Loading...
HomeMy WebLinkAboutPW18-063 - Original - Nature's Way Tree Service, LLC - Cypress Tree Removal on Bridges Ave S - 02/14/2018 4^4 O- Records Ma g'' 6' m e' n t ocument' WASF#I IiGF'®M CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Nature's Way Tree Service, LLC "Vendor Number: JD Edwards Number Contract N',umber - w< This is assigned by City Clerk's Office Project Name: Tree Removal - S2.9 Bridges Ave, S. Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment x Contract E Other: Contract Effective Date: 2/14/18 Termination Date: 60 days Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment. Contract Manager: Ran Carroll Department: PW Operations Contract Amount: 13,300,09 Approval Authority: X Department Director F-1 Mayor ❑ City Council Detail: (i.e. address, location, parcel number, tax id, etc.): Remove one cypress tree. As of: 08/27/14 KEN• T PUBLIC WORKS AGREEMENT between City of Kent and Nature's Way Tree Service, LLC THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Nature's Way Tree Service, LLC organized under the laws of the State of Washington, located and doing business at 1019 184th Ave. Ct. E., Lake Tapps, WA 98391, Phone: (253) 740-4669, Contact: Mike Harrell (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall remove one cypress tree located at 529 Bridges Ave. S. For a description, see the Scope of Work and Contractor's bid which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within sixty (60) days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Three Thousand, Three Hundred Dollars ($3,300.00), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor ninety percent (90%) of the Contract amount upon completion and acceptance of the work by the City, or at such earlier time as the City may determine is appropriate. The City will pay the remaining Contract amount upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is $150,000 or less, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the City retain the final ten percent (10%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. PUBLIC WORKS AGREEMENT - 1 ($20K or Less and No Performance Bond) B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. PUBLIC WORKS AGREEMENT - 2 ($20K or Less and No Performance Bond) B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. PUBLIC WORKS AGREEMENT - 3 ($20K or Less and No Performance Bond) At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Contractor warrants that it will faithfully and satisfactorily perform all work provided under this Agreement in accordance with the provisions of this Agreement. The Contractor shall promptly correct all defects in workmanship and materials: (1) when Contractor knows or should have known of the defect, or (2) upon Contractor's receipt of notification from the City of the existence or discovery of the defect. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for an additional year beyond the original warranty period applicable to the overall work. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. PUBLIC WORKS AGREEMENT - 4 ($20K or Less and No Performance Bond) XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's duty to defend, indemnify, and hold the City harmless, and Contractor's liability accruing from that obligation shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this PUBLIC WORKS AGREEMENT - 5 ($20K or Less and No Performance Bond) Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Public Records Act. The Contractor acknowledges that the City is a public agency subject to the Public Records Act codified in Chapter 42.56 of the Revised Code of Washington and documents, notes, emails, and other records prepared or gathered by the Contractor in its performance of this Agreement may be subject to public review and disclosure, even if those records are not produced to or possessed by the City of Kent. As such, the Contractor agrees to cooperate fully with the City in satisfying the City's duties and obligations under the Public Records Act. J. City Business License Required. Prior to commencing the tasks described in Section I, Contractor agrees to provide proof of a current city of Kent business license pursuant to Chapter 5.01 of the Kent City Code. PUBLIC WORKS AGREEMENT - 6 ($20K or Less and No Performance Bond) K. Counterr arts and Sicnat res b Fax or Email. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. Further, upon executing this Agreement, either party may deliver the signature page to the other by fax or email and that signature shall have the same force and effect as if the Agreement bearing the original signature was received in person. IN WITNESS, the parties below execute this Agreement, which shall become effective on the lest date entered below. All acts consistent with the authority of this Agreement and prior to its effective date are ratified and affirmed, and the terms of the Agreement shall be deemed to have applied. R .. _. CITYLOFlk�ENT- ONTRACTO By: By: (signature) r (signature) �I Print. Name: David A. Brock, P.E. Print Name. .- + Its: d puty irector Operations Manager Its r BATE: DATE ® � --- NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CITY OF KENT: CONTRACTOR: Timothy J. LaPorte, P.E.. Mike Harrell City of Kent Nature's Way Tree Service, LLC 220 Fourth Avenue South 1019 184"' Ave. Ct. E. 1 Kent, WA 98032 Lake Tapps, WA 98391 � ��s3� 8 �- ��0 (telephone) (283) 740-466'9 (telephone) °V (253) 856-6800 (facsimile) N/A (facsimile) NBture's Way Tree St'-Bridges 1rvtX3`011 DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. For: lVotlwrc n� Title: p' Date: _ Z- t Z-70'(o EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 BIDDER RESPONSIBILITY CRITERIA Certification of Compliance with Wage Payment Statutes This certification is required by state law (RCW 39.04.350(2)) to be submitted to the City before the contract can be awarded. The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (December 26, 2017), the bidder is not a "willful" violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction. I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct. Nature's Way Tree Service, LLC By: Signature of Authorized Official* t Printed Name: AA,o"e, Title: C� — Date: Z -k2•Zo1 City and State: k_.e. \- *If a corporation, proposal must be executed in the corporate name by the president or vice- president (or any other corporate officer accompanied by evidence of authority to sign). If a co- partnership, proposal must be executed by a partner. BIDDER RESPONSIBILITY CRITERIA - 1 EXHIBIT A PUBLIC WORKS OPERATIONS 0000 � . Dave Brock, P, , ,r./' operations Manager 2204t �E N .............. � h Avenue South WA 4802 Wkl'A s H r N r T O N Fax: 253-856-6600 PHONE: 253-856-5600 City of Kenit Vegetation Management Tree Removal Scope of Work Site locations and description of work: • 529 Bridges ave south. Removal of one cypress tree located in city right of way next to sidewalk. Grind stump, remove all debris. ** * Contractor miust pay prevailing wage. Contractor is responsible for appropriate traffic control when needed. Proof of insurance anid bonding will be required. ***Each site must be bid separate *** If you have any questions about the job please contact Ryan Carroll at 253-856-5679, Or Scott Schroeder at 253-856-5675. Please send each of the bids to Ryan Carroll at rcarroll kentwa. ov City of Kent Public Works Department Timothy J, LaPorte, P.E., Public works Director Estimate sheet Nature s Way Tree Service, LLC Customer Information Date 10191841h dive Ct E City of pent 1212612017 Lake Tapps WA 98391 253-740-4669 Services .lours To Complete Price Pruning Tree evaluation Tree removal Other comments Tree removal at 529 Bridges ave south kept wa Removal of 1 cypress tree Cfting sidewalk Remove all brush and wood from site Grind stump 4 inches belowgrade to make flat. (tailings to be left on site) Sub total $3,000.00 Tax $300.00 Total $3,300.00 EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. EXHIBIT B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. -1 CERTIFICATE OF LIABILITY INSURANCE DATE