HomeMy WebLinkAboutPW16-360 - Change Order - #1 - Road Construction Northwest, Inc. - 108th Ave SE and SE 208th St Intersection - 12/07/2017 Records M was„ "PDocument CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to the City Clerk's Office. All portions are to be completed. If you have questions, please contact the City Clerk's Office at 253-856-5725. Vendor Name: Road Construction Northwest Vendor Number: 178105 JD Edwards Number Contract Number: ? 1�-nv - 00L This is assigned by City Clerk's Office Project Name: 108th Ave SE SR515 and SE 208th St Intersection Improvements Description: ❑ Interlocal Agreement KChange Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 10/5/2016 Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Cameron Bloomer Department: Engineering Contract Amount: $793,615.00 Approval Authority: ❑ Director ❑ Mayor ❑ City Council Meeting Date Detail: (i.e. address, location, parcel number, tax id, etc.): ✓ SCENT Wns wuo'uoN CHANGE ORDER NO. # 1 NAME OF CONTRACTOR: Road Construction Northwest,, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: 108t' Ave SE R 515 and SE 208t" St. Intersection Imp. ORIGINAL CONTRACT DATE: October 5 20_16 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: This Change makes the following revisions to the Contract Documents: Item 1: Plan sheet T1 of T3 - On the NE corner, the foundation for Pedestrian Push Button (PPB) 8 is deleted. Mount the PPB on the existing signal pole. An Extension shall be installed to mount the button within 10" of the face of pedestrian curb. The foundation of PPB 9 is shifted back behind the pedestrian curb about 12", and an extension shall be installed to mount the button within 10" of the face of pedestrian curb. Item 2: Plan Sheet T1 of T3 - Make the following changes to the induction loop vehicle detectors: Shift departure loops N1 and N2 south, and route the home run the junction box at -8+25 LCL. Shift Loops 231B, 221B, 211B north approximately 4'. Add 2 loops in the dedicated right turn lane in the East Bound direction. Leave existing left turn loops 111A, 121A, 111B, 121E in place. Change loops 611A, 621A, 611B, 621B from circular loops to square 6x6 loops. See FWD 004 for a drawing of these changes. This change has been negotiated and all parties agree there are no cost or time impacts to the project. All work associated with this change are being paid for under the Lump Sum bid item 6000, and as this is a no-cost change the item will be paid in full. CHANGE ORDER - 1 OF 3 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: ...... _..................._.._ . ... Original Contract Sum.. $793,615.00 (including applicable alternates and WSST) Net Change by Previous Change Orders $0.00 (incl. applicable WSST) Current Contract Amount $793,615.00 (incl. Previous Change Orders) Current Change Order $0.00 Applicable WSST Tax on this Change $0.00 Order ev ._._.._..__. ...S—u _........ Rised Contract t Sum $793,615.00 ..._.._._.................................................................. Original Time for Completion 90 working days (insert date) Revised Time for Completion under 0 prior Change Orders (insert date) Days Required (f) for this—Chang e 0 calendar days Order Revised Time for Completion 90 working days (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CHANGE ORDER - 2 OF 3 CONTRACTOR: CITY OF KENT: By:_ /4 ,� �y: s(z� {s gn, A rs P (signature) Print Name: a P X onyer Print Name: Timothv 3. LaPorte. P.E. Its '"nt Its Public Works Director (title) "' // (title) DATE: if-zt -a r DATE: APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department [m this Fleld,you may enter the eleRronlc Neva[n where the contrast has been saved] CHANGE ORDER - 3 OF 3 TFILE NO: 200.2 N T CHANGE ORDER WORKSHEET NO. 001 Construction Management Division - Public Works Project: 10r Avenue SE (SR 515) and Project No.: 12-3006 - SE 208`h Street Intersection Improvements Project Engineer: Cameron Bloomer, PE Fed-Aid No.: HSIP-0515 (014) Owners ReD: KBA Contractor: Road Construction Northwest, Inc. Date: 6/29/17 I. PROPOSED CHANGE This Change makes the following revisions to the Contract Documents: Item 