Loading...
HomeMy WebLinkAboutPW17-410 - Original - WSDOT - Kent Valley Signal System Upgrade - 06/20/2017 Records Man,:ag' ernent KENT WASH­0 TO N Docunient CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, pilease contact City Clerk's Office.. Vendor Name: WA Department of Transportation Vendor Number: ID Edwards Number Contract Number: W 11 B 111 This is assigned by City Clerk's Office Project Dame: Kent Valley Signal System Upgrade Description: [] Interlocal Agreement ❑ Change Order Cl Amendment El Contract lZ Other: Local Agency Federal Aid Project Prospectus Contract Effective bate: 6/20/2017 Termination Date: 12/31/2018 Contract Renewal Notice (Days): N/A Number of days required notice for termination or renewal or amendment Contract Manager: Kelly Peterson Department: PW Transportation Contract Amount: Grant award $782,200 Approval Authority: E' Department Director Z Mayor City Council Detail: ('i.e. address, location, parcel number, tax id, etc.): Increase safety by modifying existing signal hardware, replacement of the existing traffic signal controllers ,and fiber optic communications equipment to allow for flashing yellow arrows at 14 intersections in the Kent Valley. DUNS # 0202536130000 Federal Tax ID #91-60,01254 Local Agency Project #K-17- 015 . As of: 08/27/1.4 • KENT Agenda Item: CONSENT - 7 TO: City Council DATE: June 6, 2017 SUBJECT: Highway Safety Improvement Program Grant - Authorize MOTION: Authorize the Mayor to sign the Washington State Department of Transportation Highway Safety Improvement Program grant in the amount of $869,153.51 subject to terms and conditions acceptable to the City Attorney and Public Works Director. SUMMARY: The Washington State Department of Transportation has awarded the City of Kent a Highway Safety Improvement Program grant in the amount of the $869,153.51. The City of Kent applied for this grant to improve safety with the installation of flashing yellow arrows, fiber optic communications, traffic signal cabinets and traffic cameras in the north part of the Kent valley. This project will include new controllers at 20 intersections, flashing yellow arrows at 14 intersections and traffic cameras at 5 intersections. This project will continue to improve safety through the use of an updated traffic signal system. Similar work was partially funded by a previous Highway Safety Improvement Program grant. EXHIBITS: Project Summary Sheet RECOMMENDED BY: Public Works Committee YEA: Fincher, Ralph NAY: N/A BUDGET IMPACTS: Provided that funds are obligated by August 31, 2017, the grant will fund 100% of the proposed work. If federal funds are obligated after this date, matching funds of $86,916 will come from B&O funds identified for the flashing yellow arrow project in the approved budget. Washington State W7F Federal Aid Department of Transportation LocalAgency Project Prospectus Prefix Route ( ) Date 06/20/2017 Federal Aid . .... .. : .... .. . . � .,,,...... .. .. . . ... , Port Number DUNS Number 02025361301000 0 al Agency Project Number I K 17-3015 WSDOT Federal Employer I Use On Tax ID Number 91 60()l?54 ly Agency CAAgency Federal Program Title C;itr of Kent v/ Yes No v( 20 205 ❑ Other Project Title Start Latitude N 47°269.32 `'l 4 52.16 Start Longitude t 1 2`�.-' Dent Valley Signal Systena Uporacle End La N 47 23 51.16" End Longitude aN 122 1 1°57.1'1" _ . . Project Termini From-To Nearest City Name Project Zip Code(+4)I `s"R 181I S Todd 131vd 5R 181/ S 2213th `it Kent 98032-2903 Begin End slf�"1.Mile Past N/A N/A Post � NlLen�y of Project � +�aLocalrd p Local Forces State Railroad ' Route ID Begin Pride Point -_-- End File Point City Number County Number County Name --... N/A _ N/A N/A 0615 17 Kin ....... . ..