ol� THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER I CONTANAME. Don Young Young Insurance Agency, LLC PHONE (253) 333-2426 FAX N (253) 333-2431 E-MAIL SS,don@youngins.net PO BOX 5340 INSURERS AFFORDING COVERAGE NAIC0 Kent WA 98064- INSURERA:Wesco Insurance Company INSURED INSURER B: Nature's Way Tree Service, LLC INSURERC: 1019 184 th Ave Ct E INSURER D: INSURER E: Lake Tapps WA 98391— INSURERF: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE UBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS y� GENERALUABILITY y WPP1143553 04/07/2017 04/07/2018 EACH OCCURRENCE S 1,000,000 X COMMERCIAL GENERAL LIABILITY / DAM O R N REMISES(Ea 9"rime) $ lOO,000 CLAIMS-MADE QOCCUR / / / / MEDEXP one person S 5,000 PERSONAL&ADV INJURY S 1,000,000 GENERAL AGGREGATE S 2,000,000 GEML AGGREGATE LIMIT APPLIESPER. / If / / PRODUCTS-COMP/OPAGG $ 2,000,000 POLICY PRO LOC / / / / S AUTOMOBILE LIABILITY / / / / COMBINED SINGLE LIMIT Ea a cldant ANY AUTO / / / / BODILY INJURY(Per person) $ ALL OWNED SCHEDULED / / / / BODILY INJURY(Per accident) $ AUTOS AUTOS HIRED AUTOS NON-OWNED / / / / PROPERTY DAMAGE $ AUTOS Per accident UMBRELLA LIAB OCCUR / / / / EACH OCCURRENCE S EXCESS LIAR CLAIMS-MADE / / / / AGGREGATE S DED RETENTIONS WORKERS COMPENSATION / / / / WC STATU- OTH- AND EMPLOYERS'LIABILITY LI OIL ANY PROPRIETOR/PARTNER/EXECUTIVE Y)N / / / / E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? N/A (Mandatory In NH) / / / / E.L.DISEASE-EA EMPLOYEE S If yes,describe under DESCRIPTION OFO PERATIONS below / / / / E.L.DISEASE-POLICY LIMIT S DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,it more space Is required) City of Kent: is listed aB an Additional Insured. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Kent Au DRIz REPRESEN TN 499 West Gome Kent WA 98032- ACORD 25(2010105) ®19 2010 ACORD CORPORATION. All rights reserved. INS026(2otoos)o1 The ACORD name and logo are registered marks of ACORD A��® DATE(MMJDDIYYYY) `�. CERTIFICATE OF LIABILITY INSURANCE 3/21/2017 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(los)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Liberty Mutual Insurance CONTACT NAME: PO Box 188065 PHONE il&C.No.Exits 800-962-7132 FVC No): 800-845-3666 Fairfield, OH 45018 E-MAIL ADDRESS: BusinessService@Liber(yMutual.com INSURERS AFFORDING COVERAGE ___ NAIC q INSURER A: Ohio Security Insurance Company 24082 INSURED INSURER B Nature's Way Tree Services LLC 1019 184th Avenue Ct E INSURER C: _ Lake Tapps WA 98391 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: 34732251 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IN SIR TYPE OF INSURANCE ADOL SUER POLPOLICY NUMBER MM1DDY EFF MM/nn/ YY LIMITS COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE S CLAIMS-MADE OCCUR NT PREMISES 1 R occurrence b MED EXP(Any one person) $ PERSONAL&ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ POLICY❑JECT ❑ LOC PRODUCTS-COMPIOPAGG $ OTHER: $ A AUTOMOBILE LIABILITY BAS56527308 3/14/2017 3/14/2018 COMBINED SINGLE LIMIT S Ea accident 1,000,000 ANY AUTO BODILY INJURY(Per person) $ OWNED SAUTOS CHEDULED AUTOS ONLY ' BODILY INJURY(Per accident) E HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident $ UMBRELLALIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB HCLAIMS-MADE AGGREGATE $ DED I I RETENTION S $ WORKERS COMPENSATION PER H- AND EMPLOYERS'LIABILITY y I N STATUTE I ER ANYPROPRIETOR/PARTNERIEXECUTIVE —1 NIA E.L.EACH ACCIDENT $ OFFICERIMEMBEREXCLUDED7 (Mandatory in NH) E.L.DISEASE-EA EMPLOYE $ Ir yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT 1$ I DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Certificate Holder is listed as Additional Insured per form CA2048. CERTIFICATE HOLDER CANCELLATION Cif of Kent SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 49 W Gowe ACCORDANCE WITH THE POLICY PROVISIONS. Kent, WA 98032 AUTHORIZED REPRESENTATIVE IIn Robert Dra oo '�/�/� 01988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD 34732251 1 56527308 1 17-18 Master Certificate l Robert Draggoo 1 3/21/2017 9:21:16 AM (PDT) i Page 1 of 2 POLICY NUMBER:WPP1143553 03 COMMERCIAL GENERAL LIABILITY CO20100413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Locations Of Covered Operations City of Kent 499 West Gowe Street, Kent,WA 98032 Information required to complete this Schedule, if not shown above,will be shown in the Declarations. A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds, the following additional organization(s) shown in the Schedule, but only exclusions apply: with respect to liability for"bodily injury", "property This insurance does not apply to "bodily injury" or damage" or "personal and advertising injury" '.property damage"occurring after: caused, in whole or in part, by: 1. Your acts or omissions; or 1. All work, including materials, parts or equipment furnished in connection with such 2. The acts or omissions of those acting on your work, on the project (other than service, behalf; maintenance or repairs) to be performed by or in the performance of your ongoing operations for on behalf of the additional insured(s) at the the additional insured(s) at the location(s) location of the covered operations has been designated above. completed;or However: 2. That portion of "your work" out of which the injury or damage arises has been put to its 1. The insurance afforded to such additional intended use by any person or organization insured only applies to the extent permitted by other than another contractor or subcontractor law; and engaged in performing operations for a 2. If coverage provided to the additional insured is principal as a part of the same project. required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 20 10 0413 0 Insurance Services Office, Inc., 2012 Page 1 of 2 C. With respect to the insurance afforded to these 2. Available under the applicable Limits of additional insureds, the following is added to Insurance shown in the Declarations; Section III—Limits Of Insurance: whichever is less. If coverage provided to the additional insured is This endorsement shall not increase the required by a contract or agreement, the most we applicable Limits of Insurance shown in the will pay on behalf of the additional insured is the Declarations. amount of insurance: 1. Required by the contract or agreement; or Page 2 of 2 0 Insurance Services Office, Inc., 2012 CG 20 10 0413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CA 20 48 02 99 DESIGNATED INSURED ENDORSEMENT The endorsement modifies insurance provided under the following BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement This endorsement identifies persons)or organization(s)who are"Insureds"under the WHO IS AN INSURED provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Endorsement Effective Policy Number BAS56527308 Named Insured Nature's Way Tree Services LLC Countersigned b (Authorized Representative) SCHEDULE Name of Person(s)or Organizations) The City of Kent 499 W Gowe Kent, WA 98032 (If no entry appears above,information required to complete this endorsement will be shown in the Dec- larations as applicable to this endorsement.) Each person or organization shown in the Schedule is an"insured"for LIABILITY COVERAGE,but only to the extent that person or organization qualifies as an "insured" under the WHO IS AN INSURED provision contained in SECTION II of the Coverage Form CA 20 49 02 99 Copyright, Insurance Sarvices Office, Inc., 1999 Page t of 1 34732251 1 56527308 1 17-18 Master Certificate I Robert Draggoo 1 3/21/2017 9:21:16 AM iPDV I Page 2 of 2 Page I of 18 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 445,40, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 2/12/2018 Count Trade Job Classification Wa e Holiday Overtime Note King Asbestos Abatement Workers Journey Level $46.57 5D 1H King Boilermakers Journey Level $64.54 5N 1C King Brick Mason Journey Level $55,82 5A IM King Brick Mason Pointer-Cautker-Cleaner $55.82 5A 1M King Building Employees Janitor $23.73 5S 2F , Servi�j�lo� King Buildin ees Traveling Waxer/Shampooer $24.18 5S 2F g Service King Building Service Employees Window Cleaner (Non- $27.23 5S 2F Scaffold) King Building Service EMptoyees Window Cleaner (Scaffold) $28.131 LS 2F King Cabinet Makers L!LSLop) Journey Level $22.74 1 King Carpenters Acoustical Worker $57.18 5D 4C King Carpenters Bridge, Dock And Wharf $57,18 5D 4C Carpenters King Carpenters Carpenter $57.18 5D 4C King Carpenters Carpenters on Stationary Tools $57.31 5D 4C King Carpenters Creosoted Material $57.28 5D 4C King Carpenters e�r s Floor Finisher $57.18 5D 4C King Carpenters Floor Layer $57.18 5D 4C King Carpenters Scaffold Erector $57.18 5D 4C King Cement Masons Journey Level $57.21 7A 1M King Divers Et Tenders Bell/Vehicle or Submersible $110.54 5D 4C Operator (Not Under Pressure) King Divers Et Tenders ,Dive Supervisor/Master $72.97 5D 4C King Divers Et Tenders Diver $110.54 5D 4C 8V King Divers Et Tenders Diver On Standby $67.971 5D 4C King Divers Et Tenders Diver Tender $61.65 5D 4C King Divers Et Tenders Manifold Operator $61.65 5D 4C King Divers Et Tenders Manifold Operator Mixed Gas $66.65 5D 4C King Divers Et Tenders Remote Operated Vehicle $611,65 5D 4C Operator/Technician King Divers Et Tenders $57.43 5A 4C https.