1: Plan sheet T1 of T3 - On the NE corner, the foundation for Pedestrian Push Button (PPB) 8 is deleted. Mount the PPB on the existing signal pole. An Extension shall be installed to mount the button within 10" of the face of pedestrian curb. The foundation of PPB 9 is shifted back behind the pedestrian curb about 12", and an extension shall be installed to mount the button within 10" of the face of pedestrian curb. Item 2: Plan Sheet T1 of T3 - Make the following changes to the induction loop vehicle detectors: Shift departure loops N1 and N2 south, and route the home run the junction box at —8+25 LCL. Shift Loops 231B, 221B, 211B north approximately 4'. Add 2 loops in the dedicated right turn lane in the East Bound direction. Leave existing left turn loops 111A, 121A, 111B, 121B in place. Change loops 611A, 621A, 611B, 621B from circular loops to square 6x6 loops. See FWD 004 for a drawing of these changes. This change has been negotiated and all parties agree there are no cost or time impacts to the project. All work associated with this change are being paid for under the Lump Sum bid item 6000, and as this is a no-cost change the item will be paid in full. This Change involves a Condition of Award DBE Subcontractor, DBE Electric. See table below showing impacts to the COA project total. DBE Change Revised COA Amount Subntractor Descnption of Work Ongmal COA Amount this CO ncluding CO 001 .... ------ .. DBE coElectric, Inc Traffic Signal Work $51,684.09 $0 00 $61,684.09 Ii. REASON AND BACKGROUND FOR CHANGE Item 1: During excavation for the foundation of Pedestrian Push Button #8, the existing signal pole foundation was found to be in conflict with the location of the new PPB foundation. The City decided to delete the foundation. Also during excavation, an existing conduit was found in conflict with the location of the PPB foundation #9. The City directed the contractor to install the foundation behind the pedestrian curb to clear the conduit. To meet ADA reach requirements, 1 REV. DATE: 4/01/10 TFILE NO: 200.2 extensions are needed to bring the buttons within 10" of the face of the pedestrian curb. Item 2: The departure loops N1 and N2 were shifted south and home runs were re-routed to a junction box at 8+25 LCL at the City's direction. This is due to conduit capacity issues in the conduit run between the junction box at 8+25 LCL and 9+35 LCL. Loops 23113, 22113, and 211B are shifted north at the City's direction to avoid poor roadway conditions and existing utilities. The two loops added to the eastbound dedicated right turn lane are done at the request of the City to replace an existing square loop that was damaged during per plan pavement removals on the SW corner. The contract documents did not call for replacement of the damaged loop. Existing loops 111A, 121A, 111B and 121E are remaining at the direction of the City because they are operational and the existing pavement was determined to be too rutted to successfully install new traffic loops. Traffic loops 611A, 621A, 611B, and 621B are being changed to square type loops due to the existing roadway being too rutted for the successful installation of circular loops. III. METHOD OF PAYMENT NEW PAY ITEM(S) Z Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch. No - Item Description Total Est. city this Unit Unit Price Total Estimated Cost of city PE Item i I _,...........___..... .._._ -._._._ ....----- Independent Estimate Attached CREME PAY ITEM ONLW Payment to be made El PAY THIS PAY ESTIMATE -REQUIRED at a later date upon completion or work material Submittals Requirvo_. ... — 9;C� Construction r in r New Sub Reqrd? No ....... DELETE EXISTING PAY ITEM(S) per 1-09.5 ® Not Applicable Change Order No. - FOR ACCOUNTING USE ONLY _. ... ..._..... .........., ......... Sch, No B.