINES TRAFFIC DIRECTION _ TRAFFIC DIRECTION 20 ......8"WHITE LINE a ° TYPE 2W RPM Y� . cvrn TYPE 2YY RPM o ati ,w 2 an 4 GAP 4 GAP EA -rr..... ...,..:P ...._....n.-ry --- OW LINE '`` 4"YELL TRAFFIC DIRECTION TRAFFIC DIRECTION DOUBLE YELLOW CENTER LINE WIDE LINE TRAFFIC DIRECTION _ ... TRAFFIC DIRECTION 30 11' 30' 1' I _.. -----..-.._._-------._____-..fI n o O TYPE 2W RPM 4"WHITE LINE 1� TYPE 2Y RPM L 4"YELLOW LINE TRAFFIC DIRECTION TRAFFIC DIRECTION LANE LINE SKIP CENTER LINE 61 -------.. rs «- C&� —TYPE 2W ORPM -- 4" WHITE LINE ...4"GAP --8" WHITE LINE EDGE LINE DOTTED WIDE LINE TRAFFIC DIRECTION .,.f.��._3 9. 21'(TYP.) 18"YELLOW BARRIER N LINE T" WHITE LINE 18"-TYPE 2Y RPM'S EQUALLY SPACED _.,. E82W RPM TRAFFIC DIRECTION DROP LANE LINE F RE BARRIER LINE ...... ..... .......... ........ --------- -- ........... NOTES; �, 1'( CITY OF KENT A RAISED PAVEMENT MARKERS(RPM'S) cn �'� ENGINEERING DEPARTMENT SHALL BE INSTALLED PER WSDOT STANDARD SPECIFICATIONS 8-09, *+yp/' ," T TYPICAL LANE MARKINGS 9-02.1(8),9-26.2 AND 9-21 4 38296 2' w DESIgNED Ea STANDARD PWN lCD, MPgwYVClS . S , ^.JE Drvl AL cHccREo ATE as .. aD)a 6-74M cry ET" ........_ APPENDIX A AND LOCATION MAPS I I 2018 Paint Line Striping & RPM/AraUCte A - 2 April 18, 2018 Project Number: R00602 i u� I I � i III I � I n r J � I I III I y � LI I ' � Illlll , i II � � ail Ll � l .. ll � l II 'IIII� �II � I I , , III ' IIi L s l � ' I I � ' I .I IIIII Il I � l , I I i ICI Il lj 7 E d LL I r a � i ik Y r r I I ' i , I I � Ii III I I Il � I � I I � IIII � � I� III I � II � II � ... ... . ....... ; .,1 .. , 1 i__ ..._, a � __.�...� ljj ej u ) � F1 i III . !� I 1 I � K L � . d � I II1IIliIIi I r � p I 5 " 8�r �� �I � I i l , lll 111 �� lill ' � �J �,i , ; � . . � I� I Illlllllil �' I � , � ��i ... .......... .......... I "dIII g w ;I w. i , l it � .. ......... ... .. ........ it .... ...... TlY_ Ii V v I v ka Li N, be 1i.. II it it Ilil ! � i I1i li ! L . _ .. , I , I li L_I III. ! II w A i II L , II I I , � � � : �4 &m ILLIII I � I `illl it LIIIII l II IIU To . a u.�j= j I ,uIIII ` I . I 1I ' L iII ' I ', I II '� I _I IIIII II a� ir LI x 1 , z> r ti iI � ILiIII I II II 61 I n Yr wi� 'Fi i K 1 "I k a� IPA n n v 111j ..� � mL d I y ...._ IT � I i I I �� _, IIa _ ll , lli 1 II I I w Y yy () 9 IN I� V I ir _ . i I I I II m II � 1 1 Li i 1 A ki 1 II 1 J ....... .............. J J... ld CIE it i a I . . . � I v �_ ' 1iI . � IIII I � I_IIIL:_� II... I I_ ....11_ � If a if � N v if i if III`t u 1 f �,f i l t d k S .I hif11 ;: i f 'fi �fi ,f ,;: .......... LN 1, 0 YwIn z N n e I U Ay m 1 1 y j N N r, .. 'Y' 'N,.:. C � CDw , Q d W maxwv ��m umro fl � w 1 J Z 3.. . •� w c Of. �.... 1� aray. 00 ra� as IM yp a *! r 7 irk z z a •'d � � � ..w M1Y wwmmwr(wunuwwuwwwwwwwonxv M j � � �Y ' 4 � tor a a ., w �.,......... ...... —.......w.cw...�... m ! w r 711 12f (,,r' vu o pA) f�➢ CB 4.J V ij �" a S In0'.tl p" k ra s no ta� ..._ ref Sir n o h Q J UI pg 2YI e/ ea St 1 5I lad$1 j4 / �> > r d% 51 'IR l r ff , rod 7 s cnlol __ 4 A rN < qr,SI � e vr� l � �S tIl4,1 SI � Q N VOI II � yyp� I;I LNNUNfZt �" � � 1/( a ,gym al rst m � �� uam m�wmnwe wwwa.�ww 00 wjfrcrar2r�zunii�m,wr �Ir�rA �rJ�nulruiir:�uz 1pmu°hln f CP " r Y v fla , V� a �� �� r rJJJ r �1 .1`li a »use � � Q- � J .nNi ev r r>,'bl 1 / dywl' �� f^,payy,�mmmmerrmr� w.w•, h fn7 n m �pprm rmnrmnu;umrwm�i�uhr�rm`I�ui¢ rmdurmcwrr/lwn aomnrzmwraaeunnmr �..rv. `*". r r• r ,<Pf / r /� "dfl ` uP/NAA/aPWinpPb;tr;nnUll��kl//¢Ir renraup aPdfifmpaieJlfi(�uu��l6/fIrll Nllllryl n('ll�,ivnhxlil�i)/N/N/ I�IVYIINV I�tr 17vl k' cad Ir v � � rT.$ •unti�Ur� �•��� rli ��f ,q( g 166 at oa ) T .oeu wl W J f � � S NO m ,ulonuunoeu rr/NMmlui rwry 4 IT Id ,, r �r,� �. grab ,� II 40I 4 ".gll0 �. r in 'rI V 2105 ...�.. �..�.. u i / Jr ff 211, Pi r �illsmimmmrrrmrrzrznurmuxra� n- mn?nonr611(tiS mwr�„° 11J r J �uNrkyyhoi uuRrcurrem r111vi� l0 (NtiY/r@ IJ6ar �wru ; nlauViwurraanmI. rrrpJlom `rvdbmx t¢eilorlrrmniruruvrai�rriJl;i „,JOk`kH1kJy�,ultrv. �, /�III�� J` uxlrunira¢m�nru.t�"" 1 11 nnaiirvnitr�atnnVCrtrdia� _ - i ' PAGE 6 DOWN 2018 Paint Line Striping Contract Location Flap Legend KENT GnoammrQmrx Paint JIMIDCoord Painting wl Paving NKMRM Convert to DYCL,coord painting wl paving ' 0 500 1,000 123 Map Key(see Appendix A) iiiiiinillor=Feet Produced by Pavement Manager'.Joaeph Araucto U'.1MXM2018 Pa1nt5trlping Mapback,I Printed.April 2018 1 of 19 r fiIVN M9'81 �� 0 If �� � Mwuwm4ww✓uwwlwwuyM ,IlwAt!urvsWm '4u •, ,, ,„u �,„);, O,SI y id1':.,i;.'r�., /µyrwwamdssrdwu4 4,11 ,,IIJI 11 av Pr lF pall,nll� rear 455 IpIUg9ADlApp ✓ pv' 0��� �.,.d "wtts, 454 cool '4 n 411 328 0,7 ek r +, n I� r T6 veil r . 1m m4.t4ktl.f,l + J� . a, 453ip t r,t r 5 10fi PI lql 1 / (rSmuYiJl� i�YlyluAuNlt J m / sGl rP�si �x rr+ _.S,C4Y.rl, Si I raorrmgm�r`"ap"'90"juat` v.y, A' ^ .mw,w....,, ...�..,.... drl 4 ya 14 r in ''d'r0/al�liroionwu+Vlr>)r4<��115�n✓✓�✓ni 4 U, �' t� Y f 1%1 �s ✓ �� rlr. trrmmtrmrrorv„aIA'inGuulA rrvnitl �'v uo 'i ,( �.ewrmtut�7 1 atii�iinivrruurrnn rn� / ( 9 r1ramp,mnm,Au eGm rsrtru�ulnrLm ` a a l e j, r 1% 0 � 1 r b i � I r.��✓yzsl! r umumnul7Narr .-..,r,� '* I f �? r"rv�KAfl,�oocmmri�wvmusurmfff �t � ,,.� ( {� f 1U llff wmrYis u, ,roo rA rn¢arnnlrr✓ I w s, r �, vyiean,wll;rniur tri+�J+yui0lre[r,oprmnr9nlnr✓iuiar�ml%��moi9/lmk�rlr�u)iY�7l�uanuu lrenlrr�nrunxripmnlllllt�ir dnxruunirrrn v _. / N 11 (lMnm)�2fp✓///r/OI�GApLJU11NYD01(^//rr I XAfl4ed89/AJDIIUOJAMINE(DIkiP(/OIIGG/////// !lIIIV/l/lllllfk �1� S 196St t 'y I 1 Ii4i Werarrnirm J m �, rn 4,uor+l � I �� �( r r_.._ ...... i m - 1 .1 syrip'rg t ... 1 r v a f� u✓ m r �� kdy ....Ilm -"- srr vGmAlwynr ✓rtr nwn 'r )L qq n„nrrs+nupoArr� U v yy yy Ir n.0)� . .n'' �. 2g l �jl m�B�m���umL,rw �Ylktn l0l� �� O r ._ 6 �ereml r+nnuUtrc IDY21 i � �45$ u, � � � r� � 1i „n at � r�1�i5 woomudw n quo _ (a I� f ,,, I.00"! 1 ,+ sll(F II1I /J�!SS I d _... ... .._ I; y " ra .:fax ce,� .�maan7mr l;Iknl611irw Imums�rrm mrrr7�4VW' I`aIf"011� I au ) i u yj�,+ArthmaolZlYeu�"�In 4V �,aaest (� „wUA✓1 v uu>1a✓ os 1 621n 11 i ' 19fl r �� ..... i .. •I✓ i� ' + . rvrnxtol wi+vMiw,,uypnl rc ,rrq. "" a5ruasanl xrrmmlrl�l!"rkrruurruirmr�orie✓arri a I+t urr' p ( a>Uxmanr, +' ✓Mi!wammrcnnwm tra rmmlivarcpammmrmf "_' rruu:wtlyw�j, - . I d :i C _ (`J cn nnr tqa�of�irvu.+m Amlwunvm vnu . � 4 C Y( C V9� ( C h1 k V7X pI 14 '(e( �/•"'••.'"'"( Y 111'n1 ,f41 Gr 277 I 'Y27 ` r vv a n, b�C/IROpN1Y��f@MAIlNKlit 4LIVIlYMFl((��}rrNIY!/lPHV1II7G JbM�lAliy}Ay;�I0.4radtim! -�-.. —� 5 If 3tl �� `�" � ', ry C II 276 � .'PAGE 7 DOWN ,. .. )f,. r`mn 2018 Faint Line Striping Contract Location Map Legend n K�NT niwauvmwuunu Paint 413EWCoord Painting wl Paving Glum Convert to DYCL,coord painting wl paving 0 500 1,000 123 Map Key(see Appendix A) yXiiiiiiin==Feet Produced by Pavement Manager.Joseph Arencto U WXDQ018 PHint S[riping Mapbook rnxd Printed_April 2018 2 OF 19 r1 ( �ii1;>'C t7J SC� I'I Ixu�w r` ''Ix IvraW ,o- �tru{'�rvn nut /� !f rl I 1!!1 SF, to&;1 li p11 1 I ( ,,� sE rP;,, J xc,ry , t !�I tIt krioIII ^ ° r m � s � r SD I s� d nar a w rr � W i q�J J bid tiX) A u1 5 - SE rMPI l,tl In I .o �m 1��jiA�e, ,nr rco AI r— a� �Er to 81 1aulr rr,r5t eg I� y �•, 1 erBH',3+I ut r0 luihl nr U nn.I r �u„ {i� ' � .� -. rl , r ev;(� f 51)01,1 �� { I111 L 1e1911 Fl , Ira i xj ) 10- rrnro r+I ri PI mm rr ip m m m4Ra^pim ea� i1 ..,.. �� � u � f � 'S/Ul WW I �Iu:.,;a.�� {a ��tJli 0 ulylr � 11 a g - Y I nlwuuuup erroAJV})pua�i}lii�7D)rxl elp'N's"t IlRmar�ir�lmnl %/IJYiIX!)IU/Fllr/0/RD � T+{ � '.•••--.__.n 9E,'16 511 En K a 1 Mist N W r Y p1 Z 4 �� I'i1 y, aY m �� m�mizrrnrni r,.{tlirnu nxmimir rmaimmar r�Wryatrxrrmr� �nurm 7r1�1�{rAfaAD,§�raanrn{r1ryu��mlorwu��miu�ml�rrrv, .... �, �„ � 'I,�, 4 �V 1i r �2 �� d� mir �11� h' .. a �Ill�mnarnnrmr rRliRN7mWd t ... �. day ya oI svI n 1 { ✓ , eL w. f xi 1W1 v r u,,l n �� t 11 fi I i 1 r 4 oEw 1)i 466 14�l dear J �a ear � P anJ' �� r;, � 14x l f . )` III, •� st r , n f t ,e utP y V F� st Orr '.V r 28� v Is' r r, 1444 � �.. Irnr'r'/ 'Y,S�'runmx,dx✓yinlrl yoifi" 'J p,%%''t4 yJ»+rr �d 00pAt"111", yvrrriw linIDwu IwJ1„Irrriu nixrnlflirgirepJemxeloumeiGiror ;1 L lbu„/ p/rcN nIt p�l.,y.Jly+' 474 I Wit �. <1 "i 4'111111111..IIIiGlfnr/u),rtpUumBxeou�rnnwWllU 1lwwml�rai�%HfoArramoJt[rersraimr¢e¢1m!,nnil(.+rnrinnlmL,m„ Jr,m rn[nmconrrLD»iJlllm urrrrrm m�'uir`9h ''i aYdumnlrl{ �f. 82086t1+ 1 3 }VI{^ { s 211 e 1 �1�1 1 rl �J wuYlYNmoaom7��ovuiar��immimm�g im�111�' ��=i -:Y',r ( �ait Y I� W a rlrllran.rvrnxl27( h t ) be sziaso / y. �� H �. Y08 0 s r u vl n wWi«Yavyaw�mrtluaii 1 r rW yr w, fix% r s, zi�� � +t�72 ) I o w 1( 1d 1 xr.� 7ci. 4811P4GE 8a, wW�axm DOWNb—affWdP1Q4ramJInio Jr%. j 2018 Paint Line Striping Contract Location Map Legend fimiff emim Paint lbCoord Painting wl Paving OWNKMConvert to DYCL,coord painting wl paving 0 500 1,000 its Map Key(see Appendix A) iiiiiiiiiijill Feet Reduced by Pavement Manager.Joseph AmuctoUIMXD12018 Paint Striping Mapbook nl Printed.April 2018 3OF19 o oIt j-' h INL IIk1N1i ' i ,(J fr _179 PI se lrr� Pl _ U su'nwa}r > (s` wurol ,T.p Fuare r se l8a si ' 1e0 PI sEin �+a�r rh 1es MI ., Etif V'" E4 1n414 1U1 � � � gyp" �,E9Be Pi n, tr t' 1 nr tti �. 1 n od � 'F I01 Yi idn ..,.�m4� sEivs P% rFPI >t.tnl o f eI � Y _ Ifn I I8n yi FQ � y r' sF Ina w vte ai �znt m in ` m 86Pi SF 1Sr (( �,,, SExs � I l 0o e6 sl a' riy I8B", vl la9a 44Nil 3 "3 Visithall ia, i .�. _I ..'� . e �is4 a ar -� p� ..._ ,u vs rani �, 4 Ian _I t�ne �. r. �I I ar'I ilrfaIu ae, In' i� F:I'k �� Instl..� 5 a 'nl TAW 61 I tl' )oz F E I'll PI IIUI nP�enR r��ir 5flt�r�uns M Mr rrnre�l6vmtml m smvir in,,rna»vuvcwcrlopr rrx� miranromIrm77nerr Oisef,V"Rt;e'� 5c 192St =( I pSr,I'YF4V }I N In u 4 �1" e✓� r iar CIL F4 t •:• � V VI � ) I KY �� 1 n r 'A r fjjjj ,a as egmomm�nulwmu�eralrmr.4l�nmM,6A^�DluruvPru>nllwarrrn��ruexluilurawamuummisvuvalw�nrrrirurra) d¢211 ,ra7�urnrr,PnrrmNP 1 - o A'h � ti 0 Yp I 11 �i i t Y9b t'rl tmst y W ti1 r p tiiroll i • - .! f l� 11F se zoo St �7 y r i ti .,M if d9V'.bY� rJ 1 ( .�.... V r,nluti rj,ivy l "Y' I, 58 � y rr+nr .�w.aw� < I V02 s, s J % rvu u u .d U L�Sr, 'Jf \\ i v a f r"x u 1 ,� , Im�ire iFrfit it xrrr � ne r >( a . se.rrtvl� rue k 11 xY SE zm vl ! 1P_IYr I ff a � �l �� �I �� ,�i E Y� r�„ nbb'r�e�. ✓""'"`". .,./'dx,.,.N \ w A 4 Ar I M204y N � I t A I V� I ruuuiiam<r(mirtrr4inmt nuwarurntrvurnwrenirrmuunllm/einiralry rnrlr,mwnaramm�PvvmPrioviprtil,mauo�ir,r wLl;urirer�lrmr rugrornnrnrrr rrollitiw,Itorlurv„rlri ,a( 8,r. 4. y. +n 5r,I )tn lrur minraBln��i�frrir nlmmuvnu�IrMrrnr26 mePn yrlllonm, umlr Mlmnpmnnim�'raallrN� .,,,, v G , e aia9° ( .,�..,. 0. w �a vn P KI Id r �.,,, ,r S/ � S vnrvl I .v ii p i F lI L YPI 1 �7 u Xr in C I/. 2011, .