CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Northwest Cascade Inc.
Vendor Number:
JD Edwards Number
Contract Number: PW 18-045 - UG'�
This is assigned by City Clerk's Office
Project Name: 640 Pressure Zone PRV North
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 2/5/18 Termination Date: fi"grkin oa s
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Bryan Bond Department: PW Engineering
Contract Amount: S1,649.774.50
Approval Authority: (CIRCLE ONE) Department Director Mayor City Council
Detail: (i.e. address, location, parcel number, tax id, etc.):
Chance Order #J.
As of: 08/27/14
�'' KE➢V T
CHANGE ORDER NO. # 2
NAME OF CONTRACTOR: Northwest Cascade Inc ("Contractor")
CONTRACT NAME & PROJECT NUMBER: 640 Pressure Zone PRV North
ORIGINAL CONTRACT DATE: February S, 2018
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Add 2 pay items - provide and install combo 3/4 inch angle check by
3/4 inch CTS PJ and combo 1 inch angle check by 1 inch CTS PJ to
bring encountered water services up to current City of Kent standards.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum,mm w - $1,649,774.50
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $-74,082.42
(incl. applicable WSST)
......................._.__......................
_
Current Contract Amount $1,575, 692.08
(incl. Previous Change Orders)
Current Change Order $6,350.00 ........................................................
Applicable WSST Tax on this Change $635.00
Order
Revised Contract Sum $1,582,677.08
CHANGE ORDER - 1 OF 3
Original Time for Completion 60
(insert date)
Revised Time for Completion under 60 working days
prior Change Orders
(insert date)
Days Required (f) for this Change 2 calendar days
Order
Revised Time for Completion 62 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below
/,
- - ._................ _ _...�................._..
CONTRACTOR: CITY KENT:
(signature) ,!"" signature)
Print Name: 1 Print Name: Timothv J. LaPorte, P.E.
Its .44CALO (P Its Public Works Director
(title) (able)
DATE: f�� DATE:/ 7 "
CHANGE ORDER - 2 OF 3
_...________.._................_..... __..
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
[h thls field,you maY enter the[IeRfoolo Ol,p th where the .t,aat has been saved]
CHANGE ORDER - 3 OF 3
FILE NO: 200.2
KENT
w.,,....,.,..
CHANGE ORDER WORKSHEET NO, 2
Construction Englneerinq Division- Public Works a -
Project: 640 Pressure Zone PRV North Project No.: 17-7999,1
Project Engineer: Grey & Osborne Fed-Aid No.: N/A
Capital Projects Phil McConnell Contractor: NW Cascade, Inc.
,Manaerp.,... .,.._„.,_
Date: 3/12/2018
I. PROPOSED CHANGE
Add 2 pay items - provide and install " Combo 3/4 inch Angle Check by 3/4 inch CTS PJ" and "
Comb 1 inch Angle Check by 1 inch CTS PJ"
II. REASON AND BACKGROUND FOR CHANGE
Required to bring water services encountered in the field up to current City of Kent Standards.
III. METHOD OF PAYMENT
NEW PAY ITEM(S) U Not Applicable
Change Order No. FOR ACCOUNTING USE ONLY
____...................._.___........._......._..__._y____-_- ........ _-_.__.____.Y ......__ ...__._____._ ..----- -...-_..- _...._ .._......,.
Sch. No. Item Description Total City this Unit Unit Price Total Estimated Cost of
i Est. City PE Item
Combo 3/4 inch Angle 50 EA $115 $5750
Check by 3/4 inch CTS PJ
Comb finch Angle Check 5 EA $120 $600
1 by 1 inch CTS PJ
C� Independent Estimate Attached X CREATE PAY ITEM ONLY - Payment to be made ❑ PAY THIS PAY ESTIMATE
REQUIRED I at a later date upon completion of work
Material Sutim tt glrg51..._QS,:,. n rr1.GCiSla1_G4Q.rd!.(j?.t5?r. New Sub Reqrd?