__ ....r _. _ _ ... WSDOT Region Legislative District(s) ; Congressional Districts) Urban Area Number fJ i*or-01%vest Region 33 sand 47 8 and 9 1 _...._. [' 7catsi Locs,i Ageney � I Plissee Start Phase 1 Estimated Cast Funding Federal Funds Is ate (Np�fpst Hundred_Dpllar (Nearest Hundred Dollar) (Neares)Hundrafi Dollar) Cu1antbl Year ---- ._r . P.E. 55,800 `�5,6 O 50,200 (37... 2017 R/ W Const. S813,31)f� 1,3f)(1 732,13()I:) _ . 1() 2iJ17 Total $1369,1(lCl i$86,900 `�782,200 ....... . Description of Existing Facility (Existing Design and PresentCondition) Roadway Width Number of Lanes _.._ Average 56 ft A verage 5 lanes ......._ _..... _. _ . ------ There arc ccurrc;ntly 1 19 Si--Jaalirccl inteJ-SCCticans thr0tJglI0LIt the City. Kent was recently able tta update its Caging signal master system, initially pUrc;,hased in the early I9h0':s.. in major part due to ra 2012 WSDOT safety o,rant. ' Description of Proposed Work Description of Proposed Work(Attach additional sheet(s)if necessary) Increase safely by modifying existing signal laaardware, rcplJ.aeenaent of the existing traffic signal controllers ancl fiber optic ecrraaJ-unic:ations equtiprnent to allow for the instailation of flashing yellow arrows at 14 intersections in the Kent Valiey. Attaclie& full description, project vicinity neap, and typical section. Local Agency Contact Person Title Phone Kelly„Peterson Transportation l:ngineering Manragcs� 253-856-5547 Mailing Address City State Zip Code 220 h'aurth Avenue `youth Kent WA � 98032-5 3 D Project Prospectus Approving Authority _ Cut 1,aa rtJaac r. - . - —...... .. �.....__ Date , e�/'�7 _ . Title y gi "' 9 {7C7�r�T�ev sett a-1Q1 Page 1' 9/2015 Previous Editions Obsolete Agency Project Title Date City of Kent Kent Valley Signal System Upgrade 06/20/2017� -Type of Proposed Work - - -- ---- - --- ---- P Project Type(Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path /Trail ❑ 3-R 56 ft 5 ❑ Reconstruction ❑Pedestrian / Facilities ❑2-R ❑ Railroad ❑ Parking ✓, Other ❑ Bridge Geometric Design Data Description Through Route _ Crossroad ✓- Principal Arterial ✓, Principal Arterial Federal ✓ Urban ✓, Minor Arterial ✓, Minor Arterial ' � Urban Functional ❑ Rural El Collector ✓ Rural ❑ Collector Classification ❑ NHS ❑ Major Collector I❑ NHS ❑ Major Collector ❑ Minor Collector ❑ Minor Collector ❑ Local Access i ❑Local Access Terrain ✓ Flat ❑ Roll ❑Mountain ✓. Flat ❑ Roll ❑Mountain Posted Speed Design Speed N/A N/A Existing ADT N/A N/A Design Year A D T N/A N/A Design Year Design Hourly Volume (DHV) I N/A !N/A Performance of Work —1 Preliminary Engineering Will Be Performed By Oth re s Agency City of Kent o 100 o -- —-- /o Construction Will Be Performed By Contract Agency Project will go out to bid. 90 0 10 0 i /o /o f Environmental Classification ❑Class I - Environmental Impact Statement(EIS) ✓ Class II - Categorically Excluded (CE) ❑Project Involves NEPA/SEPA Section 404 ✓ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑Class III - Environmental Assessment (EA) ❑Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations DOT Form 140-101 - -- - ----- - Revised 04/2015 Previous Editions Obsolete Page 2 Agency l Project Title Date City ref Kent Kent Valley Signal System Upp;rade: 06/20/2017 . . .. ....... ... .