//fortress,wa.gov/lni/wagelooku p/prvWagelooku p.aspx 2/12/2018 Page 2 of 18 Remote Operated Vehicle Tender King Dredge Workers Assistant Engineer $56.44 5D 3F King Dredge Workers Assistant Mate (Deckhand) $56.00 5D 3F King Dredge Workers Boatmen $56.44 5D 3F King Dredge Workers Engineer Welder $57.51 5D 3F King Dredge Workers Leverman, Hydraulic $58.671 5D 3F King Dredge Workers Mates $56.441 5D 3F King Dredge Workers Oiler $56.001 5D 3F King D[ywat(Applicator Journey Level $56.78 5D 1 H King Drywall Tapers Journey Level $57.43 5P 1E King Electrical Fixture Maintenance Journey Level $27.99 5L JE Workers King Electricians - Inside Cable Splicer $73.20 X 4E King Electricians - Inside Cable Splicer (tunnel) $78.591 7C 4E King Electricians - Inside Certified Welder $70.751 7C 4E King Electricians - Inside Certified Welder (tunnel) $75.89 ZC 4E King Electricians - Inside Construction Stock Person $38.691 7C 4E King Electricians - Inside Journey Level $68.30i 7C 4E King Electricians - Inside Journey Level (tunnel) $73.20 7C 4E King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - MgjQLjb9p Journey Level $14.69 1 King Electricians - Powertine Cable Splicer $73.93 5A 4D Construction King Electricians - Powertine Certified Line Welder $67.60 5A 4D Construction King Electricians - Powerline Groundperson $45.49 5A 4D Construction King Electricians - Powerline Heavy Line Equipment $67.60 5A 4D Construction Operator King Electricians - Powerline Journey Level Lineperson $67.60 5A 4D Construction King Electricians - Powertine Line Equipment Operator $57.02 5A Q Construction King Electricians - Powerline Pote Sprayer $67.60 5A 4D Construction King Electricians - Powertine P,owderperson $50.76 5A 4D Construction King Electronic Technicians Journey Level $31.001 1: King Elevator Constructors Mechanic $88.36 7D 4A King Elevator Constructors Mechanic In Charge $95.41 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $17-20 5B 1R Products Work Only King Fence Erectors Fence Erector $15.181 1�- King f!a�ers Journey Level $39.48 7A 31 King Glaziers Journey Level $60,561 7L ly King Heat Et Frost Insulators And Journeyman $67.93 5-1 4H Asbestos Workers https://fortress.wa,.gov/qni/wagelookup/prvWagenookup,aspx 2/12/2018 Page 3 of 18 King IHeating Equipment Mechanics Journey Level $78.17 7F 1E King Hod Carriers Et Mason Tenders Journey Level $48.02 7A 31 King Industrial Power Vacuum Journey Level $11,50 1 Cleaner King Inland Boatmen Boat Operator $59.86 56 .1 K King Inland Boatmen ICook $56.18 5B 1 K King Inland Boatmen Deckhand $56.18 5B 1K King Inland Boatmen Deckhand Engineer $57.261 5B J K King Inland Boatmen Launch Operator $58.59 5B 1K King Inland Boatmen Mate $58.59 5B IK King Inspection/Cleaning/Sealing Cleaner Operator, Foamer $31.49 1 Of Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Seating, Grout Truck Operator $11.50 1 Of Sewer Et Water Systems By Remote Control King Inspection/Cleaninig/Sealing Head Operator $24.91 1 Of Sewer Et Water Systems By Remote Control King Inspection/Cleaning;/Sealing Inspection/Cleaning;/Sealing Technician $19,33 1 Of Sewer Et Water Systems B Remote Control King Inspection/Cleaning/Sealing Tv Truck Operator $20.45 1 Of Sewer Et Water.,Systems B Remote Control King Insulation Applicators Journey Level $57.18 5D 4C King Ironworkers Journeyman $66.681 7N 10 King Laborers Air, Gas Or Electric Vibrating $46.57 7A 31 Screed King Laborers Airtrac Drill Operator $48.02 7A 31 King Laborers Ballast Regular Machine $46.57 7A 31 King Laborers Batch Weighman $39.48 7A 31 King Laborers Brick Pavers $46.57 7A 31 King Laborers Brush Cutter $46.57 7A 31 King Laborers Brush Hog Feeder $46,57 7A 31 King Laborers Burner $46.57 7A 3l King Laborers Caisson Worker $48.021 7A 31 King Laborers Carpenter Tender $46.571 7A I King Laborers Caulker $46.57 7A 31 King Laborers Cement Dumper-paving $47.44 7A 31 King Laborers Cement Finisher Tender $46.57 7A 31 King Laborers Change House Or Dry Shack $46.57i 7A 31 King Laborers Chipping, Gun (under 30 Lbs.) $46.57 7A 31 King Laborers Chipping Gun(30 Lbs. And $47.44 7A 31 Over) King Laborers ,Choker Setter $46.57 7A 31 King Laborers Chuck Tender $46.57 7A 31 King Laborers Clary Power Spreader $47.441 ZA 31 https://fortress.wa.gov/lrli/wagelookup/prvWagelookup.aspx 2/12/2018 Page 4 of 18 King ILaborers JClean-up Laborer 1 $46.571 ZA 1 31 1 King Laborers Concrete Dumper/chute $47.44 7A 3 Operator King Laborers Concrete Form Stripper $46.57 7A 31 King Laborers Concrete Placement Crew $47.44 A 31 King Laborers Concrete Saw Operator/core $47.44 7A 31 Driller King Laborers Crusher Feeder $39.48 7A 31 King Laborers Curing Laborer $46.57 7A 31 King Laborers Demolition: Wrecking E $46.57 7A 31 Moving (incl. Charred Material) King Laborers Ditch Digger $46.57 A 31 King Laborers Diver $48.02 A 31 King Laborers Drill Operator $47.44 A 31 (hydrautic,diamond) King Laborers Dry Stack Watts $46.57 A 31 King Laborers Dump Person $46.57 7A 31 King Laborers Epoxy Technician $46.57 A 31 King Laborers Erosion Control Worker $,46.57 7A 31 King Laborers Fatter Et Bucker Chain Saw $47.44 A 31 King Laborers Fine Graders $46.57 7A 31 King Laborers Firewatch $39.48 A 31 King Laborers Form Setter $46.57 7A 31 King Laborers Gabian Basket Builders $46.571 7A 31 King Laborers General Laborer $46.57 7A 31 King Laborers Grade Checker Et Transit $48.02 7A 31 'Person King Laborers Grinders $46.57 A 31 King Laborers Grout Machine Tender $46.571 7A 31 King Laborers Groutmen (pressure)including $47.44 7A 31 Post Tension Beams King Laborers Guardrail Erector $46-57 A 31 King Laborers Hazardous Waste Worker $48.02 7A 31 (level A) King Laborers Hazardous Waste Worker $47.44 7A 31 ([eve[ B) King Laborers Hazardous Waste Worker $46.57 7A 31 (level C) King Laborers High Scaler $48.021 7A 31 King Laborers Jackhammer $47.44 7A 31 King Laborers Laserbeam Operator $47.44 7A 31 King Laborers Maintenance Person $46.57 A 31 King Laborers Manhole Builder-mudman $47.44 7A 31 King i Laborers Material Yard Person $46.57 7A 31 King Laborers Motorman-dinky Locomotive $47.44 7A .31 King Laborers Nozzteman (concrete Pump, $47.44 7A 31 Green Cutter When Using https://fortress.wa.gov/1ni/wagelookup/prvWagelookup.aspx 2/12/2018 Page 5 of 18 Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $47.44 7A 31 King Laborers Pilot Car $39.481 7A 31 King Laborers Pipe Layer Lead $48.02 7A 31 King Laborers Pipe Layer/tailor $47.44 7A 31 King Laborers Pipe Pot Tender $47.44 7A 11 King Laborers Pipe Refiner $47.44 7A 31 King Laborers Pipe Wrapper $47.441 7A 31 King Laborers Pot Tender $46.57 7A 31 King Laborers Powderman $48.02 7A 31 King Laborers Powderman's Helper $46,57 7A 31 King Laborers Power Jacks $47.44 7A 31 King Laborers Railroad Spike Puller - Power $47.44 7A 31 King Laborers Raker - Asphalt $48.02 7A 31 King Laborers Re-timberman $48.02 7A 31 King Laborers Remote Equipment Operator $47.44 7A 31 King Laborers Rigger/signal Person $47.44 7A 31 King Laborers Rip