� Iw� t�Ir 'A7s ,... Y, s i �� CI ad .Tali PAGE 9eD47WVNi)� P _.. °In 201 In o 1 sF2l t,n ,. -- L I0I ,mum�a 2018 Paint 'Line Striping Contract Location Map Legend my,gi mimou Paint Coord Painting w!Paving SANIM Convert to DYCL,coord painting w!paving 0 MID 1,000 123 Map Key(see Appendix A) ��Feet ,1 Produced by Pavement ManagersJosephArascta UAMXD1018 Paint Striping Mapbook mxd Prinled:ApA201© 4 .1OF 19 �° ) 1� ._ 'd�unnMlPAl�rrlo�uvaiivirlimrmmvu u� W 5 216 St mn Mmv m'"'m Y V / 1 ar 9 ha� II e 2816 i1r, lt�' u�l I rcr 8g m s>u SI 1! ;210 te" .. ... , '+222 fY _. ( 22r1 St )' . ,,,,, +,223 Sr,,,, s�2s1 at .z,Y ut {V �� .^m , r3 °9 �,..:� r ,, nrr G � ........... I tiI, r / / �, „I. r ! �Y( I`tl "V III, ✓,� `v"»,w""""11w,rA /'r'4rrin rt�afi �r`Yi��ieYi/rirrus"VIM fiiy N riff wnyL(lldR IILto�.,.�„ xp.r �'Ir 7b�a pPiJdk° �tit tt r Y °� ^ "Y D 1 rs'11 w, ev e. , j ra�prl�r"rr a r r f ti 71 1 �4 SM hr %- f / r 1 �,. 4,M���, G{��.��.�u..•�� ...r}(i°{0 �tYli ..... )I /I� �� k/I un (� W Il ril II. !'� adU P aV tv to «.wrx.r d o .^'Y�✓i.?rAu t➢11/N�fi 24LI S, " vdNU AJ� 71 2n .< 1 41 q seae atl Y� 3 u' oxas vim vq�� /' Id m zn t 9I ,,^< a� ... le "� 7� 1r rs�4J el perL..�.f �� ..,� �� 52442P�,_.,. ��4 �a Ann 3r Id �� � ,7m�1 44"it 51>44 4 ! 4r fl 1, 4 t r t �t IV r t 5 I� �, zn,,. � '� eeo� 4pl arte V fi4f9 1 r 1 mM1tliPO �Nu, /tm r 1 �� t ,+( r0 P r OeLIAmr W �� / M1t � 240 St a � a aan��o m #r c n v(( C _ N" m r II a �I � Sr rr� ,r;+'3_M1 n 302 a' 1 it V 1 M1y4 Y t.- 1( { 2F'I sl "f,S 1pl / r1.rM1s /, �a(Y r 6 [ rMry /I�,r 2RY d.1 rf mn n mac r I � r Pt *II2®i. M1 PAGEr�11 Db4VM11��fr wa Ir i. FI 6l PI E"w Il 4 ,,,.......A... _ �� Sp wTilY4 A!l 2018 Faint Line Striping Contract Location Map Legend ^°"v KEb1T snr�arcrnmcmw Paint MliElittaCoord Painting wl Paving gulomConvert to DYCL,coord painting w/paving 0 500 1,000 123 Map Key(see Appendix A) ®Feet Produced by Pavement Manager'.Joseph Araurto U'.WX01201B PaintStdping Maphook and Printed'.April 201R 5 of 19 I'm numiri¢YnYg dsmnritnlunl eaxinnretm�,(4�unyN � �ikY ri ruus�Y ti 4,�'y�' ...® ri r s¢ A dltnnninurpuuuJvjirmmrvovnryrow�ra"rVfi4llGrAl6�unrrn �n � 't I` r,�1 flu! v�IIY�' �E 1 UP. .�/ ... I� mar s� II sz1Y sr d ( Ip g to 4l v bo nj / I� I a rn nY 6a"YnM YarV'nnnvunrarmti�kmN oxxv Y(tC1 I Ir I � I � � CIO , p r��lfl� 1 r sx� nt g ..5 . r 1s2/ ,v I� �" o sea( s SrIp I (�` l�in��ou�rrwmD➢ifr(r,1Ar✓�naeu vnmra�d Ir r ��rwanronm>?aw,autn�irrpulm 1 ° . tf d� r '� '�`•%" r' eg ���� �IJ l r 3kS'"> � 4 �mr e / "� ulnrp i� �9/armvanrmnnmwoJonrRuiu�uo��Anmuwuuuuuuumrnrnpr�, m I if Its A v x9 pr��'M endAnvnrmJ ' frt�n��,„�rru/tM, a Z r 0��nr Need / fin Y'n rr ✓ruromr+mn� (aU�`a 7� �r� f1 � �i ��'�s"ltr,a '" f 1I(1I �. �I A m an w r k, s+ SOI a7mA r 1 a %�Irmrarrnrr m a„ ft� � a a � � r �av � f l� '�. �r�ygNtiFlIftIY�SitlTnYii) �' o-p � 1 I A �y r rmnra%N� "U Y( so 1 t r 9 a ; �' � if / e�131 fts +ti Y q®mr an �r)i1 rin N b� a lsp� � l tiP rill 11 r q p< ! ,�... , lllttll4A. JAMBmllilln➢/yvl/!1/Otll /IPIYU IINprfiR41AN/�IAIr/f�10111� iii :II P f l (.� r II / 0 1 /1 4 N KK// I II!(I�N/UJJ Ia'flQl 111 Pfl.IH...... O%( 1 a SIN plP BMNploll➢Nlpl0 f >^ qC p „r^ 2 �! B 943 91 f )/ f ,rye, Las r:.ro, ntiw� ;(r ei rk �... 9'pl.'7.6• As �I Ju�y AI rj pM/p//vJYrrIT101mbAMll@IYLGll ff4A1%f@% N1 WFra/h fl '. pglld 1 1( '. . m 'hV ) �� a Ypamuriz'r mia "q 4lr`+ mntnuwmu✓mmalrnppnYmmomr � w L6�t 1J) fi l `S � �11 'r, � ' � r r&'e,� '�a�s � ��a�amnrprpr�nmlorm "��hRARGRdr,,,, ` 1,244 yt avt sli 3C121 J r a 2ilYN! i :"" "�w i rn iur 54�. a1E3,�__ q $ tl Kr fir( 58 s li .. ,h yk � .{".,• B { 5urr tla's valrr; �r m�.,° �^V 1 1 wt fin. f s �"; dA1��roauer 9P � ax„ � r `r 41 e.rwaaY�o- t y� r �"r✓m)in`"s4f^ iy"k�rn"V) fl ,. T, �� v i�fJ n 1 PA'G 1 tN 2 DOW uDYn ',Y \�' �II h l i ,Y4U \ rtJji 2018 Paint Line Striping Contract Location Tap Legend ENT rmuarxeainln4 Paint 6111110 Coord Painting wl Paving GROMConvert to DYCL,coord painting wl paving 0 500 1,000 its Map Key(see Appendix A) Feet //� Prod uce it by Pavement M pried e r'.Joseph A rau so U W X DO O 18 Pa 1n t 9 td phi Ma p book mxd Printed,April 2018 6OF 19 E,wmnonrati Ji�u rrnr"uiamnir�rrd7vurlr+aumiarrl,Cil in+iID1rorrn2✓,'i _..� �I� F�/IC' ' ., �� /i�� v - r d V, _ I a 0 us:,r gl 9 nit dr /7 / Lt]6t y krA P frlltr (. �/ v'ry!£Oner�n trillv } bxlri I afirmi/m irL"o „ re i1 t e� � UMtdmpg�ulmD A� r.r�p ,( ,r �,✓` 155 tvu px 454 I I I r ll flffa"rlrirrrrrrrrrrrmuun¢oinroiranrrrv�dioaii4prnrranuvroar�miiirrniurur! ;: G 2�'££5k V �� a. & rrii rrror9Jla '7GtIn, ` YWar" N ", .. //Im %./ r� J4J,�,:uzlrnnlrni rrrffa/Ir,/�erhVni�rnlumrmrrnrr/�i UU 1(S d,uv;,t It ajQ1� u I 264 I d > \7 lbw �466 J L rp r ad 238$t 2r:nn kl" 2rPrdr( 5 r. �" ,.. ... / _ � �� 1* , rtl wu7 I a" _ prl'I rnrcn 4i�i� af I°C I r ti7 a✓ 41 �hf�''„ ti, �rN ' it 444LIJ p 162 Q 50 PA➢,i?dllnnlVrrrm�rrre�,�' r0 I �� a P1 1 rr Ya71P�pal Aa Y )K t d 81 da �rJ'1 � s U' `2Y/� r C] to r I d4p !� +w n/ouy+ay/r;,iiirrc lv(n�(niipiinuopirrrrrrrrrnnn)irnvnrr nnr¢funrnnirudb!rzouivl5%uirinmfruidlnllprY/Ivu/iuru h� )i)i//frn3bAiA�iiun/vuiiur+ turl�nonma nwrnl eanuniiurirvm ara olPrdi mnlllA42Y7 1 " , rr �i'�rl 9 I z Isar r o si sed � � � r✓ w � � ( 149 Y f J L I tl1 e r tr e ✓.�� u m rr .d I!Ilulrvrrrol'peuin_t/+i uHI�(��rrnvl rrv+avhmam n ri'aI rr, N:vaI r )n rtIv�tL na�J�r iII�pw�arrcrnvt2mo0 A'G�(Nyr'a°e r,raliunr lu;V�dl r iY5rI1l'Ii+fiN/;47 risll,r,sv�znln�`��l,J Mt°a i✓ntr rrsrrrA G'�43n 6l5 nri�>��Q,0 44 �3 r�gil'[4"r4n L1.1'3 V4r rsG v7I� �4a N (7tyn$N unrmoiwnrmoorrnu wx e +YN r+r 1rHr raomna N..ac.lL r p4yn`° Dnn'r+£ll4lpur�„1'�ifi1 J( r V`IP rr art»i p * 46 ap 43.1 ;a2 7 4473 GOMrl13HA u 14.i 515 - 2 asn amai +urnnna gu 44 r 404 a Jj N nr�nl43r4 � p I �u '7£3J�73j �2ea7Y 39lu7lrl1 N 4g ✓ 3St .r-l�ri}n I� Nf a. .r rr„s vas >'NNrOr %milu�tlo2in�� r k 75G ,,,, v A Wall i 6 6617, 1, 9l � l rs ���� ...... PAGE 3 9 � I r .;Y P / L rc it I � �( � R .e PI// 2018 paint Line Striping Contract Location Flap Legend rr vwnumxannr-Paint 420MCoord Painting wl Paving 6NERMConvert to CYCL,coord painting w!paving 0 500 1,000 123 Map Key (see Appendix A) i�Feet farad used by Pavement Menegen Joseph Araaclo U\MXD\2018 pan t Striping Mapbook mxd Printed:April 2010 7 0F 19 <� ,idit(V �II^ ly PAGE3UPy � m SE M� ll 2,r10 i4Jll rcm/ra✓iNm 27� Y' ilv� 69, / ll)lI {wrf�^,)'hrG11i¢oaamnlVn 108 °! 9 // l f� Il/ J// nl ill/ /n�I,�Y 21 I Dljlp 91 vYf81 �. I l//Y@Al 4➢(3 R 11YI �/ I II I � � •- t J1/ai � 1 i�v clanYm4 n ri� e / .. ,a/ tQ)/� , ?BN bI Iti�I '211d/@oRi(/I// e1ry sl �, ! r� C 11 ,_ eF I I z6 Ifl S-0I/d rm onv s,0 u;/oinon/ 130��ny✓I,s��S _ �sy 'ez ses,e Psi a sr27n / a IIJI II 4 1 �,�. inn I C sc zle al as I le 129 221` 11( {. _ r ( tn�4Ypl nnrellld vac a I V9 �70 12ti sE IX)bi iJ 1 / tl� 'Izo lndGdi�M1 ,, �.. �,.. S1 �x, 127u alIi 57 - 1 oXtV4 e 2zze, ar , � � iYt�ofmluYr�riak0 sezzes, ol� ii . l/ Q (y Q 15! ,^ / d yy 1.223S, �r JJJ llanam(IlrIttis � I r � If rdel I tlGh _ / III a o ......... 125 �I If v x 1n ...� .0 ese sl s'r� �, .� I my ad �r'�IJ9 1?Arrlmi�r� ,l3�dL e.x?, o� I v5 e a2a 41 m I i -a kmlUOtln /-J23 s J:awnwu�r!rnlr m P: . seneiN Ir 702� �. .- ,�Aalaaa�"g�llrw�� f j, eta �r✓��F� / 4 22 Y 4 d7 t.ao�o, 'yV, I lira hJ N.a.i lmaQU7Renr1l r11�IU„r W}�u�nI;l�� 1J 1J J,1 rY1a•Y ti '� /� 1 232$I 6 n- z21 xl 6 231SI m nn r" u t +I9Irr S9 7 rn 0YeY1 1v Ii— r7' .- J`Pr r rYnalolitimi�UlYi I xwx ` � W a 1$D m _.IUL ;jih Y , 06 I a' Iti( a �I f vo i x ^I lull 46 ' S2e4l op.9 y I�;,�,..` , " 148 .�Y�1 e4 0 4'48 4vtr,.i a1z 16 SE',"I j . � 44 /nu1147=. . 143 V ro 4 �f~ e larol�/et9ilr✓ia� (9 I 1, '�' °" {d m k IWlnlmm�nim,uxnGo�l//rmiix�illinlvut/nlrr m r,�,,,._.. rrur✓ n�l dl@hltl nnm szn p 1 /uu�urlu/r�mnttn/ravJ rr»Ysrnaulnri�tnmu�urrrlwmni� nna moue ,� v s mt, ltnu �nArhg ywfl WlY 7,A� w.l f 1 P� drylt IC(/A tll �d YIlYO�1JlJl✓ 4/N �. ry td 15C G I ll 4 '7IvprlaioumudMnggl c .µ, �'i146 I+Ivu " 114 °1J Il� _� .�I rC h 6:Y Il PD"pd� �Q'x '....'". 1NU/ I(. 11 1 e I aa� fIll f )1 lug Ir ti ,� � I. .F a"N/pm `g�Yrl' r1 '"JPrthPWll4ta✓�FYtI//ltllYl/ANnIIU/Y,iN,c/1041�11r%/rr�/J/ri%i"/IIYIA(/I//A//lull/v)xlVlll I/ M1�in, %�•. hi q' ! III vJ,a lmrau/aaiin Imlamm/Yul:_ V{1 w G64i t 60 ...,, .� / a`. J`� M1 ` '' il• t! Yr xmnrcl�n�� 7rinleaal aUlU jmPm l�zmdfu/t'.wu�t,x(ai>�-wYdAa k C 9 drn ` r f zne cl C 1 / a ,. a l el x l y1,fj'� mvl t` en�umBl �. 82 �, ., i e I 252 � � ..� G C l 4P r f ��� � I, 1 � J n� y a r r, �a rl a PAGE �4�� l o� Sluur�'.Ic �Q� �� ( P �, 91 r� _ 5(s4 � /.m m� t 111 d ,r, �_. 00r .�,. ".�zsasl .. 2018 Faint Line Striping Contract Location Map uiieveienuuwuule Paint Coord Paintingwl Paving O Convert to DYCL,coord painting wl paving n � " Legendn��rEtiT 9 P 9 P 9 0 500 1,000 123 Map Key(see Appendix A) Feet Prod UOad by Pavamenl Manager.Joseph Araucto U.1MXD@018 Peirit SInping Mapboak mxd Printed:April 2016 8 OF 19 (ray'. I�,��I mom?" �'"b. a' gal 11 21., � v�,r�� �f ��n-�r 202 1 PAGE4UP >r 1 1 201 r •', go- 6 t ,6d� 4B,}!EO 1� (r §..' � PP}9{{HV �7 200 �� „>, nv ��� !� ! VI " f r sFartr5 r ✓ . Y Our, rrrlkld�. „- 2t yl 166 SE N nm'ire" ,Eelpd R r rr d " rvY "I n 'x41?vq,l 41 4 11 1 m rrG r}r pe Y I� ymrrir� ,� as,nr 1 n I '✓ I w� @y l a, i ... � I,r e ,F,22 'IY75 a rra r `y� ( rv�01"'40 „ ), 9g 1 1 sE.rnrl rl MJ U .y 11 °J •,- e, ���j ell $v dtlf f ,iuyy��eararc r2)�vuum ruwr d 9! f`a 224 St ri ^ F 9 1 r E 9pG '�" � fr r y � v {.. � r ., u n ` rrpr l!unu Wlrv. fin` V p 1 � )F 'rl Pf% m�!ar of � t .� 'se 109 / a U ,.e. .vur I' r ?r'Y• �� „I SE v22 -� 1. t r x u l SE z yyy J I` Ion •• 41u 4r 'w_ r1 ,err r r�., 101 r h r�,a 8r wl m yl �. 1e5' f v1°r, t t� 1 1 u 1 W p 4� t it a ' aayl BB � al d R41,yeEg uummh . ,rr 'I r9,�rrrMY, zart•e;� ri a it 11 � r t ,mm7r 1 4 {)�\`� C7 kPa 6317 °�� _. i ' 4n e 9 / m ^� �,r 45331 !Yid " rv„, a 1 anmmrmrkwr"orrem:Mr7 rrmMruum, �,,,,- ar °D ,Ll TICrkotiAmlJwam 192 4 Q r o 4J1 a Ir r r. see as ' m , m „� I� n u (a E 10 ➢ 4 1 J ,� .i � � ✓ °h ia11 I ; YY Vl I Y y if/ Y IJ Y '/ I I 4 ry iti. Y I m J� «anrmrvl+arvmrvnieo .. ��iln,uanuJrxwrrulllmmrrmmar,+,uruwurrchl¢lunri,,mrrrwilu,»p,ilia,aorrrnnlraluuvaiirrrr¢rri rrewmml�mdrouuarrrr�. pry y 41 ldwmr unm,/iinrrmirriuuarvVlmn,a7u�I�rlYGamnmr"1.X,' �OrrrlWanni000✓�tt I r.i VII A rrtl 4L/ e J Y o V 94 y A99 �^ I'➢Cl,r r y evnv/v/hY mmnrv�uu aowmo a 4, n Pi v mrrrww)v n! m, t a i rv, 4. G 1 n... 5, p YCw'1 4 Y R V\1 6Y ly a w s, _ r " '� / rewu 93 r� r / /Pull / a , F y �7)rrrurc calm ) YV f I rr ;ne si� q u \o / N n u uluv+w++Iryll iFeMrr+mu In nu j niunxxnl„unl Iwnnnd,�m�,b'a✓rty; df✓(qy Fuumx✓;r rluprrrirmrnuuuuuuv/[ioitauerrrrrmivn,aa m r,ur 82 i 51 irllaatduu rnuel a IIp r Itur r rt� .-..� r rae �a. .�I IifiLb, 1 1 r n� S. . a l 187 r2. n „ o Y ri !ter ..;. S put � 0I, An21 lrr'''✓' Im PAGE I5D ➢�.ry",. 187��, , xs I Y 90 I" m 2" A, f I I b�. �r �. rrr��.i I!f rill 2018 Faint Line Striping Contract Location Map Legend wuumanguurrtu Paint 4ROMUMCoord Painting wl Paving GNOMOConvert to DYCL,coord painting wl paving 0 500 11000 123 Map Key(see Appendix A) Niil Feet p Produced by Pavement Manager'.JoaephArauclo U AM 12016 X0 Paint Striping Mapboekmxd Printed_April 2018 9 OF 19 IJ f,1 N Y 4C tvGa � y. lm `w iI w Al 222 St a t Sa 4 e �sk22asr U ` 0 , a � ,....,✓ i ..