- Might of Way ..... - ,/' No Right of Way Needed Right of Way Needed All construction required by the El No Relocation El Relocation Required contract can be accomplished within the exiting right of way. _ - Utilities Railroad _. . ....__ r✓, No utility work required (, No railroad work required All utility work will be completed prior to the start All railroad work will be completed prior to the start of of the construction contract the construction contract All utility work will be completed in coordination All the railroad work will be completed in coordination with the construction contract with the construction contract. - _....._.._ . 7--- _. Description of Utifity Relocation or Adjustments and Existing Major Structures Involved in the Project N/A i FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? F-1 Yes v/ No Remarks N/A I i f This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee„ and is not inconsistent with the agency's com rehensive plan for community development. Ardency G of K Date By Mayor(Ghairperson DO F Farm 140-101 Pa0e 3 Revised 04/20,15 Previous Editions Obsolete I Upgraded Traffic Si �ti<tl 2017 Kent HSIP Grant - Project Winity Map 4 'or��Nciinted crorrr� rrurr:�er 0HS'IP Syster7n lJi��Trades (29) HSIP TS/'2 Upgrades (5) A m .,_ Eck r.r' Interconnect v. F C Fria . f h v Xd �ryWp �I� �, Project oocal AgencyProaect C�iLrr b'er.a17-3t11S gn � System Upgrade' OWN vill �,� 5� 1 Project Termini (From-To): SR/181 S r'odd Blvd - SR 181/S 228111 St 0110 ---------------- of m,. tlr.tlP1?.1d'MBu 5 I � ! a a I 86, ln' 29' 29' 14' OPTIONAL ! FRONTAGE 0.5' !0' 135' IMPROVEMENT 2% 2% 25'HMA CLASS 112'PG 64 ____ - -22 2`.6 MAX,NA%. LO'WIDE P.C.C.STDEYfALK �a o 0 TWICE WEARING COl.RSE(MIN.; SEE STD.PLAN 6-35 � � ,.� D.C.C.SIDZWA_K / TACK COAT SEE STD,PLAN 6-35 0.25'HMA CLASS 314'PG 64-22 CURB B GUTTER ITYP; 9'"o F 1v LEVELING COURS(MIN} SEE STD.PLAN 6.33 OR 5'WIDE —CAUESrt'D URFAACCIBNG 1�CODUR OF SEB I . PLANTER STRIP V17H 0.5' THIO(NESS OF 0.67"IF ONLY CRUSHED TOPSOIL TYPEIV SURFACING 15 USED. IN LANDSCAPE(PER KCC p 15.07.050)REQUIREO, SUBBASE SHALL BE GRAVEL BASE W1 i i r o THICKNESS TO BE DETERMINED BY DESIGN. L p y VOTES: 7. NEW DEVELOPMENT A0JACE4T TO AN ARTERIAL SHALL a o u, PROVIDE A ID'UTILITY AND STREET LIGHT EASEMENT ON iI ' r iz z^S 1 THE PAVEMENT WIDTH iS MADE JD OF 2 11'•W]DE-RAVEL LAVES, BOTH SIDES OF-HE FLIGHT OF-WAY. 2 1Z'-WIDE CURB LANES,AND 1 I2'-WIDE TURN LANE. S. STREET FREES WILL RE REQUIRED BEHIND THE O P z 2. THE 1'GUTTER IS INCLUDED IN THE CURB 14VE WIDTH;AND ThE 3.5'CURB is SIDEWALK. o T p 40T INCLUDED 1N THE SIDEWALK OR PLANTER STRIP WIDTH. Z n < A ;*4 `A! 3. ADD 1C TO STANDARD CROSS SECTION WHEN',JAL LEFT TuR\LANES mM ARE REQUIRED HSIP Note: Typical cross O "{, 22 Z f q1q m chi 4. ADDITIONAL WIDTH WILL BE REQUIRED FOR NONMOTORIZEC FACILI RES Il D aO a_ za IF THE STRefTISOA'A DESIGNATED BICYCL=0.CUTf SEETHE z section of streets where r- 14 z o-m TRAhSDORTAT?0N PLA MASTER N AND STANOARD PLA.%6 31. (��� �2-= flashing yellow arrows will be m IT A>E x r S. SHALL LEVEL. PROM BEHIND THEE EWAI SLOPE BEHIND I'LE lh'.AN0 EXCEEDS x installed for the Kent Valley R�z U v v SHALL BE PROVIDED.WHEN THE SLOPE BEHIND 1'LEVEL AREA EXCEEDS I O P p c 3:1,0.33'Of COMPACTED CRUSHED SURFACING TOP COURSE SHALL BE w �z ZAT N I'PRDYIDEDITHEAREA. Signal Improvement project. ���4 rn -.n c 6. DESIGN SIDEWALK CROSS GRADE SHALL BE 1.5%. � -I ..................... IN A T/T VA ........... Bpi-, .......... fil .�-WIM, Vn/l, ............m..........W ...............