[. No - Item Description Qty Unit Unit Price Cost of Item I 1 � i ------------------- Independent Estimate Attached - REQUIREDLJ INCREASE/DECREASE TO EXISTING PAY ITEM(S) ® Not Applicable Change Order No. _ FOR ACCOUNTING USE ONLY Sch No. 8I No. Item Description Qty Unit Unit Price Cost of Item Independent Estimate Attached - REQUIRED i ........a -------- TOTAL ESTIMATED COST OF CHANGE ORDER * $0 2 REV. DATE: 4/01/10 ,T FILE NO: 200.2 w..,...,.,.,. *Total of the Cost of Item Columns THIS PAY ESTIMATE IV. WORKING DAYS Original Contract gQ Due This Change Order* 0 Previous Total gQ DATE: ... DATE: * ExolanationiJustlfication Reoutred: This Change Order has no effect on the project's critical path. No days are being added or deleted with this change order. TOTAL WORKING DAYS* 90 *This Change Order + Previous Total All work, materials and measurements to be in accordance with the Standard Specifications and Contract Special Provisions for the type of work described. Prepared By: Date: Construction Supervisor: Date: Construction Manager: Date: 3 REV. DATE:4/01/10 Chapter 52 lt'& /! Z�8 Co (DC) Lo cal A clministered Projects Appendix 52.106 Change Order Checklist Change Order I , Question g Yes No IIMIFAn ;, -- —......,, .., _.. ..... ... 8 Dr It'.,chanpt 'ad„, ai,crlht t uumi, Ifyet, yw MU 2 have H k IY apNmal ¢,1t 'htNO 01 9010 funds. If r , v rn ntw;t anholl a ica ;d Pare l ul lu„tnn,preoi I" h, tLan'c(Abn over'ISA 160 amKOWS M copcuf nml.' IT nn Iht On, nn,W 0 a h w_,, )YAn and murd he as tnkprn,iaid r,al, lm"' Dc , fn hans{, Hid,Idetailall [it Inp mv,tivrd a irh do i hrnn ' ✓ - I Uo:. In., hnunr 04dn In„lad mi edlu,nru orto wr rl<inn dada' II H VA thr nnw citcmdon m nt br:Wn cd in in.0 h nm;(Ads. J e ........... if. •, an liadcpenu,lcut euriueu _<stlmzta oFti otc mus[6e lncludeJ to Itcwnent the � I ✓� k exwo on. If n",that must L""Id'el it, ih.,r hang r Otdr,i JXwq the Qaugc RK Aps V DBE 1.oK ntof lwwd Ity yru rrW&I "[n,nn,,aatJtp,aJy,L loin Local Rrtr) pn,, IfY ,Gat[] muse ohtmi k u MA 4ig nrlwwmthe Comm0M,'i p- o Do [In CI t)i du in,olr, a via lrl cal sn Ion oli tu' f Ifv' r,n uiva,td Cri uinc ita�n tuid,r!xhi r. vppioprni I�.. 1. Ifr;hmg, 0'(d�i "(Cp oalmduii ito JN noump,pipav lml appluval Ls tha kpprotulr Awhnuy atmthe 1uu danddtttm ntcd if 6 Hu Hw 11,uttyr KAI been n'U d by HA era rani ' `+ I0,the( Lavele D I.i h.en owt w I hp the QHwmg Au I mAy _ ...._ ......,...,, _._._ ..._ .... _.. ...,.._. —--- ---__...._ .... ......... ..._._._.. it Y Y Y hung &g pi oc nl. 1 1P ui n, t nm( lhriw ni.i nmstha tlh ulu r( lAuf .._.. ,_,„,._ . . .�._.. v 10. I[es an tndependcnt coi_mcr'; natimale juvh lymZ Iltc cowt5 and i[me cxRnsions been com hlPd end rioewnanls�" .__. V I. t L I las a da kd memo cuddnm g Me chrono5 ul t on ,b,i_u 01 neon, ,,ts au working days been plgmmd and plated n the file nccompanving the(;hnn+ ARPendlx 51 Y06 G/range drder Fage 1"I Rgwsetl AlJO/1014 WSDOT Local Agency Guidelines M 36-63.29 Page 52-19 October 2015 a M KENT MEMO TO FILE Project Name: 108th Avenue SE(SR 515)and SE 208th Street Date. 1 6/29/2017 Intersection Improvements Contractor Road Construction Northwest, Inc Contract NO 13 3004 Owner: City of Kent ry Federal Aid No: STPUL-1071(006) Subject: Change Order 001 Chronology of Events Message Item 1—Pedestrian Push Buttons 2/1/2017—During excavation for the PPB foundations on the NF corner,conflicts with an existing signal base and conduit require deleting one base and moving another.Verbal direction given to the contractor. 2121117—The Contractor provided RFI 008,requesting information on PPB extensions to keep within ADA reach limits. 2/22/17—The City responded accepting their proposed fix,and requesting a cost proposal. 3/28/17—The contractor provided a proposal of$700 for the addition of the PPB extensions. 4/6/17—The City requested a credit proposal for the deletion of the PPB foundation, 4/17/17—The Contractor responded that they proposal a no cost change,swaping the PPB foundation deletion for the extensions. 5/15/17—The City responded, provided their estimate and requesting a total credit of$750 for the deletion of the PPB foundation and the addition ofthe button extensions, 5/16/17—The Contractor responded, agreeing to the credit proposal of$750. Item 2—Vehicle Detection Loops 5/17/17—DBE Electric,City of Kent Signals,and KBA met onsite to discuss vehicle detection loop,conduit capacity,and existing roadway condition Issues. We also discussed potential costs of the issue,and all parties agreed there was a little extra work involved. DBE verbally suggested offsetting the cost of the PPB extensions credit with this work into a no cost change. 