DELETE EXISTING PAY ITEM(S) per 1-09.5 Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
__Sch. No. B.I. Nb. _� Item Ln��nr'Pttau G1ky Unit I Unit Price Cost of Item
U Independent Estimate Attached - REQWWED Frjn
INCREASE/DECREASE TO EXISTING PAY ITEM(S) Z Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch. No. i B.I. No. � Item Description „I f�t��r Unit Unrt Pnce � Cost of Item
1
1 REV. DATE: 4/01/10
KNT FILE NO: 200.2
i
independent Estimate Attached REQ UIRED
TOTAL ESTIMATED COST OF CHANGE ORDER 6350.00
*
*ToGI of the Cost of Item columns
THIS PAY ESTIMATE $6350.00
IV. WORKING DAYS
Original Contract r 60 Due This Change Order* Z Previous Total 60
DATE: �.._ DATE: ._....�...�.,.. ..... _.. . . ..
* Ex i.an ti n ifica 'o a iru • Direct impacts to the critical path
TOTAL WORKING DAYS* 6
*This.,,.,C,..hwi.a,.,.,ngaO e + Frevio.„us,„Tot..„al
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Capital Projects Manage'hc t f
_4nn
Date: I�
LPhU Mc
Construction Engineering (/y
Supervisor: N �'"^-`'s Date;
Paul Kuehne
Construction Manager: �..^,^.-�' .-.a`c ,-"'! TJ_��7.�"" _. Date; ...---- _........_.__
Connor
2 REV. DATE:4101110
CN
� NORTHWEST CASCADE INC .
rOti Off 1CF Au%]JSVV,PUYALWP WA u 11HG N 98yK: /rou FREE ice-562�1�4:!
Action Request The City of Kent accepts options 1 and 3 for the
Installation of check ell's on the 640 PRV project
Date: 3/9/2018 number @20055
I To: Phil McConnell
Project Manager
City afKent
220 rourli Avenue South
Kent, WA 98032
(253) 856-5542
From: Chris Quesenbury
RC: Forward Price—Angle Check Valve Installation
640 Pressure Zone PRV North N WC 9 4114
Action Request h 1
Phil,
The purpose of this Action Request to provide the City of Kent with a forward unit price for the
incorporation of angle check valve on the backside of existing meters that currently do not have
one in operation. Below is N WC's pricing for evaluation and approval movtog forward on the
project.
1. Combo'd' Angle Check Valve by%a" CTS PJ $115.00 each
A+tgdeAlta w ti+ sy�walti+ <—(" f }�d --- eh
3. Combo 1" Angle Check Valve by t" CTS PJ $120,00 each
--4. 12-Angle-Cheek-wtkit,vepmKebe-I="< 6firls, �$I" 16-cadr
The unit rate for additional waterline will be used for the poly water line between the angle check
correction and future PRV assembly accordingly.
NWC is requesting the City of Kent provide timely response and direction for which method you
would prefer to move forward with so that materials may be procured to protect the overall
project schedule and sequencing. if you would like to discuss this matter in more detail,I can be
reached at 253-255-7728.
RespectFully,
Chris Quesenbury
CNW NORTHWEST CASCADE INC .
POST OFFICE BOX 73399.PU4ALLU P.WASHINGTON 98373/TOLL FREE 800-562-4442
Action Request The City of Kent accepts options 1 and 3 for the
installation of check ell's on the 640 PRV project
Date: 3/9/2018 number @20055
To: Phil McConnell
Project Manager
City of Kent
220 Fourth Avenue South
Kent, WA 98032
(253) 856-5542
From: Chris Quesenbury
RE: Forward Price—Angle Check Valve Installation
640 Pressure Zone PRV North NWC#4114
Action Request#1
Phil,
The purpose of this Action Request to provide the City of Kent with a forward unit price for the
incorporation of angle check valve on the backside of existing meters that currently do not have
one in operation. Below is NWC's pricing for evaluation and approval moving forward on the
project.
1. Combo /,"Angle Check Valve by'/I'CI'S PJ $115.00 each
2. -----$44-24*-eae$r
3. Combo I-Angle Check Valve by 1"CTS P7 $120.00 each
--q--'r"—��Tgl�IrwiElvnrrat -'-C=1�-The unit unit rate for additional waterline will be used for the poly water line between the angle check
connection and future PRV assembly accordingly.
NWC is requesting the City of Kent provide timely response and direction for which method you
would prefer to move forward with so that materials may be procured to protect the overall
project schedule and sequencing. If you would like to discuss this matter in more detail,I can be
reached at 253-255-7128.
Respectfully,
Chris Quesenbury