HomeMy WebLinkAboutPW17-246 - Change Order - #3 - NPM Construction Co. - S 208th ST Rd Repair and Guardrail Installation Project - 10/10/2017 Records
ENT
HINGTON � Document
f1p,M/M,
v#0
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to the City Clerk's Office. All portions are to be completed.
If you have questions, please contact the City Clerk's Office at 253-856-5725.
Vendor Name: NPM Construction Co.
Vendor Number:
JD Edwards Number
Contract Number: PW q -?* -06 ?,
This is assigned by City Clerk's Office
Project Name: S 208 th St. Road Repair and Guardrail Installation
Description: El Interlocal Agreement 0 Change Order El Amendment El Contract
El Other: #3
Contract Effective Date: 10/10/17 Termination Date: 42 working days
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager:—S. Anderson Department: PW- Enaineerinq
Contract Amount: (r.47 716 4n
Approval Authority: 0 Director Mayor [] City Council Meeting Date
Detail: (i.e. address, location, parcel number, tax id, etc.):
Install curb ramps, associated pavement markings, and signage for new pedestrian
Lh
crossing on 100 Ave SE at East Hill Elementary School due to a recent traffic study
which determined that a new pedestrian crossing with ADA compliant curb ramps and
T- I'll, 1-1-1 --....... ......
signage are required to ensure student and pedestrian safety,
...........
. ....................
......................
T
CHANGE ORDER NO. #3
NAME OF CONTRACTOR: NPM Construction Co. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: S. 208th Street Road Repair and Guardrail Installation
ORIGINAL CONTRACT DATE: Mav 31, 2017
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Install curb ramps, associated pavement markings, and signage for
new pedestrian crossing on 100th Avenue SE at East Hill Elementary
School due to a recent traffic study which determined that a new
pedestrian crossing with ADA compliant curb ramps and signage are
required to ensure student and pedestrian safety.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $303,855.50
(including applicable alternates and
WSST)
Net Change b Previous Chan e Orders
9 Y 9 $21,892.19
(Incl. applicable WSST)
_ ........
._.................................
........
Current Contract Amount $325,747.69
(incl. Previous Change Orders)
Current Change Order $47,716.40
Applicable WSST Tax on this Change $0.00
Order
Revised Contract Sum $373,464.09
CHANGE ORDER - 1 OF 3
._..... .....
Original Time for Completion 20 working days
(insert date)
Revised Time for Completion under 10 working days
prior Change Orders
(insert date)
Days Required (f) for this Change 12 calendar days
Order
Revised Time for Completion 42 working days
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
........_...................._. ...._................ __... �..
CONTRACTOR: CITY OF KENT:
By: m" •g,," ' By: r
(sr9nature) AA (signato e)
Print Name:�i7/� r f•n�" P(nt e:Its r ItAA_D ..,
(title) (title)
DATE: I o - to , r DATE:._,L ry
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
keen Law Department
[m this field,you may enter the electronic file path where the contract nas been saved]
CHANGE ORDER - 3 OF 3
FILE NO: 200.2
�N T
CHANGE ORDER W ORKSIHEET NO. 3
Construction Management Division - Public Works
.. . ._
Project: 208`mRoad Repair � Project No.: 16-3005
Project Engineer: Joe Araucto Fed-Aid No.: N/A
Project Manager: Phil McConnell Contractor: NPM Construction
Date: 9/13/2017
I. PROPOSED CHANGE
Install curb ramps, associated pavement markings, and signage for new pedestrian crossing on
100th Ave SE at East Hill Elementary School
II. REASON AND BACKGROUND FOR CHANGE
Recent traffic study determined that a new pedestrian crossing with ADA compliant curb ramps
and signage are required to ensure student and pedestrian safety at East Hill Elementary School
on 100th Ave SE
III. METHOD OF PAYMENT
NEW PAY ITEM(S) [] Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
Sch No T Item Description Total Est Oty this Unit Unit Price i Total Estimated Cost of
Qty PE I Item
f
1 Demolishion and insta Ilion of 1 1 LS $47,716.40 $4/,716.4U
new curb ramp,associated
pavement markings and
sionage
_.. _..T - ,_ _
Independent Estimate Attached ® i CREFlT ITEM ON:I-Y Payment to be made ❑ PAY THIS PAY ESTIMATE
REQUIRED at a later date upon Completion of v -
MaterfalSwbn7itt�ls--Rexatr'Iined — CC: Construction Coordinator New Sub Reqrd? No
DELETE EXISTING PAY ITEM(S) per 1-09.5 M Not Applicable
Change Order No �____!.— ............ ... FOR ACCOUNTING USE ONLY
............,_...._ _....