5/23/17—Independent cost estimate totals$482.27 for the additional work. 5/30/17—The City issued FWD 004,directing the contractor to make all of the vehicle detection loop changes discussed.The FWD also notes an anticipated no cost change will be written, 1 P-11 (Rev 8/11) KINT Field Work Directive FWD 004 Project Name: 108`h Ave SE(SR 515) and SE 208`h PW Project Number: 12-3006 Street Intersection Improvements Contractor: Road Construction Northwest, Inc Federal Aid Number: HSIP-0515 (014) Subject: Vehicle Detection Loop Changes Date: May 23, 2017 Scope: Make the following changes to the Contract Documents: • Plan Sheet T1 of T3: Revise the locations of the new loops as shown on the attached revised drawing. Change Loops 611A, 621A, 611E and 621B to 6' x 6' square loops. Leave the existing loops in the NB to WB turn lanes (111A, 121A, 111B, and 121B) in place. Add 2 loops per Note_11 in the EB direction. Measurement and Payment: Costs associated with this work are anticipated to offset the credit due to the agency for the deletion of the Pedestrian Push Button Foundation from the NE Corner, note 8 on Contract Drawing T-1. A no- cost change order will be executed to formalize these changes. Attachment(s): • DC 004 Vehicle Detection Loop Changes Contractor Acknowledgement: By:_ ___ Date: Ken Joyce, Project Manager Owner Approval: By: —d1,F2o� "I, Date: 5/30/17 Cameron Bloornc-r, F°I , ResIr-dent Engineer By:_ Date: 5/26/27 Eric Connor, City of Kent THIS FIELDWORK DIRECTIVE DOES NOT PROVIDE FOR EITHER ATIME EXTENSION OR A CHANGE IN THE CONTRACT PRICE.LABOR,EQUIPMENT,AND/OR MATERIAL OUTLINED IN THI5 FIELDWORK DIRECTIVE SHALL BE PAID BY BID ITEM(S)OR A CHANGE ORDER SHALL BE DEVELOPED FOR TIME EXTENSION OR CONTRACT PRICE I NCR EA5E5. ANY PROTEST TOTHE FIELD WORK DIRECTIVE SHALL FOLLOW 1-04.5 Or THE WSDOT STANDARD SPECIFICATIONS. 1 N 0 w y Epp � f pI v L. r e I AT S) 3s 3m-177 o-lt9tlt` 0 � 1 ( �7t N i',l r 9�( 59T 4r9 SY R aP m �q, eS� $p�pAF 2�fvp j o f q�i N 8 g d d � gin 13 a pie 5MI +: eF °�� �u 1 ,I � �8 '�� �., N� r a g g „„pp Mrs 01 r1�2A 3do AP yy A Off ✓l„v' ..V..�.. p SA a ? `n ¢.4 See f a •I_i kiss; " 4 k ry 5 �„if �. ...➢. . r I l I ot c q AA 1 „ r ) . � l j I Cameron Bloomer From: Ken Joyce <ken@rcnw.com> Sent: Wednesday, September 13, 2017 9:19 AM To: Cameron Bloomer Subject: FW: 108/208 FWD 004 Traffic Loop Detectors Cameron, Please see the forward email from DBE Electric dated 5/30/2017 agreeing to the City's proposal. Respectfully, Ken Kenneth Joyce P r�jeR JA an age/ Road n"a:nustruc Vdo:ni I14inr hwwest, Iluic urn AA From: Bryan LaTorre [mailto:bryanl@dbeelectricinc.com] Sent:Tuesday, May 30, 2017 12:03 PM To: Ken Joyce<ken@rcnw.com> Cc: Brian <Brian@dbeelectricinc.com>; Mary<Mary@dbeelectricinc.com>; 'Steve Olson' <SOlson@RCNW.com>; Brian Menard<brian@rcnw.com>; Gordon Lee<gordon@rcnw.com>; Matt Wagester<matt@rcnw.com>;THR <THR@RCNW.com> Subject: RE: 108/208 FWD 004 Traffic Loop Detectors Ken, We are ok with the method of payment, i ELECTSUIC INC. Br,�avi. LOT Dry e Estimator/Materials Office: 253-887-8089 Cell: 206-397-7686 Fax: 253-804-6066 From: Ken Joyce [t d B it I�� r7 a➢r¢p v. priJ] Sent: Tuesday, May 30, 2017 10:17 AM To: Bryan LaTorre Cc: Brian; Mary; 'Steve Olson'; Brian Menard; Gordon Lee; Matt Wagester; THR Subject: FW: 108/208 FWD 004 Traffic Loop Detectors a. Hi Bryan, I finally receive direction for the traffic loop placement. Let me know if you agree with the Field Work Directive's method of payment exchanging the Credit for PPB's. Thank you, Ken Q11noth 7,yyre V"oject f;Pana Livr IRoad Consitruuation NoirflOrouuast, Inc, El M>a ('1 ;nano u0 Even rr wJ Mzoa i,r > zzK,�r wu vaose is ;�rPr>'utVu;"t2l From: Cameron Bloomer[p)&ltrr,� tJOoanrer rJk ,carr,corn] Sent:Tuesday, May 30, 2017 9:55 AM To: Ken Joyce <lu i7 r 'Steve Olson' r rnru t�>; 'Jake Boose <J �+sr,1?RCH VU :�m>; Brian Menard <iq:i�lrr(,R1rr rUw r, urru <tilJa>u?rk .