Rap Person $46.57 7A 31 King Laborers Rivet Buster $47.44 7A 31 King Laborers Rodder $47.44 7A 31 King Laborers Scaffold Erector $46.57 7A 31 King Laborers Scale Person $46.57 7A 31 King Laborers Sloper (over 20") $47.44 7A 3l King Laborers Sloper Sprayer $46.57 7A 31 King Laborers Spreader (concrete) $,47.44 7A 31 King Laborers Stake Hopper $46.57 7A 31 King Laborers Stock Pfler $46.57 7A 31 King Laborers Tamper Et Similar Electric, Air $47.44 7A 31 It Gas Operated Toots King Laborers Tamper (multiple Et Self- $47.44 7A 31 propelled) King Laborers Timber Person - Sewer $47.44 7A 31 (lagger, Shorer ✓t Cribber) King Laborers Tootroom Person (at Jobsite) $46.57 7A 31 King Laborers Topper $46.57, ZA 3l King Laborers Track Laborer $46,571 7A 31 King Laborers Track Liner (power) $47.44 7A .3l King Laborers Traffic Control Laborer $42.22 7A 31 8R King Laborers Traffic Control Supervisor $42,22 7A 31 8R King Laborers Truck Spotter $46.57 7A 31 King Laborers Tugger Operator $47.44 7A 31 King Laborers Tunnel Work-Compressed Air $92.60 7A 31 8 lWorker 0-30 psi I King Laborers 1 $97.63 7A 21 §2 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 2/12/2018 Page 6 of 18 Tunnel Work-Compressed Air Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $101.31 7A 31 80 Worker 44,01-54.00 psi King Laborers Tunnel Work-Compressed Air $107.01 7A 31 Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air $109.13 7A 31 Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $114.23 7A 31 8Q Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $116.13 7A 31 8Q Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $11813 7A 31 8Q Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $120.13 7A 31 Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $48.12 7A 31 8Q Tender King Laborers Tunnel Work-Miner $48.121 7A 31 King Laborers Vibrator $47.44 7A 3l King Laborers Vinyl Seamer $46.57 7A 31 King Laborers Watchman $35.88 7A 31 King Laborers Welder $47.44 �7A 31 King Laborers Well Point Laborer $47.441 7A 31 King Laborers Window Washer/cleaner $35.88 7A 31 King Laborers - Underground Sewer General Laborer Et Topman $46.57 7A 31 Et Water King laborers • U'nde[ground Sewer Pipe Layer $47.44 7A .31 Et Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1. jOperators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $56.781 5D 1H King Marble Setters Journey Level $55.82 5A 1M King Metal Fabrication_(In_Sh Fitter $15.86 1 King Metal Fabrication (jD_5hopj Laborer $11.50 King Metal Fabricatio0_(tg_ShopJ Machine Operator $13.04 1 King Metal Fabrication In Shop) Painter $11.50 1 King Metal Fabrication (In 5b_gpy Welder $15.48 1 King Millwright Journey Level $58,681 5D 4C King Modular Buitd!Dgs Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buitd!D�Ls Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11-56 1 King Modular BufldjaLs Production Worker $11.501 1 1 1 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 2/12/2018 Page 7 of 18 King Modular BuildinLs Toot Maintenance $11.561 1 King Modular Buildings utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $41.60 6Z 2B King Pile Driver Crew Tender $52.37 5D 4C King Pile Driver Hyperbaric Worker - $71.35 5D 4C Compressed Air Worker 0-30.00 PSI King Pile Driver Hyperbaric Worker - $76.35 5D 4C Compressed Air Worker 30.01 - 44.00 PSI King Pile Driver Hyperbaric Worker - $80.35 55DD 4C Compressed Air Worker 44,01 - 54.00 PSI King Pile Driver Hyperbaric Worker - $85.35 5D 4C Compressed Air Worker 54.01 - 60.00 PSI King Pile Driver Hyperbaric.Worker - $87,85 5D 4C Compressed Air Worker 60.01 - 64.00 PSI King Pile Driver Hyperbaric Worker - $92.85 5D 4C Compressed Air Worker 64.01 - - - 68.00 PSI King Pile Driver Hyperbaric Worker - $94.85 5D 4C Compressed Air Worker 68.01 - 70.00 PSI King Pile Driver Hyperbaric Worker - $96.85 5D 4C Compressed Air Worker 70.01 72.00 PSI King Pile Driver Hyperbaric Worker - $98.85 5D 4C Compressed Air Worker 72.01 - 74.00 PSI King Pile Driver Journey Level $57.431 5D 4C King Plasterers Journey Level $54.89 7Q 1 R King Playground Et Park Equipment Journey Level $11.50 1 Installers King plumbers It Pipefitters Journey Level $79.69 6Z 1G King Power E ui ment Operators Asphalt Plant Operators $60.49 7A 3C 8P King Power Equipment Operators Assistant Engineer $56.90 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $59.961 7A 3C 8P King Power Equipment Operators Batch Plant Operator, $59.96 7A 3C 8P Concrete King Power Equipment Operators Bobcat $56.90 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition $56.90 7A 3C 8P Equipment - - - King Power Equipment Operators Brooms $56.90 7A 3C 8P King Power Equipment Operators Bump Cutter $59.96 7A 3C BAP King Power Equipment Operators Cableways $60.49 7A 3C 8P King Power Equipment Operators Chipper $59,96 7A 3C 8P King Power Equipment Operators Compressor $56.90 7A 3C 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 2/1 /2018 Page 8 of 18 King Power Equipment Operators �Concrete Pump: Truck Mount $60.49 ZA 3C 8P J ,With Boom Attachment Over — '42 M King Power Eguipmeat Operators Concrete Finish Machine -laser $56.90 7A X 88P Screed King Power, Equipment Operators Concrete Pump - Mounted Or $59.49 7A 3C 8P Trailer High Pressure Line Pump, Pump High Pressure, King Power Equipment Operators Concrete Pump: Truck Mount $59.96 7A 3C 8P With Boom Attachment Up To 42m King Power Eguipmeat Operators Conveyors $59.49 7A 3C 8P King Power Equipment Operators Cranes Friction: 200 tons and $62.33 7A 3C 8P over King Power Equipment Operators Cranes: 20 Tons Through 44 $59.96 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 100 Tons Through 1,99 $61.10 7A 3C 8P Tons, Or 150' Of Boom (Including Jib With Attachments) King Power Eguipment Operators, Cranes: 200 tons- 299 tons, or $61.72 7A 3C 8P 250' of boom including jib with attachments King Power Equipment Operators Cranes: 300 tons and over or $62.33 7A 3C 8P 300' of boom including jib with attachments King Power Equipment Operators Cranes: 45 Tons Through 99 $60,49 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $56.90 7A 3C 8P Under King Power Equipment Operators Cranes: Friction cranes $61.72 7A 3C 8P through 199 tons King Power Equipment Operators Cranes: Through 19 Tons With $59.49 7A 3C 8P Attachments A-frame Over 10 Tons King Power Equip meat Pperators Crusher $59.96 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $59.96 7A 33CC 8P (power) King Power Equipment Operators Derricks, On Building Work $60.49 7A 3C 8P King Power Equipment Operators Dozers D-9 EL Under $59,49 7A 3C 8P King Power Equipment Operators Drill, Oilers: Auger Type, Truck $59.49 7A X 8,P Or Crane Mount King Power Equipment Operators Drilling Machine $61.10 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $56.90 7A X 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell $59.96 7A 3C 86 And Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $59.49� ZA 3� 8P I With Attachments I https://fortress.wa.gov/nni/wagelookup/prvWagelookup.aspx 2/12/2018 Page 9 of 18 King Power Equipment Operators Forklifts: Under 3000 Lbs. $56,90 7A 3C 8P I With Attachments I King Power Equipment Operators Grade Engineer: Using Blue $59-96 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $56-90 A X 8P Z_ King Power Equipment Operators Guardrail Punch $59.96 7A X 8P King Power Equipment Operators Hard Tait End Dump $60.49 7A 3C 8P Articulating Off- Road Equipment 45 Yards. Et Over King Power Eguipment Operators Hard Tait End Dump $59.96 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $59.49 7A 3C 8P Locator King Power Equipment Operators Horizontal/directional Drill $59.96 7A X 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $59.49 7A 3C 88P 10 Tons King Power Equipment Operators Hydr,atifts/boom Trucks, 10 $56.90 7A X 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Et $61.10 7A 3C 8P Over I King Power Equipment Operators Loader, Overhead, 6 Yards. $60.49 7A 3C 8P But Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $59.96 7A X 88P Yards King Power Equipment Operators Loaders, Plant Feed $59.96 7A X 8P King Power Equipment Operators