^"'fit,- �4 In It BM.r lli I r B � a C JTX SI 31 � t a nit'-,[tl6}9 f _ _..... se eaaSt z ,f ash-8 ri ux. va sw`I'`ti '•,. > o w 201 51 SE 23, y .. f se 2Je i f Pi P � ,. r 10 •� yq f Va �� it ��♦ `e, V, caAnznumnnaawuninmanmlvrurmia wYYrPAmm/nm, v aivmim pLrilkv"UIUIDDIIIYptNlllp/tlY///dYlYlYlkfl�� yl� 6 i8 R I Yf(✓ip4�ailP �/�, 6 - V� ;i a p � n h/•% 6I y a i Id yrru�"P2'if II y J I Y ,, - (( ij yyct 1 J� gq SF LN" A .I 4 1 Nc n [ I Iv wa x x u l kag�. ra � 3r In✓ - ry rr, , w 2018 Paint Line Striping Contract Location Flap 400 Legend KENT oromfir mumou Pain[ 409AMCoord Painting wl Paving Convert to DYCL,coord painting w/paving 0 500 1,000 tea Map Key(see Appendix A) MMMMC=Feet (� Produced by Pavement Manager Joseph Amuclo u.inxDt2818 Paint Striping Mapbook mxd Printed-AphI2016 10 of 19 — "a,, PAGE 5UP ( "•cr 302 6 "'noey�Jvrrl \ z vv� r Yn�rs�i�p�,�y o Q:fA eY ! A l itlR d�S m P/5i 'i St a 1� r/ / I jw��ry ��uuivwvmrud o// �l /s� I'll y i„_. m � .� inl� 589 uI r "'9 nr pp, 1aj a' AY/ `v '� 71 y "t 6 F Ay J Irdill r r a Ywl'" �o t //' A [ 1 �o \ I IN IN ly I J »ea IffA,/dl a � Yrm 1 t / "'rrrliil ur�aJ irjF�l"' S� c' mn�rrmi0/' aat Jmr+min�i , �r Y e.a,i �Yv y» ,r, l pi., I'i Nato rowiliniffa(arrr'I&lal�,.° r/ r'� Y — MI 2I3L1 5i an,.rminn�uiuvarzmuiauTmi,Yal,l�"�3.zoo� n(� � '011 ral " .,i,i ri nv ur ,i ssror Pi 1 N/i /VP pAivie / a I r y� s st 1 � 4.1 �11 In II IIJ 9dz / ' l �s'�S^/p. c rPSI I I i W Ham If if r �^f/ ...✓✓✓ �_.. .. �, ��.q�ri,�,i •� m� cI ?9tYP � ,;� �YA } .,yaSc p ton w I 'l �II�ea'r A1,N' I"P10ai, iMkWra1/N 4➢"Alv. le' i,)� /I r1r e �; <I �n py w�'zS0 SL / ^`0`° �'� a 2TO 5a �� MfiM WI !f I t KQStI Q tli/ [I v ., kn „'v�r„„YlJ7(/'UwNIJ�L"JOfI"(4�fP(6" "V' 9�/�+�P/k4.V t+,vGNW76� /u i u o� �u .,ru it f�+n g T I 1 I ( �r nYl si hvrd/6P�41n(AJ°+( n�. �� 4�r � S272 y,� n,XM ;aN+m�' xawwSw 'A1k'AV / f � I 272 St In' Ij r me �., nr —� 4n a .. (4 �( 1 m,� ' � �a> ) � �� .� �e AI .......' OLUP a RLLJ � �ry�,. gErarl rhw Rd ''�, � rPrzw) 11 i �.. _ ✓ �a 1 .- pp y "I H� _ Pro Sr �m J " dUlUldl�l ~<P , ,� w;rcr si b c r b. i� � x u p HIM Iw' r I � „ r `r t J� r _ SYftk;i f r 1 UV �¢� j Iraua jilI�{M 'dal ., m r sec.,e , ;r i �a rb.a�f / �t�m� �� �1�� a ,rn, oa l _Pi e t � 7 III I � � �a 5 28B 59 �' / �, P n r nn l mr .Y p tl o< I onFi 1 j i i S 6 a 1 r -1, Preo Yrn ' fl ".Y79911 Jrt 1Wdi rou 1 h I If r PI 01 0 i,J v� � _ li M1 29I al 'n P1bY 41 ) All 2018 Paint Line Striping Contract Location Map Legend , ICENT sewcmm Paint ONNEWCoord Painting wl Paving ONUMConvertto DYCL,coord painting wl paving 0 500 1,000 123 Map Key(see Appendix A) Feet Produced by Pavement Managed Joseph Arauclo U:lMXD1201a Paint Striping Mapbook.Trd Primed:Aril 2D16 11 OF19 � t�@ •� '✓ -w PAGE6Up 1+ A�` t27 i ��Jt rteblitR iOlod�uu t��5"�F � 1 I � r �fjU I I y k y wro,'�rU/anry'�,t f• II I {{ I a �I �p..,, � I �..� I� , ry� yl� � �/'✓ �� (I1 n � � Ar✓m+'t l�'tlihmtn unbi ,qu»xJawu 0 ,07 yk J 584 �a 1 � 5 26 U ub �Irl dir+I Its 1i@ �n4,•,.j f Sn girl l` e n „ t _ U) 68 In iwlrauu gvr th lrr� v,unvr y h r m get.no " f .�... .. 5; ... I � � I ,.... F �v �Y{PW %Mr I�tl µ i �p t " .... � 339 jj {{ >➢ t2 SL i a01 A i ). ..... ....� 1 02 J m mrM1 1 wm,x.A,ur,p` 'M'M9T.pa :m na,wM.n d wm,�, wl 4' ry .,.,.,..... .... _ w.4 .,w.r.a. 'i _m....._ I (' I V / R\t (l •• 9 WMM SE�NM1 WMA 'Pod NMA�MXMN� if f ` d'4'0 �)277 1t'< I� �•t m v, � � �! � vvvyY. llllJ� ' t , ILin '` t,hIV )i�:( ro znn l�r V f dnr g il t 116;tw fj tM, Sir w Ni x 1 ' � ( AO{r^I s e I f f $ u Is p PI z4 YIIGI M 1 5r I .=•rd al ` I�• , d f f 04 18 Paint Line Striping Contract Location Neap 20 Legend ,....,,� amnmamu Paint QM1110Coord Painting wl Paving KEN Convert to ❑YCL,coord painting wl paving "T" 0 500 1,000 123 Map Key(see Appendix A) ®IFeet Produced by Pavement Mri Joseph Amudo U.1MXD,2018 Paint Striping Mapbook,mxd Printed April2018 12 OF 19 1 11 11E 1 �dll 'I � ,,, 1�-� JPAG UP � '341 Ofj I............ if lggq //�/ ;� I j 3 69 In .......... Q rat .;Tlf --—--—--— S 261 St %...... r p Eft Ell if 368' ......... fi�l 36; 594 V*.Ei Ei V m w If f mNy n min . .......... 1Y S t 285 y,I 2R5'Ef i�f - ----- .... f . if LED I li FIE Nw 1.61 2018 Paint Line Striping Contract Location Ma Legend -11-11111 1......Paint Q'IWU MUJDCoord Painting w/Paving aM=M Convert to DYC L,coord painting yet paving 0 500 1,000 123 Map Key(see Appendix A) Nommo==Feet I Produced by Pavement Manager:JoyaphAeurto JAMXi Paint SMping Mapacalk mxd Prmlad April 2018 13 OF 19 q, 91' 1�- % f Nl, ri A 4, i, Y..it 560 e q I i 1 ", I . d I n, R 211 �I, 1�1U, 11, MiMqiqm ri welly f itwello er "n 4V 'j% 6 einoO I IA7 "1 1 546 wl 7qA lit �a ND ftpunfinmi ir:A MUROy n 69 1 m, 261 1:j A, e "n, a �� .�G` "�`4 �trr rixrlila,IGt,xir'fJrrri`irr�aioi�linmvn £l�. Ir`, v�v.0 v4��,s `et.' 1t� irin,. 'I I \ el me sr B .% ........... 54 0 Irl, I .55 3 Me 6� vIplr J,� 1 t lien E 2 In li r 41 t m SE li�8, My t�, �V, 'n, ru"\ I PI E�Y rn . ..... el LLI m T Me, 5',AA lifffln0ii 9, djl 0 Glb 550 llit" tt[ —S 277 81, ajoyflMi f rl W,,&,V4 522 Pl e, eti I W3 'A 'Irl,11. Ui Nk fll[x 290 S[ 2018 Paint Line Striping Contract Location Ma Legend KENT millfli Paint GMII=Coord Painting wl Paving GNSIMMSConvert to DYCL,coord painting wl paving 0 500 1,000 123 Map Key(see Appendix A) mm=mE==Feet I Produced by Pavement Manager.Joseph Arancto L)iMXDQUI8 Paint Striping blaphook mxd Printed APFJ 2018 14 OF 19 91 ✓ C,1-1 vw rr k"O ti C b "a,go x ,,,F2054 PI fi I A 'rF 2i53 P'li' Y'p o a e 11n ......, �nov 0rp W,m I �i ffla .....a...", at w i 513 24 , af LJ st A 134 'i J se i rcl f at L v; rr it 335 547. "Ti JI i,4^r "a "I r r" W9, yi, on,11 By St N, �4 508 A r'o 261 St 11 rr,I J, 1�", Ort ."s 507 pcl Pi 506 ... 1V8'2 me, if ""mf rY 111 fiv ,26 , " - 515 266 St M Nair t" sL ,5g SH d, A 210o, �pA ?fC T-1 e yr;I or C)M 5 ?n bi 16 JIM JAW/sAto ifirro,"Mi'll rrVn go go w MPI rr I Y'l 'A 17 9 11 ri Se rJ 1 J'Ar 0, ,o, Sr N', fe�mt Ww r L"I a d Ir, MI)Pil 28?"1 sy lul Pw✓ ................ it S, SE 2 8 1 P I f! 174 un j 7 e,w �SE 288 St n Xu0F t 2018 Paint Line Striping Contract Location Ma : Legend P a i in t 4MIEWCoord Painting w)Paving 40MMConvert to DYCL, conord painting w/paving 0 500 1,000 123 Map Key(see Appendix A) minow:=Feet I Produeed by Pavement Manager.Joseph Arence U\MXD�U18 Paint Striping Mapbook bred Printed April 2018 15 OF 19 PAGE10UP p %4 d. SE p I) p--r 4 161 PI 154 21 qg� .111:Is,s I -IIJ 523 1 n y SE26OS[ Is AJ, SE 2 J, N" 111j I k l"4, 524 W, V� III 01 Y"OfIftleffmom it ff N I 3LiIwv �,64 I SI hM 525 WJ I-"I 6 S1 me, eyes ly �E C) A J 6 wA"g,- tit j,""J rt 1? j1y4 �poI� j w q I I j G) o' ell umfw,39811 NORM& m 0,41 /,336 IV'Asef., m 527 JI �Iy PO 52 B Plil, IN 535 nb r, 'Ib I I, S �r'I B2 rvmr sm's lly�l H A y la, 0 �E 2 I'B St I " 530 1,PI 200 pr J,7 atl 111 53 201 11 el I I I p 538 SE6 Pi SE 2 RI 5F M�s 5,� P 539 oy 54 G /lJ` SE 181 54 (SE.288 St 2018 Paint Line Striping Contract Location Map Legend K F T Paint QMU=Coord Painting w/Paving NMEMConvert to DYCL,coord painting wl paving 0 500 1,000 123 Map Key(see Appendix A) WEED Feet Produced by Pavement plan,,,F,Joseph Aroucto U IMXDQ016 Pain(Shipiriq Mapbook,T-1 PrW[ed April 2LI18 16 OF 19 V� n / x�r 4, c µ appp '1' Qlpniunrmmr 15 U P .w�..q ., ro ei ( b.� rm OII UD� ., 4y f .ry'� ji 51 a`"n,,, , 1 � PAGE sera l � I i � Ib 7tr a F '~ YP[[ t Itnnrsr 1 Sq,r l t r } 7 v r t .r� N t�rrnii�el (R+� r�r�'� m�v� � �.� ,, ,.,. r rrw, � .�, � s,xa � r '� �' ,/t? 1 / Irtl orr autumulw+u+j lRtrunruwnnpo rnA% r a d Y o �l i� a>rlm ' ] rtr 1tt6 Nfaiar r "" '- r a P Tarr r�art.rvi� Ydp�Y—�i � r� i ✓n4� k�n 'EAP1/I11�00U.�,�D1 . � p S �560g�y/ijN011Yllll!lSIWISru v�� � �' tv � {1 on t �; tm r rn r n 9 f edn 1v w p� f o� I .+.� YIFS� rw«F I1AI 41y. v farrmlttr 1re� pd d 1 TI 1 L CTrv1 u. dit{� 4e 177 1 .«..,�„,� ( `��� .,t� r �-s"K� j �1TG sni I.a 1 ll ua o l I eV S ._.. 5k d1 ,�)f "� a� a�0 ri'in k'm GPE✓r rt �m �Y,;;noink r6 IN �fkf C5 " �)(p(�, uwrmurma�¢mMvrnl� 1 k41t in, p r _..,- ¢!t rasr nr 20 pi s nL28, ,r..f i D 288 St 1 1rla tir se zPo stifill"1 _ f Ez rw 1t.�nTr 1 1, 1 r. /� a �. w le t N n r P J ri1 r,J t�J r ur r d� 1 If,, All &I 1 li r d' ,l 18 'Paint Line Striping Contract Location Map LegendNT rxlwuuuulr+wln Paint 4FAUMCoord Painting wl Paving QNSEW Convert to DYCL,coord painting wl paving 0 500 11000 123 Map Key(see Appendix A) Feet P,,di by Pavement MenegecJosephAreucmU'.1MXD12018 Paint Striping M®pbeok ma Prinled April 201E BRIDGES - 1 !9 of19 i Au lk M 1 w 'I i ff �I 9 x U r IdLilNp4n,Arun �lldnPl lUi/ p rim�p ru�j� fimr�lr,onmmxn „ 'I , ,,,�i/au1fN/i�'A"mwuammA+rw�>lrrlkaruu✓�M� 1 , vWm�n �,n,' �l r rT 0 f 9E276S1 Maple Valley ` ` 1 e t f 2018 Paint Line Striping Contract Location Map Legend F IGEfJT �wwwmdvintrrwrm Paint 4NERMCoord Painting wl Paving NKNOW Convert to DYCL,coord painting wl paving 0 50o 1,000 123 Map Key(see Appendix A) MMWMK .]..Feet Produced ev Pavement Manager dosePhAmucle uaMxDl01P Part strilingMapbonk,mxd Printed.April zole CLARK SPRINGS - 18 OF 19 ! I� f! �� � 1 z < 264 1 r ." / NMvrBu 3^rl (�SS cm GG r��rt2fm p3mnnl� �� � Se� M.,.,,W, ,. / r r _ If 1 265 a236P•.• ' ) A rT /� 236PI S235,Pl ,.. 1 rr rr' "r VV CGIm.h4 `u a -' 1 :x �� .. � Wr„ ' N ur , `-i � � ¢ G L W /i'��i,Nr�r t�P�ouuvtmY�IrGV s / r a�� •� 4 r r N 4a a / r Y , mipL3I ,�4p a��� a�✓ sze9sl atr I :a4 .a . 1 l! fell soa8PI 25TJ /� weli Id St yr s 3JPI �ro Y �M 'J ��', . P .. rite 442��"" n Ir r 4r ,� lu'r �,;, !mo�n>>rravauuurroigtrr rrnoivrnllmlaoumurc;uerrmreviriimnRviirlrJrmmrrrivnmvarJrvcrrrrrnnnrr�rnrnirn,wueaxm-03�uiili�' � �,J I p x) / r mr11¢i,�nnai,roRRnmmmxrul rjavvvvm�mo�irmra�irnRmze�Irrro�i�ioelrom�rzarr4/� , 1, K. 392 mil! cu �IP 3� � IN lam'I am L, rr I r. Ra,n�sry .,r v ;i sr w JamesV ` ! /2 ¢ p"p,/00�ryrmm cliff o ,4i zl nmj a If a na �rGl o { $ k"➢cnupnr ew`r t'e® 0 6 426 rr G e M I� t l �I vz �/ 1 I N ea �I"Smith rI 6.X A,i 9„�nI r � arR?OmiiraraiaiaornimiitlnrcrmnPnro//ir.IlV4aravffaaVllllimuYNlNlrrrGauJVltd Ba7Ir^�( ( k a „ . ,W„fit„6,,,, ;�„s,' I'',,, (I Ia34t'�((ni0i47.i II/�1/ �llrrllurrorna,`�"„rrr E �kvt`Ir(rolli a 1nnnnriaf,..uZ.O�I nl , IJ I "4�[pp,20'1�dffiap RrnnOr rxirmnr ia�i� tt�;rd��iiiebri';�rxr 3xrrrrri G� m�37 366 I "a ut 41(�rl� I rrrrpa w ranKy'�qr lJyrg4yrp �Ay per e ,a 04 e: er �I f ",�� tsf parq °' b nxi rrin r?4RrnluFd[ OiMDi�ipe r�rh ' r 4e!7 0 �4C?f_St_, -.. ttrwmurr', I_ 4:3`1v '1"1423 r.'� a`r,d /� lanmmn✓oeryar . umrr uuminnnna,rmmmJ rrr -- - p t �. tn� SN9 o Ci 369 360 432� �il rills lYrdt,1111u�i7/liCl)/hlrr l7Cl uu.l2iorvlrnl I�....., Rriel t( I �1 dr ! 404 W I 4U6 3fi 37Jf 3a8 164�vi gWI�J�I+d I(n15�(�(l42+lrro-�ti�l���jrgr��:pr u�SY �.. tr+ aymio4 1) I L f a V ,U. i 6 t .ur r ir. mIn ., arm r 38r�n`r'U4 l71dit1 maiirrnrr/r m t x 4k v �,y 403 37 tvl�hr 363 .r eto ro ii W Sear �wmll nrr U ea r cl of 4 0 EM uvly'n slrr 330 I L � r�l r � I ��� St- ( � u°e i4JavQv�anlPplwl r, Syr 13 w'�ily !!`%irvG r20.rwrrrvr nll� M'I,r �1 // �t F a �I 379� r 6�6 ��� +e n� 4 All _aen ,OG^ � . \ !f� ^...^' fd0.