['Ca" f9'NV trim>; THR<tHR cr7R4:YNWcom>; Gordon Lee qor ijn ic�iUri,> Cc riprii7r tkeiC!Lb,gov; 'Wakefield, Wendy' <W\N :l,«ficlad_(PkLf�twa.gLiv> Subject: 108/208 FWD 004 Traffic Loop Detectors Hello Ken, Please see attached FWD 004, for the changes to the loop detector locations/shapes. Please let me know if there are any questions. Thank you, Cameron Bloomer, PE T 425,455.9720 1 C 206.819,7148 1 F 425.455.9732 cbltba_mgam,,Nk„'„p„ts,m,,,, ,ya_m, ri Construction Management Specialists 2 FA Sheet No.; Independent Cost Estimate aoxvxusnoN 41pA4(4[Ni Project Name: 108th Ave SE (SR 515) and SE 208th Sir Project No: 1Z-3006 Item No.: CO 001 Date 5/23/2017 Description of Work. Make alterations to the Traffic Loops and home Runs per FWD 004 Work by Subcontractor?: (mark"x"il yes) Prime Contractor, Sub-Contractor: LABOR STRAIGHTTIME OVERTIME DOLLAR NAME OCCUPATION HOURS WWR HOURS WWR AMOUNT Credit for delete 2 loops Lab.Sawcutter -2 $ 53,00 $ (i06.O0) Increased Cost. $ - Square Loops (15 chins EA) Lab. Sawcutter 1 $ 53.00 $ 53.00 Set up on separate Leg lab.Sawcutter 1 $ 53.CO $ 53.00 Run Cable, wire to controllerSW Corner, Electrician 2 $ 75,00 $ 150.00 Field Time New Layout Foreman 0.5 $ 65.00 $ 32.50 SUBTOTAL-LABOR. $ 182.50 LABOR OVERHEAD&PROFIT @ 29% $ 52.93 LABOR TOTAL $ 235.43 EQUIPMENT HOURS HOURS ADJUSTED STANDBY DOLLAR EQUIPMENT AND ATTACHMENTS WORKING STANDBY RATE RATE AMOUNT F550 Crew Truck(Rate Estimated)(SW Corner Cabl&j 2 $ 51.60 $ 103.20 PM Crew truck(Rate Estimated)(layout) OS $ 51.6C $ 25.80 SUBTOTAL-EQUIPMENT $ 129,00 EQUIPMENT OVERHEAD&PROFIT @ 21% $ 27,09 EQUIPMENT TOTAL $ 156.09 MATERIALS I SERVICE MATERIALS/SERVICE DESCRIPTION QUANTITY UNIT PRICE AMOUNT Cable on SW Corner 1 LS $ 75.00 $ 75.00 Is Deletion of 4loops,added 2 loops, longer lead cables, Estimated as even cost $ $ SUBTOTAL-MATERIALS $ 75.00 MATERIALS OVERHEAD&PROFIT @ 21% $ 15.75 MATERIALS TOTAL $ 90.75 Verification of Hours Worked: TOTAL $ 482.27 12%MARKUP(for prime when subcontract work) $ - Contractor's Representative(printed name SHEET TOTAL: $ 482.27 Contractors Representative$ ngfuae Date _ ro 0svnei s feepreaen(aYwue lannfed name) / Prime Markup on Subcontractor 5/i°w!12Zal 7 o ._....... ...... .. _wner's Representative S�gnafure Dafe 12%: <$25,000 10%: $25,000 to$100,000 Pay Estimate Entered. 7%: >$100,000 Date: ❑ ❑y If checked,this work is in dispute. By signing this form, parties 1 of 1 P-13 (Rev 7/12) INSPECTOR'S DAILY REPORT Project Name 108`h Ave SE (SR 515) &SE 208`"St Contrail No : 12 3006 ntersectlon Improvements HSIP 0515 (014) CONSTRUCTION .__.... ... __— _' - _,,.,_�„_„ . ._ Fed_Aid Na_ MANAGEMENT OWner. Qty Ot Kent KBA Project No. 01603201 Traff4c Control .._..�_.. _.. __.___ .. ..._ Traffic ConMol Flogger Cards_ Conlr Daily Rpis- Imolemented� Checked Todav9 Rea d? TCS Neme Y ..,L.Select N .�,_...__....,, Andtew Pt9go4E_ .............._...._._... TCP# Comments -..- ..__.....m .... _......... .. . __.... .—...__. ---- ---- _...._.......___... See TCS Reporlwfor tragic control tlnfo Materials Delivered DESCRtption m comerine�w Comments I Actions HMA CI /"PG 6422 mY ll..�._.- -245 Tons ... _.._...r. ..... ....... ..... select ......,_........._...... ......_ . .,_...._,.,.. elect __._._. .............._...... Online Testing r inspection ....... __,--._..-. Time Description In conformercea Lab l Comments/Actions See Terracon report this dav .. ..,,.,..,.. ...._..._.. ..... .._..._........ ._.....__._._.,,,,,.. ..........._._... ..DIaCL ....__......._...._.._...min,,,._... .. _...._..�..._._._.®..._. Time ......---._.. ................ .....____...-._...,..m... _,_..�e. .._.... .........._...___w...,._.._. _ .... 0700 No lanes of traffic taken.RCNW work+ng on final prepping of the benson nrad parking Wpt.There Is visible standing water on the low side of the excavation,and I asked Steve to dig out the wet area(about 1.5 to 2'wide)and replace with drier material. Lakeside and DBE are onsr e, 0745 John GIBE Eleotnp)informed me of a otantial sue with fittinganother conductor wind into the axss6 conduits on pkoe NW corner 0900 RCNW digging out the wet area in the benson Owl.Lakeside ispawing,the'dadkProytedy gidei of Chq 1aGMS n gE18 box dr"rVeway 0900 Spoke with John(DBE.)again and we walked the NW side,looking at the conduits.There does not appear to be enough room to pint another conductor through the conduit between the two north most junction boxes.I called Mike Sorenson,who said he will send Dan Car mail out Lakeside paving.line benson aP rking lot. 0915 RCNW fimshmjlttfaeinq CS13C in Iha bus puWl out area TErgaGon took a density last,which passed. _.._ ._.