Loaders: Elevating Type Belt $59.49 7A X 8P King Power Equipment Operators Locomotives, All $59,96 7A 3C 8P King Power Eguipment Operators Material Transfer Device $59.96 7A 3C 8P King Power Equipment Operators Mechanics, All (leadmen - $61.10 7A 3C 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Motor Patrol, Graders $60,49 7A 3C 8P King Power EquipmentOperators Mucking Machine, Mote, $60.49 7A X 8P Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $56.90 7A X 8P Distribution It Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $59.49 7A 3C 8P Mantifts), Air Tuggers,strato King Power Eguipment Operators Overhead, Bridge Type Crane: $59.96 7A 3C SP 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $61.10 7A X 8P Tons And Over I King Power Equipment Operators Overhead, Bridge Type: 45 $60.49 7A 3C 8P Tons Through 99 Tons King Power Eguipment Operators Pavement Breaker $56,90 7A X 8P King Power Eguipment Operators Pile Driver (other Than Crane $59,96 7A X 8P Mount) https://fortress.wa.gov/lnj/wagelookup/prvWagelookup.aspx 2/12/2018 Page 10 of 18 King lPower Eguipmeat Operators IPlant Oiler - Asphalt, Crusher $59.491 7A I 3C 8P King Power Eguipment Operators Posthote Digger, Mechanical $56.90 7A 3C 8P King Power Equipment Operators Power Plant $56.90 7A 3C 8P King Power Eguipmeat Operators Pumps - Water $56.90 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $60,49 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under $56.90 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $60.49 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And BetIman $56.90 7A 3C 8P King Power Equipment Operators Rigger/Signal Person, BelLman $59.49 7A 3C 8P (Certified) King Power Equipment Operators RoLLagon $60.49 7A X 8P King Power Equipment Operators Roller, Other Than Plant Mix $56.90 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $59.49 7A 3C 8P Materials King Power Equipment Operators Roto-milli, Roto-grinder $59.96 7A 3C 81? King !Power Equipment Operators Saws - Concrete $59.49 7A 3C 8P King Power Eguipmeat Operators Scraper, Self Propelled Under $59.96 7A 3C 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry $59.49 7A 3C 8P All King Power Equipment Operators Scrapers, Self-propelled: 45 $60.49 7A 3C 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment $59.49 7A 3C 8P King Power Egu.ipmeat QRgrators Shotcrete/gunite Equipment $56.90 7A 3C 8P King Power Equipmenj Operators Shovel. , Excavator, Backhoe, $59.49 7A 3C 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shove[, Excavator, Backhoe: $60�.49 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel., Excavator, Backhoes, $59.961 7A 3C 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel., Excavator, Backhoes: $61.10 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Eguipmeat Operators, Shovel, Excavator, Backhoes. $61.72 7A 3C BID Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $60.49 ZA 3C BID King Power Eguipment Operators Spreader, Topsider Et $60.49 7A 3C 8P Screedman King Power Egu,ipment Operators Subgrader Trimmer $59,96 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $59.49, 7A 3C BID King Power Equipment Operators Tower Crane Up To 175' In $61.10 7A 3C 8P Height Base To Boom King Power Egui went Operators $61,72 7A 3,C 8P https://fortress.wa,gov/1 nl/wagelooku p/prvWagelookup.aspx 2/12/2018 Page 11 of 18 Tower Crane: over 175' through 250' in height, base to boom King Power Equipment Operators Tower Cranes: over 250' in $62.33 7A X 8P height from base to boom King Power Eguipmeat Operators Transporters, All Track Or $60.49 7A 3C 8P 'Truck Type King Power Equipment Operators Trenching Machines $59,491 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $59-96 7A 3C 8P Tons And Over King Power Equipment Operators Truck Crane Oiler/driver $59.49 7A 3C 8P Under 100 Tons King Power Equipment Operators Truck Mount Portable $59.96 7A 3C 8P Conveyor King iPower Equipment Operators Welder $60.49 7A 3C 8P King Power Eguipment Operators, Wheel Tractors, Farman Type $56.90 7A 3C 8P King Power Equipment Operators, Yo Yo Pay Dozer $59.96 7A 3C 8P King Power Eguipwent Operators- Asphalt Plant Operators $60.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $56,.90 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $59.96 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $59.96 7A 3C 8P Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $56.90 7A 3C 8P Underground Sewer Et Water King Power Eguipment Operators- Brokk - Remote Demolition $56.90 7A 3C 8P Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $56.90 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators-- Bump Cutter $59.96 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cabteways $60.491 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $59.96j 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Compressor $56.90i 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $60.49 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $56.90 7A 3C 8P Underground Sewer Et Water Screed I King Power Equipment Operators- Concrete Pump - Mounted Or $59.49 7A X 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Eguipmeat Operators- Concrete Pump: Truck Mount $59.96 7A 3C 8P Underground Sewer Ft Water With Boom Attachment Up To 42m King Conveyors $59,49 7A 3C 8P https://fortress.wa.gov/1nii/wagelookup/prvWagelookup.aspx 2/12/2018 Page 12 of 18 Power Eguipwent Operators- 'Underground Sewer Et Water King Power Equipment Operators- Cranes Friction: 200 tons and $62.33 7A 3C 8P Underground Sewer Et Water over King Power Equipment Operators- Cranes: 20 Tons Through 44 $59.96 7A 3C 8P Underground Sewer EL Water Tons With Attachments King Power Equipment Operators- Cranes: 100 Tons Through 199 $61.10 7A 3C 8P Underground Sewer Et Water Tons, Or 150' Of Boom &ctuding Jib With Attachments) King Power Equipment Operators- Cranes: 200 tons- 299 tons, or $61.72 7A 3C 8P Underground Sewer Et Water 250' of boom including jib with attachments King Power Equipment Operators- Cranes: 300 tons and over or $62,3,3 7A 3C 8P (Underground Sewer Et Water 300' of boom including jib with attachments King ,Power Eguipmeat Operators- Cranes: 45 Tons Through 99 $60.49 7A X 8P 'Underground Sewer a Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-f rame - 10 Tons And $56.90 7A 3C 8P Underground Sewer Et Water Under King Power Eguipment Operators- Cranes: Friction cranes $61.72 7A 3C 8P Underground Sewer Et Water through 199 tons King Power Equipment Operators- Cranes: Through 19 Tons With $59,49 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons King Powe,r Egui,pm,ent.Operators- Crusher $59.96 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $59.96 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $60.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Dozers D-9 EL Under $59.49 7A 33CC 8P Underground Sewer Et Water King Power Equipment. Operators- Drill Oilers: Auger Type, Truck $59.49 7A 3C 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $61.10 7A 3C 8P Underground Sewer EL Water King Power Equipment Operators- Elevator And Man-lift: $56.90 7A 3C 8P Underground Sewer Et Water Permanent And Shaft Type King Power Eguipmeat Operators- Finishing Machine, Bidwell $59.96 7A 3C 8P Underground Sewer Et Water And Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $59.49 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 300�0 Lbs. $56.90 7A X 8P Underground Sewer Et Water With Attachments King Power Eguipmeat Operators- Grade Engineer: Using Blue $59.96 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $56.90 7A 3C 8P ,Underground Sewer a Water I https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 2/12/2018 Page 13 of 18 King Power EgUipment Operators- Guardrail Punch $59.96 7A 3C 8P Under roundSewer Et Water I King Power Equipment Operators- Hard Tail End Dump $60.49 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tait End Dump $59,96 7A 3C 8P Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $59.49 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $59.96 7A 3C 8P Underp,round Sewer Et Water Operator King Power Eguipmeat Operators- HydraLifts/boom Trucks Over $59.49 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $56.90 7A 3C 8P Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $61.10 7A 3C 8P Underground Sewer Et Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. $60.49 7A 3C 8P Underground Sewer Et Water But Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $59.96 7A 3C 8P Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $59.96 7A 3C 8P Underground Sewer Et Water, King Power Ecluipmeat Operators- Loaders: Elevating Type Belt $59.49 7A 3C 8P Underground Sewer Ft Water T King Power Equipment Operators- Locomotives, All $59.96 7A 3C 8P Underground Sewer Et Water I King Power Equipment perators- Material Transfer Device $59,96 7A 3C 8P Underground Sewer EL Water King Power Equipment Operators- Mechanics, All (leadmen - $61.10 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Eguipmeat Operators- Motor Patrol Graders $60.