Soh. No. B.1. No. Item Description Qty Unit Unit Price Cost of Item
11Independent Estimate Attached - REQUIRED El I
INCREASE/DECREASE TO EXISTING PAY ITEM(S) M Not Applicable
Change Order No. - FOR ACCOUNTING USE ONLY
_ .. P
. Dm _ .......
p .. � it Price--- Cost of Item
Sch No B 1 No Item esc-, n tion I city Unit Un i
1 REV. DATE: 4/01/10
TFILE NO: 200.2
T
1
w l ..... __ .,,.. ............__—...1.
Independent Estimate Attached - REQUIRED
i
TOTAL ESTIMATED COST OF CHANGE ORDER * $47716.40
—*Total of the Cost of Item Columns
THIS PAY ESTIMATE F - 47,716.40,
IV. WORKING DAYS
Original Contract 20 Due This Change Order* Previous Total 30
DATE DATE:,, _... ... ,
* Explanation0ustiheation Required: additional work to contract
TOTAL WORKING DAYS* C � 42
*This Change Order + Previous Totals
All work, materials and measurements to be in accordance with the Standard Specifications
and Contract Special Provisions for the type of work described.
Phil YLc-", ,�,'��,r;y ({'�..Capital Projects Manager: a,vDate I..V �*C71f
Construction Supervisor: Date: I 0 3 ^ 17
P ul Kuehne
Construction Manager: Vim, w^p Date:
Jric Connor
2 REV. DATE: 4/01/10
100th and 240th 76th
mob 3000 mob 1500
tesc 200 tesc 200
TC 3100 TC 2550
demo 4992 demo 2570
elec 4612 elec 300
conc 11484 conc 6149
signs 2945 signs 1882
markings 5170 markings 3148
de-mob 1141 de-mob 750
intents 40 intents 40
HMA 3600
40284 19089
15% Weekend 46326.6 Grand Total
3% bond 47716.4 19661.67 67378.07
N P M CONSTRUCTION COMPANY
PUBLIC WORKS::COMMERCIAL::RESIDENTIAL
Concrete Paving &General Construction
N P M(Construction Co
General Contractor
August 23, 2017
Jason Bryant
City of Kent
220 Fourth Ave S
Kent WA 98032
ADA Added Locations
(1) 10011 Ave SE & SE 240th St
(2) 761h Ave S Mid-block
SITE 1: 100th Ave SE & SE 2401h Street at East Hill Elementary School
Mobilization:.........$3,000.00
- Mobilize
T ESC:......$200.00
- Install 2 EA CB inserts N of future ramps
Project Temporary Traffic and Pedestrian Control:........$3,100.00
- Project Traffic Control Plans
- Project Temporary Traffic Control
Saw Cut & Demo:......$4,992.00
- Approx 100 LF saw cut
- Provide temporary access during construction
- Remove approx. 60 LF Cement Concrete Curb & Gutter
- Remove approx. 7 LF Curb
- Remove approx. 40.5 SY Cement Concrete Sidewalk
- Remove approx. 25 SY Asphalt Pavement
HMA (4"to 6").....$3.600.00
9 Tons Cl 1/2" PG64-22
Electrical:.......$4,612.00
Remove Speed Zone Flasher
- Remove existing base and restore
- New foundation including materials
- Install existing Speed Zone Flasher
Earthwork and Concrete:......$11,484.00
- Approx. 60 LF New Cement Concrete Curb and Gutter
- Approx. 19 SY New Cement Concrete Sidewalk
- 2 EA Type Parallel Curb Ramps incl 32 SF Truncated Domes
- Approx. 62 LF Pedestrian Curb
Permanent Signing;.......$2,945.00
- Remove 2 EA existing CROSSING sign
M
PO Box 1229 V 425,996.0566 LIC#NPMCOCC9070L
Maple Valley WA 9SC38 F 425.996,6673 www.nprnconstruction.com
N P M. CONSTRUCTION COMPANY