— ..,,.,m,.,,.._... 0945 RCNW removing pavement at radius-A delivery driver arrived for the benson mart.RCNW had him part in the right lane,that is now closed,The driver was able to use their mechanical pallet roller to make their delivery, Lakeside almost done navina in the benson lot 1120 Dan Carpmail(City of Kent Signals)onsile Discussing boterd,ial changes with John(DBE).1 said I would draft up thecharges and �- send them to Dan for review,before sending to RCNW.RCNW is continuing to demo around the radius. Lakeside paving infront of the driveways, .._._.._._...-..... ...r...___ p for t ....,...__....,.,se. 1300 RCNW continuing to remove pavement at the radius and prep for the HMA base They found an abandoned water valve can buried in the road,which appeared to align with the abandoned water main.We checked the plans,and there is no mention of it.We left it low, in the existing Condition.Pavement removed is at a depth between 14 and 18" .. ........... .........___ .........T_....e-ni..,_... k.....enson,...___ ..__ ......._..__1345 Spoke with the property manager for the apartments at 10+60(MIKE Jenson),a5 RCNW saltl they wanted to pave[he driveway tomorrow. He was disappointed to only get 1 days notice,but was ok with the work as long as access was maintained at all times. 1 let _ _Steve Olson know- . .—__.__ -� ..�.._.. _.._ .._—__.._. _..,,.._,. _._,__ 1430 __-��� Lakeside completed paving infront oP the driveways,and is heading down to the radius. RChIW Is not done with removals and piecing .,, CSBC.I reminded RCNW!hail we needed to corn act the storm trench and take density shpts T 545 RCNW continuing with removals and CSBC prep.Lakeside staging In the WB lanes at the radius. RCNW placed a steel s1*eed over the still too hot to put cars on HMA, and opened the north driveway so they could dig infront of the jack n the box driveway DBE cleaning ukto leave for the day._ m,_M 1715 Received a phone calidComptainl from gdtiB benson mart owners who again wanted to know how they could recoup money for lost business, I told them there isn't a formal process and I am unaware of any times where money was paid,but they could file a complaint on the City's website p.told Steve Olson about the complaint and asked they(again)do what they can to make the driveways look obviously open.RCNW placing CSBC in the last segment they will pave today,from the radius to just S of the jack n the box driveway. Lakeside walprn. ,and have been for at least a half hour 1730 _— RCNW finish�d�ilaoI CSBC and are ready ,for Lakeside to pave. �..._.._.....,.... ..._—,....._....,..m.., 1930 Lakeside placed 3lIfts,and are going to ao a wedge instead of the East lift,as they had to send their paver to another job for night work.They plan to come back and grind along t--edges,then pave the final lift with a paver.They said this would provide the best final roduct. ..2000 , _ _ Lakeside left for the day.. 2115 Pavement cooling,but still to host to put traffic on, I asked Steve to wait a little longer,and he said they would RDNWs crew is down to 4 people. Cameron Bloomer 5-17-17 Date TGE FDurJoaTlo,-A e PP€5 p-yr� - oNti S Cameron Bloomer From: Ken Joyce <ken@rcnw.conr> Sent: Tuesday, May 16 2017 9:05 AM To: Cameron Bloori Cc: matt@rcnw,com; brian@rcnw.com; 'Steve Olson'; thr@rcnw.com; 'Gordon Lee'; econnor@kentwa.gov; WWakefield@kentwa,gov Subject: RE: RR 88 DBE PPB Proposal Goad morning Cameron, The proposed credit of$750 for the deletion of the foundation/pole and change to a mount on the signal pole with extensions is acceptahle. -hank you, Kcri ^Valli I III I"II m 1Ion "Am 1l l Im, From: Cameron Bloomer [mailto:cbloomer@kbacm.com] Sent: Monday, May 15, 2D17 2:42 PM To: Ken Joyce <ken@rcnw.com> Cc: matt@rcnw.com; brian@rcnw,com; 'Steve