�:fiflel Pl '31 m/r! pY/efrrvl04r 64eAs's,cIII SI i r 7 r r"'w puo rdl . "y sdi -o Nell $ �E_bn.ol2ly St r7 YIl // Rflik HlA 45 d �� taj � �'! � V�� 4 f eCI rr RprJ", Jam` rr2 Q � Mr:w4nn,..i I z'� s:letrri, t�„` 41 f 1rm,p„ pall i !� ooenaokst rV �}6 1 ! pr f (Ir:SI Ifl m eI1 io ad eNn r r 4 vU r i S �..... � V _ ( I �.- tainry Pr eFr d 176 hand i 3� a rly I Iri[ � Ji fin' � IJ� r✓ fill� IT e Oil Ia 6'13!......, i uvixrairirop2el 5J 9 rnamuuuum t ���ryryrourupnixeiAuuiomuu ll�pi➢7rr rrz'v11 dpA7r91� b mis S � RR' N l a r�Y((�� jft Rlb .. 2018 Paint Line Striping Contract Location Map 14 ,t, w Legend rn, „w% KENT emrelx Paint 4FAI§nCoord Painting wl Paving Convert to DVCL,coord painting wl paving 0 500 1,000 1123 Map Key(see Appendix A) Feet Pmdfi It,Pavement Manage,Josopb Areoolo UiMX0A2018 Paint Striping Mapbook,mxd Printed Apil 2018 DOWNTOWN — 19 OF 19 W Vi 11V Ili I O 7--J' Y G aw TRAFFIC CONTROL PLANS 2018 Paint Line Striping & RPM/Araucto A - 3 April 18, 2018 Project Number: R00602 LEGEND SIGN LOCATION (TEMPORARY MOUNT) WORK VEHICLE - r TEMPORARY TRAFFIC CONTROL DEVICE (CONES) ARROW BOARD DISTANCE ��� (FLASHING CAUTION) ROAD TYPE BETWEEN SIGNS A B URBAN ` � PROTECTIVE/SHADOW 25/30 MPH 200 FT 200 FT VEHICLE URBAN STREETS RESIDENTIAL & PORTABLE CHANGEABLE BUSINESS DISTRICTS 350 FT 350 FT ,m 35/40 MPH MESSAGE SIGN a RURAL ROADS & URBAN ARTERIALS '500 FT 500 FT x 45/55 MPH MINIMUM TAPER LENGTH —L (FEET) LANE WIDTH POSTED SPEED (MPH) PROTECTIVE/SHADOW (FT) 25 30 35 40 45 VEHICLE 10 105 150 205 270 450 �- a 11 115 165 225 295 495 12 125 180 245 320 540 ARROW BOARD (FLASHING CAUTION) GENERAL NOTES: 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD AND CITY OF KENT SPECIFICATIONS. 2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY VEHICLES SHALL BE PROVIDED AT ALL TIMES. 3. PROTECTVE VEHICLE RECOMMENDED—MAY BE A WORK VEHICLE. ��, I 4. DEVICES (IF NEEDED) SHALL NOT ENCROACH INTO ADJACENT LANES. 5. ALL SIGNS 48"08" BLACK ON ORANGE UNLESS OTHERWISE SPECIFIED. USE SIGN SHAPE AND 6. CHANNELIZATION DEVICES (IF NEEDED) ARE LEGEND APPROPRIATE TO STANDARD TRAFFIC CONES. THE TYPE GE WORK 7, ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTONS AND/OR DRIVEWAYS, 8. ALERT AFFECTED RESIDENTS AND SCHOOLS 7 CALENDAR DAYS PRIOR TO START OF PROJECT. CHANNELIZATION DEVICE SPACING (FEET) TAPER _TANGENT 10 10 u 2018 PAINT PROJECT CITY OF KENT ffs EXHIBT ENGINEERING DEPARTMENT DATE MAR261& MOBILE j CHANNELIZATION DEVICE LEGEND SPACING (FEET) SIGN LOCATION TAPER TANGENT (TEMPORARY MOUNT) j 10 10 ■ TEMPORARY TRAFFIC DISTANCE CONTROL DEVICE (CONES) ROAD TYPE. RFTWFFN SIGNS A B ARROW BOARD URBAN (FLASHING CAUTION) 25 30 MPH 200 FT 200 FT URBAN STREETS ) °Y ` - PROTECTIVE/WORK RESIDENTIAL & BUSINESS DISTRICTS 350 FT 350 FT 'I VEHICLE 35/40 MPH l RURAL ROADS & ,ems PORTABLE CHANGEABLE URBAN ARTERIALS 500 FT 500 FT MESSAGE SIGN 45/55 MPH . a MINIMUM TAPER LENGTH =L (FEET) LANE WIDTH POSTED SPEED (MPH) (FT) 25 30 35 140 145 10 105 150 205 270 450 --WORK VEHICLE 11 115 165 225 295 495 12 125 180 245 320 540 ARROW BOARD S (FLASHING CAUTION) f GENERAL NOTES: � � I 1. ALL SIGNS AND SPACING SHALL CONFORM LANE TO THE MUTCD AND CITY OF KENT z CLOSED SPECIFICATIONS. AHEAD 2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY VEHICLES SHALL BE PROVIDED ROAD AT ALL TIMES. W WORK 3. PROTECTIVE VEHICLE RECOMMENDED—MAY BE AHEAD A WORK VEHICLE. 4. DEVICES (IF NEEDED) SHALL NOT ENCROACH W20-1 INTO ADJACENT LANES. 5. ALL SIGNS 48"x48" BLACK ON DRAINAGE V UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES (IF NEEDED) ARE ! STANDARD TRAFFIC CONES. 7. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTONS AND/OR DRIVEWAYS. 8. ALERT AFFECTED RESIDENTS AND SCHOOLS 7 CALENDAR DAYS PRIOR TO START OF PROJECT. I 2018 PAINT PROJECT CITY OF KENT SC&E-- Ws LIX�HIBRE��T ENGINEERING DEPARTMENT DATE w,R 24at5 SfIQR I PREVA I L 1 NC WAGE RAVES 2018 Paint Line Striping & RPM/Arauctc A - 4 April 18, 2018 Project Number: R00602 Page 1 of 18 I I State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 r PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. on public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. _ .................---...-.-... ......... _______ Journey Level Prevailing Wage Rates for the Effective Date 05/08/2018 Count Trade Job Classification Wage Holiday Overtime Note King Asbestos Abatement Workers lJourney Level $46.57 5D 1H King_ Boilermakers Journey Level $66.54 5N 1C King Brick Mason Journey Level $55.82 5A 1M King Brick MasonPointer-Caulker-Cleaner $55.82 5A 1M King. Bun[din Sa ¢'vi¢eEiu., r ovL s Janitor $23.73 5S 2F King Buitding Service Eriployce_, Traveling Waxer/Shampooer $24.18 SS 2F King Bufldim..; Service E!nl oy_tS F Window Cleaner (Non- $27.23 5S 2F Scaffold) King Gullding Sorvice i:ntployrtses Window Cleaner (Scaffold) $28.13 5S 2F King Cabinet Make rs..jlrt Shoff Journey Level $22.74 1 King Cant!� Acoustical Worker $57.18 5D 4C King Carpenters Bridge, Dock And Wharf $57.18 5D 4C Carpenters King t�trpe n Lers Carpenter $57.18 5D 4C King Carpenters Carpenters on Stationary Tools $57.311 5D 4C King rc=djtco Creosoted Material $57.28 5D 4C King Car palters Floor Finisher $57.18 5D 4C King Carrie^raters Floor Layer $57.18 5D 4C King C_11 Per ters Scaffold Erector $57.18 5D 4C King Cement Masons Journey Level $57.21 7A 1M King Divers it Tenders Bell/Vehicle or Submersible $110.54 5D 4C Operator (Not Under Pressure) King Divers tt Tenders Dive Supervisor/Master $72.97 5D 4C King Divers £t Tenders Diver $110.54 5D 4C 8v King Divers a- Tenders Diver On Standby $67.97 5D 4C King Divers_Fs Tenders Diver Tender $61.65 5D 4C King Divers 8i Tenders Manifold Operator $61.65 5D 4C King Diyers_tt_Tenders Manifold Operator Mixed Gas $66.65 SD 4C King Divers It Tenders Remote Operated Vehicle $61.65 5D 4C Operator/Technician King Divers.a Tenders $57.43 SA 4C httos://fortress.wa.cinv/lni/waaelnc)kun/nrvWanelnnkiin_asnx 411R/?n1R Page 2 of 18 Remote Operated Vehicle Tender King DietVe Wcar°kegs Assistant Engineer $56.44 5D 3F King Dredge Workers Assistant Mate (Deckhand) $56.00 SD 3F King DoeLd c. Worlc rs Boatmen $56.44 5D 3F King DiadsRlc Wor'ktrs Engineer Welder $57.51 5D 3F King Dredne._Workers Leverman, Hydraulic $58.67 5D 3F King Dred NNo'I ers Mates $56.44 5D 3F King Dredrie Workers Oiler r$76.96 5D 3F King DMywsall �hhcator Journey Level 5D 1H King Dr.ywall_Tnpc-,rs Journey Level 5P 1E King Electrical Fixture Maintenance Journey Level 5L 1E _Workers King Electricians - Inside Cable Splicer 7C 4E King Electricians - Inside Cable Splicer (tunnel) $82.241 7C 4E King Electricians - Inside Certified Welder $74.381 7C 4E King Electricians - Inside Certified Welder (tunnel) r$79.80 7C 4E King Electricians - Inside Construction Stock Person 7C 4E King Electricians Inside Journey Level 7C 4E King Electricians - Inside Journey Level (tunnel) 7C 4E King Eiectricians - Motor Shoga Craftsman 1 King Electricians - Motor Shop Journey Level 1 King Electricians - Powerline Cable Splicer $79.43 5A 4D Construction King Electricians- Powerline Certified Line Welder $69.75 5A 4D Construction King Electricians Powerline Groundperson $46.28 5A 4D Construction ................................. King Electricians-- Powerline Heavy Line Equipment $69.75 5A 4D Construction Operator King Electricians Powerline Journey Level Lineperson $69.75 5A 4D Construction King Electricians - Powerline Line Equipment Operator $59.01 5A 4D Construction King Electricians - Powerline Meter Installer $46.28 5A 4D 8W Construction King Electricians - Powerline Pole Sprayer $69.75 5A 44D Construction King Electricians - Powerline Powderperson $52.20 5A 4D Construction King Electronic Technicians Journey Level $31.00 _1 King Elevator Constructors Mechanic $91.24 7D 4Av King Elevator Constructors Mechanic In Charge $98.51 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $17.72 5B 1 R --Products Work Only King Fence Erectors Fence Erector $15.18 1 King t l-aggl rs Journey Level $39.48 7A 31 King, Glaziers Journey Level $61.81 7L 1Y httos://fortress.wa.clov/Ini/wacielookuD/t)rvWaaelookui).asDx 4/18/2018 Page 3 of 18 I King f leat 8. Fiost Insulators And .Journeyman $67.93 5-14H j :Asbestos Workers-s - - EKing Heatinq Equipment Mechanics Journey Level $78.17 7F 1E King Hod Can tom Ct Mason Tenders Journey Level $48.02 7A 31 King Industrial Power Vacuum Journey Level $11.50 1 I Cleaner King. Inland Boatmen Boat Operator $61.41 5B 1K King Inland.Boabn€°n Cook $56.48 5B 1K Kin Inland Boatmen Deckhand g __.. $57.48 5B 1K King Inland Boatmen Deckhand Engineer $58.81 5B 1K King Inland Boatmen Launch Operator $58.89 5B 1K King Inland Boatmen Mate $57.31 5B 1K King Cleaner Operator, Foamer, $31.49 1 Of Sewer O Watec Svstems By Operator Remote Control -------- King Inslacc.tiori/CteaiiiiiiQ/Scatii,ig Grout Truck Operator $11.50 1 Of Sewer Lt Water Syslelrrls_Liy Remote. Control King In<rrgxte iorrl(letartiiarrf5c4 ng Head Operator $24.91 1 Of Sewer a Water 5ystorns.5y Remote Control King Cleanin /Scalj(jq Technician $19.33� 1 C1F Sewer Ft Water"aysteirs Remote Control King li a c;t�onit pc, ao�,in /, iptting Tv Truck Operator $20.45 1 Of Sewer h Water S sioiriS,.B f2err€ote ConiroI ...... King fn sulatic�n A1slyl c_tors Journey Level $57.18 5D 4C King ifonworkers Journeyman $67.88 7N 10 King Laborers Air, Gas Or Electric Vibrating $46.57 7A 31 Screed King_ Laborers Airtrac Drill Operator $48.02 7A 31 King Laborers Ballast Regular Machine $46.57 7A 31 King Laborers Batch Weighman $39.48 7A 31 King Labo.re.rs Brick Pavers $46.57 7A 31 King Laborers Brush Cutter $46.57 7A 31 King Laborers_ Brush Hog Feeder $46.57 7A 31 King Laborer=., Burner $ 64 57 7A 31 King Laborers Caisson Worker $48.02 7A 31 King Laborers Carpenter Tender $46.57 7A 31 King Laborers Caulker $46.57 7A 31 King Laborers Cement Dumper-paving $47.44 7A 31 King Laborers Cement Finisher Tender $46.57 7A 31 King Laborers Change House Or Dry Shack $46.57 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $46.57 7A 31 King Laborer_: Chipping Gun(30 Lbs. And $47.44 _ 7A 31 Over) King Laborers Choker Setter $46.57 7A 31 httns://fortress.wa.anv/lni/wanpinnkiin/nrvWAnelnnktin acnx 4/1R/gn1R Page 4 of 18 King Id..bard Chuck Tcndcr $46.571 7A 1 31 King Laborers Clary Power Spreader $47.44 7A 31 King Laborers Clean-up Laborer $46.57 7A 31 King Laborers Concrete Dumper/chute $47.44 7A 31 Operator King Laborers Concrete Form Stripper $46.57 7A 31 King Laborers Concrete Placement Crew $47.44 7A 31 King Laborers Concrete Saw Operator/core $47.44 7A 31 Driller - King Laborers Crusher Feeder $39.48 7A A King Laborers Curing Laborer $46.57 7A 31 King Laborers Demolition: Wrecking Et $46.57 7A 31 Moving (incl. Charred - Material) King Laborers Ditch Digger _ $46.57 7A 31 King Laborers Diver $48.02 7A 31 King Laborers Drill Operator $47.44 7A 31 (hydrau tic,diamond) King Laborers- Dry Stack Walls $46.57 7A 31 King Laborers Dump Person $46.57 7A 31 King