PUBLIC WORKS::COMMERCIAL::RESIDENTIAL
Concrete Paving &General Construction
N P M Construction Co
General Contractor
August 23, 20t7
ADA Added Locations
(1) 10011' Ave SE & SE 2401h St
(2) 76th Ave S Mid-block
Page Two
- Remove 2 EA existing "NO PARKING sign w/post
- Install new "AHEAD" (24"x12") on existing post
- Install 2 EA new SCHOOL CROSSING SIGN ASSMBLY (S1-1 [36"x36"], W16-7P [24"x12"] w/posts
Install 2 EA new NO STOPPING OR STANDING (R7-402 [12"x18"]
Pavement Marking:...........$5,170.00
- Remove existing pavement marking (grinding)
- Approx. 140 SF Plastic Crosswalk
- Approx. 810 LF 4" Plastic Line
Cleanup/Restore:............$1,141.00
- Restoration/Clean and Demobiize
SITE 2: 76th Ave S Mid-block:
Mobilization:.........$1,500.00
- Mobilization
TESC:............$200.00
- Install 2 EA CB inserts one N and one S of future ramps
Project Temporary Traffic and Pedestrian Control:...........$2,550.00 (net add of $800.00)
- Project Traffic Control Plans
- Project Temporary Traffic Control
Saw Cut & Demo:..........$2,570.00
- Approx 80 LF saw cut (includes gutter edge with intent to not disturb asphalt)
- Remove approx. 45 LF Cement Concrete Curb & Gutter
- Remove approx. 30 SY Cement Concrete Sidewalk
Electrical:...........$300.00
- Adjust 1 EA J-Box to grade
- Install City-provided anti-skid lid
Earthwork and Concrete:.........$6,149.00
- Approx. 45 LF New Cement Concrete Curb and Gutter
- Approx. 14 SY New Cement Concrete Sidewalk
- 2 EA Type Parallel Curb Ramps Intl 16 SF Truncated Domes
- Approx. 23 LF Pedestrian Curb
Permanent Signing:.............$1,882.00
- Install new 2 EA W11-2 (30"x30") ind Telespar post
- Install new 2 EA W16-7P (24"x12") incl no post
PO Box 1229 V 425.996,0566 LIC#NPMCOCC9070L
Maple Valley WA 98038 F 425.996.6673 www.npmconstruction.com
N M CONSTRUCTION COMPANY
PUBLIC WORKS::COMMERCIAL::RESIDENTIAL
Emil Poll
I , rConcrete Paving &General Construction
P M Construction Co
General Contractor
August 23, 2017
ADA Added Locations
(1) 10011h Ave SE & SE 24011 St
(2)761h Ave S Mid-block
Page Three
- Install new 2 EA Ri-b (30"x30") incl Telespar post
Pavement Marking:.........$3,148.00
- New Plastic Crosswalk
- New Plastic Stop Bar (2 Each)
Clea nu ii Restore:.........$750.00
- Restoration/Clean and Der iize
File Intent & Affidavit:.........$80.00
- File Intent to Pay Prev Wages
- File Affidavit of Wages Paid
Sales Tax is included on material and rentals
Performance/Payment bond is excluded...please add 3% for bond
Total Quote:.............$51,825.00
ADD for Pavement Markings on 76th Ave S...........$3,948.00
NEW QUOTE TOTAL: $59,373.00
FOR SATURDAY WORK ONLY PLEASE ADD 15% TO COVER OVERTIME AND POSSIBLE PLANT FEES
Availability: Approx start Mid September
Duration: 10 to 12 working days
Thank you
Nando
rpm
PO Box 1229 V 425.996,0566 LIC##NPMCOCC9070L
Maple Valley WA 98038 F 425.996.6673 www.npmconstruction.com
� •�'�: N 5/16/2�ll�I
I � niv:� � r ��vvwaxmam.nrmenm. ` aaen mx nsa�no Qom
ry ewrm� +umnr�np sro�.r.�r