Olson' <501son@RCNW.com>; thr@rcnw.com; Gordon Lee <gordon@rcnw.com>; econnor@kentwa.gov; WWakefield@kentwa.gov Subject: RE RFI #8 DBE PPB Proposal Hello Ken, We have reviewed the proposal, and a,e estimating the change as follows. Deletions per L5 breakdown: 1 foundation at$7.500 L Pole at 1000$ Total Deletions: $2,500 Additions/Reniaining work: Extensions at$700 incl. labor Still have to install Campbell AGPS per invoice on MOH request) Any mounting hardware (—$50) Labor/equipment for install ofAGPS on signal pole (Estimated 4 Elect. hrs+Truck, $400) Total Add/remaining work: 700 F515+50k400=$1,665 1 the City would accept a credit of$750 for the deletion of the fouridatinn/pale and change to amount on the signal pole with extensions. Please let me know if this is acceptable, or provide back up documentation for additional costs, thank you, Cameron Bbornelr, PIE T ' , t ,5 f r1Q I C. 26r IV) 7195 i F '1 a "i r lr��amer{raktaaGm.c�aIn Jn(', (u 'Nra.r )II Alanogr); nr >pecwhr is CO!" From: Ken Joyce (p,J.hpllCu:ken r➢➢rcnw.conf1 Sent: Monday, April 17, 2017 9:48 AM To: Cameron Bloomer< ifluorilK rfaklr�lkwx,„t pn> Subject: RE: RFI #8 DBE PPB Proposal Hello Cameron, r; DBE Electric is agreeable to a swap of the PPE foundation not placed with the PPR extensions needed_ Is this acceptable to the city or will you need to additive/deductive cost proposal for both.Tying to minirniza the back a fourth overhead to process a difference of maybe a couple of hundred bucks, Thanks, Ken 11, iO4 w;t u,°ain Gloir,L,a I, If it::. s",- rill 7r'�'.p,, From:Cameron Bloomer [m.116r_ctctalt, rn r..fd9 73c[rr. ,orn] Sent: Thursday, April 06, 2017 9:42 AM To: Ken Joyce <kc•gr,Q!i;:nw,con;r> CC:cconn„q,r @ko LwaL1Jcru WVWof heicI Wkc ntwa gcv 'Steve Olson <SOLgta11 r,h+s'ltG.#JW rn>; Jeff Stern <JStern _R,LNW c,r2mr 'Jake Boose <J<Ikr^., ' m „rvn>; Gordon Lee<i rrrpi7¢a� Icnw,coni>; Matt Wagester r,4 R4 h➢W c,cm.,, . _ __... w.�__ am> grutatl,�rrttrre+r trnraa>; Brian Menard <huh un i➢Jet>aw;crTm>, THR<i�iMt�vzritC:NWs�oirt>; Jeff Kanyer<jr�fifrclauv.c,,,,.._, Subject: RE: RFI #8 DBE PPB Proposal Hello Ken, We have reviewed the cost,proposal and materials. I he materials are what the City Is banking for. Please submit a RADA with those For an official submittal response. On the cost, we are requesting a credit proposal for the deleted PPB foundation on the NF corner. We will review the cost for the extensions and credit proposal together and (hopefully) capture both with a single change. 'rhanl<you, 2 Camviimi IICllaou avii, in From: Ken Joyce Sent:Tuesday, March 28,2017 10:26 AM To: Cameron Bloomer<clA.)uirru,r0)ki.mcm.com> Cc: aw�i gov; 'Steve Olson' <SU�;on 0 1... 11� �—. —1111 1 - 1 ( !1>;Jeff Stern <��IA�nQ�pm �nm>; 'Jake Boose' cofn>; Gordon Lee i>; Matt Wagester n>; Brian Mena rd < LUrr>;THIR <i N ,�O HCNW coin>;Jeff Kan yer Subject: RF1#8 DBE PPB Proposal Cameron, Please see the attached proposal for the Pedestrian Push Button extensions requested in RFI #8. Include standard subcontractor markup(12%) as allowed under WSDOT Section 1-09.6 when processing. RespeaANHY, Ken 8 ELECTRIC INC. PO BOX 9169 Covington,WA 98042 r (253)887-8089 Electrical Contractor's License; DBEELE1912PM General Contractors License: DBEELEC19127M February 22, 2017 Ken Joyce Road Construction NW 2500 East Valley Road, Suite C-3 Renton,WA 98057 RE: 108"Ave SE &SE 208"St Intersection Improvements City of Kent Project M 12-3006 FA: HSIP-0515(014) PPB Extensions Dear Ken: Per your request, DBE Electric Inc. offers tl7 following pricing in regard to adding two pushbutton extensions. Our price includes all labor at the standard daytime rate, materials, equipment, and allowable markup to perform the work. Standard exclusion as listed in the DBE—Road Const. NW Subcontract Agreement still apply. • PPB Extensions-$700.00 a DBE requests .5 working days. Work which may be required to complete this change order which is the work of other trades is not a part of this change proposal. This quote is valid for(30) calendar days from the above date and void thereafter. All work affected by either the acceptance or rejection of this change is on hold pending notification by Road Const. NW to DBE Electric Inc. If you have any questions, please feel free to contact me directly, Thank you Sincerely, Bryan LaTorre .