Laborers Epoxy Technician $46.57 7A 31 King Laborers - Erosion Control Worker $46.57 7A 31 King Laborers Faller Et Bucker Chain Saw $47.44 7A 31 King Laborers Fine Graders $46.57 7A 31 King Laborers Firewatch $39.48 7A 31 King Laborers Form Setter $46.57 7A 31 King Laborers Gabian Basket Builders $46.57 7A 31 King Laborers General Laborer $46.57 7A 31 King Laborers Grade Checker Et Transit $48.02 7A 31 ....... _. Person - King Laborers Grinders $46.57 7A 31 King Laborers Grout Machine Tender $46.57 7A 31 ...... King Laborers Groutmen (pressure)including $47.44 7A 31 Post Tension Beams King Laborers Guardrail Erector $46.571 7A 31 King Laborers Hazardous Waste Worker $48.02 7A 31 (level A) - King Laborers Hazardous Waste Worker $47.44 7A 31 (level B) King Laborers Hazardous Waste Worker $46.57 7A 31 (level C) King Laborers High Scaler $48.02 7A 31 King Laborers Jackhammer $47.441 7A 31 King Laborers Laserbeam Operator $47.44 7A 31 King Laborers Maintenance Person $46.571 7A 31 King Laborers Manhole Builder-mudman $47.44 7A 31 King Laborers Material Yard Person $46.57 7A 31 httos://fortress.wa.aov/Ini/waaelookUD/DrvWaaelookui).asDx 4/18/2018 Page 5 of 18 King_ Laboiers Motorman-dinky Locomotive $47.441 7A 31 King Laborers Nozzleman (concrete Pump, $47.44 7A 31 Green Cutter When Using Combination Of High Pressure Air & Water On Concrete is Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $47.44 7A 31 King Laborers Pilot Car $39.48 7A 31 King Laborers Pipe Layer Lead $48.02 7A 31 King. Laborers Pipe Layer/tailor $47.44 7A 31 King Laborers Pipe Pot Tender $47.44 7A 31 King Laborers Pipe Retiner $47.44 7A 31 i King Laborers Pipe Wrapper $47.44 7A 31 King Laborers Pot Tender $46.57 7A 31 King Laborers Powderman $48.02 7A 31 King Laborers Powderman's Helper $46.57 7A 31 King Laborers Power Jacks $47.44 7A 31 King Laborers Railroad Spike Puller - Power $47.44 7A 31 King Laborers Raker - Asphalt $48.02 7A 31 King_ Laborers Re-timberman $48.02 7A 31 King Laborers Remote Equipment Operator $47.44 7A 31 King Laborers _ Rigger/signal Person $47.44 7A 31 King Laborers Rip Rap Person $46.57 7A 31 King Laborers Rivet Buster $47.44 7A 31 _..------- - -- King Laborers Rodder $47.44 7A 31 King Laborers Scaffold Erector $46.57�7A 31 King Laborers Scale Person $46.57 7A 31 King Laborers Stoper (over 20") $47.44 7A 31 King Laborers Sloper Sprayer $46.57 7A 31 King Laborers Spreader (concrete) $47.44 7A 31 King Lzbo ers Stake Hopper $46.57 7A 31 King Laborers Stock Piler $46.57 7A 31 King Laborers Tamper 8 Similar Electric, Air $47.44 7A 31 & Gas Operated Tools - King Laborers Tamper (multiple £t Self- $47.44 7A 31 propelled) King Laborers Timber Person - Sewer $47.44 7A 31 (lagger, Shorer a Cribber) King Laborers Toolroom Person (at Jobsite) $46.57 7A 31 King Laborers Topper $46.57 7A 31 King Laborers Track Laborer $46.57 7A 31 King Laborers Track Liner (power) $47.44 7A 31 King Laborers Traffic Control Laborer $42.22 7A 31 8R ................... - - King Laborers Traffic Control Supervisor $42.22 7A 31 8R King Laborers Truck Spotter $46.571 7A 31 King Laborers Tugger Operator $47.4 77A 31 httns://fortress-wa-ciov/lni/wanpInnkiin/nrvWanelnnkun_asnx 411R/7f11R Page 6 of 18 King �haburcr^.; Tunnel Work-Compressed Air $92.60 7A 31 Worker 0-30 psi King Laburefs Tunnel Work-Compressed Air $97.63 7A 31 Worker 30.01-44.00 psi _..... .._............ -. King I abo,ers Tunnel Work-Compressed Air $101.31 7A 31 8� Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $107.01 7A 31 84 Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air $109.13 7A 31 Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $114.23 7A 31 BQ Worker 64.01-68.00 psi _ King Laborers Tunnel Work-Compressed Air $116.13 7A 31 Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $118.13 7A 31 Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $120.13 7A 31 8S Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $48.12 7A 31 8� Tender King_ Laborers Tunnel Work-Miner $48.12 7A 31 . King Laborers Vibrator $47.44 7A 31 King Laborers Vinyl Seamer $46.57 7A 31 --- ---- - - King Laborers Watchman $35.88 7A 31 King Laborers Welder $47.44 7A 31 King Laborers Well Point Laborer $47.44 7A 31 King Laborers Window Washer/cleaner $35.88 7A 31 g ......rs Unde;gr ound Sewer General Laborer ft Topman $46.57 7A 31 Kin laNaasc�, ._.. � - _ - & Water King Laborers - UnderpL(uLld Sewaer Pipe Layer $47.44 7A 31 EL Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $56.78 5D 1H King, Marble Setters Journey Level $55.821 5A 1M King Metal Fabrication (In Shop . Fitter $15.86 1 King Metal F'rabricaaion Cln ShLLj Laborer $11.50 1 King Metal F:abrica_t_,ion.(ln Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shots), Painter $11.50 1 King Metal Fabrication (In Shopl. Welder $15.48 1 King, Millwright Journey Level $58.68 5D 4C King Mt Ag ar guilrt nr s Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King ojula,r Buildings Equipment Maintenance $11.56 1 King Modratar-8uilthmas Plumber $11.56 1 httDs://fortress.wa.aov/Ini/waaelookuD/orvWaoelookuD.asox 4/18/2018 Page 7 of 18 King �+uca64 Di_itlrlr gr Production Worker $11.50 1 King Modular_Buildins s Tool Maintenance $11.56 1 King AAL1r 18i Bulki 015 Utility Person $11.56 1 King Modular flnrldirrts Welder $11.56 1 King Painters Journey Level $41.60 6Z 2B King Pile DriverCrew Tender $52.37 5D 4C King Pile Driver Hyperbaric Worker - $71.35 5D 4C Compressed Air Worker 0-30.00 PSI King Pile Driver Hyperbaric Worker - $76.35 5D 4C Compressed Air Worker 30.01 - 44.00 PSI King Pile Driver Hyperbaric Worker - $80.35 5D 4C Compressed Air Worker 44.01 54.00 PSI King Pile Driver Hyperbaric Worker $85.35 5D 4C Compressed Air Worker 54.01 - 60.00 PSI King Pile Driver Hyperbaric Worker - $87.85 SD 4C Compressed Air Worker 60.01 64.00 PSI King Pile Driver Hyperbaric Worker - $92.85 5D 4C Compressed Air Worker 64.01 - 68.00 PSI King Pile Driver Hyperbaric Worker - $94.85 5D 4C Compressed Air Worker 68.01 - 70.00 PSI King Pile Driver Hyperbaric Worker - $96.85 5D 4C Compressed Air Worker 70.01 72.00 PSI King Pile Driver Hyperbaric Worker - $98.85 5D 4C Compressed Air Worker 72.01 - 74.00 PSI King Pile Driver Journey Level $57.43 5D 4C King Plasterers Journey Level $54.89 7Q 1R King Playground & Park ELpulpment Journey Level $11.50 1 Installers King Number Ft Petaa,* !Lk eit Journey Level $81.69 6Z 1G King P'oyne r_BJ'gr�airmr t3,Fai ator's Asphalt Plant Operators $60.49 7A 3C 8P King Nowcr Equrrs rrlr;I,OrarraCrrrs Assistant Engineer $56.90 7A 3C 8P King Power Egmpinerrt Operators Barrier Machine (zipper) $59.96 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $59.96 7A 3C 8P Concrete - - King Power_Equipment Operators Bobcat $56.90 7A 3C 8P King Pcrwe r Fctuicrment OL)ei ators Brokk - Remote Demolition $56.90 7A 3C 8P Equipment King PowerEguipment Ope^ ators Brooms $56.90 7A 3C 8P King Power �J!ljl=] Olacrators Bump Cutter $59.96 7A 3C 8P King Pav a r_ c@uapn�ent_Operator Cableways $60.49 7A 3C SP King Power,.rclgd_L eiat_C) ator's Chipper $59.96 7A 3C SP httns-//fortress.wa.anv/Ini/wanPlonkun/nrvWanelnnkrrn_acn)( 411R/7f11R Page 8 of 18 King Powerg 71to rs $56.90 7A 3C 8P guir�ment._Qpvu Compressor King Power Eouioment Orwrat.ors IConcrete Pump: Truck Mount $60.49 7A 3C 8P With Boom Attachment Over 42 M King Power EqL6SLQ!0 Concrete Finish Machine -laser $56.90 7A 3C 8P Njt..OJ�erators Concrete .......... Screed creed King Power_C ,uj0merrt Op .LsiLonq Concrete Pump - Mounted Or $59.49 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure. King PowerEoL0I?merft Operators Concrete Pump: Truck Mount $59.96 7A 3C 8P With Boom Attachment Up To �42m King Power EgufL)rnera OpLC tp . $59.49 7A 3C P Op LC Conveyors — I L King Power Eauiornent Operators Cranes Friction: 200 tons and 7A 3C 8P ............................................__ over $62.33 King Power Equipment.Operators 'Cranes: 20 Tons Through 44 $59.96 7A 3C 8P ............. Tons With Attachments King Eow(N E(MirnnL,Operators ICranes: 100 Tons Through 199 $61.10 7A 3C 8P ,Tons, Or 150' Of Boom (including Jib With Attachments) King Po%ye6 RJUiLATIEM( Operators Cranes: 200 tons- 299 tons, or $61.72 7A 3C 8P 250' of boom including jib with attachments King Powcr Equiornent Op¢ i catorz Cranes: 300 tons and over or $62.33 7A 3C 813 300' of boom including jib with attachments King E!gVpI 0 Cranes: 45 Tons Through 99 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) 7 �King !jqw(2.r Eatfloment Operators Cranes: A-f rame - 10 Tons And $56.90 7A 3C 8P Under King Cranes; Friction cranes $61.72 7A 3C 8P through 199 tons King Power Operators, Cranes: Through 19 Tons With $59.49 7A 3C 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $59.96 7A LC 8P Engineer/deck Winches $59.96 7A 3C 8P King icwcp RrqLiIt.0L�rratqrs Derricks, On Building Work $60.49 7A 3C King PcrWer E r <rrr Brat rs Dozers D-9 EL Under $59.49 7A 3C 8P King Power EauiDment Operators Drill Oilers: Auger Type, Truck $59.49 7A 3C 8P Or Crane Mount King PoWgi..E Equipment Opera Drilling Machine $61.10 7A 3C 8P guiL ��g_�qU King NcaWer,Lrttuprrent,nOpei4ecrs Elevator And Man-lift: $56.90 7A 3C 8P Permanent And Shaft Type King Power EcUtrat mentmOnar,LaI,2Lr Finishing Machine, Bidwell $59.96 7A 3C 8P And Gamaco Ft Similar Equipment King Eowc P 2r F cILM _QMAM $59.49 7A 3C L httDS://fortress.wa.aov/lni/waaelookUD/orvWaaelookuo.asox 4/18/2018 Page 9 of 18 �Forklift: 3000 Lbs And Over lWith Attachments I King Power Eouirrmen. Forklifts: Under 3000 Lbs. $56.90 7A 3C 8P ............. With Attachments King Grade Engineer: Using Blue $59.96 7A 3C SP Prints, Cut Sheets, Etc King Gradechecker/stakeman $56.901 7A 3C 8P King ElowerEcuipment Operators Guardrail Punch $59.96 7A 3C 8P King 22w�el(ji _Pllti at�L� Hard Tail End Dump $60.49 7A 3C SP Articulating Off- Road Equipment 45 Yards. Ft Over King Power Hard Tait End Dump $59,96 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King ale Horizontal/directional Drill $59.49 7A LC 8P Locator King P2ALrf rg"s Horizontal/directional Drill $59.96 7A 3C 8P Ly. .- — Lo Operator King [ w _� _g, E_q,!ji ment OperatorF H ydratifts/boom Trucks Over 59.44 7A 3C 8P 10 Tons King LoyWCrr cull e,i a tai 5 Hydratifts/boom Trucks, 10 7A 3C 8P _Ej_ ILU!a2L��L_ _ $56.90 Tons And Under King Egw ..L Equipment Operators Loader, Overhead 8 Yards. Et $61.10 7A 3C 8P Over King Powei Eampment Opet ators Loader, Overhead, 6 Yards. $60.49 7A 3C 8P But Not Including 8 Yards King En,�eIjLq2ipment: Operatots Loaders, Overhead Under 6 $59.96 7A 3C 8P ............................................ Yards King PI)w_cKl,,_qqff,rpTient,Or2q at(rrs Loaders, Plant Feed $59.96 7A 3C 8P King _EqLjjprnent Opetator Loaders: Elevating Type Belt $59.49 7A 3C 8P King Power Equipment.0 7A 3C 8P , I>erators Locomotives, All $59.96 King Power Equipment Operators Material Transfer Device $59.96 7A 3C 8P King Power EquipTient0lZerators, Mechanics, All (teadmen - $59.96 7A 7A 3C 8P $0.50 Per Hour Over Mechanic) King Power EjcuiL)n n��) s Motor Patrol Graders 7A 3C 8P q_ .I pL $60.49 King Mucking Machine, Mote, $60.49 7A 3C 8P Tunnel Drill, Boring, Road Header And/or Shield - - King Power Eqgjpp22aL22�1� Oil Distributors, Blower $56.90 7A 3C 8P Distribution ft Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $59.49 7A 3C 8P ........................................................... Mantifts), Air Tuggers,strato King Power ErAuIDITIC[It.Operators ad, Bridge Type Crane: $59.96 7A 3C SP .......................... 20 Tons Through 44 Tons King flower EuLdpulel rt OIX,'I W01 5 Overhead, Bridge Type: 100 $61.10 7A 3C 8P Tons And Over King PowL r EqUinnIr-111 L C.Y ierators I Overhead, Bridge Type: 45 $60.49 7A 3C 8P 1 Tons Through 99 Tons King k_0WLLE(jLdnlmeI'tqpf IL(lLs Pavement Breaker 7A g_g - K 9—P $56 90 httos://fortress.wa.cov/lni/wacielookiin/nrvWaciplonkii n.arny 4/1q/2n1 s Page 10 of 18 King Power r 7A�qt,�i lAnen LOpgra�qjm Pile Driver (other Than Crane $59.96 3C 8P 1 Mount) King R2Kq.,i- [.,gqjp ng it, ptL111 Plant 011ler - Asphalt, Crusher $59.49 Qrs tA J� or King Powq_r ipLnrq a!Qg Posthole Digger, Mechanical $56.90 7A 3C 8P King Power EQUiDulent Operators Power Plant $56.90 7A 3C 8P King Power Fclqi qfatqLs Pumps - Water $56.90 7A 3C 8P King Power Quad 9, Hd 41, D10 And Over $60.49 7A LC UP King Power ErjuiDment Operators Quick Tower - No Cab, Under $56.90 7A 3C 8P ................. 100 Feet In Height Based To Boom King Powei EC]UiDlnent Operators Remote Control Operator On $60.49 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Bettman $56.90 7A 3C 8P King ors Rigger/Signal Person, Bellman $59.49 7A 3C 8P (Certified) King 2awc2L-Fg-t-jWm2rnt Operators Rollagon $60.49 7A 3C 8P King PowerErguparrc l'mOpct<d rs Roller, Other Than Plant Mix $56.90 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $59.49 7A 3C 8P Equipment........ Materials King Power Ea)WUATierft 0j)S,,L, o1r , Roto-mill, Roto-grinder $59.96 7A 3C 8P King Rj�L-Eqqi e, Saws - Concrete $59.49 7A 3C 8P King Power Ecp.dprnent Operators Scraper, Self Propelled Under $59.96 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry $59.49 7A 3C 8P All King Power Eguipnient Operators Scrapers, Self-propelled: 45 $60.49 7A 3C 813 Yards And Over King Lowi�.IgL�i12Lngqk&k erz Lars Service Engineers - Equipment $59.49 7A 3C 8P �j_ King L)owc 2gitnLO a pt��Lqg� Shotcrete/gunite Equipment $56.90 7A 3C RP _ King Power EquiqMtnLOperators Shovel , Excavator, Backhoe, $59.49 7A 3C 8P Tractors Under 15 Metric Tons. King L'o wY l E P-meL,i t"2 rLe r a Lmq Shovel, Excavator, Backhoe; $60.49 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power EqqjL)on(-WCL�iL D<t orss Shovel, Excavator, Backhoes, $59.96 7A 3C 8P Tractors: 15 To 30 Metric Tons King PqwyeL-Eguizrlelll r -o eato LL-n Shovel, Excavator, Backhoes $61.10 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King agy�cr Ccjgj2gient OjLgLLLoL5 Shovel, Excavator, Backhoes: $61.72 7A 3C 8P Over 90 Metric Tons King E2we[E jqi qnL.Op Slipform Pavers $60.49 7A 3C 8P King PcswewrwEourtJYllCllt Operators Spreader, Topsider Et $60.49 7A 3C 8P Screedman King !Ql!�der 2e-t u�c ri 0 erat i- Subgrader Trimmer $59.96 7A 3C 8P _KA 1�o King F_QwerEqujprnenLQpDjjgEs Tower Bucket Elevators $59.49 7A 3C 8P King Fqwc LijEggigiiignt qrcratQ[j Tower Crane Up To 175' In $61.10 7A 3C 8P IHeight Base To Boom I httiDs://fortress.wa.aov/1ni/waaeIookUD/DrvWaaeIookuo.asi)x 4/18/2018 � Page 11 8f18 King LQwfr F(lrdfLimera Ojxr�q(.IE� Tower Crane: over 175' $61.72 7A X 8P through 250' in height, base to boom I King ejr�ILQL� Tower Cranes: over 250' in $62.33 7A 3C SP height from base to boom Truck Type King Power Ecl p. r t 0 itor, Trenching Machines King Truck Crane Oiler/driver - 100 $59.96 7A 3C 8P Tons And Over Under 100 Tons King L�(2w(,LJF t QLLL Li r 5 Truck Mount Portable 7A 3C 8P Conveyor King Power Equipment Operators Welder $60.49 7A 3C 8P King dLoi�� Wheel Tractors, Farmall Type $56.90 7A LC VP King eLi��O Lt r L Asphalt Plant Operators $60.49 7A 3C 8P It Water King L30vver Ec ent pj)ei ators- Barrier Machine (zipper) $59.96 7A 3C 8P King Power_.Ecu_ip rnent Oneratars- !Batch Plant Operator, $59.96 7A 3C 8P Undcrpround Sewer EL Water �qrjnd Sewer Et Water Equipment Brooms Undervround SEW2F Ft Water �cwqr Et Water .Underm ound Sewer EL Water King PoweLEcLqIfjinont._O ritors- Concrete Pump: Truck Mount 60.49 7A 3C 8P Undery ground Sewer a Water With Boom Attachment Over King Power Ecuumment, Coerators- Concrete Finish Machine -laser $56.90 7A 3C 8P .Lqrqgnd Sewer EL Water Screed Underpround Sewer Ft Watei Trailer High Pressure Line Pump, Pump High Pressure. King -P-o-wer-EqUip.1nont Operators-_ Concrete Pump: Truck Mount $59.96 7A 3C 8P Underg,round Sower ft Watcr With Boom Attachment Up To httDS://[8rtrpc;S.m/3.8ov/lAi/vvaoeiookun/nrvVVaoe|nnkuna-,nx 4/1R/7018 Page 12 of 18 Underpin and POWOr EquIL)Lnent_01).o.rLtor 5�L L t\111V, rower rLIUlGP[HUHL Ciareb Friction: 200 toils and $6233 /A Y_ 0 Underground Sewer Et Water over King Power Eguipirnent Opei atot s- Cranes: 20 Tons Through 44 $59.96 7A 3C 8P !J.nderpround Sewer 8. Wata Tons With Attachments King Power Equip Operators-- Cranes: 100 Tons Through 199 _$61.10 7A 3C 8P Uriderg,1`013nd Scw& L Water Tons, Or 150' Of Boom (Including Jib With Attachments) King rowel -.."quiprnent Cranes: 200 tons- 299 tons, or $61.72 ZA 3C SP Un Jergroond Water 250' of boom including jib with attachments King Power Equipment Ope i atoi s- Cranes: 300 tons and over or $62.33 2�A 3C 8P Underwound Sewer ft Water 300' of boom including jib with attachments King Power Egrupirrient Operators- Cranes: 45 Tons Through 99 $60.49 1A IC IP Under ground Sewer 6. Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Ecirl Operators- Cranes: A-frame - 10 Tons And $56.90 7A 3C 8P lLndlor.groui:Ld Sewer R Water Under King Cranes: Friction cranes $61.72 7A 3C 8P Sne" ft Wale through 199 tons _ _. ------------------- King RowctLL Cranes: Through 19 Tons With $59.49 7A 3C 8P Uridttg,mqnd Sewer Et Waten- Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $59.96 7A 3C 8P UndergrOL111d Sewer Et Water I— King Power..Eqj!iprnent Operators- Deck Engineer/deck Winches $59.96 7A 3C 8P .............Underqround (power) King Power Equipment operators- Derricks, On Building Work w_.4_9_7A 3C 8P JUnderground_Sewer It Water King Op.t�!o - Dozers D-9 Et Under $59.49 7A 3C 8P Se y?r Fr. Water King Powers cLuij jm��rs- Drill Oilers: Auger Type, Truck $59.49 7A 3C 8P _L _ Under round Sewer ft Water Or Crane Mount King Power EGUiDment Operators- Drilling Machine $61.10 7A 3C j 8P Undei i+i ound Sewer Et Water King Power.Equipment O[DeFatOFS- Elevator And Man-lift: 3C ........................................................................... Underground Sewer 8L Water Permanent And Shaft Type -------------------------- King Powcr_Egq(RKnej UperaCrars. Finishing Machine, Bidwell $59.96 7A 3C 8P Underground Sewer &. Water And Gamaco Et Similar ................ ............................................................. Equipment King Power Eau0nnent QpgE<iAp[L- Forklift: 3000 Lbs And Over $59.49 7A 3C 8P a Water With Attachments King L7.Qwor_f qujjLri)cLiLQ12nraLqr s- Forklifts: Under 3000 Lbs, $56.90 7A LC 8P _ — qu��er round Sewer R Watei With Attachments King iPowes (t�a 04i 7 A _Egtdp.rnc,nt,,Opeiators- Grade Engineer; Using Blue 59.96 7A 3C 8P Underproun d.Sewvr a Walter Prints, Cut Sheets, Etc King Gradechecker/stakeman $56.90 7A 3C 8P Underground Sewer & Water I I httDs://fortress.wa.aov/lni/waqelookuD/DrvWaaelookUD.aSDX 4/18/2018 Page 13Vf 18 King Power Ea'Apill,ent, )�er�AtaL-_ Guardrail Punch 7A 3C BP Sewer a Water King Hard Tait End Dump 7A X 8P Un-do ground Sewer Et Water Articulating Off- Road King E�LY—vqLIqo jLf Hard Tait End Dump $59.96 7A 3C 8P Equipment Under 45 Yards � m//y Water Tons And UnderUnderp Loader, Overhead 8 Yards. E Ft Water Over King Es) Tip UmLery ,roundSowei R Water But Not Including 8 Yards King Power EqUiDn-rent Operators- Loaders, Overhead Under 6 $59.96 7A X 8P L�ndprgpLorjn�j5e�er & Water Yards King f�O�t Sewer It Water King POWel' EQUij)lTient Operators- Loaders: Elevating Type Belt $59.49 7A X 8P Underp,round Sewer EL Water King aqwQ�&iquipill a tors- Material Transfer Device 7A 3C SP Undem.iOUnd Sewer ft Water King Power EQLI�D[11011t 0 Underpround Sewer a Water $0.50 Per Hour Over Underti,rowid Sewer EL Water ------------------ King LIoAqL.L.,gjil ent,.0 erators_ Mucking Machine, Mote, $60.49 7A 3C 8P Underground Sewer 8- Water Tunnel Drill, Boring, Road Header And/or ShieA King Lower Equiry_n2j�j Operators- Oil Distributors, Blower $56.90 7A X 8P Underground Sewer Ei Water Distribution Et Mulch Seeding Operator King PowerEquipmentOp .rators- Outside Hoists (elevators And _"S59.49 7A 3C 8P King Lower Equipment Operators- Overhead, Bridge Type Crane: $59.96 7A X 8P Underg,round Sewer a Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $61.10 7A 3C 8P UnderRround Sewer, Ft Water Tons And Over S,rato Ai -. Overhead, Bridge Type: 45 gridlerfiround Sewer ft Water Tons Through 99 Tons htfD3://fOMLnPSS.Vva.UAv/1Ai/vvaoelunkun/nrvVVaoe|nnk,|marnv 4/18/7018 Page 14 of 18 E qoa tL.Qq L�!a!n en 1 Pile Driver (other Than Crane Unticrs oUnd Sewer a Water Mount) King Power EquipgjgnLQper� PtantOlter - Asph-.t --l— 49 11 11 M , UU�11�1 �:m /A or UndgLqround Sewer & Water ------------ King 2_QwLr..EgLipi2je LLOpeiL�t urs- Posthote Digger, Mechanical $56.90 7A 3C 8P Uridel rij OL111d ScW('r rt Water King PowerjE%i rnent _,T_O;2r Lprs- Power Plant $56.90 7A 3C 8P L)Ilknmjad..Sewer ('k water King Epv fnj.Ecjj'iqrnent CiRgEq qrs_ Pumps - Water $56.90 7A 3C 8P Ver ft Water King Power EqUiDnIfLIt QUe.ratOrS- Quad 9, Hd 41, D10 And Over $60.49 7A 3C 8P gqLjerpround Sewer it Water King Power Ecuipment Oper, s- Quick Tower - No Cab, Under $56.90 7A 3C 8P Urdergiound Sewer & Water 100 Feet In Height Based To Boom King Power Remote Control Operator On $60.49 7A 3C 8P Underground Sewer a Water Rubber Tired Earth Moving Equipment King F-owe—rlg!1!2111 Rigger And BeRman $56.90 7A 3C 8P Underground Sewer Et Water King or,- Rigger/Signal Person, Beltman $59,49 7A 3C 8P 4Lrjderp ountl Sewef i Water (Certified) King Pqmer_Equillment.Operator, Rollagon $60.49 7A 3C 8P UnderjgLound.Sr1wer ft Water King Power E-kltn arng^rrt Oq rstors Roller, Other Than Plant Mix $56.90 7A 3C 8P qndeL.Pround Sewer & Water King Power Equipment Operators- Roller, Plant Mix Or Multi lift $59.49 j 7A 3C 8P Uriderqround Sewer Et Water Materials --------------------------- King kjqwgr Cquiprnnt -,r, Roto-milt, RoLo-grinder $59.96! 7A 3C 8P Underground Sewer Et Water King Power.fggJE21tnt OperitqLs- Saws - Concrete $59.49 7A 3C 8P Urderground Sewer a Water King Povaer_EgLupmei-it.Opc,t-atoi.�.- Scraper, Self Propelled Under $59.96 7A 3C 8P ........................ Underpjound Sewer (i Water 145 Yards King Power, EgUiPrI10111 Opef aLoi s- Scrapers - Concrete Et Carry $59.49 7A 3C 8P U�rdrr,roeund Seyew Ft Water All King Power Equipment Operators Scrapers, Self-propelled: 45 $60.491 7A X 'P Underground Sewer Ei Water Yards And Over w King Pogi Equi Service Engineers - Equipment $59.49 7A 3C 8P Underground Sewer Ft Water I L— King Power Equipment Operators Shotcrete/gunite Equipment $56.90 7A 3C 8P Urlderp'rround Sewer a Water King Shovel , Excavator, Backhoe, $59.49 7A LC 8P !!LtqLnroi,md Sewer tr Water Tractors Under 15 Metric Tons. King Shove[, Excavator, Backhoe: $60.49 7A 3C 8P Underground Sewer 11 Water Over 30 Metric Tons To 50 �Metric Tons King Power Ecluipinent Operators- Shovel, Excavator, Backhoes, $59.96 7A 3C 8P roundUnder ewel tz Water Tractors: 15 To 30 Metric Tons King Power..Equipment Coerators- $61.10 7A 3C 8P umidergound Sewer ft Water g httDs:Hfortressma.aov/1 ni/waae1ookUD/DrvWaae1ookuo.aSDX 4/18/2018 Page 15 [)f18 Over 50 Metric Tons To Metric Tons I I Sewer 6. Water King �juwer Egg�)rnqnLQperator�- Tower Bucket Elevators $59.49 7A 3C 8P �LderSLc�Ljnd Sewer 4 Water Height Base To Boom Shove[, Excavator, Backhoes: � -n, to boom King EQ��er�qMprrUtnl ODerators- Tower Cranes: over 250' in $67.33 7A 3C 8P ft Water through 250' �n height, base Sewer [L Water height from base to boom Underground Sewer a: Water Truck Type King Truck Crane Oiler/driver $59.49 7A 3C SP King L�LVgLj.cLuj Truck Mount Portable $59.96 7A 3C 8P King PowerEquip.mlent Underg!�quoqd Sewer EL Water Qij�LeL�LigLLLi�LSewer EL Water King Power Line Clearance Tiee Journey Level In Charge $50.02 5A 4A Trimmers King Power Line Clearance Tree Spray Person $47.43 5A 4A Tiininicrs King Power Line. Clearance 'rre- Tree Equipment Operator $50.02 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $44.64 5A 4A Trimmers King Flower Line Clearance Tree Tree Trimmer Groundperson $33.67 5A 4A Ti immers King ResidentiM Brick Mason Journey Level $55.82, 5A 1M King Reside Journey Level $28.20L---] 1 King Residential Cement Masons Journey Level. $22.641 1 1 httOS://fO[t[esS.VVa-onv/|ni/vvnoe|ook|m/nrvVVanp|nnk/m a-,nx 4/18/7D18 Page 16 of 18 King P �idcn i Drywall Journey Level $42.86 5D 4C _. Arrnrlie�r,tetr King Rcsidc.intl<d Drywall T�a1z rs Journey Level $51.43 5P iE - - King Resi_dential_aElectric,ians Journey Level $30.44 1 King Residential Glaziers Journey Level $41.05 7L 1 H King Residential Insulation Journey Level $26.28 1 Apnli cattors King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumber; Et Journey Level $34.69 1 P�,efitters - -- - King Residential Refrfge¢awtion a Air Journey Level $77.86 6Z 1G Conditioning Mechanics .........................m...._._......_.............................. King Residential Sheet Metal Journey Level (Field or Shop) $44.56 7F 1R Workers King Residential Soft f"per I ayy€�€s Journey Level $47.61 5A 3-1._ King ResidenUal SLrinkR€ P-fitters. Journey Level $46.58 5C 2R 4Fime Piotectr.ni - - King Residential Stone Masons Journey Level $55.82 5A 1M King Residential Terrazzo Workers Journey Level $51.361 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 --------------------------------------------------- Finishers .... .................... _--.... King Residential Tile Setters Journey Level $20.00 1 King Roofers Journey Level $51.02 5A 3H King Roofers Using Irritable Bituminous $54.02 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $78.17 7F 1E King Shipbuildinn Et Ship,Repair Boilermaker - $43.31 7M 1H King Shipbuldmg Et Ship 12epair Carpenter $41.06 7T 2B King Shipbuilding B Sliiga Repair Electrician $42.07 7T 4B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $67.93 5J 4H King Shipbuilding Et Ship Repair Laborer $41.99 7T 4B King ShjRbtiuitding fx Sljrya Repairr Machinist $42.00 7T 4B King ShipbuildinR a Ship Repair Operator $41.95 7T 4B King !4LOp uiWin Ship L�epait Painter $42.00 7T 4B King Sk,ru,l'zh ilrli€ -6r5Y F�'prrir Pipefitter $41.96 7T 4B King SWpbuil,din t B Ship RtMa#ir Rigger $42.05 7T 4B King Shipbuilding Et Ship Repair Sheet Metal $41.98 7T 4B King ShObtrildiiig Et Ship Repair Shipfitter $42.05 7T 4B King Shrpbuilding_ Si' 4kepah- Trucker $41.911 7T 4B Kiang Shipbuilding„Et Ship Repair Warehouse $41.94 7T 4B King shkpbyjtclingg tAIhLj p ft�air' Welder/Burner $42.05 7T 4B _ g a Installer Sign Installer $22.92 1 King Srgn Mamlte€s £t .:...m.�.-, _ Fleetricai King �igq_!ia1al<ers U instatters Sign Maker $21.36 1 Etcdtrica(, httas://fortress.wa.00v/Ini/wacielookUO/DrvWaaelookUD.asr)x 4/18/2018 Page 17Of18 King InstLWL?rs Non-. Sign Installer King Si,on Makers ft Installers (Hon- Sign Maker $33.25 Journey Level _�4_7.61 _LA 3J King King Solar Controls For Windows Journey Level $12.44 1 King �RLinkter Fj�ters (Fire Journey Level $75.64 5C ix King Stolre Masons Journey Level _�_55.82 5A 1M King Street And Parking,1,2t Journey Level $19.09 1 Worker King �_Ur VmQ�s Assistant Construction Site $59.49 7A 3C SID King ��iLy�,, o 15 Construction Site Surveyor $60.49 7A 3C 8P King Telecom mt in i cation Journey Level $22.76 1 Technicians King Telenhane Line Construction - Cable Splicer $40.52 5A 2B King TOP Phonc Line Construction - Hole Digger/Ground Person $22 78 5A 2B Outside King Telephone Lirw Construction - Installer (Repairer) $38.87 5A 2B Outside King Tcle)honp Une Construcj.jaj.., Special Apparatus Installer 11 $39.73 5A 2B Outside King IttopLione Line �qqstruc.tion - Telephone Equipment $40.52 5A 2B Outside Operator (Heavy) Outside Operator (Light) Outside I Outside Outside Lineperson/Installer Outside King Line Consbix1jon - Television Technician $30.69 5A 2B King TeteDhOne Line Construction - Tree Trimmer $37.74 5A 2B Outside King TerraZ70 Workers Journey Level $51.36 5A IM King Tile Setters Journey Level $51.36 5A 1M Finishers � � � � � ht±DS://f8rtneSr.vv6.U0v/lni/vvaoe|nnk||o/nrvVVnoe|ook|masnv 4/1R/7018 Page 18 of 18 King Vrruck Asphalt Mix Over 16 Yards (W. $52.70 5D 3A 8L WA-Joint Council 28) King T i w,k Di rv(N Asphalt Mix To 16 Yards (W. $51.86 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck Et Trailer $52.70 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $51.86 5D 3A 8L Council 28) King Truci< Drivers Other Trucks (W. WA-Joint $52.70 5D 3A 8L Drivers............. Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Di h-c Irrigation Pump Installer $17.71 1 Installers King Well Dt fflers Et Irriqation Pump Oiler $12.97 1 Installers—----- - King WeU DdUers ft h,dp oio .Pu Well Driller $18.00 T!_2-n 2 Installers httiDs://fortress.wa.aov/1ni/wacelookuD/DrvWaaelookuD.aSDX 4/18/2018 Benefit Code Key—Effective 3/3/2018 thru 8/30/2018 k#tWt;F;k;k;k**1:t##N:N:N:N:#;k;k;kN::kWN;�N;WMN-N-Ttt�N;�a:�444N;���;k+kN;#;k##k**;k;k;kN:i=k=k#*=kN:N;:t;k*3;k;k;k;kt#rtN#*N:WWN:WYk;YW��%��N;��N:N:N:N:N:�♦ I Overtime Codes j Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER W EEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, B, All hours worked on Saturdays shall be paid atone and one-half times the hourly rate of wage. All hOnr9 worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two (2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage.All additional hours worked and all worked on Sundays and holidays shrill be paid at double the hourly rate of wage. E, The first two (2) hours after eight(8)regular hours Monday through Friday and the first eight(8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F, The first two (2) hours after eight(8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall he paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day. shall be paid at double the hourly rate of wage. All homy worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten(10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four- ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two (2)hours after eight(8) regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All homy worked over ten(10)hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays(except makeup days if work is lost clue to inclement weather conditions)shall be paid at one and one-half times the hourly rate of wage. Alt hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key—Effective 3/3/2018 thru 8/30/2018 Overtime Codes Continuer] 1, O. The first ten(10)hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays,holidays and after twelve(12)hours, Monday through Friday and after ten(10)hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays (except makeup days if circmnstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holi days shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Christmas day) shall be paid at double the hourly rate of wage.All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S, The first two(2)hours after eight(8) regular hours Monday tlm-ough Friday and the first eight(8)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays (except Labor Day) shall be paid at Two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer))shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y, All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee) and all hours worked in excess of eight(8)hours per day (10 hours per day for a 4 x 10 workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half tunes the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day(10 in a 4 x 10 workweek)or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half limes the hourly rate of wage. All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key— Effective 3/3/2018 thru 8/30/2018 Overtime Codes Continued 2. ALL HOURS WORKED 1N EXCESS OF EIGHT(8) HOURS PER DAY OR FORTY(40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALE TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shell be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two (2) horra after tight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shrill be paid at double the hourly rate of wage. On a four-day, ten- hour weekly schedule,either Monday thru Thursday or Tuesday thou Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage. The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage. All other hours worked on the fifth, sixth, and seventh days and on holidays shall be paid at double the hourly rate of wage. 3„ ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day, or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and aft work on Saturdays shall be paid at time and one-half the straight time rate. Hours worked over twelve hours (12) in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar ($1.00) per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight(8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. C. Work performed in excess of eight(8)hours of straight time per day, or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage.After an employee has worked eight(8)hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such tune as the employee has had a break of tight(8)hours or more. 3 Benefit