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mote, $60.49 7A 3C 8P Underground Sewer Et Water Tunnel Drill, Boring, Road Header And/or Shield King Power Equipment Operators-, Oil Distributors, Blower $56.90 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $59.49 7A 3C 8P Underground Sewer Et Water Man:tifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $59.96 7A 3C 8P Under round Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $61.10 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- 'Overhead, Bridge Type: 45 $60.49 7A 3C 8P Under round Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $56.90 7A 3C 8P Underground Sewer Et Water I I King 1 $59.96 LA 3C 8P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup,aspx 2/12/2018 Page 14 of 18 1Power Equipment Operators- Pile Driver (other Than Crane Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $59.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $56.90 7A 3C 8P Underground Sewer EL Water King Power Equipmerit O erators. Power Plant $56.90 7A 3C 8P Underground Sewer Ft Water I King Power Equipment Operators- Pumps - Water $56.90 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $60.49i 7A 3C 8P Underground Sewer Et Water ...................... King Power Equipment Operators. Quick Tower - No Cab, Under $56.90 7A 3C 8P Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $60.49 7A 3C8P Under y,round Sewer EL Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $56.90 7A 3C 8P Underground Sewer EL Water King Power Equipment Operators- Rigger/Signal Person, BeRman $59,49 7A 3C 8P Underground Sewer Et Water (Certified) King Power Equipment Operators- Rottagon $60.49 7A 3C 8P Underground Sewer Et Water, I King Power Equipment Operators- Roller, Other Than Plant Mix $56.90 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- RoUer, Plant Mix Or Mutti-tift $59.49 7A X 8P Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $59.96 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $59.49 7A X 8P Underground Sewer 8t Water King Power IEcuIpment_gpLrators- Scraper, SelfPropelled Under $59.96 7A 3C 8P Undergr ound Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete & Carry $59.49 7A X BP Underground Sewer &Water All King Power EgUil2rnent Operators- Scrapers, Self-propelled: 45 $60.49 7A 3C 8P Un4gEaEqLind Sewer Et Water Yards And Over King Power Equipment Operators- ;Service Engineers - Equipment $59.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- 'Shotcrete/gunite Equipment $56.90 7A 3C 8P Underground Sewer Et Water, King Power Equipment Operators. Shovel :, Excavator, Backhoe, $59.49 7A 3C 8P Ur�ders?round Sewer Et Water Tractors Under 15 Metric Tons. King Power Eguipment Operators- Shove[, Excavator, Backhoe: $60.49 7A 3C 8P Underground Sewer Et Water Over 30,Metric Tons To 50 Metric Tons King Power, Equipment Operators: Shovel, Excavator, Backhoes, $59.96 7A X 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- $61.10 7A 3C 8P �Underground Sewer Et Water https://fortress.wa.gov/Irui/wagelookup/prvWagelookup.aspx 2/12/2018 Page 15 of 18 Shove[, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons King Power Eguipment Operators- Shove[, Excavator, Backhoes: $61.72 7A 3C 8P Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators. Stipform Pavers $60.49 7A 3C 88 Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $60.49 7A 3C 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $59.96 7A X 8P UndeLground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $59.49, 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Up To 175' In $61.10, 7A X 8P Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Tower Crane: over 175' $61.72, 7A 3C 8P Underground Sewer Et Water through 250' in height, base to boom King Power Equipment Operators- Tower Cranes. over 250' in $62.33 7A X 8P Underground Sewer Et Water height from base to boom King Power Equipment Operators- Transporters, All Track Or $60.49 7A X 8P Underground Sewer Et Water' Truck Type King Power Equipment Operators- Trenching Machines $59.49 7A X 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $59.96 7A 3C. 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver $59.49 7A 3C 8P Underground Sewer Et Water Under 100 Tons King Power Equipment Operators- Truck Mount Portable $59.96 7A X 88P Underground Sewer EL Water Conveyor King Power Equipment Operators- Weider $60.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmatt Type $56.90 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $59,96 7A 3C 8P Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $48.54 5A 4A Trimmers King Power Line Clearance Tree Spray Person $46.03 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $48.54 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $43.32 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $32.68 5A 4A Trimmers King Refrigeration Et Air Journey Level $75.36 6Z 1G Conditioning Mechanics King Residential Brick Mason Journey Level $55,82 5A im King Residential Car enters —Journey Level $28.20 1 King lResidential Cement Masons lJourney Level $22.641 1 https://fortress.wa.gov/Ini/wagelookup/prvWage9ookup.a:lspx 2/12/2018 Page 16 of 18 King Residential Drywall Journey Level $42.811 11) 4C Residential King Residential Dr wall�Ta e�rs Journey Level $57,43 5P 1 E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $40.25 7L 1H King Residential Insulation Journey Level $26.28 1. Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $,24.46 1 King Residential Plumbers Et Journey Level $34.69 1 pjpefitters King Residential Refrigeration Et Air Journey Level $75.36 6Z .1 G Conditioning, Mechanics I King 'Residential Sheet Metal Journey Level (Field or Shop) $44,56 7F 1R Workers King Residential Soft Floor Layers Journey Level $47.61 5A 3P King Residential Sprinkler Fitters Journey Level $44,98 5C 2R (Fire Protectioni King Residential Stone Masons Journey Level $55.82 5A IM King Residential Terrazzo Workers Journey Level $51.36 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 Finishers King Residential Tile Setters Journey Level $20.001 1 King Roofers )Journey Level $49.271 5A 3H King Roofers Using Irritable Bituminous $52.27 5A 3H Materials King Sheet Metal Workers Journey Level (Field or Shop) $78.17 7F JE King Shipbuilding Et Ship Repair Boilermaker $43.31 7M IH King Shipbuilding Et Ship Repair Carpenter $41.06 7T 2B King Shipbui,lding,& 5hij2 Repair Electrician $42.07 7T 4B King Shipbuilding Et Ship Heat Et Frost Insulator $67.93 5.1 4H King Shipbuilding Et Ship Repair Laborer $41.99 7T 4B King Shipbuilding 4_5hip_Repair Machinist $42.00 7T 4B King Shipbuilding Et Ship RepairOperator $41.95 7T 4B King Shipbuilding Et Ship Repair Painter $42.00 7T 46 King Shipbuilding 8t Ship RepairPipefitter $41.96 7T 4B King Shipbuilding Et Ship Repair Rigger $42.05 7T 4B King Shipbuilding Et Ship Repair Sheet Metal $41.98 7T ±B King S,hipbuitding pair Shipfitter_Lh ie p_R_ $42.05 7T 46 King S,hipbuiLding Et Ship Repair Trucker $41.91 7T 4B King Shipbuilding Et ShI2 Repair Warehouse $41.94 7T 4B King 'Shipbuilding Et Ship Repair Welder/Burner $42.05 7T 4B King Sign.Makers.ft Installers Sign Installer $22.92 1 (Electrical) King Sign Makers Et Installers Sign Maker $21.36 1 (Electrical) https://fortress.wa.gov/Oni/ agelooku p/prvWagelooku p.asp,x 2/12/2018 Page 17 of 18 King Sign Makers Ft Installers iNon- Sign Installer $27.28 1 !Electrical King Sign Makers & Installers ton- Sign Maker $33.25 1 Electrical} King iSoft Floor Layers Journey Level $47.61 5A 3D King 'Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters Fire Journey Level $74.49 5C 1—X Protection) King Stage Rigging Mechanics (lion Journey Level $13.23 1 Structural) King Stone Masons Journey Level $55.82 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $59.49 7A 3C 8P Surveyor — King Surveyors Chainman $58.93 7A 3C 8P King Surveyors Construction Site Surveyor $60.49 7A 3C 8P King.. Telecommunication Journey Level $22.76 1 Technicians _ King Telephone Line Construction - Cable Splicer $38.841 5A 2B Outside — — King Telephone Line Construction - Hole Digger/Ground Person $21.45 5A 2B Outside King Telephone Line Construction Installer (Repairer) $37.21 5A 2B Outside King Telephone,Line Construction - Special Aparatus Installer 1 $38.84 5A 2B Outside — — King Telephone Line Construction - Special Apparatus Installer 11 $38.03 5A 2B Outside King Telephone Line Construction - Telephone Equipment $38.84 5A 2B Outside Operator (Heavy) — — King Telephone Line Construction - Telephone Equipment $36.09 5A 2B Outside Operator (Light) King Telephone Line Construction - Telephone Lineperson $36.09 5A 2B Outside — — King Telephone Line Construction - Television Groundperson $20.33 5A, 2B Outside King Telephone Line Construction - Television $27.21 5A 2B Outside Lineperson/Installer King Telephone Line Construction - Television System Technician $32.55 5A 2B Outside — — King Telephone Line Construction - Television Technician $29.18 5A 2B Outside King Telephone Line Construction Tree Trimmer $36.09 5A 2B Outside — — King Terrazzo Workers Journey Level $51.36 5A 1M King Tile Setters Journey Level $51.36 5A 1M King Tile Marble Et Terrazzo Finisher $42.19 5A 11BB Finishers King Traffic Control Stripers Journey Level $44.93 7A 1 K. https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx /1 /2018 Page 18 of 18 King Truck Drivers Asphalt Mix Over 16 Yards (W, $52.70 5D 3A 8L I WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $51.86 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck Et Trailer $52.70 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $51.86 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $52.70 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers & Irrigation P= Irrigation Pump Installer $17.71 1 Installers King Wet[ Drillers Et Irrigation Pump Oiler $12.97 1. Installers I I I I King Well, Drillers Et Irrigation.,Pump Well Driller $18.00 Installers https://fortress.wa.gov/lni/wagelooku p/prvWagelooku p.aspx 2/12/2018 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two(2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two(2)hours before or after a five-eight(8)hour workweek day or a four-ten(10)hour workweek day and the first eight(8)hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two(2) hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked,except Labor Day, shall be paid at double the hourly rate of wage.All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten(10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four- ten hour schedule,shall be paid at one and one-half times the hourly rate of wage.All hours worked in excess of ten (10)hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All hours worked over ten(10)hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. N. All hours worked on Saturdays(except makeup days)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Overtime Codes Continued 1. O. The first ten(10)hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage.All hours worked on Sundays,holidays and after twelve(12)hours,Monday through Friday and after ten(10)hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall be paid at double the hourly rate of wage.All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8) hours on Saturday shall be paid atone and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer))shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four(4)hours after eight(8)regular hours Monday through Friday and the first twelve(12)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek)and on Saturdays and holidays(except labor day)shall be paid at one and one-half times the hourly rate of wage.(except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day(10 in a 4 x 10 workweek)or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Overtime Codes Continued 2. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay.All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage.All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60)in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage.All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day,ten- hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage. The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage. All other hours worked on the fifth,sixth,and seventh days and on holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10) hour shifts are established,or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours worked over twelve hours (12) in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay.Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar($1.00)per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees.Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage.After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. 3 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Overtime Codes Continued 3. D. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday, shall be paid at a premium rate of 15%over the hourly rate of wage. All other hours worked after 6:00 am on Saturdays,shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage.Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two(2) times the regular rate of pay. Work performed on Sundays between October l5th and March 15th shall be compensated at one and one half(1-1/2)times the regular rate of pay. 1. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. In the event the job is down due to weather conditions during a five day work week(Monday through Friday,)or a four day-ten hour work week(Tuesday through Friday,)then Saturday may be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday.All hours worked Monday through Saturday over twelve(12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked over twelve(12)hours per day and all hours worked on holidays shall be paid at double the hourly rate of wage. C. On Monday through Friday,the first four(4)hours of overtime after eight (8) hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay,unless a four(4)day ten(10)hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday,the first two(2)hours of overtime after ten (10)hours of straight time work shall be paid at one and one half(1-1/2)times the straight time rate of pay. On Saturday,the first twelve(12) hours of work shall be paid at one and one half(1-1/2)times the straight time rate of pay,except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer,the first ten(10)hours on Saturday may be worked at the straight time rate of pay.All hours worked over twelve(12)hours in a day and all hours worked on Sunday and Holidays shall be paid at two(2)times the straight time rate of pay. 4 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Overtime Codes Continued 4. D. All hours worked in excess of eight(8)hours per day or forty(40)hours per week shall be paid at double the hourly rate of wage.All hours worked on Saturday,Sundays and holidays shall be paid at double the hourly rate of pay.Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines, switching stations, regulating, capacitor stations,generating plants, industrial plants, associated installations and substations, except those substations whose primary function is to feed a distribution system,will be paid overtime under the following rates: The first two(2)hours after eight(8)regular hours Monday through Friday of overtime on a regular workday, shall be paid at one and one-half times the hourly rate of wage.All hours in excess of ten(10)hours will be at two(2)times the hourly rate of wage.The first eight(8)hours worked on Saturday will be paid at one and one-half(I-1/2)times the hourly rate of wage.All hours worked in excess of eight(8)hours on Saturday,and all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized,shall be paid at the double the hourly rate of wage. E. The first two(2) hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage.The Monday or Friday not utilized in the normal four- day,ten hour work week,and Saturday shall be paid at one and one half(1'/z)times the regular shift rate for the first eight (8) hours. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. All hours worked between the hours of 6:00 pm and 6:00 am,Monday through Saturday, shall be paid at a premium rate of 20%over the hourly rate of wage. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage.All hours worked on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage.All other overtime hours worked,except Labor Day, and all hours on Sunday shall be paid at double the hourly rate of wage.All hours worked on Labor Day shall be paid at three times the hourly rate of wage. Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Christmas,and Christmas Day(8). C. Holidays: New Year's Day,Presidents' Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day(8). 5 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Holiday Codes Continued 5. D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). H. Holidays:New Year's Day,Memorial Day, Independence Day,Thanksgiving Day, the Day after Thanksgiving Day, And Christmas(6). 1. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). J. Holidays: New Year's Day, Memorial Day, Independence Day,Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7). K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,The Day Before Christmas,And Christmas Day(9). L. Holidays:New Year's Day,Martin Luther King Jr.Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday after Thanksgiving Day,And Christmas Day(8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays:New Year's Day,Memorial Day, Independence Day,Labor Day, Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day(9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day(6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day.(7 1/2). S. Paid Holidays:New Year's Day,Presidents' Day, Memorial Day,Independence Day, Labor Day,Thanksgiving Day, And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,Christmas Day,And The Day Before Or After Christmas(9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(8). 6. A. Paid Holidays:New Year's Day,Presidents' Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and a Half- Day On Christmas Eve Day.(9 1/2). G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,Veterans'Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and Christmas Eve Day(11). 6 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Holiday Codes Continued 6. H. Paid Holidays:New Year's Day,New Year's Eve Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day, Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(10). I. Paid Holidays:New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day,The Last Working Day Before Christmas Day,And Christmas Day(9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8).Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays:New Year's Day,Martin Luther King Jr.Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day,Memorial Day,Independence Day, Labor Day,Veteran's Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Christmas day and Christmas day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays:New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays:New Year's Day,Martin Luther King Jr.Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 7 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Holiday Codes Continued 7. I. Holidays:New Year's Day,President's Day, Independence Day,Memorial Day, Labor Day,Thanksgiving Day,The Friday After Thanksgiving Day,The Day Before Christmas Day And Christmas Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays:New Year's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day and Christmas Day(6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day,Thanksgiving Day,the Last Work Day before Christmas Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day, And the Day after or before Christmas Day (10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day(7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday,the preceding Friday shall be a regular work day. R. Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day, Christmas Day, and the day after or before Christmas Day(10).If any of the listed holidays fall on Saturday,the preceding Friday shall be observed as the holiday. If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,Christmas Day,the Day after Christmas,and A Floating Holiday(9).If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly. 8 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Holiday Codes Continued T. Paid Holidays: New Year's Day, the Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day,and The Day after or before Christmas Day. (10). If any of the listed holidays falls on a Sunday,the day observed by the Nation shall be considered a holiday and compensated accordingly.Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Note Codes 8. D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And Level C: $0.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1.00,Level B:$0.75,Level C:$0.50,And Level D: $0.25. P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit:$2.00,Class B Suit:$1.50, Class C Suit:$1.00,And Class D Suit$0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15)minutes during the shift shall be used in determining the scale paid. R. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.These classifications are only effective on or after August 31,2012. S. Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized.Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana,or Idaho. This classification is only effective on or after August 31, 2012. T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian tragic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho.This classification is only effective on or after August 31,2012. 9 Benefit Code Key—Effective 8/31/2017 thru 3/2/2018 Note Codes Continued 8. U. Workers on hazmat projects receive additional hourly premiums as follows—Class A Suit:$2.00,Class B Suit:$1.50, And Class C Suit:$1.00. Workers performing underground work receive an additional$0.40 per hour for any and all work performed underground, including operating, servicing and repairing of equipment. The premium for underground work shall be paid for the entire shift worked. Workers who work suspended by a rope or cable receive an additional$0.50 per hour.The premium for work suspended shall be paid for the entire shift worked. Workers who do"pioneer" work(break open a cut,build road, etc.)more than one hundred fifty (150) feet above grade elevation receive an additional$0.50 per hour. V. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. The premiums are to be paid one time for the day and are not used in calculating overtime pay. Depth premiums apply to depths of fifty feet or more.Over 50'to 100'-$2.00 per foot for each foot over 50 feet.Over 10 I'to 150'-$3.00 per foot for each foot over 101 feet.Over 151'to 220'-$4.00 per foot for each foot over 220 feet. Over 221'-$5.00 per foot for each foot over 221 feet. Enclosure premiums apply when divers enter enclosures(such as pipes or tunnels) where there is no vertical ascent and is measured by the distance travelled from the entrance.25' to 300' -$1.00 per foot from entrance.300'to 600' -$1.50 per foot beginning at 300'.Over 600' -$2.00 per foot beginning at 600'. 10