<n,,... Bryan A. LaTorre � ��� � Estimator TRAFFIC SIGNALS&ILLUMINATION SYSTEMS P.O. BOX 9169 ' COVINGTON, WA 98042 *253-887-8089 - FAX 253-804-6066 An Equal Opportunity Employer—DBE Electric,Inc.is committed to equal opportunity in all areas of employment and does not discriminate against any individual an the basis of race,color,religion,sex,age,national origin,marital status,handicap,or any uther legally protected characteristic, KLECTIUC INC. Request for Information (RFI) ——------------ ...... Date: 2/21/17 Request no. DBE 42 RCNW 48 Project: 1 nRTH A\/F A n5ZTH Project Owner:---QLTY_QF_� T Contractor:3QW ...... Information Request Initiated By:3-- Regarding: Plan Specification Section; Request: • ON THE NORTHEAST CORNER THERE IS EXISTING CONDUIT AND/OR SIGNAL FOUNDATION IN THE WAY OF THE NEW PP8 FOUNDATION PER THE PLANS,THE BASE FOR THE POST FOR THE WESTBOUND CROSSING WAS ELIMINATED AND DBE RECOMMENDS A PPR EXTENSION WITH A 90 DEG ADAPTER ON THE EXISTING POLE FOR THE NEW PPB. • ON THE SAME CORNER FOR THE 5OUTHBOUND CROSSING WAS MOVED FROM THE PED CURB TO BEHIND PED CURB. DEE RECOMMENDS AN EXTENSION WITH A 90 DEG ADAPTER. Prepared By: RPVAN i ATr)PPP Date: ')/31/17 ELECTRIC INC. Response Assigned To: Project Manager Project Engineer Resident Project Representative Response: Both curb ramps on the NE corner are parallel type and the PPB must be within 10" of the face of pedestrian curb. Please submit product data and pricing for the extensions proposed. Signed:— ( a Date:__ 2/22/2017 CC: KENTK r� ,pUi6��rcri;' wnsnno.oa INSPECTOR'S DAILY REPORT 108th Ave rjE (SR515) and SE 208th St Intersection Improvements Fed Aid # HSIP-0515 (014) 1 Project#12-3006 Inspection n Time What was inspected? Conformance? Comments rAction None _...._...... Temporary Erosion and Sediment Control -- ,,.-.,—..... �..._..---- .. .. ......... _, ___-- Time Location Issue Resolution Ball m Court No issues reported Problems Encountered and Resolution Time Location Issue Resolution Ball in Court See below -— -- Diary - _ �........_. __m.._,..,._.. _._....... .......-,,,_. ---------- Time Discussion 0730 RCNW began demo of hard scale at the NW corner. I spoke with Steve Olson who requested PPBs be surveyed prior to the top back of curb, 080C Silver streak truck is on site, RCNW exporting concrete debris from the NW corner. Received a call from Steve Olson regarding the placement of the ped push buttons at the NE corner.Both push 1015 buttons have conflicts with existing items.The southern most ped button is over the existing traffic signal conduit and the northern PPB may be in conflict with the existing signal pole base.DBE Electric has installed extensions, similar to those used for pedestrian srgnal_head son other projects and su gg ested;using those. 1030 I spoke with Eric Connor and Susanne smith about the PPB locations.They are ok with moving them and using the extensions. ._._........... _....._.______--. �__ ..._ . ... .....,_........._......_ .._. _..._. Arrived onsite and confirmed the southern PPB on the NE corner was centered on the existing signal conduit It is 1100 being installed behind the conduit. DBE is using a 2"diameter sono tube for a form, and the plans call for a 1'-6" square base.This does push the base back 6'further than it would have it if it was the square base shown. 1115 RCNW continuing the remove sidewalk adjacent to the rockery.Survey is onsite, shooting in ped push buttons. 1200 Survey left the site for the day. DBE completed installing conduit and the sono tube form for the southern PPB on the NE corner. RCNW be ri i bir ear laine, ulr t hu a ,rlli rt tPw L ue cart the rockery. 1300 RCNW removing concrete curb and gutter at the at the driveway for key bank,and noted there was about 15' where the gutter was 12"thick.When it thinned back too the typical 6"depth,there was asphalt under the curb. 1330 Got a call from Ed Giraud who was onsite. I had just left. Cameron Bloomer 02-01-2017 .. . INSPEC70R � ........-Dete O ..Fn 01G.r...., G11