Code Key—Effective 3/3/2018 thru 8/30/2018 Overtime Codes Continued 3. E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage. Each week, once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two (2) times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall he compensated at one and one half(I-1/2)times the regular rate of pay. I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. In the event the job is down due to weather conditions during a five day work week(Monday through Friday,) or a four day-ten hour work week(Tuesday through Friday,) then Saturday may be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All hours worked Monday through Saturday over twelve(12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. J. All hours worked between the hours of 10:00 pm and 5:00 am, Monday through Friday, and all hours worked on Saturdays shall be paid at a one and one-halftimes the hourlyrate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SIIALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday, the first four (4) hours of overtime after eight(8) hours of straight time work shall be paid at one and one half(1-1/2) times the straight time rate of pay,unless a four(4)day ten(10)hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday, the first two(2)hours of overtime after ten (10)hours of straight time work shall be paid at one and one half(1-1/2) times the straight time rate of pay. On Saturday, the first twelve (t2) hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay,except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer,the first ten(10)hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve(12)hours in a day and all hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate of pay. 4 Benefit Code Key— Effective 3/3/2018 thru 8/30/2018 Overtime Codes Continued 4. D. All hours worked in excess of eight (8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturday,Sundays and holidays shall be paid at double the hourly torte ofpay. Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines, switching stations, regulating, capacitor stations, generating plants, industrial plants, associated installations and substations, except those substations whose primary function is to feed a distribution system, will be paid overtime under the following rates: The fist two(2)hours after eight(8) regular hours Monday through Friday of overtime on a regular workday, shall be paid at one and one-half times the hourly rate of wage.All hours in excess of ten(10)hours will be at two(2)times the hourly rate of wage. The first eight(8)hours worked on Saturday will be paid at one and one-half(1-U2)times the hourly rate of wage. All hours worked in excess of eight(8)hours on Saturday, and all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized, shall be paid at the double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage.The Monday or Friday not utilized in the normal four- day,ten hour work week, and Saturday shall be paid at one and one half(1%)tunes the regular shift rate for the first eight(8) hours. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F, All hours worked between the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid a(a premium rate of 20% over the hourly rate of wage. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day, and all hours on Sunday shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. Holiday Codes 5, A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas, and Christmas Day (8). C. Holidays: New Year's Day,Presidents' Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day(8). 5 Benefit Code Key—Effective 3/3/2018 thru 8/30/2018 11ol1day Codes Continued 5. D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day (8). H. Holidays: New Year's Day, Memorial Day,Independence Day, Thanksgiving Day, the Day after Thanksgiving Day, And Christmas(6). I. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). J. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, The Day Before Christmas,And Christmas Day(9). L. Holidays:New Year's Day,Martin Luther King Jr.Day,Memorial Day,Independence Day, Labor Day,Thanksgiving Day,Friday aflror Tlumksgivhrg Day,And Cluishnas Day (8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day, And Christmas Day. (7 1/2). S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day,Independence Day, Labor Day,Thanksgiving Day, And Christmas Day (7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And The Day Before Or After Christmas(9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(8). 6. A. Paid Holidays:New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). E. Paid Iolidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and a Half- Day On Christmas Eve Day.(9 1/2). G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and Christmas Eve Day(11). 6 Benefit Code Key—Effective 3/3/2018 thru 8/30/2018 1 loliday Codes Continued i 6. H. Paid Holidays: New Year's Day,New Year's Eve Day, Memorial Day,Independence Day,Labor Day,Thanksgiving Day, Friday After Thanksgiving Day,Christmas Day, The Day After Christmas,And A Floating Holiday(10). 1. Paid Holidays:New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,The Last Working Day Before Christmas Day,And Christmas Day(9). Z. Holidays: New Year's Day, Memorial Day,Independence. Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any ofthe listed holidays falls on a Saturday,thepreceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays: New Year's Day, Martin Luther King Jr.Day,Memorial Day, Independence Day, Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day,Labor Day,Veteran's Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F, Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays:New Year's Day,Marlin Luther King Jr. Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 7 Benefit Code Key— Effective 3/3/2018 thru 8/30/2018 Holiday Codes C'on,tinned 7. I. Holidays: New Year's Day,President's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays:New Year's Day,Independence Day, Memorial Day, Labor Day,Thanksgiving Day and Christmas Day(6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which fails on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day (8), Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day, Christmas Day, And the Day after or before Christmas Day (10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as aholiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday aftcr Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. When Christmas falls on a Saturday, the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.If any of the listed holidays falls our Saturday,the preceding Friday shall be a regular work day. R. Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday. If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Day,the Day after Christmas,and A Floating Holiday(9). If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. 8 Benefit Code Key— Effective 3/3/2018 thru 8/30/2018 Holiday Codes Continued j T, Paid Holidays: New Year's Day, the Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day, Christmas Day,and The Day after or before Christmas Day. (10). If any of the listed holidays falls on a Sunday, the day observed by the Nation ( shall be considered a holiday and compensated accordingly.Any holiday which falls on a Saturday shall be observed as aholiday on the preceding Friday. Note Codes 8. D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level 13: $0.50, And Level C: $0.25. M, Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A: $1.00,Level B: $0.75, Level C: $0.50,And Level D: $0.25. P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit: $2.00, Class B Suit:$1.50, Class C Suit: $1.00, And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shift shall be used in determining the scale paid. R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon; Montana,or Idaho. These classifications are only effective on or after August 31,2012. S, Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012. T, Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho. This classification is only effective on or after August 31, 2012, 9 Benefit Code Key— Effective 3/3/2018 thru 8/30/2018 Note Codes Continued H. U. Workers on hazmat projects receive additional hourly premiums as follows—Class A Suit: $2.00,Class B Suit:$1.50, And Class C Suit: $1.00. Workers performing underground work receive an additional $0.40 perhour for any and all work performed underground, including operating, servicing and repairing of equipment. The premium for underground work shall be paid for the entire shift worked. Workers who work suspended by a rope or cable receive an additional$0.50 per hour.The premium for work suspended shall be paid for the entire shift worked.Workers who do "pioneer"work (break open a cut, build road, etc.) more than one hundred fifty(150)feet above grade elevation receive an additional $0.50 per hour. V, In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. The premiums are to be paid one time for the day and are not used in calculating overtime pay. Depth premiums apply to depths of fifty feet or more.Over 50'to 100'-$2.00 per foot for each foot over 50 feet.Over 101'to 150'-$3.00 per foot for each foot over 101 feet. Over 15l'to 220'- $4.00 per foot for each foot over 220 feet. Over 221'-$5.00 per foot for each foot over 221 feet. Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels)where there is no vertical ascent and is treasured by the distance travelled from the entrance. 25' to 300' - $1.00 per foot from entrance. 300' to 600' -$1.50 per foot beginning at 300'. Over 600' - $2.00 per foot beginning at 6001 . W. Meter Installers work on single phase 120/240V self-contained residential meters. The Lhteman/Groundmen rates would apply to meters not fitting this description. 10 a � m p illlli ire f µ u n u o q tl ���' :;, n uw �,an H��W '" I� VW�. .. Wr I m I •' �, �' �� u�^' � � � � n d4 as w a , WI "all "' � VP W '•. � IWM �� I`m� li� IW "` '� I W'• WI �� IN i ^ Ire m a m �• ml f .m' I re. I v u 9 1 � " , '?��` � " � ' � tia# ,r+Y ,:, > g y' p . h �� l.. �. R' '�� ,q � r Yid Via, • � ]"'�"' Agenda Item: Bids -- JOB w:..,„�, ,,:,„ TO: City Council DATE: May 15, 2018 SUBJECT: 2018 Paint Line Striping and RPM Replacement Project - Award MOTION: Award the 2018 Paint Line Striping and RPM Replacement Project to Stripe Rite, Inc., in the amount of $256,855.00, and authorize the Mayor to sign all necessary documents, subject to final terms and conditions acceptable to the City Attorney and Public Works Director. SUMMARY: This project consists of installing paint striping over existing lane markings and installing raised pavement markings on various City streets. EXHIBITS: Memo dated May 15, 2018 RECOMMENDED BY: Public Works Director BUDGET IMPACTS: